SECTION LOW PRESSURE DUCTWORK
|
|
- Annabel Kennedy
- 5 years ago
- Views:
Transcription
1 SECTION LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: Firestopping and Fire and Smoke Barrier Caulking Vibration Isolation Thermal Insulation (HVAC) Air Handling Units Duct Accessories Outlets (HVAC) Tests (HVAC) REFERENCES A. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA), latest edition: 1. HVAC Duct Construction Standards (Metal and Flexible). 2. High Velocity Duct Construction Standards. B. National Fire Protection Association (NFPA): C. National Electrical Code (NEC) D. American Society of Heating, Refrigerating, and Air-conditioning Engineers, Inc. (ASHRAE) 62 - Ventilation for Acceptable Indoor Air Quality SUBMITTALS A. Ductwork: Provide 1/4" scale composite Shop Drawings. Shop Drawings shall be coordinated with other trades before submitting Catalog Cuts: Low pressure ductwork, duct sealer, and turning vanes Catalog Cuts, Ratings, and Performance Data: Flexible ductwork. B. Casings, Plenums, and Housings: Details of construction. C. Provide details of proposed typical ductwork fittings including: 1. Seams and joints. 2. Joint sealing. 3. Elbows, vaned and radius. Project No. SPECIFICATION GUIDELINES
2 4. Transitions and Offsets. 5. Taps and outlet frames. 6. Branch connections and tees. D. Duct Hanger System: Catalog cuts and shop drawing. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Flexible: Genflex or Flexible Technologies. B. Ductwork and Fittings: 1. Metalaire. 2. Semco. 3. Spiramatic. 4. United Sheet Metal. C. Ductwork Adhesive Sealing Compound: 1. Interior: a. Benjamin Foster # b. 3M Hardcast. 2. Exterior: 2.02 MATERIALS a. Flexomastic No.210 with fiberglass membrane for weatherproofing as manufactured by Weatherproofing Products, Inc. or accepted equivalent. A. Ductwork shall be fabricated and installed according to the SMACNA Standards, except as shown on drawings or specified. B. Ductwork shall have manufacturer's gage stamp intact LOW PRESSURE DUCTWORK A. Includes ductwork from low pressure air handlers, exhaust, and outside and return air ductwork. Velocities shall not exceed 1600 fpm for rectangular and 2,000 fpm for round ductwork. Static pressures not to exceed 2 inches WG. B. Provide galvanized steel ductwork, designed, constructed, installed and tested according SMACNA - "HVAC Duct Construction Standards" and as shown on drawings. Ductwork to have manufacturer's gage stamp. Provide cross-breaking or beading to prevent flexing, but do not reduce gage of metal below that required for flat ductwork sheets. Minimum gauge for all ductwork shall be 24 gauge. 1. Ductwork gages shall comply with the following: Project No. SPECIFICATION GUIDELINES
3 Greatest Dimension US Gage 0" to 12" 24 13" to 30" 24 31" to 60" 22 61" to 90" 20 over 90" Ductwork dimensions shown on the drawings are clear inside dimensions. C. Splitters and Dampers: 1. Provide as shown and as necessary for proper regulation of air distribution system. 2. Locate dampers to be easily adjustable after work is completed. Provide a set screw locking device for each splitter or damper. On insulated ducts, place locking device on a bracket so set screw is on surface of insulation and is easily operable. Provide Armaflex plug. Use Ventlock or Young Regulator. 3. Sheet Metal Gage: Construct splitters and dampers of galvanized steel 1 gauge heavier than duct where installed. D. The following ductwork and plenums shall be insulated, unless noted otherwise. 1. Outside air ductwork at air handler=s closet. E. Flexible Insulated Ductwork: 1. Lightweight duct, core of corrosion resistant reinforcing wire helix permanently bonded within fabric, insulated with 1-1/2" thick, 3/4 lb. density fiberglass flexible insulation and covered with a vapor barrier of aluminum metalized polyester film laminated to glass mesh, elastomer back coated. Duct shall meet NFPA 90A requirements and be listed as Class 1 Air Duct Material, UL 181. Minimum R=6 insulating value. 2. Flexible Collar Connections: Make connections to and from units with collars not less than 4 inches long, secured by peripheral strap iron, using 30 ounce neoprene coated glass fabric by Ventglas or accepted equivalent. Collar connections from rectangular ductwork to flexible ductwork shall be "Low Loss". 3. Manufacturers: a. Atco Rubber Products. b. Genflex. c. Thermaflex II. d. Venture Type VTKC. e. Wiremold Co. F. Turning vanes shall be provided in square elbows and shall be of same material as the ductwork. Turning vanes shall be of airfoil type, double thickness factory fabricated. Project No. SPECIFICATION GUIDELINES
4 G. Install ductwork materials and accessories according to the latest edition of SMACNA Low Velocity Duct Construction Standards as specified. These written specifications shall take precedence in case of conflict. H. Thoroughly clean ductwork before attempting test and balance. I. Where interferences arise during construction, make transition or division of ductwork on a basis of pressure drop equivalent to the original size. Obtain acceptance from A/E before fabrication. J. Seams And Joints at Exhaust, Supply, Return and Outside Air Distribution Systems: All joints shall be sealed whether longitudinal or transverse Make airtight as possible. Seal joints with 4 inch wide cloth tape with adhesive sealing compound, except ductwork exposed to weather shall have joints sealed with specified joint sealant. K. Apply Flexomastic weatherproofing with smooth finish to joints of ductwork exposed to weather as recommended by joint sealant manufacturer, with at least 2 final coats of No.210. L. Sound Levels: Discharge sound levels for occupied areas shall not exceed a rating of RC 35 as defined in ASHRAE. PART 3 EXECUTION 3.01 GENERAL A. Install ductwork as shown on drawings. B. Before systems are tested and balanced, ducts shall be thoroughly cleaned and blown out. C. Where interferences arise during construction, make transition or division of ductwork on basis of pressure drop equivalent to original size. Obtain approval from A/E before fabrication INSTALLATION A. Install ductwork materials and accessories according to the latest edition of SMACNA Low Velocity Duct Construction Standards as specified. In case of conflict with these specifications, the most restrictive shall govern. B. Seams and joints in all ductwork shall be made airtight. Seal duct joints with sealer as specified for field sealing of high pressure ductwork. Make exhaust ducts passing through return air chases airtight. C. Install flexible ductwork shall be installed in sizes to match diffuser necks as indicated on drawings schedules. Duct length shall be not less than 5 feet and no longer than 8 feet. Duct shall be adequately Project No. SPECIFICATION GUIDELINES
5 supported to prevent kinks and sharp bends. Install according to manufacturer's recommendations and as shown on drawings DUCTWORK SUPPORTS AND HANGERS A. Provide support and hangers according to SMACNA HVAC Duct Construction Standards. 1. Hangers: Hang horizontal ducts at intervals not exceeding 8 feet, with hangers of 16 gage by 1 inch wide galvanized band iron on ducts up to and ncluding 30 inches wide and 12 gage by 1-1/2" wide galvanized band iron on ducts over 30 inches wide. Extend hangers down and fasten underneath duct in addition to both sides of duct. B. Hanger straps shall be hung from inserts or clip angles secured to structure with expansion bolts in shear or tension as follows: 1. Roof Slab: In tension. 2. Structural Beams: In shear, 12 inches minimum from bottom of beam. 3. Joists: Use existing forming bolts openings only. Hangers shall be bent under ductwork at least 2 inches. Hangers for ducts over 48 inches wide shall be secured to bottom and sides of duct DUCT PENETRATIONS TO FLOOR AND FIRE WALLS A. Joints around duct penetrations shall be packed with fire safing insulation and sealed with fire and smoke barrier caulk as specified in Section 07270, Firestopping and Fire and Smoke Barrier Caulking. END OF SECTION Project No. SPECIFICATION GUIDELINES
*************************************************************************************************************
15890 DUCTWORK ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 33 13 *************************************************************************************************************
More informationLOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.
SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS
More informationPRESTON HEALTH SERVICES ARCHITECT S NO. 2700
SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.
More informationA. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More informationThe General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.
SECTION 15800! AIR DISTRIBUTION PART 1! GENERAL 1.01 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this
More informationDuctwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.
SECTION 15910 DUCT ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15890 - Ductwork. 2. 15900 - Controls and Instrumentation. 3. 15940 - Outlets (HVAC). 4. 15970 - HVAC Control System.
More informationThe General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.
SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in
More informationSECTION AIR DISTRIBUTION SYSTEM
SECTION 23 30 00 AIR DISTRIBUTION SYSTEM PART 1 - GENERAL 1.1 Scope of Work: The work covered by this section consists of providing all labor, equipment and materials and performing all operations necessary
More informationSECTION HVAC DUCTS PART I - GENERAL 1.1 RELATED DOCUMENTS
SECTION 23 31 00 - HVAC DUCTS PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION COMMON WORK RESULTS FOR HVAC
SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section
More informationRound Duct and Fittings. Standards and Dimensional Data for Air Duct and Fittings
Round Duct and Fittings Standards and Dimensional Data for Air Duct and Fittings www.airsidesheetmetal.com 973-786-6967(office) 973-786-6474(fax) Fabricated by Airside Sheet Metal Fabricators, Inc. - 2017
More informationAPPENDIX A, UMC STANDARD 6-5 STANDARD FOR INSTALLATION OF FACTORY-MADE AIR DUCTS
STANDARD FOR INSTALLATION OF FACTORY-MADE AIR DUCTS Sealing of fibrous glass duct board to the sheet metal sleeve must be made with glass fabric and mastic, except where operating pressure is less than
More informationSHEET METAL FLASHING AND TRIM Christ on the Mountain
SECTION 076200 - SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Compatibly with the bumping of flashings and trim as identified in the Membrane Roofing Section 075000.
More informationTechnical Development Program
Technical Development Program COMMERCIAL DISTRIBUTION SYSTEMS PRESENTED BY: Ray Chow Duct Design Level 1 Fundamentals Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Introduction
More informationSECTION WIREWAYS FOR RADIOLOGY EQUIPMENT
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION DUCTWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS:
SECTION 23 31 13 - DUCTWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationGE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -
at :: rangehoods. com GE Monogram Instructions Model ZV750 GE Monogram at:: rangehoods. com is a division of CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:
More informationSECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION SHEET METAL FLASHING AND TRIM
SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show
More informationSECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.
SECTION 23 05 53 IDENTIFICATION OF HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00 Common
More informationCHAPTER 6 DUCT SYSTEMS
CHAPTER 6 DUCT SYSTEMS 601.0 Scope General. 601.1 General Applicability. Ducts and plenums that are portions of a heating, cooling, absorption or evaporative cooling, or product-conveying system shall
More informationSheet Metal Worker Level 2
Level 2 Unit: B1 Welding 2 (GMAW and SMAW) Level: Two Duration: 25 hours Theory: Practical: 5 hours 20 hours Overview: Upon completion of this unit of instruction the apprentice will demonstrate knowledge
More informationUFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCESA / NASA UFGS-27 05 28.36 40 (August 2011) ----------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION CABLE TRAYS
SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationA. Product Data: For each electrical identification product indicated.
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.
SECTION 22 05 53 IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00
More information4. Metal roof jacks at penetrations and attachments
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 28.36 40 (May 2017) --------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (August 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationCSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct
More informationFLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS
DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification
More informationKS SERIES - VERTICAL INSTALLATION
CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV
More informationSt. Monica Food Pantry
St. Monica Food Pantry 23 3300-1 HVAC WORK DIVISION 23 SECTION 233300 HVAC AIR DUCT ACCESSORIES PART 1. GENERAL 1.1 WORK INCLUDES A. Gravity Operated Backdraft Dampers B. Volume dampers C. Motor operated
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More informationTYPE "B" GAS VENT. Do not connect gas vent to a solid or liquid fuelled appliance or any appliance requiring a chimney.
TYPE "B" GAS VENT SD (sizes 3", 4", 5", 6", 7") INSTALLATION INSTRUCTIONS Type "B" Gas Vents are strictly for interior or enclosed exterior use or exterior use above a roof line. Read vent and appliance
More informationPiping & Equipment Identification
Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationNever fill any required clearance space with insulation or any other building materials surrounding the chimney.
INSTALLATION AND MAINTENANCE INSTRUCTIONS 1700ºF Air-Cooled Temp/Guard Chimney Sizes 8-16 Listing No. MH8251 Tested to UL103/ULC-S604 A MAJOR CAUSE OF RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCE
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017
SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationDESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS
DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS GENERAL DESCRIPTION: The Designer Series Gutter System is a specially designed roof edge drainage product for industrial, commercial, and high end
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationSHEET METAL STUDENT GRADE RECORD Career & Technical Education
STUDENT GRADE RECORD Career & Technical Education Course Outline Modules Industry Module Test Industry Module Performance Module Competency Rating WINDHAM SCHOOL DISTRICT CORE 0. CTE Orientation 1. Basic
More informationCOMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST
COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST Two copies of this worksheet/checklist must accompany plans sets submitted with commercial kitchen application. The applicant is responsible for assuring the
More informationSECTION CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY
SECTION 26 05 36 CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY PART 1 -GENERAL 1.1 SUMMARY A. Section includes cable tray. 1.2 REFERENCES A. ASTM A 123 Standard Specification for Zinc (Hot-Dip Galvanized)
More informationInstallation Guidelines
Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.
More informationPyroscat Duct Wrap Single Layer Installation
Pyroscat Duct Wrap Single Layer Installation Product Data & Installation Guide 1. Product Description Pyroscat Duct Wrap is a flexible fire barrier system designed for grease ducts, ventilation air ducts,
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationRS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section
RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section Editing (date): Marie-Clémence DEGALLAIX (30/05/2016) Checking (date): Jean FOURCROY (02/06/2016)
More informationMetal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions
PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations
More informationSECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Nameplates. B. Tags. C. Stencils. D. Pipe Markers. 1.2 RELATED REQUIREMENTS A. Section 099123 - Interior
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More information.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.
PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationUL Construction No. 254
UL Construction No. Wind-Uplift - Class 90 (See Item No. ) / Fire Not Investigated Metal Roof Deck Panels* Snap-Clad No. MSG or No. MSG min. thickness coated steel panels. Panels in. wide max., 0 in. wide
More informationSheet Metal Worker A Guide to Course Content
Sheet Metal Worker A Guide to Course Content Sheet Metal Workers use metal of 10 gauge or lighter to make and repair products and buildings. Training Requirements: To graduate from each level of the apprenticeship
More informationM1.0 MECHNANICAL FLOOR PLAN
GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY
More information25 / 35 / 45. Rectangular Duct Connection System. Strong and Virtually Leak Free. Simple to install No additional sealing required
D U C T M A T E 25 / 35 / 45 Rectangular Duct Connection System Strong and Virtually Leak Free Simple to install No additional sealing required Available in specialty metals Consistent connections 25 /
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.
More informationPIPE/CONDUIT SUPPORTS
PIPE/CONDUIT SUPPORTS Pipe/Conduit Clamps...102-105 Unicushion... 106 Pipe & Tubing (Cush-A-Clamp ) Clamps...107-110 Pipe Hangers... 111 Pipe Rollers...111-112 Pipe Brackets... 113 Reference Tables...114-120
More informationSECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section
More information1. ASME A Scheme for the Identification of Piping Systems.
SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:
More informationSECTION MECHANICAL IDENTIFICATION
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:
More informationMECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA
MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed
More informationInstallation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio
Installation Guide Model #400 Corporate Office: 349 Highland Road East Macedonia, Ohio 44056 1.866.822.7328 www.ezbreathe.com Copyright 2006, EZ Breathe, LLC WHAT S INSIDE Before installing your EZ Breathe
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationHEARTH PRODUCTS KITS AND ACCESSORIES VERTICAL TERMINATION KITS FOR SECURE FLEX VERTICAL VENTING
HEARTH PRODUCTS KITS AND ACCESSORIES 750052M Rev. C 05/2014 VERTICAL TERMINATION KITS FOR SECURE FLEX VERTICAL VENTING INSTALLATION INSTRUCTIONS FOR SECURE FLEX VERTICAL TERMINATION KITS (CATALOG NO. 56L74
More informationINSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL
WOOD PIVOTING CIRCLE/ OVAL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to these instructions will VOID any
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationEngineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed
More informationSECTION WOOD AND PLASTIC DOORS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 081416 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT
SECTION 23 05 53 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Plastic Nameplates 2. Tags 3. Plastic Pipe Markers 4. Ceiling Tags 5. Detectable Underground Tape 6. Stencils PART 2 - PRODUCTS 2.1 MANUFACTURERS
More informationSECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Ceiling tacks. 6. Labels. 7. Lockout
More informationCSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated
DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing
More informationSECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSUPPLEMENTARY INSTALLATION INSTRUCTIONS Ventilating Fan (Contractor Pack)
SUPPLEMENTARY INSTALLATION INSTRUCTIONS Ventilating Fan (Contractor Pack) Model No. FV-08VSLA2 Contents Housing Can FV-08VSLA2 General Safety lnformation Unpacking Supplied Accessories Wiring Diagram lnstallation
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More information14000 I/O Series Flush Glaze. Fabrication and Installation Instructions
14000 I/O Series Flush Glaze Fabrication and Installation Instructions Last saved on 12/18/2009 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...4 ACCESSORIES...5 OVERVIEW...6
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationWindow Frame Installation Instructions For Nail-on and Block Frames
General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail
More informationTHERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)
THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) fig.3 Casement, Awning, Fixed Casement, Direct-Set, Double-Hung, Single-Hung & Horizontal Slider Windows Materials
More informationTable of Contents. Notes to Designer/User Map of Typical Roof Conditions Fastener Placement Fastener Selection...
Table of Contents Section Page Notes to Designer/User... 2-3 Map of Typical Roof Conditions... 4 Fastener Placement... 5 Fastener Selection... 6 Ridge/Hip Flashing... 7 Valley Flashing... 8 Eave Flashings...
More informationINS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...
INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach
More informationSection 914. JOINT AND WATERPROOFING MATERIALS
914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.
More informationAdopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) X X X X X X X X X X
Adopting Agency BSC SFM Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) Adopt only those sections that are listed below CALIFORNIA MECHANICAL CODE MATRIX ADOPTION TABLE
More informationSuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter
SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm
More informationDW HORIZONTAL INSTALLATION
AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S
More informationCFDTT-01. Control Joint Study (General)
Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area
More informationNARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions
NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe Markers. 1.02 SUBMITTALS A. Submit valve chart and schedule,
More informationICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)
ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 www.icc-rsf.com INSTALLATION AND OPERATION INSTRUCTIONS "Model VIP" CHIMNEY TYPE: FACTORY BUILT
More informationB. Sequencing: Schedule installation to keep sheathing exposure to UV within the manufacturer s recommended limits.
SECTION 06 16 43 GYPSUM SHEATHING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior GMF gypsum sheathing. 2. Joint treatment materials. 3. Panel and penetration joint and fastener treatment.
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationInstallation and Maintenance Manual IM 770-1
Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready
More informationPART MATERIALS. Section Fencing Materials. Description
PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More information