Reliability Coordinator Area Restoration Plan

Size: px
Start display at page:

Download "Reliability Coordinator Area Restoration Plan"

Transcription

1 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin Operatrs (TOP) t enable effective crdinatin f the System restratin prcess t ensure reliability is maintained during restratin and pririty is placed n restring the Intercnnectin. II. Intrductin The RC System Operatrs (RCSO) primary rle is t facilitate the restratin prcess by crdinating, cmpiling and disseminating infrmatin and maintaining system stability in rder t prevent relapse. The RCSO accmplishes this task by crdinating the actins f the Balancing Authrities (BA) and Transmissin Operatrs (TOPs) ver a wide area. The wide area view f the RC Area gives the RCSO the distinct advantage f being able t recgnize hw widespread the prblem is, what needs t be dne t stabilize the remaining prtin f the Intercnnectin, and hw t efficiently restre and resynchrnize any islands that may have been frmed during the disturbance. The bjectives f the Peak RC Area Restratin Plan include, but are nt limited t: Cmmn strategies fr entities invlved in the restratin effrt, Crdinated cmmunicatins t facilitate restratin activities, Ensuring the system is perated within secure limits, and Use f a crdinated resynchrnizatin prcess t re-establish the Intercnnectin. This restratin plan prvides the RCSOs and TOPs with requirements and general guidelines fr addressing system restratin cnditins and is categrized int the fllwing sectins: Cmmunicatins RCSO Rles and Respnsibilities TOP Rles and Respnsibilities Crdinatin f Plans System Restratin: Whle r Partial Transmissin System Islanding System Restratin: Blackut Restratin Using Cnnectin t an Energized System Classificatin: Public Page 1 f 21 Effective Date: April 1, 2019

2 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure System Restratin: Black Start Restratin Energizing a De-energized System Pst Restratin: Resuming Nrmal Operatins If any f the fllwing cnditins exist, r are presumed t exist, Peak is cnsidered t be in a Restratin event and this plan is applicable 1 : Blackstart Resurces are utilized t re-energize a shutdwn area f the BES, Separatin has ccurred with neighbring RC Areas, r An energized island has been frmed n the BES that separates TOPs within the RC Area. As the integrity and reliability f the BES is f paramunt imprtance, and takes precedence abve all ther aspects, including cmmercial peratins, all TOPs and BAs are expected t cperate and take apprpriate actin t mitigate the severity r extent f any system emergency. The RC Area Restratin Plan ends when all f the RC Area TOPs are intercnnected and the RC Area is synchrnusly cnnected t neighbring RC Areas. Nte: all entities are individually respnsible fr assessing their cmpliance with Standards f Cnduct r suspensin f Standards f Cnduct. Peak will nt instruct ther entities t suspend their cmpliance with the Standards f Cnduct. Hwever, all entities within the RC Area shuld ntify Peak if they suspend r re-instate their Standards f Cnduct. III. Cmmunicatins 2 The RCSO is the primary cntact fr disseminating infrmatin regarding restratin t neighbring RCs, and RC Area TOPs and BAs. Active cmmunicatins regarding the status f the restratin effrt will be established and maintained between the RCSO, the RC Area BAs and TOPs and neighbring RCs utilizing RC cnference calls and the Reliability Messaging Tl (RMT). 1 NERC Standard EOP Requirement R1 2 NERC Standard EOP Requirements R1.3, R1.4, and R1.5 Classificatin: Public Page 2 f 21 Effective Date: April 1, 2019

3 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Affected RC Area TOPs must reprt their initial assessment t the RCSO within ne hur f implementatin f their Restratin Plan and shuld include the fllwing infrmatin: System status (cmplete blackut, partial blackut, Islanded, damaged BES facilities, verall estimated lad lst, lad lst due t UFLS r UVLS) Status f Nuclear Plant ffsite pwer within the TOP area Knwn utages f any Black Start units, Cranking Paths r targeted baselad units in the TOP Restratin Plan. If the TOP Restratin Plan requires restratin frm a neighbring system, reprt any knwn utages t the planned restratin path. Cmmunicatin and/r data issues (lss f supervisry capability, micrwave systems, etc.) Fuel supply cncerns Alternate plans if the TOP Restratin Plan cannt be implemented Nte: Because NERC Reliability Standards EOP and EOP define the scpe f a restratin event differently fr the TOP and RC, it is pssible fr the RC t be in a restratin event while the TOP is nt. Refer t Sectin III RCSO Rles and Respnsibilities fr additinal detail. During the restratin prcess, affected RC Area TOPs must prvide rutine status updates t the RCSO at least every fur (4) hurs. Status updates shuld include the bulleted items abve as well as: Number f Islands Generatin and Lad ttals in the Island(s) BAs/TOPs within the Island Key milestnes cmpleted, such as cmpletin f a cranking path, establishment f ff-site pwer t a nuclear plant, restratin f lines capable f resynchrnizing t ther areas, changes t the status f Blackstart resurces, base lad generatin and/r the Island Frequency cntrl unit must be cmmunicated within 15 minutes f the milestne unless previusly crdinated with the RCSO. Expected milestnes that cannt be cmpleted shuld be reprted as sn as pssible. RCSO cmmunicatin, including issuing Operating Instructins, t Generatr Owners (GO) and Generatr Operatrs (GOP) will be cnveyed thrugh the hst BA/TOP. The RCSOs, TOPs, and BAs will fllw established prtcls using three-part cmmunicatins fr all Operating Instructins. Classificatin: Public Page 3 f 21 Effective Date: April 1, 2019

4 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure IV. RCSO Rles and Respnsibilities The RCSO has the authrity t crdinate restratin activities within the RC Area, mnitr restratin prgress and crdinate any needed assistance. The Wrking Shift Freman (WSF) will be the single pint f cntact fr the RCSOs regarding their restratin crdinatin activities and will crdinate reprting t regulatry and gvernment agencies as apprpriate. Fllwing a majr disturbance, the RC Area may be ttally r partially shut dwn and cntain islated electrical islands cnsisting f lad and generatin. When such a Disturbance ccurs, the RCSO shall cmplete an initial assessment t determine whether the RC Area Restratin Plan shuld be executed. The high level prcess t fllw after an event ccurs can be brken dwn int the fllwing actins: analyze, stabilize, restre, and return t nrmal peratins. 3 Analyze The RCSO will cnduct a detailed assessment f the RC Area status t determine system cnditins. Specifically, the RCSO must: Determine if electrical islanding separating RC Area TOPs r the RC Area frm a neighbring RC Area has ccurred and, if s, identify the existing islands and their respective bundaries; Determine if a prtin f the RC Area has been shut-dwn and if Blackstart Resurces are ging t be used; Identify RC Area TOPs impacted by the Disturbance; Determine the status f transmissin and generatin facilities At a minimum, the RCSO must identify majr transmissin and generatin facilities that are n lnger in service and evaluate the resultant impact t BES reliability; Identify lad required fr the restratin effrt; Identify vltage levels and frequency; and Identify any actual r ptential exceedances f System Operating Limits (SOL) r Intercnnected Reliability Operating Limits (IROL). 3 NERC Standard EOP Requirement R1.1 Classificatin: Public Page 4 f 21 Effective Date: April 1, 2019

5 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Stabilize The RCSO will determine actins necessary t stabilize and maintain reliable peratins f the RC Area as a whle and/r f existing electrical islands. The RCSO must ensure n-line generatin and lad is balanced t perate within established limits. Restre The RCSO will crdinate with impacted TOPs t identify and track restratin bjectives and gals. The RCSO must crdinate restratin activities t ensure each TOP cmpletes the actins necessary t: Prvide ff-site pwer requirements t nuclear pwer plants, as applicable; Use Blackstart Resurces as required t restre shut-dwn areas t service with primary fcus n prviding start-up pwer t available generating units and restring substatin statin service; Re-establish intercnnectins with ther TOPs within the RC Area and with neighbring RC Areas including resynchrnizatin f electrical islands; and Transfer authrity back t BAs Identify when each TOP has restred its system t a state whereby the chice f the next Lad t be restred is nt driven by the need t cntrl frequency r vltage. The RCSO will wrk with affected RC Area BAs and TOPs, including the GOPs via the hst BA/TOP, as well as neighbring RCs t mnitr restratin prgress, crdinate restratin activities and take actins t restre the BES frequency within acceptable perating limits. Actins t take may include, but are nt limited t, requiring generatin adjustments, placing additinal generatrs n-line r shedding lad. If any part f a TOP restratin plan(s) cannt be implemented as expected because actual cnditins d nt match studied cnditins, the RCSO shall utilize restratin plan philsphies t implement alternative measures fr achieving system restratin. Prir t instructing synchrnizatin between RC Area TOPs r authrizing synchrnizatin t neighbring RCs, the RCSO will 4 : Determine if each island is stable and perating within acceptable limits; Determine if, nce cmbined, the resultant island will be capable f sustaining all credible cntingencies (i.e., perating in an N-1 secure state); Evaluate system cnditins and determine: 4 NERC Reliability Standard EOP Requirement R1.2 Classificatin: Public Page 5 f 21 Effective Date: April 1, 2019

6 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Pint(s) f synchrnizatin; Status f aut-reclsing and synchrnizatin relays; Status f Remedial Actin Schemes (RAS) r relays that may affect the synchrnizatin effrt; Autmatic Generatin Cntrl (AGC) cntrl mde(s) and unit(s) used fr frequency cntrl; and Acceptable transfer limits and expected interchange upn synchrnizatin Zer schedules n tie lines is expected; Ensure each island is perating within acceptable frequency and vltage ranges. Frequency f the tw islands shuld be clsely matched with the smaller island s frequency slightly higher. Similarly, vltages shuld be clsely matched with the smaller island s vltage slightly higher. Fr synchrnizing islands between RC Area TOPs: After cmpleting the Intercnnectin Restratin Checklist (Appendix 2) and determining that the energized Islands are within parameters, the RCSO will issue an Operating Instructin t resynchrnize. The given time t cmplete the Operating Instructin will be n lnger than 15 minutes. If the resynchrnizatin is nt successful within that timeframe, the Intercnnectin Restratin Checklist must be utilized again. Operating Instructins may be required t bring Islands int acceptable parameters fr resynchrnizatin. Once acceptable parameters are achieved, an additinal Operating Instructin will be issued t resynchrnize. Fr synchrnizing islands between neighbring RCs: The RCSO will cnduct a cnference call with the RC Area TOP and the neighbring RC and their TOP t determine where re-synchrnizatin will ccur. Relevant infrmatin frm the Intercnnectin Restratin Checklist (Appendix 2) must be verified t be within parameters. The RC Area TOP will cnduct switching t energize the necessary facilities fr the neighbring RC Area TOP t re-synchrnize t Peak s RC Area. If the resynchrnizatin pint is within the neighbring RCs area, the RCSO will grant permissin fr the neighbring RC t resynchrnize t Peak s RC Area. Classificatin: Public Page 6 f 21 Effective Date: April 1, 2019

7 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure If the resynchrnizatin pint is within Peak s RC Area, the RCSO will issue an Operating Instructin t the TOP t resynchrnize. The given time t cmplete the Operating Instructin will be n lnger than 15 minutes. If the resynchrnizatin is nt successful within that timeframe, the Intercnnectin Restratin Checklist must be utilized again. After all systems have been synchrnized: The RCSO shall ensure entities are ntified thrugh an RMT message nce synchrnizatin has been accmplished. The RCSO shall crdinate lad restratin with its affected TOPs. At n time shall a TOP manually restre lad, except fr the purpses f maintaining frequency r vltage, withut verbal permissin frm the RCSO. All perating reserves shall be reestablished. Return t nrmal peratin TOPs must ntify the RCSO prir t transferring peratins and authrity back t their respective BA fllwing a restratin event. In rder t maintain the stability f the system within acceptable limits, the criteria belw will be used t assess the readiness t transfer cntrl: 5 Verify restratin bjectives met and/r TOP milestnes have been cmpleted; Verify that the RC Area can withstand the next cntingency withut exceeding Facility SOLs; Verify the Intercnnectin frequency is stable within Frequency Trigger Limits ( Hz); Verify Operating Reserves have been reestablished; Verify critical cmmunicatin paths are available and; Verify the status f the interties with neighbring RC Areas. This restratin plan ends when all RC Area TOPs are intercnnected and have transferred nrmal peratin f generatin t its respective BA and when the RC Area is intercnnected with its neighbring RC Areas. 5 NERC Standard EOP Requirement R1.6 Classificatin: Public Page 7 f 21 Effective Date: April 1, 2019

8 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure V. TOP Rles and Respnsibilities Each RC Area TOP shall have a restratin plan t re-establish its electric system in a stable and rderly manner in the event f a partial r ttal shutdwn f its system. The plan shuld include the fllwing infrmatin: Strategies fr system restratin that are crdinated with the RC Area high level strategy fr restring the Intercnnectin 6 f analyze, stabilize, restre and return t nrmal peratins. The plan must include a requirement t crdinate with the RCSO t assess initial cnditins and t keep the RCSO infrmed f prgress with key milestnes, lad/generatin restred and remaining islands nt yet synchrnized t the Intercnnectin. Refer t sectin III Cmmunicatins fr additinal detail. A descriptin f hw all Agreements r mutually agreed upn prcedures r prtcls fr ff-site pwer requirements f nuclear pwer plants, including pririty f restratin, will be fulfilled during System restratin. 7 As applicable, prcedures fr restring intercnnectins with ther TOPs under the crdinatin and authrizatin f each TOPs RC. 8 TOP plans shuld include a list f synchrnizing lcatins and a prvisin t crdinate with neighbring entities and the apprpriate RCs when tie lines are affected, when there is any ptential fr crss brder impact and when preparing t resynchrnize islands. Blackstart assistance that has been identified in the plan and is als included in the neighbring TOP plan needs t be cmpared such that the pint f intercnnectin fr establishing the cranking path frm the brder is cnsistent. Identificatin f each Blackstart Resurce and its characteristics including but nt limited t, the name f the Blackstart Resurce, its lcatin, its megawatt and megavar capacity and the type f unit 9. 6 NERC Standard EOP Requirement R1.1 7 NERC Standard EOP Requirement R1.2 8 NERC Standard EOP Requirement R1.3 9 NERC Standard EOP Requirement R1.4 Classificatin: Public Page 8 f 21 Effective Date: April 1, 2019

9 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Identificatin f Cranking Paths and initial switching requirements between each Blackstart Resurce and the unit(s) t be started 10. Identificatin f acceptable perating vltage and frequency limits during restratin. 11 Acceptable perating vltages, vltage cntrl cnsideratins, and techniques fr cntrlling vltage are included in the plan. Frequency limits, frequency cntrl cnsideratins and techniques fr cntrlling frequency are included in the plan. Fr TOPs with n generatin cntrl, list the entity respnsible fr generatin cntrl as specified in the plan. Operating Prcesses t reestablish cnnectins within the TOP s system fr areas that have been restred and are prepared fr recnnectin. 12 The island resynchrnizatin prcess described in the plan is cnsistent with the Intercnnectin Restratin Checklist (Appendix 2). The resynchrnizatin prcess described in the plan specifies that the RCSO must be ntified prir t synchrnizing any internal islands. The resynchrnizatin prcess described in the plan specifies that resynchrnizatin between RC Area TOPs r between neighbring RCs is under the crdinatin and authrity f the impacted RCs. Operating Prcesses t restre Lads required t restre the System, such as statin service fr substatins, units t be started r stabilized, the Lad needed t stabilize generatin and frequency, and prvide vltage cntrl. 13 Operating Prcesses fr transferring authrity back t the BA in accrdance with the RCs criteria. Refer t sectin IV, RC Rles and Respnsibilities, Return t Nrmal Operatin fr additinal detail NERC Standard EOP Requirement R NERC Standard EOP Requirement R NERC Standard EOP Requirement R NERC Standard EOP Requirement R NERC Standard EOP Requirement R1.9 Classificatin: Public Page 9 f 21 Effective Date: April 1, 2019

10 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure VI. Crdinatin f Plans 15 Peak reviews the TOP system restratin plans t determine if the plan is crdinated and cmpatible with the RC Area Restratin Plan and the plans f ther TOPs in the RC Area. Each TOPs system restratin plan is evaluated using the criteria listed in the RC Transmissin Operatr System Restratin Plan Wrksheet. The latest versin is lcated n bth peakrc.rg and peakrc.cm. Each RC Area TOP must submit the mst recent versin f its individual TOP restratin plan t the RC either by uplading it thrugh the secure prtal n peakrc.rg r by ing it t rctpplans@peakrc.cm. All submissins must include a cmpleted RC Transmissin Operatr System Restratin Plan Wrksheet. Peak will a cnfirmatin f receipt f individual TOP system restratin plans. Nte: If a TOP system restratin plan submittal has nt been acknwledged within 5 business days f submissin, the TOP shuld send a fllw up t rctpplans@peakrc.cm. Peak will dcument the review and will apprve r reject the TOP system restratin plan within 30 calendar days f submissin. Any issues identified will be reslved befre the plan is apprved. Peak s internal rles and respnsibilities fr apprving a TOP restratin plan are captured in the TOP Restratin Plan Review dcument. 15 NERC Standard EOP Requirement R5, R5.1 Classificatin: Public Page 10 f 21 Effective Date: April 1, 2019

11 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure VII. System Restratin: Whle r Partial Transmissin System Islanding 16 The RCSO is respnsible fr the verall crdinatin f the system restratin. Once the RCSO has determined that islanded cnditins that separate RC Area TOPs r the RC Area frm neighbring RC Areas, the RCSO will infrm all RC Area BAs, TOPs and neighbring RCs f the islanded cnditin by sending a RMT t All Reliability. The RCSO will maintain the energized prtin f the RC Area transmissin system within established line ladings, vltages and first cntingency prtectins. T ensure a crdinated respnse fr the RC Area fllwing a disturbance: All systems whlly within the separatin zne will cntact the RCSO t reprt their system status as identified in sectin III Cmmunicatins and t receive instructins. All systems whlly within the separatin zne will instruct remaining generatin within the separatin zne t increase generatin until a frequency f at least 59.5 Hz but n greater than 60.5 Hz is achieved. Systems partially affected by the separated zne may be instructed by the RCSO t adjust generatin in the zne as necessary t assist in reestablishing synchrnized ties with the Intercnnectin. If the abve actins have nt restred frequency t synchrnizing range, it is the respnsibility f the RCSO t instruct the deficient systems t increase generatin, shed lad r take ther available actin t prmptly restre the frequency t synchrnizing range. At n time shall any RC Area TOP manually restre lad except fr the purpses f maintaining vltage r frequency, unless specifically instructed t d s by the RCSO. Fr synchrnizing islands between RC Area TOPs: After cmpleting the Intercnnectin Restratin Checklist (Appendix 2) and determining that the energized Islands are within parameters, the RCSO will issue an Operating Instructin t resynchrnize. The given time t cmplete the Operating Instructin will be n lnger than 15 minutes. If the resynchrnizatin is nt successful within that timeframe, the Intercnnectin Restratin Checklist must be utilized again. Operating Instructins may be required t bring Islands int acceptable parameters fr resynchrnizatin. Once acceptable parameters are achieved, an additinal Operating Instructin will be issued t resynchrnize. 16 NERC Standard EOP Requirement R1.2 Classificatin: Public Page 11 f 21 Effective Date: April 1, 2019

12 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Fr synchrnizing islands between neighbring RCs: The RCSO will cnduct a cnference call with the RC Area TOP and the neighbring RC and their TOP t determine where re-synchrnizatin will ccur. If necessary, studies shuld be cnducted t ensure viability f the plan. Relevant infrmatin frm the Intercnnectin Restratin Checklist (Appendix 2) must be verified t be within parameters. The RC Area TOP will cnduct switching t energize the necessary facilities fr the neighbring RC Area TOP t re-synchrnize t Peak s RC Area. If the resynchrnizatin pint is within the neighbring RCs area, the RCSO will grant permissin fr the neighbring RC t resynchrnize t Peak s RC Area. If the resynchrnizatin pint is within Peak s RC Area, the RCSO will issue an Operating Instructin t the TOP t resynchrnize. The given time t cmplete the Operating Instructin will be n lnger than 15 minutes. If the resynchrnizatin is nt successful within that timeframe, the Intercnnectin Restratin Checklist must be utilized again. After all systems have been synchrnized: The RCSO shall ensure all entities are ntified thrugh an RMT message nce synchrnizatin has been accmplished. The RCSO shall crdinate lad restratin with its affected TOPs. At n time shall a TOP manually restre lad, except fr the purpses f maintaining frequency r vltage, withut verbal permissin frm the RCSO. All perating reserves shall be reestablished. Classificatin: Public Page 12 f 21 Effective Date: April 1, 2019

13 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure VIII. System Restratin: Blackut Restratin Using Cnnectin t an Energized System 17 Assumptins: One r mre TOPs in the RC Area have experienced a blackut. Other TOPs r neighbring RCs may be affected by the disturbance. The restratin can be accmplished thrugh the cnnectin t anther energized system within the RC Area. Restratin will be thrugh the implementatin f individual TOP(s) system restratin prcedures in crdinatin with the RCSO. All generatrs, transmissin lines, breakers, reactive devices, SCADA, and telecmmunicatins are available. Pririties: If nuclear statins within the RC Area have lst access t ff-site pwer, the RCSO shall crdinate with the affected TOPs t give tp pririty t restratin f ff-site pwer t the affected nuclear statins. Restre startup pwer t all available generating units. Units still running, but carrying nly their wn auxiliary lad, can be synchrnized as sn as the plant has stabilized and is ready and the transmissin system is ready. Ntify the plant peratr befre energizing a system up t a generatr. CAUTION: In restring startup pwer t a unit in a blackut cnditin (unit did nt stay n its wn auxiliary transfrmer), the restratin must be dne in such a way that the plant auxiliary busses are nt energized withut plant perating persnnel assuring that n equipment is unduly cnnected t the auxiliary bus. Failure t d this may result in equipment damage. Energize majr transmissin circuits. General Prcedures: CAUTION: The system peratr must carefully watch generatrs and tie lines t avid system separatin r high/lw vltage runaway during restratin. The RCSO will determine the bundaries f the blacked ut area and its effect n the RC Area. 17 NERC Standard EOP Requirement R1.2 Classificatin: Public Page 13 f 21 Effective Date: April 1, 2019

14 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure TOPs will determine the extent f the blackut fr their area and cmmunicate their status t the RCSO. Refer t sectin III Cmmunicatins. TOPs will determine a plan fr restratin utilizing established pririties. TOPs can begin restratin activities that d nt affect the Intercnnectin. TOP s restratin activities shuld maintain prper frequency, vltage, line lading and generatr lading within the emergency limits at all times. Any expected vilatin f these parameters shuld be crdinated with the RCSO and any affected RC Area entity. Cnsideratins shuld be made fr cld lad pickup nrmalizatin time f up t 30 minutes. In re-energizing the system, prtect utility and custmer equipment frm damage due t vervltage, undervltage, vercurrent, verfrequency r underfrequency. Emergency vltage limits are +/- 10% nminal vltage. Avid energizing high vltage cables at the end f a lng, lightly laded system. Open, r check t be pen, breakers fr transmissin and substatin capacitr banks during the initial re-energizatin prcess. Use shunt reactrs as required t cntrl vltage. CAUTION: Until statin service is restred t a substatin, the breakers at that statin can be perated nly a relatively few times befre they becme inperative due t lss f stred energy. In restring startup pwer t generating units, bypass bulk statins t speed up restratin, if pssible, except where required t cntrl vltage r prvide relay prtectin. When lading the system, in rder t cntrl the vltage, cnsideratin shuld be given t Surge Impedance Lading. Switch lines as necessary t prepare fr synchrnizatin at a plant lcatin t the Intercnnectin r t anther Island. If pssible, prvide fr synchrnizatin at an aut-synch lcatin. Adjust frequency and vltage t prepare fr synchrnizatin f the systems. After cmpleting the Intercnnectin Restratin Checklist (Appendix 2) and determining that the energized Islands are within parameters, the RCSO will issue an Operating Instructin t resynchrnize. The given time t cmplete the Operating Instructin will be n lnger than 15 minutes. If the resynchrnizatin is nt successful within that timeframe, the Intercnnectin Restratin Checklist must be utilized again. Operating Instructins may be required t bring Islands int acceptable parameters fr resynchrnizatin. Once acceptable parameters are achieved, an additinal Operating Instructin will be issued t resynchrnize. Classificatin: Public Page 14 f 21 Effective Date: April 1, 2019

15 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure IX. System Restratin: Blackstart Restratin Energizing a De-energized System 18 Assumptins: Pririties: One r mre TOPs f the RC Area have experienced a blackut cnditin. Other RC Area TOPs r neighbring RCs may be affected by the disturbance. The restratin thrugh the cnnectin t anther energized system cannt be accmplished in a timely manner r at all depending n the state f the transmissin system. Restratin will utilize individual TOP System Restratin Plans in crdinatin with the RCSO. All transmissin lines, breakers, reactive devices, SCADA and telecmmunicatins are available. Sme generatrs are assumed t have Blackstart capability. Start an Island as clse as pssible t a nuclear plant. If the nuclear plants have lst ff-site pwer, restre it as quickly as pssible. Restre startup pwer t all available generating units. Units still running, but carrying nly their wn auxiliary lad, can be synchrnized as sn as the plant has stabilized and is ready and the transmissin system is ready. Ntify the plant peratr befre energizing a system up t a generatr. CAUTION: In restring startup pwer t a unit in a blackut cnditin (unit did nt stay n its wn auxiliary transfrmer), the restratin must be dne in such a way that the plant auxiliary busses are nt energized withut plant perating persnnel assuring that n equipment is unduly cnnected t the auxiliary bus. Failure t d this may result in equipment damage. Energize majr transmissin circuits. CAUTION: The system peratr must carefully watch generatrs and tie lines t avid system separatin r high/lw vltage runaway during restratin. 18 NERC Standard EOP Requirement R1.2 Classificatin: Public Page 15 f 21 Effective Date: April 1, 2019

16 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure General Prcedures The RCSO will determine the bundaries f the blacked ut area and its effect n the RC Area. TOPs will determine the extent f the blackut fr their area and cmmunicate their system status t the RCSO as utlined in sectin III Cmmunicatins. TOPs will determine a plan fr restratin utilizing established pririties. TOPs can begin restratin activities that d nt affect the Intercnnectin. Open de-energized tie lines. Start Blackstart capable generatin. Cmmunicate Blackstart generatr status t the RCSO as cnditins change. Energize transmissin circuits with a few substatins t minimize lad pickup. Pick up radial lad areas while maintaining the ability t synchrnize the Island t an energized high vltage transmissin system. It may be difficult t maintain a clse tlerance n 60 Hz peratin. Operatin between 59.5 Hz and 60.5 Hz shuld be tlerable. In re-energizing prtins f the blacked ut system frm islated generatin, try t limit the frequency dip t a maximum f 0.2 Hz n each step f lad pick up. A step lad pick up f 5% f generatin capacity f units n line in the Island is rughly equivalent t 0.2 Hz. Cnsideratins shuld be made fr cld lad pickup nrmalizatin time f up t 30 minutes. When pssible, tie generatin areas tgether t increase the amunt f generatin available t pick up lad and minimize frequency variatins. In re-energizing the system, prtect utility and custmer equipment frm damage due t vervltage, undervltage, vercurrent, verfrequency and underfrequency. Emergency vltage limits are +/- 10% nminal vltage Avid energizing high vltage cables at the end f a lng, lightly laded system. Open, r check t be pen, breakers fr transmissin and substatin capacitr banks during the initial re-energizatin prcess. Use shunt reactrs as required t cntrl vltage. CAUTION: Until statin service is restred t a substatin, the breakers at that statin can be perated nly a relatively few times befre they becme inperative due t lss f stred energy. Classificatin: Public Page 16 f 21 Effective Date: April 1, 2019

17 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure In restring startup pwer t generating units, ensure the Island capacity is large enugh t withstand the impact f picking up subsequent auxiliary lad. In energizing the transmissin system and restring custmer service, energize it in a step-by-step ladder sequence. When lading the system, in rder t cntrl the vltage, cnsideratin shuld be given t Surge Impedance Lading. Switch lines as necessary t prvide fr synchrnizatin at a plant lcatin t the Intercnnectin r t anther island. If pssible prvide fr synchrnizatin at an aut-synch lcatin. Adjust frequency and vltage t prepare fr synchrnizatin f the systems. After cmpleting the Intercnnectin Restratin Checklist (Appendix 2) and determining that the energized Islands are within parameters, the RCSO will issue an Operating Instructin t resynchrnize. The given time t cmplete the Operating Instructin will be n lnger than 15 minutes. If the resynchrnizatin is nt successful within that timeframe, the Intercnnectin Restratin Checklist must be utilized again. Operating Instructins may be required t bring Islands int acceptable parameters fr resynchrnizatin. Once acceptable parameters are achieved, an additinal Operating Instructin will be issued t resynchrnize. X. Pst Restratin: Resuming Nrmal Operatins 19 Assumptins: All RC Area TOPs are intercnnected t the same Island. The RC Area is intercnnected with its neighbring RC Areas.. The RCSO has verified that the RC Area BES is in a stable state. Pririties: The RCSO has verified that the cause f the Disturbance that initiated the Restratin Event is knwn and is n lnger a threat t the BES. Actual RC Area BES line flws and cntingency analysis results shuld indicate that the BES is stable and perating within applicable SOLs and IROLs. 19 NERC Standard EOP Requirement R1.6 Classificatin: Public Page 17 f 21 Effective Date: April 1, 2019

18 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure General Prcedures: TOPs must ntify the RCSO prir t transferring peratins and authrity back t their respective BA fllwing a restratin event. In rder t maintain the stability f the system within acceptable limits, the criteria belw will be used t assess the readiness t transfer cntrl: 20 Verify restratin bjectives met and/r TOP milestnes have been cmpleted; Verify that the RC Area can withstand the next cntingency withut exceeding Facility SOLs; Verify the Intercnnectin frequency is stable within Frequency Trigger Limits ( Hz); Verify Operating Reserves have been reestablished; Verify critical cmmunicatin paths are available and; Verify the status f the interties with neighbring RCs When all RC Area TOPs are intercnnected, when the RC Area is intercnnected with its neighbring RC Areas and when each TOP has transferred nrmal peratin f generatin t the authrity f its respective BA, the RCSO will ensure a RMT t All Reliability is issued t ntify entities that the restratin event has ended fr the RC Area. 20 NERC Standard EOP Requirement R1.6 Classificatin: Public Page 18 f 21 Effective Date: April 1, 2019

19 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Apprved: Managing Directr f Operatins Versin Histry Rev. Date Actin By Change Tracking /19/2013 Issued fr Implementatin J Hyt Updated fr Peak Reliability and mdified apprpriate language t include AESO as a separate perating entity /31/2014 Revised and Reissued J Hyt M Granath Annual Review Cmplete. Only change: Updated address fr TOP s t submit restratin plans t the RC. rctpplans@peakrc.cm /03/2014 Revised and Reissued J Hyt Clarified that the Shift Lead RCSO will be the single pint f cntact fr the RCSOs regarding their restratin crdinatin activities /16/2015 Annual Review Revised and Reissued 5.0 5/10/2016 Annual Review Revised and Reissued 6.0 4/28/2017 Annual Review Revised and Reissued 7.0 4/25/2018 Annual Review Revised and Reissued /02/2019 Annual Review Revised and Reissued J Hyt M Granath M Granath S Khler S Khler J Hyt Annual Review cmplete. Updated restratin plan submittal website address. Other minr grammar changes thrughut. Annual Review cmplete. Updated WECCNet references t RMT Annual Review cmplete. Updated Shift Lead RCSO t Wrking Shift Freman. Annual Review cmplete. Minr grammar changes. Annual review cmplete. Updated prcedure due t NERC Standard EOP and EOP Classificatin: Public Page 19 f 21 Effective Date: April 1, 2019

20 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Nminal Transmissin Vltage Ranges* Attachment 1 Technical Parameters Nminal Vltage (kv) Minimum Vltage (kv) Maximum Vltage (kv) Cntinuus Maximum Vltage (kv) Emergency * The values shwn are general guidelines nly. Individual TOPs shuld utilize their vltage range standards. Surge impedance Lading (SIL)** Nminal Vltage (kv) Surge Impedance Lading (SIL) MW MW MW MW MW MW **SIL values shwn are t be used as general guidelines. The true SIL value will vary with the actual characteristic impedance f the line. A transmissin line laded t its surge impedance lading has n net reactive pwer flw int r ut f the line and will have apprximately a flat vltage prfile alng its length. The SIL f a line shuld be recgnized during restratin because a line laded belw its SIL generates VARS, a line laded abve its SIL, absrbs VARS. Vltage cntrl is a critical element f successful restratin effrts. Classificatin: Public Page 20 f 21 Effective Date: April 1, 2019

21 Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure Attachment 2 Simplified Intercnnectin Restratin Check Sheet Island 1 Island 2 BAs/RCs in Island Cntact Persn / Phne N. / / SYNC D Capacity / Lad / Spin / / / / Armed UFLS MWs / MSSC / / Dynamic Reserve > MSSC SYNC PT: Lcatin / CB / Methd Spinning Reserve + Enabled UFLS > MSSC? (Yes) On Cnference Call establish the fllwing: Spinning Reserve + Enabled UFLS > MSSC? (Yes) / / / / Tie Line / kv / Limit / / kv / Nminal ± 2% / (Yes / N) / (Yes / N) Frequency / 60 ± 0.2 Hz / (Yes / N) / (Yes / N) Aut Reclse disabled? (Yes) (Yes) Cncerns: Relaying / RAS? / / Additinal Tie(s) / kv Unit n 0% Drp AGC Mde Cnfirm: Tie Line Schedules zered / System changes t be avided in Islands during synchrnizing RC Apprval Time: SYNC Time: Initials: Parallel Time: Ntes: Establish additinal ties as sn as pssible. Fr lad pickup greater than 5% f n-line capacity, ntify the RCSO. BAs must agree n scheduled interchange. Flw shuld be maintained near zer if nly ne tie-line is available. As islands grw, AGC mdes, reserves, tie-line flws, etc., need t be reviewed with all BAs. Rules f thumb: 6-10% change in lad will change frequency by 1 Hz (shedding lad will raise vltage, picking up lad will lwer vltage) Typical MVAR prductin: 500 kv 2MVAR/mile; 345 kv 0.75 MVAR/mile; 230 kv 0.33 MVAR/mile Classificatin: Public Page 21 f 21 Effective Date: April 1, 2019

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure N. Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 3. Detail... 2 3.1. Capacity and Energy Emergencies... 2 3.1.1. EEA 1 All Available Generatin in Use... 3 3.1.2. EEA 2

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

Generating Facility Interconnection Guide. Revision 5.0

Generating Facility Interconnection Guide. Revision 5.0 Generating Facility Intercnnectin Guide Revisin 5.0 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12 (DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Cmmunicatins Plan ECERT Cmmunicatins Plan Rev. 0.2 Page 1 f 12 Table f Cntents OBJECTIVES:... 3 GENERAL:... 3 FAMILY COMMUNICATION:... 3 Designated

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014 1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Operating Process for Access to Gas Insulated Switchgear

Operating Process for Access to Gas Insulated Switchgear Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities.

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities. Prject QC-2015-01 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin Sessin with Cncerned Entities May 12, 2015 Outline Objectives f sessin Webinar (instructins) Québec regulatry

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature Wnder Tree Vide Slt Intrductin Wnder Tree vide slt is a 5-reel, 20-line game. The slt cnsists f 11 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except fr the

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

Information Article. Relevance

Information Article. Relevance Infrmatin Article Relevance 1. Airline (Aircraft Operatr) Crisis Respnse - an verview t assist understanding f sme significant emergency terms used by e.g. Air Traffic Service Units and Search & Rescue

More information

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC) PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing

More information

Developed By: Firefighter Alex Chapin August 2017

Developed By: Firefighter Alex Chapin August 2017 F O G N A I L O P E R A T I O N S 1. 1 Develped By: Firefighter Alex Chapin August 2017 T A S K S K I L L D E S C R I P T I O N A N D D E T A I L The fgnail, when deplyed in a timely and accurate manner

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Some Supplementary Review Information for ARMs

Some Supplementary Review Information for ARMs General Infrmatin Regarding Radilgical Areas Sme Supplementary Review Infrmatin fr ARMs As a class f areas, Radilgical Areas are designated in 10CFR835. This has a different meaning than ur use f the designatin

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

Laser Equipment Companion Manual

Laser Equipment Companion Manual Cllege f Physicians & Surgens f Alberta Laser Equipment Cmpanin Manual Owner Respnsibilities Radiatin equipment cannt be used until a CPSA registratin certificate has been issued. Register equipment accrding

More information

9/5/2017. Radio Operations and Policies. Radio Operations: Message From the Director. Radio Operations: System Description

9/5/2017. Radio Operations and Policies. Radio Operations: Message From the Director. Radio Operations: System Description Zne Batt Nuis 9/5/2017 Rensselaer Cunty Bureau f Public Safety 800 MHz User Training and Plicies : Message Frm the Directr Message Frm the Directr: This manual prvides a plan and directive fr unifrm prcedures

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Excel Step by Step Instructions Creating Lists and Charts. Microsoft Infrmatin Yu Can Enter in a Wrksheet: Labels: Any type f text r infrmatin nt used in any calculatins. Labels are used fr wrksheet headings and make wrksheets easy t read and understand. Labels can als

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON BUILDING SERVICES ENGINEERING PLAN REVIEW GUIDELINES (PRG 2): Guidelines Objective: 1. Imprve cmmunicatins between Building Services and the engineering design cmmunity that prepares

More information

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE 23rd Wrld Gas Cnference, Amsterdam 2006 MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE B. KORTTE USA ABSTRACT This paper details the features, functins and benefits f the Mueller C. MAGIC

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

Spectracom GSG ecall Test Suite

Spectracom GSG ecall Test Suite 18-Dec-2017 GSG App Nte Spectracm GSG ecall Test Suite Table f Cntents 1. Intrductin... 1 2. Befre Starting the Test... 2 3. Running the ecall Test Suite... 4 4. Psitin Errr Tests 2.2.2-2.2.4... 10 5.

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers Applicatin fr Registratin f Designated Radiatin Equipment Class 3b and 4 Lasers OWNER INFORMATION Is this equipment wned by a Zne? Yes N If yes, which Zne? If n, please cmplete the fllwing: Owner Name:

More information

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE Versin 40 This is a general manual describing a series f single axis mdule Serv Amplifiers having utput capability suitable fr driving Brushless

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

State Bank Virtual Card FAQs

State Bank Virtual Card FAQs State Bank Virtual Card FAQs 1. What is State Bank Virtual Card? State Bank Virtual Card is a limit Debit card, which can be created using the State Bank Internet Banking facility fr ecmmerce (nline) transactins.

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL Issue February 2011 ASL Intercm BV DESIGNED AND MANUFACTURED BY: ASL INTERCOM BV ZONNEBAAN 42 3542 EG UTRECHT THE NETHERLANDS

More information

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions TC 60 prg start stp THERMOCOMPUTER TC 60 h C/h C Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Alberta Infrastructure. Digital Project Delivery COBie Requirements Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie

More information

Maxon Motor & Motor Controller Manual

Maxon Motor & Motor Controller Manual Maxn Mtr & Mtr Cntrller Manual Nte: This manual is nly fr use fr the Maxn mtr and cntrller utlined belw. This infrmatin is based upn the tutrial vides fund nline and thrugh testing. NOTE: Maximum Permitted

More information

Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06

Draft AMI Use Case: D2 - Distribution Engineering or Operations optimize network based on data collected by the AMI system 04/13/06 Draft AMI Use Case: D2 - Distributin Engineering r Operatins ptimize netwrk based n data cllected by the AMI system 04/13/06 Authr: Bb Yinger Authr: Standard Cnfig Page 1 f 35 Cntents Advanced Metering

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server. Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either

More information

SolarEdge Built-in Revenue Grade Meter Troubleshooting

SolarEdge Built-in Revenue Grade Meter Troubleshooting SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

Desktop Teller Exception User Guide

Desktop Teller Exception User Guide Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

Automated Meters Frequently Asked Questions

Automated Meters Frequently Asked Questions Autmated Metering Prject Utilities Divisin Phne: 403.529.8111 Autmated Meters Frequently Asked Questins Intrductin The City f Medicine Hat has cmpleted its prject t install autmated meters fr all electric,

More information

Application Note AN-2097 Evaluation Kit for the S7500 CW Tunable Laser

Application Note AN-2097 Evaluation Kit for the S7500 CW Tunable Laser Applicatin Nte AN-2097 Evaluatin Kit fr the S7500 CW Tunable Laser 1 Intrductin The evaluatin kit is intended t facilitate testing f Finisar s S7500 widely tunable laser, S7610 Integrable Tunable Laser

More information

Tension meter dynaline HF45/LPT

Tension meter dynaline HF45/LPT Tensin meter dynaline HF45/LPT EN Operatin and maintenance manual SUMMARY 1. DEFINITIONS... 3 2. PICTOGRAMS USED IN THIS MANUAL... 3 3. STANDARD CONTENT OF DELIVERY... 3 4. INTRODUCTION... 4 4.1. Descriptin...

More information

PRODUCT SAFETY ALERT

PRODUCT SAFETY ALERT Allen-Bradley Mtr Prtectin Circuit Breakers 140M-C2E and 140M-C2T, Series A and B 140M-D8E and 140M-D8T, Series A and B 140M-F8E and 140M-F8T, Series A, B and C Starters that use Allen-Bradley Mtr Prtectin

More information

Operating Instructions

Operating Instructions TC 40 THERMOCOMPUTER TC 40 start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing the Prgramme

More information

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1 Avista Crpratin s Standards f Cnduct Implementatin and Cmpliance Prcedures 1 These prcedures explain in detail the measures taken by Avista Crp. and its affiliates t implement and cmply with the Federal

More information

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID: xtltipelement Service Infrmatin 2015 Chevrlet Crvette Crvette Service Manual 7527625 Bdy Systems Vehicle Access Repair Instructins Dcument ID: 3448513 Remte Cntrl Dr Lck and Theft Deterrent Transmitter

More information

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT Quality is the cre reference fr EurSMC s activities, aimed t fully satisfy ur custmers needs and expectatins. DISCLAIMER The infrmatin, prduct specificatins,

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

RSB Service Bulletin No.. RSB--E4--003/12

RSB Service Bulletin No.. RSB--E4--003/12 RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED

More information

SISTEMA ELEVATÓRIO ETV 460A

SISTEMA ELEVATÓRIO ETV 460A Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information

100 Super Hot Video Slot Introduction. How to Bet. Gamble Feature

100 Super Hot Video Slot Introduction. How to Bet. Gamble Feature 100 Super Ht Vide Slt Intrductin 100 Super Ht vide slt is a 5-reel, 100-line fixed game. The slt cnsists f 8 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

Dice High Video Slot. Introduction. How to Bet. Gamble Feature

Dice High Video Slot. Introduction. How to Bet. Gamble Feature Dice High Vide Slt Intrductin Hw t Bet Gamble Feature Game Cntrls Rules Dice Feature Jackpt Cards Bnus Game Interruptins Return t Player Intrductin Dice High vide slt is a 5-reel, 20-line fixed game. The

More information

WiFi Lab C. Equipment Needs:

WiFi Lab C. Equipment Needs: WiFi Lab C Event Objective: Teams will cnstruct an antenna prir t the turnament that is designed t transmit a signal at 2.4 GHz and cmplete a written test n the principles f electrmagnetic wave prpagatin.

More information

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin

More information

2018 Print and DPI Annual Competition Rules

2018 Print and DPI Annual Competition Rules Brisbane Camera Grup 'Annual Cmpetitin' takes place in Nvember each year. It's the highlight f the club cmpetitin year and submissin standards are cnsistently high. All graded members are eligible and

More information

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start: Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must

More information