SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)

Size: px
Start display at page:

Download "SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)"

Transcription

1 Ministry of New & Renewable Energy From the SelectedWorks of Radhey Shyam Meena Winter July 12, 2012 SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) RADHEY SHYAM MEENA, Er. Available at:

2

3 PHASE-I PHASE-II 600MW 600MW 650MW 650MW

4 LOCATION COAL Nimoda, Undal, Motipura, Singharia and Devri villages of Tehsil Jhalarapatan, Distt. Jhalawar LAND The GOR has alloted 842 bigha Government land and aquired 1388 bigha private khatedari land for the thermal project. WATER The state irrigation department has alloted 1200 mcft water for the project from proposed Kalisindh dam Ministry of coal, Govt. of India has alloted Paras east and Kanta basin coal blocks to RVUN in Chhatisgarh state. under joined venture with M/s. Adani Enterprises

5

6

7 KaTPP JHALAWAR, 22KV 1200MW 400KV BTAWDA GT 400KV 400KV BTAWDA GEN. 22 KV UT 22/11 KV GCB 22KV UAT 11/3.3 KV GT GT C&I 3.3KV, 220V SWITCHY ARD ICT 400/ 220 KV 220KV JWR 220KV 220KV JWR

8

9

10

11 . BUS BAR LIGHTING ARRESTER CIRCUIT BREAKER ISOLATOR CURRENT TRANSFORMER CAPCITIVE VOLTAGE TRANSFORMER WAVE TRAPER

12 The whole switchyard is grounded with MAT Grounding. In MAT grounding,5 Conductors are placed Horizontally & 8 Conductors are Placed Vertically. All Switchyard equipment are grounded by two Earthing Connection. In switchyard grounding,32mm earthing conductor is used & 75/2 GI earth Sheet is used. All switchyard are gravelled to make the tower footing resistance high.

13 BUSBAR SCHEME GT feeder Line feeder 2000A 2000A IPS tube of minimum 4.5 inch size IPS tube of minimum 4.5 inch size

14

15

16

17

18 GENERATOR BAY 17

19 Bus Sectionaliser Bay. Bus Coupler Bay 18

20 ST back charging Bay CLEARANCES 19

21 LIGHTNING ARRESTORS These are equipments designed to protect insulators of power lines and electrical installations from lightening surges by diverting the surge to earth and instantly restoring the circuit insulation to its normal strength with respect to earth.

22 CIRCUIT BREAKER A circuit breaker is an automatically operated electric switch designed to protect an electrical circuit from damage caused by overload or short circuit. Its basic function is to detect a fault condition and, by interrupting continuity, to immediately discontinue electrical flow. Unlike a fuse, which operates once and then has to be replaced, a circuit breaker can be reset (either manually or automatically) to resume normal operation.

23

24 SYSTEM ISOLATORS 400KV, 2000A, 40KA for 3.0 sec isolators for GT, lines, ICT bays shall be provided. The Isolator used in this plant is of two types. Single pole double break isolator. Double pole single break isolator.

25 CURRENT TRANSFORMERS When current in a circuit is too high to directly apply to measuring instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments 400KV oil filled live tank type hermetically sealed single phase current transformers will be used. Multi-ratio CT tapping shall be provided on the secondary side to obtain different ratios in order to different ratios In order to permit different ratios on each core, as desired.

26 C V T capacitor voltage transformer (CVT) is a transformer used to step down extra high voltage signals and provide a low voltage signal, for measurement or to operate a protective relay. Nominal/highest system voltage 400/420 KV Rated primary voltage 400 KV/1.732 Rated secondary voltage 110 V/1.732

27 An electronic filtering device designed to exclude unwanted signals or interference. It blocks the high frequency carrier waves (24 khz to 500 khz) and let power waves (50 Hz - 60 Hz) to pass through. It is basically an inductor of rating in milli henry.

28 Purpose of ICT is simply interconnection between 400KV and 220KV Switchyard. 315MVA,400/220/33 KV ONAN ONAF ODAF HV LV TV

29

30 400KV 400KV BTAWADA 220KV JHALAWAR 220KV BTAWDA KaTPP SWITCHYARD JHALAWAR

31

32 Interlocks When Circuit breaker is ON, Isolator should not operate. When Isolator is CLOSE, Earth switch should be OPEN. When Both the Bus are charged, Bus coupler should not become CLOSE. When DC supply if not available, alarm should be raised. When gas pressure inside the Breaker is reduced to 5Kg/cm2,the alarm should be raised. When the oil pressure inside the current transformer is low, then alarm should be raised. When the Nitrogen gas pressure is low at the Current Transformer, then alarm should be raised. 31

33 RADHEY SHYAM MEENA Student Member Of The Institute Of Engineering & Technology (IET) International Electrotechnical Commission (IEC) Institute Of Electrical & Electronics Engineers (IEEE) The South African Institute Of Electrical Engineers(SAIEE) Universal Association Of Computer & Electronica Engineers(UACEE) Coordinator:-Disha Gyan Sanstha(Rural Education Devlopment Technology)

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

Insulation Co-ordination For HVDC Station

Insulation Co-ordination For HVDC Station Insulation Co-ordination For HVDC Station Insulation Co-ordination Definitions As per IEC 60071 Insulation Coordination is defined as selection of dielectric strength of equipment in relation to the operating

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT Electro-Mechanical Works Guidelines for Power Evacuation and Interconnection with Grid Sponsor: Ministry of New and Renewable Energy Govt. of India

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

Unsymmetrical Fault Analysis & Protection Of The Existing Power System

Unsymmetrical Fault Analysis & Protection Of The Existing Power System Ministry of New & Renewable Energy From the SelectedWorks of Radhey Shyam Meena September 9, 2015 Unsymmetrical Fault Analysis & Protection Of The Existing Power System Radhey Shyam Meena Available at:

More information

SECTION VI TECHNICAL SCHEDULES

SECTION VI TECHNICAL SCHEDULES SECTION VI TECHNICAL SCHEDULES Kenya Power and Lighting Company VI 4.3 - i Contract A36B TECHNICAL SCHEDULES 1 PREAMBLE...1 TECHNICAL SCHEDULES SUBSTATIONS...2 SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION Sr. No. Course Content 1.0 Fault Current Calculations 1.1 Introduction to per unit and percentage impedance 1.2

More information

EAST WEST UNIVERSITY

EAST WEST UNIVERSITY EAST WEST UNIVERSITY INTERNSHIP REPORT ON SUBSTATION OF ASHUGANJ POWER STATION COMPANY LIMITED (APSCL) By Md. Anisur Rahman: (2008-2-80-026) Submitted to the Department of Electrical and Electronic Engineering

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information

Problems connected with Commissioning of Power Transformers

Problems connected with Commissioning of Power Transformers Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

Hamdy Faramawy Senior Application Specialist ABB Sweden

Hamdy Faramawy Senior Application Specialist ABB Sweden Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy

More information

Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART I

Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART I Electrical Systems - Course 135 COMPOSTE ELECTRCAL PROTECTVE SCHEMES: PART BUSES AND TRANSFORMERS L.0 ntroducton Following on from lesson 135.03-1, this lesson shows componte protective schemes for buses

More information

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS Management has tentatively approved your request subject to the following conditions: 1. All distribution materials/equipment must be purchased

More information

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM BY MR. H. C. MEHTA AT 1 ST INDIA DOBLE PROTECTION AND AUTOMATION CONFERENCE, NOV 2008 POWER-LINKER Wisdom is not Virtue but Necessity hcmehta@powerlinker.org

More information

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %

More information

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering) R10 Set No. 1 Code No: R41023 1. a) Explain how arc is initiated and sustained in a circuit breaker when the CB controls separates. b) The following data refers to a 3-phase, 50 Hz generator: emf between

More information

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy UProtection Requirements Ufor a Large scale Wind Park Shyam Musunuri Siemens Energy Abstract: In the past wind power plants typically had a small power rating when compared to the strength of the connected

More information

Transformer Protection

Transformer Protection Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing

More information

MINISTRY OF ELECTRICITY

MINISTRY OF ELECTRICITY MINISTRY OF ELECTRICITY IRAQ SUPERGRID PROJECTS 400/132 KV GIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007 LIST OF REVISIONS 1 2 3 4 5 Current Rev. Date 19.11.04 18.03.05 Aug 05 Oct 05 Jan 07

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer

More information

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8]

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8] Code No: RR320205 Set No. 1 1. (a) Explain about Bewley s Lattice diagrams and also mention the uses of these diagrams. [6+2] (b) A line of surge impedance of 400 ohms is charged from a battery of constant

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

3. COMBINED TRANSFORMERS Oil-paper insulation

3. COMBINED TRANSFORMERS Oil-paper insulation 3. COMBINED TRANSFORMERS Oil-paper insulation 123 kv Combined transformers. 26 Instrument transformers High voltage INTRODUCTION Combined instrument transformers contain a current transformer and an inductive

More information

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This

More information

Busbars and lines are important elements

Busbars and lines are important elements CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection

More information

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS Juan Manuel Gers, PhD Protection coordination principles Relay coordination is the process of selecting settings that will assure that the relays

More information

G. KOEPPL Koeppl Power Experts Switzerland

G. KOEPPL Koeppl Power Experts Switzerland PS3: Substation Design: New Solutions and Experiences Bus-Node Substation A Big Improvement in Short-Circuit and Switching Properties at Reduced Substation Costs G. KOEPPL Koeppl Power Experts Switzerland

More information

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering COURSE PLANNER Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS (2180901) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering Term: 16/2 (DECEMBER-16 to APRIL-17) Faculty: Prof. U. V.

More information

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,

More information

CEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant

CEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant CEYLON ELECTRICITY BOARD SRI LANKA GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAMME (TRANCHE 2) PACKAGE 2: LOT A MANNAR NADUKUDA TRANSMISSION DEVELOPMENT (ADB LOAN NO: 47037-SRI)

More information

4. CAPACITIVE VOLTAGE TRANSFORMERS AND COUPLING CAPACITORS Oil-paper insulation

4. CAPACITIVE VOLTAGE TRANSFORMERS AND COUPLING CAPACITORS Oil-paper insulation 4. CPCITIVE VOLTGE TRNSFORMERS ND COUPLING CPCITORS 420 kv Capacitive voltage transformers. Fingrid, Visulahti (Finland). 34 Instrument transformers High voltage INTRODUCTION Capacitive voltage transformers

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Mobile Power Transformer Test Systm

Mobile Power Transformer Test Systm TMPTTS Series Mobile Power Transformer Test Systm MPTTS Series Mobile Power Transformer Test System is design to test and diagnose in both single phase and three phase power transformer up to 500MVA. The

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application

More information

Shunt Reactor Switching

Shunt Reactor Switching Shunt Reactor Switching Dielectric stresses produced by circuit-breakers to shunt reactors. Presentation made during the IEEE Transformers Committee meeting, Amsterdam, Netherlands, April 2001 Presented

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements User s Guide General Most faults in power systems can be detected by applying

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

Transformer Protection

Transformer Protection Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary

More information

Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay

Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay Relay withdrawn from case Application The type CDG 11 relay

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

Power Station Electrical Protection A 2 B 2 C 2 Neutral C.T E M L } a 2 b 2 c 2 M M M CT Restricted E/F Relay L L L TO TRIP CIRCUIT Contents 1 The Need for Protection 2 1.1 Types of Faults............................

More information

Electrical Description

Electrical Description History of this Document Rev. no.: Date: Description of change 0 First edition 2 2003-10-08 Section 3: The rated power of the transformer can be increased by 40% if they are equipped with 6 fans for forced

More information

Technical recommendation for the purchase of Real Time Thermal Rating for transformers

Technical recommendation for the purchase of Real Time Thermal Rating for transformers Version: 1.0 Date of Issue: December 2014 1 Technical recommendation for the purchase of Real Time Thermal Rating for transformers 1 Purpose The purpose of this document is to set out and describe the

More information

EE 1402 HIGH VOLTAGE ENGINEERING

EE 1402 HIGH VOLTAGE ENGINEERING EE 1402 HIGH VOLTAGE ENGINEERING Unit 5 TESTS OF INSULATORS Type Test To Check The Design Features Routine Test To Check The Quality Of The Individual Test Piece. High Voltage Tests Include (i) Power frequency

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

Stabilized Differential Relay SPAD 346. Product Guide

Stabilized Differential Relay SPAD 346. Product Guide Issued: July 1998 Status: Updated Version: D/21.03.2006 Data subject to change without notice Features Integrated three-phase differential relay, three-phase overcurrent relay and multiconfigurable earth-fault

More information

IMP/007/011 - Code of Practice for the Application of Lightning Protection

IMP/007/011 - Code of Practice for the Application of Lightning Protection Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables nd This paper is part of the Proceedings of the 2 International Conference on Energy Production and Management (EQ 2016) www.witconferences.com Prevention of transformers damage in HPP with double generating

More information

CEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant

CEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant CEYLON ELECTRICITY BOARD SRI LANKA GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAMME (TRANCHE 2) (ADB LOAN NO:3483/3484) PACKAGE 3: LOT B Procurement of Plant Design, Supply

More information

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

Form-IV. Form of Inspection/Test Report. (Under Regulation 43) Form-IV Form of Inspection/Test Report (Under Regulation 43) 1. Name and address of the Chartered Electrical Safety Engineer 2. Name and address of the consumer (or) Owner(or) supplier: Contact No: E-Mail:

More information

Powered by technology...driven by service CURRENT TRANSFORMERS. Multifunction Meters. Transducers & Isolators. Temperature Controllers

Powered by technology...driven by service CURRENT TRANSFORMERS. Multifunction Meters. Transducers & Isolators. Temperature Controllers Multifunction Meters Transducers & Isolators Temperature Controllers Converters & Recorders Digital Panel Meters CURRENT TRANSFORMERS Current Transformers Analogue Panel Meters Shunts Digital Multimeters

More information

A3-308 HIGH SPEED GROUNDING SWITCH FOR EXTRA-HIGH VOLTAGE LINES

A3-308 HIGH SPEED GROUNDING SWITCH FOR EXTRA-HIGH VOLTAGE LINES 21, rue d'artois, F-75008 Paris http://www.cigre.org A3-308 Session 2004 CIGRÉ HIGH SPEED GROUNDING SWITCH FOR EXTRA-HIGH VOLTAGE LINES G.E. Agafonov, I.V. Babkin, B.E. Berlin Y. F. Kaminsky, S. V. Tretiakov,

More information

PCS Working Group on General Requirements C

PCS Working Group on General Requirements C WG Item 82 C57.12.00-2000 Section 7.1.4.4 Stabilizing windings Change Requested by : V. Sankar 5/07/2005 & 10/23/2006 Requested Change : Request to form a task force to discuss the following on buried

More information

Substation: From the Outside Looking In.

Substation: From the Outside Looking In. 1 Substation: From the Outside Looking In. Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the presentation 3 Today s Presenter n Greg

More information

A TRAINING REPORT ON UTTAR PRADESH POWER CORPORATION LIMITED 33/11 KV SUBSTATION INDIRANAGAR SECTOR-25, LUCKNOW(UTTAR PRADESH).

A TRAINING REPORT ON UTTAR PRADESH POWER CORPORATION LIMITED 33/11 KV SUBSTATION INDIRANAGAR SECTOR-25, LUCKNOW(UTTAR PRADESH). A TRAINING REPORT ON UTTAR PRADESH POWER CORPORATION LIMITED 33/11 KV SUBSTATION INDIRANAGAR SECTOR-25, LUCKNOW(UTTAR PRADESH). A training Report Submitted In Partial Fulfillment of the Requirements for

More information

Spark Gap Surge Protectors For Lv Mains

Spark Gap Surge Protectors For Lv Mains Spark Gap Surge Protectors For Lv Mains By Phillip Tompson BE(Hons) FIE(Aust) CPEng MIEE Managing Director Introduction In the last year or so spark gap surge protectors have appeared in the Australian

More information

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N S C I E N C E P A S S I O N T E C H N O L O G Y HVDC Transmission Michael Muhr Graz University of Technology Austria www.tugraz.at 1 Definition HV High Voltage AC Voltage > 60kV 220kV DC Voltage > 60kV

More information

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers save energy, it is precious Mfg. of all types of Distribution / Power & Furnace Transformers SYNERGY transformers SAFETY AND EFFICIENCY, COMBINED WITH LONG-TERM RELIABILITY, ARE THE HALLMARKS OF WORLD-RENOWNED

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

Secondary Arresters. Figure 1. Type L secondary surge arrester rated 175 Vac, 125 Vdc.

Secondary Arresters. Figure 1. Type L secondary surge arrester rated 175 Vac, 125 Vdc. Surge Arresters Secondary Arresters and Protective Gaps Electrical Apparatus 235-10 GENERAL INFORMATION The necessity of providing surge arrester protection on low-voltage circuits is fundamentally the

More information

Tab 8 Surge Arresters

Tab 8 Surge Arresters s en em Tab 8 Surge Arresters Si Distribution System Engineering Course Unit 10 2017 Industry Inc., All Rights Reserved Surge Arresters The main protective devices against system transient overvoltages.

More information

* Short-circuit detection at On pushbutton. Applications. Indication. S M6801_a S11 A3 S12 S21 S23 S22 S (+)

* Short-circuit detection at On pushbutton. Applications. Indication. S M6801_a S11 A3 S12 S21 S23 S22 S (+) Safety technique Emergency stop module BO 5988 safemaster 0221562 Function diagram Pushbutton on Mains or emergencystop () K1 According to EC Directive for machines 98/37/EG According to IEC/E 60204-1

More information

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY Dr. Karthik Reddy VENNA Hong URBANEK Nils ANGER Siemens AG Germany Siemens AG Germany Siemens AG Germany karthikreddy.venna@siemens.com

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and

More information

SECTION : 8.0. Guaranteed Technical Particulars

SECTION : 8.0. Guaranteed Technical Particulars SECTION : 8.0 Guaranteed Technical of "Design, Supply, Erection, Installation, Testing and Commissioning 33/11KV AIS Substation on Turnkey Basis Under Power Distribution System Development Project, Rajshahi

More information

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021 TRANSMISSION AND SUBSTATION PROJECT S OPERATING COMPANY: EGSI-TX CUSTOMER: COTTONWOOD ENERGY COMPANY, LP EJO # GS0021 FACILITY STUDY OPTIONAL SYSTEM UPGRADES FOR 1240 MW, IPP PROJECT NEAR HARTBURG, TX

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON Transformers Diagnostic Testing - OVERALL DGA Oil Screen Power Factor / Capacitance Exciting Current Transformer

More information

Distribution/Substation Transformer

Distribution/Substation Transformer Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation

More information

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations Case Study 1 Power System Planning and Design: Power Plant, Transmission Lines, and Substations Lindsay Thompson, 5203120 Presented to Riadh Habash ELG 4125 11/10/2013 1.0 ABSTRACT A power plant delivers

More information

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 8DB 12 blue GIS Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 Features Gas-insulated switchgear (GIS) type 8D/B has been an integral part of the medium-voltage portfolio at Siemens for more

More information

SLD FOR 132/33 KV DUB STATION, SOMANATHPUR

SLD FOR 132/33 KV DUB STATION, SOMANATHPUR SLD FOR 132/33 KV DUB STATION, SOMANATHPUR 132 KV BAYS TRANSF 02 NOS. 132kV MAIN BUS 132kV RESERVE BUS 20/40 MVA, 132/33kV TRANSFORMER1 20/40 MVA, 132/33kV TRANSFORMER 2 STN TFR 33/0.4KV 250KVA 33KV BAY

More information

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas

More information

Low Voltage Products. Enclosed Third Harmonic Filter THF and THF star Enclosed units. Brochure THFS1GB 03_04 1SCC330003C0201

Low Voltage Products. Enclosed Third Harmonic Filter THF and THF star Enclosed units. Brochure THFS1GB 03_04 1SCC330003C0201 Low Voltage Products Enclosed Third Harmonic Filter and star Enclosed units Brochure S1GB 3_4 1SCC333C21 The Third Harmonic - a Growing Problem Today's electrical networks and plants are under much more

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

MEDIUM & HIGH VOLTAGE

MEDIUM & HIGH VOLTAGE MEDIUM & HIGH VOLTAGE TESTING EQUIPMENT VOLTAGE WITHSTAND SGM Series Resonant Systems The SGM series are used for generating high AC voltages at a fixed frequency (mainly 50 or 60 Hz) by means of an excited

More information