1 1 P a g e DRAFT VERSION: 14 th Dec, 2017 PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM 1. This Procedure is in accordance with the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009 hereinafter referred to as the Regulations / Connectivity and General Network Access Regulations, 2017, as applicable. 2. This procedure shall come into effect from the date it is approved by Hon ble CERC. 3. Connectivity shall be applied and processed in two stages: o Stage-I Connectivity o Stage-II Connectivity Grant of Stage-I Connectivity shall not create any right of the grantee on ISTS infrastructure including bays. 4. Eligibility: Application for grant of Stage-I Connectivity can be made by: a. An entity intending to set-up wind, solar or wind-solar generating project for a capacity of 50 MW or above or, b. An entity authorized by the Central or State Government as Solar Power Park Developer, Wind Power Park Developer or Wind-Solar Power Park Developer. c. An entity acting as a Lead Generator on behalf of the constituting entities seeking connection from CTU at a single connection point using wind, solar or wind-solar energy sources, individually having less than 50 MW installed capacity but collectively having an aggregate installed capacity of 50 MW or above The generation capacity already connected to grid (Inter-State Transmission System or Intra-State Transmission System) or for which connectivity is already

2 granted under the present Regulations, cannot apply for additional connectivity for the same project capacity. Provided that in the event of a proposal to augment the capacity, a fresh application for additional capacity shall be submitted as per the provisions of this Procedure The Applicants granted Connectivity to the ISTS may change the Renewable energy source i.e. wind, solar or wind-solar after the grant of Connectivity. However, in case of any such change, the Connectivity grantee shall inform the same and obtain its acknowledgment from CTU for incorporation in relevant connection agreement(s) The applicant shall be required to submit the unique registration number issued by the appropriate authority notified in this regard after the same comes into effect All the present grantees of Connectivity for the purpose of wind/solar/wind-solar project shall be deemed to be Stage-I Connectivity grantees under this Procedure. Provided that the above shall not apply in cases where Agreement for Bay Implementation at ISTS substation has been signed before the issuance of CERC order in Petition No. 145/MP/2017 dated ; or the Solar Power Park Developers identified by MNRE whose transmission system is already under implementation. Provided that those wind/solar/wind-solar generator/developer who have emerged successful in the SECI bidding, before this procedure coming force, shall be required to sign agreement for bay implementation at ISTS substation for development of terminating bay at the ISTS pooling substation. 5. Application for Stage-I Connectivity 5.1. Applications for Grant of Connectivity to ISTS shall be made online as per the application form [FORMAT-CON-2A] available at The applicant shall clearly indicate that the nature of generation project is being established through the bidding route or as a merchant plant. 2 P a g e

3 Provided that, if at any stage, there is a change in the nature of the generation project, the same shall be intimated within 30 days to the nodal agency A printed copy of the electronically generated application form (duly signed and stamped by the applicant) along with all the necessary documents shall be submitted in a sealed envelope with Application for Grant of Connectivity clearly marked on the envelope at the following address: Chief Operating Officer (CTU-Planning) Power Grid Corporation of India Limited Saudamini, Plot No.-2, Sector-29 Gurugram , Haryana, India 5.4. Documents to be submitted along with the Application: (i) (ii) Printed copy of the electronically generated online Application duly signed and stamped with company seal by the applicant. Original notarized affidavit for authenticity as per FORMAT-CON-1 for each application. (iii) Bank generated UTR Number as proof of payment of Application Fee through NEFT/RTGS. (iv) Copy of the Board Resolution authorizing filing of application and designating a person for the same, where the Applicant is a company; (v) Copy of authorization certificate issued by the Central or State Government as wind/solar/wind-solar Power Park Developers, as may be applicable The application shall be summarily rejected in case of non-conformity with regard to: i) failure to attach any of the above documents, ii) iii) any deviation from the text of the FORMAT-CON-1, incomplete document ( e.g. sign, stamp, notarization missing etc.) 3 P a g e

4 Rejection of application on any of the above grounds or withdrawal of application shall lead to forfeiture of application fee Deemed Stage-I Connectivity grantees would have to secure the Stage-II Connectivity within 24 months from the date of original grant. 6. Grant of Stage-I Connectivity 6.1. Upon receipt of the Connectivity application, CTU shall carry out necessary study for grant of connectivity to the nearest existing ISTS sub-stations having requisite margin or to new sub-stations under planning/implementation stage New sub-stations for harnessing renewable generation potential shall be planned as per the mandate of the Ministry of New and Renewable Energy (MNRE) and based on information provided by MNRE for which CTU shall regularly interact with MNRE CTU shall grant Stage-I Connectivity by indicating two alternate locations within 60 days of the last date of the month in which the application was received CTU shall also indicate the Voltage level for the purpose of connectivity of the Dedicated Transmission Line to the ISTS line bay Unless otherwise specified at the time of grant of Stage-I Connectivity, the power carrying capacity of the Dedicated Transmission Line shall be as below: Sl. No. Table1: Capacity of the Dedicated Transmission line Voltage Level Optimal Capacity of the Dedicated Transmission Line (per circuit) 1 132kV (only for NER) 80MVA 2 220kV 300MVA 3 400kV 900 MVA 4 765kV 3000 MVA 7. Progress Monitoring for Stage-I Connectivity 7.1. Connectivity Grantee s progress for development of (generator pooling station, dedicated transmission line) transmission infrastructure and RE project shall be monitored as per the following Table: 4 P a g e

5 Table 2: Monitoring Parameters for Stage-I Connectivity Sl. Monitoring Item No. 1 Installation of Wind Masts 2 Location with GPS coordinates of generator pooling station 3 Resource Assessment Studies 4 Acquisition of Land for generator pooling station 5 Tendering and Details of generator pooling station of wind/solar/wind-solar generator/developer Status Status Report signed by board authorized representative with letter of authorization. Land Required(acres): Land Acquired(acres): (i) Planned capacity (not less than 300MVA or 80 MVA in case of NER) (ii) Voltages, MVA Capacity, No. & Rating of Transformers (iii) EHV Switchyard configuration, bays and status (iv) Low Voltage switchgear configuration, no. of sections, no. of bays in each section and status (v) Single Line Diagram of generator pooling station (vi) Date of Award of generator pooling station (vii) Progress of generator pooling station erection: Switchyard, Main Transformers, Low Voltage Switchgear Progress on the milestones listed in the Monitoring Parameter Table-2 shall be used as input for implementation of the planned ISTS system as well as to plan new augmentation Stage-I Connectivity grantee shall furnish the status of monitoring parameters on quarterly basis in the format given at FORMAT-CON-X of this procedure. 5 P a g e

6 7.3. The applicants granted Stage-I Connectivity shall have to update the quarterly progress of milestones covered in the FORMAT-CON-X by the last day of each quarter Failure to update the progress of Monitoring Parameters for three consecutive quarters shall lead to revocation of the Stage-I Connectivity, without prior notice CTU shall also update the progress of associated ISTS transmission system as applicable. 8. Application for Stage-II Connectivity 8.1. Applications for Grant of Connectivity to ISTS shall be made online as per the application form [FORMAT-CON-2B] available at A printed copy of the electronically generated application form (duly signed and stamped by the applicant) along with all the necessary documents shall be submitted in a sealed envelope with Application for Grant of Connectivity clearly marked on the envelope at the following address: Chief Operating Officer (CTU-Planning) Power Grid Corporation of India Limited Saudamini, Plot No.-2, Sector-29 Gurugram , Haryana, India 8.3. Eligibility Any of the following shall be eligible: (a) Stage-I Connectivity Grantee, after achievement of following milestones: (i) (ii) Completion of boundary wall and all civil works for its generator pooling station including control room and switchgear rooms and, Installation of required high voltage switchyard 132 kv, 220kV or 400kV level as the case may be at the generator pooling station at the Connectivity Grantee s end. 6 P a g e

7 (iii) (iv) Completion of at least 100 MVA (50 MVA for 132kV level in NER) transformation capacity at generator pooling station at the Connectivity Grantee s end. Installation of low voltage switchgear at the generator pooling station of Connectivity Grantee s end, capable of receiving power not less than 100 MVA (50 MVA for 132kV level) of planned capacity of the generator pooling station. Alternatively, (b) Wind/solar/wind-solar generator/developer who has been awarded PPA (of 7 years or more) through SECI/State agency s Bid for not less than 50 MW with delivery date within 24 months from date of submission of Stage-II Connectivity application, or (c) Wind/solar/wind-solar generator/developer who has executed PPA (of 7 years or more) for not less than 50 MW with delivery date within 24 months from date of submission of Stage-II Connectivity application. For (b) and (c) above, if the PPA has been executed with a trader, then it must also be supported with a back-to-back Power Supply Agreement (PSA) between the trader and the buyer. An entity seeking Stage-II Connectivity and not already applied for Stage-I Connectivity, shall have to simultaneously apply for Stage-I and Stage-II Connectivity The applicant seeking Stage-II Connectivity shall have to apply for LTA for minimum quantum of 50 MW within six months from the date of intimation of Stage-II connectivity grant, in default of which the Stage-II Connectivity shall be cancelled without prior notice. Provided that the start date of LTA shall not be later than the start date of Stage- II Connectivity The Applicant seeking grant of Stage-II Connectivity shall be required to submit the following along with the application: (a) Document for fulfilment of eligibility criterion: 7 P a g e

8 o In case of 8.1(a), status of the pooling station of wind/solar/wind-solar generator/developer with regard to item (i) to (iv) of 8.1(a) on an affidavit signed by board authorized representative with letter of authorization. o In case of 8.1(b) and 8.1(c), copy of PPA and PSA. (b) Construction Phase Bank Guarantee (CBG) issued by a scheduled bank in favour of Power Grid Corporation of India Ltd, as per the format given at FORMAT-CON-CBG, for the amount indicated below: o Rupees Four Crores (Rs. 4,00,00,000/-) only, for Connectivity quantum upto 80 MW (only in case of connectivity in NER). o Rupees Fifteen Crores (Rs. 15,00,00,000/-) only, for Connectivity quantum upto 300 MW. o Rupees Thirty Crores (Rs. 30,00,00,000/-) only, for Connectivity quantum exceeding 300MW and not exceeding 600 MW. o Rupees Forty Five Crores (Rs. 45,00,00,000/-) only, for Connectivity quantum exceeding 600MW and not exceeding 900 MW. o Rupees Sixty Crores (Rs. 60,00,00,000/-) only, for Connectivity quantum exceeding 900MW. 9. Failure to satisfy eligibility criteria for grant of Stage-II Connectivity 9.1. Failure to qualify for grant of Stage-II Connectivity within twenty four months of grant of Stage-I Connectivity shall result in cancellation of Stage-I Connectivity grant, without any prior notice. Provided that such a Stage-I Connectivity Grantee shall have an option to seek an extension for a period of six months on the request to be made atleast one month prior to the expiry of twenty four months from the date of grant of Stage-I Connectivity. Provided that the Stage-I Connectivity shall be cancelled, without any prior notice; in case of failure to qualify for grant of Stage-II Connectivity within the extension period of six months. 8 P a g e

9 10. Grant of Stage-II Connectivity CTU shall process Stage-II Connectivity application and may seek clarification, additional information, confirmation, and may verify the development of the generator pooling station at the wind/solar/wind-solar generator/developer end, if found necessary The intimation for Grant of Stage-II Connectivity shall be issued within a period of 30 days from the last day of the month in which the application was received, after obtaining the requisite information required for Stage-II Connectivity eligibility criterion The intimation for grant of Stage-II Connectivity shall indicate the name of the ISTS Sub-station. i) In case of an existing sub-station, the bay number and Single Line Diagram is to be provided with the intimation. ii) In case of a new or under construction sub-station, the confirmation of bay availability and the scheduled commissioning date of the sub-station shall be intimated as soon as finalised. In such cases, the bay shall be allocated to the Connectivity grantee after finalization of the same by CTU with the implementing transmission licensee of the sub-station The grant of Stage-II Connectivity shall be subject to signing of the Transmission Agreement for Connectivity with CTU within 30 days of issue of intimation, in default of which the grant of Stage-II Connectivity shall be liable to be cancelled without notice. In such case the CBG submitted along with Stage-II Connectivity application shall be returned The Transmission Agreement for Connectivity shall inter-alia include: i) Details of the allocation of bay at ISTS pooling station, if applicable ii) Scheduled commissioning date of the ISTS substation, as applicable 9 P a g e iii) Scheduled commissioning date of the wind/solar/wind-solar generator/developer pooling station and DTL in terms of para 11.2 and 11.3, as applicable iv) Penalty provision as per para 11.2 and 11.3

10 v) Undertaking to make best efforts to fully utilize the bays for dedicated transmission infrastructure Time Period of Stage-II Connectivity The grant of Stage-II Connectivity shall be for a period of twenty five years with a provision for further extensions in tranches of ten year each provided that the dedicated transmission line is being put to satisfactory use and subject to such conditions as may be notified by Central Transmission Utility from time to time. 11. Progress Monitoring after grant of Stage-II Connectivity Stage-II Connectivity grantee shall furnish progress of the monitoring parameters on quarterly basis in the format given at FORMAT-CON-Y of this procedure by the last day of each quarter. Table 3: Monitoring Parameters for Stage-II Connectivity Sl. Monitoring Item No. 1 Installation of Wind Masts 2 Location with GPS coordinates of generator pooling station Status# Status Report signed by board authorized representative with letter of authorization. 3 Walkover Survey for Dedicated Transmission Line 4 Resource Assessment Studies 5 Acquisition of Land for generator pooling station 6 Final Route Survey of Dedicated Transmission Line 7 Award and Details of Dedicated Transmission Line Land Required(acres): Land Acquired(acres): Route Survey Report to be submitted. (i) Date of Award of Tower (ii) Date of Award of Conductor (iii) No. of Foundations (Total/Completed) (iv) No. of Tower Erections (Total/Completed) 10 P a g e

11 (v) Stringing(ckm) (Total/Completed) 8 Award and Details of generator pooling station of wind/solar/wind-solar generator/developer (i) Planned capacity (not less than 300MVA) (ii) Voltages, MVA Capacity, No. & Rating of Transformers (iii) EHV Switchyard configuration, bays and status (iv) Low Voltage switchgear configuration, no. of sections, no. of bays in each section and status (v) Single Line Diagram of generator pooling station (vi) Date of Award of generator pooling station (vii) Progress of generator pooling station erection: Switchyard, Main Transformers, Low Voltage Switchgear # Status of the monitoring parameter may be indicated as completed, in case the same has already been achieved The Stage-II Connectivity grantees shall be required to complete the dedicated transmission line and pooling station of wind/solar/wind-solar generator/developer within 24 months from intimation of ISTS pooling station coordinates by CTU for dedicated transmission line or availability of the identified bay of the ISTS pooling station, whichever is later. The grantee shall have to furnish completion certificate issued by Electrical Inspectorate of CEA. If the grantee fails to complete the dedicated transmission line within above stipulated period, the LTA of the grantee shall be operationalized and they shall be liable to pay PoC transmission charges in terms of CERC Sharing Regulations, The grantee shall be permitted to switch-on the dedicated line bay circuit breaker with the ISTS sub-station only after payment of the above transmission charges The payment received in terms of above provisions in para 11.2 shall be adjusted in the POC pool on yearly basis. 11 P a g e

12 12. Technical requirements of Dedicated Transmission Infrastructure The developer shall follow the Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2010; Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010; Central Electricity Authority (Safety requirements for construction, operation and maintenance of electrical plants and electric lines) Regulations 2011; CEA Manual on Transmission Planning Criteria, 2013 and any other applicable regulations and the amendments thereof. Additionally, the developer needs to comply with the following: Dedicated Transmission Line (DTL): a) The DTL shall be of Voltage class matching with the ISTS sub-station Voltage at which it is to be connected after allocation of bay. b) The power transfer capability (MVA) of the dedicated line from the wind/solar/wind-solar pooling station to the ISTS substation shall not be less than the quantum indicated at the time of grant of Stage-I connectivity. c) At least first six (6) transmission towers of the DTL starting from the ISTS substation shall be constructed with double-circuit (D/c) towers or multicircuit (M/c) towers. CTU in coordination with ISTS transmission licensee implementing the ISTS pooling station shall indicate the requirement of D/c or M/c towers near ISTS pooling station end for each developer. The double circuit towers or multi-circuit towers of the DTL are being specified in order to reduce the RoW requirement in the vicinity of the substation and accordingly the double circuit towers shall be shared with others. d) Depending on the topology, the wind/solar/wind-solar generator/developer would have the option to loop in and loop out (LILO) the DTL for injection of power Pooling Station of the wind/solar/wind-solar generator/developer a) The DTL shall be terminated at the high voltage side of the generator/developer s pooling station. The bus switching scheme should 12 P a g e

13 be in line with the requirements specified in the CEA Manual on Transmission Planning Criteria b) The planned capacity of the generator pooling station shall be not less than the capacity of the DTL required to be provided as per the grant of connectivity. c) The total capacity of the power transformers of the generator pooling station and the rating of associated equipment like CB, CT, CVT, bus duct etc. shall not be less than the planned capacity of the generator pooling station in case the entire power from the wind/solar/wind-solar generating station is being aggregated at the lower voltage side of the generator pooling station. d) Depending on the topology, the generator pooling station may be a switching station and the wind/solar/wind-solar generator/developer would have the option to directly feed power at the generator pooling stations with feeders of the same voltage as the generating pooling station. e) The minimum aggregate evacuation capacity of the generator pooling station of wind/solar/wind-solar generator/developer to be completed in the first instance shall not be less than 100 MVA (50 MVA for 132kV level in NER). f) Short circuit rating and line bay rating of the generator pooling station at developer end may be finalised by project developer in consultation with CTU. g) With regard to requirement of reactive compensation at the wind/solar/wind-solar generator/developer s pooling station the project developer needs to comply with requirements specified at Clause 16.4 of CEA Manual on Transmission Planning Criteria Enhancement of Connectivity a. For Stage-I Connectivity grantee: The wind/solar/wind-solar generator/developer already granted Stage-I connectivity may apply separately for additional quantum of Connectivity. The application shall be processed as per the procedure laid down for Stage-I Connectivity. 13 P a g e

14 b. For Stage-II Connectivity grantee: The wind/solar/wind-solar generator/developer already granted Stage-II connectivity may apply separately for enhancement of the Connectivity up to the capacity of the DTL in the FORMAT-CON-2C with application fee of Stage-I Connectivity. It is clarified that in case of the total Connectivity quantum including the already granted Connectivity is more than the capacity of the DTL, then a fresh Stage-I Connectivity application shall be required for additional quantum. 14. Sharing of Connectivity and Dedicated Transmission Infrastructure The wind/solar/wind-solar generator/developer would be required to develop the dedicated transmission infrastructure of a definite power evacuation capacity irrespective of the quantum of connectivity applied for. In case the wind/solar/wind-solar generator/developer is not able to fully utilize the dedicated transmission infrastructure, it shall be required to share the same with other wind/solar/wind-solar generator/developer with a view to ensuring optimum utilization of the transmission system The original Connectivity grantee for wind/solar/wind-solar generator/developer or its legal assignee, as the case may be, intending to share its dedicated transmission infrastructure may do so under intimation to CTU in the prescribed FORMAT-CON-2D. For such sharing of dedicated transmission infrastructure the original grantee shall perform duties of Lead Generator in terms of Connectivity Regulations and shall enter into an Agreement to undertake all operational and commercial responsibilities in following the provisions of the Indian Electricity Grid Code and all other regulations of the Commission, such as grid security, metering, scheduling and dispatch, collection and payment or adjustment of Transmission charges, deviation charges, congestion and other charges etc. FORMAT-CON-LGN An acknowledgement of the above request shall be issued by CTU within 30 days after all necessary details have been submitted The original Connectivity grantee wind/solar/wind-solar generator/developer may charge the entity with whom it is going to share Connectivity, an upfront charges 14 P a g e

15 not exceeding Rupees Seven Crores Fifty Lakhs per year for each 25 MW with an annual escalation of 3.5% from FY onwards. Provided that the original grantee shall provide adequate capacity in the generator pooling station for peak power evacuation of the sharing entity. Provided that the sharing entity shall not be required to incur any capital expenditure on the augmentation of the pooling station of the wind/solar/windsolar generator/developer and beyond belonging to the original grantee. Provided that Operation and Maintenance expenses and Transmission Losses from the pooling station of the wind/solar/wind-solar generator/developer upto the ISTS connection point shall be shared in an equitable manner. 15. Utilization of pooling station of wind/solar/wind-solar generator/developer The Stage-II Connectivity grantee shall be required to update the status/utilization of the dedicated transmission infrastructure as per the following format by 30 th day of June and 31 st day of December of each year: Table 4: Utilization and Sharing Status of Dedicated Transmission Infrastructure Date of updating of the utilization status: DD/MM/YYYY Date of Commissioning of DTL and generator pooling station: DD/MM/YYYY Sl. Description Status/Details Remarks No. 1 Date of Commissioning of DTL and generator pooling station 2 Voltage levels of the generator pooling station high voltage/low voltage (kv/kv) 3 Planned Power evacuation capacity of the generator pooling station (MVA) 15 P a g e

16 Table 4: Utilization and Sharing Status of Dedicated Transmission Infrastructure Date of updating of the utilization status: DD/MM/YYYY Date of Commissioning of DTL and generator pooling station: DD/MM/YYYY Sl. Description Status/Details Remarks No. 4 Commissioned Power evacuation capacity of the generator pooling station (MVA) 5 Details of the capacity in use User-1 User-2 User-3. User-n Total Capacity Used In terms of undertaking given by the original grantee in the Transmission Agreement, the Stage-II Connectivity grantee shall make best efforts for utilization of transmission infrastructure to the fullest extent. If it is observed by CTU that the dedicated transmission infrastructure is under-utilized or the original grantee is abusing its position as Connectivity grantee then CTU shall seek an explanation from grantee which shall have to be furnished in an affidavit signed by representative authorized by Board of the Company within 30 days of issue of such notice. In case CTU is of the view that the spare capacity is not being put to use without reasonable justification, and it is resulting in denial of opportunity to other renewable generators/developers then the matter shall be brought to the 16 P a g e

17 notice of CERC with a recommendation for directions for use of the available spare capacity by other users in the area. 16. Transmission Planning for wind/solar/wind-solar generation project and Coordination with Ministry of New and Renewable Energy (MNRE) The location and capacity of various ISTS Pooling Stations and associated transmission facilities shall be developed keeping in view of the exploitable wind/solar potential in the area based on the information to be provided by MNRE from time to time The CTU shall coordinate with MNRE and their associated organizations in this regard at least twice in year preferably in the month of February and August of each year The location and capacity of each ISTS pooling station including its expansion shall be taken-up with explicit direction of MNRE The Transmission System planning for facilitating evacuation of wind/solar/windsolar generation shall be based on the potential of a given area and shall not be linked to number and quantum of Connectivity sought. The ISTS pooling stations including line bays at lower voltage for receiving power shall be developed as part of ISTS Based on the MNRE mandate, the transmission system so evolved shall be taken up for consultation in Standing Committee for power system planning. The transmission system shall be taken up for regulatory approval from the CERC, as applicable towards its advance implementation. 17 P a g e

18 FORMAT-RCON-1 On Non Judicial Stamp Paper of Rs.10 AFFIDAVIT IN SUPPORT OF APPLICATION FOR CONNECTIVITY I (Name) S/o Shri (Father s name) working as.. (designation) in (Name of the Applicant organization/entity).., having its registered office at (Address of the Applicant organization/entity).., do solemnly affirm and say as follows: 1. I am the..(designation). of..(name of the Applicant organization/entity), the representative in the above matter and am duly authorized by the Board Resolution dated of the above referred Company attached herewith to file the present application and to make this affidavit. 2. I submit that M/s (Name of the Applicant organization/entity). is an incorporated entity registered under the Companies Act/..Under the Articles of Association of the Company and in accordance with the provisions of Electricity Act, 2003 / Applicable Regulation(s) of CERC and Procedures notified thereunder, the Applicant can file the enclosed application. 3. I submit that all the details given in the enclosed Application for Grant of Connectivity are true and correct and nothing material has been concealed thereof. 4. I also submit that the documents enclosed are original or true copies of their respective originals. Name of the Authorised Signatory: Signature: Company Seal (mandatory): (To be duly attested by Notary) Page 1 of 130

19 Application for Stage-I Connectivity to ISTS FORMAT-RCON-2A 1 Name of the Applicant : 2 Address for Correspondence : 3 Contact Details : Name of Primary Contact Person : Designation : Phone No. (Landline) : Phone No. (Mobile) : Fax : Name of Alternate Contact Person : Designation : Phone No. (Landline) : Phone No. (Mobile) : Fax : 4 Nature of the Applicant Generator Developer Lead Generator 5 Details for Connectivity : 5a Capacity (MW) for which connectivity is required: (in MW, through Bidding route) /.. (in MW, through Merchant Route) 5b Date from which connectivity is required : 6 Location of the Generating Farms/Park : Nearest Village / Town : District : State : Latitude : Longitude : 7 Planned Capacity of the Generating Farms/Park (Stage wise) : 8 Expected timeline of completion of Generating Farms/Park (Stage Wise): 9 Details of the Generating Farms/Park :

20 Name(s) of the Farms/Park : Energy Source: Wind / Solar / Wind-Solar : Step-up/Connection Voltage : 10 Details of Nearest 400/220/132 kv sub-stations, in case information is available Sub-Station-1 Voltage levels available : Owner : Distance (Km) : Sub-Station-2 Voltage levels available : Owner : Distance (Km) : 11 Details of Application Fee RTGS/NEFT/e-transaction Amount in Rs.: RTGS/NEFT/e-Transaction No.: Date: Bank Name: Branch Name: 12 Details of Documents Enclosed with the Application (i) Notarised affidavit as per FORMAT-RCON-1 (ii) Copy of Authorisation by the Central Government as Solar Power Park Developer or Wind Power Park Developer, if any (iii) Copy of Board Resolution authorising a person for filing of application, where applicant is a company (iv) Site(s) identification (v) Consortium Agreement of Lead Generator, if applicable I confirm that I am well aware of the CERC Regulations and Detailed Procedure and all the details entered by me are in conformity with the Regulations. Submission Date: Submission Time: Name of the Authorised Signatory: Signature: Company Seal (mandatory):

21 FORMAT-RCON-3A Intimation for Grant of Stage I Connectivity 1 Intimation No. : Date : 2 Ref. Application No. : Date : 3 Name of the Applicant : 4 Address for Correspondence : 5 Nature of the Applicant : Generator Developer Lead Generator 6 Details for Connectivity : 6a Capacity (MW) for which connectivity is granted : (in MW, through Bidding Route)/.. (in MW, through Merchant Route) 6b Point at which Stage I Connectivity is granted : 6c Alternative Point at which Stage I Connectivity is granted: 6e Transmission System Required for Connectivity: 6f Transmission System Required for alternative Connectivity: Date: Signature: Designation

22 FORMAT RCON X STATUS AS PER MONITORING PARAMETERS FOR STAGE-I CONNECTIVITY (To be developed on CTU Webpage) Sl. Monitoring Item No. 1 Installation of Wind Masts 2 Location with GPS coordinates of generator pooling station 3 Resource Studies Assessment 4 Acquisition of Land for generator pooling station 5 Tendering and Details of generator pooling station of wind/solar/wind-solar generator/developer Status Status Report signed by board authorized representative with letter of authorization. Land Required(acres): Land Acquired(acres): (i) Planned capacity (not less than 300MW or 80 MW in case of NER) (ii) Voltages, MW Capacity, No. & Rating of Transformers (iii) EHV Switchyard configuration, bays and status (iv) Low Voltage switchgear configuration, no. of sections, no. of bays in each section and status (v) Single Line Diagram of generator pooling station (vi) Date of Award of generator pooling station (vii) Progress of generator pooling station erection: Switchyard, Main Transformers, Low Voltage Switchgear

23 Application for Stage-II Connectivity to ISTS FORMAT-RCON-2B 1 Name of the Applicant : 2 Intimation No. of Grant of Stage-I Connectivity, if granted : 3 Address for Correspondence : 4 Contact Details Name of Primary Contact Person : Designation : Phone No. (Landline) : Phone No. (Mobile) : Fax : Name of Alternate Contact Person : Designation : Phone No. (Landline) : Phone No. (Mobile) : Fax : 5 Nature of the Applicant : Generator Developer Lead Generator 6 Criterion for applying Stage-II Connectivity: a. Completion of works as specified in the Procedure: b. PPA through SECI/State bids: c. PPA (Exceeding 7 years) through other routes: 7 Date from which Stage-II Connectivity is required : 8 Location of the Generating Farms/Park Nearest Village / Town : District : State : Latitude : Longitude : 9 Planned Capacity of the Generating Farms/Park (Stage wise) : 10 Expected timeline of completion of Generating Farms/Park (Stage Wise): 11 Details of the Generating Farms/Park :

24 Location: Name(s) of the Farms/Park: Energy Source: Wind / Solar / Wind- Solar : Step-up Voltage at generator Pooling Station: 12 Details of Application Fee RTGS/NEFT/e-transaction : Amount (in Rs.): RTGS/NEFT/e-Transaction No. Date: Bank Name: Branch Name: 13 Details of Documents Enclosed with the Application (i) Notarised Affidavit as per FORMAT-RCON-1 (ii) Copy of Authorisation by the Central Government as Solar Power Park Developer or Wind Power Park Developer, if any (iii) Copy of Board Resolution authorising a person for filing of application, where applicant is a company (iv) Site(s) Identification (v) Consortium Agreement of Lead Generator, if applicable (vi) Documentary evidence of eligibility for applying for Stage-II Connectivity a. Self certification of completion of works as specified in the Procedure giving the requisite details of the completed Generator Pooling Station, its coordinates including installed transformation capacity. b. Copy of PPA (Exceeding 7 years) with buyer. In case PPA is with trader, it must be supported with back to back Power Supply Agreement between trader and buyer. I confirm that I am well aware of the CERC Regulations and Detailed Procedure and all the details entered by me are in conformity with the Regulations. Submission Date: Submission Time: Name of the Authorised Signatory: Signature: Company Seal (mandatory):

25 FORMAT-RCON-3B Intimation for Grant of Stage II Connectivity/ Enhancement of Stage-II Connectivity 1 Intimation No. : Date: 2 Ref. Application No. : Date: 3 Name of the Applicant: 4 Address for Correspondence: 5 Location of the Generating Station Nearest Village / Town : District : State : Latitude : Longitude : 6 Nature of the Applicant: Generator : Developer : Lead Generator : 7 Details for Stage-II Connectivity granted/ Enhancement in Capacity 7a Capacity (MW) for which connectivity is granted/ enhanced : 7b ISTS substation and bay at which Connectivity is granted: (From already identified bay in case of enhancement): 7c Date from which connectivity/enhancement in Connectivity is granted : Date: Signature: Designation: 1. Note :-Applicant given intimation for Connectivity to the grid shall have to furnish additional details to CTU for signing of Connection Agreement as per format given at FORMAT-CON-4, The Applicants are advised to furnish such details as early as possible for enabling them have lead time for any type of access.

26 2. The CTU will process the above information and will intimate the Connection details as per format given at FORMAT-CON-5. Pursuant to such Connection details, the applicant shall have to sign Connection Agreement with CTU prior to the physical inter-connection as per format given at FORMAT-CON-6. In case the connectivity is granted to the ISTS of an inter-state transmission licensee other than the CTU, a tripartite agreement shall be signed between the applicant, the Central Transmission Utility and such inter-state transmission licensee, in line with the provisions of the Regulations.

27 FORMAT RCON Y (To be developed on CTU Webpage) STATUS AS PER MONITORING PARAMETERS FOR STAGE-II CONNECTIVITY (Status Report to be signed by a board authorized representative alongwith copy of letter of authorization.) Table 3: Monitoring Parameters for Stage-II Connectivity Sl. No. Monitoring Item 1. Installation of Wind Masts 2. Location with GPS coordinates of generator pooling station 3. Walkover Survey for Dedicated Transmission Line 4. Resource Assessment Studies 5. Acquisition of Land for generator pooling station 6. Final Route Survey of Dedicated Transmission Line 7. Award and Details of Dedicated Transmission Line 8. Award and Details of generator pooling station of wind/solar/wind-solar generator/developer Status Land Required(acres): Land Acquired(acres): Route Survey Report to be submitted. (i) Date of Award of Tower (ii) Date of Award of Conductor (iii) No. of Foundations (Total/Completed) (iv) No. of Tower Erections (Total/Completed) (v) Stringing(ckm) (Total/Completed) (i) Planned capacity (not less than 300MVA) (ii) Voltages, MVA Capacity, No. & Rating of Transformers (iii) EHV Switchyard configuration, bays and status (iv) Low Voltage switchgear configuration, no. of sections, no. of bays in each section and status (v) Single Line Diagram of generator pooling station (vi) Date of Award of generator pooling station (vii) Progress of generator pooling station erection: Switchyard, Main Transformers, Low Voltage Switchgear

28 FORMAT-RCON-2C Application for Enhancement in Connectivity Quantum of Grant of Stage-II Connectivity 1 Name of the Applicant : 2 Intimation No. of Grant of Stage-II Connectivity : 3 Address for Correspondence : 4 Contact Details : Name of Primary Contact Person : Designation : Phone No. (Landline) : Phone No. (Mobile) : Fax : Name of Alternate Contact Person : Designation : Phone No. (Landline) : Phone No. (Mobile) : Fax : 5 Details of the Generating Farms/Park for additional Connectivity Name(s) of the Farms/Park: Energy Source: Wind / Solar / Wind-Solar: Scheme of interconnection/single Line: Diagram depicting existing and additional: Connectivity including various Wind/Solar: Farms and voltage levels of internal substations: 6 Details for enhancement of the Connectivity : 6a Capacity (MW) for which Stage-II Connectivity has been granted : 6b Capacity (MW) for which connectivity is required to be enhanced: 6c Date from which Connectivity is to be enhanced : 7 Location of the Generating Farms/Park Nearest Village / Town : District : State : Latitude : Longitude :

29 8 Planned Capacity of the Generating Farms/Park (Stage wise) : 9 Expected timeline of completion of Generating Farms/Park (Stage Wise): 10 Details of Application Fee RTGS/NEFT/e-transaction Amount (in Rs.): RTGS/NEFT/e-Transaction No. Date: Bank Name: Branch Name: 11 Details of Documents Enclosed with the Application (i) Notarised Affidavit as per FORMAT-RCON-1 (ii) Copy of Authorisation by the Central Government as Solar Power Park Developer or Wind Power Park Developer, if any (iii) Copy of Board Resolution authorising a person for filing of application, where applicant is a company (iv) Site(s) Identification (v) Consortium Agreement of Lead Generator, if any I confirm that I am well aware of the CERC Regulations and Detailed Procedure and all the details entered by me are in conformity with the Regulations. Submission Date: Submission Time: Name of the Authorised Signatory: Signature: Company Seal (mandatory):

30 FORMAT-RCON-CBG PROFORMA OF BANK GUARANTEE FOR PERFORMANCE (To be stamped in accordance with Stamp Act) Ref.. Bank Guarantee No. Date.. To Power Grid Corporation of India Ltd. B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi Dear Sirs, In consideration of the Power Grid Corporation of India Ltd, (hereinafter referred to as the POWERGRID which expression shall unless repugnant to the context or meaning thereof include its successors, administrators and assigns) having signed an agreement No..dated.with CUSTOMER (Name of Customer.. with its Registered/Head office at.(hereinafter referred to as the CUSTOMER which expression shall unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) WHEREAS it has been agreed by the customer in the said Agreement that in case of failure /delay to construct the generating station or making an exit or abandonment of its project by CUSTOMER, POWERGRID shall have the right to collect the estimated transmission charges of stranded transmission capacity for dedicated line at the rate mentioned in the Detailed Procedure as approved by the Commission, to compensate such damages. AND WHEREAS as per the aforesaid agreement customer is required to furnish a Bank Guarantee for a sum of Rs.(Rupees..) as a security for fulfilling its commitments to POWERGRID as stipulated in the said Agreement. We (Name & Address of the Bank) having its Head Office at.(hereinafter referred to as the Bank, which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) do hereby guarantee and undertake to pay the POWERGRID on demand any and all monies payable by the CUSTOMER to

31 the extent of..as aforesaid at any time upto ** (days/month/year) without any demur, reservation, context, recourse or protest and/or without any reference to the CUSTOMER. Any such demand made by the POWERGRID on the Bank shall be conclusive and binding not withstanding any difference between the POWERGRID and the CUSTOMER or any dispute pending before any Court, Tribunal, Arbitrator or any other authority. The Bank undertakes not to revoke this guarantee during its currency without previous consent of the POWERGRID and further agrees that the guarantee herein contained shall continue to be enforceable till the POWERGRID discharges this guarantee. The POWERGRID shall have the fullest liberty without affecting in any way the liability of the Bank under this guarantee, from time to time to extend the time for performance of the obligations under the said agreement by the CUSTOMER. The POWERGRID shall have the fullest liberty, without affecting this guarantee, to postpone from time to time the exercise of any powers vested in them or of any right which they might have against the CUSTOMER, and to exercise the same at any time in any manner, and either to enforce or to forbear to enforce any covenants, contained or implied, in the Agreement between the POWERGRID and the CUSTOMER or any other course or remedy or security available to the POWERGRID. The Bank shall not be released of its obligations under these presents by any exercise by the POWERGRID of its liberty with reference to the matters aforesaid or any of them or by reason of any other act of omission or commission on the part of the POWERGRID or any other indulgences shown by the POWERGRID or by any other matter or thing whatsoever which under law would, but for this provision have the effect of relieving the Bank. The Bank also agrees that the POWERGRID at its option shall be entitled to enforce this Guarantee against the Bank as a principal debtor, in the first instance without proceeding against the CUSTOMER and not withstanding any security or other guarantee the POWERGRID may have in relation to the CUSTOMER s liabilities. Notwithstanding anything contained hereinabove our liability under this guarantee is restricted to..and it shall remain in force upto and including..and shall be extended from time to time for such period (not exceeding.. year), as may be desired by M/s.on whose behalf this guarantee has been given. Dated this.day of 20.at WITNESS

32 . (Signature) (Signature).. (Name) (Name)... (Official Address) (Designation with Bank Stamp) Attorney as per Power of Attorney No.. Date... NOTES: 1. The stamp papers of appropriate value shall be purchased in the name of issuing Bank.

Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR

Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in 1.0 Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity / Long Term Access

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

Terms and Conditions for the Use of the EZ-Reload by Card Facility

Terms and Conditions for the Use of the EZ-Reload by Card Facility EZ-Link Pte Ltd (Co. Reg. No. 200200086M) Terms and Conditions for the Use of the EZ-Reload by Card Facility 1 DEFINITIONS AND INTERPRETATION 1.1 In these terms and conditions ( Terms and Conditions ),

More information

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR-440022 TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS At NPTI (WR), NAGPUR, MAHARASHTRA 1 NATIONAL POWER TRAINING

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA

INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL CONSULTANCY SERVICES FOR THE UPGRADATION OF A GOVERNMENT HOSPITAL IN KERALA JANUARY 2019 HITES (A FULLY OWNED SUBSIDIARY OF HLL LIFECARE LTD, A GOVERNMENT

More information

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission

More information

Volume III. After the Gold Standard,

Volume III. After the Gold Standard, 1933 August 28 Executive Order (no. 6260) of United States President Franklin D. Roosevelt concerning controls on gold exports and transactions in foreign exchange. This excerpt contains the additional

More information

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation The Republic of Belarus, Republic of Kazakhstan and the Russian

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

TAMIL NADU GOVERNMENT GAZETTE

TAMIL NADU GOVERNMENT GAZETTE TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No: 976] CHENNAI, WEDNESDAY, DECEMBER 29, 1999 Margazhi 14, Pramathi, Thiruvalluvar Aandu-2030 Part III Section 1 (a) General Statutory

More information

FORM OF APPLICATION FOR RENEWAL OF REGISTRATION CUM MEMBERSHIP CERTIFICATE (RCMC)

FORM OF APPLICATION FOR RENEWAL OF REGISTRATION CUM MEMBERSHIP CERTIFICATE (RCMC) To, FORM OF APPLICATION FOR RENEWAL OF REGISTRATION CUM MEMBERSHIP CERTIFICATE (RCMC) The Chairman Coconut Development Board (Ministry of Agriculture, Govt. of India) Kera Bhavan, SRVHS Road, Cochin 682011

More information

Sanjay Lalit, FCS Practising Company Secretary, Mumbai

Sanjay Lalit, FCS Practising Company Secretary, Mumbai ISSUE OF SWEAT EQUITY BY UNLISTED COMPANIES Sanjay Lalit, FCS Practising Company Secretary, Mumbai cssklco@gmail.com Sweat equity is one's contribution to a business or project in the form of an effort

More information

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard Technology transactions and outsourcing deals: a practitioner s perspective Michel Jaccard Overview Introduction : IT transactions specifics and outsourcing deals Typical content of an IT outsourcing agreement

More information

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK Sealed quotations are invited under Two-Bid system from reputed agencies, either by themselves or as a joint venture/consortium/partnership

More information

Unofficial Translation

Unofficial Translation Notification of the National Broadcasting and Telecommunications Commission on Criteria and Procedures for Granting A Permit to Manufacture, Import, Sell, or Offer for Sale or Install Receiver, Apparatus

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

EMPLOYEE SECONDMENT AGREEMENT

EMPLOYEE SECONDMENT AGREEMENT Exhibit 10.7 Execution Version EMPLOYEE SECONDMENT AGREEMENT This Employee Secondment Agreement (this Agreement ), effective as of December 22, 2014 (the Effective Date ), is entered into by and among

More information

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments त न ब ल र व, ए 11 प ल 2017 व :- ट प पव वलए ए ल र व वन द त न ब ( ए ) व वन 2016 प न त त त क ए ए ए ल र व वन द, व त ज न ट प पव वलए प स ट प पव, कद ल जट ए hallmarking@bis.gov.in 28/04/2017 त ज ज त लग :- ऊप क

More information

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna Fabrication and Supply of Cable Tray at CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna BROADCAST ENGINEERING CONSULTANTS INDIALIMITED 14-B, I. P. Estate, Ring Road, New Delhi CONTENTS Sr. No Title

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

Amateur Radio Club Licence

Amateur Radio Club Licence Amateur Radio Club Licence Amateur Radio Club license is issued to a bonafide Amateur Radio society, club or a school, college, or an institution or a university in India, which has the aim of investigations

More information

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Draft Business Rules Version 0.1 Following the broad consensus of Workgroup 0504 meeting 3 (WG3), held on the 10 September

More information

THE GOLF CLUB AT REDMOND RIDGE CLUB CARD PLAN No Initiation Fee and One Low Monthly Price for Year-Around Golf

THE GOLF CLUB AT REDMOND RIDGE CLUB CARD PLAN No Initiation Fee and One Low Monthly Price for Year-Around Golf THE GOLF CLUB AT REDMOND RIDGE CLUB CARD PLAN No Initiation Fee and One Low Monthly Price for Year-Around Golf BENEFITS: Year-round golf at The Golf Club at Redmond Ridge Mon-Fri Anytime and Saturday,

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

UNITED ENVIROTECH LTD (Incorporated in the Republic of Singapore) (Company registration no.: G)

UNITED ENVIROTECH LTD (Incorporated in the Republic of Singapore) (Company registration no.: G) UNITED ENVIROTECH LTD (Incorporated in the Republic of Singapore) (Company registration no.: 200306466G) THE PROPOSED ACQUISITION OF THE BUSINESS, ASSETS AND PRINCIPAL SUBSIDIARIES OF MEMSTAR TECHNOLOGY

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY GRID CODE 2010 BIHAR ELECTRICITY REGULATORY COMMISSION Grid Code Clause Title Page No. CHAPTER - 1 - GENERAL CODE SECTION-1: General 1.1 Introduction..

More information

DEPARTMENT OF ARCHITECTURE

DEPARTMENT OF ARCHITECTURE DEPARTMENT OF ARCHITECTURE Web : www.nitt.edu Phone : 0431-2503001 Short Tender Notification No.: NITT/ARCH/04/2012/ DRAWING TABLE Dated : 19-04 -2012 (Retender Those previously quoted for this tender

More information

Pickens Savings and Loan Association, F.A. Online Banking Agreement

Pickens Savings and Loan Association, F.A. Online Banking Agreement Pickens Savings and Loan Association, F.A. Online Banking Agreement INTERNET BANKING TERMS AND CONDITIONS AGREEMENT This Agreement describes your rights and obligations as a user of the Online Banking

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

Delhi Regional Office, F-8-11 Flatted Factory Complex, Rani Jhansi Road, NEW DELHI ===========================================================

Delhi Regional Office, F-8-11 Flatted Factory Complex, Rani Jhansi Road, NEW DELHI =========================================================== Delhi Regional Office, F-8-11 Flatted Factory Complex, Rani Jhansi Road, NEW DELHI 110055 =========================================================== MMTC/DRO/SMVDSB/REF/03/2017-18 Date: 22 nd.dec. 2017

More information

PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE

PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE IFB NO. KGEC/DST-WB/EE /2018-19/995 PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE Kalyani Government Engineering College Kalyani 741 235; Nadia, West Bengal 1 Government of West Bengal Office of the

More information

Thank you for your enquiry. The necessary forms for registering a sponsor s mark at Sheffield Assay Office are enclosed.

Thank you for your enquiry. The necessary forms for registering a sponsor s mark at Sheffield Assay Office are enclosed. Thank you for your enquiry. The necessary forms for registering a sponsor s mark at Sheffield Assay Office are enclosed. Registration of Sponsor s Marks Under the terms of the Hallmarking Act 1973, sponsor

More information

KRYPTONITE AUTHORIZED ONLINE SELLER APPLICATION AND AGREEMENT Effective: January 1, 2018

KRYPTONITE AUTHORIZED ONLINE SELLER APPLICATION AND AGREEMENT Effective: January 1, 2018 KRYPTONITE AUTHORIZED ONLINE SELLER APPLICATION AND AGREEMENT Effective: January 1, 2018 KRYPTONITE AUTHORIZED ONLINE SELLER APPLICATION Your submission of this Online Sales Application does not constitute

More information

Rules of the prize game Sa Zaba karticama dobivam više!

Rules of the prize game Sa Zaba karticama dobivam više! The purpose of these Rules is to ensure all participants have equal chance to enter the Prize Game and win prizes after meeting the requirements set forth in these Rules. MPG d.o.o. (with their registered

More information

Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band MHz

Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band MHz Issue 1 February 2010 Spectrum Management and Telecommunications Client Procedures Circular Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band 3650-3700 MHz Note: Section 6.5

More information

fcgkj ljdkj ¼Je lalk/ku fohkkx½ fcgkj dks'ky fodkl fe'ku] fu;kstu Hkou] csyh jksm] bade VSDl xksyecj ds ikl nwjhkk"k ua0&0612&

fcgkj ljdkj ¼Je lalk/ku fohkkx½ fcgkj dks'ky fodkl fe'ku] fu;kstu Hkou] csyh jksm] bade VSDl xksyecj ds ikl nwjhkkk ua0&0612& fcgkj ljdkj ¼Je lalk/ku fohkkx½ fcgkj dks'ky fodkl fe'ku] fu;kstu Hkou] csyh jksm] bade VSDl xksyecj ds ikl nwjhkk"k ua0&0612&2528454 Tender No. 12/2016-2017 Date-02.03.2017 Tender for Printing and Supply

More information

(Protectorate) Registration Ordinance; it shall apply to the Protectorate.

(Protectorate) Registration Ordinance; it shall apply to the Protectorate. 1058 Cap. 93] Births and Deaths (Protectorate) Registration CHAPTER 93. SECTION. BIRTHS AND DEATHS (PROTECTORATE) REGISTRATION. ARRANGEMENT OF SECTIONS. 1. Short title and application. 2. Interpretation.

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors

Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors Promulgation date: 08-24-2006 Department: China Securities Regulatory Commission,

More information

UNOFFICIAL TRANSLATION

UNOFFICIAL TRANSLATION Decree 34/2014. (IX. 25.) of the Governor of the Magyar Nemzeti Bank amending MNB Decree No. 11/2011 (IX. 6.) on the processing and distribution of banknotes and on technical tasks relating to the protection

More information

TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS)

TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS) TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS) Name of Scope of Work: Paper based Drafting, Designing, Printing, Publication and Supply work (Digital and Offset printing only) TERMS AND CONDITIONS The undersigned

More information

Enforcement Regulations of the Pharmaceutical Affairs Law

Enforcement Regulations of the Pharmaceutical Affairs Law Enforcement Regulations of the Pharmaceutical Affairs Law The Enforcement Regulations of the Pharmaceutical Affairs Law ( PAL ) shall be amended, in part, as follows: Article 24 (Product approval application

More information

TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS)

TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS) TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS) Name of Scope of Work: Paper based Drafting, Designing, Printing, Publication and Supply work (Digital and Offset printing only) TERMS AND CONDITIONS The undersigned

More information

The Helen Jerwood Preparatory School (Queen Mary s School, Tis Hazari, Delhi )

The Helen Jerwood Preparatory School (Queen Mary s School, Tis Hazari, Delhi ) No. The Helen Jerwood Preparatory School (Queen Mary s School, Tis Hazari, Delhi-110054) (A Christian minority institution under the Management of the Helen Jerwood Memorial Education Society of the Diocese

More information

The Helen Jerwood Preparatory School

The Helen Jerwood Preparatory School No. Session 2019-2020 The Helen Jerwood Preparatory School (Queen Mary's School, Tis Hazari, Delhi-110054 (A Christian minority institution under the Management of the Helen Jerwood Memorial Education

More information

WGA LOW BUDGET AGREEMENT--APPLICATION

WGA LOW BUDGET AGREEMENT--APPLICATION WGA LOW BUDGET AGREEMENT--APPLICATION ( Company ) has read the Writers Guild of America ( WGA ) Low Budget Agreement (the Low Budget Agreement ). Company desires to produce (the Picture ) under the Low

More information

CONTRACT FOR THE COMMISSIONING OF ONE OR MORE PHOTOGRAPHS OR WORKS OF ART AND AGREEMENT ON EXERCISE OF MUTUAL COPYRIGHTS

CONTRACT FOR THE COMMISSIONING OF ONE OR MORE PHOTOGRAPHS OR WORKS OF ART AND AGREEMENT ON EXERCISE OF MUTUAL COPYRIGHTS CONTRACT FOR THE COMMISSIONING OF ONE OR MORE PHOTOGRAPHS OR WORKS OF ART AND AGREEMENT ON EXERCISE OF MUTUAL COPYRIGHTS 1 SECTION 1 IDENTIFICATION OF THE PARTIES Contract between: Artist s surname and

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR In the matter of: GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Gujarat Electricity Regulatory Commission (Multi-Year Tariff) (Second Amendment) Regulations, 2018 CORAM: Shri Anand Kumar, Chairman

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

' -- [~III-~4] 7 New Delhi, the 30th September, 2013 File No.12/X/STD(CONN)/GM/CEA.-Whereas draft of the Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation

More information

INSTRUCTION FOR BIDDERS FOR

INSTRUCTION FOR BIDDERS FOR INSTRUCTION FOR BIDDERS FOR PROVIDING ARCHITECTURAL, CONSULTANCY SERVICES FOR THE MODERNIZATION & RENOVATION OF VARIOUS PROJECTS FOR A GOVERNMENT INSTITUTION LOCATED AT NORTH MALABAR REGION IN KERALA SEPTEMBER

More information

Interactive Retainer Letter

Interactive Retainer Letter Interactive Retainer Letter General Notes on Retainer Agreements (Non-Contingency) Retainer letters are recommended practice in Alberta for non-contingency retainers. The Code of Conduct makes reference

More information

WGA DOCUMENTARY SCREENPLAY CONTRACT

WGA DOCUMENTARY SCREENPLAY CONTRACT WGA DOCUMENTARY SCREENPLAY CONTRACT ( Company ) has read the Writers Guild of America ( WGA ) Documentary Screenplay Contract (the Documentary Screenplay Contract ). Company desires to produce (the Picture

More information

ART SERVICES AND ACQUISITION AGREEMENT *******************************************************************************

ART SERVICES AND ACQUISITION AGREEMENT ******************************************************************************* Form No. OGC S 99 20 UNIVERSITY OF HOUSTON SYSTEM ART SERVICES AND ACQUISITION AGREEMENT Contract No. Account No. ******************************************************************************* THIS ART

More information

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

MEDICINE LICENSE TO PUBLISH

MEDICINE LICENSE TO PUBLISH MEDICINE LICENSE TO PUBLISH This LICENSE TO PUBLISH (this License ), dated as of: DATE (the Effective Date ), is executed by the corresponding author listed on Schedule A (the Author ) to grant a license

More information

Sec Radio, television, satellite dish and communications antennas and towers.

Sec Radio, television, satellite dish and communications antennas and towers. Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise

More information

BIRTHS AND DEATHS REGISTRATION ACT

BIRTHS AND DEATHS REGISTRATION ACT CHAPTER 5:02 BIRTHS AND DEATHS REGISTRATION ACT Acts 11/1986, 7/1994, 6/2000, 22/2001, 6/2005. ARRANGEMENT OF SECTIONS PARTI PRELIMINARY Section 1. Short title. 2. Interpretation. PART II REGISTRARS AND

More information

TERMS AND CONDITIONS. for the use of the IMDS Advanced Interface by IMDS-AI using companies

TERMS AND CONDITIONS. for the use of the IMDS Advanced Interface by IMDS-AI using companies TERMS AND CONDITIONS for the use of the IMDS Advanced Interface by IMDS-AI using companies Introduction The IMDS Advanced Interface Service (hereinafter also referred to as the IMDS-AI ) was developed

More information

ARTICLE 11. Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12)

ARTICLE 11. Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12) ARTICLE 11 Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12) 1 A.11.1 See also Appendices 30 and 30A as appropriate, for the notification and recording of: a) frequency

More information

WGA LOW BUDGET AGREEMENT

WGA LOW BUDGET AGREEMENT WGA LOW BUDGET AGREEMENT ( Company ) has read the Writers Guild of America ( WGA ) Low Budget Agreement (the Low Budget Agreement ). Company desires to produce (the Picture ) under the Low Budget Agreement.

More information

THE UNIVERSITY OF AUCKLAND INTELLECTUAL PROPERTY CREATED BY STAFF AND STUDENTS POLICY Organisation & Governance

THE UNIVERSITY OF AUCKLAND INTELLECTUAL PROPERTY CREATED BY STAFF AND STUDENTS POLICY Organisation & Governance THE UNIVERSITY OF AUCKLAND INTELLECTUAL PROPERTY CREATED BY STAFF AND STUDENTS POLICY Organisation & Governance 1. INTRODUCTION AND OBJECTIVES 1.1 This policy seeks to establish a framework for managing

More information

THE BIRTHS, DEATHS AND MARRIAGES REGISTRATION ACT, 1886 ARRANGEMENT OF SECTIONS

THE BIRTHS, DEATHS AND MARRIAGES REGISTRATION ACT, 1886 ARRANGEMENT OF SECTIONS THE BIRTHS, DEATHS AND MARRIAGES REGISTRATION ACT, 1886 ARRANGEMENT OF SECTIONS CHAPTER I PRELIMINARY SECTIONS 1. Short title and commencement. 2. Extent. 3. Definitions. 4. Saving of local laws. 5. Powers

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission July 2016 Contents ef Gas Demand Side Response Methodology Final Version UK Gas Transmission Background This document sets out the Gas Demand Side Response (DSR) Methodology which is required to be established

More information

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C Appeals Policy Council for the Accreditation of Educator Preparation 1140 19th Street, N.W., Suite 400 Washington, D.C. 20036 Website: caepnet.org Phone: 202.223.0077 July 2017 Document Version Control

More information

SUB: EMPANELMENT OF CONSULTANCY AGENCIES FOR BUILDING PROJECTS/WORKS.

SUB: EMPANELMENT OF CONSULTANCY AGENCIES FOR BUILDING PROJECTS/WORKS. M/s ----------------------------------------- ----------------------------------------- ------------------------------------------- SUB: EMPANELMENT OF CONSULTANCY AGENCIES FOR BUILDING PROJECTS/WORKS.

More information

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

Type Approval JANUARY The electronic pdf version of this document found through  is the officially binding version STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

Statement of the Communications Authority

Statement of the Communications Authority Statement of the Communications Authority Assignment of Spectrum to Hong Kong Commercial Broadcasting Company Limited and Metro Broadcast Corporation Limited for the Provision of their Licensed Analogue

More information

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007. Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

25 July 2017 Without prejudice [PROVISIONS IN RELATION TO TRADE IN GOODS ALREADY INCLUDED IN THE EU TEXT PROPOSAL FOR THE TRADE IN GOODS CHAPTER]

25 July 2017 Without prejudice [PROVISIONS IN RELATION TO TRADE IN GOODS ALREADY INCLUDED IN THE EU TEXT PROPOSAL FOR THE TRADE IN GOODS CHAPTER] 25 July 2017 Without prejudice This document is the European Union's (EU) proposal for legal text provisions on energy and raw materials in the EU-Indonesia FTA. It will be tabled for discussion with Indonesia.

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

CHAPTER 309 THE BIRTHS AND DEATHS REGISTRATION ACT. Arrangement of Sections.

CHAPTER 309 THE BIRTHS AND DEATHS REGISTRATION ACT. Arrangement of Sections. CHAPTER 309 THE BIRTHS AND DEATHS REGISTRATION ACT. Arrangement of Sections. Section 1. Interpretation. PART I INTERPRETATION. PART II BIRTHS AND DEATHS REGISTRATION DISTRICTS. 2. Births and deaths registration

More information

S 0342 S T A T E O F R H O D E I S L A N D

S 0342 S T A T E O F R H O D E I S L A N D LC000 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - SMALL CELL SITING ACT Introduced By: Senators DiPalma,

More information

Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR

Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR Agenda for the 31 st Western Region constituents regarding Connectivity/LTA Applications to be held on 24.10.2018 1.0 Minutes of the 30th Western Region constituents regarding Connectivity / LTA Applications

More information

MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT

MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT Dated CORNWALL STODART LAWYERS PERSON SPECIFIED IN THE ORDER FORM (OVERLEAF) CORNWALL STODART Level 10 114 William Street DX 636 MELBOURNE VIC 3000

More information

CITY OF RICE LAKE COUNTY OF ST. LOUIS ORDINANCE NO. 52 AN ORDINANCE REGULATING SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY.

CITY OF RICE LAKE COUNTY OF ST. LOUIS ORDINANCE NO. 52 AN ORDINANCE REGULATING SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY. CITY OF RICE LAKE COUNTY OF ST. LOUIS ORDINANCE NO. 52 AN ORDINANCE REGULATING SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY. The City Council of the City of Rice Lake hereby ordains: Section

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage

More information

KKR & CO. L.P. FORM 8-K. (Current report filing) Filed 11/03/10 for the Period Ending 11/02/10

KKR & CO. L.P. FORM 8-K. (Current report filing) Filed 11/03/10 for the Period Ending 11/02/10 KKR & CO. L.P. FORM 8-K (Current report filing) Filed 11/03/10 for the Period Ending 11/02/10 Address 9 WEST 57TH STREET, SUITE 4200 NEW YORK, NY 10019 Telephone 212-750-8300 CIK 0001404912 Symbol KKR

More information

Spectrum Licence Wireless Cable Service (500 & 600 MHz Band)

Spectrum Licence Wireless Cable Service (500 & 600 MHz Band) Fairness ~ Innovation ~ Integrity Spectrum Licence Wireless Cable Service (500 & 600 MHz Band) Licensee: World on Wireless Limited Address: P.O. Box HM 1097 Hamilton HM EX Licence Number: 021-WCS-05 Issue

More information

THE HILLCREST VILLAGE HOMEOWNERS ASSOCIATION, INC. RULES FOR INSTALLATION OF ANTENNAS

THE HILLCREST VILLAGE HOMEOWNERS ASSOCIATION, INC. RULES FOR INSTALLATION OF ANTENNAS THE HILLCREST VILLAGE HOMEOWNERS ASSOCIATION, INC. RULES FOR INSTALLATION OF ANTENNAS I. Preamble These rules are adopted by the Board of Directors of The Hillcrest Village Homeowners Association, Inc.,

More information

DNVGL-CG-0214 Edition September 2016

DNVGL-CG-0214 Edition September 2016 CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by

More information

GAME RULES FOR DRAW-BASED GAMES PLAYED INTERACTIVELY. Issue 5 August 2018 INTRODUCTION

GAME RULES FOR DRAW-BASED GAMES PLAYED INTERACTIVELY. Issue 5 August 2018 INTRODUCTION GAME RULES FOR DRAW-BASED GAMES PLAYED INTERACTIVELY Issue 5 August 2018 INTRODUCTION These Game Rules have been approved by the Regulator of the National Lottery in accordance with Section 45 of the National

More information

Xena Exchange Users Agreement

Xena Exchange Users Agreement Xena Exchange Users Agreement Last Updated: April 12, 2018 1. Introduction Xena Exchange welcomes You ( User ) to use Xena Exchange s online software ( Xena s Software ) described herein in accordance

More information

ODISHA CONSTRUCTION CORPORATION LTD. (A GOVT. OF ODISHA UNDERTAKING) CENTRAL WORKSHOP,RASULGARH, BHUBANESWAR (ODISHA)

ODISHA CONSTRUCTION CORPORATION LTD. (A GOVT. OF ODISHA UNDERTAKING) CENTRAL WORKSHOP,RASULGARH, BHUBANESWAR (ODISHA) ODISHA CONSTRUCTION CORPORATION LTD. (A GOVT. OF ODISHA UNDERTAKING) CENTRAL WORKSHOP,RASULGARH, BHUBANESWAR-751010 (ODISHA) TENDER DOCUMENT FOR SUPPLY OF HEX HEAD BOLT, NUT, SCREW, WASHER, CONICAL HEAD

More information

Independence - Freedom - Happiness. Hanoi, 20 March 1996

Independence - Freedom - Happiness. Hanoi, 20 March 1996 NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 20 March 1996 MINERAL LAW Being natural resources which are an important asset of the nation and which are generally

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...

More information

PACT. agreement. The Writers Guild of Great Britain is a trade union registered at 134 Tooley Street, London SE1 2TU

PACT. agreement.   The Writers Guild of Great Britain is a trade union registered at 134 Tooley Street, London SE1 2TU PACT agreement www.writersguild.org.uk The Writers Guild of Great Britain is a trade union registered at 134 Tooley Street, London SE1 2TU MINIMUM TERMS AGREEMENT Between The Writers Guild of Great Britain

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document Version 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying the definition.

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

MERC/OA Practice Directions/2017/ March, MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016

MERC/OA Practice Directions/2017/ March, MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016 MERC/OA Practice Directions/2017/01651 8 March, 2017 MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016 Preamble Issues PRACTICE DIRECTIONS PROCESSING OF OPEN ACCESS APPLICATIONS

More information

https://www.icann.org/en/system/files/files/interim-models-gdpr-compliance-12jan18-en.pdf 2

https://www.icann.org/en/system/files/files/interim-models-gdpr-compliance-12jan18-en.pdf 2 ARTICLE 29 Data Protection Working Party Brussels, 11 April 2018 Mr Göran Marby President and CEO of the Board of Directors Internet Corporation for Assigned Names and Numbers (ICANN) 12025 Waterfront

More information

STATE LOTTERIES ACT 1966 LOTTERIES (SET FOR LIFE) RULES

STATE LOTTERIES ACT 1966 LOTTERIES (SET FOR LIFE) RULES STATE LOTTERIES ACT 1966 LOTTERIES (SET FOR LIFE) RULES This consolidation is of effect as at 27 October 2016. It is provided for convenient reference only and regard should be had to the full text of

More information

THE REAL ESTATE COUNCIL OF BRITISH COLUMBIA. IN THE MATTER OF THE REAL ESTATE SERVICES ACT S.B.C. 2004, c. 42 as amended AND IN THE MATTER OF

THE REAL ESTATE COUNCIL OF BRITISH COLUMBIA. IN THE MATTER OF THE REAL ESTATE SERVICES ACT S.B.C. 2004, c. 42 as amended AND IN THE MATTER OF File #15-469 THE REAL ESTATE COUNCIL OF BRITISH COLUMBIA IN THE MATTER OF THE REAL ESTATE SERVICES ACT S.B.C. 2004, c. 42 as amended AND IN THE MATTER OF COLLEEN MARIE FLORIS (102815) CONSENT ORDER RESPONDENT:

More information