MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Size: px
Start display at page:

Download "MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions"

Transcription

1 MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection at the generator, and it s feeding a trough. Off this trough I am feeding two 200 Amp disconnecting means. 1) How do is size the conductors to the trough? 2) How do I size the conductors to my disconnects? See and (2) first of all allows a generator to feed individual enclosures tapped from a single feeder for load separation and distribution. 1) says if those feeder conductors to the trough don t have overcurrent protection ahead of them, they shall be sized to carry 115% of the generator nameplate current rating. 2) We would then size the conductors to the disconnects per the appropriate tap rule found in and load calculations per article Is a disconnect required within sight of a range hood controller? Yes No - Maybe & Exception & (D). If the motor is 1/8 hp or less and 300 VA or less; the answer is no. (422.31(A)) If the motor is over 1/8 hp and there is no unit switch, then yes, there must be a disconnect within sight of the controller. (422.32) If the motor is over 1/8 hp and there is a unit switch, then the disconnect is permitted to be out of sight from the controller. (422.31(B) & (A-D)) NOTE: A unit switch(es) with a marked-off position that is a part of an appliance and disconnects all ungrounded conductors shall be permitted as the disconnecting means required by this article where other means for disconnection are provided in occupancies specified in (A) through (D).

2 Page 2 of 6 3. I have a lug that is attached to the meter can (not to the neutral bar which is also attached to the can). Am I allowed to attach the grounding electrode conductor to this lug. (see attached picture) No (B) states The continuity of a grounded conductor shall not depend on a connection to a metallic enclosure, raceway, or cable armor. 4. In a 120/240-volt 3-phase, 4 wire, delta-connected panelboard, are straight voltage rated 2-pole breakers (240-volts) required only when one pole is connected to the high leg ( B phase); and are slash-rated 2-pole breakers (120/240-volts) permitted where connected to the A & C phases? See that states, A circuit breaker with a straight voltage rating, such as 240V or 480V, shall be permitted to be applied in a circuit in which the nominal voltage between any two conductors does not exceed the circuit breaker s voltage rating. A circuit breaker with a slash rating, such as 120/240V shall be permitted to be applied in a solidly grounded circuit where the nominal voltage of any conductor to ground does not exceed the lower of the two values of the circuit breaker s voltage rating and the nominal voltage between any two conductors does not exceed the higher value of the circuit breaker s voltage rating. Therefore, a 240-volt circuit breaker can be connected between any two phases of a 120/240-volt, 3-phase panelboard supplied by a 120/240-volt delta 3-phase system. A 120/240-volt rated circuit breaker may service 120-volt line-to-ground circuits and/or 240-volt line-to-line circuits. A slash rated 120/240-volt circuit breaker may not be applied on a 208-volt line-to-ground circuit. There is no NEC prohibition in connecting a 2-pole, 120/240-volt rated circuit breaker between A and B or between B and C phases where the nominal voltage of any conductor to ground does not exceed the lower of the two values of the circuit breaker s voltage rating and the nominal voltage between any two conductors does not exceed the higher value of the circuit breaker s voltage rating. The UL panelboard marking guide states, Some circuit breakers, like single-pole breakers for use with handle ties rated 120/240 colts, should not be connected to the phase that is 20-volts to ground. Also the UL panelboard marking guide goes on to state, Generally, the B-phase is used only in conjunction with either the A- or C- phase for a 240 single-phase branch circuit or with both the A- and C-phase for a three-phase branch circuit. Circuit breakers or cartridge fuses rated for straight 240 volt systems are suitable for this use.

3 Page 3 of 6 5. Is a bonding jumper required around a water meter when the grounding electrode conductor is connected to the street side of the water meter? Maybe, see (D)(1) that states, Continuity of the grounding path or the bonding connection to interior piping shall not rely on water meters or filtering devices and similar equipment. If the street side of the meter has a metal water pipe that is in direct contact with the earth for 3.0 m (10 ft) or more and the grounding electrode conductor is connected to that pipe on the street side of a water meter, then that pipe is adequate as a metal underground water pipe electrode per (A)(1). However, the interior portion of the metallic water piping system on the house side of the water meter cannot benefit from that sole connection on the street side of the water meter, therefore either a bonding jumper needs to be installed around the water meter to provide continuity of the metal water piping system or a separate bonding conductor per (A) will be required to be installed to the interior water piping system that is on the house side of the water meter. See (A)(1) that states, Metal water piping system(s) installed in or attached to a building or structure shall be bonded to the service equipment enclosure, the grounded conductor at the service, the grounding electrode conductor where of sufficient size, or to the one or more grounding electrodes used. The bonding jumper(s) shall be sized in accordance with Table except as permitted in (A)(2) and (A)(3). 6. Is the 10 AWG DC grounded conductor of a PV system required to have a white outer finish or can it being re-indentified? In accordance with 200.6(A), grounded conductors that are smaller than 6 AWG and used in PV source circuits are permitted to be marked at the time of installation with a white marking at all terminations. Also see 200.6(A)(2) that states A single-conductor, sunlight-resistant, outdoor-rated cable used as a grounded conductor in photovoltaic power systems as permitted by shall be identified at the time of installation by distinctive white marking at all terminations. See also 200.6(B) and

4 Page 4 of 6 7. I have a 5000 amp feeder with 12 parallel runs of 600 kcmil THHN copper ungrounded conductors installed in 12-4" PVC conduits. What is the minimum size copper equipment grounding conductor required in each conduit? 600 kcmil or 700 kcmil? For a 5000 ampere overcurrent device Table shows a 700 kcmil. While this might seem to qualify for the allowance in (A) where the EGC is not required to be larger than the phase conductor, it does not apply to these conductors that are in parallel. This EGC sizing requirement is in place because the majority of the ground fault current could be supplied by all the phase conductors but be returned to ground by only one EGC. 8. Can you explain why the DC conductors for PV systems are sized by multiplying 125% twice? Section 690.8(A) requires the photovoltaic source circuit maximum current to be the sum of parallel module rated short circuit currents multiplied by 125% (these are maximum short circuit currents). Section 690.8(B)(1) requires the dc circuit conductors and any overcurrent protective devices to be sized to carry the maximum short circuit currents figured at 125% in 690.8(A) plus an additional 125% for continuous use or a total of 156%. This 156% will ensure the conductors are large enough to handle both normal current plus the additional fault current at the point of fault from both the array at the fault site and any that are in parallel with the array (B)(2) Overcurrent protection for photovoltaic output circuits with devices that will internally limit the amount of current from the photovoltaic output circuits (for example, where fuses are built into the system) are permitted to be rated less than 156%. These overcurrent protective devices can be rated at least at 125% of the limited current value. The conductors must still be rated at 156% (D) Where a single overcurrent device is used to protect a set of two or more parallel connected module circuits, the ampacity of each of the module interconnection conductors shall not be less than the sum of the rating of the single fuse plus 125% of the short-circuit current from the other parallel connected modules.

5 Page 5 of 6 9. Is a disconnect mandatory both inside and outside for a mini-split system? Yes-No-Maybe There are so many different makers and combinations of make-ups of these systems that no one answer will cover them all. You will have to look at the installation instructions first and then apply the proper Code section. It should be noted, however, that in some cases it is allowable for the breaker in the panel to serve as the disconnect for these units per There is a GFCI protected 125 volt 15 amp receptacle outlet installed on the front porch of a single dwelling. I have to step up onto the porch slab 4 inches from grade to access the receptacle. Can this receptacle be recognized as the required outside receptacle on the front of the dwelling unit? As the question is written, no. See (E) that states For a one-family dwelling and each unit of a two-family dwelling that is at grade level, at least one receptacle outlet accessible while standing at grade level and located not more than 2.0 m (6½ ft) above grade shall be installed at the front and back of the dwelling. NEC (E)(3) requires a receptacle outlet within the parameter of the porch. A receptacle can be located to meet both of these requirements. 11. For a 240V to 208Y/120V transformer, is it better to bond the neutral to the metal frame at the transformer itself, at the panel, or at both locations? Better to bond at the source. There are three exceptions and one may bond the neutral at either point as long as the neutral does not carry parallel current. See (A)(1) that states This connection shall be made at any single point on the separately derived system from the source to the first system disconnecting means or overcurrent device, or it shall be made at the source of a separately derived system that has no disconnecting means or overcurrent devices. Also see Exception No. 2 that states A system bonding jumper at both the source and the first disconnecting means shall be permitted where doing so does not establish a parallel path for the grounded conductor. Where a grounded conductor is used in this manner, it shall not be smaller than the size specified for the system bonding jumper but shall not be required to be larger than the ungrounded conductor(s). For the purposes of this exception, connection through the earth shall not be considered as providing a parallel path.

6 Page 6 of I was recently turned down by an inspector for using HCF MC cable to wire recessed and lay-in fixtures in a hospital. I understand that non-flexible raceways are required for emergency system wiring; but does that include whips for light fixtures, headboards, custom office furniture and other items that are difficult to connect as well? See (C) (3) 3 d. After consulting with DOI and other enforcement entities, the consensus was that lay-in fixtures (luminaires) ARE considered necessary for flexible connection to equipment and thus they, along with the other equipment mentioned above, are permitted to be installed with listed flexible metal raceways and listed metal sheathed cable assemblies; not because they are difficult to connect but because of the need for flexibility after connection.

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings SOLAR MICROINVERTER/M STANDARD PLAN - COMPREHENSIVE Microinverter and M Systems for One- and Two- Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 200-215.3 CHANGES FROM 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 200 Use and Identification of Grounded Conductors 200.2 General Grounded Conductors

More information

ECET Fall 2017 Name: _ Lab Assignment #01

ECET Fall 2017 Name: _ Lab Assignment #01 ECET 4520 - Fall 2017 Name: _ Lab Assignment #01 General Instructions: This assignment is to be completed individually. All answers/work required for each problem should be neatly written in the space

More information

Journeyman's Practice Exam

Journeyman's Practice Exam Journeyman's Practice Exam [Time limit 4.0 hrs.] (The test is open book. I've started at the front of the Code Book and worked toward the back for instructional purposes. The real test will not be in order

More information

Electrical Wiring: Commercial, Seventh Canadian Edition

Electrical Wiring: Commercial, Seventh Canadian Edition Electrical Wiring Commercial Canadian 7th Edition Mullin SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/electrical-wiring-commercialcanadian-7th-edition-mullin-solutions-manual/ Unit

More information

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit. ECET4520 Exam II Sample Exam Problems Instructions: This exam is closed book, except for the reference booklet provided by your instructor and one (8.5 x11 ) sheet of handwritten notes that may not contain

More information

Continued from Part 1 Rules 1 25.

Continued from Part 1 Rules 1 25. Continued from Part 1 Rules 1 25. 26 225.32 Disconnect Location The disconnecting means for a building or structure must be installed at a readily accessible location, either outside the building or structure

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition Jake Leahy s Electrical Code Connection A look at Grounding and Bonding of Electrical Services Article 250 2014 Florida Building Code 5 th Edition Wiring Integrity. Completed wiring installations shall

More information

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

Article 225: Outside Branch Circuits And Feeders

Article 225: Outside Branch Circuits And Feeders Part C: Code Book Questions Article 225: Outside Branch Circuits And Feeders 1.! Open (individual) aerial overhead conductors shall be insulated or covered when within! feet of a building.! (a) 10! (c)

More information

Department of Labor and Industry Electrical Licensing

Department of Labor and Industry Electrical Licensing Department of Labor and Industry Electrical Licensing License Examination Guide The information in this guide is provided by the Licensing Unit of the Department of Labor and Industry to ensure that applicants

More information

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING 1 1 1 1 1 NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING NORTH CAROLINA BUILDING CODE COUNCIL Notice of Rule-making Proceedings is hereby given by NC Building Code Council in accordance with G.S.

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights 1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights These 1 Exam Prep Tabs are based on NFPA 70: National Electrical Code, 2011. Each 1 Exam Prep Tabs sheet has five rows of Tabs. Start

More information

12.6 Delta Phase versus Line Current

12.6 Delta Phase versus Line Current Unit 12 Delta/Delta and Delta/Wye Transformers Electrical NEC Exam Preparation 12.6 Delta Phase versus Line Current Since each line conductor from a delta transformer is actually connected to two transformer

More information

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm.

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm. Commercial System Design Guidelines Application Note 1. Introduction... 1 2. Determine the number of Modules/Inverters required.... 1 3. Determining the number of Microinverters per branch circuit... 1

More information

Code Check Electrical is a field guide to common code issues in residential

Code Check Electrical is a field guide to common code issues in residential INTRODUCTION u CODES u ABBREVIATIONS Code 3Check Electrical 5th Edition By Redwood Kardon & DOUGLAS HANSEN Illustrations & Layout: Paddy Morrissey 2008 by The Taunton Press, Inc. ISBN 978-1-60085-012-7

More information

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math Chapter 1 Electrical Theory and Code Questions 1 Unit 1 Electrician s Math and Basic Electrical Formulas 3 Part A Electrician s Math 3 1 1 Fractions 3 1 2 Kilo 4 1 3 Knowing Your Answer 4 1 4 Multiplier

More information

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33 Part VIII Electrical CHAPTER 33 GENERAL REQUIREMENTS < SECTION E3301 GENERAL E3301.1 Scope. The installation of electrical systems, equipment and components indoors and outdoors that are within the scope

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades CHERRY HILLS VILLAGE COLORADO Electrical requirements for plans on all new homes, additions, remodels & Service upgrades Due to the size and uniqueness of homes built in Cherry Hills Village, a policy

More information

Wiring of the Main Distribution Panelboard

Wiring of the Main Distribution Panelboard Job Sheet 4 Wiring of the Main Distribution Panelboard OBJECTIVE To connect the service-entrance conductors. To ground the main distribution panelboard (MDP). To wire a branch circuit supplying a three-phase

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

2014 NEC Changes Part 1

2014 NEC Changes Part 1 www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

We have 3 ways to help you prepare

We have 3 ways to help you prepare P a g e 2 Texas Electrical Excel is your source for obtaining your license state exam. Call us if you have questions regarding your applications, exam preparation, exam registration and more. We have reached

More information

Short-Circuit Current Calculations

Short-Circuit Current Calculations Basic Point-to-Point Calculation Procedure Step. Determine the transformer full load amps (F.L.A.) from either the nameplate, the following formulas or Table : Multiplier = 00 *% Z transformer Step 2.

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

Three Phase Transformers

Three Phase Transformers Three Phase Transformers Theory and Calculations 8/29/2016 Copyright 2016 Dan Dudley & Associates Page 1 DELTA Transformer 8/29/2016 Copyright 2016 Dan Dudley & Associates Page 2 WYE Transformer 8/29/2016

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

POWER SERVICE DETAILS

POWER SERVICE DETAILS POWER SOURCE # POLE MOUNTED SERVICE TRANSFORMER BY POWER HANDHOLE 0/0V, -PHASE, SERVICE CONDUCTORS; -# AWG SERVICE CONDUCTOR AND -# AWG GROUNDED SERVICE CONDUCTOR (NEUTRAL) SERVICE XFMR SECONDARY. A 0V

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

CHAPTER 2 Wiring and Protection. Article 200 Use and Identification of Grounded Conductors

CHAPTER 2 Wiring and Protection. Article 200 Use and Identification of Grounded Conductors ARTICLE 200 USE AND IDENTIFICATION OF GROUNDED CONDUCTORS 70 35 CHAPTER 2 Wiring and Protection Article 200 Use and Identification of Grounded Conductors 200-1. Scope. This article provides requirements

More information

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST Item Comments 1. The electrical plan check is approved and ready to have the electrical permit issued, pending the building permit being issued.

More information

HPS Universal BUCK-BOOST TRANSFORMERS

HPS Universal BUCK-BOOST TRANSFORMERS BUCK-BOOST TRANSFORMERS Single and Three Phase Potted Buck-Boost Transformers Buck-Boost Applications & Standard Specification... 80 Selecting Buck-Boost Transformers... 81 Single Phase Selection Tables...

More information

2017 NEC TABLE OF CONTENTS

2017 NEC TABLE OF CONTENTS Article 90 Introduction 90.1 Purpose (A) Practical Safeguarding (B) Adequacy (C) Relation to Other International Standards 90.2 Scope (A Covered (B) Not Covered (C) Special Permission 90.3 Code Arrangement

More information

Quality Control Checklist - Design Drawings

Quality Control Checklist - Design Drawings Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not

More information

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems UNITY/I TM UT3K, UT4K, UT5K and UT8K Single-Phase Uninterruptible Power Systems Installation Manual MLS-0351C-OL Copyright 1994-1997 Best Power. All rights reserved. å IMPORTANT SAFETY INSTRUCTIONS! SAVE

More information

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION SECTION 16715 COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION PART 1 - GENERAL 1.01 SECTION DESCRIPTION AND BASIC REQUIREMENTS A. The Electrical Power Distribution System provides power distribution from

More information

Electrical Inspectors

Electrical Inspectors International Association of Electrical Inspectors Western Section 114th Annual Meeting September 16-19, 2018 Appleton, Wisconsin The answers to these questions are the opinion of the person that answered

More information

Note: The let-through of the protective device must be equal to or less than the short-circuit current rating of the component being protected.

Note: The let-through of the protective device must be equal to or less than the short-circuit current rating of the component being protected. CONDUCTOR SHORT-CIRCUIT PROTECTION Introduction: This paper analyzes the protection of wire from fault currents. It gives the specifier the necessary information regarding the short-circuit current rating

More information

Grounding and Bonding of Service Equipment

Grounding and Bonding of Service Equipment Grounding and Bonding of Service Equipment 1. Grounding means: attached to an earth ground. 2. Bonding means: physically connected to insure electrical continuity. NEC 250.4 1. Grounding: Electrical Systems

More information

UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS

UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS Residential Pool Permit Requirements FEES: A nonrefundable permit application fee of $25.25 and a nonrefundable plan review fee of $40.40 will be

More information

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 1444 West Garvey Avenue West Covina, CA 91793 Phone: 626-939-8425 Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* ADMINISTRATIVE 1. The following clearances

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or

More information

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet... INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...xv UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

Bulletin Voltage drop in single dwelling units Rule 8-102

Bulletin Voltage drop in single dwelling units Rule 8-102 Bulletin 8-6-0 Voltage drop in single dwelling units Rule 8-102 Scope Issued February 2014 (1) Background (2) Application of voltage drop for branch circuits in single dwelling units a) Determination of

More information

SECTION BUILDING WIRE AND CABLE

SECTION BUILDING WIRE AND CABLE SECTION 260519 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Building wire and cable. 2. Wiring connectors and connections. B. RELATED SECTIONS 1. Section 26 05 53 Electrical Identification. 2. Section

More information

Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables

Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables TECHNICAL BRIEF Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables Overview This technical brief presents voltage rise guidelines for dedicated PV branch circuits and methods for

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

Bulletin Filming in Minnesota

Bulletin Filming in Minnesota 443 Lafayette Road N. St. Paul, Minnesota 55155 www.doli.state.mn.us www.electricity.state.mn.us MINNESOTA DEPARTMENT OF LABOR & INDUSTRY (651) 284-5064 1-800-DIAL-DLI Fax: (651) 284-5749 TTY: (651) 297-4198

More information

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables Technical Brief Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables Summary Enphase Microinverters, like all utility interactive inverters, sense the current from the AC grid and

More information

Bulletin Voltage drop in single dwelling units Rule 8-102

Bulletin Voltage drop in single dwelling units Rule 8-102 Bulletin 8-6-1 Voltage drop in single dwelling units Rule 8-102 Issued April 2014 Supersedes Bulletin 8-6-0 Scope (1) Background (2) Application of voltage drop for branch circuits in single dwelling units

More information

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL PROVINCE.OF BRITISH COLUMBIA ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL Order in Council No. 0640 Approved and Oidered a -1.1995 cieuisvunigott3mor Executive Council Chambers, Victoria On the recommendation

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

ELPT 1429 RESIDENTIAL WIRING

ELPT 1429 RESIDENTIAL WIRING SYLLABUS ELPT 1429 RESIDENTIAL WIRING INDUSTRIAL AND COMMERCIAL ELECTRICITY BRAZOSPORT COLLEGE LAKE JACKSON TEXAS PREPARED BY: Larry Grable DATE: September 13, 2005 INSTRUCTOR RECOMMENDED BY: RECOMMENDED

More information

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220 Table K. Input/ Ratings & External Wiring Requirements for the 9390-/ Units Rating 50/0 Hz Basic Unit Rating at 0.9 lagging pf load Input and Bypass Input Rectifier (0.98 min. pf) plus Recharge Current

More information

Datawave Magnetic Synthesizer

Datawave Magnetic Synthesizer POWER PROTECTION Datawave Magnetic Synthesizer 100 kva to 200 kva; 50 and 60 Hz Installation, Operation, & Maintenance Manual TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS............................................1

More information

Description & Applications Questions & Answers Selection Charts Single Phase Selection Charts Three Phase...

Description & Applications Questions & Answers Selection Charts Single Phase Selection Charts Three Phase... SECTION BUCK-BOOST TRANSFORMERS A simple and economical way to correct offstandard voltages... from 95 to 500 volts; single and three phase, in sizes up to 60 kva. Simplified buck-boost rating charts make

More information

Grounding and Bonding

Grounding and Bonding Grounding and Bonding 2017 Communications Academy Joe Blaschka Jr., PE Grounding/Bonding What is it? Why do we do it? What does the National Electrical Code say? What about fixed locations? What about

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) 1 PART 1: GENERAL This section describes materials and installation requirements for low voltage

More information

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. SECTION 26 05 19 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. 1.2 CONTRACTOR SUBMITTALS A. The

More information

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL BELL SYSTEM PRACTICES Plant Series SECTION 508-100-100 Issue 3, October 1970 AT&TCo Standard ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL I. GENERAL 1.01 This section is reissued to: Revise

More information

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC BUILDING AND SAFETY DIVISION 1685 MAIN STREET, SANTA MONICA, CA 90401 310-458-2201 Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC ADMINISTRATIVE

More information

Page Electric Utility Service Specifications

Page Electric Utility Service Specifications T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum

More information

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate.

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate. Part N: Code Book Questions Article 700: Emergency Systems 1.! For emergency systems, the authority having jurisdiction shall conduct or witness a test on the! complete system upon installation and periodically

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

Energy Management Service

Energy Management Service Copyright 2013 TheSolarPlanner.com See Instructions. Energy Management Service Residential Wire Sizing Worksheet (Gauges, Lengths & Voltage Drop) Step 1: Size the source circuit conductors. This calculation

More information

BUCK-BOOST TRANSFORMERS

BUCK-BOOST TRANSFORMERS Where Are Buck-Boost Transformers Used? A typical buck-boost application is 120 volts in, 12 volts out for low voltage lighting or control circuitry. In most applications, this low voltage transformer

More information

Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable

Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable TECHNICAL BRIEF Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable Overview This technical brief presents voltage rise guidelines for dedicated PV branch circuits and methods for calculating

More information

The Variable Threshold Neutral Isolator (VTNI)

The Variable Threshold Neutral Isolator (VTNI) The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary

More information

Chapter 25. Lighting Plans

Chapter 25. Lighting Plans Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace

More information

Box Fill. We have learned how to fill or NOT overfill a conduit. We must also determine how to fill boxes and conduit bodies.

Box Fill. We have learned how to fill or NOT overfill a conduit. We must also determine how to fill boxes and conduit bodies. Box Fill We have learned how to fill or NOT overfill a conduit. We must also determine how to fill boxes and conduit bodies. Box Fill This falls into four categories: 1. Small box fill (NEC 314.16) 2.

More information

Electrical Occupations

Electrical Occupations Job Ready Assessment Blueprint Electrical Occupations Test Code: 3029 / Version: 01 Copyright 2011. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information

More information

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations Connecting the Power of the Sun DC Disconnects for Solar Photovoltaic Installations DC disconnects for solar photovoltaic installations Solar energy is heating up Interest in renewable energy sources has

More information

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SIMpull THHN, it slips and slides - all with NoLube.

SIMpull THHN, it slips and slides - all with NoLube. SOUTHWIRE S SIMpull THHN Southwire maintains its goal of revolutionizing the wire industry by providing its consumers with a product that is not only SIMpull but also requires NoLube. SIMpull THHN is a

More information

Technical Assignment #2 Electrical Existing Conditions Report

Technical Assignment #2 Electrical Existing Conditions Report Technical Assignment #2 Electrical Existing Conditions Report SYSTEM TYPE: THIS IS A RADIAL DISTRIBUTION SYSTEM BECAUSE ALL PANELS, THE MOTOR CONTROL CENTER AND THE MECHANICAL EQUIPMENT DISTRIBUTION SYSTEM

More information

RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS

RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS INFORMATION GUIDELINE 24A May 2015 CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA 92025 (760) 839-4647 Plan

More information

INTELLIMETER REGISTER

INTELLIMETER REGISTER INTELLIMETER REGISTER MODEL RG2 INSTALLATION AND CONNECTIONS INSTALLATION MANUAL WARNING: Any work on or near energized metering equipment can present a danger of electrical shock. All work on these products

More information

THHN12STGN500 THHN 12 STR Green 500

THHN12STGN500 THHN 12 STR Green 500 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 AllenWatson@elliottelectric.com Catalog Number Manufacturer Description Weight per unit Product Category Features Conductor

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Date: Given Names: Time: Assessment Time (includes 10 minutes reading time): At the end of this time you will be asked to stop. 4 hours Have you

More information

Customer Requirements RF Antenna Installations

Customer Requirements RF Antenna Installations Application Terms Attachment requirements and clearances on the Pole for Radio Frequency (RF) antenna equipment installations. This standard is intended to allow electrical workers to perform their normal

More information

THHN2BK2500 THHN 2 STR Black 2500

THHN2BK2500 THHN 2 STR Black 2500 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 AllenWatson@elliottelectric.com Catalog Number Manufacturer Description Weight per unit Product Category Features Conductor

More information

EPG. by Chris C. Kleronomos

EPG. by Chris C. Kleronomos April 1994 EFFECTIVE EQUIPMENT GROUNDING ECOS Electronics Corporation by Chris C. Kleronomos The quality of the electrical wiring and grounding in a facility containing sensitive electronic equipment is

More information

CP /240-MC4 User Manual

CP /240-MC4 User Manual CP-250-60-208/240-MC4 User Manual Chilicon Power LLC Jan 2014 1 CONTENTS Important Safety Instructions... 3 Safety Instructions... 3 CP-250 Microinverter System Introduction... 4 Inverter Label Information...

More information

Liebert Datawave GUIDE SPECIFICATIONS kva Magnetic Synthesizer Power Conditioning System

Liebert Datawave GUIDE SPECIFICATIONS kva Magnetic Synthesizer Power Conditioning System 1.1 SUMMARY DISCONTINUED PRODUCT GUIDE SPECIFICATIONS 15-75 kva Magnetic Synthesizer Power Conditioning System 1.0 GENERAL These specifications describe requirements for a complete power conditioning and

More information

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 THHN500BK500 THHN 500 STR Black 500 Southwire Company Catalog Number Manufacturer Description Weight per unit Product

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph

More information

THHN6WH500 THHN 6 STR White 500. Features Conductor Size Current Rating 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C)

THHN6WH500 THHN 6 STR White 500. Features Conductor Size Current Rating 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C) 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 Catalog Number Manufacturer Description Weight per unit Product Category THHN6WH500 THHN 6 STR White 500 Southwire Company

More information