Introduction to Substation Design TADP 542

Size: px
Start display at page:

Download "Introduction to Substation Design TADP 542"

Transcription

1 Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program

2 Drawings Drawings are prime method for communicating information about a substation project. Drawings for a new substation will usually be CAD drawings. Drawings should be created in accordance with substation owner s drafting standards.

3 Drawings Drawings for a substation project can range from a few to over a hundred depending on owner s preferences and size and type of substation project. More drawings will be included for a project that will be constructed by a contractor than for a project constructed by the substation owner s personnel.

4 Mead Drawing List

5 PD Drawing Index

6 Essential Drawings Certain drawings or groups of drawings will appear in all new substation projects. Drawing List One-Line Diagram General Arrangement Plan Site Plan, Sections and Details

7 Essential Drawings (cont.) Substation Plan, Sections and Details Foundation Plan and Details Structure Plan and Details Grounding Plan and Details Raceway Plan and Details

8 Essential Drawings (cont.) Control Building Plan, Sections and Details Relay, Control and Metering Panel Layouts and Wiring Diagrams AC and DC Schematics Material List

9 Drawing Lists Examples of Drawing Lists shown on Slides 4 and 5 of this presentation.

10 One-Line Diagrams Examples of One-Line Diagrams were shown in Presentation 2.1, Slide 10; in Presentation 2.2, Slides 14 and 16 and in Presentation 5.1, Slides 26, 30 and 39. The next two slides will show two of these one-line diagrams again.

11 Mead One-Line Diagram

12 PD One-Line Diagram

13 General Arrangement Plan Next slide shows an example of a General Arrangement Plans.

14 Mead Initial/Ultimate Plan (E-35481, Sheet 50)

15 Site Plan, Section and Details The next seven slides show examples of Site Plans, Sections and Details.

16 Mead Grading and Erosion Control Plan (E , Sheet 48)

17 Mead Landscape Plan (E-35481, Sheet 46)

18 PD Site Plan (PD-1.00)

19 PD Grading Plan (PD-2.01)

20 PD Plan and Profile Sections (PD-2.02)

21 PD Surfacing Plan (PD-2.04)

22 PD Fence Plan (PD-1.12)

23 Substation Plan, Section and Details The next seven slides show examples of Substation Plan, Elevation and Section drawings for two substations.

24 Mead General Plan (E-35481, Sheet 03)

25 Mead 115 & 13.8 kv Elevations (E , Sheet 08)

26 Mead General Plan (E-35481, Sheet 09)

27 PD Arrangement Plan (PD- 5.00)

28 PD Strain Bus Elevation (PD- 5.01)

29 PD Arrangement Plan (PD- 5.02)

30 PD Elevation C-C (PD-5.03)

31 Foundation Plan and Details The following two slides are examples of a Foundation Plan drawing and a Foundation Details drawing. The third slide shows a Foundation Plan for another substation.

32 Foundation Plan and Details

33 Mead Transformer Foundation and Oil Containment (E-35481, Sheet 44)

34 PD Foundation Plan (PD- 1.01)

35 Structure Plan and Details There isn t a separate Structure Plan unless it is a very large substation. Structures are usually identified on other drawings such as Slide 33. Structure Detail drawings are used for fabrication and assembly. Structure Drawings for first substation are listed on Slide 4. Second substation are listed in PD-7.xx series on Slide 5.

36 Grounding Plan and Details Grounding Plan is usually shown on one drawing unless it is a very large station. Grounding Details may be shown on one or more drawings. Next two slides show a Grounding Plan drawing and a Grounding Details drawing.

37 Mead Grounding Plan (E-35481, Sheet 05)

38 Mead Grounding Details (E-35481, Sheet 06)

39 Raceway Plan and Details The two slides that follow are examples of a Conduit Plan drawing and a Conduit and Cable Schedule drawing. When many conduits occupy the same trench, they are usually installed in one or more layers with several conduits in each layer (duct bank configuration). Some owners use a Cable List to provide cable information.

40 PD Conduit Plan (PD-8.00)

41 PD Conduit and Cable Schedule (PD- 8.01)

42 Control Building Plan, Sections and Details A Control Building may have many drawings associated with it. These may include a Plan view, Section views and Detail drawings of some of the equipment located with the Control Building. Several utilities use a different name for this facility instead of building. This is to avoid difficulties with local government building departments when a prefabricated structure is utilized.

43 Mead Panelhouse, Plan &Sections (E , Sheet 12)

44 Relay, Control and Metering Panel Layouts and Wiring Diagrams The next two slides are examples of a Panel Layout drawing and a Panel Wiring diagram.

45 Mead Control and SCADA Panel (E-35481, Sheet 25)

46 Mead Control and SCADA Panel (E-35481, Sheet 26)

47 AC and DC Schematics These can include three-line diagrams and AC and DC breaker panel drawings. CT and PT Schematic Diagrams may also be included.

48 Mead Wiring Diagram (E-35481, Sheet 02)Aa

49 Mead AC Station Service Wiring Diagram (E-35481, Sheet 33)

50 Mead DC Breaker Panel Wiring Diagram (E , Sheet 32)

51 Mead CT & PT Schematic Diagram (E , Sheet 34)

52 Material Lists Some owners place Material Lists on drawings. It is usually more difficult to update lists on drawings. A Control Building Material List may appear on the Control Building Plan drawing. Material Lists are often contained in either word processing documents or spreadsheet documents instead of on drawings.

53 Additional Drawings Additional drawings or groups of drawings may appear in a substation project. SCADA Equipment and Wiring Diagrams Major Equipment Physical and Electrical Oil Containment Property Fence Plan

54 SCADA Equipment and Wiring Drawings Most new substations have some form of a SCADA system. Many existing substations also have a SCADA system. Many different SCADA systems are employed and the drawings and wiring diagrams are very diverse. No example drawings will be shown here.

55 Major Equipment Physical and Electrical Drawings Manufacturer s drawing for transformers, circuit switchers and circuit breakers may be included in the drawing package. Some owners may keep the major equipment drawings separate from the substation drawings. The electrical drawings are usually needed for connecting power and control cables to the equipment.

56 Oil Containment Drawings One or more drawings may be created if extensive oil containment is required. It may be a part of another drawing if limited oil containment is required. See Slide 33 where it was combined with the transformer foundation.

57 Property Fence Plan Drawings A property perimeter fence may be required when the substation property extends some distance beyond the substation enclosure. This may require a separate drawing or it may be shown on the Site Plan drawing.

58 Additional Substation Drawing Information Refer to Appendix A of Chapter 3 of the RUS Design Guide for Rural Substations for further information regarding substation drawings.

59 Documentation In addition to the substation drawings, the following documents should be retained as part of the substation design record: Project Plan including revisions Project Schedule Project Cost Estimate Geotechnical Study

60 Documentation (cont.) Ground Resistivity Study Grounding Grid Design Structure and Foundation Design Bus Work Design Calculations Equipment Ampacity Determinations

61 Documentation (cont.) Insulation Coordination Design Construction Contract Change Orders Other Engineering Calculations as appropriate

62 Image Acknowledgements Mead Drawing List Avista Utilities PD Drawing List Grant County Public Utility District Mead One-Line Diagram Avista Utilities PD One-Line Diagram Grant County Public Utility District

63 Image Acknowledgements (cont.) Mead Initial/Ultimate Plan Avista Utilities Mead Grading and Erosion Control Plan Avista Utilities Mead Landscape Plan Avista Utilities PD Site Plan Grant County Public Utility District

64 Image Acknowledgements (cont.) PD Grading Plan Grant County Public Utility District PD Plan and Profile Sections Grant County Public Utility District PD Surfacing Plan Grant County Public Utility District PD Fence Plan Grant County Public Utility District

65 Image Acknowledgements (cont.) Mead General Plan Avista Utilities Mead 115 kv Elevation & 13.8 kv Elevation Avista Utilities Mead 13 kv Plan and Elevations Avista Utilities PD Arrangement Plan Grant County Public Utility District

66 Image Acknowledgements (cont.) PD Strain Bus Elevation Grant County Public Utility District PD Elevation B-B Grant County Public Utility District PD Elevation C-C Grant County Public Utility District Mead Ground Plan Avista Utilities

67 Image Acknowledgements (cont.) Mead Transformer Foundation and Oil Containment Avista Utilities PD Foundation Plan Grant County Public Utility District Mead Grounding Plan Avista Utilities Mead Grounding Details Avista Utilities

68 Image Acknowledgements (cont.) PD Conduit Plan Grant County Public Utility District PD Conduit and Cable Schedule Grant County Public Utility District Mead Panelhouse Layout, Plan & Sections Avista Utilities Mead Control and SCADA Panel Avista Utilities

69 Image Acknowledgements (cont.) Mead Panel 1 Wiring Diagram Avista Utilities Mead Wiring Diagram Avista Utilities Mead AC Station Service Wiring Diagram Avista Utilities Mead DC Breaker Panel, Batteries & Charger Wiring Diagram Avista Utilities

70 Image Acknowledgements (cont.) Mead CT & PT Schematic Diagram Avista Utilities

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES : IN THE MATTER OF THE PETITION OF : PUBLIC SERVICE ELECTRIC AND GAS : COMPANY FOR A DETERMINATION : PURSUANT TO THE PROVISIONS OF : N.J.S.A. 0:D-1 : BPU DOCKET

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement

NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement Version:- 1.0 Date of Issue:- January 2016 Page 1 of 25 NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement 1. Purpose The purpose of this document is to provide guidance on the submission

More information

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated

More information

Utility Interconnection and System Protection

Utility Interconnection and System Protection Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

APPENDIX 4D SUBSTATION POWER TRANSFORMERS

APPENDIX 4D SUBSTATION POWER TRANSFORMERS APPENDIX 4D SUBSTATION POWER TRANSFORMERS CPM Scheduling, Basic Engineering, and Approach for Typical Substation EPC 1 APPENDIX 4D Substation Power Transformers 1 The substation power transformers transform

More information

ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems

ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems Text Book: Electric Motors and Control Systems, by Frank D. Petruzella, published by McGraw Hill,

More information

Reference Number PDS 04 (RIC Standard: EP SP)

Reference Number PDS 04 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 04 (RIC Standard: EP 12 10 00 10 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS. experience matters

RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS.  experience matters RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS www.rrccompanies.com experience matters At the heart of a successful project lies a team of experts who can convert their knowledge to project results. Our

More information

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY:ETI CUSTOMER: PID 211 FACILITIES STUDY EJO # F4PPTX0018 PID 211 INTERCONNECTION LEWIS CREEK 138 KV Revision: 1 Rev Issue Prepared Description of Revision

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

ELPT 1429 RESIDENTIAL WIRING

ELPT 1429 RESIDENTIAL WIRING SYLLABUS ELPT 1429 RESIDENTIAL WIRING INDUSTRIAL AND COMMERCIAL ELECTRICITY BRAZOSPORT COLLEGE LAKE JACKSON TEXAS PREPARED BY: Larry Grable DATE: September 13, 2005 INSTRUCTOR RECOMMENDED BY: RECOMMENDED

More information

One line and Three line diagrams Schematics Wiring Diagrams Logic ladders Ancillary prints Pictorial instructions

One line and Three line diagrams Schematics Wiring Diagrams Logic ladders Ancillary prints Pictorial instructions One line and Three line diagrams Schematics Wiring Diagrams Logic ladders Ancillary prints Pictorial instructions One line diagram (1) One line diagrams will typically show in a simple fashion an over

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Nicholas Klemm Western Area Power Administration Rocky Mountain Region March 2012 Organizational Overview Western

More information

INTRODUCTION. General Design Criteria o (include charts from Section 2 of TSS) Functional Criteria o (from TSS section 3) Accessibility and Layout

INTRODUCTION. General Design Criteria o (include charts from Section 2 of TSS) Functional Criteria o (from TSS section 3) Accessibility and Layout Substation Subgroup Members: Please update the sections below you volunteered to review using the track changes option or highlight your changes. Once done, email your updated document to Scott Herb (SEHerb@pplweb.com)

More information

EE Lecture 15 (recorded Feb 9, 2011) Fri Feb 15, 2013

EE Lecture 15 (recorded Feb 9, 2011) Fri Feb 15, 2013 EE 5223 - Lecture 15 (recorded Feb 9, 2011) Fri Feb 15, 2013 Ongoing List of Topics: URL: http://www.ece.mtu.edu/faculty/bamork/ee5223/index.htm Term Project - structuring, details Exercises posted Today:

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision Electric Service Guide Residential Subdivision January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website

More information

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR Building Division 1855 Placer Street, Suite 102 Redding, California 96001 Phone: (530) 225-5761 Fax: (530) 245-6468 Inspection Request Line: (530) 244-5068 Web:

More information

138kV / 13.8kV Substation Protection and Control Design Project

138kV / 13.8kV Substation Protection and Control Design Project 138kV / 13.8kV Substation Protection and Control Design Project Final Report Team Client Team Advisor Team Members Team Email Team Website : sdmay18-06 : Black & Veatch :Dr. Ajjarapu : Andrew Brown Gavin

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

Transmission Facilities Rating Methodology for Florida

Transmission Facilities Rating Methodology for Florida Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke

More information

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021 TRANSMISSION AND SUBSTATION PROJECT S OPERATING COMPANY: EGSI-TX CUSTOMER: COTTONWOOD ENERGY COMPANY, LP EJO # GS0021 FACILITY STUDY OPTIONAL SYSTEM UPGRADES FOR 1240 MW, IPP PROJECT NEAR HARTBURG, TX

More information

Dairyland Power Cooperative June Transmission to Transmission (T-T) Interconnection Guidelines

Dairyland Power Cooperative June Transmission to Transmission (T-T) Interconnection Guidelines Transmission to Transmission Interconnection Guidelines for the Dairyland Power Cooperative Transmission System (new interconnections or materially modified existing interconnections) Dairyland Power Cooperative

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015 LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I EASTHAM ENGINEER'S PROJECT NUMBER G-1 GENERAL NOTES AND LEGEND C-1 EXISTING CONDITIONS PLAN DWSRF PROJECT NUMBER C-2 PROPOSED WATER STORAGE TANK SITE PLAN

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I G-1 GENERAL NOTES AND LEGEND SHEILA VANDERHOEF C-1 EXISTING CONDITIONS PLAN BOARD OF SELECTMEN C-2 PROPOSED WATER STORAGE TANK SITE PLAN CD - 2 CONSTRUCTION

More information

Standard Prices for Generators 2010

Standard Prices for Generators 2010 Standard Prices for Generators 2010 Distribution System Operator ESB Networks Page 1 of 13 CONTENTS 1.0 Background...3 2.0 Standard Pricing Approach...3 Schedule of Charges for generators excluding VAT...6

More information

Substation: From the Outside Looking In.

Substation: From the Outside Looking In. 1 Substation: From the Outside Looking In. Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the presentation 3 Today s Presenter n Greg

More information

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems These design criteria have been established to assure acceptable

More information

6B.6 Substation Grounding

6B.6 Substation Grounding 1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope

More information

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009 NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009 (12041004) 23 November (X-Paper) 09:00 12:00 Calculators may be used. This question paper consists of 7 pages.

More information

PART 1 OWNER/APPLICANT INFORMATION

PART 1 OWNER/APPLICANT INFORMATION CALHOUN COUNTY ELECTRIC COOP. ASSN. Application for Operation of Customer-Owned Generation This application should be completed as soon as possible and returned to the Cooperative in order to begin processing

More information

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008-3 Version 3.4 1 Contents 1. Scope... 3 2. Establishment and Communication of Facility Ratings:... 3 2.1.

More information

Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES

Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES Purpose This section specifies the requirements for protective relays and control devices for Generation Entities interconnecting

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer

More information

Autodesk Revit MEP Fundamentals

Autodesk Revit MEP Fundamentals Autodesk Revit MEP Fundamentals Course Length: 4 days To take full advantage of Building Information Modeling, the Autodesk Revit MEP: Fundamentals training course has been designed to teach the concepts

More information

Transmission to Distribution/ End-User Interconnection Guidelines for the Dairyland Power Cooperative Transmission System

Transmission to Distribution/ End-User Interconnection Guidelines for the Dairyland Power Cooperative Transmission System Transmission to Distribution/ End-User Interconnection Guidelines for the Dairyland Power Cooperative Transmission System Dairyland Power Cooperative December 2014 Transmission to Distribution/ End-User

More information

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems This application should be completed as soon as possible and returned to the Cooperative in order to

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Facility Ratings Methodology

Facility Ratings Methodology Facility Ratings Methodology FAC-008-3 Compliance Document Establishment Date: December 19, 2016 Effective Date: July 14 th, 2017 Approved by: Job Title Manager, Network & IRP Transmission Planning Name

More information

kv AC substation

kv AC substation 132-400 kv AC substation Outdoor AC substations Earthing systems ETS-50-08-01, Rev. 0 technical standard Document no. 13/90592-127 ETS-50-08-01 v. 0 REVISION VIEW Document no.: 13/90592-127 Version Author

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

TRANSMISSION FACILITIES...7

TRANSMISSION FACILITIES...7 Table of Contents 1. INTRODUCTION...4 1.1. Objective... 4 1.2. NERC FAC-008 Compliance... 4 1.3. Seminole s Normal Rating... 5 1.4. Seminole s Four-Hour Rating... 5 1.5. Seminole s Emergency Rating...

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation This application is to be completed and returned to the Cooperative member service representative in order to begin

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT OFFICE

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT OFFICE CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT OFFICE SPECIFICATION EO 2018 REVISION 1 October, 2009 EFFECTIVE DATE NOVEMBER 1, 2009

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

GENERAL TECHNICAL SPECIFICATION

GENERAL TECHNICAL SPECIFICATION GENERAL TECHNICAL SPECIFICATION September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING

More information

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List Standard Number: HPC-5DA-07-0011-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer

More information

Autodesk Revit MEP Learning Essentials Training Course Outline

Autodesk Revit MEP Learning Essentials Training Course Outline Module 00 Revit in a Nutshell Interactive exercise on creating and documenting a basic building Module 01 Introduction to the Principles of BIM Simple Truths Behind the hype The benefits of BIM What will

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

Transmission Facilities Rating Methodology

Transmission Facilities Rating Methodology Document title Transmission Facilities Rating Methodology Document number EGR-TRMC-00009 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning- Progress Energy

More information

Clark County Fire Prevention Las Vegas Nevada

Clark County Fire Prevention Las Vegas Nevada Clark County Fire Prevention Las Vegas Nevada PUBLIC SAFETY/FIRST RESPONDER RADIO AMPLIFICATION SYSTEMS SCOPE: This guideline sets forth requirements for the design, installation and testing of Public

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION This application should be completed and returned to in order to begin processing the request for interconnecting as required by

More information

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative:  Address: Fax Number: Interconnection of a Customer-Owned Renewable Generation System of Greater than 100 KW and Less than or Equal to 1 MW to the LCEC Electric Grid Tier 3 Application and Compliance Form Instructions: Complete

More information

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control

More information

Automated Fault Detection With PQ Monitors

Automated Fault Detection With PQ Monitors Automated Fault Detection With PQ Monitors Theo Laughner, PE Sr. Program Manager of Power Quality Acknowledgements: Anthony Murphy, PE October 12, 2015 Background Case Studies (5) Needs Tools Conclusion

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering Expo - Nov. 3, 2014 Index Normal Distribution System

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

AL AQTAAR AL ARBAAH EST. COMPANY PROFILE. Panel Boards, Substation, Instrumentation, Automation.

AL AQTAAR AL ARBAAH EST. COMPANY PROFILE. Panel Boards, Substation, Instrumentation, Automation. AL AQTAAR AL ARBAAH EST. COMPANY PROFILE Panel Boards, Substation, Instrumentation, Automation. Company Profile Al Aqtaar Al Arbaah Est. (formally known Asfar Al Jazirah Est.) was founded in Kingdom of

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

GENERAL TECHNICAL SPECIFICATION (Turnkey Work) GENERAL TECHNICAL SPECIFICATION (Turnkey Work) March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,

More information

CITY OF MORTON RESERVOIR NO. 1 REPLACEMENT - REBID

CITY OF MORTON RESERVOIR NO. 1 REPLACEMENT - REBID LEWIS COUNTY WASHINGTON THIS PROJECT IS FUNDED THROUGH THE WASHINGTON STATE DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM DWSRF NO. DM 16-452-016 CITY OFFICIALS DAN MORTENSEN Mayor PEPPY ELIZAGA

More information

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation Delivering energy safely, reliably, efficiently and affordably. For the past two summers, several substations in the Little Rock area showed low voltages with no

More information

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS AS 2067 1984 Australian Standard Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv [Title allocated by Defence Cataloguing Authority: SWITCHGEAR ASSEMBLIES, ELECTRICAL AND

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

Drawing Management Standard

Drawing Management Standard Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

Guide and Requirements for Service. at 69,000 to 287,000 Volts R 0.2

Guide and Requirements for Service. at 69,000 to 287,000 Volts R 0.2 Guide and Requirements for Service at 69,000 to 287,000 Volts R 0.2 September - 2011 Disclaimer This document is not intended as a design specification or as an instruction manual for the Load Customer

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information