1 Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom Hamdy Faramawy Senior Application Specialist ABB Sweden Abstract One of the biggest challenges today to modern power grids is maintaining the continuity of power supply to customers, in cases where a main, and vital, component of the grid experiences a fault. This may be proposed to be secured by many ways which will certainly have further cost and environmental impacts. Advanced control systems can be utilized to help automate adaptive actions that will maintain the capacity of grids, with less further investments in the bulky components. This is all possible today due to the advancements in the Intelligent Electronic Devices, IEDs and the availability of a reliable communication system as the back bone. This paper presents the FCCS, Firm Capacity Control System, which is a novel system proposed in order to firmly maintain the capacity of extra-high voltage substations by always making sure the full number of power transformers connecting the 380kV level to the 110kV level which further feeds the 110kV grid and also down to the 13.8kV level. This is crucial to some vital substations in highly populated areas and cities where the peak load is very demanding, and power supply interruption cannot be afforded under any circumstances, even if due to a fault tripping. In case one of the three 380/110kV power transformers is tripped due to a fault, the system will assess the situation based on the available inputs and will take several steps and actions in order to secure and connect the fourth, always-live, standby, power transformer. This system is different from any other, since the switching is done on the high voltage level 110kV which is the downstream. There are a lot of constraints and conditions that this system will have to look at before issuing decisions. These include the pre-fault configurations of both the 380kV and 110kV topologies, the different protection systems in operation, the tap positions of the transformers, etc. The paper will describe the idea behind this new system, its design, engineering and testing stages, its implementation and its benefits. All the operation steps and actions will be explained including the logic and possible cases and modes that this system operates through. In this paper the authors will also emphasize on how the system is implemented using both centralized and distributed bases, i.e. in one master unit or in more than one Intelligent Electronic Device, IED. The system will be described in both the classical way of implementation and the utilizing of the IEC communications implementation. Light will also be shed on some of the future suggestions and development of this system. 1. Introduction In the vastly growing power system transmission grid of Kingdom of Saudi Arabia, a requirement has been put by the operators in National Grid SA to design and implement a new novel control system which ensures the firm capacity of the 380kV Bulk Supply Point (BSP) transmission substation. The definition of firm capacity is the amount of energy (or power) available for production or transmission which can be and must be guaranteed to be available at a given time. The challenge here is to design and implement a smart system that detects disconnection of autotransformer due to internal fault and acts accordingly in very short time to put the standby transformer into service, covering for the failed transformer and avoiding further interruption of valuable power supply. This also overcomes the limitation of not being able having the additional transformer in service all the time, due to higher short circuit rating requirements (Figure 1). Many control systems exist that carry out similar functions like automatic bus transfer, transformer parallel operation, etc. but this is the first control system of its kind, in the authors knowledge, to automatically manoeuvre and control the operation of the 380/110/13.8kV, bulky, autotransformers.

2 2 3 4 Figure 1: Increasing the number of transformers in parallel increases the amount of through fault currents, thus increasing required short circuit rating. In a typical 380kV BSP substation of that kind, (Figure 2) there are usually three voltage levels: 380kV, 110kV and 13.8kV. The 380kV system is one-and-a-half circuit breaker configuration. The 110kV system is a double-busbar single circuit breaker system and the 13.8kV system is a single busbar system. 380kV Level 380kV Lines 380/110kV Autotransformer 380kV Lines 380/110kV Autotransformer 380/110kV Autotransformer 110kV Level 110/13.8kV 67MVA Transformer 110kV Lines 110/13.8kV 67MVA Transformer 110/13.8kV 67MVA Transformer 13.8kV Level 13.8kV Feeders 13.8kV Feeders Figure 2: Simplified Single Line Diagram of a typical 380/110/13.8kV BSP A Firm Capacity Control System, shortly called FCCS, monitors the loss of the power transformers in service and ensures that the supply of demand is maintained without overstressing the system by connecting a stand-by transformer. This is achieved by dynamically monitoring the station topology according to a set of pre-defined rules, defining what to monitor and, in the event of certain triggers, what to be switched. This is achieved via a single IED (ABB REC670) which houses all the logics. The first prototype of the system relies on all field signals being hardwired into the IED, however current developments into future work are now considering all the field signals transmitted over the IEC messaging, utilizing the substation automation technology. 2. Designing the Logic modules of FCCS The addition of the fourth 380/110/13.8kV standby power autotransformer introduced many challenges into the system. The switching on of the stand by transformer in case of tripping of any of the other transformers in service shall be allowed only if the tripping can be identified as a result of an

3 internal fault in the tripped transformer. FCCS logic shall prevent the switching on of the stand by transformer to a persisting short circuit at any of the outgoing feeders or to a bus bar fault. Internal faults in the tripped transformer are distinguished by observing the performance of the protection system of this power transformer. Tripping of any unit protection like differential protection, restricted earth fault protection, or any transformer mechanical protection shall initiate the FCCS operation sequence. The operation shall be blocked in case of transformer tripping by any other protection e.g. back up over current, back up earth fault, bus and breaker failure protection, etc. which are suspected and usually operating due to a downstream fault on the 110kV level. FCCS is made up of different logic modules. The first module in the start-up logic modules, which decides the readiness of the scheme by monitoring position for all HV apparatus i.e. circuit breakers and disconnecting switches. The position indications are then used to indicate the station (Figure 3) topology needed to evaluate if a valid possible switching condition exist. After any change in the station s topology, e.g. close or open of a disconnecting switch or circuit breaker, the logic dynamically evaluates the new state to find out if a valid operation situation exists, and if switching of a stand by transformer could be performed. BUS-1B 380kV D881 BUS-1A 380kV -1 D861 Q0-1 A819 OHL OHL -1 D851 Q0-1 A816-1 D841 Q0-1 A813 OHL OHL -1 D831 Q0-1 A810 Q3-1 D863-2 D862 Q0-3 A820-1 D865 Q3-2 D864 Q3-1 D853-2 D852 Q0-3 A817-1 D855 Q3-2 D854 Q3-1 D843-2 D842 Q0-3 A814-1 D845 Q3-2 D844 Q3-1 D833-2 D832 Q0-3 A811-1 D835 Q3-2 D834 Q0-2 A821 Q0-2 A818 Q0-2 A815 Q0-2 A812-2 D866-2 D856-2 D846 D884-2 D836 BUS-2B 380kV BUS-2A 380kV Q9 D6111 Q9-1 D867 Q9-1 D859 T /110/13.8kV AUTOTRF T /110/13.8kV AUTOTRF Q9 D679 Q9 D663 Q9-1 D847 Q9-1 D839 T /110/13.8kV AUTOTRF T /110/13.8kV AUTOTRF Q9 D631 Q0 A629 Q0 A621 BC-1 BC-2 Q0 A616 Q0 A608 D6109 D6110 BUS-1B 110kV D677 D678 D673 D674 BS-1 D667 D668 D661 BUS-1A 110kV D662 D629 D630 BUS-2B 110kV BUS-2A 110kV Figure 3: Simplified Single Line Diagram the 380/110/13.8kV BSP substation topology. If the first logic module identifies a valid possible switching condition, the system will go to the ready state, else it enters the not ready state until a new analysis is triggered (Figure 4). Only in the ready state switching operation can be performed (Figure 5). In every logic cycle, the first logic module checks: All input signals and forms the topology-based rules. On-Load Tap Changers (OLTC) systems. All involved circuit breakers are healthy. BS-2

4 START Checking input signals -Check status of transformers circuit breakers and isolating switches. -Check position of bus coupler and bus section. -Check OLTC and All involved CBs are healthy. All conditions ok? Logic for stand-by transformer -Check which transformer is already in service. -Identify stand-by transformer. Set FCCS not ready Valid operation conditions? Set FCCS ready Set FCCS not ready End Figure 4: Simplified start-up logic of FCCS. T804 Stand-by T803 Stand-by T802 Stand-by FCCS_Ready T801 Stand-by BC1 Closed BC2 Closed BS1 Closed BS2 Closed FCCS On Figure 5: Simplified logic of FCCS Ready A power transformer is considered in service if: Both the status of disconnecting switches and circuit breakers at both windings levels (HV / LV) are closed, indicating that the transformer is connected to (both 380 KV 110 KV) the busbars. Voltage measured at both sides of the power transformer will also ensure that the transformer is in service.

5 Logic of this module is shown in (Figure 6). There is a similar logic module for each power transformer. A811 Closed A812 Closed T801 HV VT 80% Un D839 Closed D629 Closed D630 Closed T801 LV VT 80% Un D631 Closed A608 Closed Figure 6: Simplified logic of. The same is applied for T802, T803 and T804. FCCS finds out which power transformer is the stand-by by checking if: Control authority allows FCCS to issue command to control LV CB. Status of disconnecting switches and CB at HV side indicates that the transformer is connected to the bus bar. Voltage measured at LV side of transformer. Logic of this module is shown in (Figure 7). There is a similar logic module for each power transformer. A811 Closed A812 Closed T801 HV VT 80% Un D839 Closed T801 in Stand-by D629 Closed D630 Closed T801 LV VT 80% Un D631 Closed A608 Ready for CO A608 Control In Remote A608 Open Figure 7: Simplified logic of T801 in Stand-by. The same is applied for T802, T803 and T804. FCCS finds out whether a transformer is not ready, by checking the following: Status of disconnecting switches and CB at HV side is open, indicating that the transformer is not connected to the bus bars. Control authority does not allow FCCS to issue command to control LV CB When in service transformer is tripped by protection. Any of the transformers, running in service, gets tripped by the protection system will be flagged by FCCS logic as not ready till the operator resets the tripping relays and the transformer is connected manually (remotely / locally) back to the power system. The process of restoring the power transforms back into service following protection trip will be handled as switching operation to be carried out manually (remotely / locally) by the network operator. We have to make it clear that FCCS logic does not propose to include any provision to automatically restore any transformer after it was tripped by the protection system.

6 In order to minimize the number of switching operations needed to put the stand-by transformer into service, the following pre-conditions are proposed and assumed during the design process: The stand by transformer will always be pre-energized from HV side. Isolating switch for 110kV side of the stand by transformer will be closed to one of the 110kV bus bars and 110kV bus sections /couplers will be closed. When conditions are fulfilled to set the stand bay transformer in service, two verifications processes will start to run: The close command will be verified by synchronizing function in order to assure that the stand by transformer CB is not going to be stressed during its closing operation. FCCS will take over the duty to equalize the tap position of the stand by transformer with the tap position of the in service transformer. During this process any other control facility for stand by transformer tap changed will be temporary disabled. The stand-by transformer closing sequence logic module is shown below (Figure 8). The initiation logic modules of closing operation are shown in (Figure 9, 10 11) as an example for the first transformer, T801. START FCCS Ready? Yes No Trigger by unit protection trip for transformer in service. AVR control for stand-by transformer disabled. AVR Control? No Yes Start putting the stand by transformer in service Equalize the tap positions of the stand by transformers and the transformers in service. Start synchronizing function of CB. Synch. Close? No Yes Close Stand-by transformer End Figure 8: Simplified logic of stand-by transformer closing sequence.

7 T801 Unit Protection Trip A811 Open A812 Open A608 Open Start Sequence T801 Figure 9: Simplified logic of stand-by transformer closing sequence initiation module. FCCS Ready t Start Sequence T802 Start Sequence T803 Start Sequence T804 S SET Start Closing Sequence of A608 Q t R CL R A608 Sync. On hold Q T801 in Stand-by BC1 Closed BC2 Closed BS1 Closed BS2 Closed Blocking Active T801 Tap position Equalized Figure 10: Second logic module of stand-by transformer closing sequence initiation. Start Sequence T801 Start Sequence T802 Start Sequence T801 Start Sequence T803 Blocking Active Start Sequence T801 Start Sequence T804 Start Sequence T802 Start Sequence T803 Start Sequence T802 Start Sequence T804 Start Sequence T803 Start Sequence T804 T801 Non Unit Protection Trip T802 Non Unit Protection Trip T803 Non Unit Protection Trip T804 Non Unit Protection Trip Bus Coupler Protection Trip Bus Section Protection Trip Busbar Protection Trip FCCS Off Figure 11: Blocking logic module of stand-by transformer closing sequence initiation.

8 It has to be also clarified that the transformer On Load Tap Changing Control is set, in our case, to homing mode. Homing mode is applied when a utility may want to retain a spare hot transformer that can be immediately connected to the busbar and included in the parallel control function because OLTC position is always synchronised with the parallel transformers in service. Homing facility can be applied to one or more transformers with LV circuit breaker open, which are nominated as part of the parallel transformer group. Tap position on the disconnected transformer is maintained so that its open circuit secondary terminal voltage follows the average set point voltage of the connected parallel group. FCCS is also designed to include modules for tap changers control to handle the tap position of the stand by transformer after being connected to the bus bar following tripping of any transformer in service. The logic is working in accordance with the following principles: Topology based logic is used to check if there is valid parallel operation conditions for power transformer. The control will be active only during the execution of closing sequence of stand by transformer or when the transformer is in stand-by. As already explained the design and engineering process of the FCCS logic is achieved to part the logic over different modules. This allows the system to be modular and could be implemented in one or more IEDs that will house all the logic modules or each of the modules, separately. This gives the designer more than one option for implementation. The designer can then choose the option that fits the application the most, increasing reliability by using more than one IED, however, in this case, doubling the cost of implementation. A lot of considerations will drive the implementation. 3. Implementation and Application We proposed to implement all the logic in one Intelligent Electronic Device (IED) which is ABB REC670. The hardware intended to be used for FCCS shall be 4 instances of synchrocheck, and synchronizing (one per each transformer), 4 instances of automatic voltage control for tap changer parallel control (one per each transformer), 4 instances of tap changer control and supervision with BCD coded input (one per each transformer) in addition to the other basic functions. Input /output modules will be sufficient to accommodate the required process interface signals, e.g. FCCS On/Off, Status signals, etc. The following user interface facility shall be provided Local interface at FCCS panel: FCCS ON/OFF selector switch: Used to activate /deactivate the entire system. Test ON/OFF: Used to set the system at test mode by disabling the output to the process. Local /Remote: Used to activate test mode when in local. SAS interface at station and network control level: FCCS ON/OFF command: Used to activate /deactivate the entire system. The command will be active only if the local /remote switch at FCCS panel is set to Remote position. The logic is foreseen to complete all its steps in less than 200 msec, excluding the time necessary for the tap changing equalizing. Any output contact on this REC670 operates in less than 1 msec [1]. This means that if we assume the tap changing takes around 10 seconds in total, there will be a total time of not more than 11 seconds of supply interruption due to the loss of one power transformer. The logic is tailored in the IED using the Application Configuration tool [2]. We are showing an example of the how the logic is implemented below (Figure 12, 13 14). Here are examples, of the synchronizing, tap changing and close command logic blocks. Figure 12: Example of logic implementation using the IED Application configuration tool: Synchronizing logic blocks.

9 Figure 13: Example of logic implementation using the IED Application configuration tool: Issuing of Closing command. Figure 14: Example of logic implementation using the IED Application configuration tool: Tap changing logic blocks. 4. Testing the FCCS As a prototype system, the first edition of FCCS went under extensive testing. The testing was divided into two stages: I) Logic testing and troubleshooting. The logic was downloaded to the IED and it was tested on bench. All inputs were actuated and were proving that the logic acts as designed to achieve its function, while recording times. Different scenarios are tabulated to indicate which inputs should be active and which should not, to emulate the actual operating real time scenario. Test sets were used to inject secondary voltages to provide simulation of analogue voltage measurements. This helped verify the logic design and pin-pointed human errors which were corrected in the logic.

10 II) Overall integrated system testing. All operating scenarios were tested again, but this time, using the IED in panel and while simulating the analogue and digital inputs. The system is proven in overall manner, meaning that IED is tested along with its connection with FCCS accessories and the external world. 5. Results and Conclusion All the tests proved the FCCS to be successful on bench and in panel surroundings, as designed and engineered. The times recorded were promising indicating operating times much below 150 msec in total, excluding the tap changing and circuit breaker closing times. For sake of argument it is assumed that the FCCS logic will add 200 msec to the total operation time, in order to be able to estimate the time expected for the transformer outage replacement. This means that the system successfully fulfils the utility requirement of minimizing the time the other transformers are overloaded for. Currently, the system will be commissioned and the plan is to put it into service very soon. 6. Future improvements and suggestions It is suggested that improvements can be guided in two directions. The first would be having all signals on IEC This means, for example, that transformer protection signals would be multicasted from the Protection IEDs, the status signals would be sent from the bay control units and the tap changing signals could be exchanged with the remote tap changing control IEDs. This improvement would save all the hardwiring cables which will mean more cost saving. The second improvement would be distributing the logic over more than one IED. For example, we can have each transformer modules in different IEDs. This will increase the reliability of the system by making the system more redundant. There is also a possibility of having this logic added to the tap changing control IEDs which are of the same type. This will also help reduce the cost of dedicated IED(s). Different future implementations are shown below (Figure 15 16). T801 Logic Modules T802 Logic Modules T803 Logic Modules T804 Logic Modules Figure 15: Future Improvements: Distributing the logic modules over more than one IED to achieve redundancy and increase reliability of system.

11 BCU-1 BCU-2 BCU-3 BCU-n AVR-1 AVR-2 AVR-3 AVR-4 IEC FCCS IED IEC Prot. IED-1 Prot. IED-2 Prot. IED-3 Prot. IED-4 Prot. IED-5 Prot. IED-6 Prot. IED-n Figure 16: Future Improvements: Utilizing IEC61850 Substation Automation messaging to exchange status and commands between the FCCS IED and the rest of substation IEDs instead of hardwiring all signals, to reduce cost. 7. References [1] Bay Control REC Product guide, ABB, 1MRK BEN A. [2] Protection and Control IED Manager PCM600 Getting Started Guide, ABB, 1MRS

REB500 TESTING PROCEDURES

REB500 TESTING PROCEDURES Activate HMI 500/REBWIN ver 6.10 or 7.xx. The following screen will appear. Check out the Read Only box & type the password System. Click ok. Connect the black communication cable from the Com port until

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard KENYA STANDARD KS 1859-5:2010 ICS 29.240.01 Electrical power transmission and distribution High-voltage operating regulations Part 5: Standard procedure and terminology for the issuing of operating instructions

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

Transformer protection IED RET 670

Transformer protection IED RET 670 Gunnar Stranne Transformer protection IED RET 670 Santiago Septiembre 5, 2006 1 Transformer protection IED RET670 2 Introduction features and applications Differential protection functions Restricted Earth

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

Impedance protection on power transformer.

Impedance protection on power transformer. Impedance protection on power transformer www.siemens.com/siprotec5 SIPROTEC 5 Application Impedance Protection on Power Transformer APN-045, Edition 1 Content 1...3 1.1 Introduction...3 1.2 Application

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

DG TRANSFER CONNECTION SCHEME IN ACTIVE DISTRIBUTION NETWORKS

DG TRANSFER CONNECTION SCHEME IN ACTIVE DISTRIBUTION NETWORKS DG TRANSFER CONNECTION SCHEME IN ACTIVE DISTRIBUTION NETWORKS Abdelrahman AKILA Ahmed HELAL Hussien ELDESOUKI SDEDCO Egypt AASTMT Egypt AASTMT Egypt Abdurrahman.akela@gmail.com ahmedanas@aast.edu hdesouki@aast.edu

More information

Unit 2. Single Line Diagram of Substations

Unit 2. Single Line Diagram of Substations Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission

More information

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Alexander Apostolov AREVA T&D Automation I. INTRODUCTION The electric utilities industry is going through significant

More information

A short introduction to Protection and Automation Philosophy

A short introduction to Protection and Automation Philosophy Training Center A short introduction to Protection and Automation Philosophy Philippe Goossens & Cédric Moors Training Center Contents Definitions and basic concepts Differential and distance protection

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

www. ElectricalPartManuals. com Transformer Differential Relay MD32T Transformer Differential Relay

www. ElectricalPartManuals. com Transformer Differential Relay MD32T Transformer Differential Relay Transformer Differential Relay The MD3T Transformer Differential Relay is a member of Cooper Power Systems Edison line of microprocessor based protective relays. The MD3T relay offers the following functions:

More information

Differential Protection with REF 542plus Feeder Terminal

Differential Protection with REF 542plus Feeder Terminal Differential Protection with REF 542plus Application and Setting Guide kansikuva_bw 1MRS 756281 Issued: 09.01.2007 Version: A Differential Protection with REF 542plus Application and Setting Guide Contents:

More information

The Advantages and Application of Three Winding Transformers

The Advantages and Application of Three Winding Transformers The Advantages and Application of Three Winding Transformers MSc, CEng, FIEE, FIMechE, FIPENZ Principal, Sinclair Knight Merz Abstract Although seldom used in Australia and New Zealand, three winding transformers

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

Power System Protection Manual

Power System Protection Manual Power System Protection Manual Note: This manual is in the formative stage. Not all the experiments have been covered here though they are operational in the laboratory. When the full manual is ready,

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

CP CU1. Coupling unit for line and ground testing

CP CU1. Coupling unit for line and ground testing CP CU1 Coupling unit for line and ground testing Line and ground test system CPC 100 The CPC 100 is a multifunctional test set for primary assets. When combined with the CP CU1 it covers the following

More information

Utility Interconnection and System Protection

Utility Interconnection and System Protection Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing

More information

Bus Protection Fundamentals

Bus Protection Fundamentals Bus Protection Fundamentals Terrence Smith GE Grid Solutions 2017 Texas A&M Protective Relay Conference Bus Protection Requirements High bus fault currents due to large number of circuits connected: CT

More information

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device ABB AG - EPDS The worldʼs fastest limiting and switching device Agenda The world s fastest limiting and switching device Customers Function: Insert-holder with insert Comparison: I S -limiter Circuit-breaker

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

System Protection Schemes in Power Network based on New Principles

System Protection Schemes in Power Network based on New Principles System Protection Schemes in Power Network based on New Principles Daniel Karlsson, ABB Automation Products AB S-721 59 Västerås, SWDN daniel.h.karlsson@se.abb.com Abstract This report describes how a

More information

Appendix D Fault Levels

Appendix D Fault Levels Appendix D Fault Levels Page 1 Electricity Ten Year Statement November 2013 D.1 Short Circuit Currents Short Circuit Currents Three phase to earth and single phase to earth short circuit current analyses

More information

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays

More information

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22 Why

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

SUPPLY OF CARRIER PROTECTION COUPLER TYPE NSD-50

SUPPLY OF CARRIER PROTECTION COUPLER TYPE NSD-50 (I) GENERAL : Indoor PLCC Equipments are required for important 400KV, 220KV and 132KV Sub/station for Speech, Data Transmission, Protection and Teleprinter Links. (II) GENERAL REQUIREMENT : The equipments

More information

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller

Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

The Polytransformer. The Multivoltage Substation Power Transformer

The Polytransformer. The Multivoltage Substation Power Transformer The Polytransformer The Multivoltage Substation Power Transformer The need for a single transformer for different transmission systems. Change of electric power industry to a fully competitive and deregulated

More information

Electronic Circuit Breaker ECONOMY REMOTE

Electronic Circuit Breaker ECONOMY REMOTE Electronic Circuit Breaker - Number of available output channels: 2 / 4 / 8 - Each channel has a 2-wire interface for adjusting the rated current - High capacitive loads start up reliably - The channels

More information

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction

More information

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids

More information

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and

More information

ALI UMAIR DETECTION ALGORITHM FOR THE CROSS COUNTRY EARTH FAULTS IN MEDIUM VOLTAGE NETWORK

ALI UMAIR DETECTION ALGORITHM FOR THE CROSS COUNTRY EARTH FAULTS IN MEDIUM VOLTAGE NETWORK ALI UMAIR DETECTION ALGORITHM FOR THE CROSS COUNTRY EARTH FAULTS IN MEDIUM VOLTAGE NETWORK Masters of Science Thesis Examiner: Professor Pertti Järventausta and Dr Tech. Ari Nikander Examiner and topic

More information

Earth Fault Protection

Earth Fault Protection Earth Fault Protection Course No: E03-038 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774

More information

EDS FAULT LEVELS

EDS FAULT LEVELS Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of

More information

Busbars and lines are important elements

Busbars and lines are important elements CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection

More information

Substation Testing and Commissioning: Power Transformer Through Fault Test

Substation Testing and Commissioning: Power Transformer Through Fault Test 1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of

More information

G. KOEPPL Koeppl Power Experts Switzerland

G. KOEPPL Koeppl Power Experts Switzerland PS3: Substation Design: New Solutions and Experiences Bus-Node Substation A Big Improvement in Short-Circuit and Switching Properties at Reduced Substation Costs G. KOEPPL Koeppl Power Experts Switzerland

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

Power Station Electrical Protection A 2 B 2 C 2 Neutral C.T E M L } a 2 b 2 c 2 M M M CT Restricted E/F Relay L L L TO TRIP CIRCUIT Contents 1 The Need for Protection 2 1.1 Types of Faults............................

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS 1 B. RAMESH, 2 K. P. VITTAL Student Member, IEEE, EEE Department, National Institute of Technology Karnataka,

More information

Automatic Load Sharing of Transformers using Microcontroller

Automatic Load Sharing of Transformers using Microcontroller Automatic Load Sharing of Transformers using Microcontroller Akhil Krishnan V 1, Arun P S 1, D Yathishan 1, Jomice Thomas 1, D K Narayanan 2 U.G. Students, Department of Electrical and Electronics Engineering,

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Automatic Transfer Switch (ATS) Using Programmable Logic Controller (PLC)

Automatic Transfer Switch (ATS) Using Programmable Logic Controller (PLC) Automatic Transfer Switch (ATS) Using Programmable Logic Controller (PLC) Dr. Hamdy Ashour Arab Academy for Science &Technology Department of Electrical & Computer Control Engineering P.O. 1029 Miami,

More information

Autotransformer Condition Monitoring Systems

Autotransformer Condition Monitoring Systems Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

Protection Scheme for Energy Storage Systems Operating in Island or Grid Connected Modes

Protection Scheme for Energy Storage Systems Operating in Island or Grid Connected Modes 24 th International Conference on Electricity Distribution Glasgow, 12-15 June 217 Paper 182 Protection Scheme for Energy Storage Systems Operating in Island or Grid Connected Modes Andre NEVES Bernardo

More information

Catalogue 1SFC en, Edition 3 November 2003 Supersedes Catalogue 1SFC en, Edition 2 November Arc Guard System TVOC

Catalogue 1SFC en, Edition 3 November 2003 Supersedes Catalogue 1SFC en, Edition 2 November Arc Guard System TVOC Catalogue 1SFC 266006-en, Edition 3 November 2003 Supersedes Catalogue 1SFC 266006-en, Edition 2 November 2000 Arc Guard System TVOC System units The two units of the are used as below: Approvals 1. with

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

Transformer energisation after network blackout

Transformer energisation after network blackout Transformer energisation after network blackout Impact on network restoration and improvement of its process ABSTRACT According to ENTSO-E Network policy 5, responsibility for system restoration after

More information

Line protection with transformer in the protection zone

Line protection with transformer in the protection zone Line protection with transformer in the protection zone www.siemens.com/siprotec5 Three-end line protection with transformer in the protection range SIPROTEC 5 Application Three-end line protection with

More information

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy UProtection Requirements Ufor a Large scale Wind Park Shyam Musunuri Siemens Energy Abstract: In the past wind power plants typically had a small power rating when compared to the strength of the connected

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY

More information

VOLTAGE CONTROL IN MEDIUM VOLTAGE LINES WITH HIGH PENETRATION OF DISTRIBUTED GENERATION

VOLTAGE CONTROL IN MEDIUM VOLTAGE LINES WITH HIGH PENETRATION OF DISTRIBUTED GENERATION 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http: //www.cigre.org 2013 Grid of the Future Symposium VOLTAGE CONTROL IN MEDIUM VOLTAGE LINES WITH HIGH PENETRATION OF DISTRIBUTED GENERATION

More information

Harmonic Distortion Levels Measured at The Enmax Substations

Harmonic Distortion Levels Measured at The Enmax Substations Harmonic Distortion Levels Measured at The Enmax Substations This report documents the findings on the harmonic voltage and current levels at ENMAX Power Corporation (EPC) substations. ENMAX is concerned

More information

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) 1MRS752324-MUM Issued: 3/2000 Version: D/23.06.2005 Data subject to change without notice PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) Contents 1. Introduction... 2 1.1

More information

Smart Grid Smarter Protection: Lessons Learned

Smart Grid Smarter Protection: Lessons Learned 1 Smart Grid Smarter Protection: Lessons Learned Kevin Damron and Randy Spacek Avista Utilities Abstract Avista embarked on a smart grid initiative through grants provided by the Department of Energy (DOE)

More information

2015 Relay School Bus Protection Mike Kockott March, 2015

2015 Relay School Bus Protection Mike Kockott March, 2015 2015 Relay School Bus Protection Mike Kockott March, 2015 History of Bus Protection Circulating current differential (1900s) High impedance differential (1940s) Percentage restrained differential (1960s)

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Electronic Circuit Breaker ECONOMY SMART. - Number of available output channels: 2 / 4 / 8

Electronic Circuit Breaker ECONOMY SMART. - Number of available output channels: 2 / 4 / 8 Electronic Circuit Breaker - Number of available output channels: 2 / 4 / 8 - Adjustable rated current for each channel - High capacitive loads start up reliably - The channels switch on sequentially and

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

Automatic reclosing function for high voltage networks

Automatic reclosing function for high voltage networks Automatic reclosing function for high voltage networks Budapest, December 2010. Automatic reclosing function for high voltage networks The HV automatic reclosing function for high voltage networks can

More information

Multilin DGT. Distributed Generation Trip Control Fast & Wireless Trip of Distributed Generators. Control. Advanced Communications

Multilin DGT. Distributed Generation Trip Control Fast & Wireless Trip of Distributed Generators. Control. Advanced Communications Multilin DGT Distributed Generation Trip Control Fast & Wireless Trip of Distributed Generators The desire for green power and rapid developments in renewable energy sources are driving the growth of distributed

More information

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS Hannu LAAKSONEN ABB Oy Finland hannu.laaksonen@fi.abb.com ABSTRACT Medium-voltage (MV) network short-circuit protection operation time delays have

More information

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions 1 Transmission transformers are important links in the bulk power system. They allow transfer of power from generation centers, up to the high-voltage grid, and to bulk electric substations for distribution

More information

INTEGRATED TRANSMISSION PLAN Glossary

INTEGRATED TRANSMISSION PLAN Glossary INTEGRATED TRANSMISSION PLAN Glossary SEPTEMBER 2017 GLOSSARY Term AC ACM asset health and asset health index (AHI) automatic underfrequency load shedding (AUFLS) availability bus cable capacitor bank

More information

TRAINING Learning and Training application on site. QUALIFYING Evaluation of quiz Knowledge Validation To learn required skills

TRAINING Learning and Training application on site. QUALIFYING Evaluation of quiz Knowledge Validation To learn required skills FIRST LOGIC Substation Automation Training Proficiency development training programme Client-precise. Excellence through certification on your requirements. First Logic substation automation institute

More information

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM BY MR. H. C. MEHTA AT 1 ST INDIA DOBLE PROTECTION AND AUTOMATION CONFERENCE, NOV 2008 POWER-LINKER Wisdom is not Virtue but Necessity hcmehta@powerlinker.org

More information

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements User s Guide General Most faults in power systems can be detected by applying

More information

AUTOMATIC METHOD OF PROTECTING TRANSFORMER USING PIC MICROCONTROLLER AS AN ALTERNATIVE TO THE FUSE PROTECTION TECHNIQUE A. Z. Loko 1, A. I. Bugaje 2, A. A. Bature 3 1 Department of Physics Electronics/Nasarawa

More information

THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES

THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES C.E.T. Foote*, G.W. Ault*, J.R. McDonald*, A.J. Beddoes *University of Strathclyde, UK EA Technology Limited, UK c.foote@eee.strath.ac.uk

More information

ENOSERV 2014 Relay & Protection Training Conference Course Descriptions

ENOSERV 2014 Relay & Protection Training Conference Course Descriptions ENOSERV 2014 Relay & Protection Training Conference Course Descriptions Day 1 Generation Protection/Motor Bus Transfer Generator Protection: 4 hours This session highlights MV generator protection and

More information

High speed bus transfer function block description Operation Manual

High speed bus transfer function block description Operation Manual Operation anual FDE Rev.A Page 2 sur 27 User s manual version information Version Date odification Compiled by Version 1.0 30.06.2016. First edition Kiss - Petri A 15/06/2017 Change cover and diffusion

More information

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 5th October 2010 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information