1 ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst Regional Criteria may also address issues not within the scope of reliability standards, ReliabilityFirst Regional Criteria may include specific acceptable operating or planning parameters, guides, agreements, protocols or other documents used to enhance the reliability of the regional Bulk Electric System. ReliabilityFirst Regional Criteria will typically provide benefits by promoting more consistent implementation of the NERC reliability standards within the Region. ReliabilityFirst Regional Criteria are not NERC reliability standards, regional reliability standards, or regional variances, and therefore are not enforceable under authority delegated by NERC pursuant to delegation agreements and do not require NERC approval.
2 A. Introduction 1. Title: Disturbance Monitoring and Reporting Criteria 2. Number: RFC_Criteria_PRC Purpose: To establish ReliabilityFirst criteria for Disturbance monitoring and reporting to support NERC Reliability Standard PRC Applicability: 4.1 Transmission Owners 4.2 Generator Owners 5. Effective Date: 08/2/2012 B. Criteria 2 C1 Transmission Owners and Generator Owners should ensure that equipment is installed on their respectively owned equipment as recommended below which is capable of sequence of events (SOE) recording that conforms to the following minimum criteria: C1.1 Criteria for location of SOE recording capability C1.1.1 Equipment capable of recording SOE should be installed at any substation or generating plant having any of the following attributes: Substations containing any combination of three or more Elements consisting of Transmission Lines (operated at 200 kv or above) and transformers (having primary and secondary voltage ratings of 200 kv or above). A generating unit step up transformer(s) connected at 200 kv or above to either a generating plant having a single generating unit of 250 MVA or higher nameplate rating or an aggregate plant total nameplate capacity of 750 MVA or higher.. C1.1.2 At locations requiring SOE recording per C1.1.1, the opening and closing of breaker auxiliary contacts should be recorded or the opening and closing of each circuit breaker should be derived for the change in circuit breaker position for each circuit breaker at 200 kv or above, on the following system Elements should be monitored: 2 Time synchronization requirements are specified in NERC PRC Transmission Lines operated at 200 kv or BOD Approved: 08/2/2012 Page 2 of
3 Transmission buses operated at 200 kv or Transformers having primary and secondary voltage rating of 200 kv or Generating unit step up transformers connected at 200 kv or C1.2 SOE recording equipment should be capable of determining and recording the time that an input is received to within ¼ of an electrical cycle (or less) of input change of state. C1.3 SOE recording equipment should have time stamp capability to record seconds to at least three decimal places (i.e. ss.000). C2 Transmission Owners and Generator Owners should ensure that equipment is installed on their respectively owned equipment as recommended below which is capable of Fault recording that conforms to the following minimum criteria: C2.1 Criteria for location of Fault recording capability C2.1.1 Equipment capable of Fault recording should be installed at any substation or generating plant having any of the following attributes: Substations containing any combination of three or more Elements consisting of Transmission Lines (operated at 200 kv or above) and transformers (having primary and secondary voltage ratings of 200 kv or above). A generating unit step up transformer(s) connected at 200 kv or above to either a generating plant having a single generating unit of 250 MVA or higher nameplate rating or an aggregate plant total nameplate capacity of 750 MVA or higher. C2.1.2 At locations requiring Fault recording per C2.1.1, the electrical quantities on the following system Elements should be monitored: Transmission Lines operated at 200 kv or Transmission buses operated at 200 kv or Transformers having primary and secondary voltage rating of 200 kv or Generating unit step up transformers connected at 200 kv or These transformers may be monitored at either voltage level. If the generating unit step up transformer is monitored at the lower voltage level it should also record BOD Approved: 08/2/2012 Page 3 of
4 the transformer neutral current in addition to quantities specified in C2.2. C2.2 Electrical quantities to be recorded for each monitored Element should be sufficient to determine the following: C2.2.1 The three phase to neutral voltages on a grounded system or the three phase to phase voltages on an ungrounded system (e.g. if a Generation Owner opts to monitor the generating unit step up transformer on the delta side) on: C C C The monitored line or outer buses for breaker-anda-half bus arrangements, or The monitored line for ring bus arrangement, or The monitored bus for other bus arrangements. C2.2.2 The three phase currents and the residual or neutral currents of each monitored line and transformer C2.2.3 Polarizing currents, if used. C2.2.4 Frequency. C2.2.5 Megawatts and megavars. C2.3 Technical criteria, include the following: C2.3.1 Fault recording equipment should record at least two-cycles of pre-trigger data. C2.3.2 Fault recording equipment should record any one of the following: A post trigger record length of at least 50 cycles, or The first three cycles of an event and the final cycle of an event, using either a single continuous record or multiple triggered records. C2.3.3 Fault recording equipment should have a minimum recording rate of 16 samples per cycle. C2.3.4 Fault recording equipment triggering parameters should include one or more of following analog values: Negative sequence voltage. Negative sequence current. Zero sequence current (tertiary or residual). Under voltage. BOD Approved: 08/2/2012 Page 4 of
5 Over voltage. Over current. and also one or more of the following digital values: DC trip buses. Circuit breaker contact opening. Protective relay operation. C3 Transmission Owners and Generator Owners should ensure that equipment is installed on their respectively owned equipment as recommended below which is capable of dynamic disturbance recording and conforms to the following minimum criteria: C3.1 Transmission Owners should ensure C3.1.1 Equipment capable of dynamic disturbance recording should be located at Transmission Substations as follows. However, a Dynamic Disturbance Recorder (DDR) which is recommended at a Transmission Substation per criteria C through C should be considered optional if a DDR (meeting all criteria of C3.3 through C3.4) is found to be located one or two Transmission Substations away at a common voltage level. C C C C C Transmission Substations having a total of seven or more Transmission Lines (excluding transformers) connected at 200 kv or Transmission Substations connecting to another Balancing Authority or Reliability Coordinator at 345 kv or At least one DDR within a major metro area having a total maximum load of 2,500 MW or higher. All Elements at 345 kv or above associated with Interconnection Reliability Operating Limits (IROLs). At least one DDR within an area that has an Under- Voltage Load Shedding program installed to which NERC PRC-021 applies. C3.1.2 DDRs should record at least one phase of the following system Elements connected to the Transmission Substations referenced in C Voltage and/or current recordings should be from the same phase(s). C All Transmission Lines connected at 200 kv or BOD Approved: 08/2/2012 Page 5 of
6 C Transformers with both primary and secondary windings connected at 200 kv or C3.2 Generator Owners should ensure that: C3.2.1 Equipment capable of dynamic disturbance recording should record at least one phase of the high or low side of each generating unit step up transformer(s) greater than 250 MVA nameplate rating connected at 200 kv and above for at least the following: C C A single generating unit of 1,000 MVA or higher nameplate rating or Multiple generating units in a plant having a total nameplate capacity of 2,000 MVA or higher. C3.3 Electrical quantities to be recorded for each monitored Element should be sufficient to determine the following: C3.3.1 Bus Voltage (at least one per voltage level of 200 kv or above at each DDR location). C3.3.2 Frequency (at least one per DDR location). C3.3.3 Line Current. C3.3.4 MW and MVAR flows expressed on a three-phase basis (per each monitored line or transformer). C3.4 DDRs should have the following technical criteria: C3.4.1 Any new DDRs should have the capability of continuous recording. C3.4.2 Existing DDRs which do not have continuous recording capability should be triggered according to the following: C C C DDRs should be capable of rate-of-change of frequency and rate-of-change of voltage triggers. Oscillation triggers, if available, should be set to trigger for low frequency oscillations in 0.1 to 4.0 Hz range. DDRs should be capable of recording minimum record lengths of not less than three minutes. BOD Approved: 08/2/2012 Page 6 of
7 C3.4.3 Sample data at a rate of at least 60 samples per second and should record the RMS value of electrical quantities at a rate of at least 6 records per second. C4 Transmission Owners and Generator Owners should ensure that the DME data from the DME on their respectively owned equipment is retrieved and reported as follows: C. Measures C4.1 For power system Faults, Protection System operations, and operating switching errors that causes Disturbances, the Disturbance Monitoring Equipment (DME) owner (Transmission Owner or Generator Owner) should collect Fault recording and sequence-of-events recording which directly monitors the affected power system Element. C4.2 When requested by ReliabilityFirst Corporation, the DME owner should collect all relevant dynamic disturbance recordings. C4.3 The DME owner should retain all data retrieved in accordance with C4.1 and C4.2 at least until the end of the third calendar year following the event. C4.4 The DME owner should provide all DME data to ReliabilityFirst Corporation within 30 calendar days of a request. C4.5 The data recorded by DME may be recorded in any format, including the device manufacturer s proprietary format. However, the equipment owner should, upon request, furnish the data to ReliabilityFirst Corporation in a format such that any software system capable of viewing and analyzing COMTRADE (IEEE Std. C or successor) files may be used to process and evaluate the data. C4.5.1 Known delays in interposing relays should be reported with the SOE data. C4.6 Data files reported to ReliabilityFirst Corporation should be named in conformance with IEEE C37.232, Recommended Practice for Naming Time Sequence Data Files. M1 M2 M3 The Transmission Owner and Generator Owner should each have evidence that equipment capable of SOE recording is installed at all recommended locations and conforms to the minimum criteria. (C1) The Transmission Owner and Generator Owner should each have evidence that equipment capable of Fault recording is installed at all recommended locations and conforms to the minimum criteria. (C2) The Transmission Owner and Generation Owner should each have evidence that equipment capable of dynamic disturbance recording is installed at all recommended locations and conforms to the minimum criteria. (C3) BOD Approved: 08/2/2012 Page 7 of
8 M4 The Transmission Owner and Generator Owner should each have evidence that they retained and provided Disturbance data in accordance with the reporting criteria. (C4) D. Definitions The following definition has been extracted from IEEE standards. Substation - As defined by the IEEE C2-2002, (National Electric Safety Code) An enclosed assemblage of equipment, e.g. switches, circuit breakers, buses and transformers, under control of qualified persons, through which electric energy is passed for the purpose of switching or modifying its characteristics. D. IntraRegional Differences None E. Notes Version History Version Date Action Change Tracking 1 st Draft 2 nd Draft 3 rd Draft 4 th Draft 4 th Draft 5 th Draft 6 th Draft 7 th Draft 8 th Draft th Draft th Draft /28/06 Through 10/26/06 11/13/06 Through 12/11/06 01/24/07 Through 02/21/07 05/16/07 Through 05/30/07 06/06/07 Through 06/20/07 0/13/07 Through 10/12/07 11/05/07 Through 12/04/07 01/15/08 Through 02/13/08 03/13/08 Through 04/11/08 06/11/08 Through 06/25/08 06/26/08 Through 07/11/08 Posted for 1 st Comment Period Posted for 2 nd Comment Period Posted for 3 rd Comment Period Posted for 15-Days Prior to Membership Ballot Posted for 15-Day Membership Ballot Posted for 4 th Comment Period Posted for 5 th Comment Period Posted for 6 th Comment Period Posted for 7 th Comment Period Posted for 15-Days Prior to Category Ballot Posted for 15-Day Category Ballot BOD Approved: 08/2/2012 Page 8 of
9 10 th Draft 11 th Draft 11 th Draft 11 th Draft 11 th Draft RFC_Criteria_PR C-002-RFC-01 10/27/08 Through 11/25/08 02/03/0 Through 02/17/0 02/18/0 Through 03/04/0 Posted for 8 th Comment Period Posted for 15-Days Prior to Category Ballot Posted for 15-Day Category Ballot 05/14/0 ReliabilityFirst Board Approved 07/10/0 Removed (Proposed) from Effective Date section 08/2/12 ReliabilityFirst Board converted to Regional Criterion New naming convention,, removed mandatory language, removed VRFs, VSLs and compliance section BOD Approved: 08/2/2012 Page of
PRC Disturbance Monitoring and Reporting Requirements
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationPRC Compliance Using Bitronics 70 Series Recorders
PRC-002-2 Compliance Using Bitronics 70 Series Recorders Introduction The North American Electric Reliability Council (NERC) has defined standards for disturbance monitoring and reporting requirements
More informationAt generating sites with 1200MW or greater of installed generating capacity.
A. Introduction 1. 2. Number: 3. Purpose: To provide FRCC requirements for installation of Disturbance Monitoring Equipment (DME) and reporting of Disturbance data to facilitate analyses of events and
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description
More informationFinal ballot January BOT adoption February 2015
Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More informationRecently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.
December 7 th, 2010 NPCC Full Member Committee; Please find attached a draft revised NPCC Regional Reliability Directory #12 Underfrequency Load Shedding Program Requirements and a draft revised NPCC UFLS
More information(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in
A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability
More informationInterconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose
Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System NERC Synchronized Measurement Subcommittee (SMS) Scope Document Objective The objective of the
More informationStandard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection
Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationBulk Electric System Definition Reference Document
Bulk Electric System Definition Reference Document Version 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying the definition.
More informationBulk Electric System Definition Reference Document
Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk
More informationBulk Electric System Definition Reference Document
Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying
More informationFinal ballot January BOT adoption February 2015
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationStandard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC
A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-2 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units
More informationStandard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction
A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units
More informationStandard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationNPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements
NPCC Regional Reliability Reference Directory # 12 Under frequency Load Shedding Program Requirements Task Force on System Studies Revision Review Record: June 26 th, 2009 March 3 rd, 2010 Adopted by the
More informationStandard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationImplementation Plan Project Modifications to PRC Reliability Standard PRC-025-2
Project 2016-04 Modifications to PRC-025-1 Reliability Standard PRC-025-2 Applicable Standard PRC Generator Relay Loadability Requested Retirement PRC 025 1 Generator Relay Loadability Prerequisite Standard
More informationStandard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection
Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:
More informationNERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1
NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,
More informationAppendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS
Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements
More informationNERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell
Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series
More informationStandard Development Timeline
PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the
More informationgeneration greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics:
A. Introduction 1. Title: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions 2. Number: MOD-027-1 3. Purpose: To verify that the turbine/governor
More informationDUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning
DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationUnit Auxiliary Transformer (UAT) Relay Loadability Report
Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area
More informationIDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)
IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone
More informationUnit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition
Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table
More informationIndustry Webinar Draft Standard
Industry Webinar Draft Standard Project 2010-13.2 Phase 2 of Relay Loadability: Generation PRC-025-1 Generator Relay Loadability December 13, 2012 Agenda Welcome, Introductions and Administrative NERC
More informationStandard Development Timeline
PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated
More informationNERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell
Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June
More informationImplementation of Revised IEEE Standard 1547
MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed
More informationSetting and Verification of Generation Protection to Meet NERC Reliability Standards
1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several
More informationStandard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection
A. Introduction 1. Title: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection 2. Number: PRC-019-2 3. Purpose: To verify coordination of generating unit Facility
More informationGENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW
GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945
More informationA. Introduction. VAR Voltage and Reactive Control
A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4.2 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained
More informationVAR Voltage and Reactive Control
VAR-001-4 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are
More informationA Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several
More informationStandard BAL Frequency Response and Frequency Bias Setting
A. Introduction Title: and Frequency Bias Setting Number: BAL-003-1 Purpose: To require sufficient from the Balancing (BA) to maintain Interconnection Frequency within predefined bounds by arresting frequency
More informationVAR Voltage and Reactive Control. A. Introduction
VAR-001-5 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-5 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are
More informationSimulations of open phase conditions on the high voltage side of YNd05-power plant transformers
Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,
More informationConsideration of Comments on FRCC Regional Bulk Electric System Definition Clarification Project Version 1
Consideration of Comments on FRCC Regional Bulk Electric System Definition Clarification Project Version 1 The FRCC Bulk Electric System (BES) Definition Clarification Task Force (TF) thanks all commenter
More informationSeptember 19, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme
!! September 19, 2017 VIA ELECTRONIC FILING Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 RE: Errata to for the Revised Definition of Remedial
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES Document 9020 Puget Sound Energy, Inc. PSE-TC-160.50 December 19, 2016 TABLE OF CONTENTS
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationSYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011
SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 Baselining using large quantities of historical phasor data to identify and understand patterns in interconnection-wide grid behavior, to
More informationDefinition of Bulk Electric System Phase 2
Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order
More informationStandard MOD Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions
Standard MOD-026-1 Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions Standard Development Roadmap This section is maintained by the drafting team
More informationSystem Operating Limit Definition and Exceedance Clarification
System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion
More informationNORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE)
COORDONNATEUR DE LA FIABILITÉ Direction Contrôle des mouvements d énergie Demande R-3944-2015 NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE) Original : 2016-10-14 HQCMÉ-10, Document 2 (En liasse) Standard
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-4 3. Purpose: To ensure generators provide reactive support and voltage control, within generating
More informationLoss of Solar Resources during Transmission Disturbances due to Inverter Settings II
Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Informational Webinar on Level 2 NERC Alert Ryan Quint, Senior Manager, Advanced Analytics and Modeling Rich Bauer,
More informationMay 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_
May 30, 2018 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to for the Revised Definition of Remedial Action
More informationTransmission System Phase Backup Protection
Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need
More informationNORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:
NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information
More informationPJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016
PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6
More informationWECC Standard VAR-002-WECC-2 Automatic Voltage Regulators
Document Title File Name Category Document date Adopted/approved by Date adopted/approved Custodian (entity responsible for maintenance and upkeep) Stored/filed Previous name/number Status Automatic Voltage
More informationStandard VAR Voltage and Reactive Control
A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-3 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained within
More informationDocument C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting
Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December
More informationConsiderations for Power Plant and Transmission System Protection Coordination
Considerations for Power Plant and Transmission System Protection Coordination Technical Reference Document Revision 2 System Protection and Control Subcommittee July 2015 I Table of Contents Preface...
More informationImplementation of Automatic Under Voltage Load Shedding Program in Entergy System
Implementation of Automatic Under Voltage Load Shedding Program in Entergy System Sharma Kolluri, IEEE Fellow Manager, Transmission Planning Entergy Services, Inc. Presentation at i-pcgrid Workshop San
More informationBEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR
BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF PROPOSED RELIABILITY STANDARD
More informationIEEE sion/1547revision_index.html
IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html
More informationBabak Enayati National Grid Thursday, April 17
2014 IEEE PES Transmission & Distribution Conference & Exposition Impacts of the Distribution System Renewable Energy Resources on the Power System Protection Babak Enayati National Grid Thursday, April
More informationAugust 25, 2017 VIA ELECTRONIC FILING
!! August 25, 2017 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationArizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan
Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationATTACHMENT - AESO FUNCTIONAL SPECIFICATION
ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments
More informationConnection Impact Assessment Application
Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,
More informationeach time the Frequency is above 51Hz. Continuous operation is required
GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA
More informationConnection Impact Assessment Application Form
Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information
More information4.2.1 Generators Transformers Transmission lines. 5. Background:
PRC-026-1 Relay Performance During Stable Power Swings A. Introduction 1. Title: Relay Performance During Stable Power Swings 2. Number: PRC-026-1 3. Purpose: To ensure that load-responsive protective
More informationStandard MOD Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions
Standard MOD-026-1 Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions A. Introduction 1. Title: Verification of Models and Data for Generator Excitation
More informationAugust 25, Please contact the undersigned if you have any questions concerning this filing.
!! August 25, 2017 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric
More informationNERC Protection Coordination Webinar Series July 15, Jon Gardell
Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),
More informationPC IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases
PC57.13.3 IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases OUTLINE Scope References Need for grounding; Warning Definition of Instrument transformers Grounding secondary
More informationMassive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades
1 Massive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades Paper Number: 16PESGM2419 Marianna Vaiman, V&R Energy marvaiman@vrenergy.com 2016 IEEE PES General
More informationPower Plant and Transmission System Protection Coordination
Technical Reference Document Power Plant and Transmission System Protection Coordination NERC System Protection and Control Subcommittee Revision 1 July 2010 Table of Contents 1. Introduction... 1 1.1.
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL
More informationCapstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:
Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation
More informationVAR Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More information