1 PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer 2500 V megger is to be need. b) Power Transformer neutral Earthing is to be disconnected. c) Line terminal of the megger is to be connected to one of the HV Bushings of Power transformer and Earth terminal of megger is to be connected to Power transformer Body Earth Point. IR Values are to be read on the megger by meggering the Power transformer i) The above Value is to be noted as HV to Body or Earth. ii) Then IR Value between LV terminal and body of Power transformer is to be measured & noted. ii) IR Values between HV & LV terminals are to be measured & noted. iv) The temperature of transformer oil at which the IR Values are measured is also to be noted. v) Particulars of megger is also to be noted. The maximum value shall be 60MΩ at 60 0 C temperature for transformer which are in service. For new transformer the value obtained shall be tallied with manufactures test results. Example: - HV E Mega Ohm OR INFINITE LV E Mega Ohm OR INFINITE HV LV Mega Ohm OR INFINITE 2. Continuity test :- Checking of continuity of HV windings and LV windings with megger or multimeter. To know the continuity of windings of the transformer. Example: - On HV side RY-YB-BR- Zero Megaohm or continuity On LV side ry-yb-br- Zero Megaohm or continuity 3. D.C. Resistance or Winding Resistance The Resistance of HV winding LV winding between their terminals are to be measured with precision milliohm meter/ micro ohm meter OR Wheatstone Bridge or DC resistance meter. To know the resistance of windings. Example :- For 100 KVA 11/0.4 KV trf. HV side in ohms RY= 120 to 160 YB= 120 to 160 BR=120 to 160 LV side in milliohms ry = 125 to 180 yb = 125 to 180 br =125 to 180 rn = 60 to 90 yn= 60 to 90 bn =60 to 90 Similarly for 5 MVA power trf. HV side in ohms RY= 1 to 2 YB=1 to 2 BR=1 to 2 LV side in milliohms ry = 30 to 100 yb =30 to 100 br =30 to 100 rn = 15 to 50 yn= 15 to 50 bn =15 to

2 The values shall be compared with original test results which varies with the transformer ratings. 4. Turns Ratio Test With turns Ratio meter, turns Ratio between HV & LV windings at various taps to be measured & recorded. At normal tap for 33/11 KV Delta/Star transformer the turns turns ratio is At other taps values will be as per the percentage raise or lower at the respective tap positions. In case of Delta/Star transformers of 33/11 KV rating the ratio measure between RY-rn, YB-yn and BR-bn. Being Delta/Star transformers the voltage ratio between HV winding and LV winding in each phase limb at normal tap is 33 KV OR 33 3 = KV / 3 11 At higher taps (i-e high voltage steps) less number of turns are in circuit than normal. Hence ratio values increase by a value equal to {5.196 x (no. of steps above normal) x (% rise per each tap)} 100 Similarly for lower taps than normal the ratio is equal to {5.196 x (no. of steps above normal) x (% rise per each tap)} Voltage Ratio Test :- When Turns Ratio meter is not available, Voltage Ratio Test is done at Various tap position by applying 3 phase LT (415V) supply on 33 KV side of Power transformer. At Various taps applied voltage and Resultant voltages LV side between various Phases and phases& neutral measured with precision voltmeter & noted. Example :- For any 33/11 KV power trf. Tap position V RY V YB V BR V ry V yb V br V rn V yn V bn (normal) This test is done to check both the transformer voltage ratio and tap changer. 6. Short Circuit Test The four terminals on LV side of Power transformer are shorted with 50 sq. mm. copper cable. Three phase LT supply is applied on HV side of power transformer at normal tap and currents measured in all the phases on HV side and phases & neutral on LV side values noted. In transformer factory the above test is done to measure full load transformer loss. In this case the the four terminals on LV side of Power transformer are shorted with 50 sq. mm. copper cable. Three phase LT supply is applied on HV side of power transformer at normal tap with rated current on HV side. Measure the loss in all the three phases with the help of 3 watt meter method. Total no load loss or iron loss of the trf = W1 + W2 W3 The loss varies from trf to trf

3 Example :- For any 33/11 KV power trf. Short circuit current = Rated primary current of the trf X applied voltage X100 Rated primary voltage of the trf percentage Imp of trf The Resultant HV & LV currents are as follows:- HV side current in all Phases = Rated HV current of PTR X LT Voltage applied on 33 KV side of PTR X100 Rated primary voltage i-e X Percentage Impedance Volts LV side phase Current in all phases = Rated LV current of PTR XLT Voltage applied on 33 KV side of PTR X 100 Rated primary voltage i-e X Percentage Impedance Volts LV side neutral current shall be zero or less than 1.0 amp. For example in a 1.6 MVA trf. the results are:- V RY V YB V BR I R I Y I B I r I y I b I n Short circuit current = 28 x 417 x100 = 5.75 A similarly for LT side On HT side x Open Circuit Test Three phase LT Voltage of 415 V applied on HV side of Power transformer keeping LT open. Measure the loss in all the three phases with the help of 3 watt meter method. Total no load loss or iron loss of the trf = W1 + W2 +W3 The loss varies from trf to trf. Tap position V RY V YB V BR V ry V yb V br V rn V yn V bn 2(normal) For a new 63 KVA trf. no load loss <=160watt For a new 63 KVA trf. full load loss <=1235watt 8. Magnetic Balance Test 415V, Two phase supply is to be applied to any two phases terminals on HV side of Power transformer and voltages in other two phase combination are to be measured with LT open. Sum of the Resultant two values shall be equal to the voltage applied. RY YB BR Result a) V (415 V) V 1 V 2 V= V 1 + V 2 b V 1 V (415 V) V 2 V= V 1 + V 2 ) c) V 1 V 2 V (415 V) V= V 1 + V 2 Example :- For any 33/11 KV power trf. Given V RY V YB V BR V ry V yb V br V rn V yn V bn (RY) (YB) (BR)

4 9. Vector Group Test Connect HV side R Phase terminal to LV side r Phase terminal of Power transformer. Apply 3Phase 415 V supply to HV side of Power transformer. Measure Voltages between various terminals as follows. R,r n y b B Y Voltages between Rn; Yn; RY V RY = V Rn + V Yn Voltages between Yb; Yy; V Yb = V Yy Voltages between Bb; By; V Y b > V Bb V RY V Rn V Yn V Yb V Yy V Bb For YY 0 vector group ry=yb=br and Yy=Bb 10. BDV Test of Oil Oil samples from top oil & bottom oil of Power transformer main tank as well as OLTC tank are to be collected and tested. Across 2.5 mm gap test Kit, The oil shall stand for 60 KV For/ minute. And 4 mm gap for distribution trf. oil. Power trf. oil is called as EHV GRADE POWER TRF. OIL OR ASCAREL OIL. Note :- To improve the BDV value the oil is filtered and to remove moisture from winding it is kept in heat chamber. 11. Crickel Test of Oil This test is performed to test the presence of moisture or water content in the trf oil. In this method take a one side closed steel pipe then heat the closed side of the pipe. Put the closed side of the pipe inside the oil and hear the sound from the other open side. You will hear hissing sound if there is no moisture inside the oil and you will hear boiling side if there is moisture. 12. Magnetization Current Three phase LT Voltage of 415 V applied on HV side of Power transformer keeping LT open.measure the currents of HT side in three phases with milli ammeter. 1 to 2 percent of rated full load Applied The value shall be = current of PTR X Voltage Example: - let for 1.6 MVA trf. full load current is 28/84 A. V RY V YB V BR V ry V yb V br V rn V yn V bn Magnetising current I R = A or 3.39 A I Y = A or 3.39 A I B = A or 3.39 A - 4 -

5 TESTS ON TRANSFORMERS AT FACTORY In transformer factory some more tests are conducted to know the healthy condition of a transformer they are as follows:- 1) High voltage test or source voltage test:- This test is done to check the insulation level between HV to LV, HV to Earth, LV to earth.this test is done through single phase high voltage testing set. (a)for distribution trf. HV winding testing:- 11/0.4 KV distribution trf. for 11 KV side 28 KV voltage is applied on HT side for 1 minute by shorting all HV windings and then connect it to the LV winding of testing set lead. Again short all LV windings with transformer tank then connect it to the LV winding of testing set lead. For a repair transformer 21 KV is applied on HV side i-e 75% of 28 KV. (b)for a new trf. LV winding testing:- Similarly same procedure is applied but 2.5 KV is applied on LV side for mew trf. and 1.87 KV for repair trf. i-e 75% of 2.5 KV. (c)for power trf. HV winding testing:- 33/ 11 KV power trf. for 33 KV side 68 KV voltage is applied on HT side to one phase PT and shorting all three phases for 1 minute by shorting all LV windings and then connect it to earth. For a repair transformer 21 KV is applied on HV side i-e 75% of 51 KV. (d)for power trf. LV winding testing:- 28 KV is applied on LV side for new trf. and KV for repair trf. i-e 75% of 21 KV keeping HT open. 2) Double voltage and double frequency test or induced over voltage test:- This test is done to check the insulation strength between inter turn of coils or windings. In this test double the rate of voltage and double rate of frequency is applied to the secondary side of the trf. for one minute keeping HV open. For a 11/0.4 KV distribution trf. 866 volt and 100 HZ is applied on LV side of the trf. for 1 minute keeping HV open.. For a 33/11 KV power trf. 22 KV and 100 HZ is applied on LV side of all the three phases of the trf. through a auxiliary transformer for 1 minute keeping HV open.. Auxiliary trf. is a 11/0.4 KV trf. to whom 800 volt is applied on LT side so that 22 KV will come on HT side that 22 KV is applied to the LT side of power trf. and 100 HZ through a synchronous motor. 12. Phase sequence test :- i-e R-Y-B and r-y-b- This test is done to check the proper phase sequence of trf. n with the help of phase sequence indicator. PRE COMMISSIONING CHECKS ON POWER TRANSFORMERS - 5 -

6 Check that 1) Top & Bottom valves of radiators are in open position 2) All drain valves are in closed position with dummy plates in position duly fitted with bolts & nuts 3) All filler valves in closed position with dummy plates in position duly fitted with bolts & nuts 4) No oil leakages from radiators, valves, dummies, top cover, inspection covers, oil level gauges etc. 5) Silica gel breather is in position with silica gel filled & oil in oil cup 6) The air path of silica gel breather is free with out any seals to holes of the oil cup 7) Equalizing valve of the interconnecting pipe of vent pipe to conservator tank is in open position 8) Top oil filling point of conservator tank is in closed position with cover duly bolted. 9) The valves on either side of Bucholtz relay are in open position. 10) Thermometer pockets on main tank top cover are having oil inside & Thermometer sensing bulbs are in position duly nuts fixed properly. 11) The double earthing of neutral of Power transformer is done as per standards. 12) The double earthing of body of Power transformer is done as per standards. 13) The oil levels in conservator tank, OLTC Conservator tank. 14) The operation of main Bucholtz relay & OLTC Bucholtz relay ( Trips &alarms to be checked) 15) Operation of Transformer alarms. 16) The operation of PRV to trip the breakers or operation of alarms 17) The vent pipe diaphragm is intact. 18) The lock pieces are provided, duly welded to base channels, for the support wheels of transformers (If wheels are provided) 19) Tightness of all bolts, nuts, clamps, jumpers etc. 20) Testing of earth resistance by earth megger Generally earth resistance of a s/s is measured with the help of earth megger or earth tester. A earth megger is like a insulation megger. It has five point terminals i-e C1,P1,G,P2,C2 and three earth spikes with wires. First put the first spike inside the ground then connect the spike wire to the point C1 making C1 and P1 short in the megger. Again put another spike inside the ground at a distance of 12.5 mt from the first spike in a straight line and connect the wire to P2 similarly put another spike at a distance of 12.5 mt from the second spike in a straight line and connect it to point C2 in the megger. The move the handle of the megger to measure the earth resistance it should be in-between 1 to 3. (<1 is good) 21)Before charging the PTR air is to be released from air releasing points of main tank cover of PTR, OLTC top cover, Bucholtz relays, radiators, bushings, (All releasing bolts, screws, valves shall be kept in position fully tightened after releasing air from respective points). Tests on Breakers A) I) Status of Breaker Open Measure IR values between IN & Out terminals Each limb of breaker shall be more than 3000 MΩ II) Status of Breaker Close Measure resistant of each limb by connecting IN & Out terminals to a precision Micro ohm meter it should be zero. The values shall tally with manufacturer s test report

7 III) Status of Breaker Close Measure IR values between phase & Body ground terminal of breaker for all limbs the values shall be more than 3000 MΩ B) Opening time & closing time tests to be done on all limbs. The values shall tally with test results of the Manufacturer. C) Test mechanical ON and OFF of VCB and indication of VCB and breaker. D) Similarly electrical ON and OFF of VCB and indication of VCB and breaker on both remote and local. E) As follows: a) IR values of current Transformers are to be measured. b) Polarity check on current transformers is to be made. c) Primary injection test on current transformer is to be done to check operation of relays functioning of meters and CT accuracy. Let CT ratio is /1-1 A then test the ct in different current ratings in all the three adopted ratios like 400/1 and 200/1 or 100/1 A by injecting currents like 25,50,100,150,200,250,300,400 etc. testing is done at different PSM. d) Secondary Injection test on relays is to be done. e) DC tests on breakers panel are to be done. f) Calibration of meters is to be done. g) D.C. interlock are to be tested. h) Check that all Jumpers, clamps etc. are in to CT i) Clean all the bushings. j) Ensure no leakages from the CTs. k) check proper earthing of CT s, Panel and breaker with flat separate earth. l) before wiring study carefully the Ckt. Diagram of VCB. Tests on Potential Transformers A) IR value are to be checked with megger. B) Ratio test is to be done. C) Polarity check is to be done. D) Check that there are no oil leakages E) Clamps & Jumpers properly tightened. Tests on CURRENT Transformers A) IR value are to be checked with megger. B) Ratio test is to be done through primary injection CT injection. C) Polarity check is to be done. D) Check that there are no oil leakages E) Clamps & Jumpers properly tightened Tests on protective relays A) Current injection of Relay through secondary injection kit. B) tripping time test through secondary injection kit.. Tests on Lightening Arrestors - 7 -

8 a) IR value are to be checked. b) Jumper connection to be checked Other tests in a Sub Station a) Battery charger & Battery to be checked for proper operation b) Earth Resistance is to be measured & noted. c) Meggering of Bus Bars is to be done. d) Check the entire earthing system in the Sub Station is as per standards. FUSE RATING CALCULATION OF DISTRIBUTION AND POWER TRF. For 100 KVA 11/0.4 KVA distribution trf. H.V. side line current = Rating of trf. in KVA 3 X Voltage on HV side in KV = 100/1.73X11 =5.24 A L.V. side line current = Rating of trf. in KVA 3 X Voltage on LV side in KV = 100/1.73X0.4 = A Or H.V. side line current =KVA/20 =100/20=5 A L.V. side line current =KVA + 1/3 rd of KVA= = A For 1000 KVA 33/11 KV power trf. H.V. side line current = L.V. side line current = L.V. side line current =KVA/20 =1000/20=50A H.V. side line current = L.V. side line current /3=17 A Rating of trf. in KVA 3 X Voltage on HV side in KV Rating of trf. in KVA 3 X Voltage on LV side in KV - 8 -

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %

More information

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER TECHNICAL SPECIFICATION FOR POWER TRANSFORMER NOTE: Vendor to give their offer in line with this data sheet only. Any deviations/additions/deletions shall be brought out in a separate sheet. A TECHNICAL

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers save energy, it is precious Mfg. of all types of Distribution / Power & Furnace Transformers SYNERGY transformers SAFETY AND EFFICIENCY, COMBINED WITH LONG-TERM RELIABILITY, ARE THE HALLMARKS OF WORLD-RENOWNED

More information

Commissioning Manual Distribution Transformers - Three-phase Oil Filled

Commissioning Manual Distribution Transformers - Three-phase Oil Filled 1LPL000006A2110 rev. 1 Commissioning Manual Distribution Transformers - Three-phase Oil Filled 1LPL000006A2110 rev. 1 2 / 7 Table of contents 1 Commissioning and start-up... 3 1.1 Transformer survey...

More information

ISSN: [IDSTM-18] Impact Factor: 5.164

ISSN: [IDSTM-18] Impact Factor: 5.164 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY A REVIEW OF ROUTINE TESTING ON DISTRIBUTION TRANSFORMER Sukhbir Singh 1, Parul Jangra 2, Anoop Bhagat 3, Vipin Saini 4 1 Assistant

More information

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

Form-IV. Form of Inspection/Test Report. (Under Regulation 43) Form-IV Form of Inspection/Test Report (Under Regulation 43) 1. Name and address of the Chartered Electrical Safety Engineer 2. Name and address of the consumer (or) Owner(or) supplier: Contact No: E-Mail:

More information

HOW TO SAFE GUARD THE TRANSFORMER..???

HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI Efficient and Effective network planning, Design and Forecasting Highly Reliable and Stable Protection system and co-ordination Measures to mitigate various

More information

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A Group F : No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS Table : A No. Description 1. Make & Manufacturer 2. Place of Manufacturer 3. Voltage Ratio 4. Rating

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD. Our Ref : 2/2018- Date : Messrs: Dear Sir, Tender 2/2018 Main Transformers You are kindly requested to quote for the supply and delivery DDP to our stores the transformers detailed in the attached schedules

More information

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS n Bureau of Indian Standards (BIS) is the NATIONAL STANDARD BODY. Established

More information

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

EASUN REYROLLE LIMITED

EASUN REYROLLE LIMITED OCTOBER 2003 APPLICATION AND COMMISSIONING MANUAL FOR NUMERICAL BIASED DIFFERENTIAL PROTECTION RELAY TYPE - MIB202 EASUN REYROLLE LIMITED 1 ISSUE NO : 1 st Issue DATE OF ISSUE : 01-10 - 2003 DEPARTMENT

More information

Introduction. Centrado leading-edge transformer. Introduction

Introduction. Centrado leading-edge transformer. Introduction Introduction Centrado leading-edge transformer products are designed to optimize safety and produced to deliver a great electrical power experience and solution - for factory, infrastructure, home industry,

More information

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS INTERPLANT STANDARD - STEEL INDUSTRY IPSS CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS Corresponding IS does not exist IPSS:1-04-035-08 0. FOREWORD 0.1 This Inter

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

Transformer Protection

Transformer Protection Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT SPECIFICATION SS-25 / 14 POWER TRANSFORMERS 150/15.75-21kV, 40/50 MVA WITH AUTOMATIC LOAD-RATIO CONTROL CONNECTION

More information

INDEX. Micro-ohmmeter MH-10 Page 3. MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4

INDEX. Micro-ohmmeter MH-10 Page 3. MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4 Micro-ohmmeter MH-10 Page 3 MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4 Earth resistance meter TL-5 Page 5 Indirect earth contact simulator MPC (5, 20, 50 A) Page 6 Trip time tester CR

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,

More information

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH SCHEDULE OF WORK Supply, Installation, Testing & Commissioning (SITC) of 33KV Electrical Substation for Multi Modal Logistics Hub at Visakhapatnam, Andhra Pradesh. Tender No. MMLH /HTELEC/PT /18 dated

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance

More information

Pomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers

Pomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers Pomona, CA May 24 & 25, 2016 LTC Applications - Location, Series & Preventative Auto s siemens.com/answers Introduction Tap changer at active part Example of 3-phase tapchanger Page 2 Winding Configurations

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE

More information

Session: Sub-station Maintenance and Transformer Augmentation

Session: Sub-station Maintenance and Transformer Augmentation Substation Maintenance and Transformer Augmentation Session: Sub-station Maintenance and Transformer Augmentation Learning Objective Explain the preventive maintenance of a distribution transformer Evaluation

More information

Distribution Equipments - Technology and Applications. Training Module for DISTRIBUTION TRANSFORMER

Distribution Equipments - Technology and Applications. Training Module for DISTRIBUTION TRANSFORMER Distribution Equipments - Technology and Applications Training Module for DISTRIBUTION TRANSFORMER Transformer specification Transformer design Manufacturing / quality control Testing in the Works Transportation

More information

STS Fully automatic. Large graphic display. Primary injection testing capabilities: up to 3000 A, with the optional module BUX 3000

STS Fully automatic. Large graphic display. Primary injection testing capabilities: up to 3000 A, with the optional module BUX 3000 STS 4000 Multifunction substation maintenance & commissioning test system for current, voltage and power transformers. Capacitance / Tan Delta diagnostic system with the optional module TD 5000. w w w.

More information

TRANSFORMERS PART A. 2. What is the turns ratio and transformer ratio of transformer? Turns ratio = N2/ N1 Transformer = E2/E1 = I1/ I2 =K

TRANSFORMERS PART A. 2. What is the turns ratio and transformer ratio of transformer? Turns ratio = N2/ N1 Transformer = E2/E1 = I1/ I2 =K UNIT II TRANSFORMERS PART A 1. Define a transformer? A transformer is a static device which changes the alternating voltage from one level to another. 2. What is the turns ratio and transformer ratio of

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

Prolific Systems & Technologies Pvt. Ltd. CORE DETAILS. CENTRE Figure - II L-2 X Y Wt-2

Prolific Systems & Technologies Pvt. Ltd. CORE DETAILS. CENTRE Figure - II L-2 X Y Wt-2 Plot No. A-267, MIDC, Road No. 6A, Opp. ESIS Hospital, Wagle Industrial Estate, Thane (West) - 400 604 CORE DETAILS Date: 4/2/206 Design No. mahati Step No. SIDES Figure - I B L- Wt- CENTRE Figure - II

More information

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS PURCHASE SPECIFICATIONS OF 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS SPECIFICATION NO. : OR12423 REVISION NO. : Rev 00 DATE : 01.03.2011 DISTRIBUTION : PI - 4 copies O/C - 1 copy PREPARED BY

More information

Benefits of SFRA - Case Studies

Benefits of SFRA - Case Studies 6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1 Outline Condition Monitoring in GETCO

More information

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21 Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive

More information

Transformer Factory Testing

Transformer Factory Testing Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

Contents. Measurement and checking equipment for transformation centers Micro-ohmmeter MH-10 Page 3. Indirect earth contact simulator TL-5 Page 5

Contents. Measurement and checking equipment for transformation centers Micro-ohmmeter MH-10 Page 3. Indirect earth contact simulator TL-5 Page 5 Measuring and testing equipments P 6 P.6.01 GB for substations Micro-ohmmeter MH-10 Page 3 Mega-ohmmeter MI (5, 10, 15, 20 kv) Page 4 MD (5 kv) Page 4 Indirect earth contact simulator TL-5 Page 5 Indirect

More information

Reduction in Load (Copper) loss Due to Overhauling of Power Transformer or OLTC

Reduction in Load (Copper) loss Due to Overhauling of Power Transformer or OLTC Reduction in Load (Copper) loss Due to Overhauling of Power Transformer or OLTC by Neeraj Khare BSES RAJDHANI POWER LTD. Neeraj.khare@relianceada.com, Khareneeraj974@gmail.com, BSES Rajdhani Power Limited

More information

SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS.

SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS. SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS. 1. SCOPE: This specification covers design, manufacture, testing and supply of 6.64/10.12 KV 24/15.7, 30/19.7

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

APDRP SCHEME, WESCO. Technical Specification for Distribution Transformers ( 11/0.4KV ) PART 1: GENERAL

APDRP SCHEME, WESCO. Technical Specification for Distribution Transformers ( 11/0.4KV ) PART 1: GENERAL PART 1: GENERAL 1. SCOPE This specification covers the design, engineering, manufacture, testing, supply, delivery, offloading and performance requirements of 11/0.433kV distribution transformers for outdoor

More information

Back to the Basics Current Transformer (CT) Testing

Back to the Basics Current Transformer (CT) Testing Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of

More information

148 Electric Machines

148 Electric Machines 148 Electric Machines 3.1 The emf per turn for a single-phase 2200/220- V, 50-Hz transformer is approximately 12 V. Calculate (a) the number of primary and secondary turns, and (b) the net cross-sectional

More information

OIL-IMMERSED ARC-SUPPRESSION COILS

OIL-IMMERSED ARC-SUPPRESSION COILS ISO 9001:2000 99-320 Żychlin, ul. Narutowicza 70 ISO 14001:2004 PN-N-18001:2004 www.ftz.pl Secretary s Office Tel.: +48 24 285 46 05, Fax: +48 24 285 46 31 zarzad@ftz.pl Sales and Marketing Department

More information

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and

More information

Welcome to the Session on. HT Distribution Network

Welcome to the Session on. HT Distribution Network Welcome to the Session on HT Distribution Network Learning Objective By the end of this session you will be able to: Explain the HT distribution network breakdown maintenance - possible faults, identification

More information

Problems connected with Commissioning of Power Transformers

Problems connected with Commissioning of Power Transformers Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.

More information

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. 2) The model answer and the answer written by candidate

More information

installation guide For Oil and Synthetic Ester filled Transformers

installation guide For Oil and Synthetic Ester filled Transformers installation guide For Oil and Synthetic Ester filled Transformers 02 CONTENTS : Introduction 03. : Cautionary note 03.2 : Health & Safety 03 2 : Transformer Components 04 3 : Receiving the transformer

More information

PS REV NO: 01 PAGE : 2 OF 22

PS REV NO: 01 PAGE : 2 OF 22 PAGE : 2 OF 22 1.0 INTRODUCTION Bharat Heavy Electricals Limited (BHEL), Electronics Division, Bangalore is setting up a 10 MW Solar PV Grid-connected power plant for its customer BEL at O.F.BOL, Badmal,

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, over-current protection relays, energy meters and transducers Primary injection testing capabilities

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities

More information

Industrial Applications

Industrial Applications Industrial Applications Transformers for Industrial Applications Tamini has always produced industrial transformers of high quality and reliability, designed to satisfy the most diverse and complex technical

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information

Figure 1. Why is iron a suitable material for the core of a transformer?

Figure 1. Why is iron a suitable material for the core of a transformer? INDUCED POTENTIAL, TRANSFORMERS: NAT GRID Q1. Figure 1 shows the construction of a simple transformer. Figure 1 Why is iron a suitable material for the core of a transformer? Tick one box. It is a metal.

More information

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED (SOUTHCO UTILITY)

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED (SOUTHCO UTILITY) E -Tender Notice No. Annexure - VII SOUTHCO/DEPOSIT/3.15 & 5 MVA Power Transformer /02/2015 16 Dt. 02.03.2016 NAME OF THE WORK PROCUREMENT OF33/11 KV, 3.15 MVA & 5 MVA Power Transformer SUPPLIER INFORMATION

More information

Instruction Manual for Digital Grounding Resistance Meter. Table of Contents

Instruction Manual for Digital Grounding Resistance Meter. Table of Contents I. Overview...2 II. Open-case Inspection...3 III. Safety Precautions...4 IV. Work Principle...7 V. Appearance Description...9 VI. Technical Characteristics 10 VII. Resistance Measurement Method..12 VIII.Battery

More information

ABB Automation, Inc. Substation Automation & Protection Division Coral Springs, FL Allentown, PA

ABB Automation, Inc. Substation Automation & Protection Division Coral Springs, FL Allentown, PA ABB Automation, Inc. Substation Automation & Protection Division Coral Springs, FL Allentown, PA Instruction Leaflet 41-348.1H Effective: November 1997 Supersedes I.L. I.L. 41-348.1G, Dated January 1985

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

Earth Fault Indicator EFI-BLZ-50 User Manual

Earth Fault Indicator EFI-BLZ-50 User Manual Earth Fault Indicator EFI-BLZ-50 User Manual CONTENTS SAFETY NOTICE.................................................................................... 3 1 OVERVIEW......................................................................................

More information

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

Single-Phase Transformation Review

Single-Phase Transformation Review Single-Phase Transformation Review S T U D E N T M A N U A L March 2, 2005 2 STUDENT TRAINING MANUAL Prerequisites: None Objectives: Given the Construction Standards manual and a formula sheet, you will

More information

HPS Universal BUCK-BOOST TRANSFORMERS

HPS Universal BUCK-BOOST TRANSFORMERS BUCK-BOOST TRANSFORMERS Single and Three Phase Potted Buck-Boost Transformers Buck-Boost Applications & Standard Specification... 80 Selecting Buck-Boost Transformers... 81 Single Phase Selection Tables...

More information

Be on guard for effective testing: Introduction

Be on guard for effective testing: Introduction Be on guard for effective testing: Introduction The development of the insulation tester by Evershed and Vignoles is part of our electrical history, with insulation testers produced by Megger Instruments

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. 2) The model answer and the answer written by candidate

More information

FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.

FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Regional Technical Seminar FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Field Electrical Testing Applications Key Purposes of Field Electrical Testing: Receiving inspection Acceptance testing/commissioning

More information

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

PROBLEMS on Transformers

PROBLEMS on Transformers PROBLEMS on Transformers (A) Simple Problems 1. A single-phase, 250-kVA, 11-kV/415-V, 50-Hz transformer has 80 turns on the secondary. Calculate (a) the approximate values of the primary and secondary

More information

Transformers: Basics, Maintenance, and Diagnostics

Transformers: Basics, Maintenance, and Diagnostics Basics, Maintenance, and Diagnostics U.S. Department of the Interior Bureau of Reclamation April 2005 Basics, Maintenance, and Diagnostics U.S. Department of the Interior Bureau of Reclamation Technical

More information

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: MAINTENANCE OF TRANSFORMER AND CIRCUIT BREAKER (COURSE CODE:3360907) Diploma Programme in which this course is offered

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY

More information

Howard Smart Transformer Specification Guide

Howard Smart Transformer Specification Guide Howard Smart Transformer Specification Guide General Requirements Overhead pole-type smart distribution transformers shall be single phase, 60 Hz, mineral-oil filled and self-cooled and shall conform as

More information

User s Manual For CT Model IMB

User s Manual For CT Model IMB User s Manual For CT Model IMB 2 of (13) Contents: A. Introduction... 3 B. Steps on receipt and opening the cases... 3 C. Transportation and handling... 3 D. Unpacking the transformer... 4 E. Storage...

More information

Distribution/Substation Transformer

Distribution/Substation Transformer Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation

More information

SINGLE-PHASE VSV SWITCH

SINGLE-PHASE VSV SWITCH Revision: September 2009 Supersedes: August 2007 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...3 IV. Maintenance...5

More information

TRAX Transformer and Substation Test System

TRAX Transformer and Substation Test System TRAX Replaces need for multiple test sets Saves time by eliminating need for multiple instruments learning User-friendly interface reduces training and testing time Portable and compact system components

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

OIL TRANSFORMER HV/LV

OIL TRANSFORMER HV/LV Rev.02 - Pag. 1/23 Installation, use and maintenance Manual OIL TRANSFORMER Rev.02 - Pag. 2/23 TABLE OF CONTENTS 1 INTRODUCTION... 4 1.1 Reference standard... 4 1.2 Electromagnetic compatibility... 4 1.3

More information

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

Variable Transformers Product Design & Engineering Data

Variable Transformers Product Design & Engineering Data Variable Transformers Product Design & Engineering Data Product Design & Engineering Data Type 1010B Cutaway General Information STACO ENERGY PRODUCTS CO. is a leading manufacturer of variable transformers,

More information

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved. Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing

More information

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION - S K Mishra & S K Das NHPC Ltd O&M Division 1 PRESENTATION COVERS Introduction DESCRIPTION OF EVENTS INITIAL RESPONSE DETAILED INSPECTION

More information

Electrical Description

Electrical Description History of this Document Rev. no.: Date: Description of change 0 First edition 2 2003-10-08 Section 3: The rated power of the transformer can be increased by 40% if they are equipped with 6 fans for forced

More information

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE

ECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Document Number: ECP 11-0506 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0506 DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning

More information

SINGLE-PHASE VSV SWITCH

SINGLE-PHASE VSV SWITCH May 2006 Supercedes: March 2006 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...2 IV. Maintenance...4 V. VSV Power

More information

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards The Solo, Select and Sync PWM boards provide a pulse-width modulated (PWM) signal to the EC motor to control fan speed.

More information