FACILITY RATINGS METHOD TABLE OF CONTENTS

Size: px
Start display at page:

Download "FACILITY RATINGS METHOD TABLE OF CONTENTS"

Transcription

1 FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE SCOPE COMPLIANCE DEFINITIONS RESPONSIBILITIES PROCEDURE Generating Equipment Ratings Transmission Equipment Ratings RECORDS FORMS ATTACHMENTS Uniform Environmental Conditions Table REVISION HISTORY Effective 05/10/2016 Page 1 of 23

2 1.0 PURPOSE 1.1 This procedure documents Westar Energy s Transmission Owner and Generator Owner method to develop and communicate the Facility Ratings for all solely and jointly owned Facilities. [FAC R1, R2 & R3] Effective 05/10/2016 Page 2 of 23

3 2.0 SCOPE 2.1 This method documents the technically sound principles for calculation of Normal and Emergency Facility Ratings of the solely and jointly owned Westar Energy generating units. [FAC R1 & R2] Solely owned generating facilities are rated according to this Facility Rating Method. Jointly owned generating facilities for which Westar Energy is the registered Generator Owner shall also be rated according to this Facility Rating Method. This method of rating generating units complies with SPP Planning Criteria 7.1. This method of rating generating facilities includes all applicable equipment detailed in Section 6.4 of this Facility Rating Method. 2.2 This method documents the technically sound principles for calculation of Normal and Emergency Facility Ratings of the solely and jointly owned Westar Energy Transmission Facilities regardless of voltage. [FAC R3] This method of rating Transmission Facilities considers SPP Planning Criteria 7.2. This method of rating Transmission Facilities includes all applicable equipment detailed in Section 6.5 of this Facility Rating Method. All circuit ratings are based on summer seasonal facility ratings, except as noted in Section The categories of equipment rated include, but are not limited to: generators, conductors, transformers, relay protective devices, terminal equipment, and series and shunt compensation devices as detailed in Sections 6.4 and 6.5 of this Facility Ratings Method. [FAC R2.4.1 & R3.4.1] Effective 05/10/2016 Page 3 of 23

4 3.0 COMPLIANCE 3.1 Each Generator Owner shall have documentation that shows how its Facility Ratings were determined as identified in FAC Requirement Each Generator Owner shall have a documented Facility Ratings methodology that includes all of the items identified in FAC Requirement 2, Parts 2.1 through Each Transmission Owner shall have a documented Facility Ratings methodology that includes all of the items identified in FAC Requirement 3, Parts 3.1 through Each Transmission Owner shall have evidence, such as a copy of a dated electronic note, or other comparable evidence to show that it made its Facility Ratings methodology available for inspection within 21 calendar days of a request in accordance with FAC Requirement 4. The Generator Owner shall have evidence, such as a copy of a dated electronic note, or other comparable evidence to show that it made its documentation for determining its Facility Ratings or its Facility Ratings methodology available for inspection within 21 calendar days of a request in accordance with FAC Requirement Each Transmission Owner and Generator Owner shall have evidence to show that its Facility Ratings are consistent with the documentation for determining its Facility Ratings as specified in Requirement R1 or consistent with its Facility Ratings methodology as specified in FAC Requirements R2 and R3 (Requirement R6). 3.6 Each Generator Owner shall have evidence, such as a copy of a dated electronic note, or other comparable evidence to show that it provided its Facility Ratings to its associated Reliability Coordinator(s), Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s) and Transmission Operator(s) in accordance with FAC Requirement R Each Transmission Owner (and Generator Owner subject to Requirement R2) shall have evidence, such as a copy of a dated electronic note, or other comparable evidence to show that it provided its Facility Ratings and identity of limiting equipment to its associated Reliability Coordinator(s), Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s) and Transmission Operator(s) in accordance with Requirement R8. Effective 05/10/2016 Page 4 of 23

5 4.0 DEFINITIONS 4.1 Book Rating: The rating provided by the manufacturer or a suitable conductor reference manual. Conditions for overhead conductor are generally based upon a 50 degree C temperature rise above a 25 degree C ambient temperature with 2 ft/sec wind perpendicular to the conductor. 4.2 Emergency Rating: The rating as defined by the equipment owner that specifies the level of electrical loading or output that a system, facility, or element can support, produce, or withstand for a finite period. The rating assumes acceptable loss of equipment life or other physical or safety limitations for the equipment involved. 4.3 Equipment Rating: The maximum and minimum voltage, current, frequency, real and reactive power flows on individual equipment under steady state, short-circuit and transient conditions, as permitted or assigned by the equipment owner. 4.4 Facility Rating: The maximum or minimum voltage, current, frequency, or real or reactive power flow through a facility that does not violate the applicable equipment rating of any equipment comprising the facility. 4.5 Generation Facility: Facilities that comprise all current carrying equipment from the generating unit to the point of interconnection with the Transmission Owner. 4.6 Generator Owner: Entity that owns and maintains generating units. 4.7 High Operating limit or High Alarm limit: Terms used in the displays of the SCADA / EMS real-time system and are named as such by the system developer / manufacturer. These terms are functionally equivalent to Emergency Rating. 4.8 High Warning limit: Term used in the displays of the SCADA / EMS real-time systems and is named as such by the system developer / manufacturer. 4.9 Manufacturer s Nameplate Ratings: Ratings provided by the manufacturer of equipment are assumed to consider design criteria, ambient conditions, operating limitations and other design assumptions Normal Rating: The rating as defined by the equipment owner that specifies the level of electrical loading that a system, facility, or element can support or withstand through the daily demand cycles without loss of equipment life Overhead Conductor: A wire or combination of wires not insulated from one another suitable for carrying an electric current. Overhead conductor is separate and distinct from rigid bus. Effective 05/10/2016 Page 5 of 23

6 4.12 Rigid Bus: A solid or tubular conductor Transmission Facility: Facilities that comprise the current carrying equipment connected in series between circuit breakers or comparable switching devices. A Transmission Facility shall also include substation terminal equipment including, but not limited to breakers, switches, and conductor Transmission Owner: The entity that owns and maintains Transmission Facilities. Effective 05/10/2016 Page 6 of 23

7 5.0 RESPONSIBILITIES 5.1 Facility Ratings Method is reviewed and updated by a cross-functional team of subject matter experts within Westar Energy not less frequently than once per calendar year and coordinated by NERC Compliance. The cross-functional team includes representatives from Generation Reliability Engineering, NERC Compliance, Substation Engineering, System Planning, and System Operations. 5.2 Facility Ratings Method is approved by the Director of Generation Support, the Director of Transmission & Substation Construction Services, and the Executive Director of System Operations. 5.3 Facility Ratings Method shall be posted on the Westar Energy public OASIS site. 5.4 Facility Ratings developed shall be provided to SPP to ensure accurate modeling of steady-state data in accordance with the procedures developed and maintained by the SPP Model Development Working Group. 5.5 Westar Energy shall provide requested information as specified below (for its solely and jointly owned Facilities that are existing Facilities, new Facilities, modifications to existing Facilities and re-ratings of existing Facilities) to its associated Reliability Coordinator(s), Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s) and Transmission Operator(s): [FAC R7][FAC R8] As scheduled by the requesting entities: [FAC R8.1] Facility Ratings [FAC R8.1.1] Identity of the most limiting equipment of the Facilities [FAC R8.1.2] Within 30 calendar days (or a later date if specified by the requester), for any requested Facility with a Thermal Rating that limits the use of Facilities under the requester s authority by causing any of the following: 1) An Interconnection Reliability Operating Limit, 2) A limitation of Total Transfer Capability, 3) An impediment to generator deliverability, or 4) An impediment to service to a major load center: [FAC R8.2] Identity of the existing next most limiting equipment of the Facility [FAC R8.2.1] The Thermal Rating for the next most limiting equipment identified in Requirement R8, Part [FAC R8.2.2] Effective 05/10/2016 Page 7 of 23

8 6.0 PROCEDURE 6.1 The applicable Facility Rating shall equal the most limiting applicable Equipment Rating of the individual equipment that comprises the Facility. [FAC R1.2, R2.3 & R3.3] Solely owned Facilities are rated according to this Facility Ratings Method. Facilities that are jointly owned shall utilize the lesser rating as developed by each owner consistent with the facility owner s applicable Facility Rating Method. [FAC R6] 6.2 If applicable, the following items will be considered to determine ratings: ratings provided by the equipment manufacturer, applicable industry standards, design criteria, ambient conditions, operating limitations, and other assumptions. [FAC R1.1] [FAC R2.1] [FAC R2.2] [FAC R3.1] [FAC R3.2] 6.3 Uniform Environmental Conditions [FAC R2.2.3 & R3.2.3] Solar absorptivity is the ratio of incident solar radiant energy absorbed by a material body to the incident solar radiant energy absorbed by a blackbody at the same temperature. Solar absorptivity is set to 0.9. It is assumed that solar gain is based on full sun and a clear atmosphere Infrared emissivity is the ratio of infrared radiant energy emitted by a material body to the infrared radiant energy radiated by a blackbody at the same temperature. Infrared emissivity is set to Wind speed is assumed to be 2 ft/sec at a 90-degree angle to the conductor for overhead conductor. Wind speed is assumed to be 3 ft/sec at a 90- degree angle to the conductor for rigid bus installed in substations or switching stations Ambient temperature used for calculation of ratings is 40 degrees C during the summer season and is 10 degrees C during the winter season For purposes of rating calculation, elevation above sea level for Westar Energy is 1,155 feet For purposes of rating calculation, the azimuth of outdoor facilities is east-west For purposes of rating calculation, the latitude of outdoor facilities is 35 degrees north For purposes of rating calculation, the apparent solar time is 2:00 pm (1400 hours). Effective 05/10/2016 Page 8 of 23

9 6.4 Generating Equipment Ratings Bus Isolated-phase or non-segregated bus shall be rated per the Manufacturer s Nameplate Rating. If no Manufacturer s Nameplate Rating is available, the design rating available on manufacturer s schematic drawings or manufacturer s test data shall be used. The Normal and Emergency Ratings shall be equal Rigid bus shall be rated based on the engineered design capacity of the bus or based on manufacturer s rating. The Normal Rating and Emergency Rating shall be equal Circuit Breaker Circuit breaker continuous Normal Rating and Emergency Rating shall be set to the Manufacturer s Nameplate Rating of the device Conductor Overhead conductor Normal Rating shall be rated based on the engineered design capacity of the conductors. In cases where original engineering data or design criteria on overhead conductor are not available, the conductor Normal Rating and Emergency Rating shall be set to the manufacturer s rating. This conservative approach is used in consideration of the age of facilities currently in service. The Normal and Emergency Ratings shall be equal Underground cable Normal Rating shall be rated based on the engineered design capacity of the cable or based on manufacturer s rating. The Normal Rating and Emergency Rating shall be equal Current Transformer (CT) CT continuous Normal Rating and Emergency Rating shall be set to the tap setting times the thermal rating factor of the CT at that tap if known. An unspecified thermal rating factor is assumed to be 1.0. CTs may be rated according to Appendix PL-2.E of SPP Planning Criteria as determined appropriate by subject matter expert Generating Unit Effective 05/10/2016 Page 9 of 23

10 Hydrogen cooled generators shall be rated in MVA according to Manufacturer s Nameplate Rating or capability curve for the maximum rated hydrogen pressure. The Normal and Emergency Ratings shall be equal Air cooled generators shall be rated in MVA according to the Manufacturer s Nameplate Rating or capability curve for the rated ambient air conditions. The Normal and Emergency Ratings shall be equal Power Transformer Normal Rating on generator step-up transformers shall be set to the maximum allowable Manufacturer s Nameplate Rating for the rated ambient air conditions with the Emergency Rating set equal to the Normal Rating The Emergency Rating of the generator step-up transformer, which is equal to the continuous transformer nameplate normal rating, shall be used as the High Operating limit or High Alarm limit in the SCADA / EMS real-time systems. The High Warning limit in the SCADA / EMS real-time systems for such generator step-up transformer shall be set at either 90% of the High Alarm limit or a value less than the High Alarm Limit as approved by the Director of Transmission and Generation System Operations based upon past operating experience Protective Device Effective 05/10/2016 Page 10 of 23

11 6.4.8 Protective relays shall have ratings established in such a way as to not exceed the manufacturer s specification for continuous current-carrying capacity of the device. If manufacturer s specification is not available, protective relays are assumed to be capable of carrying 5 amperes of current delivered to the input of the relay. Protective relays have only a continuous rating which establishes the Normal Rating and Emergency Rating at the same value Switches Switch Normal Rating and Emergency Rating shall be set to the Manufacturer s Nameplate Rating of the device Series Reactive Compensation Device These devices do not exist within generating facilities Shunt Reactive Compensation Device These devices do not exist within generating facilities. Effective 05/10/2016 Page 11 of 23

12 6.5 Transmission Equipment Ratings Bus Rigid bus, Normal and Emergency Rating, shall be rated in accordance with IEEE Standard 605 IEEE Guide for Bus Design in Air Insulated Substations Circuit Breaker Circuit breaker continuous Normal Rating and Emergency Rating shall be set to the Manufacturer s Nameplate Rating of the device Current Transformer (CT) CT continuous Normal Rating and Emergency Rating shall be set to the tap setting times the thermal rating factor of the CT at that tap if known. An unspecified thermal rating factor is assumed to be 1.0. CTs may be rated according to Appendix PL-2.E of SPP Planning Criteria as determined appropriate by subject matter expert Conductor For conductors used on the Westar system except SSAC (ACSS) overhead conductors shall be rated at 85 degrees C conductor temperature under normal conditions and 100 degrees C conductor temperature under emergency conditions unless designed for a lower final conductor temperature, then it should be rated at that temperature. SSAC conductors shall be rated at 200 degrees C maximum conductor temperature for Normal Rating and Emergency Rating unless designed for a lower final conductor temperature, then it should be rated at that temperature. In cases where original engineering data or design criteria on transmission lines are not available, the conductor Normal Rating and Emergency Rating shall be set equal to the manufacturer s Book Rating or the Book Rating of a suitable reference for the conductor type. This conservative approach is used in consideration of the age of Transmission Facilities currently in service. Loading at or below the Emergency Rating of overhead conductor is a continuous rating. Conductor ratings are calculated using the procedures in IEEE Standard 738 IEEE Standard for Calculating the Current-Temperature of Bare Overhead Conductors. Effective 05/10/2016 Page 12 of 23

13 For transmission lines that are constructed as double circuit but are operated as a single circuit with phase conductors in parallel, a composite conductor rating is calculated based on the individual line conductors, the line impedances, and current sharing relationship of the line conductors utilized (current divider). This calculation utilizes individual conductor ratings consistent with and ensures the most limiting conductor rating will not be exceeded with the line operating as a single circuit For conductors used on the Westar system except SSAC (ACSS) overhead conductors shall be rated at 85 degrees C conductor temperature under normal conditions and 100 degrees C conductor temperature under emergency conditions unless designed for a lower final conductor temperature, then it should be rated at that temperature. SSAC conductors shall be rated at 200 degrees C maximum conductor temperature for Normal Rating and Emergency Rating unless designed for a lower final conductor temperature, then it should be rated at that temperature. Loading at or below the Emergency Rating of overhead conductor is a continuous rating. Conductor ratings are calculated using the procedures in IEEE Standard 738 IEEE Standard for Calculating the Current-Temperature of Bare Overhead Conductors Underground cable ratings are based on manufacturer s Book Rating or the Book Rating of a suitable reference or engineering analysis for Normal Rating, Emergency Rating and short term Emergency Rating to avoid damage to the insulation due to thermal expansion. IEEE Standard 835 IEEE Standard Power Cable Ampacity Tables may be used in calculating the underground cable ratings absent manufacturer s data Power Transformer Normal Rating on transmission transformers shall be set to the maximum allowable Manufacturer s Nameplate Rating. The Emergency Rating is typically set to 110% of the Normal Rating. It may be set higher or lower based upon evaluation of field testing, operational history of the unit, and real time monitoring of oil temperatures. The Emergency Rating of transmission transformers is an eight (8) hour rating Primary Fuse Primary fuse continuous Normal Rating and Emergency Rating shall be set to the Manufacturer s Nameplate Rating of the device Protective Device Effective 05/10/2016 Page 13 of 23

14 Protective relays shall have ratings established in such a way as to not exceed the manufacturer s specification for continuous current-carrying capacity of the device. If manufacturer s specification is not available, protective relays are assumed to be capable of carrying 5 amperes of current delivered to the input of the relay. Protective relays have only a continuous rating which establishes the Normal Rating and Emergency Rating at the same value Series Reactive Compensation Device Series compensation devices shall be rated consistent with the voltage at which they are operated. Nominal operating voltage may be different from the design voltage. Reactive devices do not have any applicable Emergency Rating. Series connected reactors are specified and rated according to IEEE Standard IEEE Standard Requirements, Terminology, and Test Code for Dry- Type Air-Core Series-Connected Reactors Shunt Reactive Compensation Device Shunt compensation devices shall be rated consistent with the voltage at which they are operated. Nominal operating voltage may be different from the design voltage. Reactive devices do not have any applicable Emergency Rating. Transmission shunt capacitors are specified and rated according to: IEEE Standard 18 IEEE Standard for Shunt Power Capacitors; IEEE Standard 1036 IEEE Guide for the Application of Shunt Power Capacitors; and IEEE Standard C37.99 IEEE Guide for the Protection of Shunt Power Capacitors. Transmission shunt reactors are specified and rated according to the IEEE Standard C57.21 IEEE Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kva Switches Switch Normal Rating and Emergency Rating shall be set to the Manufacturer s Nameplate Rating of the device Wave Trap Epoxy-encapsulated wave traps shall have Normal Rating and Emergency Rating set to Manufacturer s Nameplate Rating. Drytype air-cored wave traps that are not epoxy-encapsulated wires shall have the Emergency Rating set to 110 percent of Manufacturer s Nameplate Rating. Effective 05/10/2016 Page 14 of 23

15 The composite rating on a terminal-to-terminal basis of Transmission Facilities shall be set to the most limiting equipment for normal and emergency conditions. Transmission Facility Ratings shall be updated as equipment is replaced and communicated to Transmission System Operations and to the Southwest Power Pool when such facilities are placed in service. For Multi-Breaker configuration (breaker-and-half, Ring Bus, or double breaker/double bus), the equipment rating on the substation side of the terminal shall be rated based on one-breaker open. If the ratings of terminal equipment (such as breakers, switches, etc.) are not identical at one end of the transmission line or transformer, then the equipment with the higher rating is assumed to be open when developing the overall facility rating. [FAC R6] Short-term Emergency Rating, i.e. 30 minute ratings, may be established on a case-by-case basis on equipment that may experience an overload condition while predetermined mitigation steps are executed. Short-term Emergency Ratings and their corresponding time limits will only be established after a detailed review of equipment limitations and the documentation of appropriate automatic or operator-controlled mitigation steps designed to relieve the overload to within Normal Rating or Emergency Rating. Appropriate mitigation steps must be determined to be possible to be completed within the prescribed short-term time limit. All other short-term Emergency Rating shall be set equal to the existing Emergency Rating of the facility. 6.6 The Emergency Rating of the Transmission Facilities shall be used as the High Operating limit or High Alarm limit in the SCADA / EMS real-time systems. The High Warning limit in SCADA/EMS shall be the lesser of 90% of the High Alarm limit or the Normal Rating. 6.7 The applicable Facility Rating shall be modified to account for known operating limitations. Such limitations, in general, are applicable only on a short-term basis and only within an operational framework, such as the realtime SCADA / EMS systems. This includes temporary derating of impaired equipment consistent with good utility practice or temporary derating of a facility due to topology changes. [FAC R2.2.4 & R3.2.4] Effective 05/10/2016 Page 15 of 23

16 6.8 Other considerations may be taken into account to define the ampacity rating of facilities. Heat transfer from overhead conductor or rigid bus may be conducted to any attached equipment and equipment temperature limitations may be taken in account. Parallel conductors or busses in close proximity may adversely impact the ability to radiate heat and may be considered to reduce the rating an appropriate amount. Parallel conductors used as substation bus may have a mutual inductance between them that can result in an impedance imbalance and uneven loading thereby reducing the overall ampacity of the bus. Bus fittings and accessories must be properly installed in accordance with manufacturer s recommendation to ensure that they do not limit Facility Ratings. 6.9 Under abnormal situations, winter ratings of the affected facilities can be used in the EMS, in the winter season, where applicable upon approval of the Director of Transmission and Generation System Operations. In such cases the associated EMS alarms shall be modified to accommodate the winter rating. Also in such cases the relay loadability per PRC-023 shall be verified to meet the new rating, or relay setting modifications shall be made to accommodate the winter rating. Upon return to normal operating conditions or change in season, the rating and the accompanying EMS alarms shall be returned to the original rating. Effective 05/10/2016 Page 16 of 23

17 7.0 RECORDS 7.1 The Generating Facility Ratings are developed by Generation Reliability Engineering and are maintained on a secured network drive. 7.2 The Transmission System Facility Ratings are developed and maintained by System Planning on a secured network drive. Effective 05/10/2016 Page 17 of 23

18 8.0 FORMS 8.1 None Effective 05/10/2016 Page 18 of 23

19 9.0 ATTACHMENTS 9.1 Uniform Environmental Conditions Table Conditions Input Units Apparent Solar Time 1400 hours Atmosphere Clear Azimuth of Line 90 (E/W) degrees Elevation (ft above sea level) 1155 ft Emissivity 0.88 Latitude 35 N degrees Solar Absorptivity 0.9 Temperature - Ambient Air - Summer 40 degrees C Temperature - Ambient Air - Winter 10 degrees C Temperature Emergency 100 degrees C Temperature Normal 85 degrees C Wind Angle 90 degrees Wind Speed for Conductor 2 ft/sec Wind Speed for Rigid Tubular Bus 3 ft/sec Effective 05/10/2016 Page 19 of 23

20 9.2 Multi-Breaker Facility Layout Diagram Effective 05/10/2016 Page 20 of 23

21 9.3 Single-Breaker Facility Layout Diagram Effective 05/10/2016 Page 21 of 23

22 10.0 REVISION HISTORY Effective Date: Author(s): Approved By: Superseded Date: Change History: 5/10/2016 Facility Ratings Method Team 05/14/2015 Facility Ratings Method Team 03/27/2014 Facility Ratings Method Team 09/06/2013 Facility Ratings Method Team 05/01/2013 Facility Ratings Method Team 12/18/2012 Facility Ratings Method Team Dave Benak Mark Mayworm John Olsen Dave Benak Mark Mayworm Tom Stuchlik Dave Benak Mark Mayworm Tom Stuchlik Dave Benak Mark Mayworm Dracy Jenkins Mark Mayworm Dracy Jenkins Mark Mayworm 5/14/2015 Updated references to SPP Criteria. Updated Responsibilities and Records for appropriate personnel. Updated Section 4.1. Added Section /27/2014 Revised standard references throughout. Moved Isolatedphase and Rigid bus under a new Bus subsection. Revised Section Added Section /06/2013 Revised Sections , , , 6.6, and Added Sections and Removed Section 6.7. Added Generation Plant Support Engineering to Section /01/2013 Added Sections 4.13, 4.14, and 6.6. Removed Standards & Quality Assurance group from the Responsibilities section. 12/18/2012 Revised Sections 2.2 and 4.11; Added Sections 9.2 and 9.3: Multi-Breaker Facility Layout Diagram and Single Breaker Facility Layout Diagram. 01/01/2012 Updated to include references to FAC-008-3; Annual Review 01/01/2012 Facility Ratings Method Team Tom Stuchlik Dracy Jenkins Mark Mayworm 8/11/ URP NERC FAC- 008 Generation Facility Rating Methodology Combined System Planning Policy 0602 and URP NERC FAC-008 Generation Facility Rating Methodology Effective 05/10/2016 Page 22 of 23

23 3/22/ System Planning Policy 0602 END Effective 05/10/2016 Page 23 of 23

Kansas City Power & Light Company. Transmission Facility Rating Methodology

Kansas City Power & Light Company. Transmission Facility Rating Methodology Company Prepared by: KCP&L Transmission Planning December 6, 2017 Table of Contents 1. Purpose...4 2. Generator Rating Methodology...4 3....4 3.1. Equipment Rating Methodology...4 3.2. Items considered

More information

Transmission Facilities Rating Methodology for Florida

Transmission Facilities Rating Methodology for Florida Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke

More information

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings

More information

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008 and FAC-009 Issued by: Dan Custer Reviewed by: Tom Mielnik Version 2.7 1 1.0 Scope: This document provides

More information

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008-3 Version 3.4 1 Contents 1. Scope... 3 2. Establishment and Communication of Facility Ratings:... 3 2.1.

More information

Transmission Facilities Rating Methodology

Transmission Facilities Rating Methodology Document title Transmission Facilities Rating Methodology Document number EGR-TRMC-00009 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning- Progress Energy

More information

MidAmerican Energy Company 69 kv Facility Ratings Methodology

MidAmerican Energy Company 69 kv Facility Ratings Methodology MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy

More information

TRANSMISSION FACILITIES...7

TRANSMISSION FACILITIES...7 Table of Contents 1. INTRODUCTION...4 1.1. Objective... 4 1.2. NERC FAC-008 Compliance... 4 1.3. Seminole s Normal Rating... 5 1.4. Seminole s Four-Hour Rating... 5 1.5. Seminole s Emergency Rating...

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Facility Ratings Methodology

Facility Ratings Methodology Facility Ratings Methodology FAC-008-3 Compliance Document Establishment Date: December 19, 2016 Effective Date: July 14 th, 2017 Approved by: Job Title Manager, Network & IRP Transmission Planning Name

More information

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-3 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.

More information

Tampa Electric Company Facility Rating Methodology Approved 11/20/2018

Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Tampa Electric Company Facility Rating Methodology Approved 11/20/2018 Effective Date: 12/01/2018 Responsible Department: System Planning Review Cycle: 3 Years Last Date Reviewed: 11/16/2018 Next Planned

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the Board of Trustees. Description

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping

More information

GridLiance Reliability Criteria

GridLiance Reliability Criteria GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances

More information

Voltage and Reactive Procedures CMP-VAR-01

Voltage and Reactive Procedures CMP-VAR-01 Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Nicholas Klemm Western Area Power Administration Rocky Mountain Region March 2012 Organizational Overview Western

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

Criteria. Table of Contents

Criteria. Table of Contents Criteria Title: SUBSTATION EQUIPMENT AMPACITY RATINGS Department: Document No: Issue Date: Previous Date: Asset Management CR-0063 v08 06-16-2014 12-26-2013 Table of Contents 1.0 Scope... 2 2.0 Introduction...

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) 1 PART 1: GENERAL This section describes materials and installation requirements for low voltage

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-2 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020 TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES Document 9020 Puget Sound Energy, Inc. PSE-TC-160.50 December 19, 2016 TABLE OF CONTENTS

More information

Modelling Parameters. Affect on DER Impact Study Results

Modelling Parameters. Affect on DER Impact Study Results Modelling Parameters Affect on DER Impact Study Results Agenda Distributed Energy Resources (DER) Impact Studies DER Challenge Study Steps Lessons Learned Modeling Reverse Power Transformer Configuration

More information

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g 2011 SERTP Welcome SERTP 2011 First RPSG Meeting & Interactive Training Session 9:00 AM 3:00 PM 1 2011 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection A. Introduction 1. Title: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection 2. Number: PRC-019-2 3. Purpose: To verify coordination of generating unit Facility

More information

An Introduction to Completing a NERC PRC-019 Study for Traditional and Distributed Generation Sources

An Introduction to Completing a NERC PRC-019 Study for Traditional and Distributed Generation Sources An Introduction to Completing a NERC PRC-019 Study for Traditional and Distributed Generation Sources Matthew Manley and Tony Limon POWER Engineers, Inc. Abstract -- NERC PRC standards have been implemented

More information

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team. December 7 th, 2010 NPCC Full Member Committee; Please find attached a draft revised NPCC Regional Reliability Directory #12 Underfrequency Load Shedding Program Requirements and a draft revised NPCC UFLS

More information

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table

More information

VI.D AIR DISCONNECT SWITCHES

VI.D AIR DISCONNECT SWITCHES VI.D AIR DISCONNECT SWITCHES DMS #84474 Page 1 of 20 Revised: AIR DISCONNECT SWITCH RATINGS PENNSYLVANIA - NEW JERSEY - MARYLAND INTERCONNECTION PLANNING AND ENGINEERING COMMITTEE TRANSMISSION AND SUBSTATION

More information

Facility Interconnection Requirements for Colorado Springs Utilities Version 03 TABLE OF CONTENTS

Facility Interconnection Requirements for Colorado Springs Utilities Version 03 TABLE OF CONTENTS TABLE OF CONTENTS 1.0 INTRODUCTION (NERC FAC-001 Requirement R1, R2)... 4 2.0 INTERCONNECTION REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITIES (NERC FAC-001 Requirements R3 & R4)... 4

More information

AS/NZS :2013 (IEC , , MOD)

AS/NZS :2013 (IEC , , MOD) AS/NZS 60076.7:2013 (IEC 60076-7, Ed. 1.0 2005, MOD) Australian/New Zealand Standard Power transformers Part 7: Loading guide for oil-immersed power transformers AS/NZS 60076.7:2013 AS/NZS 60076.7:2013

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

Number: Prepared by: TABLE OF CONTENTS

Number: Prepared by: TABLE OF CONTENTS Prepared by: C. J. McWhirter Issued by: D. J. Papadoulis Date: 30 August 2013 Page 1 of 19 TABLE OF CONTENTS Page 1 INTRODUCTION... 2 2 TRANSMISSION LINES... 2 3 TRANSFORMERS... 6 4 SHUNT REACTORS... 8

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection System Protection and Control Subcommittee

More information

TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line

TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line Vince Leung March 27, 2017 Reviewed by Johnny Nguyen Table of Contents Background 2 Objective 3 Base Case Assumptions

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document Version 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying the definition.

More information

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements NPCC Regional Reliability Reference Directory # 12 Under frequency Load Shedding Program Requirements Task Force on System Studies Revision Review Record: June 26 th, 2009 March 3 rd, 2010 Adopted by the

More information

Arc Flash Analysis Training

Arc Flash Analysis Training Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is

More information

System Ratings, Limits and Real-Time Monitoring. Presented to: Operating Committee April 21, 2016

System Ratings, Limits and Real-Time Monitoring. Presented to: Operating Committee April 21, 2016 System Ratings, Limits and Real-Time Monitoring Presented to: Operating Committee April 21, 2016 Thermal Facility Ratings In New England Summer ratings (April 1 to October 31) Winter ratings (November

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned Part 1 - General Scope and Product Description 1.0 This specification contains the minimum design

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

Effects of Harmonic Distortion I

Effects of Harmonic Distortion I Effects of Harmonic Distortion I Harmonic currents produced by nonlinear loads are injected back into the supply systems. These currents can interact adversely with a wide range of power system equipment,

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk

More information

Miniature substations: What they are really capable of delivering

Miniature substations: What they are really capable of delivering Miniature substations: What they are really capable of delivering by Rhett Kelly and Greg Whyte, ACTOM Medium Voltage Switchgear The latest edition of the South African national standard for miniature

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

Onsite Mobile AC High Voltage Test System

Onsite Mobile AC High Voltage Test System TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-3 3. Purpose: To ensure generators provide reactive support and voltage control, within generating

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY --

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY -- D.,.,.,. E S C R I P T I V E B U L L E T I N Bulletin DB-106 Square D Company October, 1990 ---1 I SQU ARED COMPANY -- Electrical Power Distribution System - The Heart of the Business From small commercial

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-3 3. Purpose: To ensure generators provide reactive support and voltage control, within generating

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying

More information

Standard VAR b Generator Operation for Maintaining Network Voltage Schedules

Standard VAR b Generator Operation for Maintaining Network Voltage Schedules A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-1.1b 3. Purpose: To ensure generators provide reactive and voltage control necessary to ensure

More information

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System

Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Agenda Notes for 4 th Meeting of Sub Group in respect of Preparation of Reliability Standards for Protection System and Communication System Meeting Date: 27.03.2017 Time: 1430 Hrs Venue: NRPC Conference

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24 RC0120A - RC IRO-010 Data Specification NOTE: Changes from Peak's Attachment A are highlighted in red in columns C through G Section Category Number Responsible Pa Data Item Data Transfer Method 1.1 Transmission

More information

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888

More information

BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR

BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF PROPOSED RELIABILITY STANDARD

More information

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE)

NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE) COORDONNATEUR DE LA FIABILITÉ Direction Contrôle des mouvements d énergie Demande R-3944-2015 NORMES DE FIABILITÉ DE LA NERC (VERSION ANGLAISE) Original : 2016-10-14 HQCMÉ-10, Document 2 (En liasse) Standard

More information

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED

More information

VAR Voltage and Reactive Control

VAR Voltage and Reactive Control VAR-001-4 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information