In Class Examples (ICE)

Size: px
Start display at page:

Download "In Class Examples (ICE)"

Transcription

1 In Class Examples (ICE) 1

2 1. A 3φ 765kV, 60Hz, 300km, completely transposed line has the following positive-sequence impedance and admittance: z = j = o Ω/km y = j S/km Assuming positive-sequence operation, calculate the exact ABCD parameters of the line. Identical shunt reactors (inductors) are connected from each phase conductor to neutral at both ends of the 300km 765kV line in Example 7 during light load conditions, providing 75% compensation. The reactors are removed during heavy load conditions. Full load is l.9ka at u- nity p.f. and at 730kV. Assuming that the sending-end voltage is constant, determine the following: a. Percent voltage regulation of the uncompensated line. b. The equivalent shunt admittance and series impedance of the compensated line. c. Percent voltage regulation of the compensated line. 2. Identical series capacitors are installed in each phase at both ends of the 300km 765kV line in Example 7, providing 30% compensation. Determine the theoretical maximum power that this compensated line can deliver and compare with that of the uncompensated line. Assume V S = V R = 765kV. 2

3 3. A bolted short circuit occurs in a series R-L circuit with V = 20kV, X = 8 Ω, R = 0.8 Ω, and with maximum dc offset. The circuit breaker opens 3 cycles after fault inception. Determine (a) the rms ac fault current, (b) the rms momentary current at τ = 0.5 cycles, which passes through the breaker before it opens, and (c) the rms asymmetrical fault current that the breaker interrupts. 4. A 500 MVA 20 kv, 60 Hz synchronous generator with reactances X d = 0.15 pu, X d = 0.24 pu, X d = 1.1 pu and time constants Td = 0.035, Td = 2.0, T A = 0.2s is connected to a circuit breaker. The generator is operating at 5% above rated voltage and at no-load when a bolted three-phase short-circuit occurs on the load side of the breaker. The breaker interrupts the fault 3 cycles after fault inception. Determine (a) the subtransient fault current in pu and ka rms; (b) maximum dc offset as a function of time, and (c) rms asymmetrical fault current, which the breaker interrupts, assuming maximum dc offset. 5. The synchronous generator in the figure is operating 3

4 at rated MVA, 0.95 p.f. lagging and at 5% above rated voltage when a bolted three-phase short circuit occurs at Bus 1. Calculate the pu values of (a) subtransient fault current; (b) subtransient generator and motor currents, neglecting prefault current, and (c) subtransient generator and motor currents including prefault currents. 6. Faults at Bus 1 and Bus 2 in the power system of Problem 5 are of interest. The prefault voltage is 1.05pu and prefault load current is neglected. (a) Determing the 2x2 positive sequence bus impedance matrix. (b) For a bolted three-phase short-circuit at Bus 1, use Z bus to calculate the subtransient fault current and the contribution to the fault current from the transmission line. (c) Repeat part (b) for a bolted three-phase short-circuit at Bus A three-phase line feeding a balanced-y load has one of its phases (phase b) open. The load neutral is grounded, and the unbalanced line currents are Ia = 10 0 A, Ib = 0 A, and Ic = A. Calculate the sequence currents and the neutral current. 4

5 8. A balanced-y load is in parallel with a balanceddelta-connected capacitor bank. The Y load has an impedance Z Y = (3 +j4) Ω per phase, and its neutral is grounded through an inductive reactance X n = 2 Ω. The capacitor bank has a reactance X c = 30 Ω per phase. Draw the sequence networks for this load and calculate the loadsequence impedances. 9. Draw the sequence networks for the given circuit and calculate the sequence components of the line current. Assume that the generator neutral is grounded through an impedance Z n = j10 Ω, and that the generator sequence impedances are Z g0 = j1 Ω, Z g1 = j15 Ω, and Z g2 = j3 Ω. 10. A Y-connected voltage source with the following unbalanced voltage (V ag = V, V bg = V, V cg = V) is supplied to the balanced line and load of the given circuit. The source neutral is solidly grounded. Using the method of symmetrical components, calculate the source currents I a, I b, and I c. 5

6 11. A 75 kva, 480 V /208V Y transformer with a solidly grounded neutral is connected between the source and line of the previous example. The transformer leakage reactance is X eq = 0.1 pu; winding resistances and exciting current are neglected. Using the transformer ratings as base quantities, draw the pu sequence networks and calculate the phase a source current. 12. Three identical transformers are connected as a three-phase bank in order to feed power from a 900MVA, 13.8kV generator to a 345kV transmission line and to a 34.5kV distribution line. The transformer windings are connected as follows: 13.8kV windings (X):, to generator 199.2kV windings (H): solidly grounded Y, to 345kV line 19.92kV windings (M): grounded Y through Z n =j0.1ω, to 34.5kV line The positive sequence voltages and currents of the high and medium voltage Y windings lead the corresponding quantities of the low-voltage delta winding by 30 o. Draw the pu sequence networks, using a three-phase base of 900MVA and 13.8kV for terminal X. 6

7 13. Calculate Sp and Ss delivered by the three-phase source in Example 10. Verify that Sp = 3Ss. 7

8 14. Given a 9-bus power system. The P-Q load is known at each of the nine buses. Synchronous generators are connected at buses 1, 2, 5, and 7. For power flow s- tudy identify the P and Q mismatches, and the state variables associated with each bus. Choose bus 1 as the slack bus. 16. Figure shows the single-line diagram of a five-bus power system. Input data are given in Tables 6.1, 6.2, and 6.3. As shown in Table 6.1, bus 1, to which a generator is connected, is the swing bus. Bus 3, to which a generator and a load are connected, is a voltage-controlled bus. Buses 2, 4, and 5 are load buses. Note that the loads at buses 2 and 3 are inductive since Q 2 = -Q L2 = -2.8 and -Q L3 = -0.4 are negative. For each bus k, determine which of the variables V k, δ k, P k, and Q k are input data and which are unknowns. Also, compute the elements of the second row of Y bus. 8

9 17. For the power system of Example 14, use GaussSeidel to calculate V 2 (1), the phasor voltage at bus 2 after the first iteration. Use zero initial phase angles and 1.0 p.u. initial voltage magnitudes (except at bus 3, where V 3 = 1.05 p.u.) to start the iteration procedure. 18. Determine the Jacobian matrix for the power system in Example 14. Also calculate P 2 (0) in Step 1 and J1 24 (0) in Step 2 of the first Newton-Raphson iteration. Assume zero initial phase angles and 1.0 p.u. initial voltage magnitudes (except V 3 = 1.05 p.u.). 9

10 19. An interconnected 60Hz power system consists of one area with 3 turbine generator units rated 1000MVA, 750MVA, and 500MVA, respectively. The regulation constant of each unit is R = 0.05 p.u. based on its own rating. Each unit is initially operating at one-half of its own rating, when the system load suddenly increases by 200MW. Determine: a. the per-unit area frequency response characteristic β on a 1000MVA system base, b. the steady-state drop in area frequency, and c. the increase in turbine mechanical power output of each unit. Assume that the reference power setting of each turbinegenerator remains constant. Neglect losses and the dependence of load on frequency. 20. As shown in the figure, a 60Hz power system consists of two interconnected areas. Area 1 has 2000MW of total generation and an area frequency response characteristic β 1 = 700 MW/Hz. Area 2 has 4000MW of total generation and β 2 = 1400 MW/Hz. Each area is initially generating one-half of its total generation, at p tie1 = p tie2 = 0 and at 60Hz when the load in Area 10

11 1 suddenly increases by 100MW. Determine the steadystate frequency error f and the steady-state tie-line error p tie of each area for the following two cases: a. without LFC, and b. with LFC. Neglect losses and the dependence of load on frequency. 21. An area of an interconnected power system has two fossil-fuel units operating on economic dispatch. The variable operating costs of these units are given by: C 1 = 10P e-3P 2 1 $/hr C 2 = 8P e-3P 2 2 $/hr where P 1 and P 2 are in MW. Determine the power output of each unit, the incremental operating cost, and the total operating cost C T that minimizes C T as the total load demand P T varies from 500MW to 1500MW. Generating unit inequality constraints and transmission losses are neglected. 22. Do Example 19 if the units are subject to the following inequality constraints: 11

12 100 P MW 400 P MW 21. Total transmission losses for the power system area given in Example 19 are given by: P L = 1.5e-4P O-5P 1 P e-5P 2 1 MW where P 1 and P 2 are given in MW. Determine the output of each unit, total transmission losses, total load demand, and total operating cost C T when the area λ = $/MWhr. 12

13 23. The single-line diagram of a power system is shown in the figure, where negative and zero sequence reactances are also given. The neutrals of the generator and delta-y transformers are solidly grounded. The motor neutral is grounded through a reactance X n = 0.05 pu on the motor base. (a) Draw the pu zero, positive, and negative sequence networks on a 100 MVA, 13.8 kv base in the zone of the generator. (b) Reduce the sequence networks to their Thevenin equivalents, as viewed from Bus 2. Prefault voltage is V f = pu. Prefault load current and delta-y transformer phase shift are neglected. 24. Calculate the pu subtransient fault currents in phases a, b, and c for a bolted three-phase-to-ground short circuit at Bus 2 in Example Calculate the subtransient fault current in pu and in ka for a bolted single line-to-ground short circuit from phase a to ground at Bus 2 in Example 23. Also calculate the pu line-to-ground voltages at faulted Bus 2. 13

14 26. Calculate the subtransient fault current in pu and in ka for a bolted line-to-line fault from phase b to c at Bus 2 in the Example Calculate (a) the subtransient fault current in each phase, (b) neutral fault current, and (c) contributions to the fault current from the motor and from the transmission line, for a bolted double-line-to-ground fault from phase b-to-c-to-ground at Bus 2 in Example 14. Neglect the delta Y transformer phase shifts. 28. Rework Example 27 with the -Y transformer phase shifts included. Assume American standard phase shift. 29. Faults at buses 1 and 2 for the three-phase power system given in Example 23 are of interest. The prefault voltage is 1.05 pu. Prefault load current is neglected. (a) Determine the pu zero, positive, and negative-sequence bus impedance matrices. Find the subtransient fault cur- 14

15 rent in pu for a bolted single line-to-ground fault current from phase a-to-ground (b) at Bus 1, and (c) at Bus 2. Find the pu line-to-ground voltages at (d) Bus 1 and (e) Bus 2 during the single line-to-ground fault at Bus 1. 15

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions

More information

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

Level 6 Graduate Diploma in Engineering Electrical Energy Systems 9210-114 Level 6 Graduate Diploma in Engineering Electrical Energy Systems Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler,

More information

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 % BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

IGEE 402 Power System Analysis. FINAL EXAMINATION Fall 2004

IGEE 402 Power System Analysis. FINAL EXAMINATION Fall 2004 IGEE 40 Power System Analysis FINAL EXAMINATION Fall 004 Special instructions: - Duration: 150 minutes. - Material allowed: a crib sheet (double sided 8.5 x 11), calculator. - Attempt 4 out of 7 questions.

More information

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Cork Institute of Technology Bachelor of Science (Honours) in Electrical Power Systems - Award Instructions Answer FIVE questions. (EELPS_8_Y4) Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Examiners:

More information

Conventional Paper-II-2013

Conventional Paper-II-2013 1. All parts carry equal marks Conventional Paper-II-013 (a) (d) A 0V DC shunt motor takes 0A at full load running at 500 rpm. The armature resistance is 0.4Ω and shunt field resistance of 176Ω. The machine

More information

Exercises on overhead power lines (and underground cables)

Exercises on overhead power lines (and underground cables) Exercises on overhead power lines (and underground cables) 1 From the laws of Electromagnetism it can be shown that l c = 1 v 2 where v is the speed of propagation of electromagnetic waves in the environment

More information

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC Short-Circuit Analysis IEC Standard 1996-2009 Operation Technology, Inc. Workshop Notes: Short-Circuit IEC Purpose of Short-Circuit Studies A Short-Circuit Study can be used to determine any or all of

More information

COURSE PLANNER SUBJECT: ELECTRICAL POWER SYSTEM II

COURSE PLANNER SUBJECT: ELECTRICAL POWER SYSTEM II COURSE PLANNER SUBJECT: ELECTRICAL POWER SYSTEM II [260908] B.E. Third Year Class Electrical 204 Term: 6/2 (DEC-6 to APR-7) Faculty: PROF. J. I. JARIWALA PROF. A. S. SHAH PROF. T. M. PANCHAL PROF. N. B.

More information

UNIVERSITY OF SWAZILAND MAIN EXAMINATION, DECEMBER 2016

UNIVERSITY OF SWAZILAND MAIN EXAMINATION, DECEMBER 2016 UNIVERSITY OF SWAZILAND MAIN EXAMINATION, DECEMBER 2016 FACULTY OF SCIENCE AND ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONIC ENGINEERING TITLE OF PAPER: POWER SYSTEM ANALYSIS AND OPERATION COURSE

More information

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents Page: 1 Electrical Transient Analyzer Program Short Circuit Analysis ANSI Standard 3-Phase Fault Currents Number of Buses: Swing Generator Load Total 1 0 4 5 Number of Branches: XFMR2 XFMR3 Reactor Line/Cable

More information

Rajasthan Technical University, Kota

Rajasthan Technical University, Kota COURSE - FILE Name : Dr. Dinesh Birla Branch : Electrical Engineering Session : 2014-15, Odd Semester Semester : M. Tech I st Semester Specialization : Power System Index: Course File Sr. No. Content/

More information

PAPER-II (Subjective)

PAPER-II (Subjective) PAPER-II (Subjective) 1.(A) Choose and write the correct answer from among the four options given in each case for (a) to (j) below: (a) Improved commutation in d.c machines cannot be achieved by (i) Use

More information

EN Assignment No.1 - TRANSFORMERS

EN Assignment No.1 - TRANSFORMERS EN-06 - Assignment No.1 - TRANSFORMERS Date : 13 th Jan 01 Q1) A 0kVA 00/0 Volts, 60Hz, single phase transformer is found to have the following equivalent circuit parameter referred to the high potential

More information

Spring 2000 EE361: MIDTERM EXAM 1

Spring 2000 EE361: MIDTERM EXAM 1 NAME: STUDENT NUMBER: Spring 2000 EE361: MIDTERM EXAM 1 This exam is open book and closed notes. Assume f=60 hz and use the constant µ o =4π 10-7 wherever necessary. Be sure to show all work clearly. 1.

More information

AC Power Instructor Notes

AC Power Instructor Notes Chapter 7: AC Power Instructor Notes Chapter 7 surveys important aspects of electric power. Coverage of Chapter 7 can take place immediately following Chapter 4, or as part of a later course on energy

More information

Short-circuits in ES Short-circuit: cross fault, quick emergency change in ES the most often fault in ES transient events occur during short-circuits

Short-circuits in ES Short-circuit: cross fault, quick emergency change in ES the most often fault in ES transient events occur during short-circuits Short-circuits in ES Short-circuit: cross fault, quick emergency change in ES the most often fault in ES transient eents occur during short-circuits Short-circuit formation: fault connection between phases

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

Chapter 2: Transformers

Chapter 2: Transformers Chapter 2: Transformers 2-1. The secondary winding of a transformer has a terminal voltage of v s (t) = 282.8 sin 377t V. The turns ratio of the transformer is 100:200 (a = 0.50). If the secondary current

More information

86 chapter 2 Transformers

86 chapter 2 Transformers 86 chapter 2 Transformers Wb 1.2x10 3 0 1/60 2/60 3/60 4/60 5/60 6/60 t (sec) 1.2x10 3 FIGURE P2.2 2.3 A single-phase transformer has 800 turns on the primary winding and 400 turns on the secondary winding.

More information

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS 2-1. General but less than locked-rotor amperes and flows only Electrical power systems must be designed to serve in the normal circuit path. a variety of

More information

, ,54 A

, ,54 A AEB5EN2 Ground fault Example Power line 22 kv has the partial capacity to the ground 4,3.0 F/km. Decide whether ground fault currents compensation is required if the line length is 30 km. We calculate

More information

Electrical Power Systems

Electrical Power Systems Electrical Power Systems CONCEPT, THEORY AND PRACTICE SECOND EDITION SUBIR RAY Professor MVJ College of Engineering Bangalore PHI Learning Pfcte tofm Delhi-110092 2014 Preface xv Preface to the First Edition

More information

148 Electric Machines

148 Electric Machines 148 Electric Machines 3.1 The emf per turn for a single-phase 2200/220- V, 50-Hz transformer is approximately 12 V. Calculate (a) the number of primary and secondary turns, and (b) the net cross-sectional

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

Downloaded from / 1

Downloaded from   / 1 PURWANCHAL UNIVERSITY II SEMESTER FINAL EXAMINATION-2008 LEVEL : B. E. (Computer/Electronics & Comm.) SUBJECT: BEG123EL, Electrical Engineering-I Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates

More information

SAMPLE EXAM PROBLEM PROTECTION (6 OF 80 PROBLEMS)

SAMPLE EXAM PROBLEM PROTECTION (6 OF 80 PROBLEMS) SAMPLE EXAM PROBLEM PROTECTION (6 OF 80 PROBLEMS) SLIDE In this video, we will cover a sample exam problem for the Power PE Exam. This exam problem falls under the topic of Protection, which accounts for

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Aligarh College of Engineering & Technology (College Code: 109) Affiliated to UPTU, Approved by AICTE Electrical Engg.

Aligarh College of Engineering & Technology (College Code: 109) Affiliated to UPTU, Approved by AICTE Electrical Engg. Aligarh College of Engineering & Technology (College Code: 19) Electrical Engg. (EE-11/21) Unit-I DC Network Theory 1. Distinguish the following terms: (a) Active and passive elements (b) Linearity and

More information

University of Jordan School of Engineering Electrical Engineering Department. EE 219 Electrical Circuits Lab

University of Jordan School of Engineering Electrical Engineering Department. EE 219 Electrical Circuits Lab University of Jordan School of Engineering Electrical Engineering Department EE 219 Electrical Circuits Lab EXPERIMENT 7 RESONANCE Prepared by: Dr. Mohammed Hawa EXPERIMENT 7 RESONANCE OBJECTIVE This experiment

More information

Chapter 2-1 Transformers

Chapter 2-1 Transformers Principles of Electric Machines and Power Electronics Chapter 2-1 Transformers Third Edition P. C. Sen Transformer application 1: power transmission Ideal Transformer Assumptions: 1. Negligible winding

More information

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL Basically the HVDC transmission consists in the basic case of two convertor stations which are connected to each other by a transmission link consisting of an overhead

More information

Chapter 10: Compensation of Power Transmission Systems

Chapter 10: Compensation of Power Transmission Systems Chapter 10: Compensation of Power Transmission Systems Introduction The two major problems that the modern power systems are facing are voltage and angle stabilities. There are various approaches to overcome

More information

ELECTRICAL POWER TRANSMISSION TRAINER

ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering

More information

GATE 2000 Electrical Engineering

GATE 2000 Electrical Engineering GATE 2000 Electrical Engineering SECTION A (TOTAL MARKS=75) 1. This question consists of 25 (TWENTTY FIVE) sub-questions. Each sub-question carries ONE mark. The answers to these sub-questions MUST be

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

Power System Analysis (EE-456) For BE (EE)

Power System Analysis (EE-456) For BE (EE) PRACTICAL WORK BOOK Power System Analysis (EE-456) For BE (EE) Name: Roll Number: Year: Batch: Department: Section: Semester: N.E.D. University of Engineering & Technology, Karachi SAFETY RULES 1. Please

More information

Lab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009

Lab 1. Objectives. Single Line Diagram. Methodology. Observations. Jon Jawnsy Yu 26 October 2009 Lab 1 Objectives In this lab, our objective is to simulate a simple single machine infinite bus configuration using the PowerWorld Simulator software. We design a local generator system (a synchronous

More information

GATE 2009 Electrical Engineering

GATE 2009 Electrical Engineering Q. No. 1 20 Carry One Mark Each GATE 2009 Electrical Engineering 1. The pressure coil of a dynamometer type wattmeter is (A) highly inductive (B) highly resistive (C) purely resistive (D) purely inductive

More information

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator Ishwar Lal Yadav Department of Electrical Engineering Rungta College of Engineering and Technology Bhilai, India

More information

Transmission Line Models Part 1

Transmission Line Models Part 1 Transmission Line Models Part 1 Unlike the electric machines studied so far, transmission lines are characterized by their distributed parameters: distributed resistance, inductance, and capacitance. The

More information

Power Systems Modelling and Fault Analysis

Power Systems Modelling and Fault Analysis Power Systems Modelling and Fault Analysis Theory and Practice Nasser D. Tleis BSc, MSc, PhD, CEng, FIEE AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD PARIS SAN DIEGO SAN FRANCISCO SINGAPORE SYDNEY

More information

Rajasthan Technical University, Kota

Rajasthan Technical University, Kota COURSE FILE POWER SYSTEM ENGINEERING Name Branch Session Semester : Dr. Dinesh Birla : Electrical Engineering : 2012-13, Odd Semester : B. Tech VII Semester Index: Course File Sr. No. 1 Students Detail

More information

Conventional Paper-II-2011 Part-1A

Conventional Paper-II-2011 Part-1A Conventional Paper-II-2011 Part-1A 1(a) (b) (c) (d) (e) (f) (g) (h) The purpose of providing dummy coils in the armature of a DC machine is to: (A) Increase voltage induced (B) Decrease the armature resistance

More information

Code No: R Set No. 1

Code No: R Set No. 1 Code No: R05310204 Set No. 1 III B.Tech I Semester Regular Examinations, November 2007 ELECTRICAL MACHINES-III (Electrical & Electronic Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions

More information

Connection Impact Assessment Application Form

Connection Impact Assessment Application Form Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information

More information

Fault Analysis. EE 340 Spring 2012

Fault Analysis. EE 340 Spring 2012 Fault Analysis EE 340 Spring 2012 Introduction A fault in a circuit is any failure that interferes with the normal system operation. Lighting strokes cause most faults on highvoltage transmission lines

More information

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network Preface p. iii Introduction and General Philosophies p. 1 Introduction p. 1 Classification of Relays p. 1 Analog/Digital/Numerical p. 2 Protective Relaying Systems and Their Design p. 2 Design Criteria

More information

Question Paper Profile

Question Paper Profile I Scheme Question Paper Profile Program Name : Electrical Engineering Program Group Program Code : EE/EP/EU Semester : Third Course Title : Electrical Circuits Max. Marks : 70 Time: 3 Hrs. Instructions:

More information

Adaptive Settings Of Distance Relay For MOV- Protected Series Compensated Line With Distributed Capacitance Considering Wind Power

Adaptive Settings Of Distance Relay For MOV- Protected Series Compensated Line With Distributed Capacitance Considering Wind Power Clemson University TigerPrints All Theses Theses 5-216 Adaptive Settings Of Distance Relay For MOV- Protected Series Compensated Line With Distributed Capacitance Considering Wind Power Oleg Viktorovich

More information

Electric Circuits II Three-Phase Circuits. Dr. Firas Obeidat

Electric Circuits II Three-Phase Circuits. Dr. Firas Obeidat Electric Circuits II Three-Phase Circuits Dr. Firas Obeidat 1 Table of Contents 1 Balanced Three-Phase Voltages 2 Balanced Wye-Wye Connection 3 Balanced Wye-Delta Connection 4 Balanced Delta-Delta Connection

More information

Optimal Placement of Shunt Connected Facts Device in a Series Compensated Long Transmission Line

Optimal Placement of Shunt Connected Facts Device in a Series Compensated Long Transmission Line Journal of Agriculture and Life Sciences Vol. 1, No. 1; June 2014 Optimal Placement of Shunt Connected Facts Device in a Series Compensated Long Transmission Line Sudhakar. Muthyala EEE Dept. University

More information

Chapter # : 17 Symmetrical Fault Calculations

Chapter # : 17 Symmetrical Fault Calculations Chapter # : 17 Symmetrical Fault Calculations Introduction Most of the faults on the power system lead to a short-circuit condition. The short circuit current flows through the equipment, causing considerable

More information

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) 7 February 2018 RM Zavadil COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) Brief Overview of Sub-Synchronous Resonance Series

More information

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,

More information

ETAP PowerStation 4.0

ETAP PowerStation 4.0 ETAP PowerStation 4.0 User Guide Copyright 2001 Operation Technology, Inc. All Rights Reserved This manual has copyrights by Operation Technology, Inc. All rights reserved. Under the copyright laws, this

More information

PROTECTION APPLICATION HANDBOOK

PROTECTION APPLICATION HANDBOOK BOOK No 6 Revision 0 Global Organization Innovative Solutions Product & Substation System Business Business PROTECTION APPLICATION HANDBOOK BA THS / BU Transmission Systems and Substations LEC Support

More information

KINGS COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK UNIT I BASIC CIRCUITS ANALYSIS PART A (2-MARKS)

KINGS COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK UNIT I BASIC CIRCUITS ANALYSIS PART A (2-MARKS) KINGS COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK YEAR / SEM : I / II SUBJECT CODE & NAME : EE 1151 CIRCUIT THEORY UNIT I BASIC CIRCUITS ANALYSIS PART A (2-MARKS)

More information

Tutorial on Symmetrical Components

Tutorial on Symmetrical Components Tutorial on Symmetrical Components Part : Examples Ariana Amberg and Alex Rangel, Schweitzer Engineering Laboratories, nc. Abstract Symmetrical components and the per-unit system are two of the most fundamental

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

ECEN 615 Methods of Electric Power Systems Analysis Lecture 8: Advanced Power Flow

ECEN 615 Methods of Electric Power Systems Analysis Lecture 8: Advanced Power Flow ECEN 615 Methods of Electric Power Systems nalysis Lecture 8: dvanced Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering Texas &M University overbye@tamu.edu nnouncements Read Chapter

More information

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW Electric Utility Contact Information DTE Energy Interconnection Coordinator One Energy Plaza, SB

More information

Design of SVPWM Based Inverter for Mitigation of Harmonics in Power System

Design of SVPWM Based Inverter for Mitigation of Harmonics in Power System Design of SVPWM Based Inverter for Mitigation of Harmonics in Power System 1 Leena N C, 2 B. Rajesh Kamath, 3 Shri Harsha 1,2,3 Department of EEE, Sri Siddhartha Institute of Technology, Tumkur-572105,

More information

Code No: R Set No. 1

Code No: R Set No. 1 Code No: R05220204 Set No. 1 II B.Tech II Semester Supplimentary Examinations, Aug/Sep 2007 ELECTRICAL MACHINES-II (Electrical & Electronic Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions

More information

IOCL Electrical Engineering Technical Paper

IOCL Electrical Engineering Technical Paper IOCL Electrical Engineering Technical Paper 1. Which one of the following statements is NOT TRUE for a continuous time causal and stable LTI system? (A) All the poles of the system must lie on the left

More information

Power Quality enhancement of a distribution line with DSTATCOM

Power Quality enhancement of a distribution line with DSTATCOM ower Quality enhancement of a distribution line with DSTATCOM Divya arashar 1 Department of Electrical Engineering BSACET Mathura INDIA Aseem Chandel 2 SMIEEE,Deepak arashar 3 Department of Electrical

More information

Transient Stability Improvement Of IEEE 9 Bus System With Shunt FACTS Device STATCOM

Transient Stability Improvement Of IEEE 9 Bus System With Shunt FACTS Device STATCOM Transient Stability Improvement Of IEEE 9 Bus System With Shunt FACTS Device STATCOM P.P. Panchbhai 1, P.S.Vaidya 2 1Pratiksha P Panchbhai, Dept. of Electrical Engineering, G H Raisoni College of Engineering

More information

UNIVERSITY OF TORONTO FACULTY OF APPLIED SCIENCE AND ENGINEERING. MIDTERM EXAMINATION, February Forth Year Electrical and Computer Engineering

UNIVERSITY OF TORONTO FACULTY OF APPLIED SCIENCE AND ENGINEERING. MIDTERM EXAMINATION, February Forth Year Electrical and Computer Engineering NAME: LAST UNIVERSITY OF TORONTO FACULTY OF APPLIED SCIENCE AND ENINEERIN MIDTERM EXAMINATION, February 017 Forth Year Electrical and Computer Engineering ECE413 Energy Systems and Distribution eneration

More information

Practical Transformer on Load

Practical Transformer on Load Practical Transformer on Load We now consider the deviations from the last two ideality conditions : 1. The resistance of its windings is zero. 2. There is no leakage flux. The effects of these deviations

More information

CHAPTER 9. Sinusoidal Steady-State Analysis

CHAPTER 9. Sinusoidal Steady-State Analysis CHAPTER 9 Sinusoidal Steady-State Analysis 9.1 The Sinusoidal Source A sinusoidal voltage source (independent or dependent) produces a voltage that varies sinusoidally with time. A sinusoidal current source

More information

COURSE PLANNER Subject: POWER SYSTEM OPERATION AND CONTROL [ ]

COURSE PLANNER Subject: POWER SYSTEM OPERATION AND CONTROL [ ] COURSE PLANNER Subject: POWER SYSTEM OPERATION AND CONTROL [2180909] B.E. Forth Year Branch /Class Electrical 2013 Term: 16/2 (DEC-16 to APR-17) Faculty: PROF. J. I. JARIWALA PROF. T. M. PANCHAL PROF.

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Chapter 30 Inductance, Electromagnetic. Copyright 2009 Pearson Education, Inc.

Chapter 30 Inductance, Electromagnetic. Copyright 2009 Pearson Education, Inc. Chapter 30 Inductance, Electromagnetic Oscillations, and AC Circuits 30-7 AC Circuits with AC Source Resistors, capacitors, and inductors have different phase relationships between current and voltage

More information

Exercises. 6 Exercises

Exercises. 6 Exercises 6 Exercises The following five computer exercises accompany the course. Alternative Transients Program (ATP-EMTP) will be used to compute electrical transients. First electrical network should be created

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

1 Introduction General Background The New Computer Environment Transmission System Developments Theoretical Models and Computer Programs

1 Introduction General Background The New Computer Environment Transmission System Developments Theoretical Models and Computer Programs Modeling Techniques in Power Systems 1 General Background The New Computer Environment Transmission System Developments Theoretical Models and Computer Programs 2 Transmission Systems Linear Transformation

More information

Performance Analysis on Transmission Line for Improvement of Load Flow

Performance Analysis on Transmission Line for Improvement of Load Flow Performance Analysis on Transmission Line for Improvement of Load Flow YaMinSuHlaing Department of Electrical Power Engineering Mandalay Technological University, Mandalay, Myanmar Yaminsuhlaing.yso@gmail.com

More information

CHAPTER 5 DESIGN OF DSTATCOM CONTROLLER FOR COMPENSATING UNBALANCES

CHAPTER 5 DESIGN OF DSTATCOM CONTROLLER FOR COMPENSATING UNBALANCES 86 CHAPTER 5 DESIGN OF DSTATCOM CONTROLLER FOR COMPENSATING UNBALANCES 5.1 INTRODUCTION Distribution systems face severe power quality problems like current unbalance, current harmonics, and voltage unbalance,

More information

EE Branch GATE Paper 2001 SECTION A (TOTAL MARKS = 75)

EE Branch GATE Paper 2001 SECTION A (TOTAL MARKS = 75) SECTION A (TOTAL MARKS = 75) 1. This question consists of 25 (TWENTY-FIVE) sub-questions (1.1-1.25) of ONE mark each. (25 1 = 25 ) 1.1 In a series RLC circuit at resonance, the magnitude of the voltage

More information

The power transformer

The power transformer ELEC0014 - Introduction to power and energy systems The power transformer Thierry Van Cutsem t.vancutsem@ulg.ac.be www.montefiore.ulg.ac.be/~vct November 2017 1 / 35 Power transformers are used: to transmit

More information

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations Case Study 1 Power System Planning and Design: Power Plant, Transmission Lines, and Substations Lindsay Thompson, 5203120 Presented to Riadh Habash ELG 4125 11/10/2013 1.0 ABSTRACT A power plant delivers

More information

EE 740 Transmission Lines

EE 740 Transmission Lines EE 740 Transmission Lines 1 High Voltage Power Lines (overhead) Common voltages in north America: 138, 230, 345, 500, 765 kv Bundled conductors are used in extra-high voltage lines Stranded instead of

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester

More information

Connection Impact Assessment Application

Connection Impact Assessment Application Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,

More information

The Influence of Thyristor Controlled Phase Shifting Transformer on Balance Fault Analysis

The Influence of Thyristor Controlled Phase Shifting Transformer on Balance Fault Analysis Vol.2, Issue.4, July-Aug. 2012 pp-2472-2476 ISSN: 2249-6645 The Influence of Thyristor Controlled Phase Shifting Transformer on Balance Fault Analysis Pratik Biswas (Department of Electrical Engineering,

More information

AGN 034 Alternator Reactance

AGN 034 Alternator Reactance Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 034 Alternator Reactance DEFINITION Reactance Periods Inherent to the design of an alternator are certain internal

More information

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4 Philadelphia University Faculty of Engineering Dept. of Electrical Engineering Student Name: Student Number: Final Exam Course Title: Design of T&D System Date: 15 th June 2016 Course No: 610 515/650511

More information

IV. Three-Phase Transfomers

IV. Three-Phase Transfomers I. Three-Phase Transfomers Three-Phase Transfomers The majority of the power generation/distribution systems in the world are 3- phase systems. The transformers for such circuits can be constructed either

More information

ANALYSIS OF LIGHTNING ARRESTER OVERLOADING IN FUTURE DISTRIBUTION SYSTEMS WITH DISTRIBUTED GENERATION. A Thesis JONATHAN MICHAEL SNODGRASS

ANALYSIS OF LIGHTNING ARRESTER OVERLOADING IN FUTURE DISTRIBUTION SYSTEMS WITH DISTRIBUTED GENERATION. A Thesis JONATHAN MICHAEL SNODGRASS ANALYSIS OF LIGHTNING ARRESTER OVERLOADING IN FUTURE DISTRIBUTION SYSTEMS WITH DISTRIBUTED GENERATION A Thesis by JONATHAN MICHAEL SNODGRASS Submitted to the Office of Graduate and Professional Studies

More information

GATE 2003 Electrical Engineering

GATE 2003 Electrical Engineering GATE 2003 Electrical Engineering Q.1 - Q.30 Carry one mark each 1. The given figure shows the waveform of the current passing through an inductor of resistance 1Ω and inductance 2 H. The energy absorbed

More information

The Analysis of Voltage Increase Phenomena in a Distribution Network with High Penetration of Distributed Generation

The Analysis of Voltage Increase Phenomena in a Distribution Network with High Penetration of Distributed Generation The Analysis of Voltage Increase Phenomena in a Distribution Network with High Penetration of Distributed Generation Insu Kim, Ronald G. Harley, and Raeey Regassa Georgia Institute of Technology Atlanta,

More information

PUBLICATIONS OF PROBLEMS & APPLICATION IN ENGINEERING RESEARCH - PAPER CSEA2012 ISSN: ; e-issn:

PUBLICATIONS OF PROBLEMS & APPLICATION IN ENGINEERING RESEARCH - PAPER  CSEA2012 ISSN: ; e-issn: POWER FLOW CONTROL BY USING OPTIMAL LOCATION OF STATCOM S.B. ARUNA Assistant Professor, Dept. of EEE, Sree Vidyanikethan Engineering College, Tirupati aruna_ee@hotmail.com 305 ABSTRACT In present scenario,

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

Q.1 to Q.30 carry one mark each

Q.1 to Q.30 carry one mark each Q. to Q.3 carry one mark each Q. The given Figure shows the waveform of the current passing through an inductor of resistance and inductance H. The energy absorbed by the inductor in the first four seconds

More information

LOW-RESISTANCE grounding resistors (LRGs) appear

LOW-RESISTANCE grounding resistors (LRGs) appear IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, VOL. 44, NO. 5, SEPTEMBER/OCTOBER 2008 1311 Grounding the Neutral of Electrical Systems Through Low-Resistance Grounding Resistors: An Application Case Massimo

More information

Beskrivelse av simuleringsmodell ==> Description of simulation model

Beskrivelse av simuleringsmodell ==> Description of simulation model Infrastruktur Elkraft / Energy Side / Page: 1 av / of 6 Beskrivelse av simuleringsmodell ==> Description of simulation model General The modelled system consists of one rotary converter (synchronous-synchronous

More information

El-Hawary, M.E. The Transformer Electrical Energy Systems. Series Ed. Leo Grigsby Boca Raton: CRC Press LLC, 2000

El-Hawary, M.E. The Transformer Electrical Energy Systems. Series Ed. Leo Grigsby Boca Raton: CRC Press LLC, 2000 El-Hawary, M.E. The Transformer Electrical Energy Systems. Series Ed. Leo Grigsby Boca Raton: CRC Press LLC, 000 97 Chapter 4 THE TRANSFORMER 4. NTRODUCTON The transformer is a valuable apparatus in electrical

More information

CHAPTER 2. Basic Concepts, Three-Phase Review, and Per Unit

CHAPTER 2. Basic Concepts, Three-Phase Review, and Per Unit CHAPTER 2 Basic Concepts, Three-Phase Review, and Per Unit 1 AC power versus DC power DC system: - Power delivered to the load does not fluctuate. - If the transmission line is long power is lost in the

More information

Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero

Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero Consider a bus and its associated circuits consisting of lines or transformers. The algebraic

More information