To Contractor: Cris Goldy GH Phipps Construction Companies 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, CO , Ext 1255

Size: px
Start display at page:

Download "To Contractor: Cris Goldy GH Phipps Construction Companies 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, CO , Ext 1255"

Transcription

1 Seventeenth Street Denver Colorado 00 0 Fax 0 0 amd@amdarchitects.com Anderson ndersonmason asondale ale Architects WORK CHANGE PROPOSAL REQUEST # 00 Date: June 0 Project #: 0.00 Project: DU RSECS + Knoebel Owner: Linda Lautenbach 0 E. Wesley Ave. Denver, CO 00 To Contractor: Cris Goldy GH Phipps Construction Companies Greenwood Plaza Blvd, Suite 0 Greenwood Village, CO 0 0--, Ext Distribution: Linda Lautenbach/DU Work Change Proposal Requests are NOT instructions to either stop work in progress or to execute the proposed change. Within days after receipt of Proposal Request, please submit a proposal for cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. Miscellaneous clarifications are incorporated in the Drawings and Specifications. Removed text in the Specifications is generally shown with a strike-through and added text is generally shown bolded and underlined, specifications sections affected are re-issued in full. Revised drawings/details are clouded and issued on full size sheets. Description: Revise MEP Drawings per City Comment. See attached material from SBEC. Attachments: SBEC letter dated // M. BASEMENT LEVEL PLAN M. SCHEDULES M.0 FIFTH LEVEL PLAN AREA B Issued by: EH Anderson Mason Dale P.C. (AMD) N:\-0_DU_ENGINEERING\0-CONSTRUCTION\PROPOSAL REQUESTS\PR 00 MEP REVISIONS PER CITY COMMENT.DOC

2 PROPOSAL REQUEST NO. 00 PROJECT: The Daniel Felix Ritchie School of Engineering & Computer Science + The Knoebel Center for The Study of Aging Bid Documents Dated: 0 March, 0 SBEC Project #000 DATE: June, 0 This Proposal Request becomes part of the Contract Documents and shall be acknowledged by the GC and MC. All parts of the original specifications and drawings shall remain in force except as noted below:. Mechanical Drawings: A. Drawings M., M. and M.0. Replace sheets listed with revised sheets issued for PR-00 and dated June, 0. B. This PR adds the high temperature fire dampers on the vivarium medium pressure exhaust (top and bottom) per the City of Denver comments. It also adds control points to monitor the status of each added damper.. Specifications: A. None with this PR, high temperature fire dampers were specified as part of the original bid documents. ATTACHMENTS:. Mechanical Drawings: M., M., M.0. Plumbing Drawings: None. Electrical Drawings: None. Specifications: None END OF PROPOSAL REQUEST NO. 00 P:\0\ DU - School of Engineering and Computer Science\Change Orders\PR00 - Bldg Dept Comments\PR000 MEP Narrative.doc Proposal Request No. 00 Page

3 0. A GENERAL HVAC NOTES. (REFER TO SHEET M-00) KEY NOTES The Daniel Felix Ritchie School of Engineering and Computer Science + The Knoebel Center for The Study of Aging L- / B Ø STAINLESS STEEL DUCT TO CLASS II, TYPE B BSC. PROVIDE TRANSITION AS REQUIRED TO MAKE FINAL CONNECTIONS PER MANUFACTURER S RECOMMENDATIONS. REFER TO LAB FURNISHING PLANS FOR BSC CONNECTION. Ø STAINLESS STEEL DUCT TO CAGE & BOTTLE WASHER EXHAUST CONNECTION. PROVIDE TRANSITION AS REQUIRED TO MAKE FINAL CONNECTIONS PER MANUFACTURER S RECOMMENDATIONS. REFER TO LAB FURNISHING PLANS FOR CAGE & BOTTLE WASHER CONNECTION. Ø STAINLESS STEEL DUCT TO CFH. PROVIDE TRANSITION AS REQUIRED TO MAKE FINAL CONNECTIONS PER MANUFACTURER S RECOMMENDATIONS. REFER TO LAB FURNISHING PLANS FOR CFH CONNECTION. / OA INTAKE DUCT TO CONNECT TO INSULATED OA PLENUM. LAB SPLY AIR FROM AHU- & AHU- IN SHAFT. PROVIDE HORIZONTAL COMBINATION FIRE/SMOKE DAMPER AT BOTTOM OF SHAFT PENETRATION. Mark Rodgers, AIA University Architect Office of the University Architect 00 South Race Street Denver, Colorado 00 (0) - FSD-00 / RA 0A UH-00 AHU- / RA / UH-00 L-A / L-B / C SPLY AIR FROM AHU- IN SHAFT. PROVIDE HORIZONTAL COMBINATION FIRE/SMOKE DAMPER AT BOTTOM OF SHAFT PENETRATION. RETURN AIR TO AHU- IN SHAFT. PROVIDE HORIZONTAL COMBINATION FIRE/SMOKE DAMPER AT BOTTOM OF SHAFT PENETRATION. CONNECT OA DUCT TO INSULATED OA PLENUM FOR AHU-, AHU-, AHU-, & AHU-. PROVIDE INSULATED OA PLENUM. CONCRETE HOUSE KEEPING PAD FOR. / OA INTAKE FOR SF- IN CHILLER. PROVIDE A HORIZONTAL FIRE DAMPER AT FLOOR PENETRATION. / RA () / SA (). Architect AndersonMasonDale Architects, P.C. Speer Boulevard Denver, Colorado 0 (0) - Structural Martin/Martin Consulting Engineers West Colfax Avenue Lakewood, Colorado 0-0 (0) /0 EXHAUST DUCT IN SHAFT TO EF-A & B ON ROOF. Mechanical / Electrical //0 :0: AM 0/ 0/ SA FSD-00 NOTE: SHELL AREA, ALTERNATE. SEE SPECIFICATION SECTION 0 00 FOR ADDITIONAL INFORMATION. /SA RAT HOLDING 0H CLEAN CAGE 0F CAGEWASH 0D FER- CFM ANIMAL FACILITY 0 BEDDING 0B CORE INSTRUMENTATION LAB SERVICE A "ø (TYP. ) AV-00 LFCD- 0 CFM FER- CFM 0 EV-00A FER- 0 CFM CD- 0 CFM "ø EV-00A CD- 00 CFM (TYP. ) "ø FER- 0 CFM (TYP. ) EV-00 CD- 0 CFM AV-0 CD- CFM (TYP. ) ER- 0 CFM (TYP. ) "ø CD- 0 CFM (TYP. ) AHU- / 0 (TYP. ) EV-00 CD- CFM (TYP. ) AV-00 SA- HOLDING 0J "ø "ø "ø AV-00 EV-00 AV-00 "ø AV-0 ER- CFM (TYP. ) AV-00 AV-00 ER- CFM (TYP. ) CD- 0 CFM (TYP. ) EV-00 EV-00 CD- 0 CFM AV-00 STAIR ST-B FSD-00 / SA / / AV-0 "ø "ø / EV-00 AV-00 EV-00 "ø 0A LFCD- CFM (TYP. ) EV-0 CD- CFM (TYP. ) EV-0 EV-0 0/0 0 F0 F F0 F0 FER- 00 CFM (TYP. ) S HOLDING 0G / "ø EV-0A ER- 0/ 0/ PR-00 "ø "ø 0/ "ø 0 LFCD- 0 CFM "ø CUH / LFCD- CFM FER- CFM (TYP. ) AV-00 PROCEDURE 0E CD- 0 CFM EV-00 AV-0 LFCD- CFM (TYP. ) R- 0/ 00 CFM FER- 00 CFM FER- 0 CFM 0/ SWR- / 00 CFM QUARANTINE 0C TELECOM "ø GOWN/ENTRY 0A CFM (TYP. ) ELECTRICAL 0 XRD/SEM SUITE FSD-00 ELEVATOR 0E ELEVATOR CLOSET A AHU- AHU- SWR- / 0 CFM (TYP. ) FCU-00 /0 SWR- 0/ 00 CFM FCU-00 / / R- / 00 CFM "ø AV-0 UH-00 FIRE PUMP FCU-00 0 RCD- 00 CFM 0/ R- / 00 CFM R- 0/ 00 CFM / / /0 ELECTRICAL / UH-00 FSD-00 SWR- / 00 CFM SWR- / 0 CFM CUH-00 0/ SWR- 0/ 00 CFM FCU-00 FCU-00 / L-C / L-D / L-E / L-F / L-G / L-H / L-J / L-K / STAIR ST-B D E F G H J K L M N O P Q 0 PR-00 PROVIDE -0 DUCT ATTENUATOR IN STRAIGHT SECTION OF AHU- SPLY AIR DUCT. DUCT ATTENUATOR SHALL BE A RECTANGULAR, FILM LINED, EXTENDED CASING SILENCER. COORDINATE LAYOUT OF AHU- TO AVOID INTERFERENCE WITH COLUMNS AND S. PROVIDE FLEXIBLE DUCT CONNECTION. PROVIDE '-0"X'-0" ACCESS DOOR FOR ACCESS TO INSULATED OA PLENUM. ACCESS DOOR SHALL BE TIGHT SEALING AND RATED FOR INSTALLATION IN HVAC SYSTEMS. "Ø GALVANIZED STEEL EXHAUST TO TRANSITION TO / IN EXPOSED ENCLOSURE. PROVIDE ADDITIONAL TRANSITION TO VACUUM PUMP CABINET CONNECTION. BALANCE TO 0 CFM. REFER TO LAB FOR CONNECTION. BASEMENT LEVEL PLAN PROVIDE INTERNAL SHEET METAL SEPARATION (MIN. GAUGE). "Ø GALVANIZED STEEL EXHAUST DUCT. TO CAGE RACK. BALANCE TO 0 CFM. REFER TO DETAIL FOR CEILING CONNECTIONS. PROVIDE TRANSITION REQUIRED TO MAKE FINAL CONNECTIONS PER MANUFACTURER'S RECOMMENDATIONS. REFER TO LAB FURNISHING PLANS FOR CAGE RACK CONNECTION. "Ø GALVANIZED STEEL DUCT TO CONNECT TO SNORKEL EXHAUST. BALANCE TO 0 CFM. MAKE FINAL CONNECTIONS PER MANUFACTURER'S RECOMMENDATIONS. REFER TO LAB FURNISHING PLANS FOR SNORKEL CONNECTION. PROVIDE TRANSITION AS REQUIRED. "Ø GALVANIZED STEEL EXHAUST DUCT. TO (F) CAGE RACK. INITIALLY BALANCE TO MATCH ALL ACTIVE CAGE RACKS. (F) BALANCING WILL BE DONE THROUGH BAS AT AIR VALVE. REFER TO DETAIL FOR (F) CEILING CONNECTIONS. PROVIDE MOTORIZED BUBBLE TIGHT DAMPER ZERO LEAKAGE AT " W.C. (GREENHECK: HBTR-) PROVIDE LOCAL LOW VOLTAGE WALL SWITCH WITH LOCAL INDICATING LIGHT ON SWITCH TO ILLUMINATE ON FULL CLOSED. COORDINATE ALL REQUIREMENTS WITH TCC. 0/ SA DUCT SHALL TRANSITION INTO / SA DUCT MAIN WITH RADIUS TRANSITION FROM 0/ RADIUS ELBOW. MAINTAIN CROSS SECTIONAL INSIDE DUCT DIMENSION THROUGHOUT TRANSITION. REFER TO DETAILS. PROVIDE AIR VALVE AND ALL ASSOCIATED BRANCH DUCTWORK, AIR DEVICES, ETC. AS SHOWN AS PART OF BASE BID. REFER TO ALTERNATE SPECIFICATION 000 FOR ADDITIONAL INFORMATION. PROVIDE FIRE DAMPER WITH HIGH TEMPERATURE FUSIBLE LINK AND OPEN/CLOSE INDICATOR SWITCH. REFER TO SPECIFICATIONS. ' ' ' ' /" = '-0" NORTH 00 S. Wadsworth Blvd. Suite 00 Lakewood, Colorado Voice 0-- Facsimile sbec sbengr.com SBEC #: 000 Shaffer Baucom Engineering & Consulting 00 S. Wadsworth Blvd, Suite 00 Lakewood, Colorado 0 (0) Laboratory Research Facilities Design Fifth Avenue, Suite 00 San Diego, California - () -0 Landscape Architect Design Inc. P.O. Box Bailey, Colorado 0- (0) - Civil Anderson & Hastings Consultants, Inc. W Bayaud Ave Lakewood, Colorado 0 (0) - Code Advanced Consulting Engineers, Inc. 00 S. Wadsworth, Unit Lakewood, Colorado 0 (0) -0 Acoustics D. L. Adams & Associates, Inc. Ogden Street Denver, Colorado 0 (0) Technology Rimrock A BCER Group 0 New Allegiance Drive, Suite 00 Colorado Springs, Colorado 0 () AV K Audio, LLC 00 Pearl East Circle Suite #0E Boulder, Colorado 00 (0) Fire Protection Farnsworth Group, Inc. 0 East Tufts Avenue, Suite 0 Denver, Colorado 0 (0) - Issue ISSUE FOR BID ADDENDUM 0 ADDENDUM 0 RESPONSES TO CITY OF DENVER COMMENTS PR-00 PR-00 Project Number: Drawn By: Reviewed By: Approved By: M. Date 0 MARCH 0 0 APRIL 0 APRIL 0 APRIL 0 MAY 0 0 JUNE 0 BASEMENT LEVEL PLAN -0 TDB/PKP SNH GS

4

5 0 "ø EA M.0 CUH-0 CD- CFM (TYP. ) CD- CFM (TYP. ) / / / "ø / 0/0 "ø WET RESEARCH ER- 0 CFM (TYP. ) AV- ER- 0 CFM (TYP. ) AV-A EV- "ø "ø "ø "ø ER- CFM (TYP. ) ER- CFM (TYP. ) M.0 0/ /0 "ø / "ø EV-0 AV- "ø 0 AV- CD- 0 CFM AV- CD- CFM FLEX SPORT 0A EV- ER- CFM "ø CD- CFM (TYP. ) "ø "ø "ø CD- 0 CFM FLEX SPORT 0A FLEX SPORT A ER- CFM FLEX SPORT A ER- CFM AV- ER- CFM "ø "ø ER- CFM "ø "ø ER- CFM "ø CD- 0 CFM "ø CD- CFM (TYP. ) "ø "ø "ø "ø CD- CFM (TYP. ) "ø EV- "ø "ø ER- CFM ER- CFM ER- CFM "ø "ø EV- EV- EV- "ø / EA EV- EV- AV- EV- AV-0 EV-0 AV- EV- / EA / EA "ø SA / "ø SA "ø SA / / / "ø SA / WET RESEARCH 0 / /0 EV-0A AV-0A ER- 0 CFM EV-0B AV-0B EV-0C /0 ER- 0 CFM (TYP. ) AV-0C / / 0/ CD- CFM (TYP. ) CD- CFM (TYP. ) ER- 0 CFM (TYP. ) M.0 M.0 M.0 H J K L M N PR-00 GENERAL HVAC NOTES. (REFER TO SHEET M-00) KEY NOTES Ø STAINLESS STEEL DUCT TO CFH. PROVIDE TRANSITION AS REQUIRED TO MAKE FINAL CONNECTIONS PER MANUFACTURER S RECOMMENDATIONS. REFER TO LAB FOR CFH CONNECTION. PROVIDE REMOTE CABLE OPERATED DAMPER, REFER TO DETAIL. / WELDED STEEL GREASE EXHAUST WITH HR FIRE WRAP / IN SHAFT TO EF- ON ROOF. REFER TO M. FOR CONTIN. / GALVANIZED CHILLER EMERGENCY EXHAUST IN SHAFT. 0/0 EXHAUST DUCT IN SHAFT. 0/0 EXHAUST DUCT TO EF-A & B ON ROOF. REFER TO SHT. M. FOR CONTIN. / GALVANIZED CHILLER EMERGENCY EXHAUST TO EF- ON ROOF. PROVIDE FIRE DAMPER WITH HIGH TEMPERATURE FUSIBLE LINK AND OPEN/CLOSE INDICATOR SWITCH. REFER TO SPECIFICATIONS. The Daniel Felix Ritchie School of Engineering and Computer Science + The Knoebel Center for The Study of Aging Mark Rodgers, AIA University Architect Office of the University Architect 00 South Race Street Denver, Colorado 00 (0) - Architect AndersonMasonDale Architects, P.C. Speer Boulevard Denver, Colorado 0 (0) - Structural Martin/Martin Consulting Engineers West Colfax Avenue Lakewood, Colorado 0-0 (0) -0 Mechanical / Electrical Shaffer Baucom Engineering & Consulting 00 S. Wadsworth Blvd, Suite 00 Lakewood, Colorado 0 (0) Laboratory Research Facilities Design Fifth Avenue, Suite 00 San Diego, California - () -0 Landscape Architect Design Inc. P.O. Box Bailey, Colorado 0- (0) - Civil Anderson & Hastings Consultants, Inc. W Bayaud Ave Lakewood, Colorado 0 (0) - Code Advanced Consulting Engineers, Inc. 00 S. Wadsworth, Unit Lakewood, Colorado 0 (0) -0 Acoustics D. L. Adams & Associates, Inc. Ogden Street Denver, Colorado 0 (0) Technology Rimrock A BCER Group 0 New Allegiance Drive, Suite 00 Colorado Springs, Colorado 0 () AV- EV- EV- EV-A FLEX SPORT "ø CD- 0 CFM (TYP. ) "ø ER- CFM ER- CFM (TYP. ) "ø "ø EV- AV- / / "ø "ø SA /0 AV- 0/ CD- CFM (TYP. ) O AV K Audio, LLC 00 Pearl East Circle Suite #0E Boulder, Colorado 00 (0) Fire Protection Farnsworth Group, Inc. 0 East Tufts Avenue, Suite 0 Denver, Colorado 0 (0) - Issue Date "ø 0/ 0/ EV- ER- 0 CFM (TYP. ) ISSUE FOR BID ADDENDUM 0 ADDENDUM 0 PR-00 0 MARCH 0 0 APRIL 0 APRIL 0 JUNE 0 ER- 0 CFM "ø CD- 0 CFM FLEX SPORT A ER- 0 CFM CD- 0 CFM "ø AV- 0/0 PR-00 0/0 "ø AV- ER- CFM (TYP. ) ELEVATOR E AV-0 CD- CFM (TYP. ) "ø EA EV-0 "ø SA / SA / EA AUTOCLAVE A CD- CFM (TYP. ) ER- CFM M.0 M.0 P Project Number: -0 0/0 CD- 00 CFM CD- 0 CFM (TYP. ) Drawn By: Reviewed By: Approved By: TDB/PKP SNH GS Q //0 :: AM LEVEL FIVE PLAN - AREA B ' ' ' ' /" = '-0" M.0 NORTH 00 S. Wadsworth Blvd. Suite 00 Lakewood, Colorado Voice 0-- Facsimile sbec sbengr.com SBEC #: 000 FIFTH LEVEL PLAN - AREA B M.0

R3-22 October DU RSECS + KC 2155 East Wesley Avenue Denver, CO 80208

R3-22 October DU RSECS + KC 2155 East Wesley Avenue Denver, CO 80208 3198 Speer Boulevard Denver Colorado 80211 303 294 9448 Fax 303 294 0762 www.amdarchitects.com WORK CHANGE PROPOSAL REQUES #016R1 R4 R3 2 Date: 13 10 October 2014 R3-22 October 2014 Project #: 12069.00

More information

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST Two copies of this worksheet/checklist must accompany plans sets submitted with commercial kitchen application. The applicant is responsible for assuring the

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

M1.0 MECHNANICAL FLOOR PLAN

M1.0 MECHNANICAL FLOOR PLAN GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder. ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

ADDENDUM NO. 3, March 14, 2017 A.B.C. No ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

Technical Development Program

Technical Development Program Technical Development Program COMMERCIAL DISTRIBUTION SYSTEMS PRESENTED BY: Ray Chow Duct Design Level 1 Fundamentals Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Introduction

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 15800! AIR DISTRIBUTION PART 1! GENERAL 1.01 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

SECTION LOW PRESSURE DUCTWORK

SECTION LOW PRESSURE DUCTWORK SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

*************************************************************************************************************

************************************************************************************************************* 15890 DUCTWORK ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 33 13 *************************************************************************************************************

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

Model ABV Pressure Independent Automatic Balancing Valve. Application: Standard Construction: Performance: Configurations Available:

Model ABV Pressure Independent Automatic Balancing Valve. Application: Standard Construction: Performance: Configurations Available: Application: Tag: Project: Location: Date: Engineer: Contractor: Architect: Submitted by: The ABV Automatic maintains a constant airflow volume in HVAC applications. The highly engineered damper blade

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

State College of Florida, Manatee-Sarasota

State College of Florida, Manatee-Sarasota State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

UTSA Facilities Condition Assessment. Out Brief August XX, 2009

UTSA Facilities Condition Assessment. Out Brief August XX, 2009 UTSA Facilities Condition Assessment Out Brief August XX, 2009 Agenda Opening Remarks FCA Results Summary by Category Example Deficiencies FCA Results Summary by Building Proposed Project List Potential

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

B. Samples: For color, letter style, and graphic representation required for each identification material and device. PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

Non-Residential and Multi-Family Plan Check Submittal Requirements

Non-Residential and Multi-Family Plan Check Submittal Requirements Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

(Larry D. Svitak, PE) License No

(Larry D. Svitak, PE) License No ADDENDUM NO. engineering design initiative north 5 th Street minneapolis, mn 55 Phone: () 33-55 AX: () 33-58 or Project: Nobles County Government Center AHU- Replacement EDI Project No.: 7-075 Owner: Nobles

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK AREVIATIONS AFF AOVE FINISHED FLOOR AHJ AUTHORITIES HAVING JURISDICTION APPROX APPROXIMATE LDG UILDING CLG CEILING CONST CONSTRUCTION CD CEILING DIFFUSER CO CARON DIOXIDE CXA COMMISSIONING AGENT DEG DEGREES

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing. SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS

More information

Element Z General Design Requirements Standards and Other Requirements

Element Z General Design Requirements Standards and Other Requirements P AR T 1 - GENERAL 1.01 OVERVIEW A. The Table identified in Part 2 of this document summarizes A/E deliverables and minimum level of information to be depicted on construction documents at 100 percent

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1051 - REVISED: 2009 Individual and Branch Type Air Admittance Valves MANUFACTURER: CONTACT PERSON: E-MAIL: ADDRESS:

More information

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

Company. Signed: Date:

Company. Signed: Date: ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET

More information

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall

More information

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017. Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents

More information

Specifications: Other: sign in sheet

Specifications: Other: sign in sheet To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision Electric Service Guide Residential Subdivision January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

1.1 The Bid Date has changed to October 4, The time and place will remain the same.

1.1 The Bid Date has changed to October 4, The time and place will remain the same. Addendum Number Four To The Drawings and Specifications for Pleasant Valley Elementary School Wichita, Kansas Issued: Wednesday Wichita Unified School District # 259 Project No. 12-25077 HANNEY & ASSOCIATES

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

FIT-OUT PERMIT REQUEST (GENERAL WORKS) Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

DGS Phase 1 COORDINATION DRAWINGS

DGS Phase 1 COORDINATION DRAWINGS SECTION 010500 - COORDINATION DRAWINGS PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings

More information

CONTRACTOR(S) SHALL VERIFY EXISTING CONDITIONS AND CORRELATE DIMENSIONS PRIOR TO PROVIDING THE WORK DETAILED IN THESE DRAWINGS, AND SHALL PROMPTLY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. COPYRIGHT SBLM,

More information