1 Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017

2 Traffic Presentation Topics 2 Traffic Volumes on I-710 Congestion on I-710 Vehicle Miles Traveled (VMT) and Hours of Delay (VHD) Study Area Intersections - Delay I-710 Congestion Relief Program

3 Key Inputs / Underlying Assumptions 3 Maximum Goods Movement by Freight Rail Active Transportation / Sustainable Communities Strategies (GCCOG Area) TSM / TDM / ITS Improvements Transit Improvements I-710 Freeway Design and Operational Improvements Freight Corridor (Alt. 7 only)

4 Total Vehicles: I-710 Corridor 4 Daily Volumes SR-60 I-5 I-105 SR-91 I-405 4

5 Total Autos: I-710 Corridor 5 Daily Volumes SR-60 I-5 I-105 SR-91 I-405 5

6 Total Trucks: I-710 Corridor 6 Daily Volumes SR-60 I-5 I-105 SR-91 I-405 6

7 Alt. 7 Trucks: I-710 & Freight Corridor 7 Daily Volumes Freight Corridor Ends SR-60 I-5 I-105 SR-91 I-405 Freight Corridor Begins 7

8 Alt. 7 Trucks: I-710 & Freight Corridor 8 Percentage Share of Daily Trucks SR-60 I-5 I-105 SR-91 I-405 Freight Corridor Ends Freight Corridor Begins 8

9 Alt. 7 Trucks: Freight Corridor (NB) 9 Port Trucks Transload-Secondary Domestic-Intermodal Domestic-Other Daily Volumes (Northbound) 9

10 Alt. 7 Trucks: Freight Corridor (SB) 10 Port Trucks Transload-Secondary Domestic-Intermodal Domestic-Other Daily Volumes (Southbound) 10

11 Existing 3 rd 3 rd 3 rd Washington Washington Washington Atlantic-Bandini Atlantic-Bandini Atlantic-Bandini I-710 General Purpose Lanes Slauson Florence Firestone Slauson Florence Firestone Slauson Florence Firestone Peak Hour LOS Imperial Imperial Imperial (HCS Analysis / Observed Speeds) Rosecrans Alondra 91 Rosecrans Alondra 91 Rosecrans Alondra 91 Long Beach Long Beach Long Beach Del Amo Del Amo Del Amo Level of Service LOS D or Better Willow Willow Willow LOS E PCH PCH PCH LOS F Anaheim Pico AM Anaheim Pico MD Anaheim Pico PM

12 Alt. 1 3 rd 3 rd 3 rd Washington Washington Washington Atlantic-Bandini Atlantic-Bandini Atlantic-Bandini I-710 General Purpose Lanes Slauson Florence Firestone Slauson Florence Firestone Slauson Florence Firestone Peak Hour LOS Results Imperial Rosecrans Imperial Rosecrans Imperial Rosecrans (HCS Analysis) Alondra 91 Alondra 91 Alondra 91 Long Beach Long Beach Long Beach Del Amo Del Amo Del Amo Level of Service LOS D or Better Willow Willow Willow LOS E PCH PCH PCH LOS F Anaheim Pico AM Anaheim Pico MD Anaheim Pico PM

13 Alt. 5C 3 rd 3 rd 3 rd Washington Washington Washington Atlantic-Bandini Atlantic-Bandini Atlantic-Bandini I-710 General Purpose Lanes Slauson Florence Firestone Slauson Florence Firestone Slauson Florence Firestone Peak Hour LOS Results Imperial Rosecrans Imperial Rosecrans Imperial Rosecrans (HCS Analysis) Alondra 91 Alondra 91 Alondra 91 Long Beach Long Beach Long Beach Del Amo Del Amo Del Amo Level of Service LOS D or Better Willow Willow Willow LOS E PCH PCH PCH LOS F Anaheim Pico AM Anaheim Pico MD Anaheim Pico PM

14 Alt. 7 3 rd 3 rd 3 rd Washington Washington Washington Atlantic-Bandini Atlantic-Bandini Atlantic-Bandini I-710 General Purpose Lanes Slauson Florence Firestone Slauson Florence Firestone Slauson Florence Firestone Peak Hour LOS Results Imperial Rosecrans Imperial Rosecrans Imperial Rosecrans (HCS Analysis) Alondra 91 Alondra 91 Alondra 91 Long Beach Long Beach Long Beach Del Amo Del Amo Del Amo Level of Service LOS D or Better Willow Willow Willow LOS E PCH PCH PCH LOS F Anaheim Pico AM Anaheim Pico MD Anaheim Pico PM

15 Vehicle Miles Traveled (VMT) 15 Changes in Daily VMT (in millions) I-710 Study Area SCAG Region Existing Alt. 1 (No Build) Difference % Change 6.7% 24.4% Alt. 1 (No Build) Alternative 5C Difference % Change 1.8% 0.1% Alt. 1 (No Build) Alternative Difference % Change 2.7% 0.1%

16 Vehicle Hours of Delay (VHD) 16 Changes in Delay (Daily Hours of Delay) I-710 Study Area Existing 83,500 Alt. 1 (No Build) 105,800 Difference 22,300 Increase / Decrease % Change 26.7% Alt. 1 (No Build) 105,800 Alternative 5C 102,400 Difference (3,400) % Change - 1.8% Alt. 1 (No Build) 105,800 Alternative 7 99,400 Difference (6,400) % Change - 2.7%

17 Congested Intersections (AM Pk Hr) 17 No. of Intersections Analyzed No. of Intersections with LOS E or F Existing Alt. 1 Alt. 5C Alt. 7

18 Congested Intersections (PM Pk Hr) 18 No. of Intersections Analyzed No. of Intersections with LOS E or F Existing Alt. 1 Alt. 5C Alt. 7

19 Thresholds for Impacts 19 Applied to the AM, MD and PM Peak Hours: If the intersection is projected to operate at LOS E in the build scenario and the increase in delay is 5 seconds or more. If the intersection is projected to operate at LOS F in the build scenario and the increase in delay is 2 seconds or more. If the intersection is projected to operate at LOS D or better under the No Build Alternative and degrades to LOS E or F under the build scenario.

20 Impacted Intersections (South Half) 20 Pre-Mitigation 20

21 Impacted Intersections (North Half) 21 Pre-Mitigation 21

22 Traffic Mitigation 22 Traffic Signals Access Management (TSM Measures) Signal Phasing / Coordination Restriping / Lane Reconfiguration Added Turning Lanes / Turning Lane Storage

23 Impacted Intersections 23

24 I-710 Congestion Relief Program 24

25 25 Addresses the No Build Traffic Condition No. of Intersections Analyzed No. of Intersections with LOS E or F Existing Alt. 1 Alt. 5C Alt. 7 PM Peak Hour (Year 2035)

26 I-710 Congestion Relief Program 26 Funding Program: Improve Traffic Safety Accommodate Projected Traffic Volumes Address Increased Traffic Delay resulting from projected growth in Population, Employment, and Economic Activities related to Goods Movement

27 I-710 Congestion Relief Program 27 Geographic Scope: Facilities must be located in the I-710 Project Study Area Intersections must be one of the I-710 Study Intersections with LOS E or worse in the 2035 No Build Condition Would involve locations on the arterial system beyond Caltrans ROW that are subject to local decision-making

28 I-710 Congestion Relief Program 28 Eligible Projects: Traffic Signal Upgrade, Timing, or Synchronization Traffic Surveillance Traffic Signal Coordination Safety Improvements that Reduce Incident Delay Restriping to Add Additional Turning Lanes or Storage at the Intersection Spot-Widening to Add Additional Turning Lanes or Storage at the Intersection Channelization, Shoulders, Turn-Outs, Two-Way Left Turn Lanes Curve Corrections / Improve Alignment Signing, Striping, Access Management or Traffic Control Measures for Purposes of Traffic Calming

29 I-710 Congestion Relief Program 29 Program Administration: Metro, in cooperation with the Gateway Cities COG Eligible Recipients / Implementing Agencies or Organizations: Cities County of Los Angeles (unincorporated areas)

30 I-710 Congestion Relief Program 30 Additional Criteria: Eligible projects/improvements must be consistent with the funding guidelines and requirements established by Metro under Measure R and Measure M. Any proposed improvements should account for the safe movement of bicycles and pedestrians (i.e., be consistent with Complete Streets principles.) Arterial or street widenings that would involve added through lanes beyond spot-widening at intersections are not eligible.

31 Future Deficient Intersections 31 Future I-710 No Build Traffic Conditions (Year 2035) Number of Intersections Analyzed 174 Number of Intersections Projected to Operate at LOS E or worse, in at least one of the Peak Hours (AM, MD or PM) 78

32 Future Deficient Intersections 32 No Build Traffic Conditions 32

33 Future Deficient Intersections 33 No Build Traffic Conditions 33

34 Future Deficient Intersections 34 Recommended Improvements: Signal Phasing / Coordination Restriping / Lane Reconfiguration Added Turning Lanes / Turning Lane Storage Improves Delay at Deficient Intersections to LOS D or Better

35 Recommended Improvements 35 Example Page Page 1 of 6 Analyzed using HCM procedures ( Synchro 8)

36 Recommended Improvements 36 Example Page Figure 6 of 7 36

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

Appendix A. Congestion Management Process

Appendix A. Congestion Management Process Appendix A Congestion Management Process CONGESTION MANAGEMENT PROCESS NORTHEASTERN INDIANA REGIONAL COORDINATING COUNCIL This report represents an update of the activities documenting the development

More information

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

Preparing for an Uncertain Future:

Preparing for an Uncertain Future: : for a Greater Baltimore Region DRAFT Maximize2040 is an initiative of the Baltimore Regional Transportation Board, the metropolitan planning organization for the Baltimore region. 1 SCENARIO THINKING:

More information

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets By: Marty Amundson, PE, TE, PTOE Eugene Bachtinov, P.E. Jonathan Hofert, PE, TE, PTOE Metro Provides Excellence in Service

More information

TCAG Annual Intersection Monitoring Program

TCAG Annual Intersection Monitoring Program TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT

More information

Georgia s Regional Traffic Operations Program

Georgia s Regional Traffic Operations Program Georgia s Regional Traffic Operations Program Shahram Malek, PhD, PE Vice President, ARCADIS US Inc. Regional Traffic Operations Project Manager Koushik Arunachalam, PE Associate Project Manager, ARCADIS

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

TCAG Annual Intersection Monitoring Program

TCAG Annual Intersection Monitoring Program TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT

More information

Appendix C HCS 7 ANALYTICAL REPORTS: MITIGATED SIGNALIZED AND NON-SIGNALIZED INTERSECTIONS. Draft

Appendix C HCS 7 ANALYTICAL REPORTS: MITIGATED SIGNALIZED AND NON-SIGNALIZED INTERSECTIONS. Draft Appendix C HCS 7 ANALYTICAL REPORTS: MITIGATED SIGNALIZED AND NON-SIGNALIZED INTERSECTIONS HCS7 All-Way Stop Control Report Site Information Analyst M Hays Intersection Mulberry Ave @ Newcomb St Agency/Co.

More information

Pacificans for Highway 1 Alternatives c/o Hal Bohner

Pacificans for Highway 1 Alternatives c/o Hal Bohner Pacificans for Highway 1 Alternatives c/o Hal Bohner 1 1 5 A n g e l i t a A v e n u e P a c i f i c a, C A 9 4 0 4 4 phone 650-359-4257 hbohner@earthlink.net Via Email September 6, 2012 Mr. Bijan Sartipi

More information

The Shoppes at Forney Crossings

The Shoppes at Forney Crossings F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"

More information

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis 3.0 TRAFFIC IMPACTS 3.1 TRIP GENERATION To assess the impacts that the project may have on the surrounding streets, the first step was to determine Project trip generation. Project trip generation is shown

More information

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Model Deployment Overview Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Test Conductor Team 2 3 Connected Vehicle Technology 4 Safety Pilot Model Deployment

More information

1050 Page Mill Road Office Development

1050 Page Mill Road Office Development 1050 Page Mill Road Office Development Transportation Impact Analysis Prepared for: 1050 Page Mill Road Property, LLC April 15, 2015 Hexagon Office: 2 N. Second Street, Suite 400 San Jose, CA 95113 Hexagon

More information

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT Justin Effinger, EIT Research Assistant/Teaching Assistant Department of Civil Engineering & Mechanics University of Wisconsin Milwaukee

More information

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout

More information

City of St. Petersburg Planning & Visioning Commission October 11, 2011

City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Speakers Bureau City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Project Purpose A study identifying transit options

More information

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned ARIZONA CONNECTED VEHICLE PROGRAM Arterial Connected Vehicle Test Bed Deployment and Lessons Learned Faisal Saleem ITS Branch Manager & SMARTDrive Program Manager Maricopa County Department of Transportation

More information

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC. NCTCOG Regional Travel Model Improvement Experience in 2009 and Data Management Presented to TMIP VMTSC December 7, 2009 Presenters Kathy Yu Senior Modeler Arash Mirzaei Manager Model Group Behruz Paschai

More information

A. INTRODUCTION PRINCIPAL CONCLUSIONS

A. INTRODUCTION PRINCIPAL CONCLUSIONS Chapter 16: Traffic and Parking A. INTRODUCTION This chapter examines the potential traffic and parking impacts of the proposed development of the Fresh Kills Park project. The analysis of the proposed

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010 I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third

More information

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: 2552-03-058 EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018 Hearing Information

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

Abilene District Traffic Signal Timing and Capacity Analysis

Abilene District Traffic Signal Timing and Capacity Analysis Abilene District Traffic Signal Timing and Capacity Analysis 2017 IAC Report Task-45 TransTech Lab, TechMRT Hongchao Liu, Ph.D., P.E. Jason (Bo) Pang, Ph.D. Ariel Castillo-Rodriguez, E.I.T. I Table of

More information

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS.

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. Benjamin A. Coifman, Associate Professor Department of Civil and Environmental Engineering and Geodetic Science Department

More information

Charlton/Oxford Route 20 Reconstruction Project

Charlton/Oxford Route 20 Reconstruction Project Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting

More information

MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M.

MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M. MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M. CALL TO ORDER ROLL CALL Chair Palmer called the meeting to order at 3:34 p.m. The following persons were

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

Agenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works

Agenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works Agenda Item No. August 28, 2007 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David Van Kirk, City Manager Dale I. Pfeiffer, Director of Public Works RESOLUTION TO ADOPT A MITIGATED NEGATIVE

More information

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate

More information

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation

More information

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S WHITE PAPER BENEFITS OF OPTICOM GPS Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S 2 CONTENTS Overview 3 Operation 4 Advantages of Opticom GPS 5 Opticom GPS

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 This independent report of findings, including data entry and analysis of all the consultation

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,

More information

Appendix G. Visual Simulations and Illustrations

Appendix G. Visual Simulations and Illustrations Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99

More information

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road)

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road) Adaptive Signal System Mt. Juliet, TN SR-171 (Mt. Juliet Road) Project Background Project Location Mt. Juliet, TN: 2015 Census: 28,159 Doubled since 2000 Immediately east of Metro Nashville Mt. Juliet

More information

Modeling Emerging Technology and Travel Behavior

Modeling Emerging Technology and Travel Behavior Modeling Emerging Technology and Travel Behavior presented by Marty Milkovits December 7, 2016 Agenda Review Emerging Technology, Trends, and Travel Behavior Study Background and Objectives Scenarios Developed

More information

Technical Advisory Committee MINUTES

Technical Advisory Committee MINUTES Technical Advisory Committee Wednesday, October 10, 2018 MINUTES CALL TO ORDER The Regular Meeting of the Technical Advisory Committee (TAC) was called to order at 1:30 p.m. by Chairperson Morley in Conference

More information

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING Draft January 2013 TIER TWO SCREENING REPORT November 2012 Parsons Brinckerhoff DRAFT November 2012 1 Parsons Brinckerhoff DRAFT November 2012-2

More information

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES ITS California Technical Session 9 - Innovative Technology for Local Cities Thursday, October 16, 2014 Mark Taylor, P.E., PTOE Traffic Signal Operations Engineer

More information

FM 691 CORRIDOR STUDY

FM 691 CORRIDOR STUDY FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289

More information

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Four Case Studies Agenda Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Traffic diversion caused by capacity reduction (Fort Lauderdale, FL) Impacts on traffic due

More information

A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS

A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS 0 0 A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS Rasool Andalibian (Corresponding Author) PhD Candidate Department of Civil and Environmental Engineering University of Nevada,

More information

OFFERING MEMORANDUM FOR SALE INDUSTRIAL MULTI-TENANT LEASED INVESTMENT PROPERTY. Mollie Shea Dietsch 98,757 SF BUILDING ON 149,846 SF OF LAND

OFFERING MEMORANDUM FOR SALE INDUSTRIAL MULTI-TENANT LEASED INVESTMENT PROPERTY. Mollie Shea Dietsch 98,757 SF BUILDING ON 149,846 SF OF LAND FOR SALE INDUSTRIAL MULTI-TENANT LEASED INVESTMENT PROPERTY 98,757 SF BUILDING ON 149,846 SF OF LAND COMMERCE, CALIFORNIA 90040 OFFERING MEMORANDUM PREPARED BY Mollie Shea Dietsch Senior Vice President

More information

Battery saving communication modes for wireless freeway traffic sensors

Battery saving communication modes for wireless freeway traffic sensors Battery saving communication modes for wireless freeway traffic sensors Dr. Benjamin Coifman (corresponding author) Associate Professor The Ohio State University Joint appointment with the Department of

More information

PHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground

PHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground ARCADIA LOGISTICS CENTER ARCADIA, CALIFORNIA PHASE II FOR LEASE 3 BUILDINGS +-150,672 SF TO +- 529,179 SF STATE OF THE ART DEVELOPMENT ˑ ADJACENT TO I-605, BETWEEN I-10 AND I-210 ˑ LEED SILVER DEVELOPMENT

More information

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010 I-405 Sepulveda Pass Improvements Project Quarterly Community Meeting December 9, 2010 1 Project Boundaries Southern boundary from National Bl. south to the Santa Monica-Rosa Parks Freeway (I-10) Northern

More information

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Peter Xin, P.Eng. Senior Transportation Engineer Policy

More information

Appendix B: Noise Study

Appendix B: Noise Study Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal

More information

Traffic Signal System Upgrade Needs

Traffic Signal System Upgrade Needs Traffic Signal System Upgrade Needs Presented to: Dallas City Council November 20, 2013 DEPARTMENT OF STREET SERVICES Purpose The City of Dallas has a program to achieve and maintain street pavement condition

More information

APPENDIX M NOISE ANALYSIS

APPENDIX M NOISE ANALYSIS APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

2016 CMP MONITORING AND CONFORMANCE REPORT

2016 CMP MONITORING AND CONFORMANCE REPORT 2016 CMP MONITORING AND CONFORMANCE REPORT TABLE OF CONTENTS EXECUTIVE SUMMARY 5 1 INTRODUCTION 8 2 LAND USE 10 3 CMP INTERSECTIONS 19 4 FREEWAYS 40 5 RURAL HIGHWAYS 90 6 EXPRESSWAY STUDY 96 7 BICYCLE

More information

Chapter 3 Business and Industrial Development

Chapter 3 Business and Industrial Development Chapter 3 Business and Industrial Development Existing Business/Industrial Development Bayview Ridge is a unique area with respect to economic development opportunities. The growth of industry around the

More information

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG The WISE Experience Association of Monterey Bay Area Governments (AMBAG) September 20, 2017 Bhupendra Patel, Ph.D. Director of Modeling, AMBAG Paul Ricotta, P.E. Principal Transportation Engineer, Caliper

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

The GATEway Project London s Autonomous Push

The GATEway Project London s Autonomous Push The GATEway Project London s Autonomous Push 06/2016 Why TRL? Unrivalled industry position with a focus on mobility 80 years independent transport research Public and private sector with global reach 350+

More information

Signal Coordination for Arterials and Networks CIVL 4162/6162

Signal Coordination for Arterials and Networks CIVL 4162/6162 Signal Coordination for Arterials and Networks CIVL 4162/6162 Learning Objectives Define progression of signalized intersections Quantify offset, bandwidth, bandwidth capacity Compute progression of one-way

More information

SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS

SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS Chao Chen* EECS Department University of California, Berkeley, 94720 Tel: (510)643-5894; Fax: (510)643-2356 chaos@eecs.berkeley.edu Alexander Skabardonis

More information

Single Point Urban Interchange (SPUI) with Signals

Single Point Urban Interchange (SPUI) with Signals 1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large

More information

Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data

Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data By Somaye Fakharian Qom Ph.D candidate and Research Assistant Department

More information

CTA Blue Line Forest Park Branch Feasibility/Vision Study

CTA Blue Line Forest Park Branch Feasibility/Vision Study CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!

More information

Noise Study Report. Addendum. Interstate 10 Corridor Project. In the Counties of San Bernardino and Los Angeles

Noise Study Report. Addendum. Interstate 10 Corridor Project. In the Counties of San Bernardino and Los Angeles Interstate 10 Corridor Project Draft NSR Addendum Noise Study Report Addendum Interstate 10 Corridor Project In the Counties of San Bernardino and Los Angeles 07-LA-10 PM 44.9/48.3 08-SBD-10 PM 0.0/R37.0

More information

Frequently Asked Questions

Frequently Asked Questions The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450

More information

Managing traffic through Signal Performance Measures in Pima County

Managing traffic through Signal Performance Measures in Pima County CASE STUDY Miovision TrafficLink Managing traffic through Signal Performance Measures in Pima County TrafficLink ATSPM Case Study Contents Project overview (executive summary) 2 Project objective 2 Overall

More information

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER P:\Transportation\RTP2030\Maps_Images\Map2-1.mxd Map 2-1: Capacity Projects, Thurston County, WA UV 8 12 LITTLEROCK RD SW HWY 8 173RD AVE SW OLD HWY 99 CONFEDERATED TRIBES OF THE CHEHALIS RESERVATION JAMES

More information

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Impacts of Traveler Information on the Overall Network FINAL REPORT Prepared by September 2012 i 1. Report No. ENT-2012-2 2. Government Accession

More information

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Background Objective Introduction Roadway Lighting Literature Review Study Area Data Illuminance, Crash, and Roadway

More information

EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED

EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED 4 Dec 2013 Pawan Mulukutla, MS Project Manager - EMBARQ India (pmulukutla@embarqindia.org ) Priyanka Vasudevan, MURP

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project Expressway Operations Improvement Project (TRTA SRI 50299) I. Background TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project 1. The

More information

Study Description. November 29, Overpass Road Alternatives Public Workshop

Study Description. November 29, Overpass Road Alternatives Public Workshop Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

Coastside Fire Protection District

Coastside Fire Protection District Folsom (Sacramento), CA Management Consultants Fire Station Relocation Study for the Coastside Fire Protection District Volume 1 of 2 Main Report February 19, 2014 www.ci.pasadena.ca.us 2250 East Bidwell

More information

EDUCATION COOPERATION UNIFORMITY

EDUCATION COOPERATION UNIFORMITY How Has Traffic Reporting Changed?, pg 1 EDUCATION COOPERATION UNIFORMITY $583M I-215 Project Begins, pg 3 The Official Newsletter of the Orange County Traffic Engineers Council SEPTEMBER 2009 PROGRAM

More information

Assessing the Performance of Integrated Corridor Management (ICM) Strategies

Assessing the Performance of Integrated Corridor Management (ICM) Strategies Assessing the Performance of Integrated Corridor Management (ICM) Strategies Matt Burt, Battelle Research and Evaluation Session, NATMEC 2012 June 7, 2012 1 Presentation Outline The U.S. DOT ICM Program

More information

NETWORKING LUNCH BREAK. LNL Starts Promptly at 12:15. Exchange Cards What s going on with new project? Meet Someone New

NETWORKING LUNCH BREAK. LNL Starts Promptly at 12:15. Exchange Cards What s going on with new project? Meet Someone New NETWORKING & LUNCH BREAK LNL Starts Promptly at 12:15 Exchange Cards What s going on with new project? Meet Someone New Presentation Speakers: David Woosley City of Lawrence Public Works Jessica Upchurch

More information

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017 LAND FOR SALE DEVELOPMENT OPPORTUNITY St. Louis, Missouri 63121 JUNE 2017 GWEN KNIGHT (D) +1 314 932 4096 (M) +1 314 422 0467 gwen.knight@colliers.com Table of Contents Offering Summary pg. 4-8 District

More information

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017 Plan Peoria AZ 2040 General Plan Update Public Workshop #2: Presentation June 5, 2017 Introductions City of Peoria Planning Staff Chris Jacques, AICP Planning Director Lorie Dever Senior Planner (Project

More information

Unincorporated Hawthorne - Alondra Park STUDY AREA PROFILE

Unincorporated Hawthorne - Alondra Park STUDY AREA PROFILE Unincorporated Hawthorne - Alondra Park STUDY AREA PROFILE STUDY AREA ID #34 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES

More information

Folly Rd. - Former Roller Rink Retail / Warehouse / Land Lease / BTS

Folly Rd. - Former Roller Rink Retail / Warehouse / Land Lease / BTS Folly Rd. - Former Roller Rink Retail / Warehouse / Land Lease / BTS 1523 Folly Rd. Charleston, SC 29412 Sq Ft: 16,000 Price: $5.99 PSF (Annual) NNN Lease TRAFFIC COUNT: 24,100 VPD DEMOGRAPHICS 1 Mile

More information

TRB Innovations in Travel Modeling Atlanta, June 25, 2018

TRB Innovations in Travel Modeling Atlanta, June 25, 2018 Using an Activity-Based Model with Dynamic Traffic Simulation to Explore Scenarios for Private and Shared Autonomous Vehicle Use in Jacksonville with TRB Innovations in Travel Modeling Atlanta, June 25,

More information

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details Georgia Department of Transportation Automated Traffic Signal Performance Measures Prepared for: Georgia Department of Transportation 600 West Peachtree Street, NW Atlanta, Georgia 30308 Prepared by: Atkins

More information

APPENDIX 4.8 Transportation Impact Study

APPENDIX 4.8 Transportation Impact Study APPENDIX 4.8 Transportation Impact Study Prepared for: Submitted by:, CA 95 El Dorado Hills Town Center Apartments Transportation Impact Study - Revised Draft June 207 Table of Contents.0 INTRODUCTION.....3

More information