1 Phone: (818) Fax: (818) Web: Technical Reference Capstone MicroTurbine Electrical Installation Rev F (October 2013) Page 1 of 31

2 Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Telephone: (818) Facsimile: (818) Website: Capstone Technical Support Telephone: (866) 4-CAPSTONE or (866) Rev F (October 2013) Page 2 of 31

3 Table of Contents 1. Introduction Reference Documents General Requirements Protective Earth (PE) / Chassis Ground Grounding the Microturbine Neutral Grounding Location Grounding Potential Overcurrent Protection & Disconnecting Devices Power Bay Connections MultiPac Power Connections Grid Connect Phase Sequence Transformer Applications and Impedance Allowable Connections Standalone Mode Output and Load Specification Phase Sequence Transformers for Highly Non-Linear Loads Transformer Sizing Recommendation Generic Diagrams of Isolation Transformer Installation Allowable Connections Dual Mode Installations Requiring 4-Pole Motorized Grid Breaker Allowable Connections C65 Hybrid UPS Surge Protection Device Allowable Connections Input Impedance Example 1: Model C30 - Considering 1 Microturbine Example 2: Model C65 - Considering 1 Microturbine Example 3: Considering 3 Microturbines Rev F (October 2013) Page 3 of 31

4 List of Figures Figure 1. Recommended Device Layout... 9 Figure 2. C30 User Connection Bay Figure 3. C65 User Connection Bay Figure 4. C65 HUPS User Connection Bay Figure 5. C200 User Connection Bay Figure 6. C1000 User Connection Bay Figure 7. Power Connections: MultiPac System Ground Rod At Each Unit Figure 8. Power Connections: MultiPac System Common Ground Rod Figure 9. Connection to 480V Wye Service - Direct Connection Figure 10. Connection to Non-480V Wye Service Autotransformer with Grounded Neutral Figure 11. Connection to Wye-Wye Service: Isolation Transformer Figure 12. Connection to Wye-Delta Service: Isolation Transformer Figure 13. Connection to Non-480V Wye Service Autotransformer with Floating Neutral Figure 14. Isolation Transformer Installation Example Figure 15. Isolation Transformer Installation Example Figure 16. Isolation Transformer Installation Example Figure 17. Paralleling Transformers Installation Figure 18. Stand Alone Connections: Three-Phase Loads Figure 19. Dual Mode Connections: Using an Isolation Transformer List of Tables Table 1. Referenced Documents... 6 Table 2. Overcurrent Protection Sizing... 8 Table 3. N L1 L2 L3 DC Terminal Block Specifications Table 4. Protective Earth (PE) / Chassis Ground Terminal Block Specifications Table 5. Grid Connect Allowable Configurations Matrix Table 6. HUPS Allowable Connections Rev F (October 2013) Page 4 of 31

5 1. Introduction This document presents electrical installation information for the Capstone MicroTurbine systems. Capstone Microturbines (with the exception of the C65 Hybrid UPS) provide two operational modes: Grid Connect Mode (GC) Stand Alone Mode (SA) GC mode provides alternating current (AC) electrical power in parallel with a utility grid or with another generation source. GC mode includes built-in utility-synchronization capability and protective relay functions. In this mode, the microturbine acts as a current source, controlling its current output to meet the commanded power output at the rated voltage. SA mode provides alternating current (AC) electrical power for standby, backup, or remote offgrid purposes. In this mode, the microturbine acts as a voltage source, regulating its voltage output to the configured voltage and frequency settings. A Dual Mode (DM) connection option (which requires a Dual Mode System Controller), is available and allows automatic transition between GC and SA modes. Multiple systems can be combined and controlled as a single larger generating source, commonly known as a MultiPac. Operation as a MultiPac is available for SA, GC, and Dual Mode operation. The C65 Hybrid UPS product is unique since there are two AC connections, one for grid and one for critical load. The grid connection operates in a mode very similar to GC mode, and the critical load connection operates in a mode very similar to SA mode. This product s unique electrical configuration is considered separately in Section 7. This document describes proper electrical interconnection for the Alternating Current (AC) output versions only. Refer to our Hybrid Electric Vehicle documentation for Direct Current (DC) model installation instructions. CAUTION: All of the allowable utility service connections for the various microturbine operating modes are presented in this document. Consult Capstone if your utility service connections do not agree with those presented in this document Rev F (October 2013) Page 5 of 31

6 2. Reference Documents Table 1 provides a list of Capstone documents referenced in this Technical Reference. Table 1. Referenced Documents Document Part No Description C65 Microturbine User s Manual C30 Microturbine User s Manual C30 Electrical Technical Reference C60/C65 Electrical Technical Reference MultiPac Technical Reference Protective Relay Functions Technical Reference C200 Technical Reference C1000 Technical Reference C200 CARB Product Specification C30 and C60 HEV Application Guide C200 with HRM Outline and Installation (O&I) Drawing 3. General Requirements It is the responsibility of the installer to supply all ancillary electrical equipment such as electrical cable, switchgear, transformers, and disconnects through which the microturbine delivers its output power. The equipment must be capable of safely handling the maximum potential loads, and must meet all applicable local and national regulations. This section outlines general requirements for all Capstone products. WARNING: It is essential that the installer consult all of the applicable codes and industry standards before connecting the interface wiring for the microturbine. Notice that a qualified electrician may be required to perform this work Protective Earth (PE) / Chassis Ground All Capstone Microturbine products must have protective earth (PE) grounding for the chassis. A separate ground lug is included in the user connection bay for this purpose. Commonly this PE is provided by a ground rod installation. Using a single PE connection for multiple microturbine chassis grounds is acceptable. This PE may or may not be the same ground used for the microturbine neutral; if it is not, the PE for the chassis ground and the ground for the neutral should be at equivalent potentials, with respect to earth. All electrical wiring, including protection and grounding, must conform to all local and national electrical codes and regulations. All drawings in the document will indicate the protective earth (PE)/ chassis ground by PE/G Rev F (October 2013) Page 6 of 31

7 3.2. Grounding the Microturbine Neutral All installations, for both GC and SA modes, must have the neutral wire properly grounded. This provides a ground reference for proper operation. Neglecting to properly ground the microturbine system (that is, no neutral-to-ground connection, or more than one neutral-toground connection) can cause damage to the microturbine system. All electrical wiring, including protection and grounding, must conform to all local and national electrical codes and regulations Grounding Location It is recommended to ground the neutral wire(s) in only a single location, unless local code requires more than one connection. For example, it is sometimes required by local code to ground the neutral before the conductor leaves one building and travels into another, in case the neutral is broken during earthmoving activities. In the case of multiple grounding points, these grounding points should be at equivalent earth potentials; otherwise circulating currents can occur and provide a poor reference for operation. For GC installations, the recommended location of the neutral-to-ground connection is at the utility service panel or the utility service transformer. A neutral-to-ground connection is often already present at the wye utility service transformer. For SA and DM installations, the recommended location of the neutral-to-ground connection is at the microturbine service panel. Use of four-pole breakers may necessitate multiple neutral-toground connections, and more information is provided on this subject in Section 6. If multiple neutral-to-ground connections are required, please contact Capstone Applications Engineering for approval Grounding Potential WARNING: A solid earth ground 1 of the microturbine neutral is MANDATORY for successful operation. A high-resistance ground should not be necessary, due to the very low fault current contribution of the microturbine(s) 2. However, a high-resistance ground may be possible, and will require a modification to the microturbine as well as additional external surge protection equipment (to be supplied by the installer). Please contact Capstone Applications Engineering for approval. WARNING: Any high-resistance grounding scheme MUST BE APPROVED BY CAPSTONE PRIOR TO COMMISSIONING. 1 Measurable at 5 ohms or less ground resistance per NEC, NFPA, and IEEE recommendation 2 Approximately 2X nominal current Rev F (October 2013) Page 7 of 31

8 3.3. Overcurrent Protection & Disconnecting Devices Overcurrent protection is required for each microturbine, usually by circuit breaker or fused disconnect. This overcurrent protection device must be installed between the microturbine and the electrical service panel. The type and fault-current ratings of the device must meet maximum current and voltage ratings for each microturbine model as well as meet all local codes and specifications. Recommended sizing for overcurrent protection devices is as follows: Table 2. Overcurrent Protection Sizing Microturbine Model Recommended Trip Setting 3 C30 60 A rms C65 (UL, HUPS, and all other) C65 (CE) C200 C600 C800 C A rms 150 A rms 400 A rms 1200 A rms 1600 A rms 2000 A rms If a fused disconnect switch is used instead of circuit breaker, time delay fuses are not required. Fast acting, current limiting fuses are recommended. It is recommended to install the fuses on the microturbine side of the switch. CAUTION: A lockable disconnect device should be located within sight of the microturbine. Any disconnect device should always have lockout provisions to facilitate safe maintenance operations. In the case that the service panel and microturbine are very near, it may be acceptable to use the overcurrent protection device as this lockable disconnect; please note that most circuit breakers will require additional hardware to become lockable. In the case of a long distance between the microturbine and the service panel, this should be a separate lockable switch. Figure 1 shows the recommended configuration for a four unit multipack of microturbines. 3 Recommended trip setting based on 125% of maximum microturbine steady state current as listed in the C65 Electrical Technical Reference (410001). For example, the nominal steady state current of a C200 is 310 A rms. 125% x 310 Arms = A rms. This is rounded up to 400A rms Rev F (October 2013) Page 8 of 31

9 To Primary Service Panel or Utility Service Transformer Service Panel Main Circuit Breaker Circuit Breaker Lockable Disconnect To MT2 To MT3 To MT4 MT Note: Locate the lockable disconnect within viewing distance of the microturbine Figure 1. Recommended Device Layout Always refer to the latest national and local codes relative to your location to determine the proper connection requirements Power Bay Connections The User Connections Bay for each microturbine model is shown below. NOTE: In accordance with UL 2200, the conductor gauge and torque specifications for both N L1 L2 L3 DC and grounding terminal blocks are listed in Table 3 and Table 4 respectively. This is applicable for copper and aluminum conductor types. NOTE: Final selection of conductor sizing must respect all local and national codes. The wire gauge information in Table 3 and Table 4 is only a listing of physical capabilities of the terminal blocks, and should not be substituted for a proper engineering analysis for conductor gauge Rev F (October 2013) Page 9 of 31

10 Table 3. N L1 L2 L3 DC Terminal Block Specifications Microturbine Connection C30/C65/ C65 HUPS AC C200 / C65 HUPS DC C600/C800/ C1000 Wire Size Torque Spec 4 Max # of (AWG / MCM) (mm 2 ) (Lb-in) (N-m) Conductors Min Max Min Max per phase 6 2/ MCM 600 MCM Table 4. Protective Earth (PE) / Chassis Ground Terminal Block Specifications Wire Size Torque Spec 4 Microturbine (AWG) (mm 2 ) Connection (Lb-in) (N-m) Min Max Min Max C30 / C C / C600 / C800 / C1000 Installer must land ground wire on ground bus bar using appropriate hardware 4 Torque value listed is based upon maximum wire size using UL486 recommendation. Smaller torque values may be possible for small gauge wire. Refer to UL486 for recommended torques using wire gauges smaller than the maximum torque Rev F (October 2013) Page 10 of 31

11 Figure 2. C30 User Connection Bay Figure 3. C65 User Connection Bay Rev F (October 2013) Page 11 of 31

12 DC Battery (+) Terminal DC Battery (-) Terminal PE/G Auxiliary DC Gas Pack Connection with Fusing Figure 4. C65 HUPS User Connection Bay Rev F (October 2013) Page 12 of 31

13 Figure 5. C200 User Connection Bay Rev F (October 2013) Page 13 of 31

14 Phase A Bus Bar Phase B Bus Bar Phase C Bus Bar Neutral Bus Bar Ground Bus Bar Figure 6. C1000 User Connection Bay Rev F (October 2013) Page 14 of 31

15 3.5. MultiPac Power Connections Refer to the MultiPac Technical Reference (410032) for details on MultiPac operation. Power connections between the MultiPac systems will be necessary, and these connections must consider the proper phase wiring, neutral wiring, and grounding connections between the various systems. Refer to Figure 8 for electrical connection diagram for permitted MultiPac connections. Protective earth (PE) / chassis grounding can either be a ground rod at each unit (as shown in Figure 7), or can be a single, common ground rod at the service panel (as shown in Figure 8). For simplification of the following connection diagrams in this document, this multipac is represented electrically by a set of terminals L3, L2, L1, and N labeled Single or Multipac Connections. Figure 7. Power Connections: MultiPac System Ground Rod At Each Unit Rev F (October 2013) Page 15 of 31

16 Viewable Lockable Disconnect Microturbine or Multipac Service Panel Single Unit or Multipac Connections MT Circuit Breaker Main Circuit Breaker Microturbine #1 L3 L2 L1 N G L3 L2 L1 N Microturbine #N L3 L2 L1 N G MT Circuit Breaker PE/G NOTE: All wiring shown should be connected regardless of connection type. Figure 8. Power Connections: MultiPac System Common Ground Rod 4. Grid Connect Table 5 presents the various allowable connections for the Grid Connect operating mode. The table will show important attributes for comparison including standards compliance, wiring, etc. No 3-wire delta utility service connections are allowed 5. For details on each configuration, refer to the figure number shown for that configuration. 5 No three-wire delta utility service connections are allowed because the phase-to-ground voltages float, and over time, these voltages (with respect to ground) become unbalanced and cause microturbine nuisance trips. In addition, the phase-to-ground voltages can reach levels that can break the insulation in the IGBTs-to-ground and cause equipment failure Rev F (October 2013) Page 16 of 31

17 Table 5. Grid Connect Allowable Configurations Matrix Figure No. Standards Compliance Utility Service UL1741 CE/Other Wye Delta Transformer Type 9 X X X None 10 X X X Autotransformer with Grounded Neutral 11 X X X Wye/Wye Isolation 12 X X X Wye/Delta Isolation 13 X X Autotransformer with Floating Neutral 4.1. Phase Sequence The output phase sequence is L1 to L2 to L3. Notice that improper phase sequence connections may cause the microturbine to trip. It is the installer s responsibility to verify the proper phase connections between the microturbine and the grid Transformer Applications and Impedance A voltage transformer for the microturbine will be required if the circuit voltage is outside the 400 to 480 Volts AC range. All GC mode installations with transformers between the microturbine and the grid 6 must consider maximum grid impedance. Proper sizing of transformers in the installation is required to limit the impedance seen by the microturbine. For impedance limits required for installation of each microturbine model, refer to the Electrical Specification documents referenced in Table 1. Refer to Input Impedance on page 30 for example calculation of the impedance of the line run and transformers to the utility source Allowable Connections Figure 9 through Figure 13 present the permitted utility (or transformer) connections for Capstone products. 6 To a point in the distribution grid where the voltage is 6 kv or higher Rev F (October 2013) Page 17 of 31

18 Single Unit or Multipac Connections L3 Utility Service L2 L1 N PE/G Figure 9. Connection to 480V Wye Service - Direct Connection Figure 10. Connection to Non-480V Wye Service Autotransformer with Grounded Neutral Rev F (October 2013) Page 18 of 31

19 Figure 11. Connection to Wye-Wye Service: Isolation Transformer Figure 12. Connection to Wye-Delta Service: Isolation Transformer Rev F (October 2013) Page 19 of 31

20 Figure 13. Connection to Non-480V Wye Service Autotransformer with Floating Neutral 5. Standalone Mode 5.1. Output and Load Specification The microturbine output consists of three phases and a neutral. The current in each phase need not be balanced, as long as the electrical current limits per phase are respected. Loads may be connected phase-phase or phase-neutral. The nominal Stand Alone voltage setting is available between any two phases.. For current and voltage specifications of each microturbine model, refer to the Electrical Specification documents referenced in Table Phase Sequence For SA installations, the output phase rotation sequence is L1 to L2 to L3. Notice that improper phase connections can damage the connected loads or cause microturbine trips. Capstone cannot be held responsible for equipment damage caused by improper connections. It is the installer s responsibility to verify the proper phase connections between the microturbine and the load(s) Transformers for Highly Non-Linear Loads For any SA installation with highly non-linear loads, an isolation transformer is required. This transformer functions as a harmonic filter and provides additional benefits for motor starting and kva margin. Highly non-linear loads are defined as: Any loads causing the site current THD to be greater than 8% Rev F (October 2013) Page 20 of 31

21 Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Non-linear lighting loads: Fluorescent ballasts and sodium lamps There are two major benefits that are worth consideration. First, the energy storage in the transformer windings will reduce voltage drop during DOL (across-the-line) motor starts. Second, for 400V applications, using an operating voltage of 480V on the microturbine side of the transformer will provide up to 20% higher kva margin available for starting large electric loads. For sites requiring an isolation transformer, the recommended configuration is as follows: - Delta connection on microturbine side. - Wye connection is recommended on load side. However, delta connection on load side is also acceptable if required by installation volts output setting on microturbine side (may not be commercially available in your country, so 400V is acceptable, but this limits any motor starting benefits). - Impedance between 4-8%. Lower impedance will provide overall better voltage regulation, but may require a soft start ramp to be configured on the microturbines for installations with 3 or more microturbines. Autotransformers are not allowed as an alternative to the required isolation transformer, since they do not provide the galvanic isolation and delta winding which minimize the transmission of harmonics Transformer Sizing Recommendation For any SA installation requiring a transformer, the following sizing recommendations are provided. Per the discussion in Section 5.3, the recommended configuration is one or two large transformers after the paralleling of the microturbines, so these recommended sizes can be summed based on the total number of units connected to the same paralleling bus. o 45 kva per C30 system o kva per C65 system o 300 kva per C200 system o 900 kva per C600 system o 1200 kva per C800 system o 1500 kva per C1000 system 5.5. Generic Diagrams of Isolation Transformer Installation Figure 14 through Figure 16 represent examples of allowed configurations for SA and DM installations. Capstone recommends any transformers should be placed after the paralleling of the Multipac. Figure 17 represents a connection that is not recommended, but may be possible. If individual transformers are used before the paralleling of the microturbines, these transformers must be matched with identical impedance, kva rating, wiring sequence, and phase difference (primary to secondary) Rev F (October 2013) Page 21 of 31

22 Figure 14. Isolation Transformer Installation Example Figure 15. Isolation Transformer Installation Example Rev F (October 2013) Page 22 of 31

23 Figure 16. Isolation Transformer Installation Example Figure 17. Paralleling Transformers Installation Rev F (October 2013) Page 23 of 31

24 5.6. Allowable Connections Figure 18. Stand Alone Connections: Three-Phase Loads 6. Dual Mode An installation designed to switch between GC and SA operation is identified as a Dual Mode installation, and must meet the installation requirements for both GC and SA operation, including the required isolation transformer for SA operation. Automatic transfer between modes may be accomplished with the optional Capstone Dual Mode System Controller. Refer to the Dual Mode System Controller Technical Reference (410071) for details. Whether manual or automatic, the electrical conversion from one mode to the other must be planned with care, particularly the neutral and ground connections. Safety requirements, code requirements, and functional requirements must all be met Installations Requiring 4-Pole Motorized Grid Breaker In some parts of the world, 4-pole circuit breakers are required, which will break the neutral wire as well as the three phases. Given the requirement of grounding the neutral wire in both SA mode and GC mode (discussed in Section 3.2), there may need to be a neutral-grounding relay capable of keeping the neutral grounded when the DMSC switches the motorized breaker open. This construction and theory of operation is discussed in the Dual Mode System Controller Technical Reference (410071). The below allowable connections assume 3-pole breakers, but are otherwise valid for 4-pole breaker installations, assuming the proper neutral-grounding considerations Allowable Connections Figure 19 presents indirect connection using the Dual Mode System Controller. The DMSC is installed between the isolation transformer and the protected loads, and the utility or local transformer Rev F (October 2013) Page 24 of 31

25 Single Unit or MultiPac Connections Isolation Transformer Dual Mode System Controller Wye Utility Service or Local Transformer L3 L2 L1 N G Refer to Figures 10 & 11 for isolation transformer connection details Must be continuous with the utility ground Protected Loads PE/G Figure 19. Dual Mode Connections: Using an Isolation Transformer 7. C65 Hybrid UPS The C65 Hybrid UPS microturbine comes with two AC power connections, the GLCM and LLCM. The GLCM connection should connect to the utility grid source, and the LLCM output should connect to the critical load bus. Due to the unique design of the C65 Hybrid UPS microturbine compared to other Capstone products, external isolation transformers are required on both connections to avoid momentary short circuit through the internal power electronics. The required LLCM and GLCM AC power connections must be three-phase, four wire ungrounded wye. WARNING: The neutral wire should NOT be grounded at the microturbine connection bay or at either isolation transformer. The only ground connection should be the chassis ground connection at each C65 Hybrid UPS microturbine. This is due to the fact that the positive DC bus is grounded internally. The chassis grounding is required per normal installation guidelines listed in Section CAUTION: The maximum length for the conductor between each microturbine AC connection and the isolation transformer is 10 meters. All conductor should be run using grounded conduit. Exceeding this length could result in excessive EMF generation, which could interfere with operation of sensitive electrical equipment. Contact Capstone Applications Engineering with any questions. The DC external battery should be connected with proper polarity of positive and negative verified. There should be no power grounding on the external battery string, since this is provided internally to the Hybrid UPS Microturbine. For the DC battery connection, a DC circuit Rev F (October 2013) Page 25 of 31

26 breaker disconnect must be included between the batteries and the unit. See the C65 Hybrid UPS Application Guide (Refer to Table 1) for more details on battery system specification. Three- or four-wire connections are allowable, as shown in Figure 20 and Figure 21. For fourwire connections, the critical loads need not be balanced as long as the current limits per phase are not exceeded. WARNING: Three-wire critical load connections are allowable as long as the neutral on the critical load side of the isolation transformer is grounded AND the critical loads are BALANCED. No unbalanced critical loads are allowed for 3-wire critical load connections Surge Protection Device Due to the unique internal architecture of the C65 Hybrid UPS system, a surge protection device must be installed on the grid-side connection of the isolation transformer for each unit. Capstone will provide the device required for UL installations as well as any other 4-wire 480Y/277V installations. All other wiring configurations will require an alternative surge protection device, which must be specified with the assistance of Capstone Applications Engineering. The spec sheet and installation documents from the manufacturer are listed in Appendix of the C65 Hybrid UPS Application Guide (480049). The required connections for the surge protection device are described in detail in Figure 20 through Figure 22 below. The device should be mounted with leads as short as possible, recommended not to exceed 1m in length Allowable Connections Table 6. HUPS Allowable Connections Figure No. Grid Connection Wiring 4-wire 3- wire Critical Load Connection 4-wire 3-wire UL2200/1741 Compliance Isolation Transformer Windings Surge Protection Device 16 X X Yes Wye/Wye Supplied by Capstone 17 X X Yes Wye/Wye Contact Applications Engineering 18 X X No Wye/Delta Contact Applications Engineering Rev F (October 2013) Page 26 of 31

27 Figure Wire HUPS Installation Rev F (October 2013) Page 27 of 31

28 Figure Wire HUPS Installation with Wye/Wye Transformers Rev F (October 2013) Page 28 of 31

29 Grid L3 L2 L1 N Optional Lockable Disconnect Isolation Transformer Circuit Breaker Utility Service Surge Protection Device Electrical Connection Bay Critical Load L3 L2 L1 N Optional Lockable Disconnect Isolation Transfer (Wye-Wye) Circuit Breaker Critical Load Service Panel DC Battery + - to External Battery System PE/G Figure Wire HUPS Installation with Wye/Delta Transformers Rev F (October 2013) Page 29 of 31

30 8. Input Impedance Refer to Table 1 for the Electrical Specification documents listing input impedance requirements of each microturbine model Examples of the total electrical input impedance calculations which detail the values considering the microturbine output looking towards the utility are provided in the following paragraphs. NOTE: Input impedance calculations are for Grid Connect operation only Example 1: Model C30 - Considering 1 Microturbine Total Impedance for all conductors: Z L = 0.5%, Z R = 1.0% 30 KVA MicroTurbine 480 V 208 V 240 V Utility 5 kv 45 kva 45 kva 60 kva Z L1 = 5.6% Z L2 = 6.4% Z L3 = 5% Z R1 = 1.7% Z R2 = 1.9% Z R3 = 1.6% Inductive: Z L (Total) = 5.6% (30/45) + 6.4% (30/45) + 5% (30/60) + 0.5% = 11% (Value exceeds acceptable limit of 10%) Resistive: Z R (Total) = 1.7% (30/45) + 1.9% (30/45) + 1.6% (30/60) + 1% = 4.22% (Value is within acceptable limit of 5%) 8.2. Example 2: Model C65 - Considering 1 Microturbine Total Impedance for all conductors: Z L = 0.5%, Z R = 1.0% 65 KVA MicroTurbine 480 V 208 V 240 V Utility 5 kv 75 kva 75 kva 100 kva Z L1 = 5.6% Z L2 = 6.4% Z L3 = 5% Z R1 = 1.7% Z R2 = 1.9% Z R3 = 1.6% Z L (Total) = 5.6% (65/75) + 6.4% (65/75) + 5% (65/100) + 0.5% = 14.2% (Value exceeds acceptable limit of 10%) Z R (Total) = 1.7% (65/75) + 1.9% (65/75) + 1.6% (65/100) + 1% = 5.16% (Value exceeds acceptable limits of 5%) Rev F (October 2013) Page 30 of 31

31 8.3. Example 3: Considering 3 Microturbines Total Impedance for all conductors: Z L = 0.5%, Z R = 1.0% 480 V MicroTurbine #1 30 kva 480 V 45 kva Z L1 =5.6%, Z R1 =1.7% MicroTurbine #2 30 kva 480 V 480 V 4160 V Utility 34.5 kv 45 kva Z L2 =5.6%, Z R2 =1.7% 500 kva 2000 kva Z L4 = 7.2% Z L5 = 5% Z R4 = 1.8% Z R5 = 1.3% MicroTurbine # kva 480 V kva Z L3 =4.3%, Z R3 =1.4% Note: In these calculations, the number 120 represents the sum of the Microturbine outputs ( ) Microturbine #1 (30 kva): Z L (MT1) = 5.6% (30/45) + 7.2% (125/500) + 5% (125/2000) + 0.5% = 6.3% (Value is within acceptable limits) Z R (MT1) = 1.7% (30/45) + 1.8% (125/500) + 1.3% (125/2000) + 1% = 2.7% (Value is within acceptable limits) Microturbine #2 (30 kva): Z L (MT2) = 5.6% (30/45) + 7.2% (125/500) + 5% (125/2000) + 0.5% = 6.3% (Value is within acceptable limits) Z R (MT2) = 1.7% (30/45) + 1.8% (125/500) + 1.3% (125/2000) + 1% = 2.7% (Value is within acceptable limits) Microturbine #3 (65 kva): Z L (MT3) = 4.3% (65/112.5) + 7.2% (125/500) + 5% (125/2000) + 0.5% = 5.1% (Value is within acceptable limits) Z R (MT3) = 1.4% (65/112.5) + 1.8% (125/500) + 1.3% (125/2000) + 1% = 2.3% (Value is within acceptable limits) Rev F (October 2013) Page 31 of 31

This information is intended for use in the evaluations of applications for the Capstone Model C30 MicroTurbine.

This information is intended for use in the evaluations of applications for the Capstone Model C30 MicroTurbine. Capstone Capstone Turbine Corporation 21211 Nordhoff Street Chatsworth CA 91311 USA Telephone: (818) 734-5300 Facsimile: (818) 734-5320 Website: www.microturbine.com Technical Reference Capstone Model

More information

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Connection Impact Assessment Application

Connection Impact Assessment Application Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220 Table K. Input/ Ratings & External Wiring Requirements for the 9390-/ Units Rating 50/0 Hz Basic Unit Rating at 0.9 lagging pf load Input and Bypass Input Rectifier (0.98 min. pf) plus Recharge Current

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number:  Address: NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

TN, TT & IT Earthing Arrangements

TN, TT & IT Earthing Arrangements TN, TT & IT Earthing Arrangements In IT and TN-C networks, residual current devices are far less likely to detect an insulation fault. In a TN-C system, they would also be very vulnerable to unwanted triggering

More information

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative:  Address: Fax Number: Interconnection of a Customer-Owned Renewable Generation System of Greater than 100 KW and Less than or Equal to 1 MW to the LCEC Electric Grid Tier 3 Application and Compliance Form Instructions: Complete

More information

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY WN U-60 Attachment C to Schedule 152, Page 1 SCHEDULE 152 APPLICATION FOR INTERCONNECTING A GENERATING FACILITY TIER 2 OR TIER 3 This Application is considered complete when it provides all applicable

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection

More information

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General Section 16621A - AUTOMATIC TRANSFER SWITCH Part 1 General 1.01 One 600 Amp, 3 Phase, 480 Volt Automatic Transfer Switch (ATS) shall be provided with gasketed enclosure. The ATS shall consist of an inherently

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase

More information

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL SINGLE PHASE INSTRUCTION MANUAL DIAGRAM D This manual applies to all single-phase buck & boost transformers sold by Larson Electronics. Please refer to the connection diagram on pages 4-6 for properly

More information

This document covers common questions concerning the design of an effectively grounded system.

This document covers common questions concerning the design of an effectively grounded system. This document covers common questions concerning the design of an effectively grounded system. To prevent against temporary overvoltage conditions when a line-to-ground fault occurs on the power grid.

More information

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com ARC FLASH PPE GUIDELINES FOR

More information

INTELLIMETER REGISTER

INTELLIMETER REGISTER INTELLIMETER REGISTER MODEL RG2 INSTALLATION AND CONNECTIONS INSTALLATION MANUAL WARNING: Any work on or near energized metering equipment can present a danger of electrical shock. All work on these products

More information

> the power to protect. Ground Fault Protection on Ungrounded and High Resistance Grounded Systems. Application Guide.

> the power to protect. Ground Fault Protection on Ungrounded and High Resistance Grounded Systems. Application Guide. > the power to protect Ground Fault Protection on Ungrounded and High Resistance Grounded Systems Application Guide www.i-gard.com TABLE OF CONTENTS SUBJECT PAGE 1. Introduction...1 2. Ungrounded Systems...1

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Utility Interconnection and System Protection

Utility Interconnection and System Protection Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing

More information

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES Technical Requirements for Grid-Tied DERs Projects Division 6/29/2017 Contents 1 Definitions and Acronyms... 1 2 Technical Interconnection

More information

Generation Interconnection Requirements at Voltages 34.5 kv and Below

Generation Interconnection Requirements at Voltages 34.5 kv and Below Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Upgrading Your Electrical Distribution System To Resistance Grounding

Upgrading Your Electrical Distribution System To Resistance Grounding Upgrading Your Electrical Distribution System To Resistance Grounding The term grounding is commonly used in the electrical industry to mean both equipment grounding and system grounding. Equipment grounding

More information

HPS Universal BUCK-BOOST TRANSFORMERS

HPS Universal BUCK-BOOST TRANSFORMERS BUCK-BOOST TRANSFORMERS Single and Three Phase Potted Buck-Boost Transformers Buck-Boost Applications & Standard Specification... 80 Selecting Buck-Boost Transformers... 81 Single Phase Selection Tables...

More information

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION This application should be completed and returned to in order to begin processing the request for interconnecting as required by

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Connection Impact Assessment Application Form

Connection Impact Assessment Application Form Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information

More information

ET 40 - Electrician Theory Examination Marking Schedule

ET 40 - Electrician Theory Examination Marking Schedule ET 40 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

TOSHIBA International Corp

TOSHIBA International Corp TOSHIBA International Corp GUIDE SPECIFICATIONS THREE PHASE UNINTERRUPTIBLE POWER SYSTEM TOSHIBA 4200FA 30 kva CT Internal Battery UPS GUIDE SPECIFICATIONS 1 (30 kva CT) 1.0 SCOPE 1.1 System This specification

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

PART 1 OWNER/APPLICANT INFORMATION

PART 1 OWNER/APPLICANT INFORMATION CALHOUN COUNTY ELECTRIC COOP. ASSN. Application for Operation of Customer-Owned Generation This application should be completed as soon as possible and returned to the Cooperative in order to begin processing

More information

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric

More information

~=E.i!=h. Pre-certification Transformers

~=E.i!=h. Pre-certification Transformers 7 Transformers Section 26 of the electrical code governs the use and installations of transformers. A transformer is a static device used to transfer energy from one alternating current circuit to another.

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

APQline Active Harmonic Filters. N52 W13670 NORTHPARK DR. MENOMONEE FALLS, WI P. (262) F. (262)

APQline Active Harmonic Filters. N52 W13670 NORTHPARK DR. MENOMONEE FALLS, WI P. (262) F. (262) APQline Active Harmonic Filters N52 W13670 NORTHPARK DR. MENOMONEE FALLS, WI 53051 P. (262) 754-3883 F. (262) 754-3993 www.apqpower.com Power electronic equipment and AC-DC power conversion equipment contribute

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

SINGLE-PHASE VSV SWITCH

SINGLE-PHASE VSV SWITCH May 2006 Supercedes: March 2006 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...2 IV. Maintenance...4 V. VSV Power

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas

More information

Rev /13 SSRMAN-1B SERIES USERS MANUAL SSR INTELLIGENT BURST FIRING CONTROL COPYRIGHT 2013 NUWAVE TECHNOLOGIES, INC.

Rev /13 SSRMAN-1B SERIES USERS MANUAL SSR INTELLIGENT BURST FIRING CONTROL COPYRIGHT 2013 NUWAVE TECHNOLOGIES, INC. Rev.2.2 12/13 MAN-1B SERIES USERS MANUAL INTELLIGENT BURST FIRING CONTROL COPYRIGHT 2013 MAN-1B Users Manual Page 2 TABLE OF CONTENTS 1. Ordering Codes... 2 2. Description... 2 2.1 Features... 3 3. Installation

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems This application should be completed as soon as possible and returned to the Cooperative in order to

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

Variable Transformers Product Design & Engineering Data

Variable Transformers Product Design & Engineering Data Variable Transformers Product Design & Engineering Data Product Design & Engineering Data Type 1010B Cutaway General Information STACO ENERGY PRODUCTS CO. is a leading manufacturer of variable transformers,

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems UNITY/I TM UT3K, UT4K, UT5K and UT8K Single-Phase Uninterruptible Power Systems Installation Manual MLS-0351C-OL Copyright 1994-1997 Best Power. All rights reserved. å IMPORTANT SAFETY INSTRUCTIONS! SAVE

More information

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED SECTION 16280 LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED PART 1 - GENERAL 1.1 SUMMARY This specification defines the requirements for active harmonic filter systems in order to meet IEEE-519-2014

More information

Installation requirements

Installation requirements Installation requirements for SUNNY CENTRAL 500U 1 Contents This document describes the requirements which have to be observed for the installation site of the Sunny Central 500U. The installation and

More information

High Frequency SineWave Guardian TM Filter

High Frequency SineWave Guardian TM Filter High Frequency SineWave Guardian TM Filter 380V 480V TECHNICAL REFERENCE MANUAL WARNING High Voltage! Only a qualified electrician can carry out the electrical installation of this filter. Quick Reference

More information

PC IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases

PC IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases PC57.13.3 IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases OUTLINE Scope References Need for grounding; Warning Definition of Instrument transformers Grounding secondary

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

APPENDIX B: Generation Interconnection Application Form

APPENDIX B: Generation Interconnection Application Form 2 APPENDIX B: Generation Interconnection Application Form WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect with Xcel Energy (Local electric utility)

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

Education & Training

Education & Training Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through

More information

Rev.8 03/08 SSRMAN-1P SERIES USERS MANUAL SSR INTELLIGENT PHASE ANGLE CONTROL MODULE COPYRIGHT 2008 NUWAVE TECHNOLOGIES, INC.

Rev.8 03/08 SSRMAN-1P SERIES USERS MANUAL SSR INTELLIGENT PHASE ANGLE CONTROL MODULE COPYRIGHT 2008 NUWAVE TECHNOLOGIES, INC. Rev.8 03/08 MAN-1P SERIES USERS MANUAL INTELLIGENT PHASE ANGLE MODULE COPYRIGHT 2008 MAN-1P Users Manual Page 2 TABLE OF CONTENTS 1. Ordering Codes... 2 2. Description... 2 2.1 Features... 3 3. Installation...

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET Candidate Code No. ET43 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

CP /240-MC4 User Manual

CP /240-MC4 User Manual CP-250-60-208/240-MC4 User Manual Chilicon Power LLC Jan 2014 1 CONTENTS Important Safety Instructions... 3 Safety Instructions... 3 CP-250 Microinverter System Introduction... 4 Inverter Label Information...

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. The Importance of the Neutral-Grounding Resistor Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. Presentation Preview What is high-resistance grounding (HRG)? What is the purpose of HRG? Why

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600

More information

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or

More information

Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC)

Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC) Name: Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC) 1. T F In three-phase four-wire delta systems rated 240/120 volts, sometimes

More information

Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays

Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays Dual-Source Power Supply Addendum to I.B. 17555 Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays Table of Contents Page 1.0 Introduction...1 2.0 General

More information

EE171. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

EE171. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E EE171 Electrical Equipment & Control System: Electrical Maintenance Transformers, Motors, Variable Speed Drives, Generators, Circuit Breakers, Switchgears & Protective Systems H.H. Sheikh Sultan Tower

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Introduction The topic of system grounding is extremely important, as it affects the susceptibility of the system to voltage

More information

SINGLE-PHASE VSV SWITCH

SINGLE-PHASE VSV SWITCH Revision: September 2009 Supersedes: August 2007 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...3 IV. Maintenance...5

More information

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation This application is to be completed and returned to the Cooperative member service representative in order to begin

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

TECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM

TECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM TECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM January 5, 2017 Francesco Mannarino SVP, Electricity Operations

More information

Description & Applications Questions & Answers Selection Charts Single Phase Selection Charts Three Phase...

Description & Applications Questions & Answers Selection Charts Single Phase Selection Charts Three Phase... SECTION BUCK-BOOST TRANSFORMERS A simple and economical way to correct offstandard voltages... from 95 to 500 volts; single and three phase, in sizes up to 60 kva. Simplified buck-boost rating charts make

More information

BUCK-BOOST TRANSFORMERS

BUCK-BOOST TRANSFORMERS Where Are Buck-Boost Transformers Used? A typical buck-boost application is 120 volts in, 12 volts out for low voltage lighting or control circuitry. In most applications, this low voltage transformer

More information

CHAPTER 3 WIRING DANGER

CHAPTER 3 WIRING DANGER CHAPTER WIRING DANGER Hazardous Voltage Before accessing the AC drive: Disconnect all power to the AC drive. Wait five minutes for DC bus capacitors discharge. Any electrical or mechanical modification

More information

BE1-67N GROUND DIRECTIONAL OVERCURRENT RELAY FEATURES ADDITIONAL INFORMATION. FUNCTIONS AND FEATURES Pages 2-4. APPLICATIONS Page 2

BE1-67N GROUND DIRECTIONAL OVERCURRENT RELAY FEATURES ADDITIONAL INFORMATION. FUNCTIONS AND FEATURES Pages 2-4. APPLICATIONS Page 2 BE1-67N GROUND DIRECTIONAL OVERCURRENT RELAY The BE1-67N Ground Directional Overcurrent Relay provides ground fault protection for transmission and distribution lines by sensing the direction and magnitude

More information

High Frequency Sinewave Guardian TM Filter

High Frequency Sinewave Guardian TM Filter High Frequency Sinewave Guardian TM Filter 380V 480V TECHNICAL REFERENCE MANUAL FORM: SHF-TRM-E REL. April 2015 REV. 001 2015 MTE Corporation Caution Prior to start up; confirm the drive operation mode

More information

The Variable Threshold Neutral Isolator (VTNI)

The Variable Threshold Neutral Isolator (VTNI) The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary

More information

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012 SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM Unit Objectives Describe the structure of an atom. Identify atoms with a positive charge and atoms with a negative charge. Explain

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND

More information

Power Processor - Series 700F 10KVA to 150KVA

Power Processor - Series 700F 10KVA to 150KVA Power Processor - Series 700F 10KVA to 150KVA Power Conditioning and Regulation for Commercial & Industrial Equipment General Specifications PART 1 - GENERAL 1.1 DESCRIPTION This specification defines

More information

ULTRA-K Series 600K - he

ULTRA-K Series 600K - he 5 kva 500 kva ULTRA-K Series 600K - he High Efficiency K-Rated Power Conditioning Transformers Designed to be used with linear or non-linear loads. Applications: Audio / Video Recording Equipment IT Systems

More information