Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR

Size: px
Start display at page:

Download "Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR"

Transcription

1 Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in 1.0 Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity / Long Term Access applications The Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity and Long Term Access applications held on 26/11/2018 at POWERGRID office, Gurgaon were issued vide letter no. C/CTU/N/07/17 th Con & LTA minutes dated 19/12/2018. No comments/observations have been received, accordingly the minutes may be confirmed. 2.0 Proposal for grant of LTA to the applications received from RE Energy Sources 2 no. of LTA application, as given below, have been received during Nov 18, details of which are as below: TABLE 1 Sl. No Application No./Date (Online)/ (Physical) (29/11/18)/ (03/12/18 & 05/12/2018) Applicant Mahoba Solar (UP) Pvt. Ltd. Connectivity/ Injection Point Bhadla, Rajasthan, Drawl Point LTA / Start & End Date sought by the applicant WR (Target) Entity- MSEDCL 200 MW (Start : 27/08/19 End : 27/08/44) Proposal/Remarks Stage-II application ( MW) has been granted Connectivity at 765/400/220kV Bhadla Substation. The connectivity transmission system Mahoba Solar Power Plant Switchyard Bhadla 220kV S/c line (with minimum capacity of 300 MW at nominal voltage) along with terminal bays (GIS) at Bhadla & generation switchyard is under the scope of applicant. The same is being considered for present LTA. LTA has been applied on Target Region basis (WR), however, applicant has also mentioned entity for drawal of power as MSEDCL. 1

2 Sl. No Application No./Date (Online)/ (Physical) Applicant Connectivity/ Injection Point Drawl Point LTA / Start & End Date sought by the applicant Proposal/Remarks For transfer of 200 MW to WR, augmentation of transmission system is required as mentioned at Annexure-I. Simulation studies indicate that loading on transmission system is in order with system mentioned in Exhibit-I. In view of the above, it is proposed to process the application on target region (WR) basis (29/11/18)/ (03/12/18 & 05/12/2018) Mahoba Solar (UP) Pvt. Ltd. Bhadla, Rajasthan, (Target) 50 MW (Start : 25/07/20 End : 25/07/45) Stage-II application ( MW) has been granted Connectivity at 765/400/220kV Bhadla Substation through the Connectivity transmission system mentioned at Sl. No. 1 above. The same is being considered for present LTA. LTA has been applied on Target Region basis (), however, applicant has also mentioned entity for drawal of power as BSES Yamuna power Limited (BYPL). For transfer of 50 MW to, augmentation of transmission system is required as mentioned at Annexure-I. Simulation studies indicate that loading on transmission system is in order with system mentioned in Exhibit-I. In view of the above, it is proposed to process the application on target region () basis. 2

3 The LTA grantees are required to the sign the Long Term Access Agreement within 30 days from the date of intimation of Grant of LTA and shall furnish the applicable Construction phase Bank Guarantee (CBG), no extension shall be granted on any ground and in case of failure to sign the Agreement and / or to furnish the CBG, Grant of LTA shall be revoked without any prior notice. The transmission charges shall be applicable from the date of commissioning of ISTS, irrespective of the status of commissioning of generation project. The wind/solar generation project developers shall provide adequate reactive compensation so that under all dispatch scenarios Power Factor of 0.98 shall be maintained and should also comply with the provisions of LVRT (Low Voltage Ride Through) in accordance with Connectivity Standards of CEA and CERC order in Petition No. 420/MP/2014. In addition, progress of the generation project may be intimated on quarterly basis. Members may deliberate. 3.0 Proposal for change in Stage-II connectivity intimations granted for 200 MW and 50 MW of Mahoba Solar (UP) Pvt. Ltd. for proposed solar power plant in Bhadla, Rajasthan Mahoba Solar (UP) Pvt. Ltd has been granted Stage-II connectivity for 200 MW and 50 MW vide intimation no. C/CTU/Con St- II// dated 02/08/2018 and intimation no. C/CTU/Con St-II// dated 28/09/2018 with the following connectivity transmission system: Mahoba Solar Power Plant Switchyard Bhadla 220kV S/c line (with minimum capacity of 300 MW at nominal voltage) along with terminal bays (GIS) at Bhadla & generation switchyard under the scope of applicant. Mahoba Solar (UP) Pvt. Ltd vide letter dated 29/11/2018 has stated that the generation switchyard as mentioned in the connectivity intimation is Nuri Ki Bhurj, Jodhpur, Rajasthan. Further, the applicant has stated that post energy assessment studies and based on availability of suitable land, the location of generation switchyard has been finalized at village Rawra, Jodhpur, Rajasthan. In view of this, the applicant has requested to change the connectivity transmission system in both the Stage-II intimations as given below in order to obtain CEA approval u/s 68 of Electricity Act, 2003: 3

4 Mahoba Solar Power Plant Switchyard at Rawra Bhadla 220kV S/c line (with minimum capacity of 300 MW at nominal voltage) along with terminal bays (GIS) at Bhadla & generation switchyard under the scope of applicant. It may be observed that the changed location of the proposed generation project is in the same district, i.e. Jodhpur (Rajasthan). Accordingly, it is proposed that revision to the Connectivity Intimations for 200 MW & 50 MW may be issued through above Connectivity system. Members may deliberate. xxx. 4

5 A. Tr. System in Rajasthan for LTA application at Bhadla (PG) Transmission system for LTA applications at Bhadla S/S Annexure-I 1) Establishment of 765/400kV, 3x1500MVA pooling station at suitable location near Phalodi/ Bhadla in Jodhpur (Bhadla-2 PS) 2) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri 3) Augmentation of transformation capacity at Bhadla (PG) by 400/220kV, 2x500MVA (6 th & 7 th ) transformers 4) LILO of both ckts of 765kV Ajmer Bikaner D/c line at Bhadla-2 PS 5) Bhadla-2 PS Bhadla (PG) 400kV D/c Line (Twin HTLS) 6) Bikaner(PG) Khetri S/s 765kV D/c line 7) Khetri S/s Jhatikara 765kV D/c line 8) Khetri Sikar (PG) 400kV D/c line (twin HTLS) 9) Augmentation with 765/400kV, 1x1500MVA transformer (3 rd ) at Moga S/s 10) Augmentation with 765/400kV, 1x1000MVA transformer (3 rd ) at Bhiwani (PG) 11) Ajmer (PG) Phagi 765kV D/c line 12) 1x125 MVAr (420kV), 2x240 MVAr765kV) Bus Reactor each at Bhadla-2 PS & Khetri Substation 13) 1x330 MVAr Switchable Line reactors for each circuit at each end of Ajmer Jhatikara 765kV D/c line 14) 1x240 MVAr Switchable line reactor for each circuit at each end of Bikaner Khetri 765kV D/c line 15) 1x330 MVAr Switchable line reactor for each circuit at Bhadla-2 PS end for Ajmer-Bhadla-2 PS 765kV line (after LILO) 16) 1x240 MVAr Switchable line reactor for each circuit at Bhadla-2 PS end for Bikaner-Bhadla-2 PS 765kV line (after LILO) In addition to the above, augmentation of transformation capacity at Bhadla (PG) by 400/220kV, 1x500MVA (5 th ) transformer agreed in 1 st SCT held on 11/09/2018 shall also be a part of LTA system. 5

Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR

Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR Agenda for the 31 st Western Region constituents regarding Connectivity/LTA Applications to be held on 24.10.2018 1.0 Minutes of the 30th Western Region constituents regarding Connectivity / LTA Applications

More information

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission

More information

PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM

PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM 1 P a g e DRAFT VERSION: 14 th Dec, 2017 PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM 1. This Procedure is in accordance with

More information

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project General Technical Specifications of Converters for Tokyo-Chubu Interconnection Project Note: It is possible that the contents of these specifications may be changed according to our detailed studies. Present

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

Power transformers. Shunt reactors Proven history for future success

Power transformers. Shunt reactors Proven history for future success Power transformers Shunt reactors Proven history for future success Shunt reactors an investment for today and for the future 2 Shunt reactors Improving power quality and reducing transmission costs Shunt

More information

Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits

Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits WREF 01 Paper # 048 Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits Ketut Dartawan Ricardo Austria, Le Hui and Mark Suehiro* Pterra Consulting Maui Electric Company*

More information

INCENTIVE FOR TRANSMISSION EFFICIENCY

INCENTIVE FOR TRANSMISSION EFFICIENCY INCENTIVE FOR TRANSMISSION EFFICIENCY - T. UMESH, SEE, RETD. KPTCL - & - N. RAGHUPRAKASH, EE, RA, KPTCL IN THIS SESSION Brief introduction to Transmission System Efficiency Parameters in Transmission Activity

More information

East-South HVDC Interconnector II, India : in commercial operation since 2003

East-South HVDC Interconnector II, India : in commercial operation since 2003 8006/0 5 HVDC / FACTS Highlights http://www.siemens.com/facts http://www.siemens.com/hvdc NEW! >>> Welcome to Siemens Highlights & Innovations in Transmission and Distribution East-South HVDC Interconnector

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

Summary of Relaying Reviews Reporting

Summary of Relaying Reviews Reporting Revised Attachment B (Agenda Item 6) Summary of Relaying Reviews -- 12-31-04 Reporting This form shall be used without modification to provide a summary of relaying reviews performed by each Transmisission

More information

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.

More information

Fault Ride Through Technical Assessment Report Template

Fault Ride Through Technical Assessment Report Template Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance

More information

Indication of Dynamic Model Validation Process

Indication of Dynamic Model Validation Process Indication of Dynamic Model Validation Process Document Identifier Written by David Cashman Document Version Draft Checked by Date of Current Issue November 2013 Approved by Jon O Sullivan Disclaimer EirGrid,

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

Constant Terminal Voltage. Working Group Meeting 4 19 th September 2014

Constant Terminal Voltage. Working Group Meeting 4 19 th September 2014 Constant Terminal Voltage Working Group Meeting 4 19 th September 014 Overview Options summary System under investigation Options analysis Discussion Options Option 1 Constant Terminal Voltage controlled

More information

OPERATING PROCEDURE. Table of Contents

OPERATING PROCEDURE. Table of Contents Table of Contents PURPOSE... 1 1.0 CAISO DISPATCHER RESPONSIBILITIES... 2 Monitor Loads and Generators... 2 Monitor Balancing Areas... 2 Operate CAISO Controlled Grid Voltage Equipment... 3 Voltage Schedules...

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms

More information

Voltage and Reactive Procedures CMP-VAR-01

Voltage and Reactive Procedures CMP-VAR-01 Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes

More information

Interface Energy Metering- Experience and Expectations

Interface Energy Metering- Experience and Expectations Interface Energy Metering- Experience and Expectations Vivek Pandey Akhil Gupta Ch Jagadeesh Workshop on Technical and Testing Challenges for Smart Meters 03/11/2017 1 Contents Background WR-ISTS metering

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the Special Meeting held on 21 st June, 2017 at TPCIL plant in Nellore w.r.t. perturbations at their plant in Nellore in the recent past A. Introduction

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY GRID CODE 2010 BIHAR ELECTRICITY REGULATORY COMMISSION Grid Code Clause Title Page No. CHAPTER - 1 - GENERAL CODE SECTION-1: General 1.1 Introduction..

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y. 10003 EP 7000 5 JULY 2009 VOLTAGE SCHEDULE, CONTROL, AND OPERATION OF THE TRANSMISSION SYSTEM PURPOSE This specification describes

More information

Line Loadability in Indian Perspective

Line Loadability in Indian Perspective Line Loadability in Indian Perspective P.Pentayya, U.K Verma, P. Mukhopadhyay, Gopal Mitra, GM (WRLDC) GM (ERLDC) AGM (ERLDC) DGM (ERLDC) S.Bannerjee M.Thakur, S.Sahay CM (ERLDC Sr.Eng, (ERLDC) Eng, (ERLDC)

More information

Guaranteed Dmax (MW) at Year 1-10 (See note 2 below)

Guaranteed Dmax (MW) at Year 1-10 (See note 2 below) PG&E 2016 ES RFO Appendix E2 PG&E Owned Photovoltaic Site Information Site Gates 17115 W. Gale Ave Huron, CA 93234 Huron (see note 3) Corner of West Gale Avenue and South Lassen Ave (Hwy 269), Huron, CA

More information

Var Control. Adding a transformer and transformer voltage regulation. engineers loadflow program. The control system engineers loadflow.

Var Control. Adding a transformer and transformer voltage regulation. engineers loadflow program. The control system engineers loadflow. November 2012 Adding a transformer and transformer voltage regulation to the control system engineers loadflow program The control system engineers loadflow program The loadflow program used by this website

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

5 Summary test results and additional findings

5 Summary test results and additional findings LOW VOLTAGE RIDE THROUGH WITH HIGH CURRENT INJECTION 1 2 3 4 Motivation Future Requirements Test results for symmetrical failures Test results for asymmetrical failures 5 Summary test results and additional

More information

Madhya Pradesh Electricity Grid Code (Revision-I), 2005 (No.RG-14(i) of 2005)

Madhya Pradesh Electricity Grid Code (Revision-I), 2005 (No.RG-14(i) of 2005) Bhopal, Dated: 24 th October, 2005 No.2506/MPERC/2005. In exercise of powers under Section 86(1) (h) of the Electricity Act 2003, MPERC specifies the Madhya Pradesh Electricity Grid Code (Revision 1),

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards. Notification No. 7 of 2005

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards. Notification No. 7 of 2005 GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards Notification No. 7 of 2005 In exercise of the powers conferred under Section 42 (b) of the Gujarat Electricity Industry

More information

Power Quality Requirements for Connection to the Transmission System

Power Quality Requirements for Connection to the Transmission System Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date R0B0 For Comments Yaoyu Huang February 10, 2016 R0 For Issuance Yaoyu Huang February 29, 2016 Transformer rating description

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

Annex 2 - Proposed Grid Code Legal Text

Annex 2 - Proposed Grid Code Legal Text Annex 2 - Proposed Grid Code Legal Text FAULT RIDE THROUGH LEGAL TEXT This section contains the proposed legal text to give effect to the proposals. The proposed new text is in red and is based on Grid

More information

Interface Energy Metering

Interface Energy Metering Interface Energy etering B C A D E Outline Need for etering List of Controls areas in WR Special Energy eter Regulatory Requirements Details of SEs in WR Drawal/Injection Computations Data processing at

More information

/TENDER ENQUIRY NO :ENQ/17-18/005148/BP26(07) Delivery Schedule. Test Certificate

/TENDER ENQUIRY NO :ENQ/17-18/005148/BP26(07) Delivery Schedule. Test Certificate A.O Building, Barsingsar-440, Bikaner District, Rajasthan, India /TENDER ENQUIRY NO :ENQ/7-8/00548/BP6(07) /DATE :7/0/08 /Page - Due Date of Cover-I Opening : /04/08 :00:00 hrs. IST (Check NLC eproc website

More information

May 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_

May 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_ May 30, 2018 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to for the Revised Definition of Remedial Action

More information

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Central East Voltage and Stability Analysis for Marcy FACTS Project Phase I

Central East Voltage and Stability Analysis for Marcy FACTS Project Phase I Prepared by NYISO Operations Engineering 1. INTRODUCTION Central East Voltage and Stability Analysis for The Marcy Flexible AC Transmission System (FACTS) project is a joint technology partnership between

More information

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs)

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) 1.0 GRID CONNECTION CODE BASIS 1.1 LEGISLATION 1.1.1 The legal basis for this RPP Code (RPP Code) is specified in terms of the [Electricity] Act 2016

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

VOLTAGE CONTROL STRATEGY IN WEAK DISTRIBUTION NETWORKS WITH HYBRIDS GENERATION SYSTEMS

VOLTAGE CONTROL STRATEGY IN WEAK DISTRIBUTION NETWORKS WITH HYBRIDS GENERATION SYSTEMS VOLTAGE CONTROL STRATEGY IN WEAK DISTRIBUTION NETWORKS WITH HYBRIDS GENERATION SYSTEMS Marcelo CASSIN Empresa Provincial de la Energía de Santa Fe Argentina mcassin@epe.santafe.gov.ar ABSTRACT In radial

More information

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST र ष ट र य पवन ऊर स स थ न, च नन ई NATIONAL INSTITUTE OF WIND ENERGY म व प ( न ऊर जव प र द य ग क कप द र Formerly Centre for Wind Energy Technology ) (न न और न करण य ऊर जव त रजलय, भजरत सरकजर Ministry of New

More information

Lab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009

Lab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009 Lab 1 Objectives In this lab, our objective is to simulate a simple single machine infinite bus configuration using the PowerWorld Simulator software. We design a local generator system (a synchronous

More information

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings

More information

METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE

METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE Author: AXLIU Origination Date: 05/07/2010 Version: 8.3 Revised By: Approver s Name: OXPAIS REROMAK REROMAK 1 PURPOSE Revision Date: 9/12/2016

More information

MPERC (Transmission Performance Standards) Regulations, 2004

MPERC (Transmission Performance Standards) Regulations, 2004 Bhopal, Dated: 16th July, 2004 No.1932/MPERC/2004. In exercise of the powers conferred by sections 181 (1) and 181 (2) (za) read with section 57 (1), 57 (2) and 86 (1) (i) of the Electricity Act, 2003

More information

Effect of Series Capacitor on Line Protection - A Case Study

Effect of Series Capacitor on Line Protection - A Case Study 112 NATIONAL POWER SYSTEMS CONFERENCE, NPSC 22 Effect of Series Capacitor on Line Protection - A Case Study Anand Mohan, Vikas Saxena, Mukesh Khanna & V.Thiagarajan Abstract: Series compensation is a time

More information

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions

More information

AEMO POWER OF CHOICE (POC) METER CHURN DISCUSSION

AEMO POWER OF CHOICE (POC) METER CHURN DISCUSSION AEMO POWER OF CHOICE (POC) METER CHURN DISCUSSION 24/02/2017 SLIDE 1 POWER OF CHOICE INDUSTRY MEETING AGENDA - Introduction - POC rules and AEMO procedure changes related to Meter Churn - Next steps SLIDE

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

Version 2.6 October Comments to this document can be forwarded to:

Version 2.6 October Comments to this document can be forwarded to: GRID CONNECTION CODE REQUIREMENTS FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.6 October 2012 Comments to this document

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES

POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES For use with the Power Potential DER Technical Characteristics

More information

Industry Webinar Draft Standard

Industry Webinar Draft Standard Industry Webinar Draft Standard Project 2010-13.2 Phase 2 of Relay Loadability: Generation PRC-025-1 Generator Relay Loadability December 13, 2012 Agenda Welcome, Introductions and Administrative NERC

More information

Experience with Connecting Offshore Wind Farms to the Grid

Experience with Connecting Offshore Wind Farms to the Grid Oct.26-28, 2011, Thailand PL-22 CIGRE-AORC 2011 www.cigre-aorc.com Experience with Connecting Offshore Wind Farms to the Grid J. FINN 1, A. SHAFIU 1,P. GLAUBITZ 2, J. LOTTES 2, P. RUDENKO 2, M: STEGER

More information

Definition of Bulk Electric System Phase 2

Definition of Bulk Electric System Phase 2 Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date

More information

UP Power Corporation Limited, (Through its Chairman) 7th floor, Shakti Bhawan, 14, Ashok Marg Lucknow

UP Power Corporation Limited, (Through its Chairman) 7th floor, Shakti Bhawan, 14, Ashok Marg Lucknow Petition No 959 of 2014 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Date of Order : 05.12.2014 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt Meenakshi Singh,

More information

IMP/007/011 - Code of Practice for the Application of Lightning Protection

IMP/007/011 - Code of Practice for the Application of Lightning Protection Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements

More information

GridLiance Reliability Criteria

GridLiance Reliability Criteria GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances

More information

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Power Potential. Technical Requirements for participating Distributed Energy Resources

Power Potential. Technical Requirements for participating Distributed Energy Resources Power Potential 0 Technical Requirements for participating Distributed Energy Resources 1 Table of Contents Document Control... 3 Definitions, Acronyms and Abbreviations... 4 List of referenced documents...

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

Clayton Taylor. ComRent International, LLC.

Clayton Taylor. ComRent International, LLC. Clayton Taylor CEO ComRent International, LLC. 24 Hour Tests Are Needed! New way of testing Ways to sell through testing Go after installed base Uptime and compliance 2 Eventually Generators Will Be Put

More information

Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards

Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards Consultation Paper: 1/2017 (i) Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards Issued on 19 January 2017 Contents 1. Introduction

More information

2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai

2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 :May kindly chair the meeting 3. Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New

More information

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Meeting Date: 27.03.2017 Time: 1430 Hrs Venue: NRPC Conference

More information

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax: POWER CORPORATION Power Quality Specifications and Guidelines for Customers Phone: 403-514-3700 Fax: 403-514-3719 1 GENERAL OVERVIEW........................................ 1.1 WHAT DOES THIS SPECIFICATION

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

OPERATING CODE NO. 5 (OC5)

OPERATING CODE NO. 5 (OC5) Paragraph No/Title OPERATING CODE NO. 5 (OC5) TESTING AND MONITORING CONTENTS (This contents page does not form part of the Grid Code) Page Number OC5.1 INTRODUCTION... 2 OC5.2 OBJECTIVE... 3 OC5.3 SCOPE...

More information

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.9 (July 2016) This document is approved

More information

SLD FOR 132/33 KV DUB STATION, SOMANATHPUR

SLD FOR 132/33 KV DUB STATION, SOMANATHPUR SLD FOR 132/33 KV DUB STATION, SOMANATHPUR 132 KV BAYS TRANSF 02 NOS. 132kV MAIN BUS 132kV RESERVE BUS 20/40 MVA, 132/33kV TRANSFORMER1 20/40 MVA, 132/33kV TRANSFORMER 2 STN TFR 33/0.4KV 250KVA 33KV BAY

More information

AMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Ameren Missouri, Ameren Illinois, and Ameren Transmission Company of Illinois)

AMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Ameren Missouri, Ameren Illinois, and Ameren Transmission Company of Illinois) AMEREN s (On Behalf of Its Transmission Owning Affiliates, Including Missouri, Illinois, and Transmission Company of Illinois) TRANSMISSION PLANNING CRITERIA AND GUIDELINES March 28, 2003 Revised April

More information

Transformers connected via a cable Overvoltage protection

Transformers connected via a cable Overvoltage protection A P P L I C AT I O N N OT E 2. 1 Transformers connected via a cable Overvoltage protection The APPLICATION NOTES (AN) are intended to be used in conjunction with the APPLICATION GUIDELINES Overvoltage

More information

Constant Terminal Voltage. Working Group 1 29 st January 2014

Constant Terminal Voltage. Working Group 1 29 st January 2014 Constant Terminal Voltage Working Group 1 29 st January 2014 Overview Objectives of Working Group ENTSO-E RfG Implications Options Summary Discussion 2 Objectives of Work Group National Grid in consultation

More information