Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Size: px
Start display at page:

Download "Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:"

Transcription

1 Four Case Studies

2 Agenda Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Traffic diversion caused by capacity reduction (Fort Lauderdale, FL) Impacts on traffic due to changes in arterial network (Tampa, FL) Road closures for Maintenance of Traffic (MOT) (San Antonio, TX) Analyzing managed lanes performance (Dallas, TX)

3 Role of Traffic Analysis Tools Improve decision making process Evaluate and prioritize planning/operational alternatives Improve design and evaluation time and costs Present/market strategies to the public/stakeholders Monitor performance FHWA Traffic Analysis Toolbox Volume I: Traffic Analysis Tools Primer

4 How big is the Scope study area? What is the available Cost budget? How much time Schedule do we have? What Ultimate are the answers Study the client needs? Goal

5 Scope Schedule Cost Ultimate Study Goal

6 Mesoscopic DTA Models Simulate movements of trips with some level of resolution (packets or vehicles) Discretely model queues in the network Traffic flow performance is evaluated using aggregate macroscopic flow relationships (i.e., Greenshield) Aggregation/disaggregation processes used alternatively to combine queue and flow performance measures.

7 Advantages of the Application Ready-to-use regional networks and trip tables from regional models Ability to model large sub-areas with reasonable resources Level of analysis consistent with planning level designs Excellent tool for planning level decision making process

8 Benefits For Decision Makers Tool contemplates regional impacts (like regional travel demand model) with better degree of definition Less resource-hungry than micro-simulation for large corridors Less assumptions to feed the data needs of microsimulation Easier and quicker analysis of alternatives More flexible and disaggregated than travel demand models

9 Traffic diversion caused by capacity reduction (Fort Lauderdale, FL)

10 Southeast Regional Planning Model (SERPM 7.0) Activity-Based Model (ABM) AM & PM Peaks 6:30 AM to 9:30 AM 3:30 PM to 6:30 PM 30-Minute Intervals using ABM Matrices Subarea Network 10

11 SE 17 th Street - Steps for Analysis Use Dynamic Traffic Assignment / Traffic Impact Analysis (DTA/TIA) mesoscopic tool Run 3 Scenarios Validation (No Build) Lane Reduction without Provision of Alternate Route Lane Reduction with Provision of Alternate Route Assess Measures of Effectiveness (MOEs) Volumes Travel Times Vehicle-Miles-Travelled (VMT) Vehicle-Hours-Travelled (VHT) 11

12 SE 17 th Street - Validation 12

13 SE 17 th Street - Validation 13

14 SE 17 th Street - Validation Time Slice AM Peak PM Peak % 18.6% 2 8.9% 17.4% RRRRRRRR %RRRRRRRR = 100 NN ii=1 CCCCCCCCCC ii NN % 16.8% % 21.5% % 23.4% % 23.8% RRRRRRRR = NN CCCCCCCCCC ii MMMMMMMMMM 2 ii=1 ii NN SERPM 7 Allowable %RMSE Range for: Count Values < 5,000 = 45% - 55% All Links with Counts = 32% - 39% 14

15 SE 17 th Street - Validation SE 17th Street East of Cordova Road (PM-EB) Time Slice Time Field Model Output Difference GEH 1 3:30 PM :00 PM GGGGGG = 2 MMMMMMMMMM CCCCCCCCCC 2 (MMMMMMMMMM + CCCCCCCCCC) 3 4:30 PM :00 PM :30 PM FDOT / FHWA Criteria: >85% of links must have GEH statistic value <=5 6 6:00 PM

16 SE 17 th Street Traffic Diversion Analysis No Build Lane Reduction without Provision of Alternate Route (Scenario #1) One lane in each direction assigned to exclusive transit No capacity improvements Assumes relocation of Port checkpoints on Eisenhower Blvd and SE 24 th St. to provide alternate route along SE 24 th St Lane Reduction with Provision of Alternate Route (Scenario #2) Build upon Scenario #1 Assumes completion of interrupted section of SE 20 th St Assumes relocation/removal of Port checkpoints to provide additional alternate route along SE 20 th St 16

17 SE 17 th Street Traffic Diversion Analysis SE 17 th Street Scenario #2 Additional Alternate Route Scenario #1 Alternate Route 17

18 SE 17 th Street Traffic Diversion Results Link No Build Scenario 1 Difference SE 17th Street East of Federal Highway 9,870 7,460-2,410-24% SE 17th Street East of Cordova Road ,680-1,720-18% Average -21% Link No Build Scenario 2 Difference SE 17th Street East of Federal Highway 9,870 7,270-2,600-26% SE 17th Street East of Cordova Road 9,400 6,770-2,630-28% Average -27% 18

19 SE 17 th Street Travel Time Results Travel Time From Federal Highway to 0.1 M. East of Eisenhower Boulevard (PM-EB) Travel Times, (min) No Build Scenario 1 Scenario Time Slice 19

20 Impacts on traffic due to changes in arterial network (Tampa, FL)

21 Tampa Bay Regional Planning Model (TBRPM) Time-of-Day Four-Step TDM AM Peak Analysis (6:30 AM to 9:00 AM) 30-Minute Intervals Subarea Network 21

22 Tampa Bay - Steps for Analysis Develop mesoscopic subarea model Run base (existing) model Run w/phase I network modifications Run w/phase II network modifications Run Selectlink analyses on impacted ramps Determine traffic impact on Selmon expressway Determine T&R Impact 22

23 Downtown Tampa Arterial Network Changes Phase 1 Phase 2 Legend Base Proposed Impact 23

24 Tampa Bay Results Phase I DTA Diversion Analysis (Phase I minus Base) 24

25 Tampa Bay Results Phase I Expressway Ramp Traffic Analysis Model Summary Year: 2015 Before After Morgan St Description PHASE I Traffic Demand Downtown Development Traffic Demand On-Ramp Percent Share 100% Impact 100% WB Average Daily Traffic 1,500 Traffic Diverted 1,500 24% Traffic Flow Morgan St On-Ramp Morgan St On- Ramp Tampa St On Ramp Local Short Trip 100% 76% 18.0% 6.00% 1,500 1, Toll Traffic Exit 5 (Plant Ave) West Mainline Toll Gantry Exit 5 (Plant Ave) West Mainline Toll Gantry 5.9% 94.1% 5.9% 94.1% 89 1, ,327 Toll Transactions Lost Transactions Toll Transactions Lost Transactions Summary 100.0% 94.0% 6% 1,500 1, New Transactions Revenue Transactions Revenue % Plant Ave 3,800 2,100 Plant Ave 3,795 2, % West Mainline 31,200 37,500 West Mainline 31,115 37, % System Total 109, ,800 System Total 109, , % Lost 0.08% 25

26 Tampa Bay Results Phase II DTA Diversion Analysis (Phase II minus Base) 26

27 Tampa Bay Results Phase II Expressway Ramp Traffic Analysis Model Summary Year: 2015 Before After Morgan St Description PHASE II Traffic Demand Downtown Development Traffic Demand On-Ramp Percent Share 100% Impact 100% WB Average Daily Traffic 1,500 Traffic Diverted 1,500 20% Traffic Flow Morgan St On-Ramp Morgan St On- Ramp Tampa St On Ramp Local Short Trip 100% 80% 15.0% 5.00% 1,500 1, Toll Traffic Exit 5 (Plant Ave) West Mainline Toll Gantry Exit 5 (Plant Ave) West Mainline Toll Gantry 5.9% 94.1% 5.9% 94.1% 89 1, ,341 Toll Transactions Lost Transactions Toll Transactions Lost Transactions Summary 100.0% 95.0% 5% 1,500 1, New Transactions Revenue Transactions Revenue % Plant Ave 3,800 2,100 Plant Ave 3,796 2, % West Mainline 31,200 37,500 West Mainline 31,129 37, % System Total 109, ,800 System Total 109, , % Lost 0.07% 27

28 Tampa Bay Results Phase II cont. Scenario 2015 Traffic Switch from Current Morgan St On Ramp Morgan St Ramp Use Other Local Re-routed to Street and Not Use Tampa St Ramp the Toll Road Selmon Expressway Daily Transaction Selmon Expressway Daily Revenue Plant Ave West Mainline System Total Plant Ave West Mainline System Total Before 1,500 3,800 31, ,100 $ 2,100 $ 37,500 $ 139,800 After 1, ,796 31, ,025 $ 2,098 $ 37,415 $ 139,704 % Change 20% 0.12% 0.23% 0.07% 0.12% 0.23% 0.07% Note Selmon Expressway daily transaction and revenue are based on "Tampa-Hillsborough Country Expressway Authority Comprehensive Traffic and Revenue Study 2011", by Wilbur Smith Associates. Morgan St Ramp traffic volume is based on 2009 counts used in the regional travel demand model. Reflect traffic impact of the Phase 2 network changes. 28

29 Road closures for Maintenance of Traffic (MOT) (San Antonio,TX)

30 San Antonio Travel Demand Model (TDM) Daily Four-Step TDM Determined Spatial and Temporal Limits for IH10/IH35 DTA MOT Analysis 30

31 San Antonio DTA Determined temporal analysis period based upon daily counts profile Split 24-hour Matrices to Create 3-hour Matrix 3-hour Capacities 31

32 San Antonio DTA Analyzed Base + 3 Closure Scenarios w/different Alternatives 16 Analyses Total Further refined Subarea for MOEs Vehicle-Hours-Travelled Congested Speeds 32

33 San Antonio DTA - Results % Difference from Base Condition for each MOT Scenario Percent Alternative Difference VHT_1 1A 7% 1B 24% 1C 14% 1D 91% 1E 11% 1F 4% Ranked Alternatives Congested Speed Segment Base 1A 1B 1C 1D 1E 1F IH-10 0% 0% -3% -28% 0% 0% IH-10/35-11% -15% -15% -22% -7% -7% IH-35 0% 0% 0% -20% 0% -4% Percent Alternative Difference VHT_1 1F 4% 1A 7% 1E 11% 1C 14% 1B 24% 1D 91% 33

34 Analyzing managed lanes performance (Dallas, TX)

35 Project Location/General information 13-mile managed lanes in heavily congested corridor (IH 35E to US 75, 13.3 miles) 35

36 Dallas-Fort Worth Regional Travel Demand Model for the Expanded Area (DFX) Four-step trip-based travel demand model 10,000 square mile area in North Central Texas (13 counties) TOD Model AM (6:30 AM to 8:59 AM), PM (3:00 PM to 6:29 PM); Off-Peak (9:00 AM to 2:59 PM and 6:30 PM to 6:29 AM) 36

37 Modeling Approach Economic Review Revised Demographics Regional Travel Demand Model Collected Traffic Data Counts, Class, &Speed Stated/Reveal Preference Data Corridor Macro Toll Diversion Model (Static) Sub-Area Mesoscopic Toll Diversion Model (Dynamic) Corridor Toll Diversion Model

38 LBJ Managed Lanes Corridor Toll Model Corridor Macro Toll Diversion Model (Static) 38

39 LBJ Managed Lanes DTA 150 Count Locations 15-min counts during AM period (6:30 AM to 8:59 AM) Ten (10) matrices estimated using DODME Sub-Area Mesoscopic Toll Diversion Model (Dynamic) 39

40 DODME Run DTA Output: Packet Log File Analyze Packet Log Output: Correction Factor Check: Calibration Targets Changes from matrix on last iteration Recompile time-varying trip table Factor packet volumes with correction factors Converged? STOP

41 LBJ Managed Lanes DTA Time Slices

42 LBJ DTA HEVAL Sample Results Change in Speed Time Slice VHT VMT -40.0% 70,000 MPH % 1 6:30-6: % 19, , % 60, :45-7: % 44, , % 50, :00-7: % 60, , % 4 7:15-7: % 54, ,500 40, % 5 7:30-7: % 39, ,900 30, % 6 7:45-8: % 22, ,600 20, % 7 8:00-8: % 16, ,400 10, :15-8: % 10,100 80, % :30-8: % 7,100 73, % :45-9: % 5,400 48,500 Change in Speed VHT

43 DTA Model General Approach Subarea Extraction Any Voyager Network Review & Clean-up are mandatory Matrix Slicing Four-Step Models: DODME ABM Models: As-is DTA Check Convergence HEVAL by Time Segment

44 THANK YOU VERY MUCH

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC. NCTCOG Regional Travel Model Improvement Experience in 2009 and Data Management Presented to TMIP VMTSC December 7, 2009 Presenters Kathy Yu Senior Modeler Arash Mirzaei Manager Model Group Behruz Paschai

More information

Linking TransCAD to Synchro Micro-simulation

Linking TransCAD to Synchro Micro-simulation Linking TransCAD to Synchro Micro-simulation -Using DTA as an Intermediate Maggie Lin Dr. Zong Tian (CATER) Outline Background / Introduction Development of DTA model Using DTA for Conversion Conclusions

More information

Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida

Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida Requirement Workshop December 2, 2010 Need for Assignment Estimating link flows Estimating zone to zone travel

More information

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Peter Xin, P.Eng. Senior Transportation Engineer Policy

More information

Region-wide Microsimulation-based DTA: Context, Approach, and Implementation for NFTPO

Region-wide Microsimulation-based DTA: Context, Approach, and Implementation for NFTPO Region-wide Microsimulation-based DTA: Context, Approach, and Implementation for NFTPO presented by Howard Slavin & Daniel Morgan Caliper Corporation March 27, 2014 Context: Motivation Technical Many transportation

More information

Large-scale, high-fidelity dynamic traffic assignment: framework and real-world case studies

Large-scale, high-fidelity dynamic traffic assignment: framework and real-world case studies Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 25C (2017) 1290 1299 www.elsevier.com/locate/procedia World Conference on Transport Research - WCTR 2016 Shanghai.

More information

TRB Innovations in Travel Modeling Atlanta, June 25, 2018

TRB Innovations in Travel Modeling Atlanta, June 25, 2018 Using an Activity-Based Model with Dynamic Traffic Simulation to Explore Scenarios for Private and Shared Autonomous Vehicle Use in Jacksonville with TRB Innovations in Travel Modeling Atlanta, June 25,

More information

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014 Integrated Corridor Management Brian Cronin USDOT October 14, 2014 ICM Program Objectives 1. Demonstrate and evaluate pro-active integrated approaches, strategies, and technologies for efficient, productive,

More information

By using DTA, you accept the following assumptions

By using DTA, you accept the following assumptions Modeling Express Lanes Using Dynamic Traffic Assignment Models Yi-Chang Chiu, PhD DynusT Laboratory University of Arizona Florida DOT Managed Lane Workshop May, 03 DTA Assumptions By using DTA, you accept

More information

Modeling Emerging Technology and Travel Behavior

Modeling Emerging Technology and Travel Behavior Modeling Emerging Technology and Travel Behavior presented by Marty Milkovits December 7, 2016 Agenda Review Emerging Technology, Trends, and Travel Behavior Study Background and Objectives Scenarios Developed

More information

Traffic Management for Smart Cities TNK115 SMART CITIES

Traffic Management for Smart Cities TNK115 SMART CITIES Traffic Management for Smart Cities TNK115 SMART CITIES DAVID GUNDLEGÅRD DIVISION OF COMMUNICATION AND TRANSPORT SYSTEMS Outline Introduction Traffic sensors Traffic models Frameworks Information VS Control

More information

Comparison of Simulation-Based Dynamic Traffic Assignment Approaches for Planning and Operations Management

Comparison of Simulation-Based Dynamic Traffic Assignment Approaches for Planning and Operations Management Comparison of Simulation-Based Dynamic Traffic Assignment Approaches for Planning and Operations Management Ramachandran Balakrishna Daniel Morgan Qi Yang Howard Slavin Caliper Corporation 4 th TRB Conference

More information

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG The WISE Experience Association of Monterey Bay Area Governments (AMBAG) September 20, 2017 Bhupendra Patel, Ph.D. Director of Modeling, AMBAG Paul Ricotta, P.E. Principal Transportation Engineer, Caliper

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

ABM-DTA Deep Integration: Results from the Columbus and Atlanta SHRP C10 Implementations

ABM-DTA Deep Integration: Results from the Columbus and Atlanta SHRP C10 Implementations ABM-DTA Deep Integration: Results from the Columbus and Atlanta SHRP C10 Implementations presented by Matt Stratton, WSP USA October 17, 2017 New CT-RAMP Integrable w/dta Enhanced temporal resolution:

More information

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

EXPLORING SIMULATION BASED DYNAMIC TRAFFIC ASSIGNMENT WITH A LARGE-SCALE MICROSCOPIC TRAFFIC SIMULATION MODEL

EXPLORING SIMULATION BASED DYNAMIC TRAFFIC ASSIGNMENT WITH A LARGE-SCALE MICROSCOPIC TRAFFIC SIMULATION MODEL EXPLORING SIMULATION BASED DYNAMIC TRAFFIC ASSIGNMENT WITH A LARGE-SCALE MICROSCOPIC TRAFFIC SIMULATION MODEL Peter Foytik Craig Jordan R. Michael Robinson Virginia Modeling Analysis and Simulation Center

More information

Modifying the Seed Matrix in the Iterative Proportional Fitting Method of Transit Survey Expansion

Modifying the Seed Matrix in the Iterative Proportional Fitting Method of Transit Survey Expansion Modifying the Seed Matrix in the Iterative Proportional Fitting Method of Transit Survey Expansion Sujith Rapolu Ashutosh Kumar David Schmitt Innovations in Travel Modeling (Baltimore, MD) April 30, 2014

More information

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS

ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS Bruce Hellinga Department of Civil Engineering, University of Waterloo, Waterloo,

More information

Aimsun Next User's Manual

Aimsun Next User's Manual Aimsun Next User's Manual 1. A quick guide to the new features available in Aimsun Next 8.3 1. Introduction 2. Aimsun Next 8.3 Highlights 3. Outputs 4. Traffic management 5. Microscopic simulator 6. Mesoscopic

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

Core Input Files + Engines. Node/Link/Activity Location Demand Type/ Vehicle Type VOT Table/ Emission Table. DTALite. Movement Capacity File

Core Input Files + Engines. Node/Link/Activity Location Demand Type/ Vehicle Type VOT Table/ Emission Table. DTALite. Movement Capacity File Module'1:'Introduction'to'NEXTA/DTALite:'(10AM:10:30'AM)' Twosoftwareapplications:NEXTAasGUIanddatahub;DTALiteasDTAsimulationengine 32_bitvs.64_bit:32_bitforGISshapefileimportingandlegacysupport;64_bitforlargenetwork:(e.g.

More information

Characteristics of Routes in a Road Traffic Assignment

Characteristics of Routes in a Road Traffic Assignment Characteristics of Routes in a Road Traffic Assignment by David Boyce Northwestern University, Evanston, IL Hillel Bar-Gera Ben-Gurion University of the Negev, Israel at the PTV Vision Users Group Meeting

More information

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT Justin Effinger, EIT Research Assistant/Teaching Assistant Department of Civil Engineering & Mechanics University of Wisconsin Milwaukee

More information

Greater Ukiah Area Micro-simulation Model Final Report

Greater Ukiah Area Micro-simulation Model Final Report Greater Ukiah Area Micro-simulation Model Final Report Prepared for the Mendocino Council of Governments January 2016 Prepared by: Caliper Corporation 1172 Beacon Street, Suite 300 Newton, MA 02461 Phone:

More information

Eric J. Nava Department of Civil Engineering and Engineering Mechanics, University of Arizona,

Eric J. Nava Department of Civil Engineering and Engineering Mechanics, University of Arizona, A Temporal Domain Decomposition Algorithmic Scheme for Efficient Mega-Scale Dynamic Traffic Assignment An Experience with Southern California Associations of Government (SCAG) DTA Model Yi-Chang Chiu 1

More information

Development of a Dynamic Traffic Assignment Model for Northern Nevada

Development of a Dynamic Traffic Assignment Model for Northern Nevada NDOT Research Report Report No. 342-13-803 Development of a Dynamic Traffic Assignment Model for Northern Nevada June 2014 Nevada Department of Transportation 1263 South Stewart Street Carson City, NV

More information

Appendix B: Transportation B-10 Toll Plaza Analysis

Appendix B: Transportation B-10 Toll Plaza Analysis Appendix B: Transportation B-10 Toll Plaza Analysis TRAFFIC-DESIGN STUDIES TZB TOLL PLAZA ANALYSES STUDY ASSUMPTIONS Study Goal: Provide assessment of current design concept for toll plaza operations under

More information

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 ACS-Lite The Next Generation of Traffic Signal Control Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 Outline Background on adaptive traffic signal Systems ACS-Lite Goals Development Functionality

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

San Antonio Wrong Way Driver Initiative

San Antonio Wrong Way Driver Initiative San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No.

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. 1. Report No. FHWA/TX-13/0-6657-1 Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. Accession No. 4. Title and Subtitle Investigating Regional Dynamic Traffic Assignment Modeling

More information

Crash Event Modeling Approach for Dynamic Traffic Assignment

Crash Event Modeling Approach for Dynamic Traffic Assignment Crash Event Modeling Approach for Dynamic Traffic Assignment Jay Przybyla Jeffrey Taylor Dr. Xuesong Zhou Dr. Richard Porter 4th Transportation Research Board Conference on Innovations in Travel Modeling

More information

Study Description. November 29, Overpass Road Alternatives Public Workshop

Study Description. November 29, Overpass Road Alternatives Public Workshop Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination

More information

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101

More information

OPAC Adaptive Engine Pinellas County Deployment

OPAC Adaptive Engine Pinellas County Deployment OPAC Adaptive Engine Pinellas County Deployment Farhad Pooran Telvent Transportation North America Baltimore Regional Traffic Signal Forum May 25, 2011 Presentation Agenda Adaptive control systems - expected

More information

Abilene District Traffic Signal Timing and Capacity Analysis

Abilene District Traffic Signal Timing and Capacity Analysis Abilene District Traffic Signal Timing and Capacity Analysis 2017 IAC Report Task-45 TransTech Lab, TechMRT Hongchao Liu, Ph.D., P.E. Jason (Bo) Pang, Ph.D. Ariel Castillo-Rodriguez, E.I.T. I Table of

More information

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS L.A. Griffin Director of Expressway Operations, Orlando-Orange County Expressway Authority 4974 ORL Tower Road Orlando, FL 32807 (407)

More information

Webinar on Accurate Estimates of Traffic Volume - anywhere, anytime - from GPS Probe Samples

Webinar on Accurate Estimates of Traffic Volume - anywhere, anytime - from GPS Probe Samples I-95 Corridor Coalition Webinar on Accurate Estimates of Traffic Volume - anywhere, anytime - from GPS Probe Samples May 23, 2018 I-95 Corridor Coalition www.i95coalition.org Webinar & Audio Information

More information

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Impacts of Traveler Information on the Overall Network FINAL REPORT Prepared by September 2012 i 1. Report No. ENT-2012-2 2. Government Accession

More information

Appendix A. Congestion Management Process

Appendix A. Congestion Management Process Appendix A Congestion Management Process CONGESTION MANAGEMENT PROCESS NORTHEASTERN INDIANA REGIONAL COORDINATING COUNCIL This report represents an update of the activities documenting the development

More information

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY Introduction In 2010, the North Central Texas Council of Governments (NCTCOG) launched the Regional Traffic Signal Retiming Program (RTSRP), the

More information

Assessing the Performance of Integrated Corridor Management (ICM) Strategies

Assessing the Performance of Integrated Corridor Management (ICM) Strategies Assessing the Performance of Integrated Corridor Management (ICM) Strategies Matt Burt, Battelle Research and Evaluation Session, NATMEC 2012 June 7, 2012 1 Presentation Outline The U.S. DOT ICM Program

More information

Lecture-11: Freight Assignment

Lecture-11: Freight Assignment Lecture-11: Freight Assignment 1 F R E I G H T T R A V E L D E M A N D M O D E L I N G C I V L 7 9 0 9 / 8 9 8 9 D E P A R T M E N T O F C I V I L E N G I N E E R I N G U N I V E R S I T Y O F M E M P

More information

American Council of Engineering Companies Fall Conference

American Council of Engineering Companies Fall Conference American Council of Engineering Companies Fall Conference Applying Innovative Financing Tools to New Highway Construction: A Tale of Two States October 18, 2010 Geoffrey S. Yarema Chair, Infrastructure

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION Presented by, R.NITHYANANTHAN S. KALAANIDHI Authors S.NITHYA R.NITHYANANTHAN D.SENTHURKUMAR K.GUNASEKARAN Introduction

More information

Application of the Network Robustness Index to Identifying Critical Road-Network Links in Chittenden County, Vermont

Application of the Network Robustness Index to Identifying Critical Road-Network Links in Chittenden County, Vermont A report by the University of Vermont Transportation Research Center Application of the Network Robustness Index to Identifying Critical Road-Network Links in Chittenden County, Vermont Report # 10-009

More information

Managing traffic through Signal Performance Measures in Pima County

Managing traffic through Signal Performance Measures in Pima County CASE STUDY Miovision TrafficLink Managing traffic through Signal Performance Measures in Pima County TrafficLink ATSPM Case Study Contents Project overview (executive summary) 2 Project objective 2 Overall

More information

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis 3.0 TRAFFIC IMPACTS 3.1 TRIP GENERATION To assess the impacts that the project may have on the surrounding streets, the first step was to determine Project trip generation. Project trip generation is shown

More information

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,

More information

Appendix B: Noise Study

Appendix B: Noise Study Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared

More information

ADVANCED TOLL MODELING

ADVANCED TOLL MODELING ADVANCED TOLL MODELING Presented To: Model Task Force Meeting Orlando, Florida Presented By: Jim Fennessy Fennessy Associates May 25, 2010 Advanced Toll Modeling MTF Priorities Survey 1. Time-of-Day Modeling

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY. BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ

More information

USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION. A Thesis TAO ZHANG

USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION. A Thesis TAO ZHANG USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION A Thesis by TAO ZHANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements

More information

Case Study Evaluation of Dynamic Traffic Assignment Tools

Case Study Evaluation of Dynamic Traffic Assignment Tools Portland State University PDXScholar Urban Studies and Planning Faculty Publications and Presentations Nohad A. Toulan School of Urban Studies and Planning 3-2011 Case Study Evaluation of Dynamic Traffic

More information

%&g( %&g( ) Bridge Projects DRAFT

%&g( %&g( ) Bridge Projects DRAFT BELCHER RD 66TH ST N DRAFT 09-18-14 GULF BLVD Dunedin Causeway 16 Gulf of Mexico WEST BAY DR WALSINGHAM RD Beckett Bridge 102ND AVE N 26 27 S MYRTLE AVE 113TH ST N EDGEWATER DR BAYSHORE BLVD S MISSOURI

More information

FM 691 CORRIDOR STUDY

FM 691 CORRIDOR STUDY FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation

More information

1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4.

1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4. 1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4. Travel time prediction Travel time = 2 40 9:16:00 9:15:50 Travel

More information

Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data

Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data By Somaye Fakharian Qom Ph.D candidate and Research Assistant Department

More information

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project Expressway Operations Improvement Project (TRTA SRI 50299) I. Background TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project 1. The

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

USER GUIDE FOR SPREADSHET-BASED CONCURRENCY MANAGEMENT SYSTEM

USER GUIDE FOR SPREADSHET-BASED CONCURRENCY MANAGEMENT SYSTEM i USER GUIDE FOR SPREADSHET-BASED CONCURRENCY MANAGEMENT SYSTEM September 2007 State of Florida Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, FL, 32399-2100 Center for Urban Transportation

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

City of St. Petersburg Planning & Visioning Commission October 11, 2011

City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Speakers Bureau City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Project Purpose A study identifying transit options

More information

Freeway Performance Measurement System (PeMS)

Freeway Performance Measurement System (PeMS) CALIFORNIA PATH PROGRAM INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY Freeway Performance Measurement System (PeMS) Chao Chen California PATH Research Report UCB-ITS-PRR-2003-22

More information

An Overview of TTI Automated and Connected Vehicles Research

An Overview of TTI Automated and Connected Vehicles Research An Overview of TTI Automated and Connected Vehicles Research Michael P. Manser, Ph.D. Human Factors Program Manager Associate Director of Safety Initiatives Center for Transportation Safety Texas A&M Transportation

More information

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Background Objective Introduction Roadway Lighting Literature Review Study Area Data Illuminance, Crash, and Roadway

More information

1. EXECUTIVE SUMMARY

1. EXECUTIVE SUMMARY 1. EXECUTIVE SUMMARY 1.1 INTRODUCTION This document is the Final Evaluation Report for the Genesis Advanced Traveler Information System (ATIS) Field Operational Test (FOT). This test was co-sponsored by

More information

Adaptive Signal Control in Tyler Texas

Adaptive Signal Control in Tyler Texas Kirk Houser City of Tyler Kent Kacir - Siemens Adaptive Signal Control in Tyler Texas June 16, 2007 Amarillo, TX Agenda Transportation Planning and City Comprehensive Plan Description of the Corridor Operational

More information

Final Version of Micro-Simulator

Final Version of Micro-Simulator Scalable Data Analytics, Scalable Algorithms, Software Frameworks and Visualization ICT-2013 4.2.a Project FP6-619435/SPEEDD Deliverable D8.4 Distribution Public http://speedd-project.eu Final Version

More information

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS.

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. Benjamin A. Coifman, Associate Professor Department of Civil and Environmental Engineering and Geodetic Science Department

More information

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Jamie Mackey, P.E., PTOE Utah Department of Transportation Statewide Signal Engineer jamiemackey@utah.gov NOCoE Webinar Are Your Traffic Signals Ready

More information

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016 Integrated Corridor Management (ICM) Planning Study MPO Presentation September 8, 2016 ICM Grant Background On February 26, 2015, the Broward MPO was awarded a grant by FHWA in the amount of $180,000 for

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road)

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road) Adaptive Signal System Mt. Juliet, TN SR-171 (Mt. Juliet Road) Project Background Project Location Mt. Juliet, TN: 2015 Census: 28,159 Doubled since 2000 Immediately east of Metro Nashville Mt. Juliet

More information

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING Draft January 2013 TIER TWO SCREENING REPORT November 2012 Parsons Brinckerhoff DRAFT November 2012 1 Parsons Brinckerhoff DRAFT November 2012-2

More information

Using Driving Simulator for Advance Placement of Guide Sign Design for Exits along Highways

Using Driving Simulator for Advance Placement of Guide Sign Design for Exits along Highways Using Driving Simulator for Advance Placement of Guide Sign Design for Exits along Highways Fengxiang Qiao, Xiaoyue Liu, and Lei Yu Department of Transportation Studies Texas Southern University 3100 Cleburne

More information

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence

More information

TCAG Annual Intersection Monitoring Program

TCAG Annual Intersection Monitoring Program TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT

More information

TCAG Annual Intersection Monitoring Program

TCAG Annual Intersection Monitoring Program TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT

More information

DEVELOPMENT OF A MICROSCOPIC TRAFFIC SIMULATION MODEL FOR INTERACTIVE TRAFFIC ENVIRONMENT

DEVELOPMENT OF A MICROSCOPIC TRAFFIC SIMULATION MODEL FOR INTERACTIVE TRAFFIC ENVIRONMENT DEVELOPMENT OF A MICROSCOPIC TRAFFIC SIMULATION MODEL FOR INTERACTIVE TRAFFIC ENVIRONMENT Tomoyoshi SHIRAISHI, Hisatomo HANABUSA, Masao KUWAHARA, Edward CHUNG, Shinji TANAKA, Hideki UENO, Yoshikazu OHBA,

More information

Duluth Entertainment Convention Center (DECC) Special Events Traffic Flow Study. Traffic Data Analysis and Signal Timing Coordination

Duluth Entertainment Convention Center (DECC) Special Events Traffic Flow Study. Traffic Data Analysis and Signal Timing Coordination Duluth Entertainment Convention Center (DECC) Special Events Traffic Flow Study Traffic Data Analysis and Signal Timing Coordination Final Report Prepared by Jiann-Shiou Yang Department of Electrical and

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

City of Surrey Adaptive Signal Control Pilot Project

City of Surrey Adaptive Signal Control Pilot Project City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors

More information

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1 REGIONAL TRANSIT AUTHORITY RESOLUTION NO. 98-1 BACKGROUND AND COMMENTS Meeting: PGA Committee Board of Directors Date: 1/16/98 1/22/98 Agenda Item: No. 4 No. 7C-1 Staff Contact: Barbara Dougherty, Communications

More information

Georgia s Regional Traffic Operations Program

Georgia s Regional Traffic Operations Program Georgia s Regional Traffic Operations Program Shahram Malek, PhD, PE Vice President, ARCADIS US Inc. Regional Traffic Operations Project Manager Koushik Arunachalam, PE Associate Project Manager, ARCADIS

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District 0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL

More information

State-Space Models with Kalman Filtering for Freeway Traffic Forecasting

State-Space Models with Kalman Filtering for Freeway Traffic Forecasting State-Space Models with Kalman Filtering for Freeway Traffic Forecasting Brian Portugais Boise State University brianportugais@u.boisestate.edu Mandar Khanal Boise State University mkhanal@boisestate.edu

More information