1 Clayton Taylor CEO ComRent International, LLC.

2 24 Hour Tests Are Needed! New way of testing Ways to sell through testing Go after installed base Uptime and compliance 2

3 Eventually Generators Will Be Put To The Test Ice storms Black outs Earth quakes Hurricanes Know what you don t know 3

4 4 HR Method At 1.0 Not Adequate 4 hr does not replicate realistic emergency situations Consider multiple day tests up to 5 days Does not provide for adequate transient testing 1.0 power factor does not match real world loads at the facility.9 leading power factor with capacitor becoming more important Not enough run time to validate the system through temperature, testing and installation warranty 4

5 Old Way 4 Hour Method Low voltage load banks (typically 480 VAC) Must be used with step down transformers Systems can come pre wired with all equipment mounted to a single trailer; or can come in separate containers that need to be field connected Low voltage load dbanks and transformer assemblies introduce more components that can fild fail during testing ti 5

6 24 Hour Medium Voltage Load Banks Resistive or reactive load bank Contains resistors or reactors that operate above 690 VAC and below 15,000 VAC Permanent/portable medium voltage load banks often used for commissioning power plants, maritime electrical systems, standby generator systems and substations The most common voltages used are 5kV (4,160V) and 15kV (13,800V) Commissioning power systems 6

7 Low Voltage Load Banks vs. Medium Voltage Load Banks Pieces Connection points Points of failure Mutual inductance Labor Pieces Connection points Points of failure Mutual inductance Labor 7

8 8

9 9

10 10

11 Industry Case Studies 24 HOUR TESTING, CASE IN POINT 11

12 Water and Wastewater Emergency Power Why Testing Was Needed: Commission proper operation of the entire system from fuel line through transfer switch Generators should be steploaded to accurately reflect system demands and ensure proper emergency load sequencing Transient response, noise, vibration and fuel use rates can be reviewed during the test Prevent disruption of a critical pumping process 12

13 Water and Wastewater Emergency Power Project Scope: 2.8 MW resistive load at 4160V to generator Commission new equipment at pump station 3MW of resistive iti load dbanks, a 7MVA transformer, and switchgear with medium and low voltage cable Labor for unit cable runs and tie in for the transformer 13

14 Data Centers Medium voltage load banks eliminates the use of transformers for testing ti multiple generators in a data center pod Safer for the generator since it is not subjected to fluctuations in voltage and current when a transformer is used to step the voltage down for low voltage load banks 14

15 Oil and Gas Ensure that gas turbine generators continued to work while switching out analog controls for digital controls Generators were absolutely critical to the ongoing operation of the field. If the turbines ever failed future flow rates would have been lost in the oil field With mediumvoltage load banks, the performance of the new digital controls was validated and the continued operation of the field ensured 15

16 Cruise Ships Losing generator power at sea is a catastrophe that makes front page news Medium voltage load bank testing right to the dock before the ship sets sail When a cruise line installs new diesel generators, load bank testing ensures ships keep the lightsonandthe the propellers turning Never have to say DIW Happiness aboard ship 16

17 Always Specify A 24 Hour Test Closing statements Leaving future risk and downtime intact 5 day test to mimic 100 day storm event Generators don t run under water (flood plain operation) Recap Enforce key messages 17

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

Experience with Connecting Offshore Wind Farms to the Grid

Experience with Connecting Offshore Wind Farms to the Grid Oct.26-28, 2011, Thailand PL-22 CIGRE-AORC 2011 www.cigre-aorc.com Experience with Connecting Offshore Wind Farms to the Grid J. FINN 1, A. SHAFIU 1,P. GLAUBITZ 2, J. LOTTES 2, P. RUDENKO 2, M: STEGER

More information

Form B. Connection Impact Assessment Application Form Distribution System

Form B. Connection Impact Assessment Application Form Distribution System Form B Connection Impact Assessment Application Form Distribution System This Application Form is for Generators applying for Connection Impact Assessment ( CIA ). It is important that the Generator provides

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer

More information

Initial Application Form for Connection of Distributed Generation (>10kW)

Initial Application Form for Connection of Distributed Generation (>10kW) Please complete the following information and forward to Vector Contact Details Primary Contact (who we should contact for additional information) Contact person Company name Contact numbers Daytime: Cell

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document Version 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying the definition.

More information

Quanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES

Quanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES National Conference of State Legislatures The Forum for America s Ideas April 2011 National Association of Regulatory Utility Commissioners Q U A N T A SERVI CES Quanta Technology Advancing the Grid Flexible

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk

More information

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

شركة الوقت للكهرباء والمقاوالت ذ.م.م. CONTRACTING COMPANY W.L.L. is a leading corporate in the United Arab Emirates offering quality services in the field of High Voltage Electrical work 400, 132 & 33 kv and Medium Voltage Power Distribution

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y. 10003 EP 7000 5 JULY 2009 VOLTAGE SCHEDULE, CONTROL, AND OPERATION OF THE TRANSMISSION SYSTEM PURPOSE This specification describes

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

PHASEBACK HARMONIC SILENCER. Applied Energy LLC Mackinaw Meadows Drive. Saginaw, Michigan Phone:

PHASEBACK HARMONIC SILENCER. Applied Energy LLC Mackinaw Meadows Drive. Saginaw, Michigan Phone: Applied Energy LLC 3011 Mackinaw Meadows Drive Saginaw, Michigan 48603 Phone: 989-790-1441 PHASEBACK HARMONIC SILENCER PATENT NO. 7,923,867 For Low, Medium & High Voltage Systems HARMONIC SILENCING Phaseback

More information

SWF DV/DT Solutions Sinewave Filters. N52 W13670 NORTHPARK DR. MENOMONEE FALLS, WI P. (262) F. (262)

SWF DV/DT Solutions Sinewave Filters. N52 W13670 NORTHPARK DR. MENOMONEE FALLS, WI P. (262) F. (262) SWF DV/DT Solutions Sinewave Filters N52 W13670 NORTHPARK DR. MENOMONEE FALLS, WI 53051 P. (262) 754-3883 F. (262) 754-3993 www.apqpower.com Does your application use variable frequency drives for improved

More information

Resonances in Collection Grids of Offshore Wind Farms

Resonances in Collection Grids of Offshore Wind Farms Downloaded from orbit.dtu.dk on: Dec 20, 2017 Resonances in Collection Grids of Offshore Wind Farms Holdyk, Andrzej Publication date: 2013 Link back to DTU Orbit Citation (APA): Holdyk, A. (2013). Resonances

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years

More information

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative:  Address: Fax Number: Interconnection of a Customer-Owned Renewable Generation System of Greater than 100 KW and Less than or Equal to 1 MW to the LCEC Electric Grid Tier 3 Application and Compliance Form Instructions: Complete

More information

Audio Accessory IC Series Ground Isolation Amplifier BA3121F, BA3123F Rev.A 1/8

Audio Accessory IC Series Ground Isolation Amplifier BA3121F, BA3123F Rev.A 1/8 Audio Accessory IC Series Ground Isolation Amplifier BA3121F, BA3123F No.09092EAT01 Description The BA3121F/BA3123F are ground isolation amplifiers developed for use in car audio applications. This IC

More information

P2 Power Solutions Pvt. Ltd. P2 Power Magnetics. Quality Power within your Reach. An ISO 9001:2008 Company

P2 Power Solutions Pvt. Ltd. P2 Power Magnetics. Quality Power within your Reach. An ISO 9001:2008 Company P2 Power Solutions Pvt. Ltd. An ISO 9001:2008 Company Quality Power within your Reach P2 Power Magnetics P2 Power Solutions Pvt. Ltd. P2 Power Solutions Pvt. Ltd. provides EMC and power quality solutions,

More information

Connection Impact Assessment Application Form

Connection Impact Assessment Application Form Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information

More information

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project General Technical Specifications of Converters for Tokyo-Chubu Interconnection Project Note: It is possible that the contents of these specifications may be changed according to our detailed studies. Present

More information

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks Working Group Meeting June 5-6, 2012 Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks Prof. Mario Paolone EPFL, Switzerland - Distributed Electrical Systems

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS Giuseppe Di Marzio NTNU giuseppe.di.marzio@elkraft.ntnu.no Olav B. Fosso NTNU olav.fosso@elkraft.ntnu.no Kjetil Uhlen SINTEF

More information

THE FIRST STEP IN THE RESOLUTION OF VOLTAGE DISTORTION FOR SHARED GENERATORS AND MV UNDERSEA RING MAIN IN AN OFFSHORE OIL FIELD

THE FIRST STEP IN THE RESOLUTION OF VOLTAGE DISTORTION FOR SHARED GENERATORS AND MV UNDERSEA RING MAIN IN AN OFFSHORE OIL FIELD THE FIRST STEP IN THE RESOLUTION OF VOLTAGE DISTORTION FOR SHARED GENERATORS AND MV UNDERSEA RING MAIN IN AN OFFSHORE OIL FIELD Copyright Material IEEE Paper No. PCIC - Abstract Ian C. Evans Managing Partner

More information

Grid Impact of Neutral Blocking for GIC Protection:

Grid Impact of Neutral Blocking for GIC Protection: Report submitted to EMPRIMUS - Critical Infrastructure Protection Grid Impact of Neutral Blocking for GIC Protection: Impact of neutral grounding capacitors on network resonance Prepared By: Athula Rajapakse

More information

APPENDIX B: Generation Interconnection Application Form

APPENDIX B: Generation Interconnection Application Form 2 APPENDIX B: Generation Interconnection Application Form WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect with Xcel Energy (Local electric utility)

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

Power transformers. Shunt reactors Proven history for future success

Power transformers. Shunt reactors Proven history for future success Power transformers Shunt reactors Proven history for future success Shunt reactors an investment for today and for the future 2 Shunt reactors Improving power quality and reducing transmission costs Shunt

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK PO Box 25876 Safat 13119 Kuwait Contact: Mr Atul Madhukar Vaidya Tel: +965 1822600 Fax: +965 24761963 E-Mail: factory@ahleiasg.com Website:

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

High voltage shunt capacitor banks HIGH VOLTAGE COMPENSATION AND HARMONIC FILTERING PRODUCTS

High voltage shunt capacitor banks HIGH VOLTAGE COMPENSATION AND HARMONIC FILTERING PRODUCTS High voltage shunt capacitor banks Alstom Grid high voltage shunt capacitor bank offering is divided in: By bank construction HV open rack capacitor banks HV enclosed capacitor banks By bank design HV

More information

POWERING SUBSEA LOADS OVER LONG DISTANCES

POWERING SUBSEA LOADS OVER LONG DISTANCES Space optimiced multidirve Solutions PETRONAS - PETRAD - INTSOK CCOP DEEPWATER SUBSEA TIE-BACK POWERING SUBSEA LOADS OVER LONG DISTANCES January 26, 2011 Slide 1 Presentation Overview History Typical Subsea

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

There are many important factors when trying to achieve good, reliable communications between 2 devices.

There are many important factors when trying to achieve good, reliable communications between 2 devices. APPLICATION NOTE THIS INFORMATION PROVIDED BY AUTOMATIONDIRECT.COM TECHNICAL SUPPORT These documents are provided by our technical support department to assist others. We do not guarantee that the data

More information

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 % BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and

More information

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,

More information

Do Capacitor Switching Transients Still Cause Problems?

Do Capacitor Switching Transients Still Cause Problems? Do Capacitor Switching Transients Still Cause Problems? Mark McGranaghan We have been evaluating problems related to capacitor switching transients for many years. Capacitor banks have been used on distribution

More information

UNITEST FULL MISSION ENGINE ROOM SIMULATOR

UNITEST FULL MISSION ENGINE ROOM SIMULATOR UNITEST FULL MISSION ENGINE ROOM SIMULATOR The UNITEST full mission engine room simulator is based on very modern solutions, which are presently used in medium-sized, computer-controlled engine rooms.

More information

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

Power Frequency Withstand Voltage On-site testing of 400 kv GIS Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:

More information

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation This application is to be completed and returned to the Cooperative member service representative in order to begin

More information

OBICON. Perfect Harmony. Short overview. ROBICON Perfect Harmony. System Overview. The Topology. The System. ProToPS. Motors.

OBICON. Perfect Harmony. Short overview. ROBICON Perfect Harmony. System Overview. The Topology. The System. ProToPS. Motors. and Drives Control R Interface OBICON Perfect Harmony Short overview 14.03.2007 1 System overview Product features Truly Scaleable Technology 300 kw to 30 MW (Single Channel) Large Number of Framesizes

More information

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION This application should be completed and returned to in order to begin processing the request for interconnecting as required by

More information

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Cátedra de Idiomas Inglés VI. Ingeniería Marítima

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Cátedra de Idiomas Inglés VI. Ingeniería Marítima Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Cátedra de Idiomas Inglés VI. Ingeniería Marítima UNIT II. Navigational equipment found onboard ships. Speaking. 1. Can you

More information

Lab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009

Lab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009 Lab 1 Objectives In this lab, our objective is to simulate a simple single machine infinite bus configuration using the PowerWorld Simulator software. We design a local generator system (a synchronous

More information

Distribution System Development & Preliminary Studies

Distribution System Development & Preliminary Studies Distribution System Development & Preliminary Studies IEEE CED January 27, 2016 (second night) 2016 KBR, Inc. All Rights Reserved. Agenda Distribution System Development Modeling Data Studies Overview

More information

SAMCon High Voltage Shore Connection System On-shore and Onboard

SAMCon High Voltage Shore Connection System On-shore and Onboard High Voltage Shore Connection System On-shore and Onboard Emission-free Power Supply High Voltage On-shore Power Supply System (OPS) There is increasing pressure on shipping operators and port authorities

More information

Introduction to HVDC Transmission. High Voltage Direct Current (HVDC) Transmission

Introduction to HVDC Transmission. High Voltage Direct Current (HVDC) Transmission Lecture 29 Introduction to HVDC Transmission Series Compensation 1 Fall 2003 High Voltage Direct Current (HVDC) Transmission Update to Edison s Vision AC Power Generation at Relatively Lower Voltage» Step

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

Totally Integrated Power (TIP) for the Oil and Gas Industry

Totally Integrated Power (TIP) for the Oil and Gas Industry Totally Integrated Power (TIP) for the Oil and Gas Industry Power for challenging environments Reliable. Safe. Efficient. Totally Integrated Power (TIP) Our comprehensive portfolio and extensive integration

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric

More information

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas

More information

Transformers TRANS FORM ERS

Transformers TRANS FORM ERS Transformers TRANS FORM ERS Meiden Transformers are standard design, standard quality. Our Factories on world-wide supply chain Since its founding in 1897 Meidensha Corporation has not only built up a

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

In Class Examples (ICE)

In Class Examples (ICE) In Class Examples (ICE) 1 1. A 3φ 765kV, 60Hz, 300km, completely transposed line has the following positive-sequence impedance and admittance: z = 0.0165 + j0.3306 = 0.3310 87.14 o Ω/km y = j4.67 410-6

More information

Power System Stability. Course Notes PART-1

Power System Stability. Course Notes PART-1 PHILADELPHIA UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT Power System Stability Course Notes PART-1 Dr. A.Professor Mohammed Tawfeeq Al-Zuhairi September 2012 1 Power System Stability Introduction Dr.Mohammed

More information

Delayed Current Zero Crossing Phenomena During Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena During Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena During Switching of Shunt-Compensated Lines David K Olson Paul Nyombi Xcel Energy Pratap G Mysore Pratap Consulting Services Minnesota Power Systems Conference St.

More information

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number:  Address: NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information

More information

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES IEEE PES Transmission and Distribution Conference_ Chicago April 2008 Dean Sharafi Introduction Electro-magnetic

More information

Connection Impact Assessment Application

Connection Impact Assessment Application Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Medium Engine Room Simulator - MER3D

Medium Engine Room Simulator - MER3D Medium Engine Room Simulator - MER3D PC-based Engine Room Simulator MER3D Engine Room Simulator is based on the Bergen diesel (Rolls Royce) C25:33 engines, typical of the Workboat industry and of medium-sized

More information

The power to work. Power conditioning products. Harmonic correction unit Sag ride-through power conditioner

The power to work. Power conditioning products. Harmonic correction unit Sag ride-through power conditioner conditioning products Electronic voltage regulator -Sure 700 & 800 -Suppress T7 & 100 Harmonic correction unit Sag ride-through power conditioner The power to work Basics of power quality The partner you

More information

EECS 579 Fall What is Testing?

EECS 579 Fall What is Testing? EECS 579 Fall 2001 Recap Text (new): Essentials of Electronic Testing by M. Bushnell & V. Agrawal, Kluwer, Boston, 2000. Class Home Page: http://www.eecs.umich.edu/courses/eecs579 Lecture notes and other

More information

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre.

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre. General PQ: Power Quality has multiple issues involved. Thus, need to have some benchmarking standards. Very little is spoken about the LT supply installation within an industry. There is need to understand

More information

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays

More information

THE GUIDELINE TO ELECTRIC PROPULSION

THE GUIDELINE TO ELECTRIC PROPULSION THE GUIDELINE TO ELECTRIC PROPULSION STADT STASCHO is a No Loss AC drive that supplies sinusoidal voltage and current to the electric motor and back to the main switchboard. This gives very low harmonic

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS TABLE OF CONTENTS PAGE 1.0 SCOPE... 2 2.0 STANDARDS... 2 3.0 DESIGN REQUIREMENTS... 2 3.01 Service Conditions... 2 3.02 Ratings... 3 4.0 Sectionalizer Construction... 4 5.0 Mechanism... 6 6.0 Solid Dielectric

More information

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS n Quality made in Germany n Standardized and customized solutions n Turn key projects, all from one hand 0.1-1/1 Product Portfolio Test and Measuring Systems

More information

HVDC High Voltage Direct Current

HVDC High Voltage Direct Current HVDC High Voltage Direct Current Typical HVDC Station BACK TO BACK CONVERTER STATION MONO POLAR WITH GROUND RETURN PA Back to Back Converters indicates that the Rectifiers & Inverters are located in the

More information

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics:

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics: A. Introduction 1. Title: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions 2. Number: MOD-027-1 3. Purpose: To verify that the turbine/governor

More information

PART 1 OWNER/APPLICANT INFORMATION

PART 1 OWNER/APPLICANT INFORMATION CALHOUN COUNTY ELECTRIC COOP. ASSN. Application for Operation of Customer-Owned Generation This application should be completed as soon as possible and returned to the Cooperative in order to begin processing

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication

More information

Power Quality Requirements for Connection to the Transmission System

Power Quality Requirements for Connection to the Transmission System Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

Technical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope

Technical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope Date: Page: 1 / 10 Personal Data Name: Company / institution: Phone: E-mail: Fax: Application Quotation number: (will be filled in by HIGHVOLT) Test field, stationary research institute mobile on-site

More information

Continuous Monitoring on the SSE Networks Transmission System

Continuous Monitoring on the SSE Networks Transmission System 10 th Universities High Voltage Network Colloquium 18 th - 19 th January 2017, GCU, Glasgow, Scotland Continuous Monitoring on the SSE Networks Transmission System The Need for Standards, Specifications

More information

Harmonic Solutions. Clean Power Drive Solution to Harmonic Distortion

Harmonic Solutions. Clean Power Drive Solution to Harmonic Distortion Harmonic Solutions Clean Power Drive Solution to Harmonic Distortion UTILITY GRID UTILITY SWITCH YARD IN THE FACILITY IEEE-519 POINT OF COMMON COUPLING POWER PLANT GENERATION TRANSMISSION MEDIUM VOLTAGE

More information

Thyristor power controller B DI1002 V1.0 Manual/Operating instructions

Thyristor power controller B DI1002 V1.0 Manual/Operating instructions 1 B DI1002 V1.0 Manual/Operating instructions 2 1 Introduction Before you put the thyristor controller into operation, please read these operating instructions. Keep them in safe place accessible for all

More information

Subsea Electric Power Grid

Subsea Electric Power Grid Subsea Electric Power Grid Transatlantic Science Week November 14, 2012 Anngjerd Pleym Siemens - Oil & Gas Division Integrated System Solutions Technology & Innovation Subsea power distribution is the

More information

Implementation of OPF for Voltage control recommendations in real time Refinements to Loss minimization (Ongoing) Conclusions

Implementation of OPF for Voltage control recommendations in real time Refinements to Loss minimization (Ongoing) Conclusions REAL TIME IMPLEMENTATION OF OPF BASED VOLTAGE CONTROL TOOL IN BCHydro Advanced Voltage Control Workshop, EPRI, May 19-20, 2011, Pennsylvania,U.S.A. Veera Raju VINNAKOTA (veera.raju.vinnakota@bchydro.com),

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

East-South HVDC Interconnector II, India : in commercial operation since 2003

East-South HVDC Interconnector II, India : in commercial operation since 2003 8006/0 5 HVDC / FACTS Highlights http://www.siemens.com/facts http://www.siemens.com/hvdc NEW! >>> Welcome to Siemens Highlights & Innovations in Transmission and Distribution East-South HVDC Interconnector

More information

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title POWER SYSTEM GENERATION & DISTRIBUTION Training Duration 5 days Training Venue and Dates Power System Generation & Distribution 5 08-12 December, 2019 $4,000 Dubai, UAE Trainings will be

More information

Planners Perspective on Series Compensated Transmission Lines

Planners Perspective on Series Compensated Transmission Lines TOGETHER WE DELIVER Planners Perspective on Series Compensated Transmission Lines Kenneth A. Donohoo, PE Director, System Planning Distribution and Transmission kenneth.donohoo@oncor.com Oncor Electric

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information