INCENTIVE FOR TRANSMISSION EFFICIENCY
|
|
- Eustacia May
- 6 years ago
- Views:
Transcription
1 INCENTIVE FOR TRANSMISSION EFFICIENCY - T. UMESH, SEE, RETD. KPTCL - & - N. RAGHUPRAKASH, EE, RA, KPTCL
2 IN THIS SESSION Brief introduction to Transmission System Efficiency Parameters in Transmission Activity Transmission Loss & its calculation System Availability & its calculation Incentive Calculation by KERC.
3 INTRODUCTION TO TRANSMISSION NETWORK Transmission Voltages in Karnataka Transmission System Elements AC/ DC lines Power Transformers ( ICTs) STATIC VAR Compensators BUS REACTORS
4 TRANSMISSION SYSTEM EFFICIENCY Measured in terms of Transmission loss Transmission system availability
5 TRANSMISSION LOSS MYT Regulation, clause 3.4 deals with treatment of losses. In the tariff order KERC stipulates the normative transmission losses to be achieved by KPTCL during MYT period. If the loss is less, then incentive is allowed. This gain is to be shared in the ratio of 70: 30 between STU and the users of transmission system. SLDC works out the Transmission loss month on month based on the input to the transmission system and the quantum of energy supplied to ESCOMs at the Inter Face points. This information is furnished to KERC based on which the Order for sharing of loss / gain on account of Transmission loss is issued.
6 INCENTIVE FOR TRANSMISSION EFFICIENCY KERC vide its MYT Regulations Order dated has stipulated that KPTCL shall maintain a minimum of 98% availability for recovery of full transmission charges. Recovery of fixed charges below the level of target availability shall be on pro-rata basis. At zero availability, no transmission charges shall be payable.
7 PROCEDURE FOR CALCULATION OF AVAILABILITY Availability shall be calculated and declared separately for each voltage level. The transmission elements shall be grouped into following categories. a) AC transmission lines: Each circuit of AC transmission line shall be considered as one element. b) Inter-Connecting Transformers: Each 3ph transformer or bank of three Sph transformer shall form one element.
8 PROCEDURE FOR CALCULATION OF AVAILABILITY c) Static VAR Compensator: SVC along with SVC transformer if any shall form one element. d) Switched Bus Reactor: Each switched Bus Reactor shall be considered as one element. Weightage factor for each category of transmission elements shall be as under: a) For each circuit of AC line- Surge Impedance loading (SIL) multiplied by Circuit Km. ( SIL rating for various voltage level and conductor configuration shall be as per the procedure adopted for power system analysis)
9 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM AVAILABILITY (TSA) b) For each ICT- The rated MVA capacity c) For SVC- The rated MVAR capacity d) For switched Bus Reactor: The rated MVAR capacity. The availability for each category of transmission elements shall be calculated based on the weightage factor, total hours under consideration and non-available hours for each element of that category.
10 The transmission elements under outage due to following reasons not attributable to KPTCL shall be deemed to be available: 1) Shut down of transmission elements availed by other agencies for maintenance or construction of their transmission system. 2) Manual tripping of the line due to over voltage and manual tripping of elements as per the directions of the RLDC/SLDC.
11 Outage time of elements due to acts of God and force majeure events beyond control of KPTCL shall be excluded. Outage time caused by grid disturbance not attributable to KPTCL shall also be excluded. Eg. Faults in substations or bays owned by other agencies causing outage of KPTCL elements. However, if the elements are not restored on receipt of directions from SLDC while normalizing the system following a grid disturbance within reasonable time, then the element will be considered not available for whole period of outage and outage time shall be attributable to KPTCL.
12 The % availability is calculated for each transmission element as follows: 1 st calculate Availability index= Total time under consideration-outage hours due to unscheduled interruptions/total time under consideration. Next calculate availability= Availability index*weightage factor % availability= availability/weightage factor Then, % availability of category of elements= Sum of availability of all elements/sum of weightage factor of all elements. Then, % System Availability is calculated as the average of all category availabilities.
13 FORMULA FOR CALCULATION % TSA = o*av₀ + p*avp + q*avq + r*avr X 100 o+p+q+r Where, AV = Availability o = No. of AC lines p = No. of ICTs q = Capacitor Bank r = Bus Reactors
14 Zone: Bangalore Element: AC lines Sl. No. Name of the line Voltage kv Conductor Ckt.kM SIL Weightage factor Un- Total time of Scheduled considerationhours Interrupti ons- hours Availability Index Availability (Avi) % Availability A B C=A*B D E F=(D-E)/D G=C*F H=G/C*100 1 Nelamangala - Peenya I 220 Drake % Total
15 Sl.No. Zone No. of AC lines Wf Availability No. of ICT's Wf Availability No. of SVAR's Wf Availability %TSA of Zones 1 Bagalkote Bangalore Gulbarga Hassan Mysore Tumkur KPTCL TOTAL KPTCL TOTAL AVO AVP AVQ %TSA=
16 INCENTIVE KPTCL shall be entitled to incentive on achieving annual availability beyond the target availability of 98% as per the following formula. Incentive= ATC* (TSA achieved-target availability)/target availability No incentive shall be payable above the availability of 99.75%. 50% of the incentive shall be shared by the long time customers in the ratio of their average allotted transmission capacity for the year.
17 SURGE IMPEDANCE LOADING Surge Impedance Loading (SIL) in MW s of a long transmission line is defined as ratio of (kvre)²/si where VRE is the receiving end voltage in KV and SI is surge impedance of the line. SIL is typically the limit of the maximum power that can be transmitted through the line at the voltage level considered. SIL can be increased by reducing the SI of the line.
18 SIL VALUES AS PER KEGC 2005 Typical values of SIL are as follows: a) 400 kv lines Quad conductor MW b) 400 kv lines Twin conductor-515 MW c) 220kV lines Single conductor-132 MW d) 110kV lines SC 50 MW e) 66kV lines SC 35 MW
19 SURGE IMPEDANCE SI is defined as the (L/C), where L and C are Inductance and Capacitance of the line. SI can be reduced by bundling. Bundling is the use of two or more conductors per phase, which reduces L and increases C. Hence twin/quad conductors are used in 400/765kV lines.
20 Transmission lines produce reactive power due to their natural capacitance. Mvar produced = ½ CV² Transmission lines also utilize reactive power to maintain their magnetic fields. Mvar used = ½ LI² SIL is the loading of the line when Mvar produced = Mvar used i.e., when ½ LI² = ½ CV² Which gives V/I = sqare root of L/C, which is nothing but the SI of the line.
21 THANK YOU
ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697.
ADDENDUM No. AERC. 396/2012/Pt.-III/4.-Assam Electricity Regulatory commission (Terms and Conditions for determination of Multi Year tariff) Regulations, 2015 issued vide notification No. AERC.396/2012/Pt/-II/13
More informationAnalysis of a 405 km transmission line with series compensation
Analysis of a 405 km transmission line with series compensation by Dr. Rupert Gouws, North-West University This paper presents an investigative case study and energy efficiency analysis of the 405 km,
More information, ,54 A
AEB5EN2 Ground fault Example Power line 22 kv has the partial capacity to the ground 4,3.0 F/km. Decide whether ground fault currents compensation is required if the line length is 30 km. We calculate
More informationJoe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation
Joe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation Slide 1 Excerpt from the BoA BoA: Book of Acronyms MSC/MSR: Mechanically
More informationEH2741 Communication and Control in Electric Power Systems Lecture 2
KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment
More informationLecturer: Dr. J B E AL-ATRASH No. of Pages: 4
Philadelphia University Faculty of Engineering Dept. of Electrical Engineering Student Name: Student Number: Final Exam Course Title: Design of T&D System Date: 15 th June 2016 Course No: 610 515/650511
More informationPower Quality Requirements for Connection to the Transmission System
Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers
More informationECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control
ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections
More informationLARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS
LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS Giuseppe Di Marzio NTNU giuseppe.di.marzio@elkraft.ntnu.no Olav B. Fosso NTNU olav.fosso@elkraft.ntnu.no Kjetil Uhlen SINTEF
More informationAnalysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar
Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Electrical Engineering department, Jabalpur Engineering College Jabalpur, India Abstract:
More informationImpact of Distributed Generation on Network Voltage Levels
EEE8052 Distributed Generation Taster Material Impact of Distributed Generation on Network Voltage Levels Steady-state rise in network voltage levels Existing practice is to control distribution voltage
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationProcedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses
Procedure for Obtaining data by Implementing Agency for Determination of PoC Transmission Charges and Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission
More informationCourse ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation
Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission
More informationApplication of SVCs to Satisfy Reactive Power Needs of Power Systems
1 Application of SVCs to Satisfy Reactive Power Needs of Power Systems H. K. Tyll, Senior Member, IEEE Abstract In the early days of power transmission problems like voltage deviation during load changes
More informationITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/
ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...
More informationII. RESEARCH METHODOLOGY
Comparison of thyristor controlled series capacitor and discrete PWM generator six pulses in the reduction of voltage sag Manisha Chadar Electrical Engineering Department, Jabalpur Engineering College
More informationDesign of SVPWM Based Inverter for Mitigation of Harmonics in Power System
Design of SVPWM Based Inverter for Mitigation of Harmonics in Power System 1 Leena N C, 2 B. Rajesh Kamath, 3 Shri Harsha 1,2,3 Department of EEE, Sri Siddhartha Institute of Technology, Tumkur-572105,
More informationLab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009
Lab 1 Objectives In this lab, our objective is to simulate a simple single machine infinite bus configuration using the PowerWorld Simulator software. We design a local generator system (a synchronous
More informationDelayed Current Zero Crossing Phenomena During Switching of Shunt-Compensated Lines
Delayed Current Zero Crossing Phenomena During Switching of Shunt-Compensated Lines David K Olson Paul Nyombi Xcel Energy Pratap G Mysore Pratap Consulting Services Minnesota Power Systems Conference St.
More informationTransformers TRANS FORM ERS
Transformers TRANS FORM ERS Meiden Transformers are standard design, standard quality. Our Factories on world-wide supply chain Since its founding in 1897 Meidensha Corporation has not only built up a
More informationDelayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines
Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul
More informationVoltage and Frequency Dependency
Average hourly generation (GW) System Operability Framework Voltage and Frequency Dependency The demand and generation we see on the electricity network has been changing in recent years and is set to
More informationPRUDENT PRACTICES TO IMPROVE POWER FACTOR AND REDUCE POWER LOSS.
1 PRUDENT PRACTICES TO IMPROVE POWER FACTOR AND REDUCE POWER LOSS. DEFINATIONS Working /Active Power: Normally measured in kilowatts (kw). It does the "work" for the system--providing the motion, torque,
More informationATTACHMENT - AESO FUNCTIONAL SPECIFICATION
ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments
More informationDietrich Bonmann, ABB Monselice Transformer Days, May 5, 2010 Optimized AC transmission solutions with phase-shifting transformers and shunt reactors
Dietrich Bonmann, ABB Monselice Transformer Days, May 5, 2010 Optimized AC transmission solutions with phase-shifting transformers and shunt reactors May 11, 2010 Slide 1 Why phase-shifting transformers
More informationLine Loadability in Indian Perspective
Line Loadability in Indian Perspective P.Pentayya, U.K Verma, P. Mukhopadhyay, Gopal Mitra, GM (WRLDC) GM (ERLDC) AGM (ERLDC) DGM (ERLDC) S.Bannerjee M.Thakur, S.Sahay CM (ERLDC Sr.Eng, (ERLDC) Eng, (ERLDC)
More informationEE 740 Transmission Lines
EE 740 Transmission Lines 1 High Voltage Power Lines (overhead) Common voltages in north America: 138, 230, 345, 500, 765 kv Bundled conductors are used in extra-high voltage lines Stranded instead of
More informationPower Quality enhancement of a distribution line with DSTATCOM
ower Quality enhancement of a distribution line with DSTATCOM Divya arashar 1 Department of Electrical Engineering BSACET Mathura INDIA Aseem Chandel 2 SMIEEE,Deepak arashar 3 Department of Electrical
More informationWIND FARM Flexible AC Transmission Systems
WIND FARM Flexible AC Transmission Systems WIND ENERGY AND GRID INTEGRATION Madrid 24-25 January 2006 Jacques COURAULT Assumption: Wind farm is with Fixed Speed Induction Generator (FSIG) SUMMARY 1/ Wind
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationExperience with Connecting Offshore Wind Farms to the Grid
Oct.26-28, 2011, Thailand PL-22 CIGRE-AORC 2011 www.cigre-aorc.com Experience with Connecting Offshore Wind Farms to the Grid J. FINN 1, A. SHAFIU 1,P. GLAUBITZ 2, J. LOTTES 2, P. RUDENKO 2, M: STEGER
More informationLevel 6 Graduate Diploma in Engineering Electrical Energy Systems
9210-114 Level 6 Graduate Diploma in Engineering Electrical Energy Systems Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler,
More informationATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0
ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2014-03-31 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding
More informationExercises on overhead power lines (and underground cables)
Exercises on overhead power lines (and underground cables) 1 From the laws of Electromagnetism it can be shown that l c = 1 v 2 where v is the speed of propagation of electromagnetic waves in the environment
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationRajasthan Technical University, Kota
COURSE FILE POWER SYSTEM ENGINEERING Name Branch Session Semester : Dr. Dinesh Birla : Electrical Engineering : 2012-13, Odd Semester : B. Tech VII Semester Index: Course File Sr. No. 1 Students Detail
More informationCHAPTER 8 Effect of HT Distribution Feeder Voltage on Distribution Transformer Losses
CHAPTER 8 Effect of HT Distribution Feeder Voltage on Distribution Transformer Losses 8.1 Introduction The present level of Transmission and Distribution (T & D) losses in Indian power system is estimated
More informationR10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours
Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions
More informationPower transformers. Shunt reactors Proven history for future success
Power transformers Shunt reactors Proven history for future success Shunt reactors an investment for today and for the future 2 Shunt reactors Improving power quality and reducing transmission costs Shunt
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationGeoff Brown & Associates Ltd
Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationCHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS
84 CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS 4.1 INTRODUCTION Now a days, the growth of digital economy implies a widespread use of electronic equipment not only in the industrial
More informationImpact of Thyristor Controlled Series Capacitor on Voltage Profile of Transmission Lines using PSAT
Impact of Thyristor Controlled Series Capacitor on Voltage Profile of Transmission Lines using PSAT Babar Noor 1, Muhammad Aamir Aman 1, Murad Ali 1, Sanaullah Ahmad 1, Fazal Wahab Karam. 2 Electrical
More informationFault Ride Through Technical Assessment Report Template
Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance
More informationOverview of Actuation Thrust
Overview of Actuation Thrust Fred Wang Thrust Leader, UTK Professor Prepared for CURENT Course September 4, 2013 Actuation in CURENT Wide Area Control of Power Power Grid Grid Measurement &Monitoring HVDC
More informationCentral Hudson Gas & Electric Corporation. Transmission Planning Guidelines
Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents
More informationDesign and Simulation of Passive Filter
Chapter 3 Design and Simulation of Passive Filter 3.1 Introduction Passive LC filters are conventionally used to suppress the harmonic distortion in power system. In general they consist of various shunt
More informationCERN - ST Division THE NEW 150 MVAR, 18 KV STATIC VAR COMPENSATOR FOR SPS: BACKGROUND, DESIGN AND COMMISSIONING
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN - ST Division ST-Note-2003-023 4 April 2003 THE NEW 150 MVAR, 18 KV STATIC VAR COMPENSATOR FOR SPS: BACKGROUND,
More informationEH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström
EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids
More informationUnit Auxiliary Transformer (UAT) Relay Loadability Report
Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC
More informationTertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.
Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing
More informationPower System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian institute of Technology, Kharagpur
Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian institute of Technology, Kharagpur Lecture - 10 Transmission Line Steady State Operation Voltage Control (Contd.) Welcome
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More informationGUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards. Notification No. 7 of 2005
GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) Power System Management Standards Notification No. 7 of 2005 In exercise of the powers conferred under Section 42 (b) of the Gujarat Electricity Industry
More informationBlackout Theory. EE8725 Apoorva Mysore Nataraja
Blackout Theory EE8725 Apoorva Mysore Nataraja 1 Northeast Blackout of 2003 2 Major power outages in history Blackouts People affected (millions) Location Date July 2012 India blackout 620 India 30-31
More informationThis is a preview - click here to buy the full publication. Performance of high-voltage direct current (HVDC) systems with linecommutated
TECHNICAL REPORT IEC/TR 60919-1 Edition 3.1 2013-04 colour inside Performance of high-voltage direct current (HVDC) systems with linecommutated converters Part 1: Steady-state conditions INTERNATIONAL
More informationImpact of Harmonic Resonance and V-THD in Sohar Industrial Port C Substation
Impact of Harmonic Resonance and V-THD in Sohar Industrial Port C Substation R. S. Al Abri, M. H. Albadi, M. H. Al Abri, U. K. Al Rasbi, M. H. Al Hasni, S. M. Al Shidi Abstract This paper presents an analysis
More informationAnalysis of Single and Multi Resonance Point in Reactance Characteristics of TCSC Device
Analysis of Single and Multi Resonance Point in Reactance Characteristics of TCSC Device Manojkumar Patil 1, Santosh Kompeli 2 1 Student (M.E.) Electrical Engineering Department, MSS S COE, Jalna, Maharashtra,
More informationInternational Journal of Engineering & Computer Science IJECS-IJENS Vol:12 No:06 14 Smart Power Transmission System Using FACTS Device
International Journal of Engineering & Computer Science IJECS-IJENS Vol:12 No:06 14 Smart Power Transmission System Using FACTS Device Engr.Qazi Waqar Ali ¹, Prof.Dr.Azzam ul Asar ² 1. Sarhad University
More informationATC s Mackinac Back to Back. Summary
ATC s Mackinac Back to Back HVDC Project Update Michael B. Marz American Transmission Company Summary The Need For Flow Control at Mackinac Mackinac Flow Control Requirements Available Flow Control Technologies
More informationShould we transform our lines to HVDC?
Should we transform our lines to HVDC? HVDC versushvac Gaurav Dabhi 1, Nishit Sanghvi 2, Pinkesh Patel 3 1 Electrical Eng., G.H. Patel college of Eng. & Tech., dabhi60@gmail.com 2 Electrical Eng., G.H.
More informationSmart Power Transmission System Using FACTS Device
International Journal of Applied Power Engineering (IJAPE) Vol. 2, No. 2, August 2013, pp. 61~70 ISSN: 2252-8792 61 Smart Power Transmission System Using FACTS Device Qazi Waqar Ali 1, Azzam ul Asar 2
More informationExercise 1: Power Division
Power in AC Circuits AC 2 Fundamentals Exercise 1: Power Division EXERCISE OBJECTIVE When you have completed this exercise, you will be able to determine ac power division among the components of an RLC
More informationQuanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES
National Conference of State Legislatures The Forum for America s Ideas April 2011 National Association of Regulatory Utility Commissioners Q U A N T A SERVI CES Quanta Technology Advancing the Grid Flexible
More informationSmart Wires. Distributed Series Reactance for Grid Power Flow Control. IEEE PES Chapter Meeting - Jackson, MS August 8, 2012
Smart Wires Distributed Series Reactance for Grid Power Flow Control IEEE PES Chapter Meeting - Jackson, MS August 8, 2012 Jerry Melcher Director Program Management Smart Wires Inc. 2 Agenda Technology
More informationCentral East Voltage and Stability Analysis for Marcy FACTS Project Phase I
Prepared by NYISO Operations Engineering 1. INTRODUCTION Central East Voltage and Stability Analysis for The Marcy Flexible AC Transmission System (FACTS) project is a joint technology partnership between
More informationREACTIVE POWER AND VOLTAGE CONTROL ISSUES IN ELECTRIC POWER SYSTEMS
Chapter 2 REACTIVE POWER AND VOLTAGE CONTROL ISSUES IN ELECTRIC POWER SYSTEMS Peter W. Sauer University of Illinois at Urbana-Champaign sauer@ece.uiuc.edu Abstract This chapter was prepared primarily for
More informationEast-South HVDC Interconnector II, India : in commercial operation since 2003
8006/0 5 HVDC / FACTS Highlights http://www.siemens.com/facts http://www.siemens.com/hvdc NEW! >>> Welcome to Siemens Highlights & Innovations in Transmission and Distribution East-South HVDC Interconnector
More informationELEMENTS OF FACTS CONTROLLERS
1 ELEMENTS OF FACTS CONTROLLERS Rajiv K. Varma Associate Professor Hydro One Chair in Power Systems Engineering University of Western Ontario London, ON, CANADA rkvarma@uwo.ca POWER SYSTEMS - Where are
More informationDUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning
DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationPROTECTION APPLICATION HANDBOOK
BOOK No 6 Revision 0 Global Organization Innovative Solutions Product & Substation System Business Business PROTECTION APPLICATION HANDBOOK BA THS / BU Transmission Systems and Substations LEC Support
More informationEffect of Series Capacitor on Line Protection - A Case Study
112 NATIONAL POWER SYSTEMS CONFERENCE, NPSC 22 Effect of Series Capacitor on Line Protection - A Case Study Anand Mohan, Vikas Saxena, Mukesh Khanna & V.Thiagarajan Abstract: Series compensation is a time
More informationTransient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme
I J E E E C International Journal of Electrical, Electronics ISSN No. (Online) : 2277-2626 and Computer Engineering 2(1): 7-12(2013) Transient stability improvement by using shunt FACT device (STATCOM)
More informationAgenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR
Agenda for the 18 th Northern Region constituents meeting regarding Connectivity/LTA Applications in 1.0 Minutes of 17 th Meeting of Northern Region constituents regarding Connectivity / Long Term Access
More informationEnhancement of Voltage Profile in Delta Egypt and its Importance for Oil Refining Process
International Journal of Electrical Engineering. ISSN 0974-2158 Volume 11, Number 1 (2018), pp. 115-130 International Research Publication House http://www.irphouse.com Enhancement of Voltage Profile in
More informationVoltage and Reactive Procedures CMP-VAR-01
Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes
More informationAEP INTERSTATE PROJECT: I-765
AEP INTERSTATE PROJECT: I-765 Technologies for 21 st Century Transmission I. Abstract American Electric Power (AEP) has committed to deploy state-of-the-art transmission technologies as part of the AEP
More informationIntegration of Wind Generation into Weak Grids
Integration of Wind Generation into Weak Grids Jason MacDowell GE Energy Consulting NERC ERSTF Atlanta, GA December 10-11, 2014 Outline Conventional and Power Electronic (PE) Sources Stability limitations
More informationAssessment of Saturable Reactor Replacement Options
Assessment of Saturable Reactor Replacement Options D.T.A Kho, K.S. Smith Abstract-- The performance of the dynamic reactive power compensation provided by the existing variable static compensation (STC)
More informationStudy of HVDC System in Open Access -An Indian System Experience
16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 109 Study of HVDC System in Open Access -An Indian System Experience R. K. Pandey, Senior Member IEEE, S. K. Soonee, Senior Member IEEE,
More informationFacilitating Bulk Wind Power Integration Using LCC HVDC
21, rue d Artois, F-758 PARIS CIGRE US National Committee http : //www.cigre.org 213 Grid of the Future Symposium Facilitating Bulk Wind Power Integration Using LCC HVDC A. HERNANDEZ * R.MAJUMDER W. GALLI
More informationModeling and Simulation of STATCOM
Modeling and Simulation of STATCOM Parimal Borse, India Dr. A. G. Thosar Associate Professor, India Samruddhi Shaha, India Abstract:- This paper attempts to model and simulate Flexible Alternating Current
More informationElectric Power Transmission Enhancement: A Case of Nigerian Electric Power Grid
American Journal of Electrical and Electronic Engineering,, Vol., No., - Available online at http://pubs.sciepub.com/ajeee/// Science and Education Publishing DOI:./ajeee--- Electric Power Transmission
More informationImpact Assessment Generator Form
Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project
More informationHighgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES
Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22 Why
More informationWFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS
WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE
More informationReport on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)
Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated
More informationRoll No. :... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/ POWER SYSTEM-I. Time Allotted : 3 Hours Full Marks : 70
Name : Roll No. :.... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/2011-12 2011 POWER SYSTEM-I Time Allotted : 3 Hours Full Marks : 70 The figures in the margin indicate full marks. Candidates
More informationAn Introduction to the CSCT as a New Device to Compensate Reactive Power in Electrical Networks
An Introduction to the CSCT as a New Device to Compensate Reactive Power in Electrical Networks Mohammad Tavakoli Bina, G.N.Alexandrov and Mohammad Golkhah Abstract A new shunt reactive power compensator,
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES Document 9020 Puget Sound Energy, Inc. PSE-TC-160.50 December 19, 2016 TABLE OF CONTENTS
More informationFatima Michael college of Engineering and Technology
Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric
More informationINTEGRATED TRANSMISSION PLAN Glossary
INTEGRATED TRANSMISSION PLAN Glossary SEPTEMBER 2017 GLOSSARY Term AC ACM asset health and asset health index (AHI) automatic underfrequency load shedding (AUFLS) availability bus cable capacitor bank
More informationElectrical Power Systems
Electrical Power Systems CONCEPT, THEORY AND PRACTICE SECOND EDITION SUBIR RAY Professor MVJ College of Engineering Bangalore PHI Learning Pfcte tofm Delhi-110092 2014 Preface xv Preface to the First Edition
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December
More informationSYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING
SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING 9.11/2 Transformer Testing n Type tests n Routine tests n Special tests n Applicable for tests on power and distribution transformers in factory and on-site
More information