Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR
|
|
- Ross Patrick
- 5 years ago
- Views:
Transcription
1 Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in 1.0 Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity / Long Term Access applications The Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity and Long Term Access applications held on 26/11/2018 at POWERGRID office, Gurgaon were issued vide letter no. C/CTU/N/07/17 th Con & LTA minutes dated 19/12/2018. No comments/observations have been received, accordingly the minutes may be confirmed. 2.0 Proposal for grant of LTA to the applications received from RE Energy Sources 2 no. of LTA application, as given below, have been received during Nov 18, details of which are as below: TABLE 1 Sl. No Application No./Date (Online)/ (Physical) (29/11/18)/ (03/12/18 & 05/12/2018) Applicant Mahoba Solar (UP) Pvt. Ltd. Connectivity/ Injection Point Bhadla, Rajasthan, Drawl Point LTA / Start & End Date sought by the applicant WR (Target) Entity- MSEDCL 200 MW (Start : 27/08/19 End : 27/08/44) Proposal/Remarks Stage-II application ( MW) has been granted Connectivity at 765/400/220kV Bhadla Substation. The connectivity transmission system Mahoba Solar Power Plant Switchyard Bhadla 220kV S/c line (with minimum capacity of 300 MW at nominal voltage) along with terminal bays (GIS) at Bhadla & generation switchyard is under the scope of applicant. The same is being considered for present LTA. LTA has been applied on Target Region basis (WR), however, applicant has also mentioned entity for drawal of power as MSEDCL. 1
2 Sl. No Application No./Date (Online)/ (Physical) Applicant Connectivity/ Injection Point Drawl Point LTA / Start & End Date sought by the applicant Proposal/Remarks For transfer of 200 MW to WR, augmentation of transmission system is required as mentioned at Annexure-I. Simulation studies indicate that loading on transmission system is in order with system mentioned in Exhibit-I. In view of the above, it is proposed to process the application on target region (WR) basis (29/11/18)/ (03/12/18 & 05/12/2018) Mahoba Solar (UP) Pvt. Ltd. Bhadla, Rajasthan, (Target) 50 MW (Start : 25/07/20 End : 25/07/45) Stage-II application ( MW) has been granted Connectivity at 765/400/220kV Bhadla Substation through the Connectivity transmission system mentioned at Sl. No. 1 above. The same is being considered for present LTA. LTA has been applied on Target Region basis (), however, applicant has also mentioned entity for drawal of power as BSES Yamuna power Limited (BYPL). For transfer of 50 MW to, augmentation of transmission system is required as mentioned at Annexure-I. Simulation studies indicate that loading on transmission system is in order with system mentioned in Exhibit-I. In view of the above, it is proposed to process the application on target region () basis. 2
3 The LTA grantees are required to the sign the Long Term Access Agreement within 30 days from the date of intimation of Grant of LTA and shall furnish the applicable Construction phase Bank Guarantee (CBG), no extension shall be granted on any ground and in case of failure to sign the Agreement and / or to furnish the CBG, Grant of LTA shall be revoked without any prior notice. The transmission charges shall be applicable from the date of commissioning of ISTS, irrespective of the status of commissioning of generation project. The wind/solar generation project developers shall provide adequate reactive compensation so that under all dispatch scenarios Power Factor of 0.98 shall be maintained and should also comply with the provisions of LVRT (Low Voltage Ride Through) in accordance with Connectivity Standards of CEA and CERC order in Petition No. 420/MP/2014. In addition, progress of the generation project may be intimated on quarterly basis. Members may deliberate. 3.0 Proposal for change in Stage-II connectivity intimations granted for 200 MW and 50 MW of Mahoba Solar (UP) Pvt. Ltd. for proposed solar power plant in Bhadla, Rajasthan Mahoba Solar (UP) Pvt. Ltd has been granted Stage-II connectivity for 200 MW and 50 MW vide intimation no. C/CTU/Con St- II// dated 02/08/2018 and intimation no. C/CTU/Con St-II// dated 28/09/2018 with the following connectivity transmission system: Mahoba Solar Power Plant Switchyard Bhadla 220kV S/c line (with minimum capacity of 300 MW at nominal voltage) along with terminal bays (GIS) at Bhadla & generation switchyard under the scope of applicant. Mahoba Solar (UP) Pvt. Ltd vide letter dated 29/11/2018 has stated that the generation switchyard as mentioned in the connectivity intimation is Nuri Ki Bhurj, Jodhpur, Rajasthan. Further, the applicant has stated that post energy assessment studies and based on availability of suitable land, the location of generation switchyard has been finalized at village Rawra, Jodhpur, Rajasthan. In view of this, the applicant has requested to change the connectivity transmission system in both the Stage-II intimations as given below in order to obtain CEA approval u/s 68 of Electricity Act, 2003: 3
4 Mahoba Solar Power Plant Switchyard at Rawra Bhadla 220kV S/c line (with minimum capacity of 300 MW at nominal voltage) along with terminal bays (GIS) at Bhadla & generation switchyard under the scope of applicant. It may be observed that the changed location of the proposed generation project is in the same district, i.e. Jodhpur (Rajasthan). Accordingly, it is proposed that revision to the Connectivity Intimations for 200 MW & 50 MW may be issued through above Connectivity system. Members may deliberate. xxx. 4
5 A. Tr. System in Rajasthan for LTA application at Bhadla (PG) Transmission system for LTA applications at Bhadla S/S Annexure-I 1) Establishment of 765/400kV, 3x1500MVA pooling station at suitable location near Phalodi/ Bhadla in Jodhpur (Bhadla-2 PS) 2) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri 3) Augmentation of transformation capacity at Bhadla (PG) by 400/220kV, 2x500MVA (6 th & 7 th ) transformers 4) LILO of both ckts of 765kV Ajmer Bikaner D/c line at Bhadla-2 PS 5) Bhadla-2 PS Bhadla (PG) 400kV D/c Line (Twin HTLS) 6) Bikaner(PG) Khetri S/s 765kV D/c line 7) Khetri S/s Jhatikara 765kV D/c line 8) Khetri Sikar (PG) 400kV D/c line (twin HTLS) 9) Augmentation with 765/400kV, 1x1500MVA transformer (3 rd ) at Moga S/s 10) Augmentation with 765/400kV, 1x1000MVA transformer (3 rd ) at Bhiwani (PG) 11) Ajmer (PG) Phagi 765kV D/c line 12) 1x125 MVAr (420kV), 2x240 MVAr765kV) Bus Reactor each at Bhadla-2 PS & Khetri Substation 13) 1x330 MVAr Switchable Line reactors for each circuit at each end of Ajmer Jhatikara 765kV D/c line 14) 1x240 MVAr Switchable line reactor for each circuit at each end of Bikaner Khetri 765kV D/c line 15) 1x330 MVAr Switchable line reactor for each circuit at Bhadla-2 PS end for Ajmer-Bhadla-2 PS 765kV line (after LILO) 16) 1x240 MVAr Switchable line reactor for each circuit at Bhadla-2 PS end for Bikaner-Bhadla-2 PS 765kV line (after LILO) In addition to the above, augmentation of transformation capacity at Bhadla (PG) by 400/220kV, 1x500MVA (5 th ) transformer agreed in 1 st SCT held on 11/09/2018 shall also be a part of LTA system. 5
Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR
Agenda for the 31 st Western Region constituents regarding Connectivity/LTA Applications to be held on 24.10.2018 1.0 Minutes of the 30th Western Region constituents regarding Connectivity / LTA Applications
More informationProcedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses
Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission
More informationPROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM
1 P a g e DRAFT VERSION: 14 th Dec, 2017 PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM 1. This Procedure is in accordance with
More informationGeneral Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project
General Technical Specifications of Converters for Tokyo-Chubu Interconnection Project Note: It is possible that the contents of these specifications may be changed according to our detailed studies. Present
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer
More informationATTACHMENT - AESO FUNCTIONAL SPECIFICATION
ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationPOWE R GRID CORPORATlOl\; OF INDI A LI MITED ~-= ::- (A Iiov ernment of India Enterprise) Qlit"lf3Is
-.i
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated
More informationPower transformers. Shunt reactors Proven history for future success
Power transformers Shunt reactors Proven history for future success Shunt reactors an investment for today and for the future 2 Shunt reactors Improving power quality and reducing transmission costs Shunt
More informationHarmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits
WREF 01 Paper # 048 Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits Ketut Dartawan Ricardo Austria, Le Hui and Mark Suehiro* Pterra Consulting Maui Electric Company*
More informationINCENTIVE FOR TRANSMISSION EFFICIENCY
INCENTIVE FOR TRANSMISSION EFFICIENCY - T. UMESH, SEE, RETD. KPTCL - & - N. RAGHUPRAKASH, EE, RA, KPTCL IN THIS SESSION Brief introduction to Transmission System Efficiency Parameters in Transmission Activity
More informationEast-South HVDC Interconnector II, India : in commercial operation since 2003
8006/0 5 HVDC / FACTS Highlights http://www.siemens.com/facts http://www.siemens.com/hvdc NEW! >>> Welcome to Siemens Highlights & Innovations in Transmission and Distribution East-South HVDC Interconnector
More informationReport on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)
Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area
More informationSummary of Relaying Reviews Reporting
Revised Attachment B (Agenda Item 6) Summary of Relaying Reviews -- 12-31-04 Reporting This form shall be used without modification to provide a summary of relaying reviews performed by each Transmisission
More informationDocument C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting
Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.
More informationFault Ride Through Technical Assessment Report Template
Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance
More informationIndication of Dynamic Model Validation Process
Indication of Dynamic Model Validation Process Document Identifier Written by David Cashman Document Version Draft Checked by Date of Current Issue November 2013 Approved by Jon O Sullivan Disclaimer EirGrid,
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul
More informationConstant Terminal Voltage. Working Group Meeting 4 19 th September 2014
Constant Terminal Voltage Working Group Meeting 4 19 th September 014 Overview Options summary System under investigation Options analysis Discussion Options Option 1 Constant Terminal Voltage controlled
More informationOPERATING PROCEDURE. Table of Contents
Table of Contents PURPOSE... 1 1.0 CAISO DISPATCHER RESPONSIBILITIES... 2 Monitor Loads and Generators... 2 Monitor Balancing Areas... 2 Operate CAISO Controlled Grid Voltage Equipment... 3 Voltage Schedules...
More informationWFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS
WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE
More informationCourse ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation
Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission
More informationRENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana
RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms
More informationVoltage and Reactive Procedures CMP-VAR-01
Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes
More informationInterface Energy Metering- Experience and Expectations
Interface Energy Metering- Experience and Expectations Vivek Pandey Akhil Gupta Ch Jagadeesh Workshop on Technical and Testing Challenges for Smart Meters 03/11/2017 1 Contents Background WR-ISTS metering
More informationSOUTHERN REGIONAL POWER COMMITTEE BENGALURU
SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the Special Meeting held on 21 st June, 2017 at TPCIL plant in Nellore w.r.t. perturbations at their plant in Nellore in the recent past A. Introduction
More informationUnit Auxiliary Transformer (UAT) Relay Loadability Report
Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationBIHAR ELECTRICITY REGULATORY COMMISSION
BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY GRID CODE 2010 BIHAR ELECTRICITY REGULATORY COMMISSION Grid Code Clause Title Page No. CHAPTER - 1 - GENERAL CODE SECTION-1: General 1.1 Introduction..
More informationQUESTIONNAIRE for Wind Farm Power Stations only
TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21
More informationCONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y
CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y. 10003 EP 7000 5 JULY 2009 VOLTAGE SCHEDULE, CONTROL, AND OPERATION OF THE TRANSMISSION SYSTEM PURPOSE This specification describes
More informationLine Loadability in Indian Perspective
Line Loadability in Indian Perspective P.Pentayya, U.K Verma, P. Mukhopadhyay, Gopal Mitra, GM (WRLDC) GM (ERLDC) AGM (ERLDC) DGM (ERLDC) S.Bannerjee M.Thakur, S.Sahay CM (ERLDC Sr.Eng, (ERLDC) Eng, (ERLDC)
More informationGuaranteed Dmax (MW) at Year 1-10 (See note 2 below)
PG&E 2016 ES RFO Appendix E2 PG&E Owned Photovoltaic Site Information Site Gates 17115 W. Gale Ave Huron, CA 93234 Huron (see note 3) Corner of West Gale Avenue and South Lassen Ave (Hwy 269), Huron, CA
More informationVar Control. Adding a transformer and transformer voltage regulation. engineers loadflow program. The control system engineers loadflow.
November 2012 Adding a transformer and transformer voltage regulation to the control system engineers loadflow program The control system engineers loadflow program The loadflow program used by this website
More informationNERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell
Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June
More informationReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria
ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More information5 Summary test results and additional findings
LOW VOLTAGE RIDE THROUGH WITH HIGH CURRENT INJECTION 1 2 3 4 Motivation Future Requirements Test results for symmetrical failures Test results for asymmetrical failures 5 Summary test results and additional
More informationMadhya Pradesh Electricity Grid Code (Revision-I), 2005 (No.RG-14(i) of 2005)
Bhopal, Dated: 24 th October, 2005 No.2506/MPERC/2005. In exercise of powers under Section 86(1) (h) of the Electricity Act 2003, MPERC specifies the Madhya Pradesh Electricity Grid Code (Revision 1),
More informationGUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards. Notification No. 7 of 2005
GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards Notification No. 7 of 2005 In exercise of the powers conferred under Section 42 (b) of the Gujarat Electricity Industry
More informationPower Quality Requirements for Connection to the Transmission System
Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date R0B0 For Comments Yaoyu Huang February 10, 2016 R0 For Issuance Yaoyu Huang February 29, 2016 Transformer rating description
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationCompany Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes
Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation
More informationeach time the Frequency is above 51Hz. Continuous operation is required
GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA
More informationAnnex 2 - Proposed Grid Code Legal Text
Annex 2 - Proposed Grid Code Legal Text FAULT RIDE THROUGH LEGAL TEXT This section contains the proposed legal text to give effect to the proposals. The proposed new text is in red and is based on Grid
More informationInterface Energy Metering
Interface Energy etering B C A D E Outline Need for etering List of Controls areas in WR Special Energy eter Regulatory Requirements Details of SEs in WR Drawal/Injection Computations Data processing at
More information/TENDER ENQUIRY NO :ENQ/17-18/005148/BP26(07) Delivery Schedule. Test Certificate
A.O Building, Barsingsar-440, Bikaner District, Rajasthan, India /TENDER ENQUIRY NO :ENQ/7-8/00548/BP6(07) /DATE :7/0/08 /Page - Due Date of Cover-I Opening : /04/08 :00:00 hrs. IST (Check NLC eproc website
More informationMay 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_
May 30, 2018 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to for the Revised Definition of Remedial Action
More informationImpact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods
Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing
More informationIDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)
IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone
More informationCentral East Voltage and Stability Analysis for Marcy FACTS Project Phase I
Prepared by NYISO Operations Engineering 1. INTRODUCTION Central East Voltage and Stability Analysis for The Marcy Flexible AC Transmission System (FACTS) project is a joint technology partnership between
More informationGRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs)
GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) 1.0 GRID CONNECTION CODE BASIS 1.1 LEGISLATION 1.1.1 The legal basis for this RPP Code (RPP Code) is specified in terms of the [Electricity] Act 2016
More informationCentral Hudson Gas & Electric Corporation. Transmission Planning Guidelines
Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents
More informationGeoff Brown & Associates Ltd
Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared
More informationVOLTAGE CONTROL STRATEGY IN WEAK DISTRIBUTION NETWORKS WITH HYBRIDS GENERATION SYSTEMS
VOLTAGE CONTROL STRATEGY IN WEAK DISTRIBUTION NETWORKS WITH HYBRIDS GENERATION SYSTEMS Marcelo CASSIN Empresa Provincial de la Energía de Santa Fe Argentina mcassin@epe.santafe.gov.ar ABSTRACT In radial
More informationUnit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition
Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table
More informationEXPRESSION OF INTEREST
र ष ट र य पवन ऊर स स थ न, च नन ई NATIONAL INSTITUTE OF WIND ENERGY म व प ( न ऊर जव प र द य ग क कप द र Formerly Centre for Wind Energy Technology ) (न न और न करण य ऊर जव त रजलय, भजरत सरकजर Ministry of New
More informationLab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009
Lab 1 Objectives In this lab, our objective is to simulate a simple single machine infinite bus configuration using the PowerWorld Simulator software. We design a local generator system (a synchronous
More informationROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT
ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings
More informationMETERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE
METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE Author: AXLIU Origination Date: 05/07/2010 Version: 8.3 Revised By: Approver s Name: OXPAIS REROMAK REROMAK 1 PURPOSE Revision Date: 9/12/2016
More informationMPERC (Transmission Performance Standards) Regulations, 2004
Bhopal, Dated: 16th July, 2004 No.1932/MPERC/2004. In exercise of the powers conferred by sections 181 (1) and 181 (2) (za) read with section 57 (1), 57 (2) and 86 (1) (i) of the Electricity Act, 2003
More informationEffect of Series Capacitor on Line Protection - A Case Study
112 NATIONAL POWER SYSTEMS CONFERENCE, NPSC 22 Effect of Series Capacitor on Line Protection - A Case Study Anand Mohan, Vikas Saxena, Mukesh Khanna & V.Thiagarajan Abstract: Series compensation is a time
More informationR10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours
Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions
More informationAEMO POWER OF CHOICE (POC) METER CHURN DISCUSSION
AEMO POWER OF CHOICE (POC) METER CHURN DISCUSSION 24/02/2017 SLIDE 1 POWER OF CHOICE INDUSTRY MEETING AGENDA - Introduction - POC rules and AEMO procedure changes related to Meter Churn - Next steps SLIDE
More informationFACILITY RATINGS METHOD TABLE OF CONTENTS
FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5
More informationVersion 2.6 October Comments to this document can be forwarded to:
GRID CONNECTION CODE REQUIREMENTS FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.6 October 2012 Comments to this document
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities
More informationPOWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES
POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES For use with the Power Potential DER Technical Characteristics
More informationIndustry Webinar Draft Standard
Industry Webinar Draft Standard Project 2010-13.2 Phase 2 of Relay Loadability: Generation PRC-025-1 Generator Relay Loadability December 13, 2012 Agenda Welcome, Introductions and Administrative NERC
More informationExperience with Connecting Offshore Wind Farms to the Grid
Oct.26-28, 2011, Thailand PL-22 CIGRE-AORC 2011 www.cigre-aorc.com Experience with Connecting Offshore Wind Farms to the Grid J. FINN 1, A. SHAFIU 1,P. GLAUBITZ 2, J. LOTTES 2, P. RUDENKO 2, M: STEGER
More informationDefinition of Bulk Electric System Phase 2
Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order
More informationEnergy Networks Association
The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date
More informationUP Power Corporation Limited, (Through its Chairman) 7th floor, Shakti Bhawan, 14, Ashok Marg Lucknow
Petition No 959 of 2014 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Date of Order : 05.12.2014 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt Meenakshi Singh,
More informationIMP/007/011 - Code of Practice for the Application of Lightning Protection
Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements
More informationGridLiance Reliability Criteria
GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances
More informationENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected
ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework
More informationEI HIGH VOLTAGE INSULATION TESTING POLICY
Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and
More informationPower Potential. Technical Requirements for participating Distributed Energy Resources
Power Potential 0 Technical Requirements for participating Distributed Energy Resources 1 Table of Contents Document Control... 3 Definitions, Acronyms and Abbreviations... 4 List of referenced documents...
More informationPROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA
PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval
More informationClayton Taylor. ComRent International, LLC.
Clayton Taylor CEO ComRent International, LLC. 24 Hour Tests Are Needed! New way of testing Ways to sell through testing Go after installed base Uptime and compliance 2 Eventually Generators Will Be Put
More informationPublic Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards
Consultation Paper: 1/2017 (i) Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards Issued on 19 January 2017 Contents 1. Introduction
More information2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai
1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 :May kindly chair the meeting 3. Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New
More informationAgenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System
Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Meeting Date: 27.03.2017 Time: 1430 Hrs Venue: NRPC Conference
More informationPOWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:
POWER CORPORATION Power Quality Specifications and Guidelines for Customers Phone: 403-514-3700 Fax: 403-514-3719 1 GENERAL OVERVIEW........................................ 1.1 WHAT DOES THIS SPECIFICATION
More informationELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction
More informationOPERATING CODE NO. 5 (OC5)
Paragraph No/Title OPERATING CODE NO. 5 (OC5) TESTING AND MONITORING CONTENTS (This contents page does not form part of the Grid Code) Page Number OC5.1 INTRODUCTION... 2 OC5.2 OBJECTIVE... 3 OC5.3 SCOPE...
More informationGRID CONNECTION CODE FOR RENEWABLE POWER PLANTS
GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.9 (July 2016) This document is approved
More informationSLD FOR 132/33 KV DUB STATION, SOMANATHPUR
SLD FOR 132/33 KV DUB STATION, SOMANATHPUR 132 KV BAYS TRANSF 02 NOS. 132kV MAIN BUS 132kV RESERVE BUS 20/40 MVA, 132/33kV TRANSFORMER1 20/40 MVA, 132/33kV TRANSFORMER 2 STN TFR 33/0.4KV 250KVA 33KV BAY
More informationAMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Ameren Missouri, Ameren Illinois, and Ameren Transmission Company of Illinois)
AMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Missouri, Illinois, and Transmission Company of Illinois) TRANSMISSION PLANNING CRITERIA AND GUIDELINES March 28, 2003 Revised April
More informationTransformers connected via a cable Overvoltage protection
A P P L I C AT I O N N OT E 2. 1 Transformers connected via a cable Overvoltage protection The APPLICATION NOTES (AN) are intended to be used in conjunction with the APPLICATION GUIDELINES Overvoltage
More informationConstant Terminal Voltage. Working Group 1 29 st January 2014
Constant Terminal Voltage Working Group 1 29 st January 2014 Overview Objectives of Working Group ENTSO-E RfG Implications Options Summary Discussion 2 Objectives of Work Group National Grid in consultation
More information