Knight Abbey ID 439 Contract Design I

Size: px
Start display at page:

Download "Knight Abbey ID 439 Contract Design I"

Transcription

1 Knight Abbey ID 439 Contract Design I Due: May 7 th Project Description: Students enrolled in ID-439, Contract Design I during the spring 2014 semester will be working on an office design solution for Knight Abbey Commercial Printing and Direct Mail located in Biloxi, MS. Design services will include programming analysis, concept development, schematic design, space planning, FF&E selections, and developing a set of interior construction documents. In addition, you will design a raised flooring solution that utilizes in-floor air, power and data distribution systems. Client Background: Knight-Abbey was founded by Steve Singleterry in 1980 and began as Knight Printing Company when the 26 year old started printing from his garage. The name Knight came from the fact that Steve printed in the evenings after his day job as a pressman for another printing company. By 1982, the company had moved into a small single room store front in Biloxi and in 1990, it merged with Abbey Printing. The company has grown from $200,000 in annual sales to now $7 million and employs approximately 70 employees. Knight- Abbey s main focus is in direct mail and commercial printing, including both offset and digital printing. They work directly with advertising agencies and marketing departments with an emphasis in the hospitality industry thru support of local and national casinos and resorts. They currently average jobs per week with 1 3 week turn arounds. Knight-Abbey does not focus on walk-in business, retail sales or Internet business. Knight-Abbey remains a family operated (father/daughter) business in Biloxi that continues to grow. The current location at 315 Caillavet St was devastated by Hurricane Katrina when 8 of water destroyed all their equipment. Much of the existing office configuration is set up as a make-shift operation at best. The company had hoped to take advantage of the Go Zone tax credit by building a new 40,000 sq. foot facility off Interstate 10 at Woolmarket; however, they missed the December 21, 2009 deadline due to complications with the city of Biloxi providing the water/sewer lines to the location. Architect, Mark Williams, AIA is overseeing the design of the new office facilities which will consist of approximately 14,000 sq feet. The 26,000 sq. ft press floor is not included in the scope of services for this project. The metal building will consist of split face concrete masonry units (CMU s) with brick rowlock accents and canopies suspended from above. Haworth s raised flooring system, utilizing in-floor air, power and communications will be installed throughout the office area along with a moveable wall system in the executive division. The building will feature a dropped ceiling resembling clouds over the enclosed offices and a more open design in the sales floor revealing the metal roof structure above with sky lights and indirect lighting. A flexible sprinkler system (ie: Flexhead) will be installed and sound masking will help with excessive noise from the pressroom and metal roof structure. When approaching the building from the south drive, the main entrance will be located along the southeast corner of the building adjacent to two parking lots. The landscape will feature a pond with bridges viewable from the main entrance. The main goal is to create an efficient, flexible building like no other along the Gulf Coast. The interior should be industrial feeling, whimsical and fun for employees. The 1 P a g e

2 technology and equipment associated with graphics and printing should serve as inspiration. Most of the equipment, which is made in Germany and Japan, is very high-tech. For example, the look of Apple computers is an appealing look and also a necessity for the graphic design industry. The design of the sales floor should include teaming workstations that are not the every day bull-pen design. Workstations which feature odd angles and low panels to provide open communication are desired. The facility shall meet the minimum requirements of all applicable building codes (IBC 2009) the NFPA Life Safety Code, and the Americans with Disabilities Act. Pre-Design Phase (Programming Analysis) This portion of the project is worth 50 points and is due on February 19 th. Programming documents for this project were written by students enrolled in ID 439 during the spring of Students during spring 2014 will be grouped into one of three teams (Administrative/Executive; Production/Operations; or Ancillary) and will analyze the information and provide the following items: Adjacency Matrix for entire office Detailed Criteria Matrix for assigned area (use template provided by Mrs. Hamilton) Prototypical Plan Sketches for assigned area. Schematic Design Phase Once the pre-design phase has been completed and distributed to all students, each student will prepare several schematic designs to include the following: NOTE: 4 points will be deducted from your overall grade for missed checks. Partial credit will be awarded on the following scale: -0 = A; -1 = B; -2 = C; -3 = D and -4 = F. Feb. 26 Check 1 Bubble Diagram 3ea Block Plans (trash overlays color coded) March 3 Check 2 Preliminary Floor Plan Check 3 Concept Statement March 5 Check 4 Revised Floor Plan (walls/doors and corridors) It is expected that each student will develop dozens of block plans to get three workable block plans on February 24 th. You should keep all trash drawings and number them sequentially in order for your thought process to be documented. NOTE: Preliminary/schematic design is VERY time consuming. Design Development remaining checks March 17 Check 5 Final Plan on CAD- printed with walls, doors, windows, etc. March 26 Check 6 & 7 Reflected ceiling plan (printed) and building finishes April 7 Check 8 Raised Flooring Plan (printed) April 9 Check 9 Remaining FF&E (digital images and finishes) April 14 Check 10 Finish Plan with Schedule and preliminary spec sheets April 21 Check 11 Furniture Plan and workstation typicals April 23 Check 12 Perspective views April 28 Check 13 Floor/Wall Details and elevations April 30 Check 14 Digital Layouts (do not mount samples prior to approval) 2 P a g e

3 Presentation Requirements Project solution should be presented as a bound presentation book (11 x 17 size) Title page and back cover should be laminated for durability or have a protective cover and vinyl back cover. Student name, course number and date should be on the back cover. Your firm logo is not required, but the Knight Abbey logo is required and should be consistently placed throughout the pages. All pages should include page numbers. A table of contents is recommended. Limit fonts to not more than 2 styles and only 2 heights. Regular text heights should fall between 9-12 point. The concept sketches, bubble diagram, and sequential block plans should be included in booklet. The criteria matrix and program should be included and fit graphically into your page format. Include summary of your codes research. Include your Goals and Concept Statement All floor plans and elevations included in the book should be labeled and include a graphic scale. Indicate a north arrow for your floor plan. Elevations and perspectives should contain people to provide a sense of scale. Color renderings can be completed with Photoshop or another software program of your choice or it can be hand rendered and scanned back in digitally. Drawings included in the booklet: 1 graphically drawn bubble diagram, color coded with legend and 2-3 progressive block plans graphically illustrated. Reflected Ceiling Plan with legends/specs transparency provided Raised Flooring Power/Data Plan Furniture Plan, color rendered 2 Perspective views of choice, full color rendered Workstation Axons for each typical station and 3 rendered elevations Additional material included in booklet: Concept Statement, goals, codes research, criteria matrix, program Digital pictures of building finishes (flooring, walls, laminates, paints etc.) Lighting fixtures with specs Digital pictures of furniture finishes (wood stains, fabrics, metals etc.) Pictures and specifications of all furniture Pictures of accessories and artwork CD of all files for the project in PDF format Construction Documents: Title Page (Project Information, Table of Contents, Codes Summary, Perspective of choice) Dimensioned Partition plan with enlarged plan of ADA restroom) Reflected Ceiling Plan with Legend Finish Plan with Schedule Power and Data Plan (Raised flooring and demoutable walls) Furniture Installation Plan with legend 3 P a g e

4 Details and Elevations (raised flooring detail, 2hr fire rated wall section, ADA restroom elevation, ADA cabinet section detail, Break room cabinet elevation, Reception Station Elevations. Presentation Boards: Maximum of 2ea 18 x 24 sample boards that are professionally dry mounted. Mount all FF&E samples and label/code them to a specification listing on the front of the board. Include Knight Abbey Logo and a title for the Board (IE: Interior Finishes, etc.) Spec Book: A specification book shall be completed (see template) for all furniture and finish materials. The book should be spiral bound separately and include a cover page that matches your other booklet. Your company logo and your company address should be included on each page. PROJECT DUE DATE: Wednesday, May 7 th includes a formal presentation. Appointment times and location will be announced. 4 P a g e

5 EVALUATION SHEET ID 439 Contract Design I (KNIGHT ABBEY) SPRING 2014 Name: Criteria Comments Points Possible Schematic Design (45 points) Concept Statement and goals 5 Bubble Diagram 10 Program and Matrix 10 Preliminary Block Plans/ Sketches 10 Codes Research Summary (CD cover sheet and in booklet) 10 FLOOR PLAN (50 points) Dimensioned Partition Plan (CD s) 15 Overall Space Planning /Meets 10 Program, concept, goals Plan meets Code and ADA 10 Plan Rendering 10 Labeling (room names, numbers, 5 scale, north arrow, etc) FURNITURE (40 points) Furniture Plan (CD s) and schedule 15 Furniture selections 10 Specs and lebeling 10 Artwork/accessories 5 FF&E (45 points) Finish Plan and schedule (CD s) 15 Appropriate and complete 10 Design/ Aesthetics 10 Specifications and labeling 10 RCP (30 points) Planning/Layout 15 Symbols/Legend/Specs 5 Fixture Selections 10 Power/Com Plan (20 points) Overall Planning (zone boxes, flush 15 boxes, base feeds, ventilation, etc.) Symbols/Legend Narrative 5 Details and Elevations (10 points) Wall section, ADA cab. Section 5 ADA bathroom wall elevation, Break 5 Room elevation, Reception station elevation(s) Visual Presentation (75 points) Professionalism: quality of print, images, graphic quality, composition, 20 color choice, overall organization, balance composition. Complete package. 2 Perspective Views color rendered (mechanics, choice of view, detailing) 20 Workstation Typicals 5 3 Rendered Elevations 30 MISC. (35points) Design Firm Logo 5 Bound Spec Sheets 15 Oral Presentation 15 SUBTOTAL 350 PERCENTAGE/LETTER GRADE Letter Grade Points Earned A = B = C= D = P a g e

Architecture Firm ID 439 Contract Design I Due: May 4, 2015

Architecture Firm ID 439 Contract Design I Due: May 4, 2015 Architecture Firm ID 439 Contract Design I Due: May 4, 2015 Project Objectives: 1) To engage in multi-disciplinary collaboration 2) To understand sustainability as it pertains to building methods, materials,

More information

Katrina Cottage Clay Street Cottage

Katrina Cottage Clay Street Cottage The Clay Street Cottage, designed by Bill Allison consists of 918 sq. feet. This cottage may be turned with either end facing the street depending on whether the smaller bedroom is used as a den or a bedroom.

More information

CARES. Project Description: Center for Advancement of Research and Education in Sustainability ID 240 Interior Design II Project 1 Spring 2013

CARES. Project Description: Center for Advancement of Research and Education in Sustainability ID 240 Interior Design II Project 1 Spring 2013 CARES Center for Advancement of Research and Education in Sustainability Objectives: 1) Researching client needs 2) Writing a detailed programming document 3) Preparing quick schematic solutions to a design

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

ARCHITECTURE CADD Course Syllabus

ARCHITECTURE CADD Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing

More information

Contents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together

Contents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together Contents OVERVIEW How this Book is Put Together Conventions Icon Key Files on the Website INTRODUCTION TO CHIEF ARCHITECT The Chief Architect Interface Working with the Toolbars Chief Architect s Views

More information

1. Name the horizontal member that rests on the foundation wall to support other wood members.

1. Name the horizontal member that rests on the foundation wall to support other wood members. Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests

More information

National Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS

National Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS National Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS DESIGN PROBLEM AND PROJECT DESCRIPTION I. PROJECT DESCRIPTION The design problem

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

READING ARCHITECTURAL PLANS

READING ARCHITECTURAL PLANS READING ARCHITECTURAL PLANS ARCHITECTURAL DRAWINGS FOR A HOUSE Architectural drawings contain information about the size, shape, and location of all parts of the house ARCHITECTURAL DRAWINGS FOR A HOUSE

More information

Design Process. Hand Sketching for Interiors Developing Visual Illustration Techniques SDC. Better Textbooks. Lower Prices.

Design Process. Hand Sketching for Interiors Developing Visual Illustration Techniques SDC. Better Textbooks. Lower Prices. Design Process Hand Sketching for Interiors Developing Visual Illustration Techniques Rick L. Bartholomew, RID SDC P U B L I C AT I O N S Schroff Development Corporation Better Textbooks. Lower Prices.

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

THE DESIGN PROCESS. for an interior design project

THE DESIGN PROCESS. for an interior design project THE DESIGN PROCESS for an interior design project STAGE 1 Preliminary meeting The client brief The business proposal and client s agreement to proposal THE DESIGN PROCESS for an interior design project

More information

Developer Design Review Submittal Requirements - SECTION 5

Developer Design Review Submittal Requirements - SECTION 5 Developer Design Review Submittal Requirements - SECTION 5 5.0 Developer Design Review 1.0 Procedures for Submittals - All Housing Types 1. Submittals shall be by the Guest Builder or authorized agent

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

Project 01: Infill Office Building Precast Concrete

Project 01: Infill Office Building Precast Concrete Project 01: Infill Office Building Precast Concrete NAAB Criteria: A- Life-safety and accessibility Ability to design sites, facilities, and systems to provide independent and integrated use by individuals

More information

The CAD Technician s Role in Office Practice and Procedure

The CAD Technician s Role in Office Practice and Procedure COMMERCIAL DRAFTING AND DETAILING 4TH EDITION JEFFERIS SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/commercial-drafting-detailing-4th-editionjefferis-solutions-manual/ Chapter 2

More information

Over-the-Rhine Historic District New Construction Guidelines Competition: The Challenge to elevate new build design in OTR to national recognition.

Over-the-Rhine Historic District New Construction Guidelines Competition: The Challenge to elevate new build design in OTR to national recognition. Over-the-Rhine Historic District New Construction Guidelines Competition: The Challenge to elevate new build design in OTR to national recognition. 1. Brief: Over the Rhine Foundation Infill Committee

More information

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please

More information

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG) GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN

More information

Architecture of Workplaces 2 1 st semester 2018/2019 COURSE DESCRIPTION. In case of all design phases the name of the task should be marked uniformly:

Architecture of Workplaces 2 1 st semester 2018/2019 COURSE DESCRIPTION. In case of all design phases the name of the task should be marked uniformly: Architecture of Workplaces 2 1 st semester 2018/2019 COURSE DESCRIPTION The aim of the course is to summarize the acquired architectural-technical knowledge, to prepare for the complex architectural thinking

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and

More information

Chief Architect New Feature List

Chief Architect New Feature List SYSTEM / PERFORMANCE Chief Architect Premier X4 is available in 64 bit and 32 bit versions. The 64 bit version is more efficient in managing memory and you will see better performance on larger plan files

More information

Required Supporting Information and Documentation for Historic Preservation Certification Applications

Required Supporting Information and Documentation for Historic Preservation Certification Applications Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

ADDENDUM NO. 3, March 14, 2017 A.B.C. No ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,

More information

Kankakee Community College

Kankakee Community College Kankakee Community College Course Prefix and Number: DRFT 2414 Course title: Architectural Drafting with Revit Credit hours: 4 Lecture hours: 2 Lab hours: 4 Semester: Spring 2015 Catalog Description: Prerequisite:

More information

Prerequisites: ARCH 1230: Building Technology II with a grade of C or higher or ARCH 1240 and ARCH1200 with a grade of C or higher.

Prerequisites: ARCH 1230: Building Technology II with a grade of C or higher or ARCH 1240 and ARCH1200 with a grade of C or higher. New York City College of Technology City University of New York 300 Jay Street, Brooklyn, New York 11201 Department of Architectural Technology ARCH 2330 BUILDING TECHNOLOGY III 1 cl hrs, 6 lab hrs, 4

More information

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice NCIDQ Restroom Drawing Answers to the most common questions about this drawing for the Practicum. 2016 Qpractice Table of Contents This is a summary guide of most frequently asked questions about the Practicum

More information

Prerequisites: ARCH 1230 (1231): Building Technology II with a grade of C or higher or ARCH 1240 and ARCH1200 with a grade of C or higher.

Prerequisites: ARCH 1230 (1231): Building Technology II with a grade of C or higher or ARCH 1240 and ARCH1200 with a grade of C or higher. New York City College of Technology City University of New York 300 Jay Street, Brooklyn, New York 11201 Department of Architectural Technology ARCH 2330 (2431) BUILDING TECHNOLOGY III 1 cl hrs, 6 lab

More information

Principal, Safe Hospital Services Former VP of Client Services, SiteFM 40+ Years in Healthcare Facilities Management Former Joint Commission Life

Principal, Safe Hospital Services Former VP of Client Services, SiteFM 40+ Years in Healthcare Facilities Management Former Joint Commission Life Principal, Safe Hospital Services Former VP of Client Services, SiteFM 40+ Years in Healthcare Facilities Management Former Joint Commission Life Safety Surveyor Former OSHA Voluntary Protection Program

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

STUDENT DESIGN COMPETITION

STUDENT DESIGN COMPETITION STUDENT DESIGN COMPETITION ABOUT THE NKBA STUDENT DESIGN COMPETITION A winning entry in this competition increases industry visibility and peer recognition, offers valuable publicity opportunities, and

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

RIT CAD Specifications

RIT CAD Specifications RIT CAD Specifications The design team shall provide RIT with Revit, AutoCAD, and PDF files that capture the construction conditions of the associated project. This document outlines requirements for submitting

More information

PELLISSIPPI STATE COMMUNITY COLLEGE MASTER SYLLABUS VISUAL COMMUNICATION: STUDIO II IDT 1216

PELLISSIPPI STATE COMMUNITY COLLEGE MASTER SYLLABUS VISUAL COMMUNICATION: STUDIO II IDT 1216 PELLISSIPPI STATE COMMUNITY COLLEGE MASTER SYLLABUS VISUAL COMMUNICATION: STUDIO II IDT 1216 Class Hours: 3.0 Credit Hours: 3.0 Laboratory Hours: 0.0 Revised: Spring 2013 NOTE: This course is designed

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com

More information

Drawing Standards & Conventions for IDD

Drawing Standards & Conventions for IDD Drawing Standards & Conventions for IDD This document consists of a set of standards that have been developed to maintain a consistency in Interior Decoration and Design students work. The standards are

More information

Kankakee Community College

Kankakee Community College Kankakee Community College Course prefix and number: DRFT 2414 Course title: Architectural Drafting with Revit Credit hours: 4 Lecture hours: 2 Lab hours: 4 Semester: Spring 2013 Catalog description: Prerequisite:

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

*For complete material(s) information, refer to

*For complete material(s) information, refer to Butler Community College Science, Technology, Engineering, and Math Division Brett Trimpe Revised Spring 2016 Implemented Fall 2016 COURSE OUTLINE Residential Design and CAD I Course Description EN 103.

More information

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS

MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS TABLE OF CONTENTS INTRODUCTION 1 PART ONE LAYERS AND CLASSES FOR RENOVATION PROJECT 2 OVERVIEW 2 SETTING UP LAYERS AND CLASSES 2 CREATING

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

Strengthened Technical-Vocational Education Program COURSE DESIGN

Strengthened Technical-Vocational Education Program COURSE DESIGN COURSE DESIGN COURSE TITLE : DRAFTING TECHNOLOGY NOMINAL DURATION : 1200 HOURS QUALIFICATION LEVEL : NC II COURSE DESCRIPTION : This course is designed to enhance the knowledge, skills, and positive attitudes

More information

WINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15

WINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15 Subject Code: 17309 Model Answer- Building Drawing Page No- 01 /15 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model answers

More information

Winnetka Design Review Board. Regular Meeting. August 17, :00 pm

Winnetka Design Review Board. Regular Meeting. August 17, :00 pm Winnetka Design Review Board Regular Meeting August 17, 2017-7:00 pm The Winnetka Design Review Board will hold a meeting on Thursday, August 17, 2017 at Winnetka Village Hall, 510 Green Bay Road, Winnetka,

More information

For Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT:

For Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT: City of Syracuse Zoning Administration Application for CHANGE OF OCCUPANCY Review by the Planning Commission City Hall Commons * Room 101 * 201 E. Washington Street * Syracuse, NY 13202-1426 * 315-448-8640

More information

APPLICATION FOR SITE PLAN REVIEW

APPLICATION FOR SITE PLAN REVIEW APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124

More information

Interior Design Associate in Applied Science Degree (A.A.S.)

Interior Design Associate in Applied Science Degree (A.A.S.) Berkeley College Overview Academic Programs Admissions and Finances Administration, Faculty, and Staff Contact Us Interior Design Associate in Applied Science Degree (A.A.S.) Course Requirements MAJOR

More information

Addendum for 2018-COA-486 and 2018-COA-487 for the LeRoux and Cho 77 Projecting signs

Addendum for 2018-COA-486 and 2018-COA-487 for the LeRoux and Cho 77 Projecting signs Addendum for 2018-COA-486 and 2018-COA-487 for the LeRoux and Cho 77 Projecting signs Included documents: Principle 7 of the Design Guidelines for Lower Downtown Historic District (June 19, 2007) Sugar

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

Certificate of Appropriateness (CoA) Checklist

Certificate of Appropriateness (CoA) Checklist Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

Booth Display Rules. Standard Inline booth. Perimeter booth. Island booth. Peninsula Booth

Booth Display Rules. Standard Inline booth. Perimeter booth. Island booth. Peninsula Booth Booth Display Rules Standard Inline booth A standard inline booth is 10 ft (3.05 m) deep and 10 ft wide or a multiple thereof. It is enclosed on three sides by a back wall and two sidewalls, except for

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012 SECTION 01950 - RECORD DRAWINGS & SPACE FLOOR PLANS 1.1 RECORD DRAWINGS MATERIAL AND FORMAT A. Definition 1. Final record drawings, or as-builts, are drawings, which are revised to reflect the changes

More information

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC

More information

The Mitchell Family Finished Basement Project

The Mitchell Family Finished Basement Project The Mitchell Family Finished Basement Project The Mitchell family has come to you to design a finished basement plan for their home. Before you begin, there are two main ideas architects need to keep in

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

TEC634 Architectural CAD I (formerly Architectural Drawing I) A Course Outline for Architectural CAD I

TEC634 Architectural CAD I (formerly Architectural Drawing I) A Course Outline for Architectural CAD I Parsippany-Troy Hills School District TEC634 Architectural CAD I (formerly Architectural Drawing I) A Course Outline for Architectural CAD I Developed: June 2004 Revised: October 2012 June 2016 Approved

More information

Architectural Design

Architectural Design Punch! Pro Dream House Project After completing the tutorial and scale drawing exercises the students will design their dream home using Professional Home Design program, Punch! Home Design. Using Professional

More information

September 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225

September 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225 RAILWAY INTERCHANGE 2013 RSI APPLICATION & CONTRACT FOR EXHIBIT SPACE September 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225 A. Application The company and

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

COURSE OUTLINE. Course Number Course Title Credits. Co- or Pre-requisite BCT110 Construction Materials & Methods

COURSE OUTLINE. Course Number Course Title Credits. Co- or Pre-requisite BCT110 Construction Materials & Methods COURSE OUTLINE Course Number Course Title Credits BCT101 Construction Graphics 3 Hours: 2 Lecture 2 Studio/Lab, Co- or Pre-requisite BCT110 Construction Materials & Methods Implementation sem/year Fall

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

BUS RAPID TRANSIT FOURTH PLAIN BLVD

BUS RAPID TRANSIT FOURTH PLAIN BLVD K SIGN TYPE C BAY ID INTERNALLY ILLUMINATED, DOUBLED-SIDED SIGN CABINET MOUNT TO LIGHT POLE BY OTHERS AT DRIVER STOP LINE. ALUMINUM CABINET, DIGITALLY PRINTED GRAPHIC MOUNTED TO POLYCARBONATE LENS. 22'

More information

City of Santa Paula Planning Department

City of Santa Paula Planning Department City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

COURSE OF STUDY UNIT PLANNING GUIDE ARCHITECTURE G RADE LEVEL: CREDITS CURT BANICKI 1 F ULL YEAR MICHAEL WEBER, ASST. PRINCIPAL JULY 2018

COURSE OF STUDY UNIT PLANNING GUIDE ARCHITECTURE G RADE LEVEL: CREDITS CURT BANICKI 1 F ULL YEAR MICHAEL WEBER, ASST. PRINCIPAL JULY 2018 COURSE OF STUDY UNIT PLANNING GUIDE FOR: ARCHITECTURE G RADE LEVEL: 11 12 5 CREDITS CURT BANICKI 1 F ULL YEAR PREPARED BY: MICHAEL WEBER, ASST. PRINCIPAL ENGINEERING/TECHNOLOGY SUPERVISOR JULY 2018 DUMONT

More information

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS INTRODUCTION In this lesson, you ll learn about the different types of drawings used in the construction industry, and how to read floor plans, section drawings,

More information

PLANNING Development Services Department

PLANNING Development Services Department PLANNING Development Services Department Date Stamp APPLICATION SUBMITTAL CHECKLIST for Design Review Case Number: I acknowledge that the City of Glendale requires the following items be submitted before

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

DRAFT V. SITE ELEMENTS SIGNS

DRAFT V. SITE ELEMENTS SIGNS 1. SIGNS Intent Signs are an important streetscape design element that affect not only the visual character of the Historic District but also the vitality of its businesses. Signage provides business identification,

More information

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General CEILING SYSTEMS Between us, ideas become reality WOODWORKS Installation Instructions Linear Solid Panels 1. General 1.1 Product Description WoodWorks Linear features a solid wood ceiling system in 1' x

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS WHAT S INSIDE INTRODUCTION 1 PART ONE LAYERS AND CLASSES FOR RENOVATION PROJECT 1 OVERVIEW 1 SETTING UP LAYERS AND CLASSES 1 CREATING OBJECT

More information

3 Basic Code Enforcement, Part 3

3 Basic Code Enforcement, Part 3 Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic

More information

Steel / Industrial Partition Guide

Steel / Industrial Partition Guide Steel / Industrial Partition Guide Please use this guide to assist you with assessing your partitions and industrial wall requirements. Shown on the following pages are: Partition Modules (Page 2) These

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

Miami University. Physical Facilities Department. CAD Standards. April 2004

Miami University. Physical Facilities Department. CAD Standards. April 2004 Miami University Physical Facilities Department CAD Standards April 2004 1.0.0 OVERVIEW These standards pertain to the use, production and submittal of electronic CAD files at Miami University. They have

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural

Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural and related construction. This course includes instruction

More information

2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition?

2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition? 2018 Design Competition Frequently Asked Questions Q: Are teams allowed to register in more than one category of the competition? Q: How many students can participate in a team? A: There is no max for

More information

ReImagining Works Request for Proposal for Artwork: Northwest

ReImagining Works Request for Proposal for Artwork: Northwest ReImagining Works Request for Proposal for Artwork: Northwest Open To: Regional Artists (living within a 250-mile radius of Dayton, OH, or with ties to the Dayton Metro area) Commission Amount: $45,000

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and