1 REPORT #ENG COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017 INTRODUCTION OF PARKING AND TRAFFIC BY-LAWS IN THE VICINITY OF SIDEROAD 10 AND THE 11TH LINE, TOWN OF NEW TECUMSETH RECOMMENDATION That Council receive Engineering Report #ENG ; And further that By-law (AS AMENDED) PARKING AND TRAFFIC BY-LAW Schedule A PARKING PROHIBITED be amended to add the following: Column 1 HIGHWAY 11th Line, North Side and South Side 11th Line, North Side and South Side Sideroad 10, East Side and West Side Sideroad 10, East Side and West Side Column 2 FROM Column 3 TO Sideroad metres east of Sideroad 10 Sideroad 10 11th Line 11th Line 295 metres West of Sideroad metres south of 11th Line 100 metres north of 11th Line Column 4 PERIOD Anytime Anytime Anytime Anytime And further that Council direct Staff to coordinate the installation of the required signage in accordance with the recommended parking prohibitions and restrictions, as indicated in Report #ENG OBJECTIVE This report has been prepared to recommend the implementation of parking prohibitions and traffic by-laws amendments establishing regulations that will prohibit on-street parking on the 11th Line and Sideroad 10. BACKGROUND On May 11, 2017, a Member of Council forwarded an from a Resident regarding parking concerns on Sideroad 10 in the area of the 11th Line. Information including photographs was provide in the which identified the concerns with the parking in the area. Please refer to the Location Map attached hereto as Attachment No. 1.

2 Report #ENG , June 26, 2017 Staff are bringing forward this report in response to Residents concern and to recommend changes to the applicable Municipal By-laws and regulatory signage. COMMENTS AND CONSIDERATIONS Staff conducted a site visit on June 12, 2017, to review the existing conditions, carry out measurements and monitor parking in the area of Sideroad 10 and 11th Line. In this area, the Town's trail system crosses the roadway and user have parked their vehicles on the road. On the day Staff visited the site there were no vehicles parked in the study area. Staff have summarized the road characteristics of Sideroad 10 and of the 11th Line in the area of the trail crossings below: Sideroad 10, from the 10th Line to 11th Line is a paved roadway. The pavement width is 7.0 metres wide, with metre shoulders on each side. Sideroad 10, from the 11th Line to 12th Line is a paved roadway. The pavement width is 7.0 metres wide, with metre shoulders on each side. 11th Line, from Sideroad 10 to Sideroad 15 is a paved roadway. The pavement width is 7.0 metres wide, with shoulder width up to 0.5 metre on each side. 11th Line, from Sideroad 10 to Tottenham Road (County Rd 10) is gravel with the exception of the paved portion through the intersection of 11th Line and Sideroad 10. The paved portion extends from the intersection westerly approximately 5 metres and is 7.0 metres wide, with a 0.5 metre shoulder on each side. The gravel portion is 7.5 metres wide, from edge to edge. Photographs of each road section and additional road characteristic details have been provided in Attachment No. 2 to this report. Staff have concerns with vehicles parking along each of the road sections, especially along the paved sections of road, as the existing road geometry provides narrow traveled lane widths, ranging from 3.3 metres to 3.5 metres, with minimal shoulders, on the paved sections and from 3.0 metres to 3.5 metres on the gravel sections. These dimensions meet the tolerable minimums, as identified in the 2014 Road Needs Study, for low volume roads. However, given the narrow lane widths on the paved sections a parked vehicle would essentially occupy a major portion of the lane of traffic and require through traffic to enter into the oncoming traffic lane to pass. Additionally, large trucks, and agricultural equipment will have difficulty in maneuvering around parked vehicles on the narrow roadway segments. By prohibiting parking on the north side and south side of the 11th Line and on the east side and west side of Sideroad 10, two (2) unimpeded traveled lanes will be available. The Engineering Department supports prohibiting parking on these sections of road. Page 2 of 10

3 Report #ENG , June 26, 2017 Proposed Parking Prohibitions and Restrictions The locations of the parking prohibitions and restrictions have been recommended in the manner that would prohibit parking on both sides of Sideroad 10 and on both sides of the 11th Line in each direction of the trail crossing, and are as follows: Parking is proposed to be prohibited anytime on the north side and south side of the 11th Line from the Sideroad 10 to a point 230 metres east of Sideroad 10. Parking is proposed to be prohibited anytime on the north side and south side of the 11th Line from the Sideroad 10 to a point 295 metres west of Sideroad 10. Parking is proposed to be prohibited anytime on east side and west side of Sideroad 10 from 11th Line to a point 305 metres south of 11th Line. Parking is proposed to be prohibited anytime on east side and west side of Sideroad 10 from the 11th Line to a point 100 metres south of 11th Line. The intent of the parking restrictions is to keep vehicles a minimum of 100 metres from trail entrances. The recommended parking prohibitions and restrictions are illustrated on the Parking Control Plan, Attachment No. 1. Engineering Department Staff conducted a Parking Prohibition Survey, which was hand delivered to the immediate residences in the area of the proposed parking prohibitions. The survey was delivered to a total of three (3) residences to determine if they had any objections to the proposed parking prohibitions and restrictions. The survey was only provided to properties with buildings. Vacant farmlands were not included in the survey. Respondents were given until June 20, 2017, to reply to the survey and had the following methods to return the survey: by mail, fax, or in person. The private residences that were surveyed have been identified on the Parking Control Plan. The response to the resident s survey is outlined in the information presented in Table- 1. As indicated in Table-1 the response rate for the survey was 66.6%, which is considered a good response rate, and the percentage of respondents in favour of the proposed parking prohibitions is 100%. Table 1 - Responses to Parking Survey Total Surveys Distributed to Residents 3 Total Responses 2 Percentage Response Rate 66.6% Percentage of respondents in favour of Proposed Parking 100% Prohibitions Percentage of respondents not in favour of Proposed Parking 0% Prohibitions Page 3 of 10

4 Report #ENG , June 26, 2017 A copy of the Parking Prohibition Survey is attached hereto as Attachment No. 3. FINANCIAL CONSIDERATIONS Staff, in consultation with the Public Works Department, have determined Staff time to implement the necessary installation of signage would be completed in due course of their daily tasks. The cost to purchase twenty-two (22) new Rb-151 No Parking Signs (60cm x 60cm) Parking Prohibited anytime), posts and mounting hardware is estimated to be $ An allowance in the Public Works Operating Budget will need to be acknowledged to address the unfavourable variance. Respectfully submitted: Sunil Kumar Engineering Coordinator Attachments: Attachment no. 1 - Map of proposed parking restrictions on Sideroad 10 & 11th Linesmall Attachment No. 2. Photographs of the roadway segments Attachment No. 3. Parking Survey SR10 and 11th Line Approved By: Department: Status: Rick Vatri, C.E.T. Engineering Approved - 22 Jun 2017 Mark Sirr, CPA, CMA Finance Approved - 22 Jun 2017 Blaine Parkin, P. Eng. CAO Approved - 22 Jun 2017 Page 4 of 10

5 Attachment No. 1: Proposed Parking Restriction Plan on Sideroad 10 and 11th Line SIDEROAD TH LINE 295 metres 100 metres metres 305 metres ALLISTON No-Parking restrictions BEETON 3637 Property owners contacted for parking survey TOTTENHAM M 1:6,218 Page 5 of 10

6 Attachment No. 2. Photographs of the roadway 1. Sideroad 10 north of 11th Line 2. Sideroad 10 south of 11th Line Page 6 of 10

7 3. 11th Line East of Sideroad th Line West of Sideroad 10 Page 7 of 10

8 The Corporation of the Town of New Tecumseth ENGINEERING DEPARTMENT Administration Centre 10 Wellington St. E. Alliston, Ontario Sideroad 10 & 11th Line Town of New Tecumseth ON-STREET PARKING SURVEY/NOTICE Friday, June 16, This is to personally notify and to determine support of residents that may be directly affected by a proposal to prohibit parking at the following locations: Please see attached illustration for the proposed locations of parking prohibitions. The prohibitions are in response to concerns expressed by residents of Trans-Canada trail and rail trail users who may park their vehicles in a manner that may restrict movement of vehicles, farm equipment and other road users in the vicinity of the Trans-Canada trail and rail trail and intersection of Sideroad 10 and 11th Line. Questions: 1. Would you support Prohibited Parking on both sides of 11th Line from Sideroad 10 to a point 230 metres east of Sideroad 10 Yes No 2. Would you support Prohibited Parking on both sides of 11th Line from Sideroad 10 to a point 295 metres west of Sideroad 10 Yes No 3. Would you support Prohibited Parking on both sides of Sideroad 10 from 11th Line to a point 305 metres south of 11th Line Yes No 4. Would you support Prohibited Parking on both sides of Sideroad 10 from 11th Line to a point 100 metres north of 11th Line Yes No 5. Are you owner of this property. Yes No If Town Staff are not able to directly talk to you, please fill out ONE copy of this survey p e r household by Tuesday, June 20, 2017 and a Town Staff member will come by and pick it up from you. If you are not expected h o m e, just leave the survey in your mailbox or by your door for pick up before noon on the due date noted. Survey responses must include name and address information. *Name: *Address: Postal Code: Phone #: Date: Page 8 of 10

9 Please return ONE copy of this survey per household to the Engineering Department by Tuesday, June 20, Mail: Town of New Tecumseth Attn: Sunil Kumar 10 Wellington Street East Alliston, ON, L9R 1A1 Fax: (705) In person: Administration Centre 10 Wellington St. E. Alliston, Ontario Town of New Tecumseth Website: In accordance with the Ontario Municipal Freedom of Information and Protection of Privacy Act, responses to this survey will only be used for statistical analysis. Individual information shall not be provided to others. Attachment No1.: Sideroad 10 and 11th Line Map Proposed parking restrictions. Page 9 of 10 Page 2 of 2

10 Attachment No. 1: Proposed No-Parking Restriction on SIderoad 10 and 11th Line SIDEROAD TH LINE 295 metres 100 metres metres 305 metres ALLISTON BEETON TOTTENHAM M 1:6,218 Page 10 of 10

TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE

TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE This application package contains: Page1. 2. 3. 4. 5. 6. 7. Application Process Description Minimum Fire Route Design Requirements Drawing Requirements Sample

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

Jointing Rural Intersections

Jointing Rural Intersections Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-4 Jointing Rural Intersections This section describes how to joint rural intersections by following the guidelines outlined in Iowa

More information

Robert Armstrong, Director of Development & Environmental Services. Water Meter Replacement Update

Robert Armstrong, Director of Development & Environmental Services. Water Meter Replacement Update Date Monday, February 12, 2018 From Subject Report No. DES2018-10 Robert Armstrong, Director of Development & Environmental Services Water Meter Replacement Update Roll No. N/A Recommendation That Committee

More information

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to

More information

Section 7 Specification 7.2 Painted Roadway Lines TABLE OF CONTENTS

Section 7 Specification 7.2 Painted Roadway Lines TABLE OF CONTENTS TABLE OF CONTENTS 7.2 PAINTED ROADWAY LINES... 1 7.2.1 GENERAL... 1 7.2.1.1 Description... 1 7.2.1.2 Contractor Quality Control Inspection Plan... 1 7.2.2 MATERIALS... 1 7.2.3 EQUIPMENT... 1 7.2.3.1 General...

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) 3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

Business Plan Summary

Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Mike Bushby Division Manager Fleet Services and

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2014-378 PDF version Route reference: 2013-663 Additional references: 2012-126 and 2012-126-3 Ottawa, 18 July 2014 My Broadcasting Corporation Orangeville, Ontario Application

More information

Traffic Line Painting and Other Pavement Markings

Traffic Line Painting and Other Pavement Markings Gateway to the 1000 Islands QUOTATION FOR: Traffic Line Painting and Other Pavement Markings QUOTATION CLOSING: May 23, 2013 QUOTATION NUMBER: RDS-2013-02 Submit completed quotations to: Quotation for

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/CES/ GE.41/2012/8 Distr.: General 14 March 2012 Original: English Economic Commission for Europe Conference of European Statisticians Group of Experts on

More information

CHAPTER TWO Fire Lanes & Fire Access

CHAPTER TWO Fire Lanes & Fire Access Contents: CHAPTER TWO Fire Lanes & Fire Access Access Requirements for New Construction Sites Fire Lane Signs and Installations Alternative Fire Lane Signs Fire Lane Identification (Red Painted Curbs)

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC

More information

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

APPENDIX M NOISE ANALYSIS

APPENDIX M NOISE ANALYSIS APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

Memorandum 1.0 Highway Traffic Noise

Memorandum 1.0 Highway Traffic Noise Memorandum Date: September 18, 2009 To: Chris Hiniker, SEH From: Stephen B. Platisha, P.E. Re: Updated CSAH 14 Noise Analysis The purpose of this memorandum is to provide the results of the revised traffic

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

Guidelines for the Stage of Implementation - Self-Assessment Activity

Guidelines for the Stage of Implementation - Self-Assessment Activity GUIDELINES FOR PRIVACY AND INFORMATION MANAGEMENT (PIM) PROGRAM SELF-ASSESSMENT ACTIVITY Guidelines for the Stage of Implementation - Self-Assessment Activity PURPOSE This tool is for the use of school

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

2016 Smart Cities Survey Summary Report of Survey Results

2016 Smart Cities Survey Summary Report of Survey Results Introduction 2016 Smart Cities Survey Summary Report of Survey Results In 2016, the International City/County Management Association (ICMA) conducted a survey in partnership with the Smart Cities Council

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

Temporary Sign Permit

Temporary Sign Permit 36725 Division Road, P.O. Box 457, Richmond, MI 48062 Building and Planning Department 586-727-7571 ext. 228 586-727-2489 Fax Temporary Sign Permit Application and Regulations Page 1 Updated: 15OCT15 Temporary

More information

Consultation Report 2014

Consultation Report 2014 Consultation Report DEPARTMENT: Development Services DATE: March diverse. vast. abundant. Contents Executive Summary... Part Open Houses. Open House Methodology.... Open House Results... Part Survey. Survey

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

TOWN OF FARMINGTON PLANNING BOARD April 1, 2009 APPROVED MINUTES

TOWN OF FARMINGTON PLANNING BOARD April 1, 2009 APPROVED MINUTES Page 1 of 6 Planning Board Meeting Minutes April 1, 2009 TOWN OF FARMINGTON PLANNING BOARD April 1, 2009 APPROVED MINUTES The following minutes are written as a summary of the main points that were made

More information

Advice No Rule 8 Metering and Schedule 300 Charges as Defined by Rules and Regulations

Advice No Rule 8 Metering and Schedule 300 Charges as Defined by Rules and Regulations January 4, 2017 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice No. 17-001 Rule 8 Metering and Schedule 300 Charges

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

CITY COUNCIL CONSENT CALENDAR

CITY COUNCIL CONSENT CALENDAR CITY COUNCIL CONSENT CALENDAR OCTOBER 17, 2016 SUBJECT: INITIATED BY: NOTICE OF COMPLETION FOR CIP 1606, RESIDENTIAL STREET PAVING PROGRAM DEPARTMENT OF PUBLIC WORKS (Oscar Delgado, Director of Public

More information

Item 2. September 28, 2017

Item 2. September 28, 2017 September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Geographic Terms. Manifold Data Mining Inc. January 2016

Geographic Terms. Manifold Data Mining Inc. January 2016 Geographic Terms Manifold Data Mining Inc. January 2016 The following geographic terms are adapted from the standard definition of Census geography from Statistics Canada. Block-face A block-face is one

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Dorchester County Tourism Heart of Chesapeake Country Heritage Area 2 Rose Hill Place Cambridge, Maryland 21613 p 410-228-1000 f 410-221-6545 www.visitdorchester.org REQUEST FOR PROPOSALS Two Outdoor Murals:

More information

Motioned by Commissioner Culver, seconded by Commissioner Willey, to approve the June 28, 2017 Planning Commission action summary minutes.

Motioned by Commissioner Culver, seconded by Commissioner Willey, to approve the June 28, 2017 Planning Commission action summary minutes. Page 1 of 7 PLANNING COMMISSION MEETING Meeting Action Summary 6:30 p.m. Commissioners present: Carpenter, Culver, Sands, Sinclair, Struckhoff, Weaver, Willey Staff present: McCullough, Stogsdill, Crick,

More information

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis 3.0 TRAFFIC IMPACTS 3.1 TRIP GENERATION To assess the impacts that the project may have on the surrounding streets, the first step was to determine Project trip generation. Project trip generation is shown

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

LONDON GROVE TOWNSHIP BOARD OF SUPERVISORS MEETING MINUTES November 7, :00 P.M.

LONDON GROVE TOWNSHIP BOARD OF SUPERVISORS MEETING MINUTES November 7, :00 P.M. LONDON GROVE TOWNSHIP BOARD OF SUPERVISORS MEETING MINUTES November 7, 2018 7:00 P.M. MEMBERS PRESENT: Richard Scott-Harper David Connors John Lee Irwin Stephen Zurl Thomas Szakas STAFF PRESENT: Ken Battin,

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

DETERMINATION OF POPULATION REGULATION

DETERMINATION OF POPULATION REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT DETERMINATION OF POPULATION REGULATION Alberta Regulation 63/2001 With amendments up to and including Alberta Regulation 198/2017 Office Consolidation Published

More information

THE CORPORATION OF THE TOWNSHIP OF ENNISKILLEN EIGHTEENTH MEETING MINUTES SEPTEMBER

THE CORPORATION OF THE TOWNSHIP OF ENNISKILLEN EIGHTEENTH MEETING MINUTES SEPTEMBER THE CORPORATION OF THE TOWNSHIP OF ENNISKILLEN EIGHTEENTH MEETING MINUTES SEPTEMBER 11 2018 A meeting of the Council of the Corporation of the Township of Enniskillen was held on Tuesday September 11 th

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

PUBLICATION 213. Think Safety First

PUBLICATION 213. Think Safety First PUBLICATION 213 (67 PA CODE, CHAPTER 212) Think Safety First Pub 213 (02-08) Appendix Appendix A - Temporary/Portable

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

Driver Education Classroom and In-Car Curriculum Unit 3 Space Management System

Driver Education Classroom and In-Car Curriculum Unit 3 Space Management System Driver Education Classroom and In-Car Curriculum Unit 3 Space Management System Driver Education Classroom and In-Car Instruction Unit 3-2 Unit Introduction Unit 3 will introduce operator procedural and

More information

B PERMANENT INTERMEDIATE SIGNS AND SUPPORT SYSTEMS - SSP 799S17

B PERMANENT INTERMEDIATE SIGNS AND SUPPORT SYSTEMS - SSP 799S17 B799-10 - PERMANENT INTERMEDIATE SIGNS AND SUPPORT SYSTEMS - SSP 799S17 799-4.1 GENERAL A permanent ground mounted intermediate sign support system is defined as a permanent sign(s) and its breakaway support

More information

Copy of Dreamland Resort Emergency Web Page

Copy of Dreamland Resort Emergency Web Page Copy of Dreamland Resort Emergency Web Page The following information will provide an overview of the emergency procedures in effect at Dreamland Resort and a guide to the location of medical facilities

More information

Guide Sign Policy for Secondary State Highways Edition

Guide Sign Policy for Secondary State Highways Edition Massachusetts Highway Department, Ten Park Plaza, Boston, MA 02116-3973 ` Guide Sign Policy for Secondary State Highways 2005 Edition Revised September 2005 1. PURPOSE The Massachusetts Highway Department

More information

Council Communication May 17, 2016, Business Meeting

Council Communication May 17, 2016, Business Meeting Council Communication May 17, 2016, Business Meeting Request from the Public Art Commission for approval of mural concepts on Calle Guanajuato FROM: Ann Seltzer, management analyst, seltzera@ashland.or.us

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

SITE PLAN APPLICATION

SITE PLAN APPLICATION SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective

More information

The following discussion is intended to address the mitigation measure CUL 11 from the Final EIS for Ocotillo Express Wind Energy Project.

The following discussion is intended to address the mitigation measure CUL 11 from the Final EIS for Ocotillo Express Wind Energy Project. Ocotillo Express LLC Pier 1, Bay 3 San Francisco, CA 94111 T 415 283 4000 F 415 362 7000 www.patternenergy.com MEMO To Brian Paul, BLM From James Dermody, Pattern Energy Copy David Hochart, Dudek Subject

More information

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS Development Services Department, 3363 West Park Place, Pensacola, Fl 32505 (850) 595-3475 UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS All Unplatted Subdivision Application Submittal

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

The Shoppes at Forney Crossings

The Shoppes at Forney Crossings F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"

More information

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS City of Greenwood Village Community Development Department 6060 S. Quebec Street Greenwood Village, CO 80111-4591 (303) 486-5783; FAX (303) 773-1238 SUBMITTAL

More information

EVALUATION OF COMPLEX AT-GRADE RAIL CROSSING DESIGNS USING A DRIVER SIMULATION

EVALUATION OF COMPLEX AT-GRADE RAIL CROSSING DESIGNS USING A DRIVER SIMULATION EVALUATION OF COMPLEX AT-GRADE RAIL CROSSING DESIGNS USING A DRIVER SIMULATION Authors: John Robinson, Ph.D., P. Eng. Delphi-MRC Alison Smiley, Ph.D., CCPE Human Factors North Jeff Caird, Ph.D. University

More information

Architectural Review Application

Architectural Review Application Architectural Review Application City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 Architectural Review Overview: The Architectural

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

STATISTICS ACT NO. 4 OF 2006 STATISTICS (CENSUS OF POPULATION) ORDER, 2008 SUBSIDIARY LEGISLATION. List of Subsidiary Legislation.

STATISTICS ACT NO. 4 OF 2006 STATISTICS (CENSUS OF POPULATION) ORDER, 2008 SUBSIDIARY LEGISLATION. List of Subsidiary Legislation. NO. 4 OF 2006 STATISTICS ACT SUBSIDIARY LEGISLATION Page List of Subsidiary Legislation 1. Statistics (Census of Population) Order, 2008... S18 21 STATISTICS (CENSUS OF POPULATION) ORDER, 2008 [L.N. 107/2008.]

More information

ESP 171 Urban and Regional Planning. Demographic Report. Due Tuesday, 5/10 at noon

ESP 171 Urban and Regional Planning. Demographic Report. Due Tuesday, 5/10 at noon ESP 171 Urban and Regional Planning Demographic Report Due Tuesday, 5/10 at noon Purpose The starting point for planning is an assessment of current conditions the answer to the question where are we now.

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

MINUTES. Charles Farris was absent from the meeting. Also present was Rodger Lentz, Janet Holland of Development Services and two interested citizens.

MINUTES. Charles Farris was absent from the meeting. Also present was Rodger Lentz, Janet Holland of Development Services and two interested citizens. MINUTES Planning & Design Review Board January 9, 2018 The regularly scheduled meeting of the City of Wilson Planning and Design Review Board was held on Tuesday, January 9, 2018 at 7:00 pm in the Council

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB

More information

Revised Public Hearing Minutes Approved Tuesday, August 5, :00 p.m.

Revised Public Hearing Minutes Approved Tuesday, August 5, :00 p.m. Cherokee County Planning Commission Revised Public Hearing Minutes Approved 9-9-2014 Tuesday, August 5, 2014 7:00 p.m. The Cherokee County Planning Commission held its regularly scheduled meeting on Tuesday,

More information

Charlton/Oxford Route 20 Reconstruction Project

Charlton/Oxford Route 20 Reconstruction Project Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011 Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please

More information

!!!! Remote Sensing of Roads and Highways in Colorado

!!!! Remote Sensing of Roads and Highways in Colorado !!!! Remote Sensing of Roads and Highways in Colorado Large-Area Road-Surface Quality and Land-Cover Classification Using Very-High Spatial Resolution Aerial and Satellite Data Contract No. RITARS-12-H-CUB

More information

CITY COMMENTS ON THE OMBUDSMAN S RECOMMENDATIONS

CITY COMMENTS ON THE OMBUDSMAN S RECOMMENDATIONS CITY COMMENTS ON THE OMBUDSMAN S RECOMMENDATIONS RECOMMENDATION 1 Eligibility and Appeals We recommend that the City of Winnipeg establish revised Handi-Transit eligibility criteria that considers whether

More information

BLOOR WEST UKRAINIAN MURAL

BLOOR WEST UKRAINIAN MURAL BLOOR WEST UKRAINIAN MURAL MAKE SURE TO READ THIS DOCUMENT BEFORE SUBMITTING YOUR APPLICATION APPLICATION EXTENDED DEADLINE: Friday, February 17, 2017 at 4pm (ET) Email completed package to bloorwestmural@gmail.com

More information

FRENCHTOWN CHARTER TOWNSHIP PLANNING COMMISSION OFFICE (734) EXT. 4 FAX (734)

FRENCHTOWN CHARTER TOWNSHIP PLANNING COMMISSION OFFICE (734) EXT. 4 FAX (734) FRENCHTOWN CHARTER TOWNSHIP PLANNING COMMISSION OFFICE (734) 242-5900 EXT. 4 FAX (734) 242-1634 PARCEL I.D.# DATE APPLICANT ADDRESS CITY STATE ZIP CODE TELEPHONE ( ) FAX ( ) OWNER ADDRESS CITY STATE ZIP

More information

PHASE ONE PROJECT REPORT

PHASE ONE PROJECT REPORT MOORHEAD AREA INTEGRATED TRAIN DETECTION AND TRAFFIC CONTROL SYSTEM PHASE ONE PROJECT REPORT December 2000 Prepared for: Minnesota Department of Transportation Office of Advanced Transportation Systems

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2018-253 PDF version Reference: 2018-16 Ottawa, 26 July 2018 Steven Huber, on behalf of a corporation to be incorporated Assiniboia, Saskatchewan Public record for this application:

More information

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 This independent report of findings, including data entry and analysis of all the consultation

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

General Wireless Permit Package Submission and Review Guidelines. Non VDOT (Existing and New) Structures within VDOT Right of Way

General Wireless Permit Package Submission and Review Guidelines. Non VDOT (Existing and New) Structures within VDOT Right of Way General Wireless Permit Package Submission and Review Guidelines Non VDOT (Existing and New) Structures within VDOT Right of Way January 1, 2018 This document applies to new wireless installations on new

More information

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: May 4, 2015

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: May 4, 2015 BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: May 4, 2015 CASE NUMBER 5967/4155/1652 APPLICANT NAME LOCATION VARIANCE REQUEST John D. McCampbell 1564 Duval Street (North side of Duval Street, 255 ± East

More information