Operating Process for Access to Gas Insulated Switchgear

Size: px
Start display at page:

Download "Operating Process for Access to Gas Insulated Switchgear"

Transcription

1 Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument Cntrl Revisin n: 2 HP TRIM N: Apprval/ Reviewed date: 28 August 2017 Business prcess: Manage Health, Safety & Envirnment Dcument type: Crprate-wide prcedure Prcess wner: Manager Health, Safety & Envirnment Authr: J Masn Reviewers: J Wrkman Apprver: K McCall, Manager Health, Safety & Envirnment Warning: A printed cpy f this dcument may nt be the current versin. Please refer t transgrid.cm.au t verify the current versin.

2 Table f Cntents 1. Overview Purpse Plicy Base Reference Dcuments Scpe Implementatin Dcument Lcatin Making GIS Equipment Safe fr Wrk Pwer System Safety Rules Requirements General Requirements Electrical and Mechanical Safety features Defeating f Interlcks during Operatinal Switching Defeating f Interlcks during Maintenance Activities Preparatin f Switching Instructins Order f Switching Operatins Making GIS Equipment Safe fr Wrk using Remte Operatin Islatin Earthing Securing the Islatin and Earthing Making GIS Equipment Safe t Wrk where Lcal peratin is required Islatin Earthing Definitins Change histry Mnitring and Review Appendix A: Equipment Features at TransGrid GIS Substatins Haymarket 132kV GIS Haymarket 330kV GIS Beacnsfield Suth and Beacnsfield Nrth 132kV GIS Hlryd 330kV GIS Rkwd Rd 330kV GIS Rkwd Rd 132kV GIS Taree GIS Orange GIS Sapphire GIS Appendix B: Example Switching Sequences Haymarket 132kV GIS - Feeder Bay Equipment Only (9SC feeder) Haymarket 132kV GIS - Feeder Only (9SC feeder) Haymarket 330kV GIS - Bay Equipment Only (CB 5412A) Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 2 f 19

3 1. Overview 1.1. Purpse This dcument prvides apprved prcedures fr Islating and Earthing High Vltage GIS Equipment in accrdance with the Pwer System Safety Rules Categry Plicy Base Dcument Pwer System Safety Rules 1.3. Reference Dcuments Dcument Access fr Wrk n High Vltage Apparatus 1.4. Scpe This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Accuntability Respnsible persn Manager/Health Safety and Envirnment Mgr Training Authrised persns Respnsibility Maintenance and wnership f this prcedure Implementatin f training prgrams assciated with this prcedure Cmply with this prcedure 1.5. Implementatin This prcedure is t be implemented in cnjunctin with the implementatin f TransGrid s Pwer System Safety Rules. It will be available as a resurce, published n the Wire. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 3 f 19

4 1.6. Dcument Lcatin Blck diagram shwing lcatin f dcument in relatin t thers. Pwer System Safety Rules Categry 5 Categry 6 Categry 7 Operating Prcess fr Access t HV Apparatus Operating Prcess fr Access t Gas Insulated Switchgear Access fr Wrk n HV Substatin Apparatus Access fr Wrk n HV Overhead Lines Access fr Wrk n HV Transmissin Cables Prcedures Safe Wrk Practices n HV Substatin Apparatus Safe Wrk Practices n HV Overhead Lines Safe Wrk Practices n HV Cables Wrk Instructins Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 4 f 19

5 2. Making GIS Equipment Safe fr Wrk 2.1. Pwer System Safety Rules Requirements The Pwer System Safety Rules require that: Making GIS Safe fr Wrk Fr nrmal switching peratins, GIS shall be perated remtely using the substatin Human machine Interface (HMI) r ther remte cntrl facility; and Manual peratin f GIS fr switching purpses shall nt be cnsidered when equipment is energised, as this will bypass all interlcking. Nrmally GIS switchgear must be perated remtely. Operatin frm the lcal cntrl cubicle is nt cnsidered t be remte peratin therefre if remte peratin is nt pssible then additin precautins are required as detailed in Sectin 2.4. In additin t these requirements, all wrkers shall vacate the GIS hall during switching peratins General Requirements Electrical and Mechanical Safety features Extensive interlcking is prvided at GIS substatins t inhibit the clsing f an earth nt live High Vltage cnductrs. Safety may als be prvided by three-psitin switches that are mechanically designed t prevent any individual phase frm being in mre than ne state at any ne time, i.e. a phase that switches t earth cannt physically als be in the clsed psitin at the same time. Characteristics f equipment specific t individual sites are prvided in Appendix A Defeating f Interlcks during Operatinal Switching Where the nature f the wrk requires the defeating f interlcks during peratinal switching Rules and f the Pwer System Safety Rules shall apply Defeating f Interlcks during Maintenance Activities After the issue f an Access Authrity it is permissible fr the wrk team t defeat interlcking n equipment under their cntrl during maintenance activities Preparatin f Switching Instructins The High Vltage Switching Instructin will nt be written in a manner that prescribes remte r lcal peratin fr each step. This will assist the wrk where remte peratin is unexpectedly unavailable. It will be the respnsibility f the authrised persn perfrming the switching t cmply with the requirements f sectin 2.3 and 2.4 f this prcedure. Example switching sequences that are written in this style are prvided in Appendix B Order f Switching Operatins All switching shall be carried ut in accrdance with all the nrmal rules and cnventins except: Earths may be applied prir t islating VT secndary circuits and will be the nrmal practice; Visual checking f individual switchgear status using the mechanical indicatin is nt required. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 5 f 19

6 Lcking and tagging f apparatus shall be undertaken when cnvenient, rather than immediately after cmpleting each individual peratin. This is t allw the switcher t cmplete a number f remte peratins befre returning t the switchgear. Nte: Fr certain types f switchgear it is necessary t lck the islatrs befre clsing the earths Making GIS Equipment Safe fr Wrk using Remte Operatin Where Remte peratin f GIS switchgear is available the requirements f this sectin apply. An example switching sequence that cmplies with this prcedure is prvided in Appendix B Islatin Islatin will be in accrdance with Rule 5.6.2(a) f the Safety Rules. The switchgear psitin n the HMI satisfies the requirements f this rule Earthing The applicatin f HV Access Authrity earths shall be in accrdance with Rule f the Pwer System Safety Rules. An apprved earthing methd shall be used that ensures: Earthing switches shall nly be clsed nt High Vltage cnductrs that are identified as deenergised frm all surces by vltage and/r discnnectr indicatin. Earthing switches may be applied t High Vltage cnductrs that are identified as de-energised if the earth is already in place and is being extended t ther cnductrs by the clsure f a circuit breaker Securing the Islatin and Earthing This is t be dne n the switchgear level by lcking / tagging effective pints f islatin in their pen psitins and lcking / tagging effective earthing switches in their clsed psitins 2.4. Making GIS Equipment Safe t Wrk where Lcal peratin is required When there is n capability t perate the GIS equipment remtely r the remte capability is nt functining then Rule f the Pwer System Safety Rules applies. The additinal safety precautins applicable in such circumstances are as fllws: Islatin The indicatin f the switchgear psitin must be established visually, either directly r by using apprpriate cameras. The gas pressure must als be cnfirmed as satisfactry Earthing There are n additinal requirements when earthing lcally. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 6 f 19

7 3. Definitins Nil 4. Change histry Revisin n Apprved by Amendment 0 EGM/Netwrk Services & Operatins 1 Ken McCall, Manager/Health Safety and Envirnment 2 Ken McCall, Manager/Health Safety and Envirnment Superseded dcument GD HS G3 001, Prcedure updated and restructured t include: - Beacnsfield Nrth and Beacnsfield Suth 132kV GIS (including renaming f the Prcedure) - Crrectin t EnergyAustralia references - References t current versin f the Pwer System Safety Rules Prcedure updated t include Hlryd and Rkwd Rd GIS Inclusin f sectin t cver defeating f interlcks during maintenance activities All significant new additins and alteratins t Revisin 1 have been highlighted in this versin by a red vertical sidebar. Editrial changes (where the intent has nt been changed) have nt been highlighted. The fllwinghas als been changed: - Scpe revised t be generic t GIS sites; - Duplicatin f PSSR requirements remved; - Sectin Sectin revised 5. Mnitring and Review The Manager/Health Safety and Envirnment is respnsible fr the nging mnitring and review f the dcuments assciated with the Pwer System Safety Rules. This can include but is nt limited t: (a) Requesting regular feedback n the effectiveness f prcedures and wrk instructins. Apprpriate feedback tls include fcus grups and nline assessments; (b) Where a change has ccurred in ur prcesses; and (c) Recmmendatins arising frm incidents. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 7 f 19

8 6. Appendix A: Equipment Features at TransGrid GIS Substatins 6.1. Haymarket 132kV GIS The 132kV GIS at Haymarket is ttally enclsed, three phase encapsulated SF 6 insulated with the fllwing features: All High Vltage switching peratins can be carried ut frm the substatin cntrl rm as well as frm the lcal cntrl panels n the equipment flr. It is nly necessary t g t the equipment flr fr switching purpses t carry ut lw vltage/mechanical islatins t render equipment inperable, t apply lcks and t apply tags. The discnnectr/earthing switches are three psitin switches. They are essentially a rtating switch that has the states clsed / pen / earthed, but they are plarised in that nly ne side f the switch can be earthed. The mechanical design f the switch prevents any phase being in the clsed and earthed psitin simultaneusly. A self-checking system is prvided n the three-psitin switches t mnitr drive mtr current; if the current is utside the nrmal perating range, the system renders the switch inperable and alarms the unhealthy cnditin. This is designed t detect mechanical prblems such as failure f the drive shaft between phases that culd result in (say) 2 phases being in the earthed psitin and 1 phase being in the clsed psitin. Fault-making high speed earthing switches n all cables (line side f line discnnectr nly) and n all transfrmers (transfrmer side f transfrmer discnnectr nly). Nn fault-making earthing switches in all 3-psitin switches and n all 132kV bus sectins. The electrical interlck system cnsists f hardwiring between auxiliary cntacts at the GIS and is separate frm the substatin cntrl system. A mal-peratin f the substatin cntrl system will nt affect the GIS interlcking system. The interlcking is functinal fr bth lcal and remte electrical peratin. Manual peratin f the devices ver-rides all interlcking. Manual peratin facilities are intended and designed fr maintenance purpses nly, after islatin and earthing has been cmpleted. Manual peratin facilities are neither intended nr designed t be used fr High Vltage switching purpses. The electrical interlck system incrprates the fllwing design philsphy: Earthing switch peratin is inhibited unless all f the assciated discnnectrs are pen Earthing switch peratin is inhibited when the equipment t be earthed is energised. Fr cables and bus sectins three phase VT secndary vltages are used fr this check. Discnnectr peratin is inhibited when the discnnectr is under lad, unless there are tw ther lcal parallel circuits clsed. Discnnectr peratin is inhibited frm applying an earth t an unearthed sectin f switchgear. Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit. The psitin f the equipment is determined by the use f auxiliary cntacts cnnected t the perating shaft. Mechanical status indicatin is available n the frnt panel f all device perating mechanisms. Due t the physical arrangement f the GIS this will nt be visible n all circuit breakers. Viewing f cntact psitin is prvided n all discnnectrs and earthing switches via windws fitted t the GIS chambers using fixed r prtable cameras depending n accessibility f the windw. The camera view can be difficult t interpret and the nging reliability f the cameras and ptical fibre cabling has nt been warranted by the manufacturer. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 8 f 19

9 Prving de-energised facilities have been prvided adjacent t all earthing switches using capacitive cupling t detect High Vltage. Due t the extremely limited accessibility f sme f these pints, caxial cables have been used t prvide access t them fr perating purpses. The nging reliability f the fixed caxial cables prvided fr prving de-energised equipment has nt been warranted by the manufacturer. Explsin venting has been designed such that the GIS may be perated safely frm the lcal cntrl panel Haymarket 330kV GIS Ttally enclsed Gas Insulated Switchgear (GIS) is used at Haymarket 330/132kV Substatin fr 330kV transfrmer bays and the 330kV cable 42 t Sydney Suth substatin. The 330kV GIS at Haymarket is ttally enclsed, single phase encapsulated SF 6 insulated with the fllwing features: All High Vltage switching peratins can be carried ut frm the substatin cntrl rm as well as frm the lcal cntrl panels n the equipment flr. It is nly necessary t g t the equipment flr fr switching purpses t carry ut lw vltage/mechanical islatins t render equipment inperable, t apply lcks and t apply tags. Discnnectrs and nn-fault making earthing switches have a single mtrised perating mechanism per three-phase set. High-speed fault making earthing switches have a single mtrised perating mechanism per phase and may be perated individually. A self-checking system is prvided n each discnnectr and earthing switch drive, t mnitr drive mtr current; if the current is utside the nrmal perating range, the system renders the switch inperable and alarms the unhealthy cnditin. This is designed t detect mechanical prblems such as failure f the drive shaft between phases that culd result in (say) 2 phases being in the pen psitin and 1 phase being in the clsed psitin. Fault-making high-speed earthing switches are directly cnnected t 42 cable and each transfrmer. All ther earthing switches are nt fault-making. The electrical interlcking system cnsists f hardwiring between auxiliary cntacts at the GIS and is separate frm the substatin cntrl system. A mal-peratin f the substatin cntrl system will nt affect the GIS interlcking system. The General De-Interlcking key switch at the lcal cntrl panel verrides all interlcking fr switchgear in that bay. Interlcking functins shall be active fr all High Vltage switching purpses. The electrical interlcking system is functinal fr bth lcal and remte electrical peratin. Manual peratin f the devices verrides all interlcking. Manual peratin facilities are intended and designed fr maintenance purpses nly, after islatin and earthing has been cmpleted. Manual peratin facilities are neither intended nr designed t be used fr High Vltage switching purpses. The electrical interlcking system incrprates the fllwing design philsphy: Earthing switch peratin is inhibited unless all f the assciated discnnectrs are pen, including n the 132kV side f the transfrmer fr transfrmer earthing switches. Discnnectr peratin is inhibited when the assciated circuit breaker is clsed. Discnnectr peratin is inhibited frm extending an earth t an unearthed sectin f switchgear. Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit. The psitin f the equipment is determined by the use f auxiliary cntacts driven by the perating shaft. Mechanical status indicatin is available at each phase f all equipment and is readily visible. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 9 f 19

10 Viewing f cntact psitin is prvided n all discnnectrs and earthing switches via windws fitted t the GIS chambers using prtable cameras. Viewing f the cntacts using the naked eye is nt recmmended due t the prximity t sme windws f mving, external linkages f the perating mechanism. There is n prvisin fr prving de-energised n the 330kV GIS. The lcal cntrl panels are lcated several metres frm the switchgear. Explsin venting has been designed such that the GIS may be perated safely frm the lcal cntrl panel Beacnsfield Suth and Beacnsfield Nrth 132kV GIS The 132kV GIS at Beacnsfield Suth and Beacnsfield Nrth substatins is ttally enclsed, three phase encapsulated SF 6 insulated with the fllwing features: All High Vltage switching peratins can be carried ut frm the substatin cntrl rm as well as frm the lcal cntrl panels n the equipment flr. It is nly necessary t g t the equipment flr fr switching purpses t carry ut lw vltage/mechanical islatins t render equipment inperable, t apply lcks and t apply tags. The discnnectr/earthing switches are three psitin switches. They cnsist f a single plunger that can nly mve lengthwise ne directin mving it twards the earthing psitin, the ther directin mving it twards the islatr clsed psitin. The mechanical design f the switch prevents any phase being in the clsed and earthed psitin simultaneusly. A mal-peratin n the three-psitin switches is indicated n the cntrl system by being in the Intermediate psitin. The interlcking system ensures that further peratin f this equipment is nt pssible if it is in the intermediate psitin. This status indicatr is available n the substatin cntrl system. Fault-making high speed earthing switches are n: all cables (line side f line discnnectr nly) all transfrmers (transfrmer side f transfrmer discnnectr nly). All bus sectin cnnectins (bus side f islatrs nly) Nn fault-making earthing switches in all 3-psitin switches and n all 132kV bus sectins. The electrical interlck system cnsists f hardwiring between auxiliary cntacts at the GIS and is separate frm the substatin cntrl system. A mal-peratin f the substatin cntrl system will nt affect the GIS interlcking system. The psitin f the equipment is determined by the use f auxiliary cntacts cnnected t the perating shaft. The interlcking is functinal fr bth lcal and remte electrical peratin. Manual peratin f the devices ver-rides all interlcking, blcking peratin f all equipment that is dependent n its state. Manual peratin facilities are intended and designed fr maintenance purpses nly after islatin and earthing has been cmpleted. Manual peratin facilities are neither intended nr designed t be used fr High Vltage switching purpses. The electrical interlck system incrprates the fllwing design philsphy: (a) Fr Line/Cable bays: Earthing switch peratin is inhibited unless all f the assciated discnnectrs are pen Line Earthing switch peratin is inhibited when the equipment t be earthed is energised. Three phase VT secndary vltages are used fr this check. Bus earthing switch peratin is inhibited unless all surces f supply are islated Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit r in an intermediate state Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 10 f 19

11 Cable bay Islatrs are inhibited frm peratin unless all bay Earth Switches are pen (b) Fr Bus Cuplers and bus sectin cnnectrs : Earthing switch peratin is inhibited unless all f the assciated discnnectrs are pen Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit r in an intermediate state. Cable bay Islatrs are inhibited frm peratin unless bth cupler Earth Switches are pen. Mechanical status indicatin is available n the Lcal Cntrl Cubicle. The status f all HV equipment that can be perated and the HV equipment n which its peratin depends (accrding t the interlcks) is available frm the Substatin Cntrl System. Viewing f cntact psitin is prvided n all discnnectrs and earthing switches via windws fitted t the GIS chambers using prtable cameras and light surces. Specific Prving de-energised facilities have nt been prvided. The nly indicatrs are: Visual indicatin via the windws; Electrical indicatin at the substatin level (N Vlts/N Current); and Use f VT Secndaries and/r HVDS system where fitted. Explsin venting has been designed such that the GIS may be perated safely frm the lcal cntrl panel Hlryd 330kV GIS Ttally enclsed Gas Insulated Switchgear (GIS) is used at Hlryd 330/132kV Substatin fr 330kV transfrmer bays, the 330kV lines 1C and 1F t Sydney West substatin and the 330kV Cables 43 and 44 t Rkwd Rd. The 330kV GIS at Hlryd is ttally enclsed, single phase encapsulated SF 6 insulated with the fllwing features: All High Vltage switching peratins can be carried ut frm the substatin cntrl rm as well as frm the lcal cntrl panels n the equipment flr. It is nly necessary t g t the equipment flr fr switching purpses t carry ut lw vltage/mechanical islatins t render equipment inperable, t apply lcks and t apply tags. Discnnectrs and nn-fault making earthing switches have a single mtrised perating mechanism per three-phase set. High speed fault making earthing switches have a single mtrised perating mechanism per three phase set. A self-checking system is prvided n each discnnectr and earthing switch drive, t mnitr drive mtr current; if the current is utside the nrmal perating range, the system renders the switch inperable and alarms the unhealthy cnditin. This is designed t detect mechanical prblems such as failure f the drive shaft between phases that culd result in (say) 2 phases being in the pen psitin and 1 phase being in the clsed psitin. Fault-making high-speed earthing switches are directly cnnected t: N.1 and N.2 330/132kV transfrmers (ESw 5410, 5420) 1F and 1C 330kV lines (ESw 1C0, 1F0) 43 and kV cables (ESw 430, 440) N.1 Capacitr (ESw 5710) 5X1 Spare Bay (ESw 5X10) Bus Sectins Earthing Switches 5110, 5120, 5130, All ther earthing switches are nt fault-making. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 11 f 19

12 The electrical interlcking system cnsists f hardwiring between auxiliary cntacts at the GIS and is separate frm the substatin cntrl system. A mal-peratin f the substatin cntrl system will nt affect the GIS interlcking system. The General De-Interlcking key switch at the lcal cntrl panel verrides all interlcking fr switchgear in that bay. Interlcking functins shall be active fr all High Vltage switching purpses. The electrical interlcking system is functinal fr bth lcal and remte electrical peratin. Manual peratin f the devices verrides all interlcking. Manual peratin facilities are intended and designed fr maintenance purpses nly, after islatin and earthing has been cmpleted. Manual peratin facilities are neither intended nr designed t be used fr High Vltage switching purpses. The electrical interlcking system incrprates the fllwing design philsphy: Earthing switch peratin is inhibited unless all f the assciated GIS discnnectrs are pen. This des nt include the 132kV side f the transfrmer fr transfrmer earthing switches. Discnnectr peratin is inhibited when the assciated circuit breaker is clsed. Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit. The psitin f the equipment is determined by the use f auxiliary cntacts driven by the perating shaft. Mechanical status indicatin is available n a single phase nly per three phase set and is readily visible. Viewing f cntact psitin is prvided n all discnnectrs and earthing switches via windws fitted t the GIS chambers where accessible. Viewing f the cntacts using the naked eye is nt recmmended due t the prximity t sme windws f mving, external linkages f the perating mechanism. There is n prvisin fr prving de-energised n the 330kV GIS. The lcal cntrl panels are lcated a few metres frm the switchgear. Explsin venting has been designed such that the GIS may be perated safely frm the lcal cntrl panel. Lcal lcking and tagging f a discnnectr is required after pening f a discnnectr and prir t clsing an adjacent earthing switch Rkwd Rd 330kV GIS Ttally enclsed Gas Insulated Switchgear (GIS) is used at Rkwd Rd 330/132kV Substatin fr 330kV transfrmer bays, the 330kV cables 43 and 44 t Hlryd substatin, and N. 4 Reactr Bay. The 330kV GIS at Rkwd Rd is ttally enclsed, single phase encapsulated SF 6 insulated with the fllwing features: All High Vltage switching peratins can be carried ut frm the substatin cntrl rm as well as frm the lcal cntrl panels n the equipment flr. It is nly necessary t g t the equipment flr fr switching purpses t carry ut lw vltage/mechanical islatins t render equipment inperable, t apply lcks and t apply tags. Discnnectrs and nn-fault making earthing switches have a single mtrised perating mechanism per three-phase set. High speed fault making earthing switches have a single mtrised perating mechanism per three phase set. A self-checking system is prvided n each discnnectr and earthing switch drive, t mnitr drive mtr current; if the current is utside the nrmal perating range, the system renders the switch inperable and alarms the unhealthy cnditin. This is designed t detect mechanical prblems such as failure f the drive shaft between phases that culd result in (say) 2 phases being in the pen psitin and 1 phase being in the clsed psitin. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 12 f 19

13 Fault-making high-speed earthing switches are directly cnnected t: N.1, N.2 and N.3 330/132kV transfrmers (ESw 5410, 5420, 5430) 43 and kV cables (ESw 430, 440) N.4 Reactr (ESw 5940/1) Bus Sectins Earthing Switches 5110, 5110/1, 5130, 5130/1. All ther earthing switches are nt fault-making. The electrical interlcking system cnsists f hardwiring between auxiliary cntacts at the GIS and is separate frm the substatin cntrl system. A mal-peratin f the substatin cntrl system will nt affect the GIS interlcking system. The General De-Interlcking key switch at the lcal cntrl panel verrides all interlcking fr switchgear in that bay. Interlcking functins shall be active fr all High Vltage switching purpses. The electrical interlcking system is functinal fr bth lcal and remte electrical peratin. Manual peratin f the devices verrides all interlcking. Manual peratin facilities are intended and designed fr maintenance purpses nly, after islatin and earthing has been cmpleted. Manual peratin facilities are neither intended nr designed t be used fr High Vltage switching purpses. The electrical interlcking system incrprates the fllwing design philsphy: Earthing switch peratin is inhibited unless all f the assciated GIS discnnectrs are pen. This des nt include the 132kV side f the transfrmer fr transfrmer earthing switches. Discnnectr peratin is inhibited when the assciated circuit breaker is clsed. Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit. The psitin f the equipment is determined by the use f auxiliary cntacts driven by the perating shaft. Mechanical status indicatin is available n a single phase nly per three phase set and is readily visible. Viewing f cntact psitin is prvided n all discnnectrs and earthing switches via windws fitted t the GIS chambers where accessible. Viewing f the cntacts using the naked eye is nt recmmended due t the prximity t sme windws f mving, external linkages f the perating mechanism. There is n prvisin fr prving de-energised n the 330kV GIS. The lcal cntrl panels are lcated a few metres frm the switchgear. Explsin venting has been designed such that the GIS may be perated safely frm the lcal cntrl panel. Lcal lcking and tagging f a discnnectr is required after pening f a discnnectr and prir t clsing an adjacent earthing switch Rkwd Rd 132kV GIS The 132kV GIS at Rkwd Rd substatin is ttally enclsed, three phase encapsulated SF 6 insulated with the fllwing features: All High Vltage switching peratins can be carried ut frm the substatin cntrl rm as well as frm the lcal cntrl panels n the equipment flr. It is nly necessary t g t the equipment flr fr switching purpses t carry ut lw vltage/mechanical islatins t render equipment inperable, t apply lcks and t apply tags. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 13 f 19

14 The discnnectr/earthing switches are three psitin switches. They cnsist f a single plunger that can nly mve lengthwise ne directin mving it twards the earthing psitin, the ther directin mving it twards the islatr clsed psitin. The mechanical design f the switch prevents any phase being in the clsed and earthed psitin simultaneusly. A mal-peratin n the three-psitin switches is indicated n the cntrl system by being in the Intermediate psitin. The interlcking system ensures that further peratin f this equipment is nt pssible if it is in the intermediate psitin. This status indicatr is available n the substatin cntrl system. Fault-making high speed earthing switches are n: all lines, cables and reactr bays (line side f line discnnectr nly) all transfrmers (transfrmer side f transfrmer discnnectr nly). All bus sectin cnnectins (ESw 4110, 4110/2, 4120, 4120/2, 4130, 4130/2). They are nt 3 psitin switches. All ther Earthing Switches are nt fault-making earthing switches. The electrical interlck system cnsists f hardwiring between auxiliary cntacts at the GIS and is separate frm the substatin cntrl system. A mal-peratin f the substatin cntrl system will nt affect the GIS interlcking system. The psitin f the equipment is determined by the use f auxiliary cntacts cnnected t the perating shaft. The interlcking is functinal fr bth lcal and remte electrical peratin. Manual peratin f the devices ver-rides all interlcking, blcking peratin f all equipment that is dependent n its state. Manual peratin facilities are intended and designed fr maintenance purpses nly after islatin and earthing has been cmpleted. Manual peratin facilities are neither intended nr designed t be used fr High Vltage switching purpses. The Interlcking system prevents the simultaneus peratin f apparatus, and will blck the peratin f ther HV equipment if the status f any mnitred HV equipment is in an intermediate psitin. The electrical interlck system incrprates the fllwing design philsphy: (a) (b) (c) Fr Transfrmer bays: Transfrmer Earthing switch peratin is inhibited when the transfrmer is nt islated n the 132kV and 330kV side. Fr Line bays: Earthing switch peratin is inhibited unless all f the adjacent discnnectrs are pen Bus earthing switch peratin is inhibited unless all surces f supply are islated Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit r in an intermediate state Fr Bus Cuplers: Earthing switch peratin is inhibited unless all f the assciated discnnectrs are pen Circuit breaker clse peratin is inhibited when assciated discnnectrs are in transit r in an intermediate state. Line bay Islatrs are inhibited frm peratin unless bth cupler Earth Switches are pen. Mechanical status indicatin is available n all CB s, Discnnectrs and earthing switches. The status f all HV equipment that can be perated and the HV equipment n which its peratin depends (accrding t the interlcks) is available frm the Substatin Cntrl System. Viewing f cntact psitin is prvided n all discnnectrs and earthing switches via windws fitted t the GIS chambers using prtable cameras and light surces. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 14 f 19

15 Specific Prving de-energised facilities have nt been prvided. The nly indicatrs are: Visual indicatin via the windws; Electrical indicatin at the substatin level (N Vlts/N Current); and Use f VT Secndaries and/r HVDS system where fitted. Explsin venting has been designed such that the GIS may be perated safely frm the lcal cntrl panel Taree GIS TBA 6.8. Orange GIS TBA 6.9. Sapphire GIS TBA Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 15 f 19

16 6.10. Appendix B: Example Switching Sequences Haymarket 132kV GIS - Feeder Bay Equipment Only (9SC feeder) Refer t Haymarket HVOD diagram HYM The fllwing switching sequence is an example that applies the principles fr islatin and earthing when using remte r lcal peratin f switchgear. Manual peratin is prhibited. It is assumed that the feeder and bth bus sectins will remain energised during an utage f the bay equipment. Nte that there are n integral earthing and shrt-circuiting equipment with adequate fault making capacity within the area t be islated s the requirements f Sectins and apply. All lcal and remte peratins are cmmn except thse specifically stated as Lcal Operatin r Remte Operatin. Switching t Islate and Earth Operative step Operating functin Secndary actin and explanatin OFF-LOAD 9SC Open CB 9SC2 Use CB status indicatin ISOLATE AND EARTH Open Disc 9SC5 Lcal Operatin : Ensure visible break exists Remte Operatin : Use discnnectr status indicatin t check change f status Open Disc 9SC6 Lcal Operatin : Ensure visible break exists Remte Operatin : Use discnnectr status indicatin t check change f status Open Disc 9SC1 Lcal Operatin : Ensure visible break exists Remte Operatin : Use discnnectr status indicatin t check change f status Check pen CB 9SC2 Use CB status indicatin Clse E/S 9SC0/2 (Nte 1) Use earthing switch status indicatin t check change f status Clse CB 9SC2 (Nte 2) Use CB status indicatin t check change f status Clse E/S 9SC0/A3 (Nte 3) Use earthing switch status indicatin t check change f status Clse E/S 9SC0/B3 (Nte 3) Use earthing switch status indicatin t check change f status Nrmal cnditin n cmpletin f PRI All three islatin pints are nw cnsidered cnfirmed and earths have been applied Ntes: (a) Earthing switch 9SC0/2 may be clsed because the HV cnductrs are indicated as de- energised frm the: busbars by bus discnnectr indicatin (r visible break if perating lcally), and cable by cable discnnectr indicatin (r visible break if perating lcally). Fllwing clsure f this earthing switch, earths are cnsidered t have been applied t the cnductrs between the line discnnectr and the circuit breaker. If the line discnnectr had nt pened successfully the interlcking wuld have prevented the earths frm being applied. The mechanical design f the 3-psitin switch prevents any ne phase frm being in the clsed and earthed psitins simultaneusly. (b) Clsing circuit breaker 9SC2 extends the earths frm E/S 9SC0/2 up t the islatin pints at 9SC5 and 9SC6. This cnfirms that bus discnnectrs 9SC5 and 9SC6 are pen n the cnductrs that 9SC0/2 has earthed. The islatin pints 9SC5 and 9SC6 are nw cnsidered cnfirmed. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 16 f 19

17 (c) Either earthing switch 9SC0/A3 r 9SC0/B3 may be clsed because the pen cnditins f 9SC6 and 9SC5 have already been cnfirmed (de-energised frm the busbars) and Disc 9SC1 is indicated as pen (de-energised frm the cable). Secure the Islatin and Earthing This is t be dne n the switchgear level by securing the three psitin switches 9SC1, 9SC5 and 96C6 in their pen psitins and securing earthing switches 9SC0/2, 9SC0/A3 and 9SC0/B3 in their clsed psitins Access t three psitin switches 9SC1, 9SC5 and 9SC6 is nt prvided in the abve switching sequence and therefre the manual peratin f the switches is nt available and the lcks prvided n the manual peratin pints shall remain intact with apprpriate tags applied. Electrical peratin f all 3-psitin switches shall be disabled in the lcal cntrl cubicle by the pening f links and applicatin f tags. Prepare the Area fr Access Authrity Issue If earths are required t be remved t enable testing f the abve equipment, high vltage access t the 3- psitin switch will need t be requested r (and mre likely) the external earth cnnectins t the GIS may be remved. These shall nly be remved under testing high vltage access cnditins. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 17 f 19

18 6.12. Haymarket 132kV GIS - Feeder Only (9SC feeder) Refer t Haymarket HVOD diagram HYM The fllwing switching sequence is an example that applies the principles fr islatin and earthing when using remte r lcal peratin f switchgear. This switching sequence assumes that the feeder will be ffladed by TransGrid, islated at the remte end by AusGrid, then islated and earthed by TransGrid and finally earthed by AusGrid. Nte: All checks f islatin shall be perfrmed using ALL three phases. All lcal and remte peratins are cmmn except thse specifically stated as Lcal Operatin r Remte Operatin Switching t Islate and Earth Operative step Operating functin Secndary actin and explanatin OFF-LOAD 9SC Open CB 9SC2 Use CB status and current indicatins t ensure ff-lad Request AusGrid t Islate 9SC feeder within their system AusGrid are required t islate the transmissin line frm all surces f supply within their system using a prcedure acceptable t TransGrid. Receive clearance frm AusGrid that 9SC feeder is islated within their system ISOLATE AND EARTH Open Disc 9SC1 (Nte 1) Lcal Operatin : Ensure visible break exists Remte Operatin : Use discnnectr status indicatin t check change f status Check feeder de-energised Use feeder vltage indicatin Open CB 9SC2 (Nte 2) Use CB status indicatin t check change f status Clse E/S 9SC0 (Nte 3) Use earthing switch status indicatin t check change f status NOTES: (a) The effectiveness f the 9SC1 pint f islatin is cnfirmed by: The switch psitin indicatin (r visible break if perating lcally), (b) Circuit breaker 9SC2 may be left in either the pen r clsed psitin as far as this prcedure is cncerned. (c) Earthing switch 9SC0 is an integral earthing and shrt-circuiting device with adequate fault making capacity. Earthing switch 9SC0 may be clsed because the HV cnductrs are indicated as de- energised frm the: Busbars by discnnectr indicatin r visible break; and Transmissin line by the islatin clearance frm AusGrid Secure the Islatin and Earthing This is t be dne n the switchgear level by securing the three psitin switch 9SC1 in the pen psitin, securing earthing switch 9SC0 in the clsed psitin and islating the feeder CVT. Access t three psitin switch 9SC1 is nt prvided in the abve switching sequence and therefre the manual peratin f the switch is nt available and the lcks prvided at the manual peratin pint shall remain intact with apprpriate tags applied. Electrical peratin f the 3-psitin switch and earthing switch shall be disabled in the lcal cntrl cubicle by the pening f links and applicatin f tags. Advise AusGrid that the transmissin line is islated and earthed. This switching sequence nly prvides access t the transmissin line, if access is required t the TransGrid bay equipment further islatin and earthing steps will be required. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 18 f 19

19 6.13. Haymarket 330kV GIS - Bay Equipment Only (CB 5412A) Refer t Haymarket HVOD diagram HYM The fllwing switching sequence is an example that applies the principles fr islatin and earthing when using remte r lcal peratin f switchgear. All checks f islatin shall be perfrmed using ALL three phases. This example assumes that the N.1 and N.3 transfrmers will remain energised during an utage f the bay equipment. All lcal and remte peratins are cmmn except thse specifically stated as Lcal Operatin r Remte Operatin Switching t Islate and Earth Operative step Operating functin Secndary actin and explanatin OFF-LOAD CB5412A BAY Open CB 5412A Use CB status + current indicatins t ensure ff-lad ISOLATE AND EARTH Open Disc 5417 (Nte 1) Lcal Operatin : Ensure visible break exists Remte Operatin : Use discnnectr status indicatin t check change f status Open Disc 5437 Lcal Operatin : Ensure visible break exists Remte Operatin : Use discnnectr status indicatin t check change f status Clse E/S 5410/A2 (Nte 2) Use earthing switch status indicatin t check change t clsed status Clse E/S 5410/A3 Use earthing switch status indicatin t check change t clsed status NOTES: (a) The effectiveness f the 5417 and 5437 pints f islatin are cnfirmed by: The switch psitin indicatin (r visible break if perating lcally), (b) Earthing switches 5410/A2 and 5410/A3 are integral earthing and shrt-circuiting devices with adequate fault making capacity. Earthing switch 5410/A2 may be clsed because the HV cnductrs are indicated as de-energised frm: N.3 Tx by discnnectr indicatin r visible break, and N.1 Tx by discnnectr indicatin r visible break. Secure the Islatin and Earthing This is t be dne n the switchgear level by securing the discnnectrs 5417 and 5437 in their pen psitins and securing earthing switches 5410/A2 and 5410/A3 in their clsed psitins. Operating Prcess fr Access t Gas Insulated Switchgear Revisin N: 2 Page 19 f 19

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID: xtltipelement Service Infrmatin 2015 Chevrlet Crvette Crvette Service Manual 7527625 Bdy Systems Vehicle Access Repair Instructins Dcument ID: 3448513 Remte Cntrl Dr Lck and Theft Deterrent Transmitter

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6 SlarEdge Immersin Heater Cntrller Installatin Guide Fr Eurpe, APAC & Suth Africa Versin 1.6 Cntents Cntents HANDLING AND SAFETY INSTRUCTIONS 2 Safety Symbls Infrmatin 2 Immersin Heater Cntrller Installatin

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. 2-gang Art. N. : HS2 RF 4-gang Art. N. : HS4 RF Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

GENERAL TECHNICAL DATA Specifications, Directives and Standards

GENERAL TECHNICAL DATA Specifications, Directives and Standards GENERAL TECHNICAL DATA Specificatins, Directives and Standards The Camden prducts listed in this catalgue are develped and manufactured accrding t the rules set ut in IEC internatinal publicatins and EN

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E AIR CONDITER REMOTE CONTROLLER ILLUSTRAT CS406-R5E 00550905 0009 Thank yu very much fr purchasing ur air cnditiner. Please read this wner's manual carefully befre using yur air cnditiner. CONTENTS Handling

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System VIP-200 Vide ver IP Extender and Matrix System Pint t Pint Extensin Cnfiguratin Quick Start Guide PureLink TM 535 East Crescent Avenue Ramsey, NJ 07446 USA Cntents What is in the bx... 3 Transmitter kit

More information

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI)

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI) CURRENT AND VOLTAGE SENSORS General Infrmatin Overhead Current and Vltage Mnitring Insulatrs (CVMI) Many electric utilities are using Distributin Autmatin (DA) fr bth verhead and undergrund systems. DA

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

Beechcraft Bonanza HID Landing Light Assembly Kit

Beechcraft Bonanza HID Landing Light Assembly Kit Beech Bnanza HID Light Assembly Kit Manual N. HID-B-001 Issue Date: 5-8-05 STC N. SA01834CH Revisin Date: 12-22-07 Beechcraft Bnanza HID Landing Light Assembly Kit INSTALLATION MANUAL N. HID-B-001 Beechcraft

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1 Altis Flight Manager PC applicatin fr AerbTec devices AerbTec Altis v3 User Manual 1 Table f Cntents Intrductin...3 Requirements...3 Installatin...3 Applicatin...3 USB Driver fr Altis v3 interface ALink...4.NET

More information

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY 100W: BOP 20-5, BOP 50-2, BOP 100-1 200W: BOP 20-10, BOP 36-6, BOP 50-4, BOP 72-3, BOP 100-2, BOP 200-1 400W: BOP 20-20, BOP 36-12, BOP

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

AF4000 MOD-1 OEM Production Line Troubleshooting Guide

AF4000 MOD-1 OEM Production Line Troubleshooting Guide Revisin 0: Initial dcument creatin, 9/2006, M. Rgers AF4000 MOD-1 OEM Prductin Line Trubleshting Guide If erratic system behavir is bserved that cannt be reslved by the methds utlined belw, ensure that

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

SISTEMA ELEVATÓRIO ETV 460A

SISTEMA ELEVATÓRIO ETV 460A Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )

More information

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC) PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing

More information

CB-030S Circuit Board

CB-030S Circuit Board CB-030S Circuit Bard Designed fr use with the high trque PM486FH (up t 7A) Adjustable acceleratin and deceleratin time (0 t 2.5s) Stable speed peratin Switch fr manual r autmatic recvery f the thermal

More information

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014 1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun

More information

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech

More information

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note RS232 Cmmunicatin Between a Sunny By 2500U and a PC Technical Nte Revisin 1.5 July 8, 2003 Kent Sheldn Revisin Histry 1.5 July 8, 2003 Kent Sheldn Cntact update 20830 Red Dg Rad Grass Valley, CA 95945

More information

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo)

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo) Standard Operating Prcedure fr SEM3 (ThermFisher / FEI Apre) Befre beginning, ensure yu have an active reservatin fr SEM3 in CreResearch@Duke Lading a Sample: If Sample Exchange Windw is nt pen, click

More information

GE Multilin 339 Motor Protection Specifications

GE Multilin 339 Motor Protection Specifications GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad

More information

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE Versin 40 This is a general manual describing a series f single axis mdule Serv Amplifiers having utput capability suitable fr driving Brushless

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

Using the Laser Cutter

Using the Laser Cutter Using the Laser Cutter Prerequisites Befre yu will be allwed t use the laser cutter, yu must cmplete these three steps: 1. Yu must have cmpleted the Laser Cutter training at Cyberia 2. Yu must schedule

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

CONTENTS. Product Type Output No of Output Input Approvals Page! and Series Power Outputs Voltage Voltage Number. Open Frame.

CONTENTS. Product Type Output No of Output Input Approvals Page! and Series Power Outputs Voltage Voltage Number. Open Frame. NTENTS Prduct Type Output N f Output Input Apprvals Page! and Series Pwer Outputs Vltage Vltage Number Open Frame RA 15t29W 1 5, 15 r 24V 100, 120, 220, 240V a.c. CE 211 RB 30 t 58W 1 5, 12 r 24V 100,

More information

Cover Glass Monitor. Operation Manual

Cover Glass Monitor. Operation Manual Cver Glass Mnitr Operatin Manual WARNING WORKING AROUND HIGH-POWERED LASERS CAN BE DANGEROUS Laser Mechanisms, Inc. s cutting heads must never be perated withut the cutting head interlck switch being cnnected.

More information

Dry Contact Sensor

Dry Contact Sensor www.akcp.cm Dry Cntact Sensr Intrductin The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

PPA PORTS UKC STANDARDS

PPA PORTS UKC STANDARDS TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL

More information

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION PS 430 FOUR CHANNEL REMOTE SPEAKER STATION USER MANUAL August 2016 This prduct is designed and manufactured by: ASL Intercm BV Znnebaan 42 3542 EG Utrecht The Netherlands Phne: +31 (0)30 2411901 Fax: +31

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2 Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,

More information

PSR extractor. Switch to Master guide. Edition : 1.3 Edition Date : 22/01/08 Status : Released Issue

PSR extractor. Switch to Master guide. Edition : 1.3 Edition Date : 22/01/08 Status : Released Issue PSR extractr Switch t Master guide Editin : 1.3 Editin Date : 22/01/08 Status : Released Issue DOCUMENT IDENTIFICATION SHEET DOCUMENT DESCRIPTION Dcument Title PSR Extractr : Switch t Master Guide Dcument

More information

ACM1281 NFC Reader Module Reference Information

ACM1281 NFC Reader Module Reference Information ACM1281 NFC Reader Mdule Reference Infrmatin ACM1281 NFC Reader Mdule Technical Reference Infrmatin V1.00 Subject t change withut prir ntice inf@acs.cm.hk www.acs.cm.hk Versin Histry Date By Changes Versin

More information

Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06

Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06 Draft AMI Use Case: D2 - Distributin Engineering r Operatins ptimize netwrk based n data cllected by the AMI system 04/13/06 Authr: Bb Yinger Authr: Standard Cnfig Page 1 f 35 Cntents Advanced Metering

More information

Reliability Coordinator Area Restoration Plan

Reliability Coordinator Area Restoration Plan Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin

More information

ORIGINAL SIZE SYSTEM CONTROL DWG. FILE. ROSEMOUNT 2410 OrCADl. o o

ORIGINAL SIZE SYSTEM CONTROL DWG. FILE. ROSEMOUNT 2410 OrCADl. o o CH. ORDER CH. ORDER N CH. ORDER N CH. ORDER N FIELDBUS INTRINSICALLY SAFE CONCEPT (FISCO) APPROVAL FISCO allws f intrinsically safe apparatus t assciated apparatus nt specially examined in such cmbinatin.

More information

These specifications describe requirements for a power distribution unit (PDU) distributing power to sensitive loads.

These specifications describe requirements for a power distribution unit (PDU) distributing power to sensitive loads. PDI PwerPak 2 Pwer Distributin Unit Guide Specificatins (Revisin 002, 6/1/2017) 1 General 1.1 Summary These specificatins describe requirements fr a pwer distributin unit (PDU) distributing pwer t sensitive

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

SolarEdge Built-in Revenue Grade Meter Troubleshooting

SolarEdge Built-in Revenue Grade Meter Troubleshooting SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices

More information

Standard OPS-020 Avionics and Communications

Standard OPS-020 Avionics and Communications Standard OPS-020 Avinics and Cmmunicatins The Natinal Aerial Firefighting Centre r NAFC is a business unit f the Australasian Fire and Emergency Service Authrities Cuncil Limited (ACN 060 049 327). The

More information

A_LT-2W & B_LT-2W Series 2W, FIXED INPUT, ISOLATED & UNREGULATED DUAL/SINGLE OUTPUT DC-DC CONVERTER

A_LT-2W & B_LT-2W Series 2W, FIXED INPUT, ISOLATED & UNREGULATED DUAL/SINGLE OUTPUT DC-DC CONVERTER A_LT-2W & B_LT-2W Series 2W, FIXED INPUT, ISOLATED & UNULATED DUAL/SINGLE OUTPUT - CONVERTER FEATURES Efficiency up t 85% Lw Temperature rise 1KV Islatin SMD Package Operating Temperature Range: - C ~

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT Quality is the cre reference fr EurSMC s activities, aimed t fully satisfy ur custmers needs and expectatins. DISCLAIMER The infrmatin, prduct specificatins,

More information

Damocles 2404i Manual

Damocles 2404i Manual Damcles 2404i Inputs 1 8 Each blue terminal is shared by tw inputs. POWER 12V supply (+U / GND) ETHERNET Link & Activity Inputs 17 24 Each blue terminal is shared by tw inputs. Cnfiguratin Default: DIP1=

More information

Lightning Protection. Study/Report UMKC Substation. Kansas City, Missouri. Burns & McDonnell. University of Missouri - Kansas City.

Lightning Protection. Study/Report UMKC Substation. Kansas City, Missouri. Burns & McDonnell. University of Missouri - Kansas City. Lightning Prtectin Study/Reprt UMKC Substatin Kansas City, Missuri Burns & McDnnell University f Missuri - Kansas City By: Rbert Biggs The fllwing lightning prtectin study, with its assciated drawings,

More information

Arc Vault Protection System

Arc Vault Protection System GE Energy Industrial Slutins Arc Vault Prtectin System Applicatin and Technical Guide HAZARD CLASSIFICATIONS The fllwing imprtant highlighted infrmatin appears thrughut this dcument t warn f ptential hazards

More information

RSB Service Bulletin No.. RSB--E4--003/12

RSB Service Bulletin No.. RSB--E4--003/12 RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure N. Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 3. Detail... 2 3.1. Capacity and Energy Emergencies... 2 3.1.1. EEA 1 All Available Generatin in Use... 3 3.1.2. EEA 2

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved Hw t Install a Slate Tile Flr By See Jane Drill TM Cpyright 2014, All Rights Reserved Resurces Needed t Cmplete the Jb Tls & Supplies Pwer drill with mixing want (a bucket trwel can als be used fr mixing)

More information

Dispatcher Control for MotoTRBO Capacity Plus Systems

Dispatcher Control for MotoTRBO Capacity Plus Systems Dispatcher Cntrl fr MtTRBO Capacity Plus Systems This tutrial prvides brief instructins t set up the dispatch cntrl ver MtTRBO Capacity Plus systems, using SmartPTT dispatch sftware. Bth cases are cnsidered:

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

Introduction to Life Cycle Risk Management Help Page

Introduction to Life Cycle Risk Management Help Page Select a frequently asked questin (FAQ) t skip t its answer. Hw is the curse rganized? Wh shuld take this curse? Hw d I get credit fr this curse? What d all the navigatin buttns d? Hw d I knw what t click?

More information

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning Versin:- 2.0 Date f Issue:- Sept 2013 Page 1 f 9 Nrthern Pwergrid Appendices A and B fr ENA Engineering Recmmendatin G81 Part 1: Design and Planning Framewrk fr design and planning, materials specificatin,

More information

2017 NEC Significant Code Changes Part 5

2017 NEC Significant Code Changes Part 5 2017 NEC Significant Cde Changes Part 5 Fur (4) Cntinuing Educatin Hurs Curse Apprval #EE1005 Apprved Cntinuing Educatin fr Prfessinal Engineers 2017 NEC Significant Cde Changes Part 5 i Table f Cntents

More information

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range Remte Sensing & Zning Installatin Guide Pr Technlgies P.O. Bx 3377 Springfield, MO 65804 Tll ree : 888-776-47 Web: www.priaq.cm Hurs f Operatin: M- 9AM - 6PM Eastern Table f Cntents Table f Cntents Quick

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information