SLD FOR 132/33 KV DUB STATION, SOMANATHPUR

Size: px
Start display at page:

Download "SLD FOR 132/33 KV DUB STATION, SOMANATHPUR"

Transcription

1 SLD FOR 132/33 KV DUB STATION, SOMANATHPUR 132 KV BAYS TRANSF 02 NOS. 132kV MAIN BUS 132kV RESERVE BUS 20/40 MVA, 132/33kV TRANSFORMER1 20/40 MVA, 132/33kV TRANSFORMER 2 STN TFR 33/0.4KV 250KVA 33KV BAY FEEDER 04 NOS. TRANSF 02 NOS. BUS COU 01 NO. 33kV MAIN BUS PVC CABLE PVC CABLE 33kV RESERVE BUS F1 F2 F3 F4 F5 Page 1 of 15

2 STRACTURAL NETWORK OF 132/33 KV SUB STATION FOR 132/33 KV SUB STATION AT SOMNATHPUR 132 KV SIDE TIS TIS G1 G1 R G2 G O T4S T4S A G2 G D T1S G1 G1 T1S Transfo Transfo 3.5 rmer rmer 3.5 G1,2 G1,2 4.5 T1S TIS T1S O A D R O A D R 33 KV SIDE R O T9S T9S T9S O T9S T9S T9S T9S A 5.5 A G4X D T9S G4X G4X G4X T9S D T9S T9S T9S T9S 7.05 T8S G4 G4 G4 G4 G4 G4 T8S T8S T8S T8S 7.25 G6 G6 G Page 2 of 15

3 T9S T9S T9S R O A D R O A D *ALL THE DIMENSIONS ARE IN MTRS 132/33kV SUB STATION ATSOMNATHPUR SYMBOLS USED SURGE ARRESTOR AUTO TRANSFORMER WAVE TRAP CURRENT TRANSFORMER POWER TRANSFORMER IND VOLTAGE TRANSFORMER SA PVC CABLE STATION AUXILIARY SYSTEM CAP VOLTAGE TRANSFORMER AB SWI HG FUSE STN TFR CABLE ISOLATOR EARTH SWITCH CKT BKR Page 3 of 15

4 132/33kV SUB STATION AT SOMNATHPUR SCOPE OF WORK OTHER IMPORTANT INFORMATIONS 132kV Feeder bay 2Nos. 132kV BUS CONDUCTOR MAIN TWIN ACSR MOOSE 132kV Transfoprmer Bay 2 Nos. 132kV BUS CONDUCTOR MAIN BUS TWIN ACSR MOOSE 132/33kV, 12.5MVA 2 No 132kV BUS CONDUCTOR RESERVE SINNGLE ACSR MOOSE 33kV Feeder bay 4Nos. 33kV BUS CONDUCTOR MAIN TWIN ACSR MOOSE 33kV Transfoprmer Bay 2 Nos. 33kV BUS CONDUCTOR RESERVE SINNGLE ACSR MOOSE 33kV Bus Couplar Bay 1 No. BUS CONFIGURATION: MAIN & TRANSFER BUS SYSTEM. 132kV EQUIPMENTS / MATERIALS 33kV EQUIPMENTS / MATERIALS Sl No. Items Qty Sl No. Items Qty 1 SF6 Circuit Breaker 2 1 Vaccum C Breaker 8 2 Current Transformer 6 2 Current Transforme 24 3 Surge Arrester 6 3 IVT 3 4 BPI 21 4 Surge Arrester 21 5 SI w/o ES 2 5 BPI 6 DI w/o ES 2 6 SI w/o ES 9 7 D Ten Insulator string 7 DI w/o ES 2 8 S.Ten Insulator string 8 DI with ES 5 9 Sus Insulator string 9 SI with BM 2 10 BMK 1 10 NCT 4 For Tfr 11 Lighting Board 1 11 D Ten Insulator string 12 Receptical Board 1 12 S.Ten Insulator string 13 Receptical Tfr oil filter 1 13 Sus Insulator string 14 T1S 14 BMK 3 15 T4S 15 Lighting Board 1 16 G1 16 Receptical Board 1 17 G2 17 T9S 18 G1,2 18 T8S 19 G1X 19 G4 20 G4X 21 G KVA STN TFR 2 For Stn Tfr 23 HG FUSE SET 2 For Stn Tfr 24 AB Switch 2 set For Stn Tfr 25 Surge Arrester 6 For Stn Tfr Page 4 of 15

5 SLD FOR 220 KV BAY EXTENSION(3 BUS SYSTEM) AT 400/220 SUB STATION AT JAYAPUR(PGCIL) 220 KV BAYS FDR 2 NOS FDR FDR MAIN BUS I (TWIN MOOSE) MAIN BUS II (TWIN MOOSE) TRANSFER BUS (TWIN MOOSE) SLD FOR 220 KV BAY EXTENSION(1&1/2 CB BUS SYSTEM) AT 220/132/33kV SUB STATION AT JAYANAGAR(OPTCL) FDR WT WT FDR CB CB CB BUS I BUS II Page 5 of 15

6 SYMBOLS USED SURGE ARRESTOR AUTO TRANSFORMER WAVE TRAP CURRENT TRANSFORMER POWER TRANSFORMER IND VOLTAGE TRANSFORMER SA PVC CABLE STATION AUXILIARY SYSTEM CAP VOLTAGE TRANSFORMER AB SWI HG FUSE STN TFR CABLE ISOLATOR CKT BKR EARTH SWITCH Page 6 of 15

7 STRACTURAL LAYOUT FOR 220 KV BAY EXTENSION AT JAYAPUR(PGCIL) KV SIDE EXISTING PORTION SCOPE OF THE WORK 18 STRACTURAL LAYOUT FOR 220 KV BAY EXTENSION AT JAYANAGAR(OPTCL) 18 Mtrs 14 Mtrs 31 Mtrs 14 Mtrs 18 Mtrs Page 7 of 15

8 DBC BBM BBC DBC DBC BBC BBM DBC R R FENCING O 220 KV MAIN BUS 220 KV MAIN BUS 17 MtRS TBM TBM TBM TBM A O A D D EXISTING SIDE OF THE SUB STATION 136 MTRS SCOPE OF THE WORK 1. DBC = 04 Nos. 2. BBC = 02 Nos. 3. TBM = 04 Nos 4. BBM = 02 Nos. Page 8 of 15

9 INDICATIVE SLD & STRUCTURAL LAYOUT (ANNEXURE VII) OF THE SUBSTATION SLD FOR 220/132 SUB STATION ATMENDHASAL 220 KV BUS 1 SCOPE OF WORK 220 KV BAYS TFR 2 NOS SCOPE OF WORK 132 KV BAYS FDR 2 NOS TFR 02 NOS B/C 01 NO 220 KV BUS 2 AT 220 KV BAY EXTENSION WORK MENDHASAL 220 KV TRANSFER BUS FDR FDR 220/132/33KV 220/132/33KV 160 MVA AT MVA AT 2 BUS IVT 132 KV MAIN BUS 132 KV RESERVE BUS 132 KV UNEQUIPPED LEVELLED SPARE BAY TFR I BAY BUS COUPLER TFR II BAY Page 9 of 15

10 LEVELLED SPARE BAY CT WT IN R&B PHASE EACH CIRCUIT CVT SA FDR CHANDAKA FDR KHURDHA Page 10 of 15

11 STRUCTURAL LAYOUT FOR 220/132 SUB STATION ATMENDHASAL KV BAY EXTENSION WORK AT MENDHASAL 18 EXISTING 7 MTRS WIDE ROAD Page 11 of 15

12 OC TYPE TOWER FENCING R O A MAIN GATE D O A 220/132/33 KV 220/132/33 KV 160 MVA AT MVA AT R O A D FENCING FENCING G1X G1X R T1S T1S T1S T1S T1S T1S T1S R R O G2 O 10.4 G1 G1 A T4S T4S A T4S D T1S D A G2 T4S G1X G1 T1S T1S G1X T1S T1S T1S TIS T1S R O A D FENCING Page 12 of 15

13 220/132/33kV SUB STATION AT KARADAGADIA SYMBOLS USED SURGE ARRESTOR AUTO TRANSFORMER WAVE TRAP CURRENT TRANSFORMER POWER TRANSFORMER IND VOLTAGE TRANSFORMER SA PVC CABLE STATION AUXILIARY SYSTEM CAP VOLTAGE TRANSFORMER AB SWI HG FUSE STN TFR CABLE ISOLATOR EARTH SWITCH CKT BKR Page 13 of 15

14 SCOPE OF WORK 220/132 kv SUB STATION ATMENDHASAL 220kV BUS CONDUCTOR BUS1,BUS 2 TWIN ACSR MOOSE 220kV BUS CONDUCTOR TRANSFER SINNGLE ACSR MOOSE 220kV Transformer Bay 2 Nos. 132kV Feeder bay 4 Nos BUS CONFIGURATION: TWO MAIN & ONE TRANSFER BUS SYSTEM. 220/132/33 KV,160 MVA TFR:02 Nos.(2 Nos equipped & 2 Nos not equipped) 132kV BUS CONDUCTOR MAIN TWIN ACSR MOOSE 132kV Transformer Bay 2 Nos. 132kV BUS CONDUCTOR RESERVE SINNGLE ACSR MOOSE 132kV Bus Couplar Bay 1 No. BUS CONFIGURATION: MAIN & TRANSFER BUS SYSTEM. REQUIREMENT OF EQUIPMENT/MATERIALS 220 KV EQUIPMENTS / MATERIALS 132kV EQUIPMENTS / MATERIALS Sl No. Items Qty Sl No. Items Qty 1 SF6 Circuit Breake2 NOS 1 SF6 Circuit Breake 5 2 Current Transforme 6 2 Current Transforme 15 3 CVT 01 NO 3 CVT 6 4 IVT 01 NO 4 IVT 3 5 Surge Arrester 6 5 Surge Arrester 12 6 Wave Trap 01 NO 6 Wave Trap 4 7 BPI 7 BPI 8 SI w/o ES 2 NOS 8 SI w/o ES 8 9 SI with ES 2 NOS 9 DI w/o ES 2 10 Tandem Isolator 4 10 DI with ES 2 11 D Ten Insulator string 11 D Ten Insulator string 12 S.Ten Insulator string 12 S.Ten Insulator string 13 Sus Insulator string 13 Sus Insulator string 14 BMK 2 NOS 14 BMK 3 15 Lighting Board 1 15 Lighting Board 1 16 Receptical Board 1 16 Receptical Board 2 17 Receptical Tfr oil fil 1 17 Receptical Tfr oil fil T1S T4S 20 G1 21 G2 22 G1,2 23 G1X Page 14 of 15

15 SINGLE LINE DIAGRAM SHOWING INSTALLATIONS, REMOVING AND ERECTION OF PLCC EQUIPMENT ANNEXURE VI SCHEMATIC LAYOUT FOR SPEECH & DATA FOR 132KV KHURDA CHANDAKA LILO AT MENDHASAL Khurda Mendhasal Chandaka R WT R WT Y Y B WT B WT CVT CVT CVT CVT CVT CVT LMDU LMU LMU LMDU LMD LMU LMDU LMU U PUNCO M E X I S T N G *ETI 22 E X I S T N G *ETI 21 E X I S T N G *ETI 22 E X I S T N G *PUNCO M E X I S T N G *ETI 21 E X I S T N G DPLC(8KH Z) Sp + Data DPLC(8KH Z) Sp + Data * Marked ETI/PUNCOM carrier sets working at Chandaka for Khurda direction are to be shifted to Mendhasal and used in between Khurda Mendhasal for speech and data. Page 15 of 15

CHAPTER-E-21. T1 Column With Beam Arrangement in Substation. T2 Column With Beam Arrangement in Substation

CHAPTER-E-21. T1 Column With Beam Arrangement in Substation. T2 Column With Beam Arrangement in Substation CHAPTER-E-21 Sl No Drawing Name Drawing Number 1 Single Line Diagram (GIS S/s) ODSSP/SS/SLD/1-REV-C 2 Single Line Diagram (Outdoor S/s) ODSSP/SS/SLD/3 3 Sub- station Layout for GIS Type ODSSP/SS/SLY/1

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester

More information

Substation: From the Outside Looking In.

Substation: From the Outside Looking In. 1 Substation: From the Outside Looking In. Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the presentation 3 Today s Presenter n Greg

More information

LIST OF DRAWINGS. 1. C/ENGG/NEPAL/DANA/SLD/01 (2 SHEET) Single Line diagram of 220/132/33kV Dana Substation

LIST OF DRAWINGS. 1. C/ENGG/NEPAL/DANA/SLD/01 (2 SHEET) Single Line diagram of 220/132/33kV Dana Substation Annexure-I LIST OF DRAWINGS S. No. DRAWING NO. TITLE Project specific drawings A) 220/132/33kV Dana Substation 1. C/ENGG/NEPAL/DANA/SLD/01 (2 SHEET) Single Line diagram of 220/132/33kV Dana Substation

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information

Saturday-Sunday Training Report

Saturday-Sunday Training Report DEPARTMENT OF ELECTRICAL ENGINEERING Saturday-Sunday Training Report 9 th -10 th January,2015 At 220 KV Substation, Shapur H.O.D Prof. M. M. Baraiya T. P. O Prof. M. M. Makavana Visited Student Nagariya

More information

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH SCHEDULE OF WORK Supply, Installation, Testing & Commissioning (SITC) of 33KV Electrical Substation for Multi Modal Logistics Hub at Visakhapatnam, Andhra Pradesh. Tender No. MMLH /HTELEC/PT /18 dated

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

230/26kV Steelbald T3 Replacement project ITEM QTY. DESCRIPTION MFG. TYPE OR CAT. NO.

230/26kV Steelbald T3 Replacement project ITEM QTY. DESCRIPTION MFG. TYPE OR CAT. NO. 1 of 5 230KV BUS MATERIALS AND STRUCTURES K5 120 954 MCM AAC, 37 STRAND, CODE NAME "MAGNOLIA" MID STATE A954-01BA01 K6 35 4/0 AAC, 7 STR., CODE NAME "OXLIP" MID STATE AAC N32 12 TERMINAL, 954 MCM AAC TO

More information

ELEC Transmission i and

ELEC Transmission i and ELEC-1104 Lecture 5: Transmission i and Distribution ib ti Power System Layout Transmission and Distribution The transmission system is to transmit a large amount of energy from the power stations s to

More information

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

GENERAL TECHNICAL SPECIFICATION (Turnkey Work) GENERAL TECHNICAL SPECIFICATION (Turnkey Work) March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,

More information

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) Ministry of New & Renewable Energy From the SelectedWorks of Radhey Shyam Meena Winter July 12, 2012 SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) RADHEY SHYAM MEENA, Er. Available

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 % BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

Busbar and Modular Wiring Systems

Busbar and Modular Wiring Systems Chapter 11 Busbar and Modular Wiring Systems 11.1 BUSBAR SYSTEM The wide range of busbar system is available and can be used for single or three-phase distribution to many types of applications ranging

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

A TRAINING REPORT ON UTTAR PRADESH POWER CORPORATION LIMITED 33/11 KV SUBSTATION INDIRANAGAR SECTOR-25, LUCKNOW(UTTAR PRADESH).

A TRAINING REPORT ON UTTAR PRADESH POWER CORPORATION LIMITED 33/11 KV SUBSTATION INDIRANAGAR SECTOR-25, LUCKNOW(UTTAR PRADESH). A TRAINING REPORT ON UTTAR PRADESH POWER CORPORATION LIMITED 33/11 KV SUBSTATION INDIRANAGAR SECTOR-25, LUCKNOW(UTTAR PRADESH). A training Report Submitted In Partial Fulfillment of the Requirements for

More information

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground

More information

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021 TRANSMISSION AND SUBSTATION PROJECT S OPERATING COMPANY: EGSI-TX CUSTOMER: COTTONWOOD ENERGY COMPANY, LP EJO # GS0021 FACILITY STUDY OPTIONAL SYSTEM UPGRADES FOR 1240 MW, IPP PROJECT NEAR HARTBURG, TX

More information

ANNEXURE-I. Documents to be uploaded 1 Certificate of Registration with Industries 2 VAT Certificate 3 Service Tax Certificate

ANNEXURE-I. Documents to be uploaded 1 Certificate of Registration with Industries 2 VAT Certificate 3 Service Tax Certificate ANNEXURE-I Documents to be uploaded 1 Certificate of Registration with Industries 2 VAT Certificate 3 Service Tax Certificate 4 Excise Duty Registration Certificate 5 Pan Card 6 Approved Vendor Certificates

More information

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations Case Study 1 Power System Planning and Design: Power Plant, Transmission Lines, and Substations Lindsay Thompson, 5203120 Presented to Riadh Habash ELG 4125 11/10/2013 1.0 ABSTRACT A power plant delivers

More information

GENERAL TECHNICAL SPECIFICATION

GENERAL TECHNICAL SPECIFICATION GENERAL TECHNICAL SPECIFICATION September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering) R10 Set No. 1 Code No: R41023 1. a) Explain how arc is initiated and sustained in a circuit breaker when the CB controls separates. b) The following data refers to a 3-phase, 50 Hz generator: emf between

More information

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,

More information

Roll No. :... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/ POWER SYSTEM-I. Time Allotted : 3 Hours Full Marks : 70

Roll No. :... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/ POWER SYSTEM-I. Time Allotted : 3 Hours Full Marks : 70 Name : Roll No. :.... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/2011-12 2011 POWER SYSTEM-I Time Allotted : 3 Hours Full Marks : 70 The figures in the margin indicate full marks. Candidates

More information

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities Company Directive STANDARD TECHNIQUE: TP14C Distribution Business Provided Metering Facilities Summary This standard technique document details the metering facilities to be provided by the distribution

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

EL 403 MODEL TEST PAPER - 1 POWER SYSTEMS. Time: Three Hours Maximum Marks: 100

EL 403 MODEL TEST PAPER - 1 POWER SYSTEMS. Time: Three Hours Maximum Marks: 100 POWER SYSTEMS Time: Three Hours Maximum Marks: 0 Answer five questions, taking ANY TWO from Group A, any two from Group B and all from Group C. All parts of a question (a, b, etc. ) should be answered

More information

The Upgradabilty of Conventional Three Phase Delta/Star Networks

The Upgradabilty of Conventional Three Phase Delta/Star Networks The Upgradabilty of Conventional Three Phase Delta/Star Networks WHY NEW STANDARDS? CAPITAL COSTS Initial Final OPERATIONAL COSTS UPGRADABILITY SAFETY MAINTAINANCE CONVENTIONAL CONFIGURATION Electrification

More information

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY:ETI CUSTOMER: PID 211 FACILITIES STUDY EJO # F4PPTX0018 PID 211 INTERCONNECTION LEWIS CREEK 138 KV Revision: 1 Rev Issue Prepared Description of Revision

More information

Earth Fault Protection

Earth Fault Protection Earth Fault Protection Course No: E03-038 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774

More information

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

Form-IV. Form of Inspection/Test Report. (Under Regulation 43) Form-IV Form of Inspection/Test Report (Under Regulation 43) 1. Name and address of the Chartered Electrical Safety Engineer 2. Name and address of the consumer (or) Owner(or) supplier: Contact No: E-Mail:

More information

Testing & Commissioning Report of

Testing & Commissioning Report of Testing & Commissioning Report of "66/33KV Olakha Sub-Station" By: Cheten Tshering Olakha Sub-Station, SMD Semtokha. Transmission Department Bhutan Power Corporation Limited Thimphu. BHUTAN POWER CORPORATION

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

INVESTIGATION OF ENERGY LOSS IN A TRANSMISSION SUBSTATION USING ONITSHA 330/132KV AS A CASE STUDY F.O. Enemuoh, T.L. Alumona and C.H.

INVESTIGATION OF ENERGY LOSS IN A TRANSMISSION SUBSTATION USING ONITSHA 330/132KV AS A CASE STUDY F.O. Enemuoh, T.L. Alumona and C.H. INVESTIGATION OF ENERGY LOSS IN A TRANSMISSION SUBSTATION USING ONITSHA 330/132KV AS A CASE STUDY F.O. Enemuoh, T.L. Alumona and C.H. Aliche 1,2 nnamdi azikiwe university, awka, anambra state, nigeria.

More information

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4 Philadelphia University Faculty of Engineering Dept. of Electrical Engineering Student Name: Student Number: Final Exam Course Title: Design of T&D System Date: 15 th June 2016 Course No: 610 515/650511

More information

Reference Number PDS 04 (RIC Standard: EP SP)

Reference Number PDS 04 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 04 (RIC Standard: EP 12 10 00 10 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

DISTRIBUTION DEVICE COORDINATION

DISTRIBUTION DEVICE COORDINATION DISTRIBUTION DEVICE COORDINATION Kevin Damron & Calvin Howard Avista Utilities Presented March th, 08 At the 5 th Annual Hands-On Relay School Washington State University Pullman, Washington TABLE OF CONTENTS

More information

230/26kV Brandy Branch T2 Substation Addition JEA ITEM QTY. DESCRIPTION MFG. TYPE OR CAT. NO.

230/26kV Brandy Branch T2 Substation Addition JEA ITEM QTY. DESCRIPTION MFG. TYPE OR CAT. NO. of 8 20KV GALVANIZED STEEL STRUCTURE A 6 20KV BUS SUPPORT STAND, Ø LOW, 20'-0" BUS HEIGHT APPX WT = 766 LBS EA C 4 20KV BUS SUPPORT STAND, -PHASE, HIGH, 0'-0" BUS HEIGHT '-0" PHASE SPACING REF. 5262 APPX

More information

Introduction to Substation Design TADP 542

Introduction to Substation Design TADP 542 Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program Drawings Drawings are prime method for communicating

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

The power line carrier equipment will provide speech, telecontrol and teleprotection channels over 50 Hz, 132 KV transmission systems.

The power line carrier equipment will provide speech, telecontrol and teleprotection channels over 50 Hz, 132 KV transmission systems. National Electric Power Company Telecommunication and Control Department Supply of Outdoor Coupling Equipments ( Line Traps and Coupling Filters ) Tender No. 8/2018 A) General NEPCO is extending the transmission

More information

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

Power Frequency Withstand Voltage On-site testing of 400 kv GIS Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:

More information

MINISTRY OF ELECTRICITY

MINISTRY OF ELECTRICITY MINISTRY OF ELECTRICITY IRAQ SUPERGRID PROJECTS 400/132 KV GIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007 LIST OF REVISIONS 1 2 3 4 5 Current Rev. Date 19.11.04 18.03.05 Aug 05 Oct 05 Jan 07

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

1.0 mh, 3150 A LINE TRAP

1.0 mh, 3150 A LINE TRAP GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 1.0 mh, 3150 A LINE TRAP GETCO/E/TS-400KV WT 0904/R0, Dt: 09.01.2012

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS Juan Manuel Gers, PhD Protection coordination principles Relay coordination is the process of selecting settings that will assure that the relays

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation M. Kondalu1, Dr. P.S. Subramanyam2 Electrical & Electronics Engineering, JNT University. Hyderabad. Joginpally B.R. Engineering College,

More information

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages Session Four: ractical Insulation Co-ordination Session Four: ractical Insulation Co-ordination for Lightning Induced Overvoltages Jason Mayer Technical Director, Energy Services, Aurecon Introduction

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

TRANSMISSION FACILITIES...7

TRANSMISSION FACILITIES...7 Table of Contents 1. INTRODUCTION...4 1.1. Objective... 4 1.2. NERC FAC-008 Compliance... 4 1.3. Seminole s Normal Rating... 5 1.4. Seminole s Four-Hour Rating... 5 1.5. Seminole s Emergency Rating...

More information

TRAINING Learning and Training application on site. QUALIFYING Evaluation of quiz Knowledge Validation To learn required skills

TRAINING Learning and Training application on site. QUALIFYING Evaluation of quiz Knowledge Validation To learn required skills FIRST LOGIC Substation Automation Training Proficiency development training programme Client-precise. Excellence through certification on your requirements. First Logic substation automation institute

More information

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering COURSE PLANNER Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS (2180901) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering Term: 16/2 (DECEMBER-16 to APRIL-17) Faculty: Prof. U. V.

More information

Education & Training

Education & Training Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through

More information

Status of deposit work for EHV connections: Annuxure -B DGVCL. Status. M/s.ABG cement Ltd. At Vill:Mora, Ta:Choryasi, Dist:Surat. 2nd week of Mar 2012

Status of deposit work for EHV connections: Annuxure -B DGVCL. Status. M/s.ABG cement Ltd. At Vill:Mora, Ta:Choryasi, Dist:Surat. 2nd week of Mar 2012 1 Navsari DGVCL M/s.ABG cement Ltd. At Vill:Mora, Ta:Choryasi, Dist:Surat of deposit work for EHV connections: III 6000 03.10.10 100% Party has assured work completion certificate their contractor before

More information

Quality Control Checklist - Design Drawings

Quality Control Checklist - Design Drawings Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not

More information

List of Item Codes of Various Materials Purchased by Materials Management Cell(H.O.,Mumbai) through e-tender website https://cpa1.mahadiscom.

List of Item Codes of Various Materials Purchased by Materials Management Cell(H.O.,Mumbai) through e-tender website https://cpa1.mahadiscom. List of Item Codes of Various Materials Purchased by Materials Management Cell(H.O.,Mumbai) through e-tender website https://cpa1.mahadiscom.in : M.M. PURCHASE GROUP-I : New Service Connection (N.S.C.)

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date R0B0 For Comments Yaoyu Huang February 10, 2016 R0 For Issuance Yaoyu Huang February 29, 2016 Transformer rating description

More information

Electrical Engineering. Power Systems. Comprehensive Theory with Solved Examples and Practice Questions. Publications

Electrical Engineering. Power Systems. Comprehensive Theory with Solved Examples and Practice Questions. Publications Electrical Engineering Power Systems Comprehensive Theory with Solved Examples and Practice Questions Publications Publications MADE EASY Publications Corporate Office: 44-A/4, Kalu Sarai (Near Hauz Khas

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM BY MR. H. C. MEHTA AT 1 ST INDIA DOBLE PROTECTION AND AUTOMATION CONFERENCE, NOV 2008 POWER-LINKER Wisdom is not Virtue but Necessity hcmehta@powerlinker.org

More information

Current / residual current and voltage transformers. Current / residual current and voltage transformers

Current / residual current and voltage transformers. Current / residual current and voltage transformers Current / residual current and voltage transformers Current / residual current and voltage transformers 1 Overview Current transformer overview DIN rail current transformer with fuse Current transformer...

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: MAINTENANCE OF TRANSFORMER AND CIRCUIT BREAKER (COURSE CODE:3360907) Diploma Programme in which this course is offered

More information

La protection sélective des réseaux électriques

La protection sélective des réseaux électriques La protection sélective des réseaux électriques ULG 21. 11. 2012 The T&D grids Generation Transmission Distribution Industry The electricity network ensure an efficient supply of energy High Voltage Transformers

More information

UNIT OF QUANTITY DESCRIPTION. Steel cylinders of liquefied gas SF6 of 20kg capacity.

UNIT OF QUANTITY DESCRIPTION. Steel cylinders of liquefied gas SF6 of 20kg capacity. 04-69-70001 Steel cylinders of liquefied gas SF6 of 20kg capacity. 6 Each 04-69-70002 Nissan 4WD Patrol Station Wagon GL, (LHD) 1 Unit 04-69-70003 Rear differential lock & free wheel hubs (automatic),

More information

The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500 kv Substation

The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500 kv Substation The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500 kv Substation J. W. Woo, J. S. Kwak, H. J. Ju, H. H. Lee, J. D. Moon Abstract--To meet increasing power demand,

More information

NIC Project Medium Voltage Direct Current Link Technical Specification

NIC Project Medium Voltage Direct Current Link Technical Specification 1 SCOPE This Specification details SP Energy Networks (SPEN) requirements for a bidirectional Medium Voltage Direct Current (MVDC) Link for the Angle-DC project, being carried out in conjunction with Ofgem

More information

~=E.i!=h. Pre-certification Transformers

~=E.i!=h. Pre-certification Transformers 7 Transformers Section 26 of the electrical code governs the use and installations of transformers. A transformer is a static device used to transfer energy from one alternating current circuit to another.

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: SWITCHGEAR & PROTECTION (COURSE CODE: )

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: SWITCHGEAR & PROTECTION (COURSE CODE: ) GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: SWITCHGEAR & PROTECTION (COURSE CODE: 3360901 ) Diploma Programme in which this course is offered Electrical Engineering

More information

Tab 2 Voltage Stresses Switching Transients

Tab 2 Voltage Stresses Switching Transients Tab 2 Voltage Stresses Switching Transients Distribution System Engineering Course Unit 10 2017 Industry, Inc. All rights reserved. Transient Overvoltages Decay with time, usually within one or two cycles

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK PO Box 25876 Safat 13119 Kuwait Contact: Mr Atul Madhukar Vaidya Tel: +965 1822600 Fax: +965 24761963 E-Mail: factory@ahleiasg.com Website:

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information

A PRACTICAL SUMMER TRAINING REPORT ON

A PRACTICAL SUMMER TRAINING REPORT ON A PRACTICAL SUMMER TRAINING REPORT ON DELHI TRANSCO LIMITED 220 KV GRID SUBSTATION AT SARITA VIHAR NATIONAL POWER TRAINING INSTITUTE (NR) BADARPUR, NEW DELHI UNDER THE GUIDANCE OF MR. RAM SINGH (A.M.)

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information

CEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant

CEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant CEYLON ELECTRICITY BOARD SRI LANKA GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAMME (TRANCHE 2) PACKAGE 2: LOT A MANNAR NADUKUDA TRANSMISSION DEVELOPMENT (ADB LOAN NO: 47037-SRI)

More information

BIRD ISLAND FLATS SUBSTATION (BUILDING 67) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS CABLE CONNECTION POTENTIAL

More information

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI Importance of Grounding in Power System Presented by Mr. H Jayakumar Ex- Joint Director CPRI OBJECT OF EARTHING Prime Object of Earthing is to Provide a Zero Potential Surface in and around and under the

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

Overvoltage Protection

Overvoltage Protection Overvoltage Protection S T U D E N T M A N U A L March 31, 2005 2 STUDENT TRAINING MANUAL Prerequisites: Single-Phase Transformer Load Checks Objectives: From memory, you will be able to describe the electrical

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

1 Fundamentals of Protection Fuse and Circuit Breakers Protective Relays Protection of Generators and Transformers 08

1 Fundamentals of Protection Fuse and Circuit Breakers Protective Relays Protection of Generators and Transformers 08 Government of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru Course Title: SWITCHGEAR AND PROTECTION Course Code : 1EE3T Semester : V Course Group : Core Teaching

More information

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another.

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another. TRANSMISSION LINES PRELIMINARIES Generators and loads are connected together through transmission lines transporting electric power from one place to another. Transmission line must, therefore, take power

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

PIPSPC. Prepared by Eng: Ahmed Safie Eldin. And. Introduction. Protection Control. Practical. System. Power

PIPSPC. Prepared by Eng: Ahmed Safie Eldin. And. Introduction. Protection Control. Practical. System. Power PIPSPC Practical Introduction Power System Protection Control Practical Introduction To Power System Protection And Control Prepared by Eng: Ahmed Safie Eldin 2005 Contents POWER SYSTEMS PRINCIPALS. 1

More information

6B.6 Substation Grounding

6B.6 Substation Grounding 1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer

More information