1 Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Paper Reference Number: Name of the presenter: D. Anaraki Ardakani: Abstract Using Gas Insulated Substation in urban areas in the world has been widely popular. After installation, and before being put into service, the GIS shall be tested in order to check the correct operation and the dielectric integrity of the equipment. Since it is especially important for GIS, the dielectric integrity shall be checked in order to eliminate fortuitous causes (wrong fastening, damage during handling, transportation, storage and installation, presence of foreign bodies, etc.) which might in the future give rise to an internal fault. Because of their different purpose, these tests shall not replace the type tests or the routine tests carried out on the transport units and, as far as possible, in the factory. They are supplementary to the dielectric routine tests with the aim of checking the dielectric integrity of the completed installation and of detecting irregularities as mentioned above. In this paper, a novel test set-up and the measurement results of a 400 kv GIS has been installed for the Sheykh Bahai Substation, Tehran, Iran, are presented. The study of test conclusion shows that it is done successfully in three phases. Key words: Dielectric on site test, GIS, Cascade transformer, Power frequency withstand voltage test, MATLAB 1. Introduction Gas Insulated Substation (GIS) has been in service for more than 40 years and they have shown a high level of reliability with extremely small failure rates even for modern GIS showing a high compactness.gis was first developed in various countries between 1968 and After about 5 years of experience, the use rate increased to about 20% of new substations in countries where space is limited. In other countries with space easily available, the higher cost of GIS relative to AIS has limited use to special cases. For example, in the U.S., only about 2% of new substations are GIS (Bolin, 2003). Each GIS in compare with Air Insulated Substation (AIS) with similar condition need to 10% space. In many countries the safety of electrical installations against military and terrorist attack has prime importance. This kind of substation is a proper choice since it can be concealed and protected easily. In Iran, also many GISs have been installed successfully up to extra high levels of voltage such as 400 kv and they are in use presently. Although the reliability of GIS is high, any internal breakdown that does occur invariably causes extensive damage and an outage of several days

2 duration is needed to affect the repair. During this time the associated circuit may be out of operation and the consequential losses can be high, especially if the GIS is operating at 420 kv or above. If in addition the GIS is connecting the output of a nuclear station to the transmission network and the breakdown leads to a reactor shutdown, the financial penalties could be most severe (A.Hadda, 2007).Therefore after installation, and before being put into service, the GIS shall be tested in order to check the correct operation and the dielectric integrity of the equipment. These tests and verifications comprise dielectric tests on the main circuits, dielectric tests on auxiliary circuits, measurement of the resistance of the main circuit, gas tightness tests, checks and verifications, and gas quality verifications ( IEC ,2012). Because of their different purpose, these tests shall not replace the type tests or the routine tests carried out on the transport units and, as far as possible, in the factory. On-site high-voltage tests are required (IEC , 2006): 1- As withstand tests as part of a commissioning procedure on equipment to demonstrate that transport from manufacturer to site, and the erection on-site complies with manufacturer s specification; 2- As withstand tests after on-site repair, to demonstrate that the equipment has been successfully repaired, and is in a suitable condition to return to service; 3- For diagnostic purposes, e.g. PD measurement, to demonstrate if the insulation is still free from dangerous defects, and as an indication of life expectation In this paper, the quality of performing the power frequency test in 400 kv GIS substation of Sheikh Bahai and the measured results are demonstrated. In the following sections, we will review the possible solutions to perform the test; the method which is used and the voltage measurement are desired in these segments. 2. The Possible Solutions Generally the normal laboratory testing equipment is not proper for transportation and Special designs of portable systems are necessary. These may take the form of custom-built vehicles containing, for example, High Voltage (HV) testing transformers and standard capacitors. It is obvious that an important factor in test equipment design is the need for greater mechanical strength than their counterparts in the laboratory and increased awareness regarding safety aspects while setting up temporary test areas. (A.Hadda, 2007). The power frequency voltage may be produced by (IEC , 2012): test sets with a test transformer, test sets with a variable resonant reactor for constant frequency, test sets with a constant resonant reactor for variable frequency, energizing power or voltage transformers from the low-voltage side which entails no dismantling after testing. 3. APPLIED SOLUTION: CASCADED VOLTAGE TRANSFORMERS

3 In this test the method which is used is test set with a test transformer. High voltage transformers are not usually proper for portable test system due to their big dimensions and high weight. Many experiments are performed for dielectric test on GIS, and systems with different power and energy are employed for on-site tests. In order to perform the AC test we need a voltage source with a high power due to Load capacitances of GIS installations are relatively high (10 or even 20 nf per bus bar). For instance, an 8 nf capacitor in kv voltage needs 1 A current in output which is considered a high power. Two high voltage transformers are made and designed for the test in this study The structure and components of system set This system includes following components (Fig. 1) 1) Regulating Transformer 2) Compensating Reactor 3) Cascade Transformers 4) Voltage Divider 5) Control Panel 6) Damping Resistor 7) High Voltage Connections and Earth System Insulating case transformers are well suited for cascade connection. These transformers are made as the standard essentials IEC for the test. HV transformers are supplied by a Regulating transformer. These regulating transformers are designed in different ranges. Regulating transformer supply the desired voltage by a motor which has a standard rate. According to standard after that voltage reaches to 75% of test voltage, it would increase by 2% of test voltage per second. In order to compensate the reactive power made by capacitor currents of substation, compensation reactors are used in low voltage side. These reactors are placed in low voltage side and its preference is to need a low power for regulating transformer. In this test, three reactors (two air core and one oil reactor) by different capacities are used. According to every capacitance of each test level, its connections are added to the circuit manually in parallel forms. In order to limit the current and increase short circuit impedance of transformer when possibility of discharge occurs, the damping resistor is placed in low voltage circuit in series mode on the regulating transformer output Test procedure As regards the aim of these tests is to offer a final check before energizing. It is very important that the chosen test procedure does not jeopardize sound parts of the GIS.

4 1) Regulating Transformer 2) Compensating Reactor 3) Cascade Transformers 4) Voltage Divider 5) Control Panel 6) Damping Resistor Fig 1: General schematic of test circuit In choosing an appropriate test method for each individual case, a special agreement may be necessary in the interest of practicability and economy, e.g. the electrical power requirements and the dimensions and weight of the test equipment may need to be considered (James, 2007). Before the test starts, is considered the following points: The GIS shall be installed completely and gas-filled at its rated filling density. Some parts may be disconnected for the test, either because of their high charging current or because of their effect on voltage limitation, such as high voltage cables and overhead lines; power transformers and, occasionally, voltage transformers; surge arresters and protective spark gaps. The sections which, in such cases, are not being tested, and which are isolated by a circuit breaker or a disconnector from the section under test, shall be earthed For 3-phase enclosed GIS, the specified test voltage shall be applied between each phase conductor, one at a time, and the enclosure, the other phase conductors being connected to the earthed enclosure. The insulation between phase conductors shall not be subjected to any other separate dielectric test on site. The test voltage source may be connected to any convenient point of the phase conductor under test.

5 It is often convenient to divide the whole installation of GIS into sections by opening circuit breakers and disconnectors for following reasons (IEC , 2012): to limit the capacitive load on the test voltage source; to facilitate the location of disruptive discharges; to limit the discharged energy if a disruptive discharge occurs. In this test, the substation which is installed is divided to three separate sections (section1, section2, section3) which is shown in Fig. 2. Considering that transport units have normally been subjected to routine tests, the probability of disruptive discharges is higher for the complete installation than for individual functional units, disruptive discharges in correctly installed equipment shall be avoided and agreed between the manufacturer and user applied voltage are done by the following test sequence (IEC , 2012): The testing voltage is increased to 230 kv and it is kept to 15 (min). Testing voltage is being increased again to kv and is kept to 1 (min). Then the voltage level would return to zero as soon as possible (Fig. 3). The switchgear shall be considered to have passed the test if each section has withstood the specified test voltage without any disruptive discharge. Fig 2: The GIS is divided to three parts to perform the test, which is shown in different layouts.

6 (V (kv)) (t(min)) Fig 3: Test sequence 4. Simulation Before doing the practical test, simulation is performed with MATLAB (version 7.0.4) and the results are used for the practical test.the simulation is according to maximum load (capacitance of the largest sections) 6 nf, technical specification of test equipments (for example Transformer 1 (T1):0.5/400 kv, Transformer 2 (T2):0.4/300 kv) and existing reactors in this test that have different reactance (L1=0.5 mh, L2=1 mh, L3=4 mh). Due to the table I the max of current in reactors is about 1260 A (L1) and the network current with maximum 300 A and regulating transformer with maximum 400 A is needed. 5. Practical Test According to standard it is often convenient to divide the whole installation of GIS into sections so this substation by opening circuit breakers and disconnectors is divided in to three sections in the test and test sequence applied to each section. In table II different current of each reactor and secondary transformer and regulating transformer are shown. Currents are relatively high that supplied by reactors. Without these reactors demanded power and subsequently the reactor dimension would increase. Also the network with a high power is needed. The reason of diversity in capacitor current of each section is the length of bus bars and their different capacitance. Section 3 has a higher capacity according to the extra Bus duct than other sections and thus, the longer length. Then it would have higher capacitor current (charging current). The used transformers in the test have the transformation ratio of 400 V/300 kv, 500 V/400 kv, so we get 700 kv for the whole set. Max. of Load (nf) Reactors Current (A) L1=0.5(mH) L2=1(mH) L3=4(mH) Capacitor Current (ma) Output Voltage (kv) Network Current (A) Secondary Current of Regulating Transformer (A) TABLE I. CURRENT OF REACTORS, REGULATING TRANSFORME AND CAPACITOR IN SIMULATON OF TEST CIRCUIT In order to get the final testing kv voltage, the primary 238 V is needed. In sections 1 and 2 only one reactor (L1) is used according to load capacitance. As shown in table II even by

7 the compensation reactors, a relatively high current flowed in the secondary regulating transformer. If the reactors didn t use, the maximum current in low voltage side reached to 1400 A instead of 400 A, which is a high current and it actually would make the test impossible and impracticable. Because this regulating transformer definitely would have big dimension and volume, they cannot be moved easily and there were no low voltage network available having these feature. So one of the essential parts of this test was to lower the transformer current to 400 A, based on available tools and equipment. Hence, using the reactors to meet this essential need was one of the most important parts of the test (each reactor have different maximum current, L1=1500 A, L2=700 A, L3=600 A). The other of essential parts of the test was power limitation of T2, according to simulation the maximum capacitor current in section3 (the largest section) is higher than power of T2 and it could cause problem to do the test. But, considering the short time (1 minute) of the maximum apply test voltage, it is negligible. A capacitive divider was used in the test to measure the HV output. In order to remove the corona and proper distribution of voltage a top electrode is placed on its upper cover of divider (Fig. 4). The top electrode is either an aluminum toroid. To measurement of output voltage is use Digital Peak Voltmeter (DPV). This voltmeter is made in the Academic Center for Education, Culture and Research (ACECR) and measures the output voltage. The earth connections between the elements are considered star mode. For each element, the set is connected to the earth independently. Fig 4: A view of HV capacitors for voltage divider (left),and cascade transformers (right) No. of Sections Phase Name A B C A B C A B C Output Voltage (kv) Reactors Current (A) L1 L2 L Secondary Current of regulating transformer (A) Capacitor current (Charging current) (ma) TABLE II. CURRENT OF REACTORS, REGULATING TRANSFORME AND CAPACITOR IN TEST CIRCUIT

8 In this test tried to consider the shortest route for the earth connection especially in GIS substation, in order to prevent the voltage differences if possible flashover happens (James, 2007). In order to apply high voltage on every Bushing s head, an HV connection with diameter of 8 cm is used to remove corona. 6. Test result The test with kv is indicated by cascade transformer (two transformers) with displayed currents in table II is performed at 400 kv substation of Sheikh Bahai-Tehran. The highest current lead to the highest power of 330 kva. During the test no breakdown is seen. Finally all the sections were tested in the applied voltage of 230kv in 15 (min) and kv in 1 (min) without any problems or errors. 7. Conclusion Dielectric testing on GIS substation is one of the most important indicators to confirm the accuracy of these systems before initiation. According to the large dimensions of the substations it is impossible to test whole GIS before its installation. On the other hand, because of relatively large capacitance of such systems, especially in cases where the total length of the installed GIS exceeds some tens of meters, the high voltage source has to be capable of delivering relatively high levels of current. In this paper, a high voltage test set is proposed to perform in-situ insulation tests on a 400 kv GIS installed for the Sheikh Bahai- Tehran Iran.Different solutions are discussed for the test and its results. The method used in the test includes two cascade transformers with 1 A output current which fed by a regulating transformer. In this method three low voltage reactors used to compensate the capacitive current and minimize the input current of the test transformers.gis is divided into sections and the applied voltage of each step was kv. The results show that the test was successful and the GIS was confirmed in the dielectric test. References Bolin, P. (2003). Electric Power Substations Engineering. CRC Press. Feser, k. (1980). High Voltage of Testing ofmetalenclosed,gis on-site Oscillating switching Impulse Voltages. HAEFELY. Hadda, A., D. W. (2007). Advances in high voltage engineering. London: IET Power and energy Series 40. (2012). High-voltage switchgearandcontrolgear Part 203: Gas-insulated metal-enclosed for rated voltages above 52 kv. Switzerland: IEC. (2006). High-voltage test techniques Part 3:Definitions and requirements for on-site testing. Switzerland: IEC. James, R. (2007). Condition Assessment of High Voltage Insulation in Power System Equipment. IET Power and Energy.

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

HIGH VOLTAGE ENGINEERING(FEEE6402) LECTURER-24

HIGH VOLTAGE ENGINEERING(FEEE6402) LECTURER-24 LECTURER-24 GENERATION OF HIGH ALTERNATING VOLTAGES When test voltage requirements are less than about 300kV, a single transformer can be used for test purposes. The impedance of the transformer should

More information

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR 621 212 DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING EE1003 HIGH VOLTAGE ENGINEERING QUESTION BANK UNIT-I OVER VOLTAGES IN ELECTRICAL POWER SYSTEM

More information

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING YEAR / SEM : IV / VII UNIT I OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS 1. What

More information

Estimation of Re-striking Transient Overvoltages in a 3-Phase 132KV Gas insulated Substation

Estimation of Re-striking Transient Overvoltages in a 3-Phase 132KV Gas insulated Substation Estimation of Re-striking Transient Overvoltages in a 3-Phase 132KV Gas insulated Substation M. Kondalu1, Dr. P.S. Subramanyam2 Electrical & Electronics Engineering, JNT University. Hyderabad. 1 Kondalu_m@yahoo.com

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Estimation of Re-striking Transient Over voltages in a 132KV Gas insulated Substation

Estimation of Re-striking Transient Over voltages in a 132KV Gas insulated Substation Estimation of Re-striking Transient Over voltages in a 132KV Gas insulated Substation M. Kondalu1, P.S. Subramanyam2 Electrical & Electronics Engineering, JNT University. Hyderabad. 1 Kondalu_m@yahoo.com

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

Testing of 400 kv GIS

Testing of 400 kv GIS Testing of 400 kv GIS Robert le Roux, Dermot Dorgan, Brian Perry ESB International - Ireland Paper 028 1 Introduction The 400 kv transmission is designed for critical periods of low loading. Due to critical

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

TECHNICAL REPORT. Insulation co-ordination

TECHNICAL REPORT. Insulation co-ordination TECHNICAL REPORT IEC TR 60071-4 First edition 2004-06 Insulation co-ordination Part 4: Computational guide to insulation co-ordination and modelling of electrical networks IEC 2004 Copyright - all rights

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60071-2 Third edition 1996-12 Insulation co-ordination Part 2: Application guide This English-language version is derived from the original bilingual publication by leaving out

More information

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

FGJTCFWPKPUVKVWVGQHVGEJPQNQI[ FGRCTVOGPVQHGNGEVTKECNGPIKPGGTKPI VGG246JKIJXQNVCIGGPIKPGGTKPI FGJTFWP"KPUKWG"QH"GEJPQNQI[" FGRTOGP"QH"GNGETKEN"GPIKPGGTKPI" GG"46"JKIJ"XQNIG"GPIKPGGTKPI Resonant Transformers: The fig. (b) shows the equivalent circuit of a high voltage testing transformer (shown

More information

EE High Voltage Engineering UNIT IV - MEASUREMENT OF HIGH VOLTAGES AND HIGH CURRENTS PART-A 1. Mention the techniques used in impulse current

EE High Voltage Engineering UNIT IV - MEASUREMENT OF HIGH VOLTAGES AND HIGH CURRENTS PART-A 1. Mention the techniques used in impulse current EE6701 - High Voltage Engineering UNIT IV - MEASUREMENT OF HIGH VOLTAGES AND HIGH CURRENTS PART-A 1. Mention the techniques used in impulse current measurements. Hall generators, Faraday generators and

More information

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS M. Kondalu, Dr. P.S. Subramanyam Electrical & Electronics Engineering, JNT University. Hyderabad. Joginpally B.R. Engineering

More information

MEDIUM & HIGH VOLTAGE

MEDIUM & HIGH VOLTAGE MEDIUM & HIGH VOLTAGE TESTING EQUIPMENT VOLTAGE WITHSTAND SGM Series Resonant Systems The SGM series are used for generating high AC voltages at a fixed frequency (mainly 50 or 60 Hz) by means of an excited

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK PO Box 25876 Safat 13119 Kuwait Contact: Mr Atul Madhukar Vaidya Tel: +965 1822600 Fax: +965 24761963 E-Mail: factory@ahleiasg.com Website:

More information

Transformers connected via a cable Overvoltage protection

Transformers connected via a cable Overvoltage protection A P P L I C AT I O N N OT E 2. 1 Transformers connected via a cable Overvoltage protection The APPLICATION NOTES (AN) are intended to be used in conjunction with the APPLICATION GUIDELINES Overvoltage

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

A Simple Simulation Model for Analyzing Very Fast Transient Overvoltage in Gas Insulated Switchgear

A Simple Simulation Model for Analyzing Very Fast Transient Overvoltage in Gas Insulated Switchgear A Simple Simulation Model for Analyzing Very Fast Transient Overvoltage in Gas Insulated Switchgear Nguyen Nhat Nam Abstract The paper presents an simple model based on ATP-EMTP software to analyze very

More information

RESONANT TRANSFORMER

RESONANT TRANSFORMER RESONANT TRANSFORMER Whenever the requirement of the test voltage is too much high, a single unit transformer can not produce such high voltage very economically, because for high voltage measurement,

More information

High Voltage Engineering

High Voltage Engineering High Voltage Engineering Course Code: EE 2316 Prof. Dr. Magdi M. El-Saadawi www.saadawi1.net E-mail : saadawi1@gmail.com www.facebook.com/magdi.saadawi 1 Contents Chapter 1 Introduction to High Voltage

More information

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

شركة الوقت للكهرباء والمقاوالت ذ.م.م. CONTRACTING COMPANY W.L.L. is a leading corporate in the United Arab Emirates offering quality services in the field of High Voltage Electrical work 400, 132 & 33 kv and Medium Voltage Power Distribution

More information

HV Module Systems for Testing, Training and Research

HV Module Systems for Testing, Training and Research HV Module Systems for Testing, Training and Research 4.0/3 Application Advantages Principle of HV circuit Smaller high-voltage (HV) test systems are necessary for research, development and quality testing

More information

Electric Stresses on Surge Arrester Insulation under Standard and

Electric Stresses on Surge Arrester Insulation under Standard and Chapter 5 Electric Stresses on Surge Arrester Insulation under Standard and Non-standard Impulse Voltages 5.1 Introduction Metal oxide surge arresters are used to protect medium and high voltage systems

More information

MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT

MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT Claus NEUMANN Darmstadt University of Technology Germany claus.neumann@amprion.net Klaus WINTER Swedish Neutral

More information

EE 1402 HIGH VOLTAGE ENGINEERING

EE 1402 HIGH VOLTAGE ENGINEERING EE 1402 HIGH VOLTAGE ENGINEERING Unit 5 TESTS OF INSULATORS Type Test To Check The Design Features Routine Test To Check The Quality Of The Individual Test Piece. High Voltage Tests Include (i) Power frequency

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

HV AC TESTING OF SUPER-LONG CABLES

HV AC TESTING OF SUPER-LONG CABLES HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The

More information

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES 23 CHAPTER 2 v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES 2.1 INTRODUCTION For reliable design of power system, proper insulation coordination among the power system equipment is necessary. Insulation

More information

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009 NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009 (12041004) 23 November (X-Paper) 09:00 12:00 Calculators may be used. This question paper consists of 7 pages.

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

In-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC

In-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC In-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC60099-5 Overview of presentation Motivation for condition monitoring of metal oxide surge arresters (MOSA) The Surge

More information

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING Andreas F.X. WELSCH*, Siegfried A. RUHLAND* *AREVA Sachsenwerk GmbH - Germany andreas.welsch@areva-td.com

More information

ELECTRICAL POWER TRANSMISSION TRAINER

ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering

More information

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 8DB 12 blue GIS Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 Features Gas-insulated switchgear (GIS) type 8D/B has been an integral part of the medium-voltage portfolio at Siemens for more

More information

High-Voltage Test Techniques

High-Voltage Test Techniques High-Voltage Test Techniques Dieter Kind Kurt Feser 2nd Revised and Enlarged Edition With 211 Figures and 12 Laboratory Experiments Translated from the German by Y. Narayana Rao Professor of Electrical

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables nd This paper is part of the Proceedings of the 2 International Conference on Energy Production and Management (EQ 2016) www.witconferences.com Prevention of transformers damage in HPP with double generating

More information

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Generation of Sub-nanosecond Pulses

Generation of Sub-nanosecond Pulses Chapter - 6 Generation of Sub-nanosecond Pulses 6.1 Introduction principle of peaking circuit In certain applications like high power microwaves (HPM), pulsed laser drivers, etc., very fast rise times

More information

Modeling insulation in high-voltage substations

Modeling insulation in high-voltage substations 38 ABB REVIEW DESIGNED FOR SAFETY DESIGNED FOR SAFETY Modeling insulation in high-voltage substations The goal of insulation coordination is to determine the dielectric strength of transformers and other

More information

High voltage engineering

High voltage engineering High voltage engineering Overvoltages power frequency switching surges lightning surges Overvoltage protection earth wires spark gaps surge arresters Insulation coordination Overvoltages power frequency

More information

Field Measurement of Transmission Cable Dissipation Factor

Field Measurement of Transmission Cable Dissipation Factor Workshop 2000, Alexandria, Virginia, 13 & 14 September 2000 paper No.: 1 Field Measurement of Transmission Cable Dissipation Factor John H. Cooper, Power Delivery Consultants, Inc. Abstract This presentation

More information

AC Resonant Test Systems Tank Type Up to 500 kv

AC Resonant Test Systems Tank Type Up to 500 kv R AC Resonant Test Systems Tank Type Up to 500 kv PHENIX TECHNOLOGIES Testing Applications High power AC Resonant Test Systems are used where the load is largely capacitive with very low real power losses

More information

Onsite Mobile AC High Voltage Test System

Onsite Mobile AC High Voltage Test System TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument

More information

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications: SGMF(T) series Onsite Mobile AC High Voltage Test System On-site AC high voltage test systems are used for voltage withstanding test, partial discharge measurement, tan delta measurement on those instrument

More information

The Application of Partial Discharge Measurement and Location on CGIS

The Application of Partial Discharge Measurement and Location on CGIS International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing

More information

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation W. Buesch 1) G. Palmieri M.Miesch J. Marmonier O. Chuniaud ALSTOM LTD 1) ALSTOM LTD High Voltage Equipment

More information

700 Series AC Dielectric Test Sets

700 Series AC Dielectric Test Sets 700 Series AC Dielectric Test Sets AC Test Systems HAEFELY HIPOTRONICS standard line of AC Dielectric Test Systems is designed to perform high voltage AC tests on electrical apparatus in accordance with

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS n Quality made in Germany n Standardized and customized solutions n Turn key projects, all from one hand 0.1-1/1 Product Portfolio Test and Measuring Systems

More information

AC Resonant Test Systems Tank Type Up to 150 kv

AC Resonant Test Systems Tank Type Up to 150 kv R AC Resonant Test Systems Tank Type Up to 150 kv PHENIX TECHNOLOGIES Testing Applications AC Resonant Test Systems are used where the load is largely capacitive with very low real power losses such as

More information

MAJOR ADVANCES IN MV/LV SUBSTATIONS. Th.Grima et JF.Faltermeier. Groupe CAHORS, France SUMMARY

MAJOR ADVANCES IN MV/LV SUBSTATIONS. Th.Grima et JF.Faltermeier. Groupe CAHORS, France SUMMARY MJOR DVNCES IN MV/LV SUSTTIONS Th.Grima et JF.Faltermeier Groupe CHORS, France SUMMRY Improvements on the reliability of the components of the network, combined with a well-considered policy of cost reduction

More information

AC Dielectric Test Sets

AC Dielectric Test Sets AC Dielectric Test Sets AC Test Systems Hipotronics standard line of AC Test Systems are designed to perform high voltage AC tests on electrical apparatus in accordance with IEC60, IEEE 4 and IEC 270 and

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 60071-5 First edition 2002-06 Insulation co-ordination Part 5: Procedures for high-voltage direct current (HVDC) converter stations Coordination de l isolement - Partie 5:

More information

700 Series AC Dielectric Test Sets

700 Series AC Dielectric Test Sets 700 Series AC Dielectric Test Sets AC Test Systems HAEFELY HIPOTRONICS standard line of AC Test Systems is designed to perform high voltage AC tests on electrical apparatus in accordance with IEC60, IEEE

More information

MINISTRY OF ELECTRICITY

MINISTRY OF ELECTRICITY MINISTRY OF ELECTRICITY IRAQ SUPERGRID PROJECTS 400/132 KV GIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007 LIST OF REVISIONS 1 2 3 4 5 Current Rev. Date 19.11.04 18.03.05 Aug 05 Oct 05 Jan 07

More information

Prepared by Mick Maytum

Prepared by Mick Maytum IEC Technical Committee 109: Standards on insulation co-ordination for low-voltage equipment Warning Prepared by Mick Maytum mjmaytum@gmail.com The document content is of a general nature only and is not

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

DEPARTMENT OF ELECTRICAL ENGINEERING DIT UNIVERSITY EHV AC AND DC TRANSMISSION

DEPARTMENT OF ELECTRICAL ENGINEERING DIT UNIVERSITY EHV AC AND DC TRANSMISSION Generation of High A.. Voltages: Most of the present day transmission and distribution networks are operating on a.c. voltages and hence most of the testing equipment relate to high a.c. voltages. A single

More information

Our Brands. Where we are?

Our Brands. Where we are? CATALOG 2019 Our Brands Aktif trade mark for Measuring, Protection, Automatic Meter Reading, Billing and Energy Management Software. by Aktif Aktif trade mark for Measuring, Protection, Control and Power

More information

Technical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope

Technical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope Date: Page: 1 / 10 Personal Data Name: Company / institution: Phone: E-mail: Fax: Application Quotation number: (will be filled in by HIGHVOLT) Test field, stationary research institute mobile on-site

More information

Mitigating Murphy s Law While Test. Frédéric Dollinger

Mitigating Murphy s Law While Test. Frédéric Dollinger Mitigating Murphy s Law While Test Frédéric Dollinger Curriculum Vitae Frédéric Dollinger HAEFELY HIPOTRONICS factory Basel Switzerland Area Sales & Marketing Manager Dipl. Ing. / M.Sc. Mechatronic Language:

More information

Arc Suppression Coils

Arc Suppression Coils Arc Suppression Coils (22kV Arc Suppression Coils ) Introduction Resonance grounding by Petersen coils (Arc Suppression Coils) has been used in Scandinavia and other European countries for some eighty

More information

Reprint E Two Years of Experience with a Mobile Resonant Test System for Testing of Installed Medium- and High Voltage Power Cables

Reprint E Two Years of Experience with a Mobile Resonant Test System for Testing of Installed Medium- and High Voltage Power Cables Two Years of Experience with a Mobile Resonant System for ing of Installed Medium- and High Voltage Power Cables P. Schikarski M. Gamlin J. Rickmann P. Peeters P. v.d. Nieuwendijk R. Koning Reprint ISH

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

GIS Disconnector Switching Operation VFTO Study

GIS Disconnector Switching Operation VFTO Study GIS Disconnector Switching Operation VFTO Study Mariusz Stosur, Marcin Szewczyk, Wojciech Piasecki, Marek Florkowski, Marek Fulczyk ABB Corporate Research Center in Krakow Starowislna 13A, 31-038 Krakow,

More information

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES Shohreh Monshizadeh Islamic Azad University South Tehran Branch (IAU), Tehran,

More information

High Votage Module AC/DC/Impulse Test System

High Votage Module AC/DC/Impulse Test System TSGADI Series High Votage Module AC/DC/Impulse Test System A digital control and measuring system is used to be control the difference output AC/DC/Impulse and related protection device such as over voltage

More information

24 th International Conference on Electricity Distribution Glasgow, June Paper 0881 ABSTRACT STATE OF THE ART INTRODUCTION ECOTAP VPD

24 th International Conference on Electricity Distribution Glasgow, June Paper 0881 ABSTRACT STATE OF THE ART INTRODUCTION ECOTAP VPD A NEW GENERATION VOLTAGE REGULATION DISTRIBUTION TRANSFORMER WITH AN ON LOAD TAP CHANGER FOR POWER QUALITY IMPROVEMENT IN THE ELECTRICAL DISTRIBUTION SYSTEMS Sudheer MOKKAPATY Jens WEISS Frank SCHALOW

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60060-3 First edition 2006-02 High-voltage test techniques Part 3: Definitions and requirements for on-site testing Reference number IEC 60060-3:2006(E) Publication numbering

More information

Tab 2 Voltage Stresses Switching Transients

Tab 2 Voltage Stresses Switching Transients Tab 2 Voltage Stresses Switching Transients Distribution System Engineering Course Unit 10 2017 Industry, Inc. All rights reserved. Transient Overvoltages Decay with time, usually within one or two cycles

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

Novità sulla IEC ; -10; -12

Novità sulla IEC ; -10; -12 Novità sulla IEC 61000-4-9; -10; -12 DIPL. ING. MARKUS FUHRER 11.06.2018 Content Recently revised standards IEC 61000-4-9 Ed. 2.0 2016-07 Impulse magnetic field IEC 61000-4-10 Ed. 2.0 2016-07 Damped oscillatory

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

PANIMALAR ENGINEERING COLLEGE Department of Electrical and Electronics Engineering

PANIMALAR ENGINEERING COLLEGE Department of Electrical and Electronics Engineering PANIMALAR ENGINEERING COLLEGE Department of Electrical and Electronics Engineering 1. Write some applications of high voltage? High Voltage Engineering 2 mark Question with answers Unit I Overvoltages

More information

Arrester Disconnector

Arrester Disconnector Arrester Disconnector ArresterFacts 005 Photo ArresterWorks Prepared by Jonathan Woodworth Consulting Engineer ArresterWorks May 4, 2008 Copyright ArresterWorks 2008 Jonathan J. Woodworth Page1 The Arrester

More information

Power Engineering II. High Voltage Testing

Power Engineering II. High Voltage Testing High Voltage Testing HV Test Laboratories Voltage levels of transmission systems increase with the rise of transmitted power. Long-distance transmissions are often arranged by HVDC systems. However, a

More information

GENERATOR TESTING APPLICATION GUIDE. reliable. precision.

GENERATOR TESTING APPLICATION GUIDE.  reliable. precision. GENERATOR TESTING APPLICATION GUIDE www.haefely-hipotronics.com reliable. precision. 2 GENERATOR TESTING CONTENTS Product Line Overview 3 AC Hipot Testing 4 Partial Discharge Measurement 5 DC Hipot Testing

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

Calculation of Transients at Different Distances in a Single Phase 220KV Gas insulated Substation

Calculation of Transients at Different Distances in a Single Phase 220KV Gas insulated Substation Calculation of Transients at Different Distances in a Single Phase 220KV Gas insulated Substation M. Kondalu1, Dr. P.S. Subramanyam2 Electrical & Electronics Engineering, JNT University. Hyderabad. 1 Kondalu_m@yahoo.com

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS AMENDMENT NO. 1 SEPTEMBER 2011 TO IS 15086 (Part 1) : 2001/IEC 60099-1 (1991) SURGE ARRESTORS PART 1 NON-LINEAR RESISTOR TYPE GAPPED SURGE ARRESTORS FOR a.c. SYSTEMS (The Amendment was originally published

More information

Be on guard for effective testing: Introduction

Be on guard for effective testing: Introduction Be on guard for effective testing: Introduction The development of the insulation tester by Evershed and Vignoles is part of our electrical history, with insulation testers produced by Megger Instruments

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

Back to the Basics Current Transformer (CT) Testing

Back to the Basics Current Transformer (CT) Testing Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information