2.1 PROJECT MANAGEMENT

Size: px
Start display at page:

Download "2.1 PROJECT MANAGEMENT"

Transcription

1 2.1 Prject Management General 2.1 PROJECT MANAGEMENT GENERAL The Design Team and Cnstructr will wrk primarily with the Prject Manager frm Masn Facilities. All input and crdinatin shall be cnducted thrugh the Prject Manager. Input during design will be generated by varius elements f the campus cmmunity, including Facilities and its allied departments. At award f the cnstructin cntract, a representative frm Facilities will versee the cntractr s wrk and administer the cnstructin cntract. Rles and respnsibilities are defined in the CPSM and prmulgated by the Bureau f Capital Outlay Management (BCOM). Terms such as Gerge Masn University," Masn, r the university" used in the Design Manual refer t Gerge Masn University Facilities (Prject Manager), especially when apprval permissin r cnsultatin is referenced. Refer t the chart belw fr the general flw f the Design Prcess at Gerge Masn University COMMUNICATION PLAN AND PROCEDURES Gerge Masn University, as an agency f the Cmmnwealth f Virginia, fllws the prcedures fr design as utlined in the CPSM. Prir t a prject being frmulated and assigned a prject cde by BCOM, ften the university will develp a planning level package that develps scpe, feasibility, and prgramming fr a prpsed effrt. This effrt is geared t aid in the submissin f a prject as a part f Gerge Masn University s capital plan. Nrmally these effrts are spearheaded by a planner within Facilities. See als Pre-Design belw. Fr Capital Prjects, the prcess invlves 6 basic steps as utlined in the fllwing diagram. Schematic Design Preliminary Design Cnstructin Dcuments Bidding/ Prcurement Cnstructin Phase and Services Prject Clse-ut and Recrd Dcuments At each stage f the capital prject develpment prcess, the State Review Agency and Authrity Having Jurisdictin, BCOM, executes reviews f the prject fr cde and state cmpliance requirements, while the university reviews the prject fr additinal prject requirements. The Prject Manager will be the primary pint f cntact and shepherd the prject thrugh all stages f the prject. 28 June,

2 2.1 Prject Management Cmmunicatin Plan and Prcedures Fr all nn-capital prjects, this prcess is smewhat abbreviated. Unlike in capital prjects, the state review agency, BCOM, des nt require interim reviews f design submittals, and in sme cases has delegated authrity t the lcal agency fr maintenance, minr renvatin, and mdificatin prjects. Initial Design Final Design Bidding/ Prcurement Cnstructin Phase and Services Prject Clse-ut and Recrd Dcuments As nted abve, at each stage the university will either review design submittals prir t sending them t BCOM r cncurrently review design submittals while they are at BCOM. A prcess similar t the fllwing flw chart will be fllwed and managed by the Prject Manager. Typically, review by the university will take days Meeting Minutes The Design Team shall prvide meeting minutes fr all meetings during the design prcess. Typically, the prject will maintain recurring mnthly, bi-weekly, r weekly meeting, depending n the design develpment schedule. Sme meetings may target particular tpics, while the purpse f thers will be general prgress updates. Other meetings may take the frm f wrkshps r design charettes. The Design Team shall make a recrd f meeting 28 June,

3 2.1 Prject Management Cmmunicatin Plan and Prcedures participants and the items discussed. Meeting minutes shall be distributed primarily t the Prject Manager, but may include thers as requested. Minutes shall be prvided in an editable electrnic frmat, and saved fr recrd in PDF frmat fllwing a minimum 2 week cmmenting perid. During the Cnstructin Phase the Design Team must schedule bi-weekly (r semi-mnthly) cnstructin prgress meetings in cnsultatin with the Prject Manager and Owner. The purpse f the meetings is t review prgress f the wrk during the previus week, discuss anticipated prgress during the fllwing weeks, and review critical peratins and ptential issues. The Design Team shall cnduct the meeting and is slely respnsible fr generating the written recrd r minutes f each prgress meeting. The Design Team distributes prgress meeting minutes in an electrnic editable frmat t the Owner and the Cntractr(s). All bjectins r crrectins are nted as such at the next prgress meeting r in writing t the Design Team. The Design Team is t be ntified at the next prgress meeting r in writing explaining the bjectin. The minutes f the next Prgress Meeting shall reflect any bjectin r respnse frm the Design Team. The Design Team may transmit the agenda and minutes fr each prgress meeting using electrnic means as directed by Prject Manager Decisin-Making Decisin making as a part f the design prcess shall be facilitated by the Prject Manager and the Planner assigned t the prject. Ultimate authrity fr all decisins resides with the Vice President f Facilities, delegated and affirmed by the Directrs f the varius departments f the Facilities rganizatin Day-t-Day Management f Prject Refer t the CPSM, Chapter 2.2 fr definitin f the Prject Manager INVOICING CPSM, Chapter Prprtining f the A/E Fee and Payments Alternates N deductin shall be made frm the Design Team s fee fr any penalty r liquidated damages charged t any cntractr, excepting in Design-Build prjects. N additinal cmpensatin shall be made fr preparatin f alternates, unless the Owner prir t executin f the wrk apprves such additinal cmpensatin in writing Payments During Pre-Design Activities (Prgrammatic Phase), Schematic Design, Design Develpment, and Cntract Dcuments and Bidding, the university shall make mnthly payments t the Design Team based n the prgress f the wrk as utlined in the Cmmnwealth f Virginia s Cnstructin and Prfessinal Services Manual (Capital Outlay Manual). Such payments shall in n event exceed the fee limits fr phases as set frth in the cntract. These payments shall be limited in prprtin t the Owner s estimate f prgress and percentage cmpletin f the wrk in the current phase. During Cnstructin, the payments tward the fixed fee due fr that phase shall be made t the Design Team in prprtin t prgress payments made t the Cnstructr fr cnstructin f the Prject, as certified by the Design Team. The Design Team shall use a frmat fr payments as prvided by the DEB. 28 June,

4 2.1 Prject Management Invicing Change Orders The Design Team cannt prceed n change rders withut the written authrizatin frm Masn. Change rders cannt be billed withut such authrizatin. Refer t the CPSM, Chapter All change rders shall be sequentially numbered when apprved. The revised cntract amunt shall be shwn n the invice alng with the riginal cntract amunt and the previus cntract amunt if mre than ne change rder. Invices shall fllw the same frmat as previusly described SCHEDULES During the design phase (thrugh cmpletin f Wrking Drawings and permit issuance) the Design Team shall develp a prject schedule that details all design deliverables, BCOM review perids, and perids f design effrt. A minimum f 4 weeks and an average f 6 weeks shuld be allcated fr the review f any design submittal by BCOM. Prir t submittal t BCOM r lcal cde review authrities, the Design Team shall allw sufficient time fr Masn s internal review. Anntatins shall be made fr critical meetings and design charette wrkshps. The Design Team shall crdinate clsely with the Prject Manager fr the availability f Masn persnnel and scheduling f ther resurces thrugh the design phase f a prject. The fllwing chart f meetings is prvided as a reference fr the meetings that are anticipated during thrughut the prject: 28 June,

5 2.1 Prject Management Schedules Meeting Name (ne per phase unless therwise nted) Feasibility Prgramming Schematic Design Preliminary Design Wrking Drawings Cnstructin Cmmissining Clse-ut Warranty Kick-ff Meeting x w w w w x x w x Cre Team Member Peridic Meeting (suggested every 2x weeks) Cre Team and Design Team Meeting (in cnjunctin with the abve) Cre Team and CM/DB/GC Pre-Cnstructin Meeting (with the abve) Design Meetings (numerus per phase, may be in peridic meetings) Cre Team Member Internal Meeting (nce mnthly r as needed) x x x x x x x x x x x x x x x x x w w x x w x x x x x x x x x x x x x Interview with Users (as required) x x x w Value Engineering x x x Sustainability x x x x w x x Prject Review (ne per mnth) x x x x x x x x x Finishes Determinatin/Selectin x x x Architectural Design Review (ne initial, until UA apprved, per phase) x x x x ITU Meeting x x x x w Facilities Management Shps Input Meeting - MEP Fcus Facilities Management Shps Input Meeting - Others (e.g. Recycling) Pre-Survey Meeting Pst-Survey Meeting Utilities Meeting (ne per phase with each utility) x x x EHS Meeting x x x x x x x x x x x x x x x x x x 28 June,

6 2.1 Prject Management Schedules Meeting Name (ne per phase unless therwise nted) Feasibility Prgramming Schematic Design Preliminary Design Wrking Drawings Cnstructin Cmmissining Clse-ut Warranty Parking and Transprtatin Meeting x x x x Public Safety Meeting Space Administratin Presentatin x x x ADA Cmpliance Meeting x x x x Auxiliary Enterprises (when nt the primary client) x w w Twn hall Presentatins x x x Pre-Cnstructin Meeting Cnstructin Prgress Meeting (every 2x weeks, with Cre Team Meeting) x x x x Preparatry Meeting x x Punch-list Generatin (at cnclusin f each phase f cnstructin) Punch-list Reslutin (every 2x weeks) Turn-ver Meeting (t FM) x x Warranty Review (NLT 3 mnths prir t cnclusin f gernal warranty) x x x x Cde Key: x w Must Occur Can be waived (Especially if similar meeting ccurs in earlier phase, and n additinal team members), but assumed t take place Optinal (Discretin f Team Leader, see Prject Team Member Checklist) 28 June,

7 2.1 Prject Management Schedules Cnstructin Phase During the Cnstructin Phase, the Design Team shall review and prvide infrmatin related t the reasnableness f the Cntractr/CM schedule fr executin (in D-B this will be dne as an independent analysis by the Design Team n behalf f the university). At the Bidding/Prpsal/GMP stage, the Design Team is respnsible fr ntifying the university if it feels it des nt have adequate Cnstructin Phase services cverage in terms f fee, persnnel, r scpe f services t cver the prject as a part f the cnstructin schedule review. The Design Team shall wrk with the Prject Manager t accunt fr any variatins/cntract mdificatins that may be required DELIVERABLES General CPSM: 67/Default.aspx BCOM frms: Virginia Public Recrds Management Manual: VPRRM Retentin Schedules: Cnstructin Operatins Building Infrmatin Exchange: The Cmmnwealth DEB has strict requirements fr reprting, and subsequent apprval f updates at each stage f the prject, and the CPSM des a thrugh jb f describing the submittal requirements fr each phase f a prject. Chapter 5 f the 2012 CPSM cvers Prject Submittal Standards and Requirements. Specifically: The CO-3a, Terms and Cnditins f the A/E Cntract, Sectins 15 and 16, prescribe required dcuments t be prvided t the Owner, at the cmpletin f the Design Team s wrk. Refer t Chapter 5 f the CPSM fr general requirements n all prject submittals, specifically the requirement fr all prject dcuments, (drawings, specificatins, cntracts, invices, crrespndence, etc.), t be clearly marked with the 11 digit Prject Identificatin Cde. Refer t CPSM, Chapter 5.11 fr Prject Submissin Requirements, specifically the Table fr Required Submittal Cpies by Phase fr Capital Prjects in Chapter f the CPSM. The Design Team shall prvide at a minimum the number indicated as required fr review by BCOM and State Fire Marshall. Additinal cpies, as apprpriate fr a particular prject shall be crdinated with the university. Refer t the Table fr Required Submittal Cpies by Phase fr Nn-Capital Prjects in Chapter f the CPSM. Crdinate with the university fr additinal cpies that may be required. Refer t Chapter 5.2 f the CPSM fr General Requirements fr Drawings. These requirements generally pertain t a printed drawing, and the CPSM requires hardcpy drawings fr submissin t BCOM. Further clarificatin n the required frmat can be fund in Sectin 2.2 f the Design Manual. 28 June,

8 2.1 Prject Management Deliverables Refer t Chapter 5.3 (specifically, Sectin 5.3.3) f the CPSM fr infrmatin n Specificatin Standards. Nte that submissin t BCOM shall be hardcpy 8.5 x11 frmat. Chapter f the CPSM states that, These dcuments shall be prvided t the Owner electrnically in PDF frmat. The Owner may als request additinal cpies f the recrd dcuments in ther frmats at its discretin. Beynd the requirements f the CPSM, the university has submittal requirements in cnjunctin with the design phase f a prject and the Cnstructin Phase. These are detailed in the Design Manual and are partially indicated in the fllwing checklist: 28 June,

9 2.1 Prject Management Deliverables Masn Design Submittal Checklist Item Schematic Design Schematic Re- Submit Preliminary Design Preliminary Re-Submit Wrking Drawings WD Re- Submit Building Permit Fire Alarm/ Sprinkler FA/Sprink. Re-Submit Basis f Design Narrative (with which Agency agrees) DPB Frm S-1, Prject Scpe Prfile (updated t reflect current scpe) BCOM Required Items (see als CPSM) Cst Estimate prvided by Architect/Engineer Sils Reprt with Bring Lgs (prvided by Agency) Calculatins (1 cpy fr each discipline) Drawings (WD and BP* Drawings must be sealed) Bring Lgs (psted n drawings) Shp Drawings (prvided by GC/CM/DB, with sealed review cver sheet) Equipment Cut Sheets Building Systems and Equipment Checklist Prject Manual, including: Prject-Specific IFB Ntice Prject-Specific Bid Frm Frm CO-7 (General Cnditins, unedited) Frm CO-7a (Instructins t Bidders, unedited) Other Standard Frms Prject-Specific Technical Specificatin Sectins Sils Reprt (cpy bund in Prject Manual) 28 June,

10 2.1 Prject Management Deliverables Masn Design Submittal Checklist Item Schematic Design Schematic Re- Submit Preliminary Design Preliminary Re-Submit Wrking Drawings WD Re- Submit Building Permit Fire Alarm/ Sprinkler FA/Sprink. Re-Submit Other Items (list belw): Stmt. f Struct. & Special Inspectins (CO-6a & CO-6b) Independent Cst Estimate prvided by Agency (CM Est. if CM, DB Cntract if DB) V.E. Study & Recmmendatins (Reprt & VE-1) Applicatin fr Building Permit (CO- 17a) Design Team Respnses t BCOM Review GMU Additinal Required Items Prepped Frm DGS _04-08_Transmittal_fr_Review Departure frm the GMU Deisgn Manual Lg/Matrix Request fr Cde Mdificatin Matrix LEED r VEES Screcard Update with Back-up Dcumentatin Prgram Re-Cnfirmatin (with DPB S-1 Frm) Blcking and Stacking/Linkage-Adjacency Analysis Reference Master Plan Dcumentatin Cmpliance Check AARB Apprval (SD r PD and WD) Updated Building Systems and Equipment Checklist Owners Perfrmance Requirements (OPR) (and revisins) BOD/Actual Equipment Cut Sheets 28 June,

11 2.1 Prject Management Deliverables Masn Design Submittal Checklist Item Schematic Design Schematic Re- Submit Preliminary Design Preliminary Re-Submit Wrking Drawings WD Re- Submit Building Permit Fire Alarm/ Sprinkler FA/Sprink. Re-Submit Engineering Analysis & Calculatins Structural Civil Mechanical Plumbing Electrical Fire/Life Safety Accustics/AV Net/Telecm Lad Letters/Utilities Electric LL (Per Dminin Pwer), Revised at PD Water Cnnectin (Per City f Fairfax), Revised at WD Sanitary Fixture Cunt/DU Cunt (Per Cunty f Fairfax), Revised at WD Gas (Per Washingtn Gas), Revised at WD Site Utility Ruting Diagram (Revised at PD) Health Department (Fd Service nly) Detailed List f Owner Prvided Items that Impact the Cnstructin/Design (Includes FF&E required) Cnslidiated Submittals List Cnslidated Bench/Attic Stck List Cnslidated Warrenty List Cnslidated Training Requirements List Cnslidated Planned/Designed Outages 28 June,

12 2.1 Prject Management Deliverables Masn Design Submittal Checklist Item Schematic Design Schematic Re- Submit Preliminary Design Preliminary Re-Submit Wrking Drawings WD Re- Submit Building Permit Fire Alarm/ Sprinkler FA/Sprink. Re-Submit EIR SWPPP VSMP/NPDES/E&S Cntrls Permit Applicatin HAZMAT Survey Disclsure (Survey by Agency) DEQ Frm 7/AST Back-up Life Cycle Cst versus First Cst Analysis (CM/DB r A/E) Additive Bid Items List (with Pririty and Order) CxA Issues Lg and Status ICE/CM: Schematic Estimates/DB: Prpsal Cst CM/DB: Risk Analysis Matrix CM/DB: VE Items List/Lg CM/DB: Design Review Cmments/Lg GC/CM/DB: Phasing/Lgistics Plan (GC after Permit) CM/DB: Lng Lead Item Matrix CM/DB: Cnstructin Schedule CM/DB: Site Specific Safety Plan CM: GMP/ICE: Final Estimate GC: Ntice f Intent t Award Cnstructin Cntract Nte: Unless therwise apprved by the Prject Manager r a GMU Frm is prvided, all parties shall utilize standard DGS r DPB Frms fr all f the abve tasks that pertain. These frms can be fund at the fllwing tw links: BCOM Frms Center r DPB Frms Center 28 June,

13 2.1 Prject Management Deliverables Pre-Design Pre-Design has tw distinct meanings at Masn. The first refers t studies, effrts, and planning dne in rder t develp and rund ut the capital plan fr submissin t the Cmmnwealth; referred t Pre-Planning Studies. The secnd are activities that ccur prir t the executin f the design f a particular prject that has been apprved/authrized by the Cmmnwealth and Gerge Masn University fr executin; Pre-Design Activities Pre-Planning Studies The Directr f Campus Planning leads the effrt t cnstruct the university s 6-year capital plan. On a Biannual basis this plan is develped and submitted t the Cmmnwealth fr apprval. In rder t cnstruct this plan, the first step is t refer t Masn s Master Plan Dcument(s). These can be fund at Master Plan dcuments are peridically updated as needed by the university in cllabratin with cnsulting firms, under the directin f the Campus Planning prtin f Facilities. Pre-Planning Studies are executed t define the scpe, schedule, and budget fr a ptential capital prject at the university. Design firms are ften prcured fr these studies thrugh term cntracts that the university already has established. Deliverables fr Pre-Planning Studies include: Prject justificatin narrative Cnceptual cst estimate Massing studies Review and validatin f deferred maintenance (if applicable) Site analysis Utility crdinatin planning Phasing/sequencing/schedule plan A Planner frm the Campus Planning prtin f Facilities will versee and direct a pre-planning study. A specific scpe, details and requirements will be develped fr each study. Planning studies require the use f the Design Manual t ensure that the prject develped and submitted int the capital plan accunts fr all aspects f its eventual develpment Pre-Design Activities Refer t the CPSM, Chapter 5.5 fr details n the required pre-design cnference. Agendas and meeting minutes frm this cnference shall be dcumented and kept in the permanent prject recrd. Prir t the start f design, the Design Team must furnish a planned design schedule, a prpsed fee allcatin and a clear understanding f the scpe f services fr the prject. These are anntated and agreed upn based n a Memrandum f Understanding that becmes a part f the CO-3 A/E services cntract. 28 June,

14 2.1 Prject Management Deliverables The Design Team shall fully understand the prgram and ther requirements thrugh a review f the prject authrizatin indicated n the CO-2 and prject submissin dcumentatin that the university has used t define the prject at the utset. These dcuments can be prvided t the Design Team by the university. Fr the purpse f fee negtiatins, Masn s anticipated fee amunt may be withheld frm the Design Team during this stage f the prject. As a part f the Pre-Design Phase, the Design Team shall prvide the university with a reprt n the existing cnditins, as well as any absent investigatins that are t ccur in subsequent phases. This reprt, t be delivered prir t the beginning f Schematic Design, shall include applicable narratives, diagrams, phtgraphs, and ther descriptive items. This reprt will require psitive cncurrence by the university prir t entering int Schematic Design. Refer t Sectin 2.3 Existing Cnditins in the Design Manual fr additinal requirements. It is during this phase that the final design services cntract is develped and finalized. The Design Team shall ensure that they have a full understanding f the varius respnsibilities and typical cntract mechanisms used as it relates t specialty cnsultants. The fllwing anntates sme f thse requirements: CxA Services: Masn typically acquires Cmmissining Agent (CxA) services independently frm the prime Design Team cntract. If there is a CxA hired by Masn, the Design Team shall wrk clsely with them t crdinate and assure respnsibilities fr design develpment and cnstructin prject cmmissining are cncluded and scped crrectly in the design dcuments. The Prject Manager will facilitate the prcess f scpe clarificatin fr the varius services. If Masn des nt hire an independent CxA, they will direct the Design Team t hire such services, r pt t have the Design Team prvide certain CxA services as Masn directs. Getechnical Engineering Services: Masn typically acquires Getechnical Engineering services independently frm the prime Design Team cntract. If there is a Getechnical Engineer hired by Masn, the Design Team shall wrk clsely with them t crdinate and develp the subsurface investigatin plan during design. Likewise they will crdinate with the Getechnical Engineer regarding fundatin and ther related design elements f the prject during design develpment. Shuld it be necessary, Masn s Getechnical Engineer may be brught in t aid with field issues as they ccur during the cnstructin phase f the prject. The Design Team will ensure Bring Plans are adequately presented in the design dcuments per CPSM requirements. The Prject Manager will facilitate the prcess f scpe clarificatin fr the varius services. If Masn des nt hire an independent Getechnical Engineer, they will direct the Design Team t hire such services, r pt t have the Design Team prvide certain Getechnical Engineering services as Masn directs. Engineering and Materials Testing Services: Per CPSM requirements, Engineering and Materials Testing services must be independently prcured by Masn fr all capital and nn-capital prjects permitted thrugh BCOM. The Design Team shall wrk clsely with the Engineering and Materials Testing team t ensure that all quality assurance testing is timely, crdinated, and nted in the cnstructin cntract dcuments. Likewise they will crdinate with the Engineering and Materials Testing service regarding structural and ther related design elements f the prject during design develpment. The Engineering and Materials Testing team will be brught in t aid with field issues as they ccur during the cnstructin phase f the prject. The Design Team will ensure that the testing plans are adequately presented in the design dcuments per CPSM requirements. The Prject Manager will facilitate the prcess f scpe clarificatin fr the varius services. AV Cnsultant: It is expected that the prject design team will prvide a qualified AV cnsultant (preferably pssessing a InfCmm CAVSP Emerald Level r higher rganizatinal certificatin) t 28 June,

15 2.1 Prject Management Deliverables assist with AV infrastructure, Acustics (a separate acustical cnsultant is permissible) and AV drawings t be included in the cnstructin dcumentatin when ne f the fllwing scenaris exist: There are classrms in the prject; Specialty Classrms r Labs (Discipline Specific Spaces); Experimental Classrms; Classrms with 150 seats r greater; r when mre than 3 Classrms are a part f the prject scpe. Outside f these scenaris, and when a prject is utside f the ability f Masn s resurces t execute the scpe f the prject (as determined by the university), the shall Design Team prvide: a) A qualified AV cnsultant fr AV infrastructure and AV Systems Design fr any prject where nn-classrm spaces are t be equipped with AV equipment and b) Crdinatin amng classrm & nn-classrm space designs in rder t cnslidate purchasing, design, implementatin, etc. Estimating Services: Masn will hire an independent cst estimatr (ICE) n all prjects (either independently, r thrugh CM Pre-Cnstructin Services, r by virtue f the Design-Build prpsal price). Fr CM/Traditinal General Cntractr prjects, the Design Team shall prvide such assistance as is required t ensure the ICE/CM is able t adequately estimate the prject at the varius stages f the prject. Likewise, the Design Team will wrk with the ICE/CM t execute estimate recnciliatin at the directin f the university at each design phase/estimate. Masn Term Cnsultants: It is nted that Masn has several term cnsultants that it may pt t use r prvide prtins f design effrt thrughut the prcess. Several f these perfrm specialty services that enable better synchrnizatin with verall campus systems and themes. The Prject Manager will facilitate the prcess f scpe clarificatin fr the varius services Schematic Design Refer t CPSM, Chapter 5.6 fr requirements fr submittal t BCOM at the Schematic Design phase. Nte that this phase is als called initial design in nn-capital prjects. In additin t these requirements, the Design Team shall prvide the fllwing items as a part f the Schematic Submittal (packaged separately frm, but at the same time as the items abve): A listing f any and all deviatins frm the Design Manual fr apprval by the university, if applicable. Such deviatins require a narrative justificatin fr each deviatin prvided by the Design Team. A listing f any and all deviatins frm the cde fr review by the university, if applicable. The Design Team shall prepare a justificatin in accrdance with (IAW) the CPSM and the VUSBC fr each deviatin. If agreed upn by the university, the Design Team shall prepare a cde waiver fr submissin t BCOM. Prvide a LEED (r Envisin) checklist fr the prject as it is understd with backup dcumentatin. Prvide a tabular prgram recnfirmatin based upn the design as it is understd. Deviatin frm the prgram as it was established by the university prir t Schematic Design shall require a narrative r ther justificatin n the part f the Design Team. Prvide blcking/stacking and linkage/adjacency analysis infrmatin. The Design Team shall determine the best way t present this infrmatin in crdinatin with the university. Prvide cnfirmatin and reference infrmatin related t the applicable Gerge Masn University Master Plan(s). The Design Team shall prvide a narrative and/r depictins n hw this prject fits within the 28 June,

16 2.1 Prject Management Deliverables larger cntext f the campus in terms f the Master Plan. It must be made clear that the Design Team has carefully analyzed the Master Plan and incrprated the applicable elements int the prpsed design. Prvide materials t supprt submissin t the Art and Architecture Review Bard (AARB). Based n directin frm the university, the Design Team shall prvide bards and ther depictins and be prepared t present these t the AARB. Prvide an anntated cpy f the Owners Perfrmance Requirements. This dcument shall fllw a standard template (AASHRAE Guideline 0) and indicate the perfrmance measures fr the prject. This dcument will be initially drafted by the independent CxA if there is ne as a part f the prject; therwise, drafting f the dcument shall be dne by the Design Team. Prvide a cpy f any and all calculatins, by discipline, used in the design t this stage. Prvide an Electrical Lad letter in the frmat used by the applicable utility fr the site/campus. Prvide an anntated diagram that indicates desired utility ruting n the site f cnstructin. As directed by the university, prvide life-cycle cst analysis fr elements f the design. In D-B and CM prjects this is t be dne in cnjunctin with the cnstructin executin prtin f the team. Prvide the CxA issues lg and status reprt with anntatins frm the Design Team, when CxA services are prvided fr a prject. Prvide a recnciled cpy f the estimate as executed by an independent cst estimatr r the CM (in additin t the Design Team s recnciled cst estimate), if applicable. Fr CM/D-B prjects prvide a cpy f the risk analysis matrix in crdinatin with the university at an rder f magnitude level. Prvide a VE Items listing using the applicable DEB frm. Fr CM/D-B prjects, prvide a cpy f the updated anticipated cnstructin schedule Preliminary Design Refer t the CPSM, Chapter 5.7 fr requirements fr submittal t BCOM at the Preliminary Design phase. Specific requirements fr drawings are enumerated, and cmpliance with the NCS is strngly encuraged. In additin t these requirements, the Design Team shall prvide the fllwing items as a part f the Preliminary Design Submittal (packaged separately frm, but at the same time as the items abve): A listing f any and all deviatins indicated in the design, frm this design manual fr apprval by the university, if applicable. Such deviatins require a narrative justificatin fr each deviatin prvided by the Design Team, beynd thse previusly apprved. A listing f any and all deviatins indicated in the design, frm the cde fr review by the university, if applicable. The Design Team shall prepare a justificatin in accrdance with (IAW) the CPSM and the VUSBC fr each deviatin. If agreed upn by the university, the Design Team shall prepare a cde waiver fr submissin t BCOM, beynd thse previusly apprved. 28 June,

17 2.1 Prject Management Deliverables Prvide an anntated and updated cpy f the design issues identified by the university and/r BCOM in prir design submissins, with lcatins t find reslutins within the design submittal. Cmments and reslutins are t be segregated int reslved and unreslved issues in the lg/cmment sheet, as determined by the university. Prvide a LEED (r Envisin) checklist fr the prject, as it is understd, with backup dcumentatin. Prvide a tabular prgram recnfirmatin based upn the design as it is understd. Deviatin frm the prgram as it was established by the university prir t Schematic Design shall require a narrative r ther justificatin n the part f the Design Team. Prvide blcking/stacking and linkage/adjacency analysis infrmatin. The Design Team shall determine the best way t present this infrmatin in crdinatin with the University. Prvide cnfirmatin and reference infrmatin related the applicable Gerge Masn University Master Plan(s). The Design Team shall prvide a narrative and/r depictins n hw this prject fits within the larger cntext f the campus in terms f the Master Plan. It must be made clear that the Design Team has carefully analyzed the Master Plan and incrprated the applicable elements int the prpsed design. Prvide materials t supprt submissin t the Art and Architecture Review Bard (AARB). Based n directin frm the university, the Design Team shall prvide bards and ther depictins and be prepared t present these t the AARB, if the prject has nt previusly garnered full apprval frm the AARB. Prvide an updated and revised cpy f the Owners Perfrmance Requirements. This dcument shall fllw a standard template (AASHRAE Guideline 0) and indicate the perfrmance measures fr the prject. Prvide a cpy f infrmatin as it relates the Basis f Design f any majr cmpnent. Items such as cutsheets, standard details and drawings, and peratins infrmatin shall be prvided fr review by the university. Prvide an initial furniture design and layut. Such layuts and designs shall be clsely crdinated and apprved by the Masn Interir Design staff. Prvide a cpy f any and all calculatins, by discipline, used in the design t this stage. Prvide an Electrical Lad letter in the frmat used by the applicable utility fr the site/campus. Prvide water cnnectin infrmatin in the frmat used by the applicable utility fr the site/campus. Prvide a sanitary fixture cunt/husing unit cunt in the frmat used by the applicable utility fr the site/campus. Prvide a Gas Lad letter in the frmat used by the applicable utility fr the site/campus, if applicable. Prvide a revised anntated diagram that indicates desired utility ruting n the site f cnstructin. Prvide infrmatin fr the Health Department in the frmat used by the applicable utility fr the site/campus, if applicable. Prvide a detailed listing, n behalf f the university, f the wner-prvided items that affect the prject. This includes but is nt limited t the furnishing, fixtures and equipment t be prvided. 28 June,

18 2.1 Prject Management Deliverables Prvide a cnslidated listing f all submittals indicated in the prject manual in a frmat acceptable t the university. Prvide a listing and indicatin f the anticipated bench/attic stck (if any) fr the prject. Prvide an Envirnmental Impact Reprt in accrdance with state and federal requirements. Prvide a strmwater pllutin preventin plan (if applicable) in accrdance with state and federal requirements. Prvide a Virginia Strmwater Management Prgram and Ersin and Sediment Cntrl Permit applicatin fr the prject. Prvide a recmmendatin fr the Hazardus Materials disclsure statement based upn the Hazardus Materials survey infrmatin prvided by the university. Prvide infrmatin t supprt air permitting by the university fr any emitting device in the prject and/r infrmatin t supprt strage tank permitting in accrdance with state and federal law. As directed by the university, prvide life-cycle cst analysis fr elements f the design. In D-B and CM prjects this is t be dne in cnjunctin with the cnstructin executin prtin f the team. Prvide a listing f prpsed Additive Bid items in the design, with applicable pririties. Prvide the CxA issues lg and status reprt with anntatins frm the Design Team, when CxA services are prvided fr a prject. Prvide a recnciled cpy f the estimate as executed by an independent cst estimatr r the CM (in additin t the Design Team s recnciled cst estimate), if applicable. Fr CM/D-B prjects prvide a cpy f the risk analysis matrix in crdinatin with the university. This risk shuld allw fr an understanding f the impact in terms f weeks f time r in terms f the nearest thusand dllars f expense. Prvide a VE Items listing using the applicable DEB frm. Fr CM/D-B prjects, prvide a cpy f the updated anticipated cnstructin schedule. Fr CM/D-B prjects, prvide a cpy f the phasing/site lgistics plan created by the cnstructin executr. Prvide a listing f any lng lead item (in excess f 10% f the anticipated cnstructin duratin) fr the prject. This listing shall include anticipated time fr prcurement, delivery and installatin, as well as the latest date f rder t meet the anticipated cnstructin schedule critical path requirements. Fr CM/D-B prjects, prvide a cpy the site specific safety plan fr review Wrking Drawing Phase Dcumentatin Refer t CPSM, Chapter 5.8 fr requirements fr submittals t BCOM at the Wrking Drawings Phase (Cnstructin Dcuments Phase). This phase is als referred t as Final Design in nn-capital prjects. 28 June,

19 2.1 Prject Management Deliverables In additin t these requirements, the Design Team shall prvide the fllwing items as a part f the Wrking Drawing Submittal (packaged separately frm, but at the same time as the items abve): A listing f any and all deviatins frm the Design Manual fr apprval by the university, if applicable. Such deviatins require a narrative justificatin fr each deviatin prvided by the Design Team, beynd thse previusly apprved. A listing f any and all deviatins frm the cde fr review by the university, if applicable. The Design Team shall prepare a justificatin in accrdance with (IAW) the CPSM and the VUSBC fr each deviatin. If agreed upn by the university, the Design Team shall prepare a cde waiver fr submissin t BCOM, beynd thse previusly apprved. Prvide an anntated and updated cpy f the design issues identified by the university and/r BCOM in prir design submissin, with lcatins t find reslutins within the design submittal. Cmments and reslutins are t be segregated int reslved and unreslved issues in this lg/cmment sheet, as determined by the university. Prvide a LEED (r Envisin) checklist fr the prject as it is understd with backup dcumentatin. In additin, demnstratin f submissin f the LEED design submittal credit apprvals shall be prvided. Prvide a tabular prgram recnfirmatin based upn the design as it is understd. Deviatin frm the prgram as it was established by the university prir t Schematic Design shall require a narrative r ther justificatin n the part f the Design Team. Prvide cnfirmatin and reference infrmatin related t the applicable Gerge Masn University Master Plan(s). The Design Team shall prvide a narrative and/r depictins n hw this prject fits within the larger cntext f the campus in terms f the Master Plan. It must be made clear that the Design Team has carefully analyzed the Master Plan and incrprated the applicable elements f thse plans in the design presented. Prvide materials t supprt submissin t the Art and Architecture Review Bard (AARB). Based n directin frm the university, the Design Team shall prvide bards and ther depictins and be prepared t present these t the AARB, if the prject has nt previusly garnered full apprval frm the AARB. Prvide an updated and revised cpy f the Owners Perfrmance Requirements. This dcument shall fllw a standard template (AASHRAE Guideline 0) and indicate the perfrmance measures fr the prject. Prvide an updated cpy f the Building Systems and Equipment Checklist as indicated in Chapter f the CPSM. Prvide a cpy f infrmatin as it relates the Basis f Design f any majr cmpnent. Items such as cutsheets, standard details and drawings and peratins infrmatin shall be prvided fr review by the university if nt already prvided. Prvide air-flw drawings and diagrams fr all mechanical systems. Prvide a cpy f any and all calculatins, by discipline, used in the design t this stage. Prvide an Electrical Lad letter in the frmat used by the applicable utility fr the site/campus, if nt already prvided at an earlier stage and nt in need f revisin. 28 June,

20 2.1 Prject Management Deliverables Prvide water cnnectin infrmatin in the frmat used by the applicable utility fr the site/campus, if nt already prvided at an earlier stage and nt in need f revisin. Prvide a sanitary fixture cunt/husing unit cunt in the frmat used by the applicable utility fr the site/campus, if nt already prvided at an earlier stage and nt in need f revisin. Prvide a Gas Lad letter in the frmat used by the applicable utility fr the site/campus, if applicable, if nt already prvided at an earlier stage and nt in need f revisin. Prvide infrmatin fr the Health Department in the frmat used by the applicable utility fr the site/campus, if applicable. Prvide a detailed listing, n behalf f the university, f the wner prvided items that affect the prject. This includes but is nt limited t the furnishing, fixtures and equipment t be prvided. Prvide a cnslidated listing f all submittals indicated in the prject manual in a frmat acceptable t the university. Prvide a listing and indicatin f the anticipated bench/attic stck (if any) fr the prject. Prvide a listing f all warranties t be prvided as a part f the prject t the university. Prvide a listing f all training t be prvided as a part f the prject t the university. Prvide a listing f all required/planned/anticipated utages related t the cnstructin f the prject. Prvide a strm water pllutin preventin plan (if applicable) in accrdance with state and federal requirements, if nt already prvided at an earlier stage. Prvide a Virginia Strmwater Management Prgram and Ersin and Sediment Cntrl Permit applicatin fr the prject. Prvide a recmmendatin fr the Hazardus Materials disclsure statement based upn the Hazardus Materials survey infrmatin prvided by the university. Prvide infrmatin t supprt air permitting by the university fr any emitting device in the prject and/r infrmatin t supprt strage tank permitting in accrdance with state and federal law. As directed by the university, prvide life-cycle cst analysis fr elements f the design. In D-B and CM prjects this is t be dne in cnjunctin with the cnstructin executin prtin f the team. Prvide a listing f prpsed Additive Bid items in the design, with applicable pririties. Prvide the CxA issues lg and status reprt with anntatins frm the Design Team, when CxA services are prvided fr a prject. Fr CM/D-B prjects prvide a cpy f the risk analysis matrix in crdinatin with the university. This risk shuld allw fr an understanding f the impact in terms f days f time r in terms f the nearest hundred dllars f expense. Prvide a VE Items listing using the applicable DEB frm. 28 June,

21 2.1 Prject Management Deliverables Fr CM/D-B prjects, prvide a cpy f the updated anticipated cnstructin schedule. Fr CM/D-B prjects, prvide a cpy f the phasing/site lgistics plan created by the cnstructin executr. Prvide a listing f any lng lead item (in excess f 10% f the anticipated cnstructin duratin) fr the prject. Such a listing shall include anticipated time fr prcurement, delivery and install, as well as the latest date f rder t meet the anticipated cnstructin schedule critical path requirements. Fr CM/D-B prjects, prvide a cpy the site specific safety plan fr review, if nt already prvided Permit Phase Dcumentatin Refer t Chapter 5.9 f the CPSM fr requirements fr Bid Frms and Prcedures. In additin t these requirements, the Design Team shall prvide the fllwing items as a part f the Permit Submittal (packaged separately frm, but at the same time as the items abve): A listing f any and all deviatins frm the Design Manual fr apprval by the university, if applicable. Such deviatins require a narrative justificatin fr each deviatin prvided by the Design Team, beynd thse previusly apprved. A listing f any and all deviatins frm the cde fr review by the university, if applicable. The Design Team shall prepare a justificatin in accrdance with (IAW) the CPSM and the VUSBC fr each deviatin. If agreed upn by the university, the Design Team shall prepare a cde waiver fr submissin t BCOM, beynd thse previusly apprved. Prvide an anntated and updated cpy f the design issues identified by the university and/r BCOM in prir design submissins, with lcatins t find reslutins within the design submittal. Cmments and reslutins are t be segregated int reslved and unreslved issues in this lg/cmment sheet, as determined by the university. Prvide cnfirmatin and reference infrmatin related the applicable Gerge Masn University Master Plan(s). The Design Team shall prvide a narrative and r depictins n hw this prject fits within the larger cntext f the campus in terms f the Master Plan. It must be made clear that the Design Team team has carefully analyzed the Master Plan and incrprated the applicable elements f thse plans in the design presented. Prvide a cpy f infrmatin as it relates the Basis f Design f any majr cmpnent. Items such as cutsheets, standard details and drawings, and peratins infrmatin shall be prvided fr review by the university, if nt already prvided. Prvide a cpy f any and all calculatins, by discipline, used in the design t this stage. Prvide a recmmendatin fr the Hazardus Materials disclsure statement based upn the Hazardus Materials survey infrmatin prvided by the university. Prvide infrmatin t supprt air permitting by the university fr any emitting device in the prject and/r infrmatin t supprt strage tank permitting in accrdance with state and federal law. Prvide a listing f prpsed Additive Bid items in the design, with applicable pririties. 28 June,

22 2.1 Prject Management Deliverables Fr CM/D-B prjects, prvide a cpy f the updated anticipated cnstructin schedule. Fr CM/D-B prjects, prvide a cpy f the phasing/site lgistics plan created by the cnstructin executr. Prvide a listing f any lng lead item (in excess f 10% f the anticipated cnstructin duratin) fr the prject. Such a listing shall include anticipated time fr prcurement, delivery and installatin, as well as the latest date f rder t meet the anticipated cnstructin schedule critical path requirements. Fr CM/D-B prjects, prvide a cpy the site specific safety plan fr review, if nt already prvided. Fr CM Prjects, a cpy f the Guaranteed Maximum Price Prpsal and acceptance by the university. Fr D-B/Design-Bid-Build/General Cntracted prjects, a cpy f the Ntice f Intent t Award Cnstructin Phase Dcumentatin Refer t Chapter f the Design Manual fr infrmatin regarding Prject Recrd Dcumentatin. Refer t Chapters 7.10 thrugh 7.17 f the CPSM fr Requirements f the A/E during the Cnstructin Phase. The university intends fr the Design Team t prvide all services bth required and ptinal as indicated in Chapters and f the CPSM with the fllwing exceptins: The university des nt want the Design Team t cnduct the mnthly pay meeting. The university may pt t nt have the Design Team certify pay requests and apprve the CO-12 schedule f values. The university des nt want the Design Team t receive the cntactrs affidavit f claims. During a prject the Design Team shall maintain a recrd cpy f the fllwing items, t be prvided t the university: Submittals, including shp drawings Change rders, Architects Supplemental Instructins, Bulletins, and similar dcuments. Testing recrds, abatement reprts Dcumentatin, including apprved submittals, f prject "piggy-back" cntracts fr Fixtures, Furnishings, and Equipment (CPSM, Chapter ) All CM RFPs and respnses Any and all inspectin reprts Meeting Minutes Bid prcess dcuments, cntracts (as per state req.) Revisins t Drawings r Specificatins and any addendums 28 June,

23 2.1 Prject Management Deliverables Envirnmental Impact Statements, Getechnical Reprts, Strm Water Management Plans, and Site utilities survey infrmatin Prject Recrd Dcumentatin Refer t Chapter 7.24 f the CPSM fr the requirements fr Recrd Drawings and Specificatins. Prject Recrd Dcumentatin includes the cmplete and frmal dcumentatin f the prject. Of critical cncern is the recrd drawings and specificatins, but the dcumentatin includes ther items as well. The university requires that the Design Team shepherd this prcess t cnclusin and deliver all Prject Recrd Dcumentatin, as indicated belw, in a timely manner. It is nted that the Design Team may r may nt be the riginatr r primary caretaker f these dcuments, but it is still the respnsibility f the Design Team t ensure that these dcuments are prperly btained, catalged, cllated, and prvided. Prject Recrd Dcumentatin shall be prvided in electrnic frmat in tw manners (except as nted belw). First, the dcuments shall be prvided in an Adbe Prtable Dcument Frmat (PDF), replicating the printed recrd derived directly frm the sftware r surce derived. If it is nt pssible t derive a PDF directly frm the editable versin, prvide a scanned cpy in PDF frmat. Secndly, the dcuments shall be prvided in their riginal editable frmat; the riginal editable frmat must be cmpatible with Masn s sftware (see belw). Editable files shall be bundled t include all external references and bjects. The Design Team shall prepare recrd drawings shwing the as-built cnditins, lcatins and dimensins based n the cntractr s as-built set f drawings and specificatins, and ther data furnished by the cntractr t the Design Team Recrd Drawings and Specificatins Refer t Chapter f the CPSM. Nte that this sectin f the CPSM des nt accunt fully fr current technlgy and recrds strage that is utilized by the university. It remains a requirement f the university t prvide a hard-cpy deliverable, which is stamped Recrd Drawings / Recrd Specificatins, and recnciled with the cntractr s field infrmatin (see Chapter 7.18 f the CPSM). Additinal university requirements fr full prject Recrd Drawings and Specificatins are included in the Design Manual. The fllwing utlines the prcedure that the university fllws fr the develpment f Prject Recrd Drawings and Specificatins: The Design Team shall btain a cpy f the cntractr s as-built drawings frm the field at substantial cmpletin. Prir t develping the recrd drawings, the Design Team shall scan in the cntractrs asbuilts int Adbe Prtable Dcument Frmat (PDF), and catalg the drawings clearly. The A/E shall then prvide tw DVD/CD media cpies f these drawing files t the university. Based n all f the prject dcumentatin cllected in the Cnstructin Phase and the cntractr s asbuilts, the Design Team shall draft a set f prject recrd drawings and specificatins. Upn cmpletin f draft recrd drawings and specificatins by the Design Team, the Design Team shall prvide tw paper cpies t the university fr review. 28 June,

24 2.1 Prject Management Deliverables When the cmpleted draft recrd drawings and specificatins are returned t the university, the reviewer will either accept r reject them. If they are rejected, the unaccepted dcuments will be reprted fr additinal revisins and returned t the Design Team fr a secnd draft recrd drawings and specificatins dcument release. Fllwing university reviews, incrprating cmments, and upn final acceptance by the university, prvide: Hard Cpy: ne signed and sealed cpy f final Recrd Drawings n Mylar, ne full size signed and sealed cpy f final Recrd Drawings n standard white bnd paper, ne signed and sealed cpy f final Recrd Specificatins n standard white bnd paper. Electrnic Cpy: t CD/DVD media cpies f : ne set f files in an editable design sftware frmat that Masn uses (see belw) and ne in Adbe Prtable Dcument Frmat (PDF), replicating the printed recrd drawings and specificatins derived directly frm the design sftware. All editable design files shall be bundled t include all external references and bjects. The specific requirements f the accepted drawings and specificatins fr Masn's use are as mandated by the CPSM Additinal Prject Recrd Dcumentatin Virginia Recrds Management Manual.pdf: Infrastructure Update Wrksheet Infrastructure Value Wrksheet.pdf The Design Team shall ensure that in additin t the Prject Recrd Drawings and Specificatins, the fllwing items are prvided t the university: Prvide the final apprved and certified LEED (r Envisin) checklist fr the prject with all backup dcumentatin. Inclusive in this is a cpy f any and all certificatin paperwrk, certificates, r acknwledgements frm the applicable rating agency. Prject warranties manuals Prject Operatins and Maintenance (O&M) manuals A cpy f all ther recrds maintained by the Design Team during the Cnstructin Phase in electrnic frmat All prject submittal dcumentatin shall be prvided bth electrnically and in riginal frmat. 28 June,

CHAPTER 2 DESIGN PROCEDURES Table of Contents

CHAPTER 2 DESIGN PROCEDURES Table of Contents 2.1 Prject Management CHAPTER 2 DESIGN PROCEDURES Table f Cntents 2.1 PROJECT MANAGEMENT... 2 2.1.1 GENERAL... 2 2.1.2 COMMUNICATION PLAN AND PROCEDURES... 2 2.1.3 INVOICING... 3 2.1.4 SCHEDULES... 4 2.1.5

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

City of Sarasota Public Art Requirements Information Package

City of Sarasota Public Art Requirements Information Package City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS SUBMITTAL REQUIREMENTS FOR The Plat Imprvement prcess invlves the review and apprval f detailed engineering drawings and infrmatin related t an apprved preliminary plat such as grading, radways, sewer,

More information

New construction or additions permit guide

New construction or additions permit guide Cmmunity Develpment Department 12350 W. 87 th St. Pkwy., Lenexa, KS 66215 913.477.7700 fax 913.477.7730 New cnstructin r additins permit guide The infrmatin prvided are general requirements which shuld

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Alberta Infrastructure. Digital Project Delivery COBie Requirements Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON BUILDING SERVICES ENGINEERING PLAN REVIEW GUIDELINES (PRG 2): Guidelines Objective: 1. Imprve cmmunicatins between Building Services and the engineering design cmmunity that prepares

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines ROSCOMMON COUNTY Public Summary f FOIA Prcedures and Guidelines This is nly a summary f the Cunty s FOIA Prcedures and Guidelines. Fr mre details and infrmatin, cpies f the Cunty s FOIA Prcedures and Guidelines

More information

Permission for Use of Images Policy

Permission for Use of Images Policy Permissin fr Use f Images Plicy All images in ur pht cllectins are subject t apprval by the Directr & Permissin f Use f Images frm must be filled ut prir t the image being released t the researcher. Nt

More information

FEE-HELP, VET FEE-HELP and VET Student Loans Re-Credit Application Form

FEE-HELP, VET FEE-HELP and VET Student Loans Re-Credit Application Form FEE-HELP, VET FEE-HELP and VET Student Lans Re-Credit Applicatin Frm Wh shuld use this frm? Yu shuld use this frm ONLY if all f the fllwing statements apply t yu: Yu tk ut a FEE-HELP, VET FEE-HELP, r VET

More information

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD Intrductin The Denver Internatinal Airprt (DEN) Art & Culture Prgram (in cllabratin

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines IONIA COUNTY Public Summary f FOIA Prcedures and Guidelines It is the public plicy f this state that all persns (except thse persns incarcerated in state r lcal crrectinal facilities) are entitled t full

More information

Rapid Innovation Fund (RIF) Program Overview

Rapid Innovation Fund (RIF) Program Overview Rapid Innvatin Fund (RIF) Prgram Overview Ted Bujewski, Directr, Rapid Innvatin Fund Prgram Office f the Under Secretary f Defense (Research and Engineering) January 2019 Backgrund Established as the Rapid

More information

Appendix M Trellis Type Shade Structure Design Guide

Appendix M Trellis Type Shade Structure Design Guide Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis

More information

Unit 123 STAC Conditions of Contest Aug 2016

Unit 123 STAC Conditions of Contest Aug 2016 Unit 123 STAC Cnditins f Cntest Aug 2016 Key Infrmatin fr Club Owners: Last Revised: July 9, 2016 (marked with in the left margin) Sanctin Number STAC Dates ST1608077 Start: Aug 8, 2016 End: Aug 14, 2016

More information

JHU SCHOOL OF MEDICINE SUBAWARD & SUBCONTRACT INFORMATION SHEET

JHU SCHOOL OF MEDICINE SUBAWARD & SUBCONTRACT INFORMATION SHEET JHU SCHOOL OF MEDICINE SUBAWARD & SUBCONTRACT INFORMATION SHEET Please submit cmpleted sub infsheets (in WORD), the signature page (PDF), and ther required dcuments t ORASUBCONTRACTS@jhmi.edu. JHU Cntact

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

BILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS

BILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS BILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS N critical cmpliance issue Received in ur ffice n time Single sided 8 ½ x 11 inch white paper Blue r black pen N staples Any necessary back up Lg ntes

More information

PPA PORTS UKC STANDARDS

PPA PORTS UKC STANDARDS TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Open Call for Artists and Arts Professionals 2018

Open Call for Artists and Arts Professionals 2018 Open Call fr Artists and Arts Prfessinals 2018 Open Call fr Artists and Arts Prfessinals 2018 All materials must be received by 5:00 pm EST n Friday, March 16, 2018 Art n the Atlanta BeltLine is seeking

More information

Model Assignment Issued September 2008

Model Assignment Issued September 2008 Mdel Assignment Issued September 2008 OCR Level 3 Principal Learning in Engineering Unit F558: Selectin and applicatin f engineering materials Please nte: This OCR mdel assignment may be used t prvide

More information

Introduction to Life Cycle Risk Management Help Page

Introduction to Life Cycle Risk Management Help Page Select a frequently asked questin (FAQ) t skip t its answer. Hw is the curse rganized? Wh shuld take this curse? Hw d I get credit fr this curse? What d all the navigatin buttns d? Hw d I knw what t click?

More information

THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT

THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT IN THE MATTER OF THE LEGAL PROFESSION ACT, R.S.A. 2000, c. L-8 AND IN THE MATTER OF A HEARING REGARDING THE CONDUCT OF BRIAN SEKIYA, A MEMBER OF THE

More information

Journal of Mississippi Academy of Sciences

Journal of Mississippi Academy of Sciences Jurnal f Mississippi Academy f Sciences Authr Guidelines Editrial Plicy. The Editrial Bard publishes articles n all aspects f science that are f general interest t the scientific cmmunity. General articles

More information

The University of Pennsylvania Lighting Guidelines: Interior Lighting Controls Lighting Control Design Guidelines & Instructions for Use

The University of Pennsylvania Lighting Guidelines: Interior Lighting Controls Lighting Control Design Guidelines & Instructions for Use The University f Pennsylvania Lighting Guidelines: Interir Lighting Cntrls Lighting Cntrl Design Guidelines & Instructins fr Use Prepared by: www.keystnels.cm 1362 S. Athertn Street State Cllege, PA 16801

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1 SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre

More information

Princeton University Library Digital Preservation Action Plan

Princeton University Library Digital Preservation Action Plan Princetn University Library Digital Preservatin Actin Plan Building n existing digital preservatin effrts, guided by the Digital Preservatin Framewrk, and supprted by Hydra, the Actin Plan utlines fur

More information

Medicare Program Integrity Manual Chapter 14 - National Provider Identifier

Medicare Program Integrity Manual Chapter 14 - National Provider Identifier Medicare Prgram Integrity Manual Chapter 14 - Natinal Prvider Identifier Transmittals fr Chapter 14 Table f Cntents (Rev. 270, 10-05-08) 14.1 - Access t Natinal Plan and Prvider Enumeratin System (NPPES)

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

Reliability Coordinator Area Restoration Plan

Reliability Coordinator Area Restoration Plan Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

APPENDIX 6A MODULE 6 DESIGN DEVELOPMENT REVIEW COMMENTS

APPENDIX 6A MODULE 6 DESIGN DEVELOPMENT REVIEW COMMENTS APPENDIX 6A MODULE 6 DESIGN DEVELOPMENT REVIEW COMMENTS District: Twn/City f XXX Schl: XXX Owner s Prject Manager: Name Designer Firm: Name Submittal Received Date: Mnth XX, Year Review Date: Mnth XX,

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT

WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT CITY OF ENCINITAS DEVELOPMENT SERVICES DEPARTMENT 505 Suth Vulcan Avenue Encinitas CA 92024 (760) 633-2710 W Applicant/Permittees are t becme familiar

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS Carsn City Building Divisin 108 E. Prctr Street Carsn City, Nevada 89701 (775) 887-2310 Hearing Impaired: 711 bldgdiv@carsn.rg www.carsn.rg/building MANUFACTURED HOME New Hmes, Replacements, and Additins

More information

Prospectus. Solo or Group Exhibition Opportunities at Gallery Underground

Prospectus. Solo or Group Exhibition Opportunities at Gallery Underground 1 Prspectus Sl r Grup Exhibitin Opprtunities at Gallery Undergrund Gallery Undergrund annunces sl r grup exhibitin pprtunities fr artists frm the Greater Washingtn, DC area. Our gallery at the Shps at

More information

Wireless Institute of Australia 2015 ANZAC Commemoration Plan

Wireless Institute of Australia 2015 ANZAC Commemoration Plan Wireless Institute f Australia 2015 ANZAC Cmmemratin Plan Versin 9a Public 1 Cntents Page Framewrk 3 Use f the wrd ANZAC 3 VK100ANZAC Callsign 3 Use f the VK100ANZAC callsign 3 VK100ANZAC Statin Requirements

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

This course is intended for people who aspire to careers as computer programmers and game developers.

This course is intended for people who aspire to careers as computer programmers and game developers. Instructr Sam Stkes Email sstkes@micrsft.cm Classrm SAC 2012 Class time 7 PM t 10 PM Office Call r email t set up apt. Office Hurs Phne 949 6275736 Skype: scalsamstkes URL http://blgs.msdn.cm/devschl Curse

More information

JJ / CP RFP Response to Inquiries

JJ / CP RFP Response to Inquiries GENERAL QUESTIONS Is it pssible t have pages 19 thrugh 40? The MS Wrd versin f the RFP can be fund n the Clerk f the Curt s website at www.ckcuntyclerkfcurt.rg. Please clarify the due date f the prpsals.

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

Software Engineering

Software Engineering What Is Sftware Engineering? Sftware Engineering Sftware engineering is the study and an applicatin f engineering t the, develpment, and maintenance f sftware. The applicatin f a systematic, disciplined,

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI 600 025 GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT (Prescribed Frmat and Specificatin) 1. GENERAL: The guideline is intended t prvide brad guidelines

More information

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12 (DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Cmmunicatins Plan ECERT Cmmunicatins Plan Rev. 0.2 Page 1 f 12 Table f Cntents OBJECTIVES:... 3 GENERAL:... 3 FAMILY COMMUNICATION:... 3 Designated

More information

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP)

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP) Independent Assciatin f Latin America and the Caribbean AILAC Ad-Hc Wrking Grup n the Durban Platfrm fr Enhanced Actin (ADP) Submissin n the ex-ante infrmatin requirements fr the cmmunicatin f INDCs and

More information

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research DRIVING TOMORROW Our plan t lead and innvate Twin Cities Campus Strategic Plan Grand Challenges Research Transfrming the University f Minnesta thrugh the Enhancement f Interdisciplinary Research Prvst

More information

Al Dhafra Petroleum Operating Company HLMS ADP/ Deadline: 4 Sept. 2014

Al Dhafra Petroleum Operating Company HLMS ADP/ Deadline: 4 Sept. 2014 Client: Ref.: Deadline: 4 Sept. 2014 Al Dhafra Petrleum Operating Cmpany HLMS14.004.ADP/170814 POSITION BASIC FUNCTION REQUIRED QUALIFICATIONS PREFERRED QUALIFICATIONS 1. Specialist Gelgy T crdinate explratin

More information

Call to Artists. PO Box 369 Lake Oswego, OR

Call to Artists. PO Box 369 Lake Oswego, OR PO Bx 369 Lake Osweg, OR 97034 503.675.2531 www.artscuncill.rg Call t Artists Prgram & Lcatin: Gallery Withut Walls, Lake Osweg, Oregn Budget: $850.00 hnrarium / An pprtunity t be nminated fr an up t $15,000

More information

RSB Service Bulletin No.. RSB--E4--003/12

RSB Service Bulletin No.. RSB--E4--003/12 RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED

More information

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference:

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference: Cnsultancy Prpsal Abstract This dcument lays ut the cnsultancy service prpsal details Reference: www.gamalearn.cm e-mail: inf@gamalearn.cm Page 1 f 8 Table f Cntents: Overview... 3 Cnsultatin Services:

More information

Laser Equipment Companion Manual

Laser Equipment Companion Manual Cllege f Physicians & Surgens f Alberta Laser Equipment Cmpanin Manual Owner Respnsibilities Radiatin equipment cannt be used until a CPSA registratin certificate has been issued. Register equipment accrding

More information

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1

Avista Corporation s Standards of Conduct Implementation and Compliance Procedures 1 Avista Crpratin s Standards f Cnduct Implementatin and Cmpliance Prcedures 1 These prcedures explain in detail the measures taken by Avista Crp. and its affiliates t implement and cmply with the Federal

More information

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers Applicatin fr Registratin f Designated Radiatin Equipment Class 3b and 4 Lasers OWNER INFORMATION Is this equipment wned by a Zne? Yes N If yes, which Zne? If n, please cmplete the fllwing: Owner Name:

More information

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012)

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012) NSW Prttype User Manual AUTHORITIES Delegatin agreement frm the Eurpean Cmmissin MOVE D2/ME D(2012) Versin: 1.2 Date: 22/09/2015 NSW Prttype/ Users Manual/ Authrities TABLE OF CONTENTS 1 Intrductin...

More information

Project Information o Simulating Cumulus Entrainment: A Resolution Problem, or Conceptual? o Sonia Lasher-Trapp, UIUC o

Project Information o Simulating Cumulus Entrainment: A Resolution Problem, or Conceptual? o Sonia Lasher-Trapp, UIUC o Annual Reprt fr Blue Waters Allcatin: Snia Lasher-Trapp, Oct 2016 Prject Infrmatin Simulating Cumulus Entrainment: A Reslutin Prblem, r Cnceptual? Snia Lasher-Trapp, UIUC slasher@illinis.edu Executive

More information

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering?

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering? Privacy is the Glbal Ba2lefield - D we have the Tls and Standards t Fight and What is Privacy Engineering? Jhn Sab, Chair OASIS IDTrust Member Sectin and Chair, PMRM Technical Cmmittee Jhn.sab711@yah.cm

More information

TRANSPORTADORA DE GAS DEL PERU

TRANSPORTADORA DE GAS DEL PERU Page 1 0 ISSUE FOR CONSTRUCTION 03..05.02 GIU BOF GIU B ISSUE FOR APPROVAL 02.01.02 GIU BOF GIU A ISSUE FOR APPROVAL 12.06.01 GIU BOF GIU REV.. DESCRIPTION DATA PROJ. EXEC. CONT. APROV. TRANSPORTADORA

More information

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted

More information

Creative Scotland is the national development agency for the arts, screen and creative industries.

Creative Scotland is the national development agency for the arts, screen and creative industries. Creative Sctland is the natinal develpment agency fr the arts, screen and creative industries. Unlcking Ptential, Embracing Ambitin Creative Sctland is the public bdy that supprts the arts, screen and

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC) PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing

More information

9/5/2017. Radio Operations and Policies. Radio Operations: Message From the Director. Radio Operations: System Description

9/5/2017. Radio Operations and Policies. Radio Operations: Message From the Director. Radio Operations: System Description Zne Batt Nuis 9/5/2017 Rensselaer Cunty Bureau f Public Safety 800 MHz User Training and Plicies : Message Frm the Directr Message Frm the Directr: This manual prvides a plan and directive fr unifrm prcedures

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include

More information

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note RS232 Cmmunicatin Between a Sunny By 2500U and a PC Technical Nte Revisin 1.5 July 8, 2003 Kent Sheldn Revisin Histry 1.5 July 8, 2003 Kent Sheldn Cntact update 20830 Red Dg Rad Grass Valley, CA 95945

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

CITY OF BURLINGTON ~ PUBLIC ART POLICY. Vision

CITY OF BURLINGTON ~ PUBLIC ART POLICY. Vision CITY OF BURLINGTON ~ PUBLIC ART POLICY Visin Public art will cntribute t Burlingtn s unique and vibrant cmmunity identity by affirming a sense f place, strengthening cnnectins between peple and place,

More information

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Minneaplis Dwntwn Experience Cmmittee & The Minneaplis Dwntwn Cuncil HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Request fr Creativity Issue Date: June 2016 Submissin Deadline: June 24, 2016 at 5:00 p.m.

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure N. Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 3. Detail... 2 3.1. Capacity and Energy Emergencies... 2 3.1.1. EEA 1 All Available Generatin in Use... 3 3.1.2. EEA 2

More information