1 Generating Facility Intercnnectin Guide Revisin 5.0

2 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234 N2000 Ridgeview Parkway Curt Waukesha, WI Generating Facility Intercnnectin Guide i Revisin5.0

3 A merican Transmissin Cmpany (ATC) is a member f the Midcntinent Independent System Operatr (MISO) 1. ATC wns, plans, cnstructs, perates, maintains and will expand its transmissin facilities t prvide adequate and reliable transmissin f pwer. ATC prvides nndiscriminatry service t all custmers, supprting effective cmpetitin in energy markets withut favring any market participant. ATC wns apprximately 9,400 miles f transmissin lines and 520 substatins in prtins f Wiscnsin, Michigan, Minnesta and Illinis and is intercnnected with mre than 60 Generating Facilities wned by municipalities, cperatives, independent pwer prducers and investr-wned utilities. In general, ATC accmmdates additins r mdificatins fr generatin custmers accrding t the requirements f Attachment X f MISO s Open Access Transmissin, Energy and Operating Reserve Markets Tariff. ATC will cllabrate with MISO and the Custmer in develpment and implementatin f the apprpriate intercnnectin slutin in respnse t the Custmer s requested need. The Custmer is directed t MISO fr frmal submittal f an Intercnnectin Request fr a Generating Facility fr each f the fllwing types f prjects: 1. Intercnnectin f new generating capacity t the Transmissin System. 2. Mdificatins 2 t existing intercnnected Generating Facilities, as defined by MISO. This Generating Facility Intercnnectin Guide is intended t supplement MISO requirements and address ATC s rle within that prcess. Any questins r requests fr additinal infrmatin cncerning Generating Facility intercnnectin t the Transmissin System shuld be directed t: giantices@atcllc.cm ATC Intercnnectin Services Capitalized terms are defined in the Glssary in Appendix A f this Guide r in Attachment X f MISO s Open Access Transmissin and Energy Markets Tariff. 2 It is pssible that the Custmer may have a prpsed mdificatin that MISO wuld nt cnsider a Material Mdificatin r substantive mdificatin t the perating characteristics f an existing Generating Facility accrding t Sectin 2.1 f Attachment X f the MISO Tariff, but may therwise have an impact n the Transmissin System r generatin-transmissin intercnnectin. Cnsult Sectin 7.0 and Appendix B f this Guide fr ATC s requirements pertinent t such prpsed mdificatins. Generating Facility Intercnnectin Guide ii Revisin5.0

4 Table f Cntents 1 Intrductin Purpse 1 ATC s Rle 1 Legal and Regulatry Requirements 2 2 New r Mdified Generating Facility Intercnnectin Prcess Initiatin and Develpment 3 Intercnnectin Studies 3 Data Requirements 3 Intercnnectin Agreement 5 Crdinatin with Lcal Utilities 5 3 Design Requirements Intercnnectin Cnfiguratin 6 Demarcatin and Ownership 7 Substatin Site 7 Pwer Factr 8 Lw Vltage Ride-Thrugh Capability 9 Generatin Vltage, Reactive Pwer and/r Pwer Factr Cntrl 9 Pwer Quality, Vltage Flicker and Harmnics 9 Frequency 9 Fault Current 9 Auxiliary Pwer 9 Vltage Level 9 Basic Impulse Insulatin Level 10 Recmmended Custmer Step-Up Transfrmer Cnfiguratin 10 4 Prtectin 10 Generating Facility Intercnnectin Guide iii Revisin5.0

5 General 10 Frequency Prtectin (IEEE 81) 11 Custmer Breaker Failure Prtectin (IEEE 50BF) 12 Synchrnism Check Relay (IEEE 25) 12 Bus Differential Prtectin (IEEE 87) 12 Reverse Pwer (IEEE 32) 12 Pwer Transfrmer Grund Time Overcurrent Prtectin (IEEE 51N) 12 Prtectin Redundancy 12 Generatr Tripping 12 Recmmended Generatr Prtectin Functins 13 Transmissin Line Autmatic Reclsing Near Generating Facility 14 Grunding 14 Equipment Ratings 15 5 Telemetry and Metering Requirements Telemetry 15 Lcal Balancing Authrity Metering 17 6 Testing, Inspectin and Cmmissining Testing and Inspectin 17 Initial Transfrmer Energizatin 17 Reductin f DC Residual Flux 17 Generating Facility Synchrnizatin 17 7 Requirements after Cmmercial Operatin Operating Guidelines 18 Generating Facility Vltage Schedule 18 Unit Stability 18 System Restratin (Black Start) 19 Maintenance Testing 19 Generating Facility Intercnnectin Guide iv Revisin5.0

6 Detectin f and Tripping fr an Electrical Island Cnditin 19 Generating Facility Mdificatins 19 8 Requirements Assuring Reliable Operatin at the Intercnnectin Pint 20 Revisin Histry 22 9 Appendix A: Glssary f Terms Appendix B: Generatr Data Requirements Data Requirements Matrix 27 Data Requirements Timeline Appendix C: Generating Unit Test Requirements Data Requirements Timeline 30 Generating Facility Intercnnectin Guide v Revisin5.0

7 1 Intrductin 1.1 Purpse As a transmissin-nly utility, ATC partners with its intercnnected and intercnnecting Custmers fr lng-term, successful Generating Facility Intercnnectins. This Generating Facility Intercnnectin Guide describes the minimum requirements fr the cnnectin f generatin t the Transmissin System. Additinal specific requirements will be identified during studies cnducted in cnnectin with the particular Custmer-prpsed prject. The Federal Energy Regulatry Cmmissin (FERC) set frth the prcess fr intercnnectin f generatin t the Transmissin System in its Order N and, fr nn-synchrnus generatin, in its Orders N. 661 and 661-A. 3 This prcess is administered by the Midcntinent Independent System Operatr (MISO) accrding t the Attachment X Generatr Intercnnectin Prcedures (GIP) f its Open Access Transmissin, Energy and Operating Reserve Markets Tariff (Tariff). The GIP gverns the intercnnectin f new r increased generating capacity t the transmissin facilities subject t MISO Tariff, including ATC s Transmissin System. New Generatin The primary applicatin f this Guide is fr the intercnnectin f new generating capacity. New intercnnectins at existing substatins will be designed utilizing this Guide while accmmdating previus intercnnectin requirements and limitatins. Existing Generatin It is essential that the Custmer and ATC maintain updated detail n the characteristics f Generating Facilities intercnnected t the Transmissin System. Mdificatin f an existing Generating Facility may impact the Transmissin System, the intercnnectin service prvided t the Custmer r ther Custmers at ther lcatins. Therefre, the Custmer is t ntify ATC f planned r prpsed mdificatin accrding t Sectin 7 f this Guide and ATC will prvide guidance n hw t prceed. Distributin-Cnnected Generatin This Guide des nt apply t generatin cnnected t distributin systems that are themselves intercnnected t the Transmissin System (generally thse perating at vltages belw 50 kv). Fr infrmatin cncerning such distributin-cnnected generatin, reference the ATC Lad Intercnnectin Guide n the ATC Web site at ATC s Rle The ATC Intercnnectin Services grup crdinates ATC s cllabratin with the Custmer and MISO thrughut the fllwing prcesses: 3 Standardizatin f Generatin Intercnnectin Agreements and Prcedures, Order N et seq, Fed. Reg. Vl. 68, N. 160 (August 19, 2003), Order 661, 111 FERC 61,353 (June 2, 2005) and Order 661-A, ,254 (December 12, 2005). Generating Facility Intercnnectin Guide 1 Revisin 4.0

8 New Generatin As crdinated with MISO, ATC perfrms the Intercnnectin System Impact Study and Facilities Study within the GIP Definitive Planning Phase. ATC als perfrms verificatin analysis prir t cmmercial peratin f the Generating Facility using the Custmer s final as-built infrmatin t ensure that the Generating Facility characteristics, as were prvided by the Custmer fr the intercnnectin studies, are cnsistent with the Facility, as installed. Additinally, ATC will review the rle f any prpsed Generating Facility in ATC s Black Start System Restratin Plan. Existing Generatin Fr Custmer planned r prpsed mdificatins t existing Generating Facilities that may ptentially impact the Transmissin System r intercnnectin, ATC will perfrm analysis as described in Sectin 7 f this Guide t determine impacts and the time and csts f assciated upgrades. 1.3 Legal and Regulatry Requirements FERC Thrughut the intercnnectin prcess, ATC adheres t the FERC Standards f Cnduct 4 as well as the rules relating t critical energy infrastructure infrmatin. State The states in which ATC perates have their wn requirements fr generatr siting and cnstructin. This Guide is nt intended t describe thse requirements. The Custmer will be respnsible fr cmpliance with the specific state requirements and prcesses. Further infrmatin regarding these requirements and prcesses is available frm the pertinent state regulatry agency: Public Service Cmmissin f Wiscnsin - Michigan Public Service Cmmissin - Minnesta Public Utilities Cmmissin - Illinis Cmmerce Cmmissin NERC ATC is registered as a Transmissin Owner, Transmissin Operatr, Transmissin Planner, and Planning Crdinatr with bth the Midcntinent Reliability Organizatin (MRO) and ReliabilityFirst Crpratin (RFC) under the requirements f the electric reliability rganizatin, the Nrth American Electric Reliability Crpratin (NERC). ATC and the Custmer will plan, design, cnstruct, wn, perate, and maintain their respective facilities within the Transmissin System, Intercnnectin Facilities, and Generating Facility cnsistent with Applicable Reliability Standards. 4 Order N. 888, 61 FR (May 10, 1996) Generating Facility Intercnnectin Guide 2 Revisin5.0

9 2 New r Mdified Generating Facility Intercnnectin Prcess The specific steps and requirements f the prcess fr intercnnecting new generating capacity t ATC s Transmissin System are set frth in detail in MISO s Business Practices Manual (BPM) Generatr Intercnnectin. This guideline is intended t prvide further infrmatin cncerning hw ATC can assist the Custmer thrughut this prcess. 2.1 Initiatin and Develpment A Custmer request fr intercnnectin t MISO begins the MISO Pre-Queue and Applicatin Review prcess. The specific requirements f the intercnnectin request are available n the MISO website Generatr Intercnnectin page at: ctin.aspx In additin t the frmal mechanisms, ATC encurages cmmunicatin thrughut the prcess and ffers meeting with prspective generatr Custmers prir t and during the develpment f the intercnnectin request. 2.2 Intercnnectin Studies ATC will wrk with the Custmer thrughut the study prcess. The basic prcess invlves: a. Applicatin Review b. System Planning and Analysis (the SPA) Feasibility study will be perfrmed by MISO t test the system readiness fr an intercnnectin. c. Definitive Planning Phase (DPP) Intercnnectin System Impact and Facilities Studies with Technical and Nntechnical milestnes will need t be met t transitin t the DPP. Intercnnectin Facilities Study is an engineering reprt with scpe, schedule and cst estimates fr design and cnstructin f the Netwrk Upgrades and Intercnnectin Facilities. The Custmer may cnsult the MISO BPM fr Generatr Intercnnectin fr further details n milestnes and the scpe, timeframe and depsits required fr each f the Intercnnectin Studies. 2.3 Data Requirements Infrmatin is required frm the Custmer during the intercnnectin study prcess under the GIP and thrughut the life f the intercnnected peratin f the Generating Facility. Generally, Generating Facility Intercnnectin Guide 3 Revisin5.0

10 the infrmatin required during the GIP is nted in Table 2-1 belw. Additinal details are included in Appendix B f this Guide. Sectin 7 f this Guide addresses ATC s prcess fr wrking with Custmers t manage and maintain accurate data nce new generating capacity achieves Cmmercial Operatin. Table 2-1: MISO Generatr Intercnnectin Prcess Summary Prcess Cmpnents Required Infrmatin Pre-Queue and Applicatin Review System Planning & Analysis (SPA) Definitive Planning Cnstructin - Pre-Queue Discussins - Applicatin t MISO - Meet Milestne 1 (M1) - Feasibility Study - G-T Study Prcess Path Decisin (SPA r DPP) - System Impact Study - Meet Milestne 2 (M2) - SPA Review and Ptential Restudy (if SPA path taken) - Abbreviated System Impact Study (if SPA path nt taken) - Meet Milestne 3 (M3) - Facilities Study - IA Negtiatin Generic stability mdel; Pint f Intercnnectin (POI); impedance t POI; ne-line diagram; generatin utput; step-up transfrmer data; prf f site cntrl Generating Facility unit ratings, exciter data, reactance, time cnstants and curves; step-up transfrmer data; gvernr data; excitatin system data; Wind Farm specific data. M2 - Detailed stability mdel; definitive POI; definitive ne-line diagram: definitive generatin utput; prf f site cntrl; necessary permits; regulatry apprval; bard apprval; M2 depsit M3 ne f three: (1) Depsit equal estimated cst f Netwrk Upgrades, (2) Pwer purchase agreement r evidence f inclusin in state resurce adequacy plan, r (3) Evidence f turbine rder. Any required technical data, including: - Intercnnectin substatin lcatin and detail - Preliminary and final design Generating Facility Intercnnectin Guide 4 Revisin5.0

11 2.4 Intercnnectin Agreement After the Intercnnectin Studies are cmpleted and prir t final design and cnstructin f any required Netwrk Upgrades, the Custmer, ATC and MISO will execute a Generatr Intercnnectin Agreement (GIA). The GIA sets frth a schedule f milestnes fr the cnstructin f the Intercnnectin Facilities and Netwrk Upgrades necessary t intercnnect the prpsed new generating capacity, as determined by the Intercnnectin Studies. The schedule reflects the expected time t btain all necessary gvernmental and regulatry apprvals and permits required fr the cnstructin and peratin f the Generating Facility, Intercnnectin Facilities, and Netwrk Upgrades. The GIA als establishes the terms and cnditins fr the intercnnected peratin f the Generating Facility including, amng ther things, peratinal crdinatin, utage scheduling, crdinatin f planned and emergent maintenance, future mdificatins, billings and payments and ther cmmunicatins and crdinatin prcedures. Sme additinal detail in this regard is prvided in Sectin 7 f this Guide. 2.5 Crdinatin with Lcal Utilities Generating Facility intercnnectin prjects require significant crdinatin with ther lcal utilities. As a transmissin-nly cmpany, ATC des nt prvide lcal distributin utility services, but as a business partner, ATC supprts the integratin f new generatin int its territry. The Custmer is respnsible fr cmpliance with the requirements f the lcal distributin utilities and while this Guide is nt intended t describe thse requirements in detail, there are a number f typical issues that warrant cnsideratin early in the intercnnectin prcess. a. Facilities lcatins and ptential cnflicts Overhead distributin facilities Undergrund distributin facilities Delivery rute fr large equipment, including crane-walk plans fr equipment installatin b. Metering Balancing authrity metering 5 Revenue metering c. Temprary (cnstructin) and permanent service Auxiliary pwer 5 Cnsult ATC s Crdinatin f Balancing Authrity Business Practice fr guidance n the crdinatin f Balancing Authrity Area (BAA) facilities assciated with generatr intercnnectins. Generating Facility Intercnnectin Guide 5 Revisin5.0

12 3 Design Requirements 3.1 Intercnnectin Cnfiguratin Minimum Cnfiguratin The cnfiguratin f the intercnnectin substatin will depend n several factrs including, but nt limited t the number and size f generating units cnnected, the nminal vltage f the transmissin facilities t which the generatin is being intercnnected, the number f transmissin utlets either existing r required and whether r nt any f the transmissin lines are part f a black start system restratin path. The cnfiguratin f the Intercnnectin Facilities will be determined thrugh the study prcess. Hwever, the exact transmissin line and substatin lcatins may be mdified during the detailed design and regulatry prcess. As shwn in Figure 1, fr intercnnectin t the Transmissin System at vltages f 100 kv and abve, the minimum cnfiguratin fr the ATC intercnnectin substatin will be a three-psitin ring bus. Straight bus cnfiguratins may be cnsidered fr intercnnectin at vltages belw 100 kv, subject t the prvisins f Sectin 7.6 f this Guide. As shwn in Figure 2, an ATC-wned circuit breaker and discnnect switch in series with the Custmer s transfrmer circuit breaker as part f the ATC Intercnnectin Facilities will be required fr any straight bus cnfiguratin. As shwn in bth Figure 1 and Figure 2, fr all intercnnectins, the Custmer will, at minimum, prcure, install, wn and maintain a circuit breaker and discnnect switch between the Pint f Change f Ownership (PCO) and the Custmer s transfrmer (step-up r auxiliary) t transmissin vltage t be lcated in the Custmer s substatin. ATC Circuit Breaker ATC Ring Bus ATC Circuit Breaker POI ATC Circuit Breaker ATC Substatin Custmer Substatin PCO Custmer Circuit Breaker XXXX Custmer Transfrmer Generatr r Auxiliary Bus Generating Facility Intercnnectin Guide 6 Revisin5.0

13 Figure 1 Minimum cnfiguratin fr intercnnectin at 100 kv and abve POI ATC Straight Bus ATC Circuit Breaker ATC Substatin PCO Custmer Substatin Custmer Circuit Breaker XXXX Custmer Transfrmer Generatr r Auxiliary Bus Figure 2 Straight bus cnfiguratin Prximity f ATC and Custmer Substatins Fr an ATC intercnnectin substatin built adjacent t the Custmer s substatin, the cnnectin between the ATC netwrk bus and the Custmer s substatin will be cnsidered by ATC as a bus extensin and a bus prtectin scheme will be required. Hwever, if the substatins are nt adjacent, the cnnectin will be cnsidered a line, nt a bus extensin and a line prtectin scheme will be emplyed by ATC Demarcatin and Ownership The Pint f Intercnnectin (POI) will be the pint at which the ATC Intercnnectin Facilities cnnect t the ATC intercnnectin substatin bus. The PCO will be at the pint at which the strain bus frm the Custmer s substatin cnnects t the dead end structure f the ATC Intercnnectin Facilities lcated in the ATC intercnnectin substatin. In the event that the intercnnectin is via rigid bus cnductr, the PCO will be the terminal cnnectin f ATC s switch in the ATC intercnnectin substatin. Substatin Site ATC s intercnnectin substatin will be designed as an entirely separate substatin frm the Custmer s substatin. The Custmer will be required t prvide a suitable site fr the ATC intercnnectin substatin. The Custmer will be required t cnvey t ATC all necessary easements, in a frm acceptable t ATC, ver all prperty wned, leased r therwise cntrlled by the Custmer, including easements fr ingress and egress t permit ATC access t all f the Generating Facility Intercnnectin Guide 7 Revisin5.0

14 ATC Intercnnectin Facilities and Netwrk Upgrades, which are n the prperty f the Custmer. Additinally, the site that the Custmer prvides t ATC must be sufficiently large enugh t accmmdate the present and future uses f ATC and meet the rugh grading requirements f ATC. The Custmer will be respnsible fr btaining all necessary zning, building, envirnmental, strm water retentin r detentin and ther permits r apprvals. The specific real estate requirements will be determined during the detailed design. If the Custmer s substatin is adjacent t the ATC intercnnectin substatin, a fence separating them will be required. ATC will design, wn and maintain this cmmn fence accrding t its standards. 3.4 Pwer Factr ATC s standard pwer factr range fr synchrnus and nn-synchrnus (e.g., wind turbines) generatin is 0.95 leading (when a Generating Facility is cnsuming reactive pwer frm the Transmissin System) t 0.90 lagging (when a Generating Facility is supplying reactive pwer t the Transmissin System) 6. The Generating Facility must be capable f maintaining a cmpsite pwer delivery at the POI acrss ATC s standard pwer factr range at all pwer utput levels between 10% and the Generating Facility s maximum rated pwer utput. Cntinuus dynamic peratin by nn-synchrnus machines thrughut the pwer factr design range as measured at the POI may be required if the Intercnnectin Studies identify this requirement. Such peratin will accunt fr the net effect f all energy prductin devices n the Custmer s side f the PCO. 6 These values have been apprved by the FERC fr use by ATC. (cf. FERC Orders ER and ER06-866) Generating Facility Intercnnectin Guide 8 Revisin5.0

15 Lw Vltage Ride-Thrugh Capability All generatrs cnnected t the Transmissin System must be capable f riding thrugh disturbances that depress system vltages, as required by FERC Orders 661-A and 693. All generatrs must cmmunicate the lw vltage as-built ride-thrugh capability f the Generating Facility fllwing the Cmmercial Operatin Date (COD). Generatin Vltage, Reactive Pwer and/r Pwer Factr Cntrl The Custmer must design the Generating Facility such that cntrls are included n each generating unit t be intercnnected t cntrl vltage, reactive pwer, and/r pwer factr cnsistent with the requirements f the GIA and Sectin 7.2 f this Guide. Additinally, the Custmer must design the Generating Facility t include prvisins fr pwer system stabilizers, except where exempted by the FERC. Depending n the size and lcatin f the generatr, a pwer system stabilizer may be required fr intercnnectin. Pwer Quality, Vltage Flicker and Harmnics The design, energizatin and peratin f any Generating Facilities must be cnsistent with ATC s Tariff-required Planning Criteria and Planning Guidelines PLG-CR-0004 and 0005 regarding pwer quality including harmnics; permissible vltage deviatins, flicker and distrtin; and distrtin f current wavefrms as measured at the POI. ATC s Planning Criteria and Operating Instructins are available upn request. Frequency The intercnnected Transmissin System has a nminal perating frequency f 60 Hz. The Custmer will install bth generatin cntrls and prtective relaying equipment necessary t maintain prper Transmissin System frequency (cf. Sectin 4.2). Fault Current Custmer facilities cnnected t ATC s Transmissin System can be subjected t fault levels that are largely the prduct f system characteristics and intercnnectin impedance. The Custmer s facilities must pssess sufficient fault interrupting and mmentary withstand ratings t meet the maximum expected fault current, with apprpriate margin fr future system grwth. ATC will prvide the transmissin cntributin t the fault current levels at the Pint f Intercnnectin in the System Impact Study reprt and therwise at the request f the Custmer. Auxiliary Pwer The Custmer shall prcure its wn primary and secndary surces f auxiliary pwer fr its substatin. ATC shall prcure its wn primary surce f auxiliary pwer fr the ATC intercnnectin substatin. ATC may require the Custmer t prvide, at Custmer s expense, a secndary surce f auxiliary pwer t the ATC intercnnectin substatin ff f the Custmer s substatin equipment. Vltage Level New intercnnectins must effectively address the vltage requirements f bth this sectin and Sectin 7.2. ATC perates transmissin facilities predminantly at nminal system vltages f 69, 138, 345 kv. Fr the purpses f this guide, any reference t 138 kv vltage levels shall als Generating Facility Intercnnectin Guide 9 Revisin5.0

16 encmpass intercnnectins t ATC s 115 kv system as well. ATC will discuss with the Custmer n a case-by-case basis requirements assciated with intercnnectins t the relatively small amunt f 161 and 230 kv facilities wned and perated by ATC Basic Impulse Insulatin Level ATC and the Custmer must ensure that all equipment is adequately prtected frm excessive system ver-vltages. This includes selectin f equipment Basic Impulse Insulatin Level (BIL) and prtective devices (e.g. surge arresters) t achieve prper insulatin crdinatin acrss the intercnnectin. ATC designs its transmissin facilities fr the BILs shwn in Table 3.1 belw. Intercnnectins at 230kV r 161kV will be reviewed n an exceptin basis. New substatins energized at 115 kv will be built t 138 kv system BIL. Additins t existing substatins energized at 115 kv r 138 kv; with 550 kv BIL cnstructin will be cntinued similar t their riginal design. In all ther cases cnsideratin will be given t the existing substatin design. Table 3.1: Basic Impulse Insulatin Levels (BIL) Nminal Operating Vltage (phase-t-phase) 345 kv 138 kv 69 kv Basic Insulatin Level (BIL) 1300 kv kv kv 1. In sme remte lcatins and transfrmers a 1050 kv BIL may be acceptable. 2. In sme remte lcatins and transfrmers a 550 kv BIL may be acceptable Recmmended Custmer Step-Up Transfrmer Cnfiguratin ATC recmmends that the Custmer install a generatr step-up r substatin transfrmer with a high-side, nminal center tap, with tw taps abve and tw taps belw, each set at 2.5% f the nminal vltage. ATC als recmmends a high-side grunded wye, transfrmer bank fr intercnnectin f a generating unit. Any ther transfrmer cnfiguratin may require enhanced prtectin, as determined by ATC. 4 Prtectin 4.1 General All Generating Facility intercnnectins t the Transmissin System shall be designed t avid safety hazards r t avid adversely affecting the quality f electric transmissin service t ATC custmers. Prtective equipment may need t be added t standard ATC facilities t prvide adequate prtectin f the Transmissin System. Requirements fr additinal prtective equipment will vary depending upn the amunt f generating capacity being added and n the nature f ATC s lcal system Prtective Relaying As part f the prtectin facilities, ATC will design and cnstruct a prtective relaying scheme t prtect the Transmissin System frm faults ccurring n the Custmer s Intercnnectin Facilities, the Generating Facility, ATC Intercnnectin Facilities, r the Transmissin System. The Custmer will be respnsible fr prtecting the Generating Generating Facility Intercnnectin Guide 10 Revisin5.0

17 Facility and all Custmer Intercnnectin Facilities frm faults ccurring n its facilities r the Transmissin System Prtective Devices The Custmer will design, install, set, and maintain all prtective devices necessary t prtect the Generating Facility in accrdance with ANSI/IEEE standards, Gd Utility Practice(s), Applicable Reliability Standards, the Intercnnectin System Impact and Facilities Studies and applicable standards and guides. Prtective devices, including thse perfrming the prtective functins required by ATC in accrdance with this Guide, will be installed by the Custmer t discnnect the Generating Facility frm the Transmissin System whenever a fault, abnrmal perating cnditin r equipment failure ccurs n r within the Generating Facility. The Custmer will ensure that such prtective devices and related equipment prperly crdinate with ATC prtective equipment, bth lcally and remtely and prvide a cmparable level f prtectin t the Generating Facility and the Custmer Intercnnectin Facilities as is prvided by ATC fr the ATC Intercnnectin Facilities and Transmissin System. The specific requirements and specific prtective devices t be installed will be determined in the Intercnnectin Studies. ATC Prtectin Relay The Custmer will allw ATC t review the Generating Facility prtectin, cntrl design and settings and their crdinatin, where applicable, with the ATC prtective devices prir t and after the COD. ATC reserves the right t refuse t allw the Custmer t initiate the tender f energy t the Transmissin System if, in the judgment f ATC, the Generating Facility prtectin devices, cntrls r verall prtectin methds d nt adequately prevent the Generating Facility frm intrducing r causing an adverse impact n the Transmissin System. Prtective Relay Requirements Prtective relays utilized by the Custmer shall: a. Meet r exceed ANSI/IEEE standards fr prtective relays (i.e., C , C , C , and C ). b. Have the apprpriate dcumentatin cvering applicatin, testing, maintenance, and service. c. Give psitive indicatin f what has caused a trip (targets). d. Have a means f testing that des nt require disturbance t wiring (e.g. a drawut case, test-blcks, test switches, etc.). The Custmer shall use micrprcessr-based prtective relays that include selfdiagnstic abilities, sequence f events, event-recrding capabilities, and perating flexibility. 4.2 Frequency Prtectin (IEEE 81) Generating Facility Intercnnectin Guide 11 Revisin5.0

18 The design f the Generating Facility relating t ver-frequency prtectin f the Generating Facility is discretinary with the Custmer. Hwever, the ver-frequency prtectin used by the Custmer will be prvided t ATC. Under-frequency prtectin will be in accrdance with the Applicable Reliability Standards Custmer Breaker Failure Prtectin (IEEE 50BF) The Custmer shall install a lcal dedicated 50BF breaker failure prtective relay n its breaker n the high-side f the generatr step-up transfrmer. The 50BF relay will be crdinated with ATC in rder t trip adjacent substatin breakers, in the event the generatr breaker fails t successfully pen fr any reasn. Synchrnism Check Relay (IEEE 25) The Custmer will synchrnize the Generating Facility t the Transmissin System acrss the Custmer-wned breaker installed n the high-side f the generatr step-up transfrmer. The Custmer shall prvide a synchrnism-check relay t supervise the autmatic r manual synchrnizatin f the Generating Facility t the Transmissin System. Autmatic synchrnismcheck relays will cntain the manufacturer s ptinal vltage mnitring functins and supervise the clsing f the circuit breaker. ATC will be entitled t review the settings and peratin f the Generating Facility s synchrnism check relay. Bus Differential Prtectin (IEEE 87) The Custmer shall prvide a dedicated current transfrmer input t the ATC bus differential prtectin scheme t prvide crdinated bus differential prtectin f ATC s bus. This current transfrmer shall be placed in a manner t ensure that the bus differential prtectin verlaps the generatr bus r step-up transfrmer prtectin. Reverse Pwer (IEEE 32) The prtectin system fr all cmbustin turbine generatrs cnnected t the Transmissin System and the reverse pwer relay pickup shall be set n mre than -7% f the machine rated MVA t prtect the Transmissin System frm a pssible vltage cllapse due t the gas turbine high pwer cnsumptin during mtring. Pwer Transfrmer Grund Time Overcurrent Prtectin (IEEE 51N) The Custmer shall install grund time vercurrent prtectin fr all generatr step-up and auxiliary pwer transfrmers t prtect them frm internal grund faults. Such prtectin will be crdinated with the backup grund time vercurrent prtectin. Prtectin Redundancy In accrdance with Gd Utility Practice, the Custmer shall design prtectin schemes such that n single cmpnent failure will prevent the islatin f faults and/r failed equipment. This may require prviding redundant r backup prtective schemes with separate sensing surces, separate trip paths, dual trip cils n breakers, separate cntrl pwer supplies, etc. Generatr Tripping Generating Facility Intercnnectin Guide 12 Revisin5.0

19 Each generating unit f the Generating Facility must be capable f discnnecting itself frm ATC s Transmissin System in the event f a system fault, abnrmal perating cnditin r equipment r system failure. If the Generating Facility is a wind farm, it must be discnnected at the cllectr bus t remve the grund surce f the cllectr t eliminate its cntributin t a system fault, abnrmal perating cnditin r equipment r system failure Recmmended Generatr Prtectin Functins ATC recmmends the fllwing prtective functins, which may prvide the Generating Facility with additinal backup prtectin frm transmissin relaying malfunctins, misperatins, equipment r system failure Phase Distance (Impedance) Prtectin (IEEE 21) The Custmer s distance relay zne that extends int the Transmissin System shuld be time-crdinated with line prtective relays t assure transmissin prtectin perates first. The time delay will be set higher than a secnd zne clearing time fr a line fault (typically 20 cycles). Impedance prtectin is prvided fr a generating unit when transmissin line(s) that cnnect it t the Transmissin System are prtected with phase distance relays. Time Overcurrent with Vltage Cntrl/Restraint (IEEE 51V) The Custmer s vercurrent relays that are vltage-cntrlled r vltage-restrained shuld be set belw lad current fr adequate sensitivity t Transmissin System faults while restraining peratin under emergency verlad cnditins. T prevent miscrdinatin with transmissin relaying, vercurrent relays shuld be sufficiently timedelayed. The time-delay setting shuld be based n the wrst-case crdinatin with ATC prtective relays, which is usually a delayed trip with breaker failure clearing times. Backup time vercurrent prtectin is prvided fr a Generating Facility when transmissin line(s) that cnnect it t the transmissin grid are prtected by vercurrent relays. Backup Grund Time Overcurrent Prtectin (IEEE 51N) It is recmmended that any backup grund time vercurrent prtectin perate fr grund faults at the end f all transmissin lines cming ut f the Generating Facility and be set t crdinate with the slwest grund fault prtectin n the Transmissin System. This relay is typically installed in the high-side neutral f the generatr step-up transfrmer. Negative Sequence Current (Unbalanced Lad) Prtectin (IEEE 46) The Custmer shuld apply a negative sequence time vercurrent relay t prtect the Generating Facility frm external unbalanced cnditins such as system phase-t-phase faults and pen cnductrs that can damage a generating unit(s). Out-f-Step (Lss f Synchrnism) Prtectin (IEEE 78) Generating Facility Intercnnectin Guide 13 Revisin5.0

20 The Custmer shall ensure that each generating unit is capable f separating frm the Transmissin System befre an ut-f-step cnditin r lss f synchrnism can ccur Vltage Balance (IEEE 60) The Custmer shuld ensure the fllwing vltage-dependent prtective functins are blcked when a lss f fuse is detected t prevent relaying misperatin: a. Phase distance (impedance) prtectin (IEEE 21); b. Under-vltage prtectin (IEEE 27); c. Lss f field (under-excitatin) prtectin (IEEE 40); d. Time vercurrent with vltage cntrl/restraint (IEEE 51V); e. Under-frequency prtectin (IEEE 81) Transmissin Line Autmatic Reclsing Near Generating Facility The autmatic re-clsing f breakers n ATC transmissin lines can be ptentially damaging t Custmer equipment that is in clse electrical prximity t the lines. As a general plicy, ATC will nt eliminate autmatic reclsing f verhead transmissin lines near a Generating Facility because that culd significantly affect the reliability f service t transmissin custmers. In rder t mitigate pssible negative effects f line autmatic reclsing n generating facilities, ATC typically will nt reclse lines fr the mst severe three-phase faults n the Transmissin System and will reclse a line first at a terminal remte frm the Generating Facility bus, fllwed by synchrnism check reclsing f the breaker at the Generating Facility bus. Autmatic reclsing is single-sht and is blcked shuld a fault be f a permanent nature. ATC may install additinal equipment t minimize the ptentially adverse effects f autmatic reclsing. This usually cnsists f cmmunicatin and/r cntrl equipment t discnnect the Generating Facility (r t cnfirm that it is discnnected) befre an ATC line is reclsed. In cases where the ATC intercnnectin substatin has tw transmissin utlets, a line side single-phase vltage-sensing ptential device will be installed at the remte terminal f each line. Additinally, the autmatic reclsing scheme at the remte terminal f each line will supprt disabling autmatic reclsing via supervisry cntrl Grunding The Custmer must design, install, and maintain grunding facilities t grund the Custmer s Intercnnectin Facilities. ATC reserves the right t apprve the grunding system design t ensure that the grunding system prperly prtects ATC s Intercnnectin Facilities. Additinally, ATC will determine the required shrt circuit ratings fr all f the ATC Intercnnectin Facilities and Netwrk Upgrades during the detailed design f such facilities. The Custmer shall prvide apprpriately sized r shrt circuit-rated Intercnnectin Facilities cmparable t thse required by ATC. The Custmer and ATC will design their respective substatins grund grids separately fr the maximum available fault current as specified by ATC. The grund grids f bth substatins will then be cnnected tgether at several lcatins alng the cmmn fence (if applicable) befre the substatins are placed in-service. The Custmer and ATC s designs shall address safe tuch and Generating Facility Intercnnectin Guide 14 Revisin5.0

21 step ptential nt nly fr their respective grund grids, but als fr alng the fence line with the cnnectin f the grund grids Equipment Ratings ATC shall determine the individual equipment ratings fr the ATC Intercnnectin Facilities and Netwrk Upgrades during the detailed design f the facilities in accrdance with its design standards and the Intercnnectin Studies. The Custmer shall size its Intercnnectin Facilities t apprpriately crdinate with the ATC Intercnnectin Facilities. ATC and the Custmer shall exchange infrmatin befre the COD r implementatin f any future mdificatins, including identificatin f the mst limiting piece f equipment, t achieve cmmn understanding f each party s respective Intercnnectin Facilities nrmal and emergency ratings. 5 Telemetry and Metering Requirements 5.1 Telemetry The Custmer shall prvide ATC with real-time analg and digital Generating Facility data. The methd in which the signals shall be transmitted t the ATC lcatin will be specified during the detail design f the Intercnnectin Facilities and Netwrk Upgrades. The Custmer shall prvide the data in a frmat acceptable t ATC. If the Custmer cannt supply the data in an acceptable frmat like ICCP, then ATC will install an RTU at the Generating Facility t cllect this infrmatin. Additinally, the Custmer will install and maintain intercnnectin metering and status data fr the cnnectin f each generating unit, except as nted belw In general, ATC requires cntinuus telemetry f the items listed in Sectins thrugh Status f Circuit Breakers The status f circuit breakers wned by the Custmer with the fllwing functins will be cmmunicated t ATC cntinuusly: Breakers capable f discnnecting the Generating Facility frm the Transmissin System Breakers capable f discnnecting any auxiliary lad frm the Transmissin System Breakers capable f discnnecting any device that is required t be in-service t meet the unit(s) requirements fr reactive pwer cmpensatin as part f the Intercnnectin Agreement Generating Facility Intercnnectin Guide 15 Revisin5.0

22 Status f Relay Equipment Status f relay equipment is required when the Custmer s relay equipment is prtecting, as primary r backup, any f ATC s Transmissin System equipment. Instantaneus Real and Reactive Pwer Data Instantaneus real and reactive pwer data are required fr each generating unit at the generatr terminal r cmpensated t the generatr terminal. Fr wind farms, aggregated real and reactive pwer data at the cllectin substatin are required. Lad values, MW and MVAR, fr the fllwing lcatins will need t be cntinuusly cmmunicated t ATC: All Generating Facility auxiliary lads cnnected between the generatr terminal and the POI with the Transmissin System All Generating Facility auxiliary lads cnnected directly t the Transmissin System All third-party lads supplied frm the Generating Facility f Custmer Intercnnectin Facilities Instantaneus Vltage Data Instantaneus vltage data needs t be cntinuusly cmmunicated at the terminal f each generatr fr all generatr types with the exceptin f wind farms. Fr wind farms, instantaneus vltage data will be cllected at the substatin bus. Instantaneus vltage data will als be cllected and cmmunicated at the terminal f any device installed t prvide static r dynamic reactive pwer cmpensatin within the Custmer s substatin Status and Readiness Cntinuus cmmunicatin is required as t the status f whether the fllwing is in-service and ready : Any pwer system stabilizer installed Autmatic vltage regulatr (AVR) Any special prtectin system (SPS) Any reactive pwer cmpensatin, whether static r dynamic Generating Facility Intercnnectin Guide 16 Revisin5.0

23 5.2 Lcal Balancing Authrity Metering The Custmer is respnsible fr wrking with an apprpriate Lcal Balancing Authrity t install necessary metering facilities, including instrument transfrmers within the Custmer s intercnnectin substatin. Prir t energizing the intercnnectin via the Transmissin System, the Custmer must prvide evidence f a Balancing Authrity Agreement t ATC. See ATC s Crdinatin f Lcal Balancing Authrity Metering Bundary Mdificatins Business Practice fr additinal infrmatin: 6 Testing, Inspectin and Cmmissining Testing and Inspectin Befre ATC prvides final apprval fr energizatin f the intercnnectin, the Custmer must demnstrate t ATC, thrugh witnessed tests and/r certified test dcumentatin, that the Generating Facility and each generating unit will nt have adverse impact n the peratin f the Transmissin System. Such tests and inspectins will include pre-energizatin testing f equipment cnnected t the transmissin bus, prtectin and cntrl systems and precmmercial testing f the gvernr, excitatin and/r pwer system stabilizer cntrls. Prtectin and cntrl systems include, but are nt limited t, AC auxiliary, DC systems, relaying systems, ptential and current circuits, and cmmunicatin systems. Initial Transfrmer Energizatin Installatin and cmmissining f a new Custmer transfrmer will require the initial energizatin t ccur frm the Transmissin System. Prir t initial energizatin f a new Custmer transfrmer at a new r existing Generating Facility and if determined necessary by ATC, the Custmer must permanently install mitigatin equipment (e.g., pre-insertin resistrs n the highside transfrmer circuit breaker) r cmmissin a technical study f the initial energizatin event t ensure that the initial energizatin f the transfrmer will nt result in any unacceptable impact t the Transmissin System r any ther intercnnected custmers. If the Custmer cmmissins a technical study fr this purpse, a final reprt must be submitted t ATC fr review n less than ten (10) business days prir t the Custmer s planned date fr initial energizatin. Reductin f DC Residual Flux The Custmer will perfrm an excitatin current test t determine if the cre f any new Custmer transfrmer is magnetized. If the test establishes that the cre is magnetized, the Custmer will perfrm the transfrmer manufacturer s recmmended prcedures t reduce the residual DC flux n the cre. The Custmer will then re-perfrm the excitatin current test t verify that the cre has been de-magnetized. The Custmer will prvide dcumented results f these prcedures t ATC prir t energizatin f the Custmer transfrmer. Generating Facility Synchrnizatin Unless therwise permitted by ATC, the Generating Facility shall be synchrnized t the Transmissin System at the Custmer s step-up transfrmer s high-side circuit breaker installed at Generating Facility Intercnnectin Guide 17 Revisin5.0

24 the POI. ATC shall furnish Transmissin System bus ptentials that may be used by the Custmer fr synchrnizing the Generating Facility t the Transmissin System. 7 Requirements after Cmmercial Operatin The GIA (per Sectin 2.4) establishes the terms and cnditins fr the intercnnected peratin f the Generating Facility after achieving Cmmercial Operatin, especially prcedures fr cmmunicatin and crdinatin amng the Custmer, ATC, and MISO. ATC sees such effective cmmunicatin and crdinatin as essential t planning, perating, and maintaining a safe and reliable Transmissin System and Generating Facility Intercnnectin. This sectin prvides summary guidance n certain Intercnnectin Agreement prvisins that may impact the Custmer s decisin-making in the design f new r mdified Generating Facilities fr intercnnectin t the Transmissin System. The Custmer shuld cnsult the Intercnnectin Agreement fr additinal detail n requirements pertinent t nging intercnnected peratins Operating Guidelines The specific requirements f each intercnnectin will dictate the establishment f mutually agreeable intercnnectin and/r perating guidelines applicable t each Generating Facility, if necessary. Generating Facility Vltage Schedule NERC Mandatry Reliability Standards VAR-001 and VAR-002 set frth the requirements Transmissin Operatrs and Generatr Operatrs/Owners must fllw t maintain netwrk vltage schedules. VAR-001 requires that the Transmissin Operatr specify a vltage schedule at the POI and direct the Generatr Operatr t cmply with the schedule in autmatic vltage cntrl mde (AVR in-service and cntrlling vltage). VAR-002 requires that the Generatr Operatr maintain the vltage schedule set by ATC and perate each generatr in autmatic vltage cntrl mde, amng ther requirements. VAR-001 prvides that [t]he vltage schedule is a vltage target that must be maintained within a tlerance band during a specified perid. ATC s standard vltage schedule is a target vltage f 102% f the nminal vltage at the Pint f Intercnnectin within a maximum permissible range f 95% t 105% until ATC specifies a new vltage schedule. The Generating Facility must be designed and perated fr this vltage schedule unless directed therwise. In additin, peratin within a desired tlerance band f 100% t 105% is recmmended t ensure efficient and reliable peratin f the bulk electric system due t real time system cnditins that may nt have been specifically mdeled in the planning hrizn. 7.3 Unit Stability The Custmer shall perate the Generating Facility in accrdance with the perating requirements f ATC, MISO, NERC, and any applicable reginal entity in additin t the stability requirements identified in the Intercnnectin System Impact Study reprt, r its equivalent, prepared fr the intercnnectin and which have been psted n the Transmissin Prvider s OASIS at: Generating Facility Intercnnectin Guide 18 Revisin5.0

25 System Restratin (Black Start) The Custmer is nt required t perate as a Black Start Resurce unless designated by a separate Black Start Service agreement. Hwever, in accrdance with Gd Utility Practice, Custmer will participate, when called upn by MISO r ATC, in ATC s Black Start System Restratin Plan fr the Generating Facility and ATC s Transmissin System, as well as any verificatin testing. The Custmer is required t supply t ATC its facility black ut plans. These plans shall include the equivalized impedance f the systems within the Generating Facility auxiliary system t large mtrs expected t be started during emergency cnditins alng with the apprpriate timedmain mdeling assumptins fr each large mtr t be used by ATC t cnfirm ATC s Black Start Plan. ATC will use this infrmatin t study the ability f a degraded system t start large mtrs, such as fans, pumps, and ther equipment during system black uts and restratin. The Custmer will als be expected t participate in any Black Start System Restratin Plan verificatin testing. Maintenance Testing After cmmissining f the Generating Facility, peridic maintenance, testing, mdificatin r trubleshting f Custmer equipment shall be dne with cnsideratin f the impact t the Transmissin System. Prtective relay testing that can trip any element f the Transmissin System shall be discussed and apprved by the ATC system peratr 10 business days prir t testing f equipment. Detectin f and Tripping fr an Electrical Island Cnditin In circumstances where the Generating Facility has n gvernr cntrls and the transmissin system design culd result in an islanding cnditin fr the utage f tw transmissin elements, ATC requires the Custmer t implement additinal prtectin systems as mutually agreed by the Custmer and ATC t prevent generatin frm being islated r islanded with intercnnected lad. Alternatively, ATC will require the Custmer t curtail their generatin fr circumstances that culd result in an island cnditin with the next cntingency. Generating Facility Mdificatins It is f critical imprtance fr reliable intercnnectin service and peratin f the Transmissin System that the Generatr Owner cmmunicate t ATC prpsed and planned changes t the Generating Facility, Intercnnectin Facilities and related equipment. Cmmunicatin f changes shuld ccur as early as pssible using the ATC Generating Facilities Mdificatin Ntificatin (GFMN) frm fund at: The GFMN frm may be sent t ATC via at: giantices@atcllc.cm The GFMN is t be used t cmmunicate events including, but nt limited t, the fllwing: Plant/Unit mdificatins due t emergency changes Planned/Prpsed plant/unit mdificatins Generating Facility Intercnnectin Guide 19 Revisin5.0

26 Plant/unit retirements nte that the GFMN des nt replace ther ntificatin requirements; it is in additin t thse requirements Plant/unit develpment The submittal f unit verificatin data created as a result f peridic testing The submittal f generatr data/infrmatin, as required, fr reprting data related t NERC and/r Reginal Entity standards The submittal f generatr data/infrmatin as required reprting due t MISO transmissin and/r energy market needs If prpsed mdificatins are determined t have an impact n the Transmissin System, ATC and the Custmer will cllabrate n the apprpriate slutin(s) t enable successful implementatin f the prpsed unit mdificatin. The Annual Review ATC perfrms an Annual Generatr Review t ensure the accuracy f its infrmatin fr Generating Facilities cnnected t the Transmissin System. Infrmatin btained via the Annual Review als cntributes t ATC filings made t RFC, MRO and NERC. The primary ATC functins using the Annual Review results are Planning, System Prtectin and Real Time Operatins. ATC will send an cmmunicatin t Generatr Owners requesting the fllwing infrmatin t initiate the Annual Review prcess: Any planned retirements f plants/units Any planned develpment f new plants/units Any mdificatins made in the prir year fr which ATC is unaware Any mdificatins planned r prpsed fr the future Special data reviews such as capability curve cnfirmatins Generating Unit Testing ATC desires t supprt and take part in the Generatr Owner s generatr reactive pwer capability verificatin testing. Crdinatin between the Generatr Owner and ATC will prvide a better test envirnment. ATC encurages the Generatr Owner t use the NERC MOD 25 frmat t reprt the results, the same frmat Generatr Owners use t reprt this data t NERC. Appendix C, Generating Unit Test Requirements, cntains detailed infrmatin fr crdinating testing. 8 Requirements Assuring Reliable Operatin at the Intercnnectin Pint ATC desires t ensure the peratinal reliability f intercnnectins t the ATC Transmissin System. The Intercnnectin Custmer will meet the fllwing needs in rder t receive apprval t cmmence peratin f a new plant r mve t peratin any mdificatins impacting an intercnnectin pint. The fllwing dates are used as end dates fr receiving all required dcumentatin and test results: 60 Calendar days prir t the first synchrnizatin date fr fssil r nuclear plants 60 Calendar days prir t the COD fr all ther plant types Generating Facility Intercnnectin Guide 20 Revisin5.0

27 Fr new plants, ATC apprval will prvide the Intercnnectin Custmer with the ability t submit the COD letter identified in Appendix E f the GIA. Fr mdificatins t existing facilities impacting a generatin t transmissin intercnnectin pint that d nt require MISO interventin, ATC apprval will allw the intercnnectin custmer t mve frward with peratin. Appendix B f this Guide identifies ptential reprting requirements including: Descriptin f the Generatr Requirements Matrix which identifies the timing, ratinale and uses f the data. Generatr Requirements Milestne and Prcess Timeline which prvides a picture f the milestnes, shwing where the milestnes fall. Effective Date: 4/11/14 Revisin: 5.0 TITLE: Generating Facility Intercnnectin Guide Apprved by: Page 21 f 39 Tm Finc, Vice President External Relatins & Plicy Generating Facility Intercnnectin Guide 21 Revisin5.0

28 Revisin Histry Revisin Authr Date Sectin Descriptin 1.0 Andrew Ctter All New / first publicatin 2.0 Andrew Ctter App. B - Added sectin Crdinatin with Lcal Utilities - 3-psitin ring bus as minimum cnfiguratin fr mst intercnnectins - Substatin site must meet ATC rugh-grade requirements - Synchrnism checking devices required in certain instances - Added generatr data requirement detail 2.1 Andrew Ctter App. B - Updated Black Start unit data requirements 3.0 Andrew Ctter App. B App. B 4.0 Andrew Ctter Randy Lange 5.0 Randy Lange and Heather Andrew App. B App. C 04/2014 Varius Sectin - Updated Figure Added sectin Vltage Level - Added sectin Basic Impulse Insulatin Level - Added sectin Detectin f and Tripping fr an Electrical Island Cnditin - Added crrespnding NERC reliability standard reference t B.13 - Added sectin Recmmended Custmer Step-Up Transfrmer Cnfiguratin - Added sectin 7.7 Generating Facility Mdificatins - Mdified Generatr Data Inventry Matrix - Added Appendix C Generating Unit Test Requirements -Cleaned up abbreviatins and naming -Added Sectin 8 -Added summary f the Requirements Matrix in Appendix C Generating Facility Intercnnectin Guide 22 Revisin 4.0

29 9 Appendix A: Glssary f Terms Any capitalized terms nt defined herein will have the meanings set frth in the MISO Tariff. Applicable Reginal Reliability Organizatin: the reliability rganizatin f NERC applicable t the Balancing Authrity f the Transmissin System t which the Generating Facility is directly intercnnected. ATC is a registered member f bth the Midwest Reliability Organizatin (MRO) and ReliabilityFirst Crpratin (RFC). Applicable Reliability Standards: the requirements and guidelines f NERC, the Applicable Reginal Reliability Organizatin, and the Balancing Authrity f the Transmissin System t which the Generating Facility is directly intercnnected. ATC Intercnnectin Facilities: all facilities and equipment wned by ATC frm the Pint f Change f Ownership t the Pint f Intercnnectin as identified in the GIA. The ATC Intercnnectin Facilities are sle-use facilities and d nt include Netwrk Upgrades r the Custmer s Intercnnectin Facilities. Balancing Authrity: an entity respnsible fr managing an electric system area (a Balancing Authrity Area) bunded by intercnnectin metering and telemetry; and capable f cntrlling generatin t maintain its interchange schedule with ther Balancing Authrity Areas and cntributing t frequency regulatin and which has received certificatin by NERC r a Reginal Reliability Cuncil f NERC. Cmmercial Operatin: the status f a Generating Facility that has cmmenced generating electricity fr sale, excluding electricity generated during Trial Operatin. Custmer: any entity that already has intercnnected r prpses t intercnnect a Generating Facility with the Transmissin System. Custmer s Intercnnectin Facilities: all facilities and equipment, as identified in the GIA, that are lcated between the Generating Facility and the Pint f Change f Ownership, including any equipment necessary t physically and electrically intercnnect the Generating Facility t the Transmissin System. Electric Reliability Organizatin: the Nrth American Electric Reliability Crpratin authrized by the FERC t prmulgate, seek apprval fr, and enfrce Mandatry Reliability Standards. Electrical Island: An islated perating cnditin which cuples a generatr(s) t lcal lad with n external cnnectin t the Transmissin System. Emergency Cnditin: a cnditin r situatin: (1) that in the reasnable judgment f the Party making the claim is imminently likely t endanger, r is cntributing t the endangerment f, life, prperty, r public health and safety; r (2) that, in the case f either MISO r ATC, is imminently likely (as determined in a nn-discriminatry manner) t cause a material adverse Generating Facility Intercnnectin Guide 23 Revisin 4.0

30 effect n the security f, r damage t the Transmissin System, the ATC Intercnnectin Facilities r the electric systems f thers t which the Transmissin System is directly cnnected; r (3) that, in the case f the Custmer, is imminently likely (as determined in a nndiscriminatry manner) t cause a material adverse effect n the security f, r damage t, the Generating Facility r the Custmer s Intercnnectin Facilities. System restratin and blackstart will be cnsidered Emergency Cnditins; prvided that the Custmer is nt bligated by this LGIA t pssess black-start capability. Any cnditin r situatin that results frm lack f sufficient generating capacity t meet lad requirements r that results slely frm ecnmic cnditins will nt cnstitute an Emergency Cnditin, unless ne f the enumerated cnditins r situatins identified in this definitin als exists. Federal Pwer Act: the Federal Pwer Act, as amended, 16 U.S.C. 791a et seq. FERC: the Federal Energy Regulatry Cmmissin r its successr. Generating Facility: the Custmer s device(s) fr the prductin f electricity cnsisting f ne r mre generating units identified in the Intercnnectin Request, but nt including the Custmer s Intercnnectin Facilities. Generating Facility Capacity: the aggregate net capacity f the Generating Facility where it includes multiple generating units at the Pint f Intercnnectin. Generatr Intercnnectin Agreement (GIA): the intercnnectin agreement in the frm f Appendix 6 f MISO s Generatr Intercnnectin Prcedures. Generatr Intercnnectin Prcedures (GIP): the intercnnectin prcedures that are included in the MISO Tariff and applicable t an Intercnnectin Request pertaining t a Generating Facility. Generatr Upgrades: the additins, mdificatins, and upgrades t the electric system f an existing generating facility r f a higher queued Generating Facility at r beynd the Pint f Intercnnectin t facilitate intercnnectin f the Generating Facility and render the transmissin service necessary t affect the Custmer s whlesale sale f electricity in interstate cmmerce. Gd Utility Practice: any f the practices, methds and acts engaged in r apprved by a significant prtin f the electric industry during the relevant time perid, r any f the practices, methds and acts which, in the exercise f reasnable judgment in light f the facts knwn at the time the decisin was made, culd have been expected t accmplish the desired result at a reasnable cst cnsistent with gd business practices, reliability, safety and expeditin. Gd Utility Practice is nt intended t be limited t the ptimum practice, methd, r act t the exclusin f all thers, but rather t be acceptable practices, methds, r acts generally accepted in the regin. Gvernmental Authrity: any federal, state, lcal r ther gvernmental regulatry r administrative agency, curt, cmmissin, department, bard, r ther gvernmental subdivisin, legislature, rulemaking bard, tribunal, r ther gvernmental authrity having jurisdictin ver Generating Facility Intercnnectin Guide 24 Revisin5.0

31 the Parties, their respective facilities, r the respective services they prvide, and exercising r entitled t exercise any administrative, executive, plice, r taxing authrity r pwer; prvided, hwever, that such term des nt include the Custmer, MISO, ATC, r any Affiliate theref. Initial Synchrnizatin Date: the date upn which the Generating Facility is initially synchrnized and upn which Trial Operatin may begin. In-Service Date: the date upn which the Custmer reasnably expects it will be ready t begin use f the ATC Intercnnectin Facilities t btain backfeed pwer. Intercnnectin Agreement: the agreement executed r t be executed by ATC, the Custmer, and MISO and filed at the FERC; representing mutually agreeable terms and cnditins pertinent t the intercnnectin f the Generating Facility t the Transmissin System. The frm f this agreement nt nly acceptably includes MISO s pr frma Generatr Intercnnectin Agreement (GIA), but als agreements executed and filed fr Generating Facilities whse intercnnectin preceded the existence f the GIA. Intercnnectin Facilities: all facilities and equipment between the Generating Facility and the Pint f Intercnnectin, including any mdificatin, additins r upgrades that are necessary t physically and electrically intercnnect the Generating Facility t the Transmissin System. Intercnnectin Facilities d nt include Generatr Upgrades r Netwrk Upgrades. Intercnnectin Facilities Study: a study cnducted by MISO, r its agent, fr the Custmer t determine a list f facilities (including the ATC Intercnnectin Facilities, System Prtectin Facilities, and if such upgrades have been determined, Netwrk Upgrades, Distributin Upgrades, Generatr Upgrades, and upgrades n Affected Systems, as identified in the Intercnnectin System Impact Study), the cst f thse facilities, and the time required t intercnnect the Generating Facility with the Transmissin System. The scpe f the study is defined in Sectin 8 f MISO Generatr Intercnnectin Prcedures. Intercnnectin Feasibility Study: a preliminary evaluatin f the system impact f intercnnecting the Generating Facility t the Transmissin System, the scpe f which is described in Sectin 6 f MISO Generatr Intercnnectin Prcedures. Intercnnectin Request: a Custmer s request, in the frm f Appendix 1 t the Generatr Intercnnectin Prcedures, t intercnnect a new Generating Facility, r t increase the capacity f, r make a Material Mdificatin t the perating characteristics f, an existing Generating Facility that is intercnnected with the Transmissin System. Intercnnectin Study: any f the fllwing studies: the Intercnnectin Feasibility Study, the Intercnnectin System Impact Study, and the Intercnnectin Facilities Study, r the Restudy f any f the abve, described in the Generatr Intercnnectin Prcedures. Intercnnectin System Impact Study: an engineering study that evaluates the impact f the prpsed intercnnectin n the safety and reliability f Transmissin System and, if applicable, an Affected System. The study will identify and detail the system impacts that wuld result if the Generating Facility were intercnnected withut prject mdificatins r system mdificatins, Generating Facility Intercnnectin Guide 25 Revisin5.0

32 fcusing n the Adverse System Impacts identified in the Intercnnectin Feasibility Study, r t study ptential impacts, including but nt limited t thse identified in the Scping Meeting as described in the Generatr Intercnnectin Prcedures. Mandatry Reliability Standards: thse standards prmulgated and apprved by NERC as the ERO, r any Reginal Entity authrized t d s, as ratified and apprved by the FERC that are applicable t ATC and the Custmer. MISO: the Midcntinent Independent System Operatr, Inc., the Reginal Transmissin Organizatin that administers the tariff and prvides transmissin and energy market services ver the transmissin facilities f its transmissin-wning members in interstate cmmerce. NERC: the Nrth American Electric Reliability Crpratin r its successr rganizatin. Netwrk Upgrades: the additins, mdificatins, and upgrades t the Transmissin System required at r beynd the pint at which the Intercnnectin Facilities cnnect t the Transmissin System t accmmdate the intercnnectin f the Generating Facility t the Transmissin System. Pint f Change f Ownership (PCO): the pint, as set frth in Appendix A t the GIA r Exhibit 1 f an Intercnnectin Agreement, where the Custmer s Intercnnectin Facilities cnnect t the ATC Intercnnectin Facilities. Pint f Intercnnectin (POI): the pint at which the ATC Intercnnectin Facilities cnnect t the ATC intercnnectin substatin bus. Reginal Entity: the entity r entities that have entered int a delegatin agreement with NERC and that have respnsibility fr the audit and investigatin f the cmpliance with Mandatry Reliability Standards. Tariff: MISO Tariff thrugh which pen access transmissin service and Intercnnectin Service are ffered, as filed with the FERC, and as amended r supplemented frm time t time, r any successr tariff. Transmissin Operatr: any entity respnsible fr the reliability f its lcal transmissin system, and that perates r directs the peratins f the transmissin facilities. Transmissin System: the facilities wned by ATC and cntrlled r perated by MISO and ATC at vltages 69 kv and are used t prvide transmissin service r Whlesale Distributin Service under the Tariff. Trial Operatin: the perid during which the Custmer is engaged in n-site test peratins and cmmissining f the Generating Facility prir t Cmmercial Operatin. Generating Facility Intercnnectin Guide 26 Revisin5.0

33 10 Appendix B: Generatr Data Requirements ATC requires the fllwing infrmatin frm the Custmer t prperly ensure prper system peratin and t mdel any Generating Facility cnnected t the Transmissin System. This infrmatin is required: Fr Cmmercial Operatin f a new plant r unit Fr a mdificatin impacting an existing intercnnectin If Generating Facility capability infrmatin has changed during implementatin (e.g., frm typical/estimated t apprved/final r due t a design mdificatin) If Generating Facility capability infrmatin has changed due t plant/unit maturatin The Generatin Data Requirements Matrix can be requested at: giantices@atcllc.cm ATC Intercnnectin Services Mdificatins t Existing Plants/Units The generatr data requirements identified in Appendix B are applicable t new Generating Facility Intercnnectins and any mdificatins made t existing Generating Facilities (e.g., exciters, gvernrs, prtectin systems, main r auxiliary transfrmers, etc.). The Generatr Owner shall cmmunicate any planned generatr mdificatins t the plant that wuld impact any f the parameters listed in Appendix B. Such mdificatins are cmmunicated t ATC accrding t the terms f the Intercnnectin Agreement. Please cmmunicate mdificatins using ATC s Generating Facilities Mdificatin Ntificatin (GFMN) frm which is available nline at; Send the GFMN t ATC using the fllwing address: giantices@atcllc.cm Upn receiving a GFMN, ATC will review the Custmer s prpsed/planned mdificatin(s) and determine the impact f these n the transmissin system. If mdificatins are determined t impact the transmissin system, ATC will establish a discussin t determine the apprpriate slutin(s) t enable successful implementatin Data Requirements Matrix The G-T Cmmercial Operatin Matrix, which can be seen n the GMD database, is used as a guide and a template t determine the milestnes needed t meet the Intercnnecting Custmers COD. The Matrix lists the requirements, critical dates, cmpliance bligatins and respnsibilities. The timeline shwn in Figure 3 lists a cndensed versin f the Matrix including the majr milestnes and prcess f a G-T Intercnnectin prject. Generating Facility Intercnnectin Guide 27 Revisin5.0

34 10.2 Data Requirements Timeline The fllwing Timeline shws the ATC requirements identified in Sectin The Element Numbers are identified n the Timeline as hw they are tied t critical dates. Generating Facility Intercnnectin Guide 28 Revisin5.0

35 COAT Generatin Based Timeline GIA Apprval Technical Meeting Start Prject Design Start Cnstructin Initial Energizatin Date (ATC Assets in Place and Functinal) Initial Backfeed Date Initial Sync Date COD Apprval Date Cmmercial Operatin Date Prject Develpment Perid Prject Design Perid Cnstructin Perid Usually the Same Date COD Apprval Perid COD Recnciliatin Perid Cmmercial Operatin Perid 30 Days Prir t Prject Design # Days Prir t Start f Cnstructin # 15 & 16 Prir t Start f Cnstructin # (18, 21 & 23) 720 Days Prir t COD (2 Years) # Days Prir t Energizatin Date # Days Prir t Initial Backfeed Date # Days After Energizatin Date # Days Befre COD # Days Prir t COD (1 Year) # 43 At Energizatin Date # (34, 36 & 38) Prir t GIA Apprval Technical Meeting # 1-6 Prir t Start f Prject Design # 7, 8, 9, 10, Days Prir t Start f Cnstructin # Days Prir t Energizatin (14 Mnths) # Days Prir t COD # Days Prir t Energizatin Date # 29 & Days Prir t Initial Backfeed Date # Days Befre COD # (63) Any Time Prir t COD # (100) Definitin Item numbers in Red are ATC internal r ccur prir t the GIA Executin. Therefre, these are nt reflected in the GIA Appendix B r C. Figure 3 Data Requirements Timeline Generating Facility Intercnnectin Guide 29 Revisin 4.0

36 11 Appendix C: Generating Unit Test Requirements This Appendix summarizes the detailed guide Generatr Owners use in scheduling generating unit testing with ATC as well as sets frth the cmmunicatin requirements fr the data derived frm such testing. A sample f a generatr capability curve can be seen in Figure 4. A flwchart dcumenting the prcess is included in Figure 5. The entire guide can be seen thrugh the Generatr Mdeling Database extranet site. Fr further details n the extranet site cntact ATC- Intercnnectin Services Data Requirements Timeline Fllwing are the ATC requirements f a Generatr Owner when the Generatr Owner is planning t perfrm a test f a generating unit. The requirement and benefits fall int tw categries: 1. Test Plan and Executin a. ATC real time Operatins are aware f tests, are then aware f real time system anmalies and can react accrdingly b. ATC Operatins can supprt the Generatr Owner test with adjustments t the transmissin system c. ATC System Prtectin is aware f special cnditins that may exist during the test and can react prir t the test d. ATC Operatins EMS functin has awareness and can then recrd specific reactins during the test fr the use in real time peratins 2. ATC Receipt f Resulting Test Results a. Prvides/cnfirms the mst current generatr capabilities allwing ATC Planning, System Prtectin and real time Operatins t adjust data and system expectatins b. Results can directly impact the utcme f ATC 10-Year Plan c. Satisfies the fllwing Regulatry Requirements: i. FAC-008 Facilities Rating Methdlgy ii. MOD-024 Identifies the Test Data Required iii. VAR-002 Identifies the Requirement fr the Cmmunicatin iv. TOP-003 Defines Test Requirements Generating Facility Intercnnectin Guide 30 Revisin 4.0

37 Figure 4 Generatr Capability Curve Generating Facility Intercnnectin Guide 31 Revisin5.0

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

Reliability Coordinator Area Restoration Plan

Reliability Coordinator Area Restoration Plan Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure N. Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 3. Detail... 2 3.1. Capacity and Energy Emergencies... 2 3.1.1. EEA 1 All Available Generatin in Use... 3 3.1.2. EEA 2

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Operating Process for Access to Gas Insulated Switchgear

Operating Process for Access to Gas Insulated Switchgear Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument

More information

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014 1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities.

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities. Prject QC-2015-01 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin Sessin with Cncerned Entities May 12, 2015 Outline Objectives f sessin Webinar (instructins) Québec regulatry

More information

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6 SlarEdge Immersin Heater Cntrller Installatin Guide Fr Eurpe, APAC & Suth Africa Versin 1.6 Cntents Cntents HANDLING AND SAFETY INSTRUCTIONS 2 Safety Symbls Infrmatin 2 Immersin Heater Cntrller Installatin

More information

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should: AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr

More information

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Streamer AG INMR Wrld Cngress 2017 EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Authrs: Jens Bthe, Etienne Cuisinier SUMMARY: Fr nw mre than 20 years, Streamer has dedicated its

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

GE Multilin 339 Motor Protection Specifications

GE Multilin 339 Motor Protection Specifications GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY 100W: BOP 20-5, BOP 50-2, BOP 100-1 200W: BOP 20-10, BOP 36-6, BOP 50-4, BOP 72-3, BOP 100-2, BOP 200-1 400W: BOP 20-20, BOP 36-12, BOP

More information

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments PID Cntrl with ADwin Prcessrs with Sub-Micrsecnd Respnse Times Cntrl a Variety f I/O CHESTERLAND OH March 9, 2015 *Adapted frm PID Cntrl with ADwin, by Dug Rathburn, Keithley Instruments By Terry Nagy,

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1 Avista Crpratin s Standards f Cnduct Implementatin and Cmpliance Prcedures 1 These prcedures explain in detail the measures taken by Avista Crp. and its affiliates t implement and cmply with the Federal

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

City of Sarasota Public Art Requirements Information Package

City of Sarasota Public Art Requirements Information Package City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin

More information

ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II

ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II ADANA SCIENCE AND TECHNOLOGY UNIVERSITY ELECTRICAL ELECTRONICS ENGINEERING DEPARTMENT ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6 Operatinal Amplifiers II OPERATIONAL AMPLIFIERS Objectives The

More information

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION PS 430 FOUR CHANNEL REMOTE SPEAKER STATION USER MANUAL August 2016 This prduct is designed and manufactured by: ASL Intercm BV Znnebaan 42 3542 EG Utrecht The Netherlands Phne: +31 (0)30 2411901 Fax: +31

More information

Technical Requirements for Frequency Containment Reserve Provision in the Nordic Synchronous Area

Technical Requirements for Frequency Containment Reserve Provision in the Nordic Synchronous Area Technical Requirements fr Frequency Cntainment Reserve Prvisin in the Nrdic Synchrnus Area Draft 2017 Prequalificatin Wrking Grup, FCP prject 26 June 2017 THIS IS A DOCUMENT DESCRIBING THE NEW TECHNICAL

More information

Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06

Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06 Draft AMI Use Case: D2 - Distributin Engineering r Operatins ptimize netwrk based n data cllected by the AMI system 04/13/06 Authr: Bb Yinger Authr: Standard Cnfig Page 1 f 35 Cntents Advanced Metering

More information

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT Quality is the cre reference fr EurSMC s activities, aimed t fully satisfy ur custmers needs and expectatins. DISCLAIMER The infrmatin, prduct specificatins,

More information

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE Versin 40 This is a general manual describing a series f single axis mdule Serv Amplifiers having utput capability suitable fr driving Brushless

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

CB-030S Circuit Board

CB-030S Circuit Board CB-030S Circuit Bard Designed fr use with the high trque PM486FH (up t 7A) Adjustable acceleratin and deceleratin time (0 t 2.5s) Stable speed peratin Switch fr manual r autmatic recvery f the thermal

More information

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note RS232 Cmmunicatin Between a Sunny By 2500U and a PC Technical Nte Revisin 1.5 July 8, 2003 Kent Sheldn Revisin Histry 1.5 July 8, 2003 Kent Sheldn Cntact update 20830 Red Dg Rad Grass Valley, CA 95945

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

Switch to Save Program. Frequently Asked Questions

Switch to Save Program. Frequently Asked Questions Switch t Save Prgram Frequently Asked Questins Prject Partners Invlved Bendig Bank has partnered with Energy Makevers t create the Switch t Save prgram. Envirnment & Sustainability Trudy Ellery, Head f

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI)

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI) CURRENT AND VOLTAGE SENSORS General Infrmatin Overhead Current and Vltage Mnitring Insulatrs (CVMI) Many electric utilities are using Distributin Autmatin (DA) fr bth verhead and undergrund systems. DA

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

A Basis for LDO and It s Thermal Design

A Basis for LDO and It s Thermal Design A Basis fr LDO and It s Thermal Design Hawk Chen Intrductin The AIC LDO family device, a 3-terminal regulatr, can be easily used with all prtectin features that are expected in high perfrmance vltage regulatin

More information

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2 Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,

More information

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin

More information

SENSOR AND MEASUREMENT TECHNOLOGY

SENSOR AND MEASUREMENT TECHNOLOGY SENSOR AND MEASUREMENT TECHNOLOGY FOR SENSOR MANUFACTURERS The perfect wireless system FOR MACHINE MANUFACTURERS Transferring sensr data directly int the cntrl unit Using the Wireless Sensr Gateway DATAEAGLE

More information

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech

More information

Developed By: Firefighter Alex Chapin August 2017

Developed By: Firefighter Alex Chapin August 2017 F O G N A I L O P E R A T I O N S 1. 1 Develped By: Firefighter Alex Chapin August 2017 T A S K S K I L L D E S C R I P T I O N A N D D E T A I L The fgnail, when deplyed in a timely and accurate manner

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada Wide Area Synchrnized Frequency Measurement System Architecture with Secure Cmmunicatin fr 500kV/220kV Egyptian Grid M M Eissa (SIEEE), Egypt Mahmud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hssam Gabbar,

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter .,Plc..d,~t l~ucji PA300 DIGITAL BASS PROCESSOR Cngratulatins n yur purchase f a Planet Audi signal prcessr. It has been designed, engineered and manufactured t bring yu the highest level f perfrmance

More information

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines ROSCOMMON COUNTY Public Summary f FOIA Prcedures and Guidelines This is nly a summary f the Cunty s FOIA Prcedures and Guidelines. Fr mre details and infrmatin, cpies f the Cunty s FOIA Prcedures and Guidelines

More information

A New Protection Technique Against Overvoltages in Low-Voltage Electrical Networks. Experimental Results

A New Protection Technique Against Overvoltages in Low-Voltage Electrical Networks. Experimental Results 160 A New Prtectin Technique Against Overvltages in Lw-Vltage Electrical Netwrks. Experimental Results Mircea TĂMAŞ, Emil MERDAN and Călin MUNTEANU Abstract: This paper prpses a new apprach ver the electrical

More information

Radiofrequency Radiation Assessment Report

Radiofrequency Radiation Assessment Report Radifrequency Radiatin Assessment Reprt Cathlic Schls Office Lismre Xavier Cathlic Cllege and Hly Family Primary Schl July 2014 Reference: C109995:J123349 Nel Arnld & Assciates Pty Ltd Level 1, 2 Mayneview

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

DOCUMENT OBSOLETE. Advanced Systems Tester 900AST Series Calibration Verification Procedure. Instructions. February A

DOCUMENT OBSOLETE. Advanced Systems Tester 900AST Series Calibration Verification Procedure. Instructions. February A Advanced Systems Tester 900AST Series Calibratin Verificatin Prcedure Instructins February 2006 Table f Cntents Intrductin...3 Test Instruments Required...3 Test Cmpnents Required...3 Test Prcedure...3

More information

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include

More information

IEEE C802.16h-06/029

IEEE C802.16h-06/029 Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Experiment 4 Op-Amp Circuits

Experiment 4 Op-Amp Circuits Experiment 4 Op-Amp Circuits Purpse: In this experiment, yu will learn abut peratinal amplifiers (r p-amps). Simple circuits cntaining peratinal amplifiers can be used t perfrm mathematical peratins, such

More information

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD Intrductin The Denver Internatinal Airprt (DEN) Art & Culture Prgram (in cllabratin

More information

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE 23rd Wrld Gas Cnference, Amsterdam 2006 MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE B. KORTTE USA ABSTRACT This paper details the features, functins and benefits f the Mueller C. MAGIC

More information

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1 SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning Versin:- 2.0 Date f Issue:- Sept 2013 Page 1 f 9 Nrthern Pwergrid Appendices A and B fr ENA Engineering Recmmendatin G81 Part 1: Design and Planning Framewrk fr design and planning, materials specificatin,

More information

Automated Meters Frequently Asked Questions

Automated Meters Frequently Asked Questions Autmated Metering Prject Utilities Divisin Phne: 403.529.8111 Autmated Meters Frequently Asked Questins Intrductin The City f Medicine Hat has cmpleted its prject t install autmated meters fr all electric,

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn

More information

GE Multilin 369 LV & MV Motor Management Relay Specifications

GE Multilin 369 LV & MV Motor Management Relay Specifications GE Multilin 369 LV & MV Mtr Management Relay Specificatins The mtr management relay shall prvide primary prtectin and management t medium vltage mtrs. The relay shall be equipped with the fllwing prtectin

More information

THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT

THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT IN THE MATTER OF THE LEGAL PROFESSION ACT, R.S.A. 2000, c. L-8 AND IN THE MATTER OF A HEARING REGARDING THE CONDUCT OF BRIAN SEKIYA, A MEMBER OF THE

More information

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines IONIA COUNTY Public Summary f FOIA Prcedures and Guidelines It is the public plicy f this state that all persns (except thse persns incarcerated in state r lcal crrectinal facilities) are entitled t full

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information