1 APPENDIX 6A MODULE 6 DESIGN DEVELOPMENT REVIEW COMMENTS District: Twn/City f XXX Schl: XXX Owner s Prject Manager: Name Designer Firm: Name Submittal Received Date: Mnth XX, Year Review Date: Mnth XX, Year (Date Sent t Cnsultant fr Review Date Ready fr MP Review) Reviewed by: First initial & last name (Cnsultant, MSBA Architectural Reviewer(s), MSBA CP PM, MSBA Sr PM and Peer Reviewers) MSBA REVIEW COMMENTS The fllwing cmments 1 n the Design Develpment submittal are issued pursuant t a review f the prject submittal dcument fr the [new cnstructin] [additin/renvatin] f the prpsed prject and presented as a Design Develpment submissin in accrdance with the MSBA Mdule 6 Guidelines. 6A.1 Summary Cmments Basic Prject Infrmatin: List enrllment PFA GSF prject type delivery methd Cmments here: Bullet pints here Additinal cmments here: Bullet pints here Repeat any items frm review that require special nte r respnse within sner time than standard cmments 1 The written cmments prvided by the MSBA are slely fr purpses f determining whether the submittal dcuments, analysis prcess, prpsed planning cncept and any ther design dcuments submitted fr MSBA review appear cnsistent with the MSBA s guidelines and requirements, and are nt fr the purpse f determining whether the prpsed design and its prcess may meet any legal requirements impsed by federal, state r lcal law, including, but nt limited t, zning rdinances and bylaws, envirnmental regulatins, building cdes, sanitary cdes, safety cdes and public prcurement laws r fr the purpse f determining whether the prpsed design and prcess meet any applicable prfessinal standard f care r any ther standard f care. Prject designers are bligated t implement detailed planning and technical review prcedures t effect crdinatin f design criteria, buildability, and technical adequacy f prject cncepts. Each city, twn and reginal schl district shall be slely respnsible fr ensuring that its prject develpment cncepts cmply with all applicable prvisins f federal, state, and lcal law. The MSBA recmmends that each city, twn and reginal schl district have its legal cunsel review its develpment prcess and subsequent bid dcuments t ensure that it is in cmpliance with all prvisins f federal, state and lcal law, prir t bidding. The MSBA shall nt be respnsible fr any legal fees r csts f any kind that may be incurred by a city, twn r reginal schl district in relatin t MSBA requirements r the preparatin and review f the prject s planning prcess r plans and specificatins. Massachusetts Schl Building Authrity Mdule 6 Detailed Design

2 6A.2 OPM Deliverables: Unless specifically stated therwise, the OPM deliverables are included in the submissin with n respnse frm MSBA required. 6A.2.1 Submittal Review & Crdinatin: Review designer submissins; make recmmendatins t Owner. Address each f the fllwing items individually, and describe hw each was evaluated Apprve submissin Apprve partially; reject remainder Reject the submissin Prvide additinal supprting infrmatin Crdinate design; include written recmmendatins t the Owner Technical accuracy, crdinatin & clarity Efficiency & cst effectiveness Operability Cnstructability Phasing Bid-ability Site access during cnstructin Crdinate the cmmissining cnsultant s review Include Cx review & District respnse Incrprate Cx recmmendatins Crdinate the District respnse t MSBA cmments f previus submittal Include MSBA review & District respnse Cmments addressed / cmment reslutin utstanding 6A.2.2 Prject Schedule: All schedules shuld be presented in calendar days. Update prject schedule: As a minimum, the schedule update shuld prvide the same level f detail as was included in Exhibit C f the Prject Funding Agreement, expanded and updated t include milestnes fr Design Develpment, Bidding, Cnstructin, and Clseut. The updated schedule shuld include prpsed critical path and cnstructin milestne infrmatin. In additin t the cnstructin milestnes, the schedule must als include the fllwing infrmatin as listed in MSBA Mdule 7, Schedule Activities: Punch list start and end dates Date f Prject Registratin with the US Green Building Cuncil ( USGBC ) r Cllabratin fr High Perfrmance Schls ( CHPS ) Prvisinal/Design package submittal date t USGBC r CHPS Submittal date f 50% DCAMM Ntificatin and 100% DCAMM Ntificatin General Cntractr/Cnstructin Manager request fr final payment Cmmissining Cnsultant inspectin (substantial cmpletin plus apprximately 10 mnths) Submittal date f Final Cmmissining Reprt t MSBA Massachusetts Schl Building Authrity Mdule 6 Detailed Design

3 Submittal date f Final Cnstructin package including but nt limited t Final Cmmissining Reprt t USGBC r CHPS Anticipated issuance date f final Green Schl Prgram Certificatin letter frm USGBC r CHPS Submittal date t MSBA f Cmmissining Certificate f Cmpletin Submittal date t MSBA f final reimbursement request Indicate submissin dates fr the fllwing apprvals. In additin, prvide dates fr any ther state r federal apprval nt listed belw (the fllwing list is nt a cmprehensive itemizatin f required state apprvals; ther requirements may apply, and sme f the items listed belw may nt be applicable t this prject). Indicate Nt Applicable where apprpriate: DESE - Special Educatin apprval by Department f Elementary and Secndary Educatin MHC Prject Ntificatin Frm and apprvals by MA Histrical Cmmissin OIG - Cnstructin Manager at Risk apprval by the Office f Inspectr General Executive Office f Energy and Envirnmental Affairs / EEA: MEPA - MA Envirnmental Plicy Act by Energy & Envirnmental Affairs: ENF - Envirnmental Ntificatin Frm EIR - Envirnmental Impact Reprt Article 97 Land Dispsitin Plicy apprval by Energy & Envirnmental Affairs MA DEP - Massachusetts Department f Envirnmental Prtectin MA DOT - Massachusetts Department f Transprtatin MA DPH - Massachusetts Department f Public Health EPA NPDES Natinal Pllutant Discharge Eliminatin System Ntice f Intent apprval by the US Envirnmental Prtectin Agency MAAB - Accessibility variances by MA Architectural Access Bard Indicate all required state reviews r permits n the milestne schedule including actual r planned dates f apprval which are required in rder t maintain the planned bidding and cnstructin schedule and milestnes indicated therein. Fr required state reviews r permits which have nt been btained n schedule, prvide a separate (subnetwrk) schedule depicting recvery actins t btain required apprvals in rder t maintain the bidding and cnstructin schedule. The schedule is t be updated and submitted t MSBA with each OPM mnthly reprt and as ften as is required t reflect any changes, including any changes t milestne dates, but must be submitted with each design submittal (DD, 60% CD, 90% CD). The schedule shall reflect any variances in the updated schedule relative t the baseline prject schedule included with the Prject Scpe and Budget Agreement. Massachusetts Schl Building Authrity Mdule 6 Detailed Design

4 Indicate the date fr submissin t MSBA f the Design Develpment, and prpsed dates fr submissin f the 60% and 90% Cnstructin Dcuments submittals. The schedule is t incrprate 21 calendar day required duratin fr MSBA review f each submissin, and a minimum f 14 calendar days fr prject team incrpratin f MSBA review cmments as well as all thers int the prject dcuments prir t the due date f the next submissin r finalizing prject dcuments fr bidding. 35 calendar days fr each submissin is the minimum acceptable duratin; if the prject team believes additinal time is required fr any r all f the submissins the duratins fr these activities are t be increased accrdingly. 6A.2.3 Scpe and Budget Develp prject scpe and budget: Recnciled cnstructin cst estimate including Designer/OPM cmparisn chart: Prepare independent cnstructin cst estimates pursuant t Sectin f the Cntract fr Prject Management Services, with escalatin t the mid-pint f cnstructin, fr cmparisn with the Designer s cst estimate, based upn design develpment prgress dcuments. CMR (if applicable) If Owner has nt yet cntracted with a Cnstructin Manager (CM), the OPM must develp a cnstructin cst estimate fr cmparisn with the Designer s cst estimate If the Owner has given the CM a Ntice t Prceed, the OPM must review cst estimates prvided by the Designer and CM and prvide a detailed line by line recnciliatin f the Designer s and CM s cnstructin cst estimates Updated prject budget in the ttal prject budget frmat, based n the recnciled cnstructin cst estimate. If the recnciled estimate is nt used fr the updated prject budget, prvide an explanatin. Value Engineering recmmendatins Fr any Value Engineering recmmendatins which have been accepted, prvide a cpy f the Cmmittee vte 6A.3 Designer Deliverable: Unless specifically stated therwise, the Designer deliverables are included in the submissin with n respnse frm MSBA required. 6A.3.1 General Requirements Submit updated wrk plan Basis f Design narrative descriptin fr all disciplines Building cde analysis Massachusetts Schl Building Authrity Mdule 6 Detailed Design

5 Prvide a list identifying all prpsed prprietary items (if any)with an affidavit which shall indicate an elected bdy f the district (schl cmmittee, city r twn cuncil, r selectmen, - but nt an ad-hc building cmmittee) has been presented with prpsals fr prprietary requirements apprval actin, has had an pprtunity t investigate, r t require staff r cnsultant investigatin upn each item s prpsed, and has majrity vted in an pen public sessin that is in the public interest t d s. Prvide MSBA with a certified cpy f the vte f the elected bdy. An interir clr thery statement describing prpsed paint and material selectins and clrs fr typical and special spaces, why they have been selected and hw these selectins relate t exterir materials and clrs. Cnfirm that clr and material selectins have been presented t and apprved by the District Cnfirmatin f prject registratin with CHPS r USGBC Structural narrative including methds f lateral bracing and hw requirements f earthquake cde will be met Structural calculatins and required flr lads Energy calculatins Life Cycle cst analysis fr energy and water cnsuming devices Heat gain and lss calculatins fr Heating, Ventilating and Air Cnditining systems Calculatins shwing ttal electrical lad Security and visual access requirements: Cnfirmatin that the persns respnsible fr implementatin f the District s emergency prcedures, and respnding emergency medical, fire prtectin, and plice agency representatives have been cnsulted in the planning prcess and any assciated requirements have been included in the prject Identificatin f any ther security related items particular t the District and/r the prpsed prject Verificatin that the fllwing safety and security related issues have been reviewed and are in accrdance with the District s prcedures as nted abve: Main entrance design describe District prtcl fr visitr entry and check-in related t the current design fr visitrs t remain in the vestibule versus a side sub-vestibule Classrm lckset hardware - cnfirm hardware functins are cmpatible with the District s prtcls related t lckdwn Classrm / Instructinal spaces visibility - cnfirm that the inclusin f sidelights at entrance lcatins is cmpatible with the District s current standards related t visibility frm crridrs and whether any related visin cntrl ptin measures are t be incrprated Alternative entry lcatins - cnfirm prject includes site and building signage, as may be required by District s emergency prcedures, t identify lcatins where first respnders may mre directly reach a persn needing medical attentin; Knx Massachusetts Schl Building Authrity Mdule 6 Detailed Design - 5 -

6 Bxes; and prvisins fr building plans t be delivered t lcal fire and respnse agencies Quality Cntrl dcuments demnstrating: Ceiling clearances Mechanical rm and shaft sizes Crdinate specificatins and drawings Filed sub-bid wrk Scheduling Equipment and pwer Existing and new cnstructin Phasing 6A.3.2 Space Summary Updated space summary and signed certificatin that reflects the current design MSBA REVIEWER WILL INSERT SPACE SUMMARY CHART HERE Cmparisn f the current design with the final educatinal prgram, and cnfirmatin that there are n variatins. If there are variatins, the written summary must address the fllwing: Explanatin f deviatins within the space summary frm the Prject Funding Agreement [MSBA accepts this variatin t the apprved prject with n further actin required]. [Prir t MSBA accepting this variatin t the prject, the design team must describe in detail the reasn fr the change]. The MSBA cnsiders that deviatins include changes in the size f a specific space, the ttal nsf f a prgram area (e.g. general classrms, vc tech, dining etc.), the lcatin f a space, the surrunding adjacencies f a space and r the intended purpse f the rm; The submittal must clearly call ut deviatins t lcatin and surrunding adjacencies thrugh the use f redlines r cluding The explanatin shuld clearly identify the basis f the change identifying bth architectural and/r prgrammatic reasns If the basis f the change is prgrammatic, the submittal shuld include a red-lined versin f the educatinal plan included in the Prject Funding Agreement Regarding DESE apprved SPED spaces; If the District wishes t submit a change t its DESE apprved submittal, it must a) cnfirm that all changes t SPED spaces are final; b) prvide a new submittal utilizing the frmat f the riginal submittal requirements and clearly nting any changes thrugh use f cluded flr plans and red-lined narratives Massachusetts Schl Building Authrity Mdule 6 Detailed Design - 6 -

7 and tables; and c) indicate hw the prject schedule can accmmdate a ptential resubmittal and apprval by DESE. Please prvide a separate package fr changes t DESE apprved SPED spaces If the District chses nt t change frm the DESE apprved submittal it shuld cnfirm that the spaces are the same r explain when and hw the spaces will be returned t the apprved size, cnfiguratin and lcatin Regarding DESE apprved Public Day Educatin spaces; If the District wishes t submit a change t its DESE apprved submittal, it must a) cnfirm that all changes t Public Day Educatin spaces are final; b) prvide a new submittal utilizing the frmat f the riginal submittal requirements and clearly nting any changes thrugh use f cluded flr plans and red-lined narratives and tables; and c) indicate hw the prject schedule can accmmdate a ptential resubmittal and apprval by DESE. Please prvide a separate package fr changes t Public Day Educatin Spaces. If the District chses nt t change frm the DESE apprved submittal it shuld cnfirm that the spaces are the same r explain when and hw the spaces will be returned t the apprved size, cnfiguratin and lcatin Regarding DESE pre-apprved Chapter 74 Prgram spaces; If the District wishes t submit a change t its DESE apprved submittal, it must a) cnfirm that all changes t Chapter 74 Prgram spaces are final; b) prvide a new submittal utilizing the frmat f the riginal submittal requirements and clearly nting any changes thrugh use f cluded flr plans and red-lined narratives and tables; and c) indicate hw the prject schedule can accmmdate a ptential resubmittal and apprval by DESE. Please prvide a separate package fr changes t the Chapter 74 Prgramming. If the District chses nt t change frm the DESE apprved submittal it shuld cnfirm that the spaces are the same r explain when and hw the spaces will be returned t the apprved size, cnfiguratin and lcatin 6A.3.3 Prject Apprvals Describe the status f the fllwing apprvals. In additin, prvide the status f any ther state r federal apprval nt listed belw (the fllwing list is nt a cmprehensive itemizatin f required state apprvals; ther requirements may apply, and sme f the items listed belw may nt be applicable t this prject). Prvide a cpy f the apprpriate applicatin frms and/r apprval letters where applicable. Indicate Nt Applicable where apprpriate. Fr each agency apprval required fr this prject, indicate the date when apprval was received. All required apprvals shuld Massachusetts Schl Building Authrity Mdule 6 Detailed Design - 7 -

8 have an assciated apprval date indicated as part f the 90% CD submissin and prir t advertising fr bids. DESE - Special Educatin apprval by Department f Elementary and Secndary Educatin MHC Prject Ntificatin Frm and apprvals by MA Histrical Cmmissin OIG - Cnstructin Manager at Risk apprval by the Office f Inspectr General Executive Office f Energy and Envirnmental Affairs / EEA: MEPA - MA Envirnmental Plicy Act by Energy & Envirnmental Affairs: ENF - Envirnmental Ntificatin Frm EIR - Envirnmental Impact Reprt Article 97 Land Dispsitin Plicy apprval by Energy & Envirnmental Affairs MA DEP - Massachusetts Department f Envirnmental Prtectin MA DOT - Massachusetts Department f Transprtatin MA DPH - Massachusetts Department f Public Health EPA NPDES Natinal Pllutant Discharge Eliminatin System Ntice f Intent apprval by the US Envirnmental Prtectin Agency MAAB - Accessibility variances by MA Architectural Access Bard Cnfirmatin that the Prject has undergne review and btained all necessary apprvals by any departments r agencies f the Cmmnwealth required by law t review the Prject, including but nt limited t the apprvals listed abve. Attach such letter f dcumentatin evidencing such reviews and apprvals. In accrdance with Sectin 4.12 f the Prject Funding Agreement (the PFA ), the District must btain such reviews r apprvals prir t the slicitatin f cnstructin bids Fr any required state reviews r permits fr which apprval has nt been btained as f the Design Develpment submissin date, prvide a status update including actins taken t date and actins planned t btain the required state reviews and permit apprval(s) in rder t cmply with PFA Sectin 4.12 and maintain the prjected schedule milestnes listed in OPM Deliverables List and target dates fr all lcal zning apprvals, testing and permits. Prvide a certificatin that all applicable utility fficials have been cntacted by the designer regarding each basic design, and utility cnnectins 6A.3.4 Cst Estimates Cnstructin cst estimate using the Unifrmat II Classificatin t Level 3, Shwing unit rates and quantities; prjected t mid-pint f cnstructin AND Cnstructin cst estimate using the CSI MasterFrmat 6-digit frmat t Level 3 and MGL c.149 s 44F (filed sub-bid) frmat. Shwing unit rates and quantities; prjected t mid-pint f cnstructin Massachusetts Schl Building Authrity Mdule 6 Detailed Design

9 6A.3.5 Drawings (develped t Design Develpment prgress level) Cver sheet shwing a list f all drawings, symbls, abbreviatins, ntes, lcatins map (the prject title shuld be visible when the drawings are rlled) Site and utility drawings shwing the fllwing: Existing and prpsed cnturs and lcatins f the prpsed building r additin(s). Shw entry level elevatins and key exterir grades at perimeter shwing drainage away frm the building. Indicate all retaining walls. Include benchmarks f site if survey is available All utilities existing and prpsed, indicating lcatin, elevatin, cmpsitin and size e.g., gas and electric utility prviders Rads, laid ut parking areas, walks, recreatin areas, terraces and ther site imprvements Building lcatins fixed and referenced frm main survey baseline, if available Plant materials with preliminary schedule Architectural drawings shwing the fllwing: Demlitin drawings and temprary wrk required Flr plans (minimum 1/8" = 1'0") Key plans / verall plans where required Building perimeter with exterir wall thicknesses and verall dimensins Structural grid Plan requirements f mechanical and electrical systems Building cre; elevatrs, stairs, shafts, public tilets, with dimensins Internal partitins; apprpriate thicknesses and dimensins t fix basic rganizatins; indicate fire rated partitins and smke partitins Dr swings Finish flr elevatins crdinated with exterir grade elevatins at all interir exterir transitins. Built-in furniture and equipment Furniture layut cncept drawings Mdular 4, 8, r 1 unit mdular dimensins n Masnry Large scale plans shwing key areas e.g. lbby, special spaces. Indicate flr surface materials. (minimum scale 1/4" = 1'0") Rf plans shwing the fllwing: Prpsed systems type Pitch and drainage pattern Rf drain, gutters and scuppers Skylights, stair halls thrugh rf, penthuses, majr equipment, chimneys Building sectins - One transverse and ne lngitudinal sectin. Indicate flr t ceiling heights and flr-t-flr heights. Label all spaces Building sectins updated and crdinated with plans and elevatins Massachusetts Schl Building Authrity Mdule 6 Detailed Design

10 Building elevatins shwing the fllwing: Full height elevatins including rf structures, e.g., mechanical equipment, chimneys, and penthuses Flr elevatins, flr-t-flr height, and verall height related t benchmarks n site plans Windws, strefrnt & curtain wall systems All clumns lcated n a centerline and crdinated with the structural drawings. Materials indicating majr cntrl and expansin jints, and divisins f materials where required Luver lcatins crdinated between building elevatins, flr plans, mechanical equipment, prject manual etc. Exterir grades and tpgraphical features in cntext Full height wall sectins fr main elevatins and at special cnditins. Shw fundatin and perimeter treatment, wall cnstructin including insulatin and supprting structure, fenestratin and mechanical penetratins, and flr cnstructin Interir elevatins: Shw at all spaces, e.g. library, lbby, and all typical spaces, e.g. classrm Reflected ceiling plans: Shw prttypical structural, fire prtectin, mechanical and electrical infrmatin fr classrms and majr spaces, including lighting layuts with ceiling height and material changes Schedules: Finish schedule by rm types Dr schedule by rm types Windw schedule Equipment schedules; e.g., fd service, instructinal media Structural Cncepts: Framing plans; typical flr framing, rf framing, special framing, shw framing at majr penings and sizes f members Fundatin plan shwing sizes and lcatins f typical cmpnents All clumns and beams are identified and listed in the clumn and beam schedule Preliminary details including flr and rf deck Details fr special and/r incidental structural features; e.g. tunnels, cnnecting bridges and unique architectural features Cnnectin t existing buildings at fundatin and at key pints at existing structure if applicable All cnstructin jint and expansin jint lcatins crdinated with structural drawings Fire prtectin; flr plans indicating wet r dry type systems, hse racks r cabinets and fire department tie-ins. Indicate a fire pump where required. Shw typical sprinkler head layut. Massachusetts Schl Building Authrity Mdule 6 Detailed Design

11 Plumbing and sanitary systems; flr plans indicating lcatins f all plumbing fixtures and special features, and apprximate lcatin and size f all piping systems and principal items f equipment Heating, Ventilating and Air Cnditining Systems: Shw lcatins and apprximate sizes f piping systems, air handling systems and principal items f equipment such as cmpressrs r cling twers Indicate space requirements f majr equipments and their lcatin in mechanical rms and fan rms. Indicate shaft requirements Adequate ceiling heights exists at wrst-case duct intersectin Ceiling diffusers/registers match mechanical drawings, including all sffit and vent lcatins. Electrical Systems: All services including thse fr special purpses shall be lcated and indicated Light fixtures n electrical drawings match reflected ceiling plans Switchgear and emergency generatr Electrical equipment lcatins are crdinated with site paving and grading All mtrized equipment is crdinated with electrical drawings All pwer equipment has electrical cnnectins Fire alarm system drawings shwing all initiatin and signaling devices, cntrl panels, annunciatr panels, etc. Security system drawings Cmmunicatins drawings shwing chases, majr equipment lcatins and any special distributin requirements 6A Prject Crdinatin The structural, mechanical, r ther disciplines, d nt cnflict with architectural plans r specificatins. Structural dimensins match Architectural drawings Clumn rientatin matches Architectural drawings. Clumn grid lines match Architectural drawings. Clumn and bearing wall lcatins match Architectural drawings Clumn lcatins crdinated with all ther disciplines Seismic detailing crdinates with Architectural drawings Beams and clumns prtruding hrizntally and vertically int stairwells, and ther interir spaces. The finish grade elevatins crdinated between all disciplines. Mechanical equipment pwer requirements and physical lcatins, including special infrmatin as t wh munts, cnnects, tests, etc. Verificatin f ptential spatial cnflicts in mechanical equipment. Rm wall/flr/ceiling cnstructin crdinated with the finish schedule Civil earthwrk grading and excavatin plans are crdinated with architectural and landscape plans All rm numbers are crdinated between all disciplines Massachusetts Schl Building Authrity Mdule 6 Detailed Design

12 Equipment plan crdinates with architectural plans All kitchen equipment cnnected t utility systems 6A.3.6 Prject Manual (develped t Design Develpment prgress level) Getechnical reprt, including lcatins and dates f test bring hles and results f sil investigatin, including water levels, allwable slid bearing pressure and bttm grades f fting and slabs Outline Specificatins in the current versin f CSI Master spec divisins including: Site wrk: clearing, drives, walks, parking areas, fences, excavatin, backfill, planting, ftings n earth, rck, piles, caissns, prpsed bearing pressures, bring lgs Fundatin walls; type f cncrete, reinfrcing, type and extent f waterprfing Fting drains; type, dispsal f drainage Exterir walls: superstructure, type, materials, brick type, alternate cladding, back-up materials, damp prfing material and extent, special features Rfs; type, vapr barrier, insulatin, flashings, all materials Flashings; general types, all materials, weights, where each type is t be used Sheet metal; gutters, leaders, thers uses, except flashing Windws; general types, materials, sub-frames, finish, glazing, screens Rugh penings fr all drs and windws crdinated Drs, exterir and interir; types and thicknesses and fire rating identified if applicable. Steps, exterir; including platfrms and landings' materials Stairs, interir; including platfrms, landings, walls, materials and finishes Framing; wd, cncrete r metal systems in accrdance with general design Partitins; materials, thicknesses, finishes Cabinet and casewrk; types and materials Fd Service Equipment; list f equipment t be prvided Furring; lathing, plastering, materials and lcatins Insulatin thermal; types, thicknesses, methds f applicatin and lcatins Acustical treatments; types, thicknesses, methds f applicatin and lcatins Interir finishes; materials fr flrs, walls, bases, wainscts, trim, ceilings, ceiling heights Fire prtectin; standpipe systems, sprinkler systems, fire pumps and accessries Massachusetts Schl Building Authrity Mdule 6 Detailed Design

13 Water supply; surce; lcatin f main t which cnnectin will be made; type f pipe fr service main; lad requirements; lad factrs and pressures Sanitary sewers; sewage dispsal system, pipe and ther materials. Strm sewers; strm drainage dispsal system (institutin r lcal facility), pipe and ther materials Gas main; material, size, lcatin. Interface with utility cmpany. Plumbing; systems such as wastes, vents, ht water, cld water, gas, air, xygen, vacuum, main surce f supply, materials fr each, water heaters, pumps, thermal insulatin fixture quality, all special features. Heating, ventilating and air cnditining; type f heating and refrigeratin plants, type and capacity f bilers and cling equipment, fuel, type f burners, fuel strage, heaters, feed water pumps and heaters, thermal insulatin, type f heating medium, supply and return piping, radiatin, unit heaters, radiant heating, principal air cnditining equipment types, special features, supply, return and exhaust ductwrk Electric wrk; service cnnectin, lcatin, institutin r public utility, verhead r undergrund, transfrmers including type and lcatin, types f cnduit and wiring, types f fixtures, lcatin f main switchbard, radi, fire alarm, telephne, public address, emergency lighting and wiring, emergency r ther generatrs, special features, including Master TV, infrmatin retrieval and/r data prcessing system Elevatrs, dumbwaiters and platfrm lifts; capacities, speed, travel in feet, landings, peratin, cntrls, platfrm sizes, machine type and lcatin, car and entrance finishes, signals Other built-in equipment, types and materials All Wrk by thers specificatins crdinated The sub-cntractr identified fr the installatin f all equipment supprts and anchrs fr walls, flr and ceilings Special features Massachusetts Schl Building Authrity Mdule 6 Detailed Design

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

ENGINEERING SURVEYING GEOGRAPHIC INFORMATION SYSTEMS COMMERCIAL BUILDING PERMIT APPLICATION

ENGINEERING SURVEYING GEOGRAPHIC INFORMATION SYSTEMS COMMERCIAL BUILDING PERMIT APPLICATION ENGINEERING SURVEYING GEOGRAPHIC INFORMATION SYSTEMS 130 Cecil Street Cannsburg, PA 15317 724.916.0061 inf@hmtandassciates.cm COMMERCIAL BUILDING PERMIT APPLICATION 1. PROPERTY INFORMATION Municipality:

More information

New construction or additions permit guide

New construction or additions permit guide Cmmunity Develpment Department 12350 W. 87 th St. Pkwy., Lenexa, KS 66215 913.477.7700 fax 913.477.7730 New cnstructin r additins permit guide The infrmatin prvided are general requirements which shuld

More information

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1 SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre

More information

Open Call for Artists and Arts Professionals 2018

Open Call for Artists and Arts Professionals 2018 Open Call fr Artists and Arts Prfessinals 2018 Open Call fr Artists and Arts Prfessinals 2018 All materials must be received by 5:00 pm EST n Friday, March 16, 2018 Art n the Atlanta BeltLine is seeking

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON BUILDING SERVICES ENGINEERING PLAN REVIEW GUIDELINES (PRG 2): Guidelines Objective: 1. Imprve cmmunicatins between Building Services and the engineering design cmmunity that prepares

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

Appendix M Trellis Type Shade Structure Design Guide

Appendix M Trellis Type Shade Structure Design Guide Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis

More information

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS SUBMITTAL REQUIREMENTS FOR The Plat Imprvement prcess invlves the review and apprval f detailed engineering drawings and infrmatin related t an apprved preliminary plat such as grading, radways, sewer,

More information

Property Address/Location: Case No.: (to be completed by Staff)

Property Address/Location: Case No.: (to be completed by Staff) Site Develpment Plan Applicatin Checklist City f Greenwd Village Cmmunity Develpment Department 6060 S. Quebec Street Greenwd Village, CO 80111-4591 (303) 486-5783; FAX (303) 773-1238 Prperty Address/Lcatin:

More information

Call to Artists. PO Box 369 Lake Oswego, OR

Call to Artists. PO Box 369 Lake Oswego, OR PO Bx 369 Lake Osweg, OR 97034 503.675.2531 www.artscuncill.rg Call t Artists Prgram & Lcatin: Gallery Withut Walls, Lake Osweg, Oregn Budget: $850.00 hnrarium / An pprtunity t be nminated fr an up t $15,000

More information

2.1 PROJECT MANAGEMENT

2.1 PROJECT MANAGEMENT 2.1 Prject Management 2.1.1 General 2.1 PROJECT MANAGEMENT 2.1.1 GENERAL The Design Team and Cnstructr will wrk primarily with the Prject Manager frm Masn Facilities. All input and crdinatin shall be cnducted

More information

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Alberta Infrastructure. Digital Project Delivery COBie Requirements Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie

More information

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD Intrductin The Denver Internatinal Airprt (DEN) Art & Culture Prgram (in cllabratin

More information

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes

More information

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST Pre-Cnsultatin Meeting City f Welland Applicatin Fee Regin f Niagara Review Fee NPCA Review Fee Cmpleted Applicatin Frm Ten (10) cpies f all required

More information

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS Carsn City Building Divisin 108 E. Prctr Street Carsn City, Nevada 89701 (775) 887-2310 Hearing Impaired: 711 bldgdiv@carsn.rg www.carsn.rg/building MANUFACTURED HOME New Hmes, Replacements, and Additins

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.:

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.: The Crpratin f Delta COUNCIL REPORT Regular Meeting F. 11 T: Mayr and Cuncil File N.: LU007147 Frm: Cmmunity Planning & Develpment Department Date: June 10, 2014 Develpment Permit Amendment fr the Prperty

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

Town of Truckee Residential Plan Submittal Checklist

Town of Truckee Residential Plan Submittal Checklist Twn f Truckee Residential Plan Submittal Checklist This checklist delineates the specific requirements f cnstructin dcuments and shuld be used by the designer(s) when develping the required submittal dcumentatin

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet Twnship f Derry Dauphin Cunty, Pennsylvania Residential Deck Additin Submittal Guide and Cnstructin Fact Sheet The text and illustratins included in this guide represent tables and illustratins frm the

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

City of Sarasota Public Art Requirements Information Package

City of Sarasota Public Art Requirements Information Package City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin

More information

CHAPTER 2 DESIGN PROCEDURES Table of Contents

CHAPTER 2 DESIGN PROCEDURES Table of Contents 2.1 Prject Management CHAPTER 2 DESIGN PROCEDURES Table f Cntents 2.1 PROJECT MANAGEMENT... 2 2.1.1 GENERAL... 2 2.1.2 COMMUNICATION PLAN AND PROCEDURES... 2 2.1.3 INVOICING... 3 2.1.4 SCHEDULES... 4 2.1.5

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

The University of Pennsylvania Lighting Guidelines: Interior Lighting Controls Lighting Control Design Guidelines & Instructions for Use

The University of Pennsylvania Lighting Guidelines: Interior Lighting Controls Lighting Control Design Guidelines & Instructions for Use The University f Pennsylvania Lighting Guidelines: Interir Lighting Cntrls Lighting Cntrl Design Guidelines & Instructins fr Use Prepared by: www.keystnels.cm 1362 S. Athertn Street State Cllege, PA 16801

More information

MINIMUM ACCEPTABLE PLAN SUBMITTALS M.A.P.S. CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA (760)

MINIMUM ACCEPTABLE PLAN SUBMITTALS M.A.P.S. CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA (760) MINIMUM ACCEPTABLE PLAN SUBMITTALS M.A.P.S. INFORMATION GUIDELINE 7 January 2017 CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA 92025 (760)839-4647 This guideline is intended t assist

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1)

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1) CELRL-PM-R April ARCOS BULLITEN - SUBJECT: IT Design. REFERENCE: a. Army Reserve IT Manual, Change b. Army Reserve Design Prcess Submittal Requirements (DPSR) c. USARC G-/ IT Design Whitepaper, April (

More information

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs 5500K LED Mdule Descriptin: Size, Quantity f LEDs, Pwer, Brightness Vltage Dimming CRI: (R4) 84 ~6 x 6 x 0.28-in, 36 LEDs, 6-watts, 60 lm ~6 x 6 x 0.28-in, 49 LEDs, 8-watts, 830 lm ~2 x 2 x 0.28-in, 44

More information

CITY OF BURLINGTON ~ PUBLIC ART POLICY. Vision

CITY OF BURLINGTON ~ PUBLIC ART POLICY. Vision CITY OF BURLINGTON ~ PUBLIC ART POLICY Visin Public art will cntribute t Burlingtn s unique and vibrant cmmunity identity by affirming a sense f place, strengthening cnnectins between peple and place,

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

City of Richmond. Report to Committee

City of Richmond. Report to Committee City f Richmnd Reprt t Cmmittee T: Frm: Re: Parks, Recreatin and Cultural Services Cmmittee Jane Fernyhugh Directr, Arts, Culture and Heritage Services Public Art Cmmunity Mural Prgram Date: January 5,

More information

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines ROSCOMMON COUNTY Public Summary f FOIA Prcedures and Guidelines This is nly a summary f the Cunty s FOIA Prcedures and Guidelines. Fr mre details and infrmatin, cpies f the Cunty s FOIA Prcedures and Guidelines

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

Pool & Hot Tub Guide

Pool & Hot Tub Guide Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines IONIA COUNTY Public Summary f FOIA Prcedures and Guidelines It is the public plicy f this state that all persns (except thse persns incarcerated in state r lcal crrectinal facilities) are entitled t full

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

PPA PORTS UKC STANDARDS

PPA PORTS UKC STANDARDS TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL

More information

JJ / CP RFP Response to Inquiries

JJ / CP RFP Response to Inquiries GENERAL QUESTIONS Is it pssible t have pages 19 thrugh 40? The MS Wrd versin f the RFP can be fund n the Clerk f the Curt s website at www.ckcuntyclerkfcurt.rg. Please clarify the due date f the prpsals.

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

Rapid Innovation Fund (RIF) Program Overview

Rapid Innovation Fund (RIF) Program Overview Rapid Innvatin Fund (RIF) Prgram Overview Ted Bujewski, Directr, Rapid Innvatin Fund Prgram Office f the Under Secretary f Defense (Research and Engineering) January 2019 Backgrund Established as the Rapid

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include

More information

Prospectus. Solo or Group Exhibition Opportunities at Gallery Underground

Prospectus. Solo or Group Exhibition Opportunities at Gallery Underground 1 Prspectus Sl r Grup Exhibitin Opprtunities at Gallery Undergrund Gallery Undergrund annunces sl r grup exhibitin pprtunities fr artists frm the Greater Washingtn, DC area. Our gallery at the Shps at

More information

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Minneaplis Dwntwn Experience Cmmittee & The Minneaplis Dwntwn Cuncil HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Request fr Creativity Issue Date: June 2016 Submissin Deadline: June 24, 2016 at 5:00 p.m.

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Revit Architecture - syllabus

Revit Architecture - syllabus Revit Architecture - syllabus Revit Architecture Sessin 1 Ttal Duratin : 120 Hurs Tpics Intrductin Building Infrmatin Mdelling Revit Architecture Histry Features Revit File Types Explring User Interface

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers Applicatin fr Registratin f Designated Radiatin Equipment Class 3b and 4 Lasers OWNER INFORMATION Is this equipment wned by a Zne? Yes N If yes, which Zne? If n, please cmplete the fllwing: Owner Name:

More information

Wireless Bridge Module for DXR2.E

Wireless Bridge Module for DXR2.E Technical Specificatin Sheet Dcument N. A6V11470500 July 31, 2018 Wireless Bridge Mdule fr DXR2.E Descriptin A wireless bridge cnnects tw wired netwrks tgether ver Wi-Fi utilizing a Wireless Access Pint.

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

EXHIBIT E SOLAR PV SYSTEM DESIGN SPECIFICATIONS

EXHIBIT E SOLAR PV SYSTEM DESIGN SPECIFICATIONS SlarizeCNY Slar PV RFP EXHIBIT E CNY Reginal Planning and Develpment Bard EXHIBIT E SOLAR PV SYSTEM DESIGN SPECIFICATIONS Table f Cntents 1. Site Access... 2 2. Prject Management... 2 2.1 Prject Manager...

More information

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

BIM Guidelines for Minor Renovations

BIM Guidelines for Minor Renovations BIM Guidelines fr Minr Renvatins Duke Facilities Management Office f Prject Management 114 Suth Buchanan Bulevard, Durham, NC 27708 O: 919.660.4252 F: 919.684.4243 March 30, 2017 v3.0 1 ACKNOWLEDGEMENTS...

More information

Request for Statement of Interest (SOI) Advanced Traffic Management System (ATMS) Software Development and Integration

Request for Statement of Interest (SOI) Advanced Traffic Management System (ATMS) Software Development and Integration Request fr Statement f Interest (SOI) Advanced Traffic Management System (ATMS) Sftware Develpment and Integratin The Kane Cunty Divisin f Transprtatin (KDOT) is in need f prfessinal services frm a qualified

More information

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012)

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012) NSW Prttype User Manual AUTHORITIES Delegatin agreement frm the Eurpean Cmmissin MOVE D2/ME D(2012) Versin: 1.2 Date: 22/09/2015 NSW Prttype/ Users Manual/ Authrities TABLE OF CONTENTS 1 Intrductin...

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

KIP Cost Center User Guide

KIP Cost Center User Guide - 1 - KIP Cst Center User Guide Cntents 1 Intrductin... 3 1.1 Requirements:... 4 1.2 Supprted Operating Systems... 4 2 Installatin... 5 3 Setup... 8 4 KIP Cst Center Main Screen Print Mde... 12 4.1 Lading

More information

Submission Guidance. The Editorial Board is keen to receive submissions from students, past and present, of the University of Aberdeen.

Submission Guidance. The Editorial Board is keen to receive submissions from students, past and present, of the University of Aberdeen. Submissin Guidance The Editrial Bard is keen t receive submissins frm students, past and present, f the University f Aberdeen. Overview The purpse f the ASLR is t shwcase the wrk f the students f Aberdeen,

More information

The Santa Cruz Mural Program is overseen by the Santa Cruz Arts Commission.

The Santa Cruz Mural Program is overseen by the Santa Cruz Arts Commission. INTRODUCTION This plicy applies t all mural prjects that are funded in whle r in part by the City. This plicy utlines the three tiers f mural funding and apprval prcedures used by the Santa Cruz City Arts

More information

Permission for Use of Images Policy

Permission for Use of Images Policy Permissin fr Use f Images Plicy All images in ur pht cllectins are subject t apprval by the Directr & Permissin f Use f Images frm must be filled ut prir t the image being released t the researcher. Nt

More information

Generating Facility Interconnection Guide. Revision 5.0

Generating Facility Interconnection Guide. Revision 5.0 Generating Facility Intercnnectin Guide Revisin 5.0 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234

More information

Heavy Equipment Operation II

Heavy Equipment Operation II Heavy Equipment Operatin II Curse Design 2008-2009 Curse Infrmatin Organizatin Eastern Arizna Cllege Divisin Industrial Technlgy Educatin Curse Number TEC 151 Title Heavy Equipment Operatin II Credits

More information

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note RS232 Cmmunicatin Between a Sunny By 2500U and a PC Technical Nte Revisin 1.5 July 8, 2003 Kent Sheldn Revisin Histry 1.5 July 8, 2003 Kent Sheldn Cntact update 20830 Red Dg Rad Grass Valley, CA 95945

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

Type Seating/Surface SF/student Details/Notes. Fixed seating; sloped or tiered floor Movable seats, fixed tables; two rows per riser.

Type Seating/Surface SF/student Details/Notes. Fixed seating; sloped or tiered floor Movable seats, fixed tables; two rows per riser. 3.2 Interir Space Standards 3.2.2 Classrms 3.2.2 CLASSROOMS 3.2.2.1 General The Design Team must crdinate all classrm designs with the Office f Campus Planning and the Infrmatin Technlgy Unit including,

More information

Project Description Arctic Safety Center

Project Description Arctic Safety Center Prject Descriptin Arctic Safety Center Classificatin: Open Status: Final Expiry date: 2012-10-21 Page 1 f 11 Prject Descriptin Arctic Safety Center Dcument n. : Prject n.: Prject: 990020 Arctic Safety

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

BIM Guidelines for Major Renovations

BIM Guidelines for Major Renovations BIM Guidelines fr Majr Renvatins Duke Facilities Management Office f Prject Management 114 Suth Buchanan Bulevard, Durham, NC 27708 O: 919.660.4252 F: 919.684.4243 March 30, 2017 v3.0 1 ACKNOWLEDGEMENTS...

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

EE015: Electrical Drawings and Schematics

EE015: Electrical Drawings and Schematics T e l N : + 9 7 1 2 6 6 5 4 5 4 6 F a x N : + 9 7 1 2 6 6 5 4 1 8 2 E m a i l : a i s h a @ c m c - m e. c m w w w. c m c - m e. c m EE015: Electrical Drawings and Schematics EE015 Rev.001 CMCT COURSE

More information

plumbing DESIGN & DRAFTING TRAINING Electro Mechanical LLC

plumbing DESIGN & DRAFTING TRAINING Electro Mechanical LLC Electr Mechanical LLC plumbing DESIGN & DRAFTING TRAINING Tel # +91 40-64586460, 64103603 ; URL: www.kgmech.cm Electr Mechanical LLC KG-MECH LLC., with its inceptin has been diversified its business in

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering?

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering? Privacy is the Glbal Ba2lefield - D we have the Tls and Standards t Fight and What is Privacy Engineering? Jhn Sab, Chair OASIS IDTrust Member Sectin and Chair, PMRM Technical Cmmittee Jhn.sab711@yah.cm

More information

Formative Evaluation of GeeGuides: Educational Technology to Enhance Art Exploration

Formative Evaluation of GeeGuides: Educational Technology to Enhance Art Exploration Frmative Evaluatin f GeeGuides: Educatinal Technlgy t Enhance Art Explratin Prepared by Clleen F. Manning Senir Research Assciate Gdman Research Grup, Inc. Submitted t GeeGuides LLC March 2005 EXECUTIVE

More information