ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS
|
|
- Alaina Joseph
- 6 years ago
- Views:
Transcription
1 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/ Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002 Dispensatin fr Signalling s (Design Practice Nte). Rev 1 cvers signalling dispensatin nly; Rev 2 t be develped t cver ther disciplines. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 f 17
2 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 External Distributin List: Name Psitin Organisatin Len Neist Chief Engineer Public Transprt Victria Aidan Wright Steven Perks Cassie Khaw Jim Hunter Steve Petzierides Daniel Cullen Jeremy Rae Alex Rbinsn General Manager, Asset Perfrmance Principal Engineer Signalling Cnfiguratin Manager General Manager, Netwrk Engineering Prgram Manager, Signalling Track & Pwer Engineering Directr Manager Prgram Engineering Engineering Manager Public Transprt Victria Public Transprt Victria Public Transprt Victria VLine VicTrack Melburne Metr Rail Authrity Level Crssing Remval Authrity Evlutin Rail Nte: This prcedure has been prepared in cnsultatin with PTV and V/Line, and been reviewed by the relevant stakehlders. In this regard, PTV issued a cmmunicatin nte (attachment t dated 22 August 2017) regarding submissin f dispensatin requests t ARTO Chief Engineer Office, supprted by drawing dispensatin argument, fr acceptance. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 f 17
3 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Table f Cntents 1. Purpse Scpe Abbreviatins and Acrnyms Definitins Guiding Principles Prcess Dispensatin Types Respnsibilities Exclusins Related Dcuments Appendix A Dispensatin Type A: N New Design Wrk Occurring On Appendix B - Dispensatin Type B: New Design Wrk Occurring On Appendix C Definitin Detailed Clarificatin Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 f 17
4 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Purpse This dcument details Metr Trains Melburne s (MTM) prcess fr submitting dispensatin requests fr drawings where there is justificatin t nt cmply with Public Transprt Victria s (PTV) Management System (DMS) requirements. The dcument clarifies the definitin f cmpliant and nn-cmpliant drawing frm the DMS drafting perspective and when a dispensatin shall be necessary fr acceptance f a drawing int the DMS. While there is a requirement t prepare DMS cmpliant drawings fr all wrks, the dispensatin prcess has been intrduced t recgnise that there are sme cases where the practicability f bringing existing nn-cmpliant drawings t standard utweighs the benefit. 2. Scpe The prcedure applies t all As-In-Service (AIS) drawings that are bked back int the PTV DMS. This dcument prvides guidance n the dispensatin rules t signalling drawings with all ther disciplines t be cnsidered in a future update t this dcument. In the meantime, the principles described in this dcument will als be applicable fr reviewing dispensatins fr ther disciplines. 3. Abbreviatins and Acrnyms AIS As In-Service ARTO Accredited Rail Transprt Operatr BIF Bk in Frm BP Bnding Plan DMS Management System MTM Metr Trains Melburne OCE Office f the Chief Engineer PTV Public Transprt Victria SAP Signalling Arrangement Plan SFAIRP S Far As Is Reasnably Practicable VRIOGS Victrian Rail Industry Operatr Grup Standards Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 f 17
5 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Definitins As-In-Service r As-Built Cmpnent Replacement Crrelatin Cmpliant Certificatin Dispensatin Assurance Argument Nn-Cmpliant Shall Shuld As-in-Service drawings reflect what has been cnstructed and/r installed in the field at the time f certificatin fr DMS bk in. The terms As-in-Service (AIS) and As-built are used interchangeably thrughut the rail industry. Cmpnent Replacement refers t a type f wrk that des nt result in a change t the functinality and/r integrity f the system. Such wrks may include like-fr-like cmpnent replacement (as defined in L1-CHE-INS-071). Crrelatin is the prcess f checking the drawing against the infrastructure site t ensure it accurately reflects what exists in the field. A drawing that cnfrms t the requirements f the apprpriate versin f PTV Infrastructure Drafting Standards r the legacy VRIOGS DMS standards as applicable. The prcess f assuring that the AIS drawing accurately reflects what have been cnstructed and/r installed in the field as far as the changes are cncerned, and fr the remaining prtins, the cntents f the previus drawing have been shwn/re-drawn accurately. An argument prviding assurance which demnstrates that the risks assciated with the nn-cmpliant drawing have been managed S Far As Is Reasnably Practicable (SFAIRP). A drawing that des nt cmply t the relevant PTV Infrastructure Drafting Standard. Is used as the descriptive wrd t express a requirement that is mandatry t achieve cnfrmance. Is used as the descriptive wrd t express a requirement that is recmmended in rder t achieve cmpliance but nt a mandatry requirement. Nte: Fr further detailed clarificatin n these definitins refer t Appendix C. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 f 17
6 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Guiding Principles The PTV Infrastructure Drafting Standards (frmerly knwn as VRIOGS 007.2) defines the standards required fr a Cmpliant. All AIS drawings are required t be bked int the DMS, fully cmpliant t the PTV Infrastructure Drafting Standard r the standard applicable when the drawing was created. Dispensatins shall nly be cnsidered when there is sufficient justificatin and assurance that the verall functinality f the circuit, system r netwrk is nt cmprmised and risk has been managed SFAIRP by the nn-cmpliant drawing being submitted fr bk-in. Dispensatin requests shall nly be cnsidered, if applied, during the design phase. Dispensatin Requests submitted after IFC, nt related t updates t references cvered under Dispensatin Type A (refer Appendix A), shall require special apprval by the MTM Chief Engineer in cnsultatin with PTV. The designer shall develp cmpliant AIS drawings in rder t manage SFAIRP safety risks assciated with nn-cmpliant drawings. When the designer identifies drawings that are prpsed t be submitted as nncmpliant, the designer shall request a drawing dispensatin. This request shall be submitted as sn as the designer becmes aware that a dispensatin may be required, within either the develpment r design phase. All dispensatin requests shall be supprted by a Dispensatin Assurance Argument which demnstrates that the risks assciated with the drawings remaining nncmpliant have been managed SFAIRP. The Dispensatin Assurance Argument shall ensure that, by the drawing remaining nn-cmpliant, risks t the peratinal netwrk, maintainer and future designers have been managed SFAIRP. The Dispensatin Assurance Argument is t be cmpleted within the dispensatin request frm (L4-CHE-FOR-075) with any additinal supprting dcumentatin attached. The request fr dispensatins shall be reviewed by the Office f the Chief Engineer (OCE) and apprved nly when there is sufficient justificatin. It shall be evaluated based upn the fllwing: The level f risk that exists r that is intrduced against the level f effrt and cst required t meet cmpliance; r That it is risk prhibitive t make the drawing cmpliant. PTV may cnduct audits f the prcess based n dispensatin reviews carried ut within a specified timeframe. Cnsultants and cntractrs wh undertake design shall endeavur t meet the DMS drawing standard and ensure that they have accunted fr the wrk in terms f prject prgram and budgeting. Stringent review and apprval criteria apply. Dispensatins will nt be granted purely n the basis f cntractual agreements, prgram r financial grunds. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 f 17
7 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Prcess Requests fr Dispensatin shall be submitted as per the flwchart belw. Start (Fllw During Design Phase) DRAWING DISPENSATION REQUEST PROCESS Dispensatin Identificatin & Preparatin Phase (By Designer) Is the (s) New r Currently Existing n PTV DMS System? New Designer t Create New Cmpliant Existing Is the Existing (s) DMS Cmpliant r Nn- Cmpliant? Cmpliant Designer t Ensure Updated (s) is fully Cmpliant Nn-Cmpliant Shuld the (s) be updated and made Cmpliant? Yes Designer t Ensure Updated (s) is fully Cmpliant N Designer t Prepare Dispensatin Assurance Argument Yes Designer t Prepare Mark- Up (s) N Dispensatin Review & Apprval Phase (By OCE) Ensure Dispensatin Request is raised based n the Guidelines (use Frm L4-CHE-FOR-075) Via PM / IM Submit t OCE t seek Apprval OCE t review Dispensatin Request based n Dispensatin Types, Assurance Argument, Justificatins & Mark Ups Submitted OCE t Send Ntificatin f Dispensatin Request Outcme Is the Designer Required t Re-Assess the Dispensatin Request and Re-Submit* Submit As-Built (s) t OCE fr Review (with Dispensatin Apprval Ntificatin fr reference where applicable) *Dispensatin Requests that fail t get accepted by the OCE are t be made fully DMS cmpliant r else Re- Assessed and Re-submitted with further Evaluatin if directed by Engineering Was the Dispensatin Request Apprved r Rejected? Rejected Accepted? Rejected Designer t revise drawing based n Cmments & Directins PTV t cmment (if any) within 10 days Apprved Ensure revised prtins f (s) are Cmpliant and clearly capture in Ntes t distinguish between Cmpliant and Nn Cmpliant prtins fr rerefence by future designers Accepted Bk In t PTV DMS Fllw usual As Built Review Prcess. (fr All s) Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 f 17
8 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Designers shall request dispensatin in line with the fllwing requirements: Requests shuld be made as early as pssible, but prir t the detailed design phase, r final design phase, when there is exemptin frm prviding a detailed design. Requests shall be against ne f the dispensatin types listed within this dcument. A Dispensatin Assurance Argument shall be supplied by the designer and shall include justificatins fr the drawings t remain nn-cmpliant r partially nncmpliant in accrdance with the SFAIRP principle. Design drawings mark-up f the design changes shall be attached (yellw and red drawings fr signalling designs) t the request. A drawing dispensatin request frm (L4-CHE-FOR-075) shall be cmpleted and include all f the abve required infrmatin fr review and apprval. Dispensatin requests shall be sent t EDRG.DMS@metrtrains.cm.au via the ARTO Prject Manager r Interface Manager. The OCE shall review the request in-line with the fllwing requirements: Requests shall be reviewed t ensure all dispensatin requirements have been satisfied. Requests shall be reviewed against the dispensatin types listed within this dcument s lng as the underlying risks have been demnstrated t be managed within the SFAIRP principle. Dispensatin requests shall be reviewed by the OCE within 10 business days f submissin, hwever dispensatin apprval may take lnger fr cmplex requests that require cnsultatin with PTV. The applicant will be ntified f the review cmpletin timeframe when it takes lnger than the stipulated timeframe. The utcme f the dispensatin shall be dcumented int the drawing dispensatin request frm (L4-CHE-FOR-075). Where the OCE has queries abut the dispensatin request, they shall cnsult with PTV prir t any apprval being given. Apprved dispensatins shall be submitted t PTV fr audit. OCE apprved dispensatins shall be cmmunicated t the requestr in parallel with the submissin t PTV. Nte: 1) PTV has the ability t prvide cmments in regards t an apprved dispensatin within 10 days f apprval. MTM will infrm the designer that the dispensatin request is t be re-visited if cmments have been received frm PTV. The OCE shall re-visit the request within 2 business days. Designers shall be respnsible fr cmplying with any amendment t the dispensatin apprval arising frm the PTV audit utcme. 2) If the cntext f the dispensatin changes such that it des nt meet the riginal criteria fr which it was apprved (e.g. changes in drawing dispensatin argument, increase in the scpe f design n the drawings apprved within the dispensatin t such an extent that it vids the dispensatin argument, multiple dispensatin requests n the same drawing that prevent the pprtunity fr making the drawing cmpliant at sme stage, etc.) between the time f apprval and the submissin f drawings fr DMS bk in, the OCE reserves the right t reverse the decisin and withdraw the dispensatin and subsequently review all dispensatins granted fr the prject. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 f 17
9 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 PTV may cnduct an audit in line with the fllwing requirements: Ensure that all the requirements f the designer and MTM have been adhered t. Review that the dispensatins have been granted in accrdance with the dispensatin types listed within this dcument. Nte: Audits can als be cnducted by PTV thrughut the cycle f the prject until the final submissin f drawings t DMS in the cntext f the dispensatin changes (as stated in the MTM dispensatin review prcess in Nte 2 abve), dispensatin requests, designer and ARTO assessment prcess. 7. Dispensatin Types Dispensatin Requests shall be submitted under ne f the fllwing classificatin Types: Dispensatin Categry Type A (A1 and A2) Type B (B1, B2, B3 and B4) Descriptin N New Design Wrk Occurring n New Design Wrk Occurring n Reference Refer Appendix A fr details Refer Appendix B fr details 8. Respnsibilities The MTM Prject Manager (Interface Manager in the case f an Alliance) is respnsible fr: Understanding the dispensatin prcess and managing external and internal parties t ensure that AIS drawings are crrectly bked back int the DMS Ensuring that dispensatin prcess is adhered t by designers (bth in-huse and external t the ARTO) Ensuring that all drawings and new drawing numbers bked ut frm the DMS are bked back int the DMS fr clse-ut The designer is respnsible fr: Submitting a dispensatin in line with the requirements f this prcedure Cmpleting the Dispensatin Assurance Argument Crrelatin f drawings (bth cmpliant & nn-cmpliant) prir t perfrming any design as per MTM Design and Review requirement The ARTO OCE is respnsible fr: Reviewing the Dispensatin Assurance Argument Apprving/Rejecting dispensatins in line with the requirements f this prcedure Cnsulting PTV where required if in dubt f the validity f a dispensatin request Peridic review and update f this prcedure, including cnsultatin with PTV Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 f 17
10 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 PTV is respnsible fr: Perfrming audits f dispensatin request and dispensatin prcess Review and cmment n updates t the dispensatin prcess Prpse updates t the dispensatin prcess Further clarificatin t the prcess can be btained frm the ARTO OCE. 9. Exclusins Dispensatins shall nt be cnsidered r applicable t the fllwing situatins: a. If the drawing is cmpliant as defined in this dcument, whether r nt taken ut f the DMS Cmpliant r Nn-Cmpliant vault, all updates shall be reflected in a cmpliant manner and bked back int the DMS Cmpliant vault. b. s cmpliant t a legacy drafting standard (i.e. VRIOGS 007.2) shall be updated keeping t drafting standard at the time f the drawing creatin r later, whichever is apprpriate. The drawing shall be bked int the Cmpliant vault and n dispensatin will be needed in such circumstances. c. If new equipment r terminals are intrduced within a lcatin bx, the entire bx layut drawing shall be redrawn, including the cntact analysis, and crrelated t the extent f the prject mdificatin/installatin. These drawings shall be fully cmpliant. N dispensatin shall be granted if there is a change in the lcatin layut. Fr layut f apparatus, terminatins and cntact analysis drawings, it is expected that the fllwing will be cmpleted as a minimum: Full wire cunt/null cunt and layut check. Equipment psitin t be crrelated. Any incnsistencies fund that relate t the circuits (e.g. new wire cunt des nt match actual circuit drawing) shall be flagged with a nte and d nt require further investigatin unless related t the wrks being undertaken r deemed as safety critical. These shall be brught t the attentin f the OCE. Nte t be added if functin and sheet reference is nt crrelated. 10. Related Dcuments PTV Infrastructure Drafting Standards PTV DMS Prcesses VRIOGS Infrastructure Standards L4-CHE-FOR-075 Dispensatin Request Frm L1-CHE-INS-071 Design Practice Nte - Like Fr Like Wrks Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 f 17
11 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Appendix A Dispensatin Type A: N New Design Wrk Occurring On Type A1: Update t references nly A dispensatin under Type A1 may be granted where the existing Nn-Cmpliant drawing requires nly ther drawing reference numbers r asset names t be changed. The revisin histry and revisin letter shall be updated, as apprpriate. The drawing shall be submitted t the Nn-Cmpliant vault and indicated as Revised in the Bk in Frm (BIF). Type A2: Crrectin f incnsistencies/errrs A dispensatin under Type A2 may be granted where the existing Nn-Cmpliant drawing requires amendments nly t reflect crrectins identified during ther design, maintenance r crrelatin activities. changes shall be limited t the crrectin f incnsistencies/errrs identified n existing Nn-Cmpliant drawings and plans during the design, maintenance r crrelatin prcess r frm marked up field drawings, fr dispensatins t be granted. The revisin histry and revisin letter shall be updated, as apprpriate. The drawing shall be submitted t the Nn-Cmpliant vault and indicated as Revised in the BIF. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 f 17
12 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Appendix B - Dispensatin Type B: New Design Wrk Occurring On Type B1: Minr wrks where the functinal change des nt require any verificatin r cnfiguratin t ccur. A dispensatin under Type B1 may be granted where minr wrks that d nt result in a functinal change, as determined by the OCE, have been undertaken n drawings cvering a large gegraphical area such as signalling arrangement, bnding plans, cable running plan, territry plans etc. The designer shall als demnstrate that the drawings cannt be made cmpliant in a practical manner. Examples f this include: Alteratins t cable running plan, signalling arrangement plan and/r bnding plan t reflect change f: transfrmers, pint machine type, signal cnversin frm incandescent t LED r intrductin f bms gates and/r lights; Maintenance wrks recrded with in-field drawing mark ups fr any signalling drawings; Planned maintenance and renewal wrks resulting in cmpnent replacement fr any signalling drawings. If the functinal change des require verificatin f the signalling circuits then the drawing shall be redrawn t PTV Infrastructure Drafting Standards. If the drawing has been re-drawn t PTV Infrastructure Drafting Standards but has nt been fully crrelated against the field install, a nte at the bttm f the drawing shall read: "REDRAWN, SUPERSEDES DRAWING N. ### REV X. - DATED DD/MM/YY, DRAWING IS NOT FULLY CORRELATED." The drawing shall be submitted t the Cmpliant vault and shwn as revised in the BIF. If the drawing has nt been re-drawn t PTV Infrastructure Drafting Standards, the drawing shall be submitted t the Nn-Cmpliant vault and shwn as revised in the BIF. Fr the last update, the revisin blck and revisin letter shall be updated, as apprpriate, in bth instances. Type B2: s nt fully crrelated and retain as nn-cmpliant. Due t the cmplexity, invlving large area and the risk with crrelating existing running assets, the fllwing specific cases where drawings may nt be fully crrelated and retain as nn-cmpliant and dispensatin may be granted: a. Fr territry plan and cable running plan cver large signalling areas and, due t the age f the assciated cmpnents r cables, there is a significant risk in crrelating the assets ver such a large regin. It is highly recmmended that crrelatin be undertaken nly fr the purpse f the prject mdificatin/installatin where necessary. The existing nn-cmpliant territry plan and cable running plan may be updated in the fllwing way: Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 f 17
13 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Where a minr functinal change ccurs in ne r multiple lcatins, a dispensatin under Type B2 may be granted. Territry plan and cable running plan drawings (lng plts) can be updated and retained as nn-cmpliant. Fr the last update, the revisin blck and revisin letter shall be updated, as apprpriate. The drawing shall be submitted t the Nn-Cmpliant vault and bked in as revised in the BIF. Where a majr functinal change ccurs, a dispensatin under Type B2 may be granted where independent circuits r independent cable running have been mdified frm the nn-cmpliant drawing and all the cntents f the affected lcatins shall be made CAD cmpliant nt new A3 drawing(s). Nte 1: Lcatin refers t a defined bundary within the territry plan which is cmmnly knwn as a panel. Nte 2: The mdified prtins/circuits f the newly created A3 drawing(s) are t be fully crrelated. Nte 3: Infrmatin relating t bnding, cable running and signalling pwer shall be transferred t the relevant existing DMS drawings if available. Otherwise this infrmatin may be retained within the territry plan. Example: Territry Plan, The riginal territry plan may be maintained with the re-drawn prtins f Lcatin(s) remved with apprpriate crss referencing t the re-drawn A3 (s). It shall be nted that the crrelated circuit(s) alng with all ther circuits and assets within the jurisdictin f the Lcatin shall be re-drawn nt ne r multiple A3 drawings. Only the unaffected Lcatins f the territry plan shall remain in the riginal lng plt drawing. Where the territry plan has majr alteratins, the prject and/r design rganisatin shall re-draw the whle territry plan and cmply with the PTV Infrastructure Drafting Standard. This shall be at the discretin f the OCE and PTV. b. Fr nn-cmpliant cntrl table / release table / lcking table cntaining a number f independent signals r pint cntrl (n a single sheet) but the mdificatin nly affects minr prtin(s) f the cntrl table, the fllwing shall apply. Affected signals r pint cntrl shall be remved frm existing nn-cmpliant table and redrawn nt current cntrl table frmat as new cmpliant drawing(s) and remaining prtins f the cntrl table may be retained n the existing nncmpliant drawing(s). The remved prtins f the cntrl table frm the existing drawing shall be crssed-ut. Crss referencing frm the new cmpliant drawings back t the riginal nncmpliant drawing shall als be prvided. The new cmpliant drawing shall have a nte at the bttm f the drawing shall read: "REDRAWN & REVISED. PART SUPERSEDES DRAWING N. XYZ. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 f 17
14 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 A dispensatin under Categry B2 may be granted t retain nn-cmpliant drawing fr such cases. In the case where cntrl table is in a recent frmat (nt necessarily latest), OCE can agree that the cntrl table can be updated in the standard when cntrl table was created, prvided it is demnstrated that the practicability f bringing drawing t current standard utweighs the benefit and the risk is managed SFAIRP. c. Fr relay rm where new equipment r terminal(s) intrduced, the extent f crrelatins required shall be determined in cnsultatin with the OCE as part f design review prcess, as due cnsideratin will have t be given fr excessive wrk. The fllwing shall apply. An entire relay rm is nt required t have a full wire cunt, nly the rack assciated with the wrks will be crrelated) and fr circumstances where it is nt pssible/advisable t disturb wires (e.g. plug cupler f SSI mdule r lcatins where ld/delicate wiring shuld nt be tuched). Fr such drawings where dispensatin may be deemed necessary, a dispensatin under Categry B2 may be granted t retain nn-cmpliant drawing fr such cases. Type B3: Gegraphic mdule drawing nt fully crrelated and retained as nn-cmpliant. A dispensatin under Type B3 may be granted fr gegraphic mdule drawings. Due t the age f the assciated cmpnents, there is a significant risk with crrelating these assets. Thus, it is recmmended that crrelatin be undertaken nly fr the purpse f the prject mdificatin/installatin. Where necessary, the gegraphic drawing will be retained as nn-cmpliant. Fr the last update, the revisin blck and revisin letter shall be updated, as apprpriate. The drawing shall be submitted t the Nn-Cmpliant vault and bked in as revised in the BIF. Type B4: Lng plt signalling arrangement plans and bnding plans nt fully crrelated and retained as nn-cmpliant while new lng plt and A3 sheets view are created fully cmpliant fr the entire area cvered by PTV s master index drawing(s) Signalling Arrangement Plans (SAP) and Bnding Plans (BP) (lng plts), that include a functinal change shall be re-drawn fully cmpliant with PTV s Infrastructure Drafting Standard. This shall include all affected cntents and assets spanning up t the bundaries f the assciated PTV master index drawing. All the affected circuits f the new design and circuits assciated with their functinality shall be fully crrelated. The re-drawn SAP and BP lng plt in additin t the A3 sheets view shall be treated as cmpliant drawings and shall be bked int the cmpliant vault. It shall als be reflected as new in the BIF as it pssesses a new drawing number. All areas utside the affected master index drawing bundary may remain as they are n the riginal SAP/BP (lng plts) with the re-drawn prtins remved with apprpriate crss referencing t the re-drawn lng plt and A3 sheets view. It shall be nted that the crrelated circuit(s) alng with all ther circuits and assets within the jurisdictin f the master index drawing, shall be re-drawn n the lng plt and A3 sheets view. Curves, gradients and assets lcatin in the unaffected areas f the design can be fund frm the PASS Asset system. Infrmatin nt available frm PASS Asset system in the unaffected areas f the design can be left ut t be addressed by future prjects. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 14 f 17
15 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 The lng plt and A3 sheets view shall include ntes t clearly indicate which circuits have been crrelated. The certified PDF cpy f the A3 sheets view shall include cluds arund the prtins f the drawing cntent that were mdified and crrelated. Dispensatin request under Type B4 shall be raised fr the existing lng plt SAP and BP that remain nn-cmpliant. A dispensatin under Type B4 shall als be raised when a re-drawn SAP r BP lng plt is mre than 3m lng r mre than 7 sheets r fr clarity requires drawing size mre than A3 but it matches against PTV s master index plan bundaries. The fllwing shall apply as the lng plts are prgressively mdified and cnverted t A3 s: If nt already n cmpliant A3 drawings, the designer shall mve all cntent assciated with the master index drawing bundary nt a new lng plt and A3 sheets (r apprpriate apprved size) as per PTV s Infrastructure drafting standards when they undertake any wrk within a jurisdictin. The newly created lng plt and A3 sheets view shall be made cmpliant. Dispensatin may be cnsidered fr minr design changes. This will be by exceptin nly and the designer shall cnsult the ARTO OCE prir t raising such dispensatin requests. Dispensatin will be cnsidered fr cmpnent changes and infrastructure maintenance and renewal type f wrks as stipulated in this prcedure. The designer respnsible fr cnverting the remaining part f the lng plt drawing shall supersede the existing lng plt drawing accrdingly. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 15 f 17
16 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August Appendix C Definitin Detailed Clarificatin As-In-Service r As-Built Cmpnent Replacement Crrelatin In the case f new drawings, the designer and certifier are respnsible t Ensure certified drawings are accurate representatin f the actual as in service cnditin in the field. In the case f a mdified cmpliant drawings, the designer and certifier are respnsible t Ensure the updated prtins f the certified drawing have been crrelated n site and reflect what exists in the field; and That n change has been made t the rest f the cmpliant drawing. When an existing nn-cmpliant drawing is redrawn t PTV Infrastructure Drafting Standards the designer and certifier are respnsible t Ensure the updated prtins f the drawing are crrelated n site t accurately reflect what exists in the field; and The remainder f the drawing has been checked t ensure it has been accurately redrawn t reflect the existing DMS drawing. Cmpnent Replacement may include planned maintenance and renewal wrks such as replacement f pint machines; replacement f track circuits; cnversin f signal head frm incandescent t LED type; replacement f ld style mechanical train-stp t new style; replacement f ld style bm mechanism t new style; replacement f battery charger r pwer supply r UPS; and/r replacement f timer. Crrelatin shall be undertaken fr relevant prtins f the drawings (bth cmpliant & nn-cmpliant) bked ut frm the DMS befre any design r validatin prcess is carried ut. The prtins f the drawings that require crrelatin, in rder t cnfirm the functinality and integrity f the signalling safety and maintainability, is at the discretin f the designer, checker, reviewer and tester. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 16 f 17
17 L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Cmpliant Dispensatin Assurance Argument Certificatin f s / Rle f Certifier Existing drawings shall be updated as per the crrespnding drafting standard at the time f the drawing creatin r later, whichever is apprpriate t maintain cnsistency acrss the drawing, in rder t avid cnfusin fr maintainers and future designers. If a nn-cmpliant drawing is re-drawn t the PTV Infrastructure Drafting Standards, while nly updating prtins f the drawing t reflect the design changes ccurring n the netwrk, the updated drawing shall be treated as cmpliant. Cmpliant drawings shall be bked in and reside in the DMS cmpliant vault. s that maintain the filename and drawing number frmat cnsistent with the PTV Infrastructure Drafting Standards shall als be treated as cmpliant. s that have been drawn cmpliant t the current r previus PTV Infrastructure Drafting Standards, including VRIOGS 007.2, but have been bked in t the DMS nn-cmpliant vault due t the ftnte drawing is nt fully site crrelated shall be acceptable fr bking int the cmpliant vault n their next update. Nte: Cmpliance against the drafting standard des nt include the need fr crrelatin. The assurance argument shall be cnducted by the designer t state that, if the drawing is left nn-cmpliant, the risks t the peratinal netwrk, maintainer and future designers have been managed SFAIRP. It shall als cnfirm that the verall functinality f the assciated circuits, systems and netwrk n the drawing is as intended. This assurance argument is purely fr the purpse f applying dispensatin and has n relatin t the safety f the signalling system which is cvered thrugh the signalling design and review prcesses. s are required t be certified as AIS, in accrdance with the DMS Prcesses befre it can be accepted back int the DMS. A certifier is respnsible t ensure the affected/updated prtins f the drawing are crrelated t accurately reflect what exists in the field and the remaining prtins f the drawing have been checked t ensure they have been accurately redrawn t reflect the existing DMS drawing. Certificatin is the prcess f the certifier ensuring this. The certified PDF cpy f the A3 sheets view shall include cluds arund the prtins f the drawing cntent that were mdified and crrelated. Cluds shall nly be dne thrugh hand mark up by the certifier and shall nt be included in the CAD file and clear cpy f the PDF file. The certifier must have the technical cmpetency t perfrm this rle. Apprving Manager: Chief Engineer Apprval Date: 01/08/2017 Next Review Date: 01/08/2019 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 17 f 17
COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)
COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required
More informationCommon Network Operation Tools
Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk
More informationStandard Authorization Request Form
When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke
More informationVictorian Student Number Data Quality and Process Guidelines for Victorian Government Schools
Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early
More informationAPPENDIX B TRAFFIC IMPACT STUDY CRITERIA
APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r
More informationSubmission Guidance. The Editorial Board is keen to receive submissions from students, past and present, of the University of Aberdeen.
Submissin Guidance The Editrial Bard is keen t receive submissins frm students, past and present, f the University f Aberdeen. Overview The purpse f the ASLR is t shwcase the wrk f the students f Aberdeen,
More informationDorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature
Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr
More informationPPA PORTS UKC STANDARDS
TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL
More informationEvidence analysis VET Quality Framework
Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty
More informationSubmission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations
The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit
More informationCommunication Protocol Procedure
APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins
More informationC&E Mobility Policy (Standard)
C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment
More informationAcceptance and verification PCI tests according to MIL-STD
Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE
More informationSafety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach
Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based
More information1.12 Equipment Manager
Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment
More informationUpgrading to PlanetPress Suite Version 5
Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt
More informationDEVELOPMENT APPLICATION
DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept
More informationSBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM
SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes
More informationSpecification for Learning and Qualifications for Physical Intervention Skills
Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it
More informationSupplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01
Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft
More informationApplication for Drive Technology
Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.
More informationConnection tariffs
Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER
More informationReliability Coordinator Procedure
Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...
More informationTransmission Substation Field Instructions
4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin
More informationInformation Article. Relevance
Infrmatin Article Relevance 1. Airline (Aircraft Operatr) Crisis Respnse - an verview t assist understanding f sme significant emergency terms used by e.g. Air Traffic Service Units and Search & Rescue
More informationCleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017
Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing
More informationDXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732
Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical
More informationAccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements
AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements
More informationNSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012)
NSW Prttype User Manual AUTHORITIES Delegatin agreement frm the Eurpean Cmmissin MOVE D2/ME D(2012) Versin: 1.2 Date: 22/09/2015 NSW Prttype/ Users Manual/ Authrities TABLE OF CONTENTS 1 Intrductin...
More informationThe Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study
L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted
More informationFuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist
Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and
More informationProject Description Arctic Safety Center
Prject Descriptin Arctic Safety Center Classificatin: Open Status: Final Expiry date: 2012-10-21 Page 1 f 11 Prject Descriptin Arctic Safety Center Dcument n. : Prject n.: Prject: 990020 Arctic Safety
More informationBLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment
BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA
More informationTransmit and receive information by marine radio or telephone
MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate
More informationDescribing Digital Materials in Finding Aids
Describing Digital Materials in Finding Aids Versin 2.0 March 14, 2013 Intrductin Staff frm the Michigan Histrical Cllectins, University Archives and Recrds Prgram, and Digital Curatin adpted the fllwing
More informationConsolidated Edison Company of New York. Developer Welcome Kit
Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable
More informationAnnex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2
Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,
More informationVILLAGE COORDINATOR AGREEMENT
Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR
More informationPuget Sound Company Overview. Purpose of the Project. Solution Overview
Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within
More informationAlberta Infrastructure. Digital Project Delivery COBie Requirements
Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie
More informationMay 30 and 31, 2015 Saturday, 10 a.m. to 4 p.m. and Sunday, 1 to 4 p.m.
Art Arund Every Crner: Cnversatins and Demnstratins with Artists at the Tyler Public Library May 30 and 31, 2015 Saturday, 10 a.m. t 4 p.m. and Sunday, 1 t 4 p.m. Artist Submissin Deadline: Friday, May
More informationIA CERTIFICATE (Revision 3 Revised for Annual review)
Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT
More informationDesktop Teller Exception User Guide
Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw
More informationSome Supplementary Review Information for ARMs
General Infrmatin Regarding Radilgical Areas Sme Supplementary Review Infrmatin fr ARMs As a class f areas, Radilgical Areas are designated in 10CFR835. This has a different meaning than ur use f the designatin
More informationBV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5
Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...
More informationProject QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities
Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins
More informationCATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications
CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity
More informationPS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS
PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk
More information6. Verifying Identification for DBS (England only)
6. Verifying Identificatin fr DBS (England nly) Membership Secretaries play an imprtant rle in the prvisin f the Disclsure service, in particular yu need t: Check and validate the infrmatin prvided by
More informationNATF CIP Requirement R1 Guideline
Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves
More informationJournal of Mississippi Academy of Sciences
Jurnal f Mississippi Academy f Sciences Authr Guidelines Editrial Plicy. The Editrial Bard publishes articles n all aspects f science that are f general interest t the scientific cmmunity. General articles
More informationWASHINGTON COUNTY OREGON
WASHINGTON COUNTY OREGON BUILDING SERVICES ENGINEERING PLAN REVIEW GUIDELINES (PRG 2): Guidelines Objective: 1. Imprve cmmunicatins between Building Services and the engineering design cmmunity that prepares
More informationSHADOW OF THE DRAGON AGE OF SIGMAR
AGE OF SIGMAR SHADOW OF THE DRAGON Welcme t the first annual Age f Sigmar event at Dragn-Fall. We are very excited abut this year s narrative event and what it means t the new cmmunity frming arund the
More informationACA Standard Measurement One-time program
Service Request 101183 ACA Standard Measurement One-time prgram Created n: December 22, 2015 Last Mdified n: 12/23/2015 Prepared by Baskar Chitravel Infrmatin Technlgy Services Office f the President University
More informationModel Assignment Issued September 2008
Mdel Assignment Issued September 2008 OCR Level 3 Principal Learning in Engineering Unit F558: Selectin and applicatin f engineering materials Please nte: This OCR mdel assignment may be used t prvide
More informationApplication Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.
Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin
More informationFEE-HELP, VET FEE-HELP and VET Student Loans Re-Credit Application Form
FEE-HELP, VET FEE-HELP and VET Student Lans Re-Credit Applicatin Frm Wh shuld use this frm? Yu shuld use this frm ONLY if all f the fllwing statements apply t yu: Yu tk ut a FEE-HELP, VET FEE-HELP, r VET
More informationDevelop preliminary specification and plans from a design brief
Unit Title: OCR unit number 1 Level: 2 Credit value: 3 Guided learning hurs: 24 Unit reference number A/503/5851 Develp preliminary specificatin and plans frm a design brief Unit purpse and aim The fcus
More informationPhotoVu Digital Picture Frame Service & Repair Guide
PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu
More informationLAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION
Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn
More informationSITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1
SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre
More informationNetwork Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005
Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and
More informationOctober Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)
1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane
More informationBeechcraft Bonanza HID Landing Light Assembly Kit
Beech Bnanza HID Light Assembly Kit Manual N. HID-B-001 Issue Date: 5-8-05 STC N. SA01834CH Revisin Date: 12-22-07 Beechcraft Bnanza HID Landing Light Assembly Kit INSTALLATION MANUAL N. HID-B-001 Beechcraft
More informationBILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS
BILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS N critical cmpliance issue Received in ur ffice n time Single sided 8 ½ x 11 inch white paper Blue r black pen N staples Any necessary back up Lg ntes
More informationGuidelines for Preparation of Accepted Papers (Full Length) / Posters
23 rd Internatinal Cngress n Irrigatin and Drainage 8-14 Octber 2017, Mexic City, Mexic Theme: Mdernizing Irrigatin and Drainage fr a New Green Revlutin Guidelines fr Preparatin f Accepted Papers (Full
More informationAQTF Audit Report. Easternwell Training Pty Ltd Conditions audited
AQTF Audit Reprt Easternwell Training Pty Ltd - 31843 FM-PMA-34A TRIM N: 09/182321 Versin 5 24 February 2010 Training and Internatinal Quality Organisatin details Registratin expiry 03/12/2013 Principal
More informationOperating Process for Access to Gas Insulated Switchgear
Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument
More informationMeaningful Use Stage 2- Menu Measure 3 Imaging Results Configuration Guide
Enterprise EHR Meaningful Use Stage 2- Menu Measure 3 Imaging Results Cnfiguratin Guide Last Updated: January 30, 2014 Cpyright 2013 Allscripts Healthcare, LLC. www.allscripts.cm MU Menu 3 Imaging Results
More information2018 Print and DPI Annual Competition Rules
Brisbane Camera Grup 'Annual Cmpetitin' takes place in Nvember each year. It's the highlight f the club cmpetitin year and submissin standards are cnsistently high. All graded members are eligible and
More informationSARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com
SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...
More informationPLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH
Syllabus fr dctral studies in the subject f PLANNING AND DECISION ANALYSIS Schl f Architecture and the Built Envirnment, KTH General regulatins and guidelines fr dctral studies are fund in the cmprehensive
More informationPotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)
PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing
More informationFigure 1: A Battleship game by Pogo
CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many
More informationKennecott Utah Copper Corporation Safety and Health Standards
Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include
More informationHigh Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord
High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall
More information8.1. Name authority concepts and problems
Overview Name authrity cntrl 8.1. Name authrity cncepts and prblems The Rules, Standards, and Authrity Cntrl mdules prvided a fundatin fr understanding name authrity cntrl. By way f review, all authrity
More informationida Certification Services IEC Functional Safety Assessment Project: Tri Lok Triple Offset Butterfly Valves Customer: Bray International, Inc.
e ida Certificatin Services IEC 61508 Functinal Safety Assessment Prject: Tri Lk Triple Offset Butterfly Valves Custmer: Bray Internatinal, Inc. Hustn, Texas USA Cntract Number: Q07/12-19 Reprt N.: BRA
More informationCity of Sarasota Public Art Requirements Information Package
City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin
More informationDragon Fall Age of Sigmar Event
Dragn Fall Age f Sigmar Event Welcme t the first annual Age f Sigmar event at Dragn-Fall. We are very excited abut this year s narrative event and what it means t the new cmmunity frming arund the Age
More informationYou Be The Chemist Challenge Official Competition Format
2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians
More informationACM1281 NFC Reader Module Reference Information
ACM1281 NFC Reader Mdule Reference Infrmatin ACM1281 NFC Reader Mdule Technical Reference Infrmatin V1.00 Subject t change withut prir ntice inf@acs.cm.hk www.acs.cm.hk Versin Histry Date By Changes Versin
More informationCENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT
CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI 600 025 GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT (Prescribed Frmat and Specificatin) 1. GENERAL: The guideline is intended t prvide brad guidelines
More informationUNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, DC FORM 8-K
UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washingtn, DC 20549 FORM 8-K CURRENT REPORT PURSUANT TO SECTION 13 r 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date f Reprt (Date f earliest event reprted):
More informationParticipation is open on equal conditions to all national and international experienced individual consultants.
REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS
More information3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group
Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre
More informationOpen Call for Artists and Arts Professionals 2018
Open Call fr Artists and Arts Prfessinals 2018 Open Call fr Artists and Arts Prfessinals 2018 All materials must be received by 5:00 pm EST n Friday, March 16, 2018 Art n the Atlanta BeltLine is seeking
More information6/22/17 MEMO TO: CALL TO TEEN ARTISTS (AGES 15-18) NEW Creative Crosswalk project in ViBe District
6/22/17 MEMO TO: CALL TO TEEN ARTISTS (AGES 15-18) RE: NEW Creative Crsswalk prject in ViBe District ViBe Creative District will hst a NEW creative crsswalk painting event n the Secnd Saturday f July (7/8/17)
More informationRadiofrequency Radiation Assessment Report
Radifrequency Radiatin Assessment Reprt Cathlic Schls Office Lismre Xavier Cathlic Cllege and Hly Family Primary Schl July 2014 Reference: C109995:J123349 Nel Arnld & Assciates Pty Ltd Level 1, 2 Mayneview
More informationIEC Functional Safety Assessment
IEC 61508 Functinal Safety Assessment Prject: 1052 Series Actuatrs Cmpany: Fisher Cntrls Internatinal LLC, Inc. (an Emersn Prcess Management cmpany) Marshalltwn, IA USA Cntract Number: Q13/05-046 Reprt
More informationINSTRUCTOR: Office Hours: Robert Michael
METBD 111, Sectin 001: SOLIDS MODELING II INSTRUCTOR: Office Hurs: Rbert Michael Tuesday: 2:00 3:00 pm 8 Prischak Building Thursday: 2:00 3:00 pm 898-6192 Friday: 11:00 12:00 pm rxm61@psu.edu (thers by
More informationTRANSPORTADORA DE GAS DEL PERU
Page 1 0 ISSUE FOR CONSTRUCTION 03..05.02 GIU BOF GIU B ISSUE FOR APPROVAL 02.01.02 GIU BOF GIU A ISSUE FOR APPROVAL 12.06.01 GIU BOF GIU REV.. DESCRIPTION DATA PROJ. EXEC. CONT. APROV. TRANSPORTADORA
More informationSignature Assignment. Course. ANTH 2302: Introduction to Archaeology. Ethical Case Dilemma. Assignment ID (to be assigned)
Signature Assignment : Intrductin t Archaelgy Outcmes/Rubrics t be Assessed by the Assignment Cmmunicatin Critical Thinking Empirical and Quantitative Reasning Scial Respnsibility Assignment Descriptin
More informationRequest for Quotations for Radio Production and Broadcast Services In Ondo and Edo States, Nigeria
Date: June 21, 2016 Ref.: Subject: RFQ/16/103 Request fr Qutatins fr Radi Prductin and Bradcast Services In Ond and Ed States, Nigeria The Internatinal Fundatin fr Electral Systems (IFES), invites yur
More informationReliability Coordinator Area Restoration Plan
Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin
More informationRSB Service Bulletin No.. RSB--E4--003/12
RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED
More informationIndustrial use cases: Description and business impact D1.2.a Automotive Use Case
Cllabrative Large-scale Integrating Prject Open Platfrm fr EvlutiNary Certificatin Of Safety-critical Systems Industrial use cases: Descriptin and business impact Autmtive Use Case Wrk Package: WP1: Industrial
More information2.1 PROJECT MANAGEMENT
2.1 Prject Management 2.1.1 General 2.1 PROJECT MANAGEMENT 2.1.1 GENERAL The Design Team and Cnstructr will wrk primarily with the Prject Manager frm Masn Facilities. All input and crdinatin shall be cnducted
More informationEnabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS
DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr
More informationIEEE C802.16h-06/029
Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice
More information