Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR

Size: px
Start display at page:

Download "Location of Generating Station. Seeking Connectivity (MW) Raigarh, Chhattisgarh WR"

Transcription

1

2

3

4

5 Agenda for the 31 st Western Region constituents regarding Connectivity/LTA Applications to be held on Minutes of the 30th Western Region constituents regarding Connectivity / LTA Applications The Minutes of the 30 th Meeting of Western Region constituents regarding Long Term Access and Connectivity applications held on were issued vide letter dated No comments/observations have been received; accordingly the minutes may kindly be confirmed. 2.0 Agenda for grant of ISTS connectivity to LARA STPP Stage-II (2x800MW) of NTPC Ltd. (Application no ) 1) M/s NTPC Ltd. was granted connectivity to its Lara STPP-I generation project (2x800MW) located in Chhattisgarh vide intimation dated The above connectivity was granted through Lara STPP I Raigarh (Kotra) PS 400kV D/c line. Further, Long Term Access (LTA) for transfer of MW power from the Lara-I project to various beneficiaries in WR was granted to NTPC Ltd. vide intimation dated Lara STPP I Champa PS 400kV D/c (quad) line was identified for grant of LTA (along with other transmission elements). 2) M/s NTPC Ltd. has submitted the connectivity application no dated for grant of connectivity to its additional 2x800MW Lara STPP-II generation project. The Connectivity has been sought from The details of the application are given below: Sl.No 1 Name of the Applicant NTPC Ltd. (2x800MW Lara Stage-II Project) Location of Generating Station Raigarh, Chhattisgarh WR Seeking Connectivity (MW) Date from which Connectivity required Comm. Schedule ) System studies reveal that injection of additional 1600MW at the existing switchyard of Lara STPP-I generation project, which is connected both to Raigarh (Kotra) and Champa pooling stations, leads to the issue of high fault current at Raigarh (Kotra) PS (i.e. beyond the design rating of 50kA). It is also observed that majority of fault contribution comes from Champa PS through Champa PS Lara STPP (Stage-I & II) Raigarh (Kotra) 400kV D/c line. 4) In view of the above, it is proposed to provide connectivity to Lara STPP Stage-II project at Raigarh (Kotra) PS as per the arrangement given below: 1

6 Agenda for 31 st meeting of WR constituents for Connectivity & LTA Applications i. Shifting of Lara STPP I - Raigarh(Kotra) 400kV D/c line to Lara STPP-II bus so as to form Lara STPP II Raigarh (Kotra) 400kV D/c line along with associated bays at generation end ii. Lara STPP II - Raigarh(Kotra) 400kV (2 nd ) D/c line (new) along with associated bays at both ends 5) With the above arrangement, Lara STPP-I (2x800MW) shall remain connected to the ISTS through the existing Lara STPP I Champa PS 400kV D/c (quad) line (about 113km.) which shall be capable of evacuation of power from the Stage-I project. Further, it is proposed to keep the Lara STPP Stages I and II disconnected from each other in order to control the high short circuit level at Raigarh (Kotra) PS. 6) In view of the above, it is proposed to grant connectivity to NTPC Ltd. for its Lara STPP-II generation project with the transmission system given below (under the scope of NTPC Ltd.): i. Shifting of Lara STPP I - Raigarh(Kotra) 400kV D/c line to Lara STPP-II bus so as to form Lara STPP II Raigarh (Kotra) 400kV D/c line along with associated bays at generation end ii. Lara STPP II - Raigarh(Kotra) 400kV (2nd) D/c line (new) along with associated bays at both ends iii. Lara STPP-I & Lara STPP-II buses to be kept disconnected from each other under normal operating conditions With the above arrangement, the connectivity line of Lara STPP-I generation project of NTPC shall also stand revised as Lara STPP I Champa PS 400kV D/c (quad) line (existing). 3.0 Revocation of 1200MW connectivity granted to Pipavav Energy Pvt. Ltd. (PEPL) Pipavav Energy Pvt. Ltd. was granted connectivity and LTA for 1200MW vide intimation dated The LTA granted to M/s PEPL was revoked vide letter dated on account of non-signing of LTA Agreement. Further, it was informed to M/s PEPL vide the above letter that the grant of connectivity is also liable to be revoked unless it is submitted on affidavit (within 15 days) that sufficient progress has been achieved and the connectivity is likely to be used in a reasonable future (i.e. next 1 to 2 years). However, M/s PEPL is yet to submit the progress of its generating station. In view of the above, it is proposed to revoke the connectivity granted to M/s PEPL vide intimation dated Members may deliberate x x x x x x x x x x

Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR

Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in 1.0 Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity / Long Term Access

More information

Interface Energy Metering

Interface Energy Metering Interface Energy etering B C A D E Outline Need for etering List of Controls areas in WR Special Energy eter Regulatory Requirements Details of SEs in WR Drawal/Injection Computations Data processing at

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM

PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM 1 P a g e DRAFT VERSION: 14 th Dec, 2017 PROCEDURE FOR GRANT OF CONNECTIVITY FOR WIND / SOLAR/ WIND-SOLAR GENERATOR/DEVELOPER TO INTER-STATE TRANSMISSION SYSTEM 1. This Procedure is in accordance with

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai

2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 :May kindly chair the meeting 3. Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New

More information

TCN Ref: PSER:SCT:RKL-M1797:TCN-03 Date:

TCN Ref: PSER:SCT:RKL-M1797:TCN-03 Date: TN - 03 Ref: PSER:ST:RKL-M1797:TN-03 Date: 20-02-2017 Sub Tender hange Notice (TN) - 03 Job Design, Engineering, Manufacturing, Supply, Erection, Testing, ommissioning, Etc Of Air onditioning System For

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the Special Meeting held on 21 st June, 2017 at TPCIL plant in Nellore w.r.t. perturbations at their plant in Nellore in the recent past A. Introduction

More information

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM BY MR. H. C. MEHTA AT 1 ST INDIA DOBLE PROTECTION AND AUTOMATION CONFERENCE, NOV 2008 POWER-LINKER Wisdom is not Virtue but Necessity hcmehta@powerlinker.org

More information

INCENTIVE FOR TRANSMISSION EFFICIENCY

INCENTIVE FOR TRANSMISSION EFFICIENCY INCENTIVE FOR TRANSMISSION EFFICIENCY - T. UMESH, SEE, RETD. KPTCL - & - N. RAGHUPRAKASH, EE, RA, KPTCL IN THIS SESSION Brief introduction to Transmission System Efficiency Parameters in Transmission Activity

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY GRID CODE 2010 BIHAR ELECTRICITY REGULATORY COMMISSION Grid Code Clause Title Page No. CHAPTER - 1 - GENERAL CODE SECTION-1: General 1.1 Introduction..

More information

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project General Technical Specifications of Converters for Tokyo-Chubu Interconnection Project Note: It is possible that the contents of these specifications may be changed according to our detailed studies. Present

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses

Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission

More information

IN THE DISPUTES TRIBUNAL [2013] NZDT 37 APPLICANT RESPONDENT ORDER OF THE DISPUTES TRIBUNAL

IN THE DISPUTES TRIBUNAL [2013] NZDT 37 APPLICANT RESPONDENT ORDER OF THE DISPUTES TRIBUNAL IN THE DISPUTES TRIBUNAL [2013] NZDT 37 BETWEEN ABH APPLICANT AND ZYV Ltd RESPONDENT Date of Order: 28 May 2013 Referee: Referee A Davidson ORDER OF THE DISPUTES TRIBUNAL The Tribunal hereby orders that

More information

138kV / 13.8kV Substation Protection and Control Design Project

138kV / 13.8kV Substation Protection and Control Design Project 138kV / 13.8kV Substation Protection and Control Design Project Final Report Team Client Team Advisor Team Members Team Email Team Website : sdmay18-06 : Black & Veatch :Dr. Ajjarapu : Andrew Brown Gavin

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Interface Energy Metering- Experience and Expectations

Interface Energy Metering- Experience and Expectations Interface Energy Metering- Experience and Expectations Vivek Pandey Akhil Gupta Ch Jagadeesh Workshop on Technical and Testing Challenges for Smart Meters 03/11/2017 1 Contents Background WR-ISTS metering

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

CIGRE SC B1 Colloquium on H.V. Insulated Cables New Delhi (India) on Oct. 2017

CIGRE SC B1 Colloquium on H.V. Insulated Cables New Delhi (India) on Oct. 2017 CIGRE SC B1 Colloquium on H.V. Insulated Cables New Delhi (India) on 13-14 Oct. 2017 Challenges in Planning and Design of Cable Transmission System of Pugalur North Trichur HVDC System- Users Perspective

More information

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C Appeals Policy Council for the Accreditation of Educator Preparation 1140 19th Street, N.W., Suite 400 Washington, D.C. 20036 Website: caepnet.org Phone: 202.223.0077 July 2017 Document Version Control

More information

Constant Terminal Voltage. Working Group Meeting 4 19 th September 2014

Constant Terminal Voltage. Working Group Meeting 4 19 th September 2014 Constant Terminal Voltage Working Group Meeting 4 19 th September 014 Overview Options summary System under investigation Options analysis Discussion Options Option 1 Constant Terminal Voltage controlled

More information

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team. December 7 th, 2010 NPCC Full Member Committee; Please find attached a draft revised NPCC Regional Reliability Directory #12 Underfrequency Load Shedding Program Requirements and a draft revised NPCC UFLS

More information

Summary of Relaying Reviews Reporting

Summary of Relaying Reviews Reporting Revised Attachment B (Agenda Item 6) Summary of Relaying Reviews -- 12-31-04 Reporting This form shall be used without modification to provide a summary of relaying reviews performed by each Transmisission

More information

EDS GRID AND PRIMARY SUBSTATION CIVIL DESIGN STANDARDS

EDS GRID AND PRIMARY SUBSTATION CIVIL DESIGN STANDARDS Document Number: EDS 07-0105 ENGINEERING DESIGN STANDARD EDS 07-0105 GRID AND PRIMARY SUBSTATION CIVIL DESIGN STANDARDS Network(s): Summary: EPN, LPN, SPN This design standard details the current civil

More information

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS

NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR-440022 TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS At NPTI (WR), NAGPUR, MAHARASHTRA 1 NATIONAL POWER TRAINING

More information

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements NPCC Regional Reliability Reference Directory # 12 Under frequency Load Shedding Program Requirements Task Force on System Studies Revision Review Record: June 26 th, 2009 March 3 rd, 2010 Adopted by the

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

GridLiance Reliability Criteria

GridLiance Reliability Criteria GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances

More information

Terrestrial Radiocommunication Agreements and Arrangements

Terrestrial Radiocommunication Agreements and Arrangements Spectrum Management Terrestrial Radiocommunication Agreements and Arrangements Agreement Regarding the Use of Frequency Bands 150.050-162.000 MHz, 451.500-454.500 MHz, and 456-460 MHz Paired with 466-470

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

VOLUME - 4 (GENERAL TECHNICAL SPECIFICATIONS)

VOLUME - 4 (GENERAL TECHNICAL SPECIFICATIONS) TENDER DOCUMENT NIT No. DLI/C&E/WI-665/535R FOR Tender for Supply of 3CX185 mm2, 11 KV (UE) grade, Power Cable for Augmentation of Raw Material Handling Receipt and Handling Facilities with new OHP Part

More information

Working Party 5D. Radiocommunication Study Groups 参考資料 2

Working Party 5D. Radiocommunication Study Groups 参考資料 2 参考資料 2 Radiocommunication Study Groups Source: Document 5D/TEMP/357(Rev.1) Document IMT-ADV/24-E 27 July 2010 English only Working Party 5D PROCESS AND THE USE OF GLOBAL CORE SPECIFICATION (GCS), REFERENCES

More information

BritNed Interconnector between Holland and England. Methodology Statement for Determination of System-to-System Flows

BritNed Interconnector between Holland and England. Methodology Statement for Determination of System-to-System Flows BritNed Interconnector between Holland and England Methodology Statement for Determination of System-to-System Flows 1. Requirement for Methodology Statement 1.1 This Methodology Statement is produced

More information

SELECTING NATIONAL MW BOUNDARIES

SELECTING NATIONAL MW BOUNDARIES SELECTING NATIONAL MW BOUNDARIES ENTSO-E guidance document for national implementation for network codes on grid connection 16 November 2016 Table of Contents DESCRIPTION...2 Codes(s) and Article(s)...2

More information

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades CHERRY HILLS VILLAGE COLORADO Electrical requirements for plans on all new homes, additions, remodels & Service upgrades Due to the size and uniqueness of homes built in Cherry Hills Village, a policy

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

Transformers connected via a cable Overvoltage protection

Transformers connected via a cable Overvoltage protection A P P L I C AT I O N N OT E 2. 1 Transformers connected via a cable Overvoltage protection The APPLICATION NOTES (AN) are intended to be used in conjunction with the APPLICATION GUIDELINES Overvoltage

More information

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

GENERAL TECHNICAL SPECIFICATION (Turnkey Work) GENERAL TECHNICAL SPECIFICATION (Turnkey Work) March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,

More information

Industry Webinar Draft Standard

Industry Webinar Draft Standard Industry Webinar Draft Standard Project 2010-13.2 Phase 2 of Relay Loadability: Generation PRC-025-1 Generator Relay Loadability December 13, 2012 Agenda Welcome, Introductions and Administrative NERC

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28GHz The spectrum authorised under this Licence was formerly authorised under licences issued by Ofcom on 05 July

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date R0B0 For Comments Yaoyu Huang February 10, 2016 R0 For Issuance Yaoyu Huang February 29, 2016 Transformer rating description

More information

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

Level 6 Graduate Diploma in Engineering Electrical Energy Systems 9210-114 Level 6 Graduate Diploma in Engineering Electrical Energy Systems Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler,

More information

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG

More information

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Mr.S.B.Dandawate*, Mrs.S.L.Shaikh** *,**(Department of Electrical Engineering, Walchand College of

More information

Madhya Pradesh Electricity Grid Code (Revision-I), 2005 (No.RG-14(i) of 2005)

Madhya Pradesh Electricity Grid Code (Revision-I), 2005 (No.RG-14(i) of 2005) Bhopal, Dated: 24 th October, 2005 No.2506/MPERC/2005. In exercise of powers under Section 86(1) (h) of the Electricity Act 2003, MPERC specifies the Madhya Pradesh Electricity Grid Code (Revision 1),

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit) Incentive Guidelines Aid for Research and Development Projects (Tax Credit) Issue Date: 8 th June 2017 Version: 1 http://support.maltaenterprise.com 2 Contents 1. Introduction 2 Definitions 3. Incentive

More information

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Meeting Date: 27.03.2017 Time: 1430 Hrs Venue: NRPC Conference

More information

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions

More information

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

Collaboration Agreement

Collaboration Agreement Collaboration Agreement Central London, West London, Hammersmith & Fulham, Hounslow, Ealing Clinical Commissioning Groups January 2014 Version 5 1 Context In December 2011 the eight North West London (NWL)

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated

More information

POWER UPGRADATION AND POSSIBILITY OF SMALL POWER TAPPING FROM COMPOSITE AC- DC TRANSMISSION SYSTEM

POWER UPGRADATION AND POSSIBILITY OF SMALL POWER TAPPING FROM COMPOSITE AC- DC TRANSMISSION SYSTEM Int. J. Elec&Electr.Eng&Telecoms. 2013 K Shobha Rani and C N Arpitha, 2013 Research Paper ISSN 2319 2518 www.ijeetc.com Vol. 2, No. 3, July 2013 2013 IJEETC. All Rights Reserved POWER UPGRADATION AND POSSIBILITY

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Corporate Office, Sardar Patel Vidyut Bhavan, Race Course, VADODARA 390 007. TECHNICAL SPECIFICATIONS OF CVT / COUPLING CAPACITOR STRUCTURE SPECIAL INSTRUCTIONS

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

Small Cell Design Review and Inspection Process Page 1

Small Cell Design Review and Inspection Process Page 1 / Joint Pole Small Cell Design Review and Process Page V Submit Small Cell Application for Point of Connection Submit Make Ready Application to the Joint Pole for Pole Attachment Redesign 9 compliance

More information

G59 and G83 Protection Requirements

G59 and G83 Protection Requirements G59 and G83 Protection Requirements Stakeholder Workshop 25 th April 2013, Glasgow 1 Energy Networks Association Introduction Graham Stein Technical Policy Manager Network Strategy National Grid graham.stein@nationalgrid.com

More information

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

APPLICATION NOTES. Electrical Fast Transient (EFT) Noise Test Solution ELAN MICROELECTRONICS CORP.

APPLICATION NOTES. Electrical Fast Transient (EFT) Noise Test Solution ELAN MICROELECTRONICS CORP. Electrical Fast Transient (EFT) Noise Test Solution APPLICATION NOTES ELAN MICROELECTRONICS CORP. Document Number : AN-025 Date of Issue : March 2007 Issue Version : 1.0 Supported Chips : OTP Type: EM78P341N

More information

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems Summary for Call for Nominations 1. Background and scope ITER will be the world's largest experimental facility to demonstrate

More information

Certification of EXPLOSION PROTECTED ELECTRICAL EQUIPMENT

Certification of EXPLOSION PROTECTED ELECTRICAL EQUIPMENT Certificate of Conformity Certificate No: ANZEx 11.2009 Issue: 0 16 December 2011 Original Issue Applicant: Pepperl+Fuchs GmbH Lilienthalstrasse 200 68307 Mannheim GERMANY Electrical Equipment: Isolation

More information

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date: TCN 01 Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date: 21-02-2011 Sub Tender Change Notice (TCN- 01). Job Identification & Receipt of materials, Erection, Testing, Commissioning, Handing over etc

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

EDS KV TRIPLEX CABLE RATING

EDS KV TRIPLEX CABLE RATING Document Number: EDS 02-0027 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 02-0027 11KV TRIPLEX CABLE RATING This engineering design standard provides the cable ratings and important

More information

' -- [~III-~4] 7 New Delhi, the 30th September, 2013 File No.12/X/STD(CONN)/GM/CEA.-Whereas draft of the Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation

More information

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents Page: 1 Electrical Transient Analyzer Program Short Circuit Analysis ANSI Standard 3-Phase Fault Currents Number of Buses: Swing Generator Load Total 1 0 4 5 Number of Branches: XFMR2 XFMR3 Reactor Line/Cable

More information

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697.

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697. ADDENDUM No. AERC. 396/2012/Pt.-III/4.-Assam Electricity Regulatory commission (Terms and Conditions for determination of Multi Year tariff) Regulations, 2015 issued vide notification No. AERC.396/2012/Pt/-II/13

More information

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date

More information

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4 Philadelphia University Faculty of Engineering Dept. of Electrical Engineering Student Name: Student Number: Final Exam Course Title: Design of T&D System Date: 15 th June 2016 Course No: 610 515/650511

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

OPERATING PROCEDURE. Table of Contents

OPERATING PROCEDURE. Table of Contents Table of Contents PURPOSE... 1 1.0 CAISO DISPATCHER RESPONSIBILITIES... 2 Monitor Loads and Generators... 2 Monitor Balancing Areas... 2 Operate CAISO Controlled Grid Voltage Equipment... 3 Voltage Schedules...

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

Relion 605 series. Self-Powered Feeder Protection REJ603 Application manual

Relion 605 series. Self-Powered Feeder Protection REJ603 Application manual Relion 605 series Relion 605 series Relion 605 series Self-Powered Feeder Protection REJ603 Application manual Document ID: 1MDU07206-YN 6 2 4 This document and parts thereof must not be reproduced or

More information

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework

More information

Effect of Series Capacitor on Line Protection - A Case Study

Effect of Series Capacitor on Line Protection - A Case Study 112 NATIONAL POWER SYSTEMS CONFERENCE, NPSC 22 Effect of Series Capacitor on Line Protection - A Case Study Anand Mohan, Vikas Saxena, Mukesh Khanna & V.Thiagarajan Abstract: Series compensation is a time

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table

More information

DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM

DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM H. Huang V. Ramaswami D. Kumar Siemens AG Power Transmission and Distribution 91056 Erlangen, Germany TransGrid Solutions Inc., Winnipeg, Canada INTRODUCTION

More information

J. HENRY SCHRODER BANK & TRUST COMPANY N/K/A IBJ SCHRODER BANK & TRUST COMPANY TAT (E) (CR) - ORDER

J. HENRY SCHRODER BANK & TRUST COMPANY N/K/A IBJ SCHRODER BANK & TRUST COMPANY TAT (E) (CR) - ORDER J. HENRY SCHRODER BANK & TRUST COMPANY N/K/A IBJ SCHRODER BANK & TRUST COMPANY - ORDER -07/03/96 J. HENRY SCHRODER BANK & TRUST COMPANY N/K/A IBJ SCHRODER BANK & TRUST COMPANY TAT (E) 93-117 (CR) - ORDER

More information

State of Shimane Nuclear Power Station

State of Shimane Nuclear Power Station Investors Meeting for FY2017 Financial Results State of Shimane Nuclear Power Station May 11, 2017 The Chugoku Electric Power Co., Inc. 1. Process of Compliance Examinations 1 In December 2013, we submitted

More information

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU Technology solutions and innovations for developing economies Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT

More information

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28 GHz This Licence replaces the version of the licence issued by Ofcom on 18 February 2016 to UK Broadband Limited.

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

Guaranteed Dmax (MW) at Year 1-10 (See note 2 below)

Guaranteed Dmax (MW) at Year 1-10 (See note 2 below) PG&E 2016 ES RFO Appendix E2 PG&E Owned Photovoltaic Site Information Site Gates 17115 W. Gale Ave Huron, CA 93234 Huron (see note 3) Corner of West Gale Avenue and South Lassen Ave (Hwy 269), Huron, CA

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2014-03-31 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information