Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

Size: px
Start display at page:

Download "Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products"

Transcription

1 Plumbing Plans

2 Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste

3 Types of pipes: Introduction (cont d.) Copper Plastic Poly, PVC, CPVC, PEX Steel Galvanized, black, corrugated stainless, stainless Cast iron

4 Introduction (cont d.) Residential plans Generally don t require complete plumbing plan Need should be verified with local building code In most cases, requirements can be provided on floor plan Symbols for fixtures Notes for specific applications or conditions

5 Plumbing Terms and Definitions Key terminology: Cleanout Drain Fitting Hose bibb Main Plumbing fixture, system, and wall Potable water Riser Rough-in Run Sanitary sewer Sewer Soil pipe

6 Terms and Definitions (cont d.) Key terminology (cont d.): Stack Storm sewer Trap Valve Vanity Vent pipe and stack Waste pipe and stack Water closet Water distributing pipe Water heater, main, and meter Water service

7 Size of Plumbing Piping Water supply plumbing is based on: Amount of water needed Supply pressure Pipe length Number of stories to be supplied Flow pressure needed at farthest point

8 Size of Plumbing Piping (cont d.) Size of drainage piping is based on: Standards established for fixture type Average amount of waste discharged through the fixture in a given amount of time Size of vent pipes is based on: Number of drainage fixture units that drain into waste portion of vent stack

9 Universal Plumbing Installations Design considerations: Sinks Water closet Bathtubs Showers Consider ease of access by wheelchair

10 Plumbing Schedules Similar to door, window, and lighting fixture schedules Mortgage lenders may require a complete description of materials

11 Plumbing Drawings Usually not on the same sheet as complete floor plan Only plumbing items on floor plans are fixtures Generally drawn separately Floor plan is used as a base drawing May be prepared by a drafter or in conjunction with a plumbing contractor

12

13 Water Systems Water supply to a structure begins at: Water meter for public systems Water storage tank for private well systems Water supply to home or business: Known as the main line Generally 1" plastic pipe Use common plumbing wall, when possible

14 Water Systems (cont d.) Water heaters Placed on a platform with an overflow tray Recommended sizes vary Hose bibbs Faucets used to attach a hose Outside hose bibbs require a separate valve Allows owner to turn off water to hose bibb during freezing weather

15 Drainage and Vent Systems Drainage system Provides for distribution of solid and liquid waste to sewer line Vent system Allows continuous airflow through the system Gases and odors can dissipate Bacteria do not have an opportunity to develop

16

17 Isometric Plumbing Drawings Provide threedimensional representation of a plumbing layout (i.e., plumbing riser diagram)

18 Sanitary sewer system Sewage Disposal Underground pipes collect and transfer wastewater to treatment plants or private sewage treatment Includes domestic, business, and industry Not designed to handle storm water Systems: Public sewers Private sewage disposal (septic tank, cesspool)

19 Sewage Disposal (cont d.) Public sewers Located underneath street or easement Sewer connected to house Private sewage disposal Septic system with leach lines Gravity or pump-fed

20 Fire Sprinkler Systems 2009 International Residential Code (IRC) Section P2904 of the International Plumbing Code (IPC) Requires automatic fire sprinkler systems for all new townhouse construction Not required on additions or alterations made to existing townhomes

21 Fire Sprinkler Systems Help save lives by reducing heat, flames, and smoke Water plug releases water when heat reaches a certain temperature Design usually requires a fire sprinkler specialist

22 Metrics in Plumbing Pipe is made of a wide variety of materials Identified by trade names Nominal sizes related loosely to actual dimensions Metric values established by International Organization for Standardization Relate nominal pipe sizes in inches to metric equivalents (i.e., diameter nominal)

23 Adding Plumbing Information to the Floor Plan Residential floor plan drawings plumbing symbols and notes May be placed with all other floor plan content Aid in reading and understanding Notes are generally minimal Can also be placed on a separate drawing

24 Commercial Plumbing Drawings In most cases, are an individual component of the complete set of plans Architect or mechanical engineer prepares plumbing drawings over base floor plan Keeps drawing clear of unwanted information Makes it easier for the plumbing contractor to read the print

25

26

A. This Section includes plumbing fixtures and related components.

A. This Section includes plumbing fixtures and related components. SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural,

More information

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9195 CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

Chicago Plumber Licensure Examination Information

Chicago Plumber Licensure Examination Information Chicago Plumber Licensure Examination Information This candidate guide should help you prepare for the Chicago plumber licensure examination. Part I contains general information about testing procedures.

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

ERRATA AND REVISIONS to the CANADIAN PLUMBING CODE

ERRATA AND REVISIONS to the CANADIAN PLUMBING CODE NATONAL RESEARCH COUNCL OF CANADA ASSOCATE COMMTTEE ON THE NATONAL BULDNG CODE ERRATA AND REVSONS to the CANADAN PLUMBNG CODE 1970 (ncorporating changes from Change Series No.2 to the National Building

More information

BUILDING DEPARTMENT CURRENT

BUILDING DEPARTMENT CURRENT CITY OF LAPEER FEE SCHEDULE EFFECTIVE 7-1-2018 BUILDING DESCRIPTION BUILDING DEPARTMENT CURRENT FEE Administrative Plan Review Fees Plan Review $81.00 per hour; 1 hr minimum Commercial Plan Review Deposit

More information

CITY OF COLUMBIA DEPARTMENT OF UTILITIES AND ENGINEERING WASTEWATER COMPLIANCE FATS, OILS, AND GREASE REGISTRATION APPLICATION

CITY OF COLUMBIA DEPARTMENT OF UTILITIES AND ENGINEERING WASTEWATER COMPLIANCE FATS, OILS, AND GREASE REGISTRATION APPLICATION CITY OF COLUMBIA DEPARTMENT OF UTILITIES AND ENGINEERING WASTEWATER COMPLIANCE FATS, OILS, AND GREASE REGISTRATION APPLICATION Return form to: Stephen Sealey, Wastewater Compliance Specialist 1200 Simmon

More information

REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE No. 9197 REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers oard, 2008. All rights reserved. No part of this publication may be reproduced by any means

More information

Standards Manager Web Standards List PPI-Plastic Pipe Institute

Standards Manager Web Standards List PPI-Plastic Pipe Institute Standards Manager Web Standards List PPI-Plastic Pipe Institute Id Number Title Year Organization Page 1 TN-44 LONG TERM RESISTANCE OF AWWA C906 POLYETHYLENE (PE) PIPE TO POTABLE WATER 2015 PPI 0 DISINFECTANTS

More information

Thermoplastic Valves Sewer Disconnect

Thermoplastic Valves Sewer Disconnect Sewer onnect Spears Sewer onnect functions as both cleanout and disconnect device, plus helps prevent sewage backup during hurricanes and floods. Complete unit consists of body and plunger (sold separately

More information

Plan Review and Standards

Plan Review and Standards Plan Review and Standards Minnesota Rules, part 4720.0010, states that prior to the installation, alteration, or extension of any water supply infrastructure, plans and specifications must be submitted

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES SECTION 224000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes 1. Faucets for lavatories and sinks. 2. Flushometers. 3. Toilet seats. 4. Protective shielding guards. 5. Fixture

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

Basic Plan Set Requirements

Basic Plan Set Requirements Attachment Three Basic Plan Set Requirements DRAWING CATEGORY & CONTENT 35% 65%, 95% and Stamped GENERAL Cover Sheet & Sheet Inde General Legend & Vicinity Map Abbreviations & General Notes Scope of Work

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

Measuring Pipes and Pipe Fittings

Measuring Pipes and Pipe Fittings Measuring Pipes and Pipe Fittings by Larry Johnston When you repair or modify home plumbing, knowing the kind and size of pipe you need can save you time and trouble not to mention trips to the hardware

More information

Yavapai County Development Services

Yavapai County Development Services Yavapai County Development Services Prescott Office 1120 Commerce Dr., Prescott, AZ 86305 (928) 771-3214 Fax: (928) 771-3432 Cottonwood Office 10 S. 6 th Street, Cottonwood, AZ 86326 (928) 639-8151 Fax:

More information

Plumbing. Study Guide. Assessment: 3601 Plumbing Apprentice Technician. Aligned to NCCER National Standards

Plumbing. Study Guide. Assessment: 3601 Plumbing Apprentice Technician. Aligned to NCCER National Standards Plumbing Study Guide Assessment: 3601 Plumbing Apprentice Technician Aligned to NCCER National Standards Overview This study guide is designed to help students prepare for the Plumbing Apprentice Technician

More information

Students will learn to correctly prepare, assemble, and solvent weld ABS piping.

Students will learn to correctly prepare, assemble, and solvent weld ABS piping. Description Students will learn to correctly prepare, assemble, and solvent weld ABS piping. Lesson Outcomes The student will be able to: Accurately cut plastic piping Prepare plastic piping for solvent

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

Fitting C.O. Adapter

Fitting C.O. Adapter ABS-DWV Fittings ABS/DWV Service Weight Pipe Schedule 30 Single step solvent cementing procedures no primer required. Excellent solvent cementing characteristics. Black. 84/Ctn. x h Hub Sanitary 0321612

More information

Accessible Toilet Stalls 6/18/03 1

Accessible Toilet Stalls 6/18/03 1 Accessible Toilet Stalls 6/18/03 1 Section 11-4.17 Toilet Stalls Florida standard stall (11-4.17.3.1) In new construction the standard accessible stall shall contain an accessible lavatory within it, the

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

Role of BIM. in Plumbing System -K Chandrakanth and M Vinay Kumar. Abstract. 3 Dimension. Introduction: Collaborative Design:

Role of BIM. in Plumbing System -K Chandrakanth and M Vinay Kumar. Abstract. 3 Dimension. Introduction: Collaborative Design: Role of BIM in Plumbing System -K Chandrakanth and M Vinay Kumar Abstract As we look at the plumbing industry, especially in the building sector from design stage to operation & maintenance, huge amount

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

ARCHITECTURE CADD Course Syllabus

ARCHITECTURE CADD Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

Fitting C.O. Adapter

Fitting C.O. Adapter ABS-DWV Fittings ABS/DWV Service Weight Pipe Schedule 30 Single step solvent cementing procedures no primer required. Excellent solvent cementing characteristics. Black. 84/Ctn. h x h x h Hub Sanitary

More information

Trade of Plumbing. Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2

Trade of Plumbing. Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2 Trade of Plumbing Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 1 Thermal Process

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL

More information

B17. Sewer Site Plans BULLETIN

B17. Sewer Site Plans BULLETIN BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES

2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES APT #1 APT #1 11/12/2014 NEW GARAGE LOCKS $ 89.00 11/12/2014 NEW LOCKS $ 169.80 1/11/2015 GARAGE KEY COPIES $ 6.47 1/23/2015 PLUMBING REPAIRS REPLACED MAIN BATH SINK PIPES $ 299.76 2/2/2015 PAINTING $

More information

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address: #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

76'-0" 10'-5 7/8" 10'-2" 3 7/8 15'-10 1/8" 5'-0" 42'-1 7/8" DINING. IS x83 KITCHEN. 36x80 CLAYTON WAKARUSA

76'-0 10'-5 7/8 10'-2 3 7/8 15'-10 1/8 5'-0 42'-1 7/8 DINING. IS x83 KITCHEN. 36x80 CLAYTON WAKARUSA SHEAR WALL "B" SHEAR WALL "A" '-0" 70'- /" '- /" '- /" 7'-0" '- 7/" '-0 /" '-0" 0'- 7/" 0'-" MASTER BATH / MASTER BEDROOM / DINING 0 WS FURN x0 ES / LAUN. SHELF D W / W/H 9 / WS '-" WS / WS WALK IN / 0E

More information

Fee: Received By: Date: Application #:

Fee: Received By: Date: Application #: Delta County Health Department Environmental Health Division 255 W. 6 th Street Delta, Colorado 81416, Ph.970-874-2165 ON-SITE WASTEWATER TREATMENT SYSTEM APPLICATION INSTRUCTIONS 1. Please fill out the

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

DECK PERMIT APPLICATION PACKET

DECK PERMIT APPLICATION PACKET Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal

More information

Non-Residential and Multi-Family Plan Check Submittal Requirements

Non-Residential and Multi-Family Plan Check Submittal Requirements Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Quick-Drain Installation Requirements Large Volume Drainage Models

Quick-Drain Installation Requirements Large Volume Drainage Models Quick-Drain Installation Requirements Large Volume Drainage Models Installation of the Quick-Drain-QFLV and Quick-Drain-HFLV Fluid Management Systems is a straightforward process. These installation instructions

More information

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS RESIDENTIAL BUILDING PERMIT REQUIREMENTS Before a building permit is issued for any new construction, addition or accessory building, the following items must be supplied to the Building Inspector for

More information

Training Manual The Installation of Siphonic Pipework

Training Manual The Installation of Siphonic Pipework Training Manual The Installation of Siphonic Pipework The Engineered Rainwater Solution Training Manual: The Installation of Siphonic Pipework o Overview of Principals of Siphonic Drainage o Interpreting

More information

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 4000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Thurston County Permitting System Policies &Procedures Page: 1 of 3

Thurston County Permitting System Policies &Procedures Page: 1 of 3 Thurston County Permitting System Policies &Procedures Page: 1 of 3 Number: Title: ONST.11.POL.802 APPLICATION OF RECOMMENDED STANDARDS AND GUIDANCE FOR PRESSURE DISTRIBUTION SEWAGE SYSTEMS July 2009 VERSION

More information

Schedule of Adopted Service Charge Increases

Schedule of Adopted Service Charge Increases Low Graphics Version Homepage >... > Public Works Home > > New /Wastewater Rates Administration Wastewater Storm Drain Street Services Equipment Maintenance Government Buildings Engineering Capital Improvement

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

Plan Submittal and Review Checklist

Plan Submittal and Review Checklist Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -

More information

NOTICE OF INCORPORATION United States Legal Document

NOTICE OF INCORPORATION United States Legal Document NOTICE OF INCORPORATION United States Legal Document All citizens and residents are hereby advised that this is a legally binding document duly incorporated by reference and that failure to comply with

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

LIFT. Please give your shopfitters not only this information sheet but also the floor plan showing the exact position of the unit.

LIFT. Please give your shopfitters not only this information sheet but also the floor plan showing the exact position of the unit. Installation instructions LIFT Backwash unit Important notes for the salon owner This technical information has been produced for your shopfitters. Remember to give them good advance warning so that your

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

Pembroke/ Hopkins Park Community Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815)

Pembroke/ Hopkins Park Community Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815) Pembroke/ Hopkins Park Community Outreach Program 13355 E. 3000 S. Rd., Pembroke Township, IL 60958 Tel: (815) 944-8817 Fax: (815) 944-5675 Level One MODULE 02101-05 INTRODUCTION TO THE PLUMBING PROFESSION

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice NCIDQ Restroom Drawing Answers to the most common questions about this drawing for the Practicum. 2016 Qpractice Table of Contents This is a summary guide of most frequently asked questions about the Practicum

More information

SECTION 095 SPECIFICATIONS DETAIL DRAWINGS. Index of Detail Drawings

SECTION 095 SPECIFICATIONS DETAIL DRAWINGS. Index of Detail Drawings SECTION 095 SPECIFICATIONS DETAIL DRAWINGS Index of Detail Drawings Flat Top Manhole... 095-1 Splash Drop Manhole and Regular Drop Manhole... 095-2 Special Detail Splash Drop Manhole and Special Detail

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

Quick-Drain Installation Requirements

Quick-Drain Installation Requirements Quick-Drain Installation Requirements Installation of the Quick-Drain-QF and Quick-Drain-HF Fluid Management Systems is a straightforward process. These installation instructions are written in a general

More information

Credentials for Career Technical Education Teachers and/or Students

Credentials for Career Technical Education Teachers and/or Students s for Career Technical Education Teachers and/or Students 2012-2013 Concentration - Automotive Technology Engine National Institute for Automotive Performance* Service Excellence () Brakes* Electrical/

More information

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

M1.0 MECHNANICAL FLOOR PLAN

M1.0 MECHNANICAL FLOOR PLAN GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY

More information

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 46 00 (January 2008) ---------------------------- Preparing Activity: USACE Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED FACILITIES

More information

TIE-ROD AND PIPE JOINTS

TIE-ROD AND PIPE JOINTS CHAPTER 5 Machines use various parts which are joined in several ways for the machine to function as whole. We have learnt about some devices like fasteners (temporary & permanent) and some simple joints

More information

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL This summary is not all inclusive of the requirements set forth by the York County Planning & Development Services, York County

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

1907 Grayson Street North Charleston, SC TMS: FRANKLIN DESIGN

1907 Grayson Street North Charleston, SC TMS: FRANKLIN DESIGN Metanoia Houses 1907 Grayson Street North Charleston, SC 29405 TMS: 469-12-00-090 DESIGN Chris Bonner, Architect 582 Rutledge Ave Charleston SC 29403 843.608.1858 www.bstudioarchitecture.com 1907 Grayson

More information

PROJECT ADDRESS: PERMIT #

PROJECT ADDRESS: PERMIT # Residential Building/Mechanical/Plumbing Permit Checklist Community Development 6000 Main St. SW Lakewood, WA 98499 Phone (253) 512-2261 permits@cityoflakewood.us PROJECT ADDRESS: PERMIT # Plans shall

More information

APPLICATION FOR THE APPROVAL OF BUILDING PLANS (Complete in black ink)

APPLICATION FOR THE APPROVAL OF BUILDING PLANS (Complete in black ink) APPLICATION FOR THE APPROVAL OF BUILDING PLANS (Complete in black ink) APPLICATION : OFFICE: PROPERTY PORTION TOWNSHIP ERF EXTENSION TYPE OF WORK TO BE EXECUTED TYPE OF BUILDING New Re-Roofing Preliminary

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information