1 Attachment #2 PPW Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements required for the Tremaine Road and James Snow Parkway transportation corridors, in the Town of Milton, pursuant to the Municipal Class EA process, to the year This study is also intended to accommodate Provincial Class EA requirements since the Highway 401 interchange is a Provincial project. The Environmental Assessment study addresses these improvements while taking into consideration future needs, transit, pedestrians, and cyclists on these roadways. The Environmental Study Report The Environmental Study Report (ESR) documents the planning process followed in accordance with the procedures set out under the Municipal Class Environmental Assessment (MEA 2000) for Schedule C projects. In general the ESR documents the planning and decision making process, including public-consultation, which was followed to arrive at the preferred design. The ESR also sets out mitigating measures proposed to avoid or minimize environmental impacts. Specifically, this ESR documents: The background to the study; The need and justification for the study; A description of the problem; The studies and measures undertaken to resolve the problem; The planning, preliminary design and public consultation processes followed to arrive at the preferred design; The principal environmental impacts of the study; The mitigating measures to be employed to offset the anticipated impacts and next steps in terms of required detail design. Background Tremaine Road is a north-south major arterial within the Regional transportation network in the Town of Milton. This roadway is a boundary road between the City of Burlington and the Town of Oakville and as a boundary road between the Town of Milton and the Town of Halton Hills to the north. Tremaine Road also represents the general westerly boundary between the urban and rural areas within the Town of Milton and is adjacent to the Niagara Escarpment. Presently, Tremaine Road crosses over both Highway 401 and Highway 407, with no direct access to either facility. Tremaine Road also traverses an existing at-grade crossing of the CPR line, north of Steeles Avenue (Regional Road 8). Within the study limits of this Class Environmental Assessment, James Snow Parkway is a new east-west major arterial within the Regional transportation network in the Town of

2 Pg. 2 Milton. Presently, to the east of Regional Road 25, James Snow Parkway terminates west of the CN Rail line. Construction of James Snow Parkway from Steeles Avenue (Regional Road 8) to Boston Church Road (east of CN Rail line) is underway starting in 2007, with the grade separation at the CN Rail line scheduled for construction in James Snow Parkway from Regional Road 25 to approximately 50 m west of 16 Mile Creek tributary (including the culvert over the creek) is under construction starting in This Class Environmental Assessment includes transportation corridor improvements for the portion of James Snow Parkway from 50 m west of the 16 Mile Creek tributary to its connection with Tremaine Road. In addition, the Sherwood Survey Master Transportation/Transit Plan (MTTP) done as part of the Sherwood Survey Secondary Plan for this area identified the need for a new interchange with Highway 401 at Tremaine Road. This interchange and subsequent connection to Tremaine Road would provide significantly improved access from the Town of Milton to the Greater Toronto Area (GTA). This is an integral link within the Regional transportation network, connecting the central area of Halton Region to the rest of the GTA. The Sherwood Survey MTTP formed the basis for the need and justification for the road widenings and connection to Highway 401. In June 2004, Council approved the Halton Transportation Master Plan (HTMP) (PPW92-04), which developed a dynamic integrated transportation strategy that considered all modes of travel including transit, cycling, walking and automobiles, as well as other strategies within the Region of Halton. This study established the transportation network within the Region to the year The study followed the first two Phases of the Municipal Class Environmental Assessment (Municipal Class EA) process including need and justification, identification and evaluation of alternative planning solutions, and the selection of a preferred solution. Based on the results of the study, the need for capacity improvements (widening from 2 to 4 lanes) for this section of Tremaine Road and the extension of James Snow Parkway (4 lanes) was identified, and an Environmental Assessment for these two roadways was recommended for inclusion in the Region s Capital program. The widening of Tremaine Road from Derry Road (Regional Road 7) to Main Street is scheduled for 2010 and from Main Street to Steeles Avenue (Regional Road 8) in The widening of Tremaine Road from Steeles Avenue north to the Highway 401 interchange is presently beyond the 10-year Capital Budget; however, this stretch of Tremaine Road was identified for construction between 2016 and 2021, as part of the development charges process. The extension of James Snow Parkway is scheduled in As part of this Environmental Assessment, the construction timing of the Tremaine Road and James Snow Parkway transportation corridors has been reviewed and incorporated into the 2007 Capital Budget process. Planning Alternatives During Phase 2 of the roads component of this study, a range of planning alternatives was considered to address the need for transportation improvements. Alternatives considered included:

3 Pg. 3 Do Nothing Do not undertake any improvements or changes on Tremaine Road or extend James Snow Parkway within the Study Area (carried forward for comparison purposes only); Improve Other Roadways (i.e. Derry Road, Regional Road 25) to accommodate the projected future traffic demand for Tremaine Road or James Snow Parkway (identified in HTMP); Limit Future Development in the Area Do not allow any future development in the area, which would be against the intent of the Secondary Plan for this area established by the Town (not carried forward); Provide Public Transit Service within the Town of Milton connecting to the major activity centres of the Greater Toronto Area (GTA), Hamilton and Niagara Region to encourage a shift in modal choice from the automobile to public transit modes (carried forward HTMP); Use Travel Demand Management Measures aimed at shifting travel behaviour to reduce peak hour travel demands (i.e. carpooling, HOV lanes, flexible work hours) (carried forward HTMP); Implement Safety Improvements to the roadways and associated transportation facilities (carried forward); Implement Localized Intersection and/or Traffic Control Improvements, which includes the installation of traffic signal control and the optimization of traffic signal timing along the study corridor to increase efficiency of operation (carried forward); Widen Tremaine Road from two to four lanes including geometric improvements at intersections (carried forward); and Extension of James Snow Parkway as a four lane facility to connect with Tremaine Road (carried forward). The widening of Tremaine Road along its existing alignment is the preferred solution, south of Main Street and the realignment of Tremaine Road is the preferred solution north of Main Street in conjunction with a grade separation at the CPR line and a new interchange with Highway 401. These scenarios are in combination with improved transit, TDM, safety improvements, traffic operational improvements, and localized intersection improvements to provide a sustainable solution. The need for the extension of James Snow Parkway will support development within the Escarpment Business Community area and will ultimately provide connectivity between nortwest and southeast Milton. In addition to the widening and realignment of Tremaine Road to address future transportation deficiencies, the overall corridor will also include the protection for future auxiliary lanes, traffic optimization and traffic signal co-ordination measures and the incorporation of on-road cycling facilities as well as the future provision for sidewalks/multi-use trails within the boulevard where warranted.

4 Pg. 4 Capacity Currently, the Tremaine Road transportation corridor between Derry Road and Campbellville Road is operating at an acceptable level of service with limited roadway capacity deficiencies. However, due to future traffic growth from proposed development in the area including the Escarpment Business Community in the area north of the Highway 401 and west of Regional Road 25 (9,500 new employees at buildout) and 40,300 new residents and 5,600 new employees within the Sherwood Survey Secondary Plan area at full build out, the area roadways will exceed capacity and the intersections will be severely congested without transportation improvements. Traffic infiltration of neighbouring areas will also occur, causing the local streets and intersections to operate unsatisfactorily. Tremaine Road and James Snow Parkway were analysed with and without proposed road improvements (widening to four lanes / extension of four lanes plus turn lanes) for the horizon year of The 2021 traffic conditions without road improvements identified unacceptable levels of service and capacity operations. The traffic conditions with recommended road improvements mitigated the levels of service and volume to capacity ratios to acceptable levels. The addition of the new intersections and new roadways, improvements to existing intersections, a rail crossing grade separation and new interchange are all key components of the transportation network required in order for this area to accommodate the approved future growth for Sherwood Survey Secondary Plan area. Preferred Roadway Alternative In assessing the proposed future widening and realignment of Tremaine Road, alternatives were developed in several locations. After detailed evaluation of the alternatives generated for the proposed widening and realignment and in attempting to eliminate major impacts to properties and significant natural features within the study area, selection of the preferred roadway alternative was made in each area and presented to the public and stakeholder agencies. This resulted in receiving further input and refinement of the alignment for Tremaine Road. A preliminary design was completed for Tremaine Road on this basis. The specific location of the Highway 401 interchange was proposed by the Ministry of Transportation, Conservation Halton, Town of Milton and the Region during the earlier Sherwood Survey Secondary Plan process and was confirmed through the Environmental Assessment process. Modifications were carried out to refine geometric requirements and to address property impacts and natural environment impacts associated with the interchange. These were also presented and discussed with interested developers and stakeholder agencies. Preliminary design incorporated these refinements for the interchange. The alignment of the James Snow Parkway extension was pursued, building on the previously recommended alignment developed through the Sherwood Survey Secondary Plan and subsequent development planning for this area. Given the constraints of the area and the desire to contain the majority of the roadway on development lands, alignment modifications were made to result in the least impact to adjacent property

5 Pg. 5 owners who were not part of the development group in the area and to optimize development opportunities, while retaining suitable geometric design. In addition to the two primary Regional road improvements, this EA study also included improvement to 3rd Sideroad to improve road safety and operations between proposed Tremaine Road and the hamlet of Milton Heights. 3 rd Sideroad proposed improvements were originally considered part of this study as a result of the numerous concerns brought forward by the existing residents and supported by the Town of Milton. Public input was also sought and received on that component of the study. Following the completion and filing of the Environmental Assessment Report, the detailed design phase will commence. During this phase, some modifications may be implemented from the Environmental Assessment Study and its recommendations on design features. The detailed design phase has a public consultation process as well. Road Geometrics / Drainage Tremaine Road is currently an undivided two-lane roadway with a rural cross-section and a posted speed limit of 80 km/h south of Steeles Avenue and 60 km/h north of Steeles Avenue to 30 m south of the CPR crossing, where it transitions to 50 km/h through the Milton Heights neighbourhood. James Snow Parkway will have a posted speed limit of 60 km/h. Based on the forecasted traffic volumes and existing conditions, the technically preferred alternative for Tremaine Road is to widen the existing roadway to four lanes. The technically preferred alternative for James Snow Parkway is to extend the roadway westerly to the proposed Tremaine Road at four lanes. Auxiliary lanes will be added at some intersections and protection for future auxiliary lanes will be provided at other intersection locations. It is proposed that Tremaine Road be constructed with an urban cross-section adjacent to future development and across Sixteen Mile Creek, and a rural cross-section adjacent to the Niagara Escarpment and agricultural lands. The cross-section will consist of a continuous 2 m flush centre median and four (two in each direction) 3.65 m wide lanes. The urban cross-section will contain delineated 1.5 m cycling lanes, and a row of vegetation and sidewalks/multi-use trails in the boulevards on Tremaine Road. The rural cross-section will contain 2.5 m shoulders which will include 1.0 m paved cycling facilities and ditches. James Snow Parkway will be an urban cross-section with a continuous 2 m flush centre median and four (two in each direction) 3.65 m wide lanes with 1.5 m delineated cycling lanes and provision for a row of vegetation and sidewalks/multi-use trails in the boulevards. A storm sewer and grassed swale system will be constructed for storm water run-off within the Tremaine Road and James Snow Parkway rights-of-way, which may drain into proposed storm water management ponds of adjacent development where possible, or before entering Sixteen Mile Creek and its tributaries, as well as Indian Creek and its tributaries.

6 Pg. 6 Structures There are two existing bridges within the study limits. The first structure crosses Sixteen Mile Creek, approximately 0.10 km south of Kelso Road. The structure is 10.8 m wide with a 13.0 m single span concrete rigid frame bridge which was built in The bridge is in generally good condition with minor cracking according to the 2004 Road Needs Study. The second structure is the Tremaine Road bridge over Highway 401. The bridge is under the jurisdiction of the Ministry of Transportation (MTO). The MTO undertook repairs to the deck soffit a few years ago due to trucks hitting the underside of the bridge which also involved lowering the surface of Highway 401. MTO has tentatively scheduled rehabilitation of the bridge in A new 50 m long structure will need to be constructed as a result of the realignment of Tremaine Road across 16 Mile Creek to minimize impacts on the Regional Flood Plain and to accommodate the meander belt of the creek. There will be a total of 18 culvert and storm water related structures along the new Tremaine Road corridor, extending from Derry Road to north of Highway 401. A grade separation passing under the CPR Line will also be constructed as part of the realignment of Tremaine Road. This structure will span approximately 57 m in length. The Tremaine Road and Highway 401 Interchange will also be constructed as part of this project. Through this Class EA, the Ministry is protecting for a future cross-section that will consist of 8 travel lanes and 2 High Occupancy Vehicle (HOV) lanes. The structure over Highway 401 will accommodate 4 travel lanes, delineated cycling lanes and sidewalks on Tremaine Road and will span a length of approximately 88 m. Access Requirements Presently, between Derry Road and the CPR line, there are a total of 32 residential and farm accesses. Existing accesses to the properties along both sides of Tremaine Road, through this section, will be maintained. Access to adjacent parcels that are presently in various stages of the development process, as the Sherwood Survey identifies the majority of property south of Steeles Avenue and east of Tremaine Road for future residential, will be restricted to accessing Tremaine Road at future signalized intersection locations. These locations will be approved as part of future draft plan of subdivision applications. It is anticipated that there will be two new intersection locations with Tremaine Road south of Main Street. Given the preferred design to re-align Tremaine Road north of Main Street, all accesses to the existing Tremaine Road, will be maintained, as this roadway will not be affected by the new Tremaine Road. Two access roads are being proposed as connections to the new Tremaine Road to service the residents along the existing Tremaine Road. Access Road A will connect to the realigned Tremaine Road south of Steeles Avenue and Access Road B will connect to the realigned Tremaine Road north of the CPR tracks.

7 Pg. 7 There is also potential for an additional intersection location north of Access Road B and south of 3 rd Sideroad, provided that Regional Access Management Guidelines are met. It should be noted that allocation has been made for portions of the land north of Derry Road, immediately west of the CN Rail line, for which there are active applications and site servicing permits have been issued. Although future access from these parcels will connect the development to Tremaine Road, the present phase will have an access intersection to Derry Road only. An alternative was developed for the extension of James Snow Parkway between Tremaine Road and west of Regional Road 25, which was derived from the work previously undertaken as part of the Sherwood Survey Secondary Plan process. This stretch of James Snow Parkway is almost completely located on lands slated for development as part of the Escarpment Business Community, except at its connection with Tremaine Road. The alignment of James Snow Parkway attempts to eliminate major impacts to properties and provides a realignment of Campbellville Road east of the connection to Tremaine Road. Roundabouts As part of the Class Environmental Assessment, the potential for the introduction of roundabouts was reviewed. The use of roundabouts at major intersection roadways i.e. James Snow Parkway at Tremaine Road, have been eliminated given the anticipated roadway volumes and potential property impacts. The development intersections along Tremaine Road will operate under stop control on the minor roadways, as the anticipated volumes are minor compared with the volumes on Tremaine Road and are therefore not a viable alternative. However, the intersection of the re-aligned Main Street and Tremaine Road is recommended for a roundabout given the anticipated volumes and turning moves on these two streets will be more balanced. This will allow for the development of a gateway into the Milton downtown. Right-of-Way Requirements In December of 2003, Regional Council through Report PPW approved Regional Official Plan Amendment No. 23 Functional Plan and Right-of-Way Plan of Arterial Roads. The right-of-way width for Tremaine Road and James Snow Parkway is designated as 35 m. The existing right-of-way for Tremaine Road within the study area varies from 20 m to 25 m. Given the re-alignment of Tremaine Road north of Main Street and extension of James Snow Parkway, there is no existing right-of-way through these new corridors and no property acquired to date. In order to accommodate the proposed roadways, turn lanes at intersections, boulevard treatments and grading requirements, the preferred alignment requires a right-of-way width that varies between 35 to 50 m. This is in accordance with the Regional Right-of-Way Dimension Guidelines contained in the Halton Transportation Master Plan. The property requirements, as identified through this Environmental Assessment, are proposed for the widening and realignment of Tremaine Road and James Snow Parkway, to accommodate the preferred cross-section, with the majority of the required rights-of-way being acquired through the development process.

8 Pg. 8 Utility Impacts Milton Hydro lines run along both sides of the existing Tremaine Road corridor, along with Bell Canada and Cogeco cable lines. These utility lines will have to be relocated to accommodate the widening. Special Study Area The special study area located southwest of the proposed Highway 401 interchange has been noted as part of this process as requiring detail design prior to finalizing the required buffer width and subsequent property impact, as the creek has been identified as a habitat for Redside Dace. As part of the Class EA process there was significant discussions relating to the requirements for the proposed realigned tributary of Sixteen Mile Creek (NW-2-G1) and the impacts of this re-location. At this stage of the process, given that detail design falls outside of the requirements of a Class EA, although it is desirable by the adjacent land owners to undertake this process as part of the Class EA undertaking, it has been agreed to by the agencies to review potential further reduction strategies for reducing the buffer width through subsequent processes outside of the scope of this EA. To date, as part of this EA study, significant property reductions have been achieved through minor design modifications of the interchange ramp, integration of the MTO minimum offset from MTO right-of-way to be incorporated into the creek buffer and identification of potential quality vs. quantity vegetation. Public Consultation Process Pursuant to the Municipal Class EA, public consultation plays a key and significant role in the successful completion of an Environmental Assessment project. Technical Agencies Committee and Stakeholder Advisory Group were established for this project. As a result of the input from the Technical Agencies Committee, the Stakeholders and the general public at the PIC, the following issues and concerns have been addressed as part of the study: Capacity within the corridor; Road Geometrics; Drainage; Structures; Access to Properties; Property impacts to adjacent property owners; Development and Planning; Pedestrian and Cycling Facilities; Traffic operations along Tremaine Road and James Snow Parkway corridors; Traffic operations on Third Line into Kelso Conservation Area (Town jurisdiction); Noise impacts; Utility impacts; and Timing of project.

9 Pg. 9 Construction Schedule The two to four-lane widening and realignment of the Tremaine Road and James Snow Parkway transportation corridors is scheduled for construction in several stages beginning in 2011 as identified in the 2007 Capital Budget. Following the filing and approval of the ESR, discussions will commence with the Ministry of Transportation in regards to the rehabilitation of the existing Tremaine Road structure tentatively scheduled for 2010, and the need for the early implementation of the Tremaine Road interchange, as well as general cost sharing between the MTO, Region and Town.

APPENDIX M NOISE ANALYSIS

APPENDIX M NOISE ANALYSIS APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 This independent report of findings, including data entry and analysis of all the consultation

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO

PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO PREAMBLE 1 PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO HIGHWAY 404 AND 16 TH AVENUE INTERCHANGE RECONSTRUCTION

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017

COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017 REPORT #ENG-2017-37 COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017 INTRODUCTION OF PARKING AND TRAFFIC BY-LAWS IN THE VICINITY OF SIDEROAD 10 AND THE 11TH LINE, TOWN OF NEW TECUMSETH RECOMMENDATION That

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

Town of Milton Phasing: Urban Expansion Area

Town of Milton Phasing: Urban Expansion Area Campbellville Road Hi gh w ay Line 1 Town of Milton Phasing: Urban Expansion Area Esquesing 40 No 3 Side Road Peru Road R oad Boston Ch urch Road Ke lso Regional Ro ad 25 Dublin Lin e No 5 Side Road ESTABLISHED

More information

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

PETER MALINAS/ANTHONY DELLISOLA (GTA CONSULTANTS) HARDYS ROAD, CLYDE NORTH REVIEW OF TRAFFIC DESIGN ELEMENTS OF EXTERNAL INTERSECTIONS

PETER MALINAS/ANTHONY DELLISOLA (GTA CONSULTANTS) HARDYS ROAD, CLYDE NORTH REVIEW OF TRAFFIC DESIGN ELEMENTS OF EXTERNAL INTERSECTIONS GTA Memo 2012 MEMORANDUM TO: FROM: GREG BURSILL (DENNIS FAMILY CORPORATION) PETER MALINAS/ANTHONY DELLISOLA (GTA CONSULTANTS) DATE: 6 MAY 2013 OUR REF: 13M1241100 PAGE 1 OF 8 RE: HARDYS, CLYDE NORTH REVIEW

More information

Q. Will prevailing winds and wind speeds be taken into account in the noise study?

Q. Will prevailing winds and wind speeds be taken into account in the noise study? Anthony Henday Noise Study Questions asked at Open House (October 24, 2016) March 2, 2017 Q. Will prevailing winds and wind speeds be taken into account in the noise study? Yes, engineers will review weather

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS SITE PLAN CONTROL ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS Site Plan Control is a process involving municipal approval of the lay-out, design and appearance of certain new developments, as authorized

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

MnDOT Contract Exhibit A- Scope of Services. Project Information -

MnDOT Contract Exhibit A- Scope of Services. Project Information - Detail Design For Pedestrian Improvements on Trunk Highways 23, 59, and 68 In the Marshall Area Introduction and Project Information Introduction The purpose of this contract is to provide the State with

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County.

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County. Noise Impact Analysis NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road Washington County November 2011 Prepared for: Washington County Department of Land Use and Transportation

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary Richmond Official Community Plan CITY CENTRE AREA ST. ALBANS SUB-AREA PLAN Bylaw 7100 Schedule 2.10A ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN KEY MAP PLAN AREA MAP

More information

Appendix G. Visual Simulations and Illustrations

Appendix G. Visual Simulations and Illustrations Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99

More information

Checklist for Tentative Subdivision Map

Checklist for Tentative Subdivision Map Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay

More information

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land

More information

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

STREETSCAPE FEASIBILITY TERMS OF REFERENCE Introduction STREETSCAPE FEASIBILITY TERMS OF REFERENCE As outlined in the Official Plan, Section 9, Build A Desirable Urban Form, Mississauga will transform the public realm to create a strong sense of

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

CHAPTER 3. Public Schools Facility Element

CHAPTER 3. Public Schools Facility Element CHAPTER 3 Public Schools Facility Element Page 1 of 12 CHAPTER 3 PUBLIC SCHOOL FACILITIES ELEMENT GOAL 3.1: Collaborate and coordinate with the School Board of Volusia County to provide and maintain a

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information

CHAPTER 26 SITE PLAN REVIEW

CHAPTER 26 SITE PLAN REVIEW CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

Study Description. November 29, Overpass Road Alternatives Public Workshop

Study Description. November 29, Overpass Road Alternatives Public Workshop Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination

More information

BAY MEADOWS SPECIFIC PLAN

BAY MEADOWS SPECIFIC PLAN BAY MEADOWS SPECIFIC PLAN Adopted by the San Mateo City Council April 22, 1997 Amended March 4, 2002, November 4, 2005 and January 4, 2010 BAY MEADOWS SPECIFIC PLAN Adopted by the San Mateo City Council

More information

PUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions

PUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions PUBLIC WORKS DEPARTMENT File: E-2000 July 11, 2011 To: All Manual Holders and Engineering Standard Drawing Revisions Please find attached a list of the revisions to the and the Engineering Standard Drawings.

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017 The Supervisors of Clay Township met on a regularly scheduled meeting date of July 10, 2017, at the Clay Township Municipal Office,

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

Consultation Report 2014

Consultation Report 2014 Consultation Report DEPARTMENT: Development Services DATE: March diverse. vast. abundant. Contents Executive Summary... Part Open Houses. Open House Methodology.... Open House Results... Part Survey. Survey

More information

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units.

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units. 3. HOUSING ELEMENT The purpose of this element is to provide plans and policies that will assist the City in meeting identified or projected deficits in the supply of housing, correcting substandard or

More information

EVALUATION OF COMPLEX AT-GRADE RAIL CROSSING DESIGNS USING A DRIVER SIMULATION

EVALUATION OF COMPLEX AT-GRADE RAIL CROSSING DESIGNS USING A DRIVER SIMULATION EVALUATION OF COMPLEX AT-GRADE RAIL CROSSING DESIGNS USING A DRIVER SIMULATION Authors: John Robinson, Ph.D., P. Eng. Delphi-MRC Alison Smiley, Ph.D., CCPE Human Factors North Jeff Caird, Ph.D. University

More information

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

Northwest Rail Corridor Update

Northwest Rail Corridor Update Northwest Rail Corridor Update Governments Team February 13, 2009 1 Meeting Agenda 1. Program Updates 1. RTD FasTracks Program Update 2. Annual Program Evaluation 2. NWR EE Updates 1. New USACE Representative

More information

Automated Machine Guidance

Automated Machine Guidance Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,

More information

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Application and Checklist Land Disturbing Activities Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based

More information

Agenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works

Agenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works Agenda Item No. August 28, 2007 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David Van Kirk, City Manager Dale I. Pfeiffer, Director of Public Works RESOLUTION TO ADOPT A MITIGATED NEGATIVE

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

Item 2. September 28, 2017

Item 2. September 28, 2017 September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone.

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone. 10019 103 Avenue NW Edmonton, AB T5J 0G9 P: 780-496-6079 F: 780-577-3537 sdab@edmonton.ca edmontonsdab.ca Date: November 2, 2018 Project Number: 286136272-001 File Number: SDAB-D-18-181 Notice of Decision

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE Dennis Gratton Manager, Rail planning, Rail Implementation Office & Annie Hillis Public Art Coordinator, Rail Implementation Office November 7, 2013 OVERVIEW

More information

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

MUNICIPALITY OF NORTHERN BRUCE PENINSULA COUNCIL MEETING AGENDA NO December 19, At 1:00 p.m.

MUNICIPALITY OF NORTHERN BRUCE PENINSULA COUNCIL MEETING AGENDA NO December 19, At 1:00 p.m. MUNICIPALITY OF NORTHERN BRUCE PENINSULA COUNCIL MEETING AGENDA NO. 11-28 December 19, 2011 Page At 1:00 p.m. 1. CALL TO ORDER AND DISCLOSURE OF PECUNIARY INTEREST 2. APPROVAL OF THE AGENDA 1. APPROVAL

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

The Long Point Causeway: a history and future for reptiles. Scott Gillingwater

The Long Point Causeway: a history and future for reptiles. Scott Gillingwater The Long Point Causeway: a history and future for reptiles Scott Gillingwater Environmental Effects Long Point World Biosphere Reserve UNESCO designated the Long Point World Biosphere Reserve in April

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991 BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 AND the Proposed District Plan STATEMENT OF EVIDENCE OF TIMOTHY CARR

More information

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

dpd client assistance memo CAM   Plot Plan Requirements Basic Plot Plan What is a Plot Plan? dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City

More information

Traffic Signal System Upgrade Needs

Traffic Signal System Upgrade Needs Traffic Signal System Upgrade Needs Presented to: Dallas City Council November 20, 2013 DEPARTMENT OF STREET SERVICES Purpose The City of Dallas has a program to achieve and maintain street pavement condition

More information

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia

More information

Traffic Noise and Vibration Impact Assessment Technical Report for the North Meadows Extension to US 85 and Interstate 25

Traffic Noise and Vibration Impact Assessment Technical Report for the North Meadows Extension to US 85 and Interstate 25 Traffic Noise and Vibration Impact Assessment Technical Report for the North Meadows Extension to US 85 and Interstate 25 February 2010 Prepared for: Town of Castle Rock Douglas County Colorado Department

More information

B PERMANENT INTERMEDIATE SIGNS AND SUPPORT SYSTEMS - SSP 799S17

B PERMANENT INTERMEDIATE SIGNS AND SUPPORT SYSTEMS - SSP 799S17 B799-10 - PERMANENT INTERMEDIATE SIGNS AND SUPPORT SYSTEMS - SSP 799S17 799-4.1 GENERAL A permanent ground mounted intermediate sign support system is defined as a permanent sign(s) and its breakaway support

More information