Georgia s Regional Traffic Operations Program

Size: px
Start display at page:

Download "Georgia s Regional Traffic Operations Program"

Transcription

1 Georgia s Regional Traffic Operations Program Shahram Malek, PhD, PE Vice President, ARCADIS US Inc. Regional Traffic Operations Project Manager Koushik Arunachalam, PE Associate Project Manager, ARCADIS US Inc.

2 Traffic Signals Poor signal timing 5 to 10 percent of all traffic delay 295 million vehicle-hours of delay on major roadways 9000 Traffic Signals Over 50% located in the Atlanta Region

3 Who Operates the Traffic Signals? 9000 Signals Statewide Maintaining Agencies: 7 GDOT Districts 54 Counties 36 Cities Top 5 maintaining agencies: GDOT: 2417 signals City of Atlanta: 975 signals Gwinnett County: 674 signals DeKalb County: 661 signals Cobb County: 543 signals

4 Atlanta Region s Signal Operators In most major metropolitan areas: State DOT manages the freeway network Local agencies manage arterials In Atlanta: 4 GDOT Districts 15 Counties 22 Cities

5 ITS Projects STC 6 PM STC 1 STC 2 ATC Contractor STC 3 STC 4 LED Display Upgrades GDOT Count Data Loop Contractor 1 Loop Contractor 2 STC 5 Signal Maintenance Contractor Timing Contracts Traffic Engineer Local Agencies Loop Contracts Signal Shop CID

6 ITS Projects PM STC 6 STC 1 STC 2 ATC Contractor STC 3 STC 4 LED Display Upgrades GDOT Count Data Loop Contractor 1 Loop Contractor 2 STC 5 Signal Maintenance Contractor Timing Contracts Traffic Engineer Local Agencies Loop Contracts Signal Shop CID

7 RTOP s Role Traffic Signal Maintenance and Repair Issues Regional Focus Mainline Priority Cross-Jurisdictional Actively Manage Traffic Flow Mission: To increase travel throughput by minimizing congestion and reducing delays along regional commuter corridors through improved signal operations.

8 RTOP Partners

9 Memorandum of Understanding Responsibilities GDOT GDOT Lead Local Agency Corridor Traffic Signal Timing GDOT Local Lead Local Agency Timing Adjustments * Preventative/Routine Maintenance After Hours/Emergency Response Detector, Communication, and Surveillance Repair Actively Manage and Monitor (Peak Hours) Major Repair *Subject to GDOT approval Georgia s Regional Signal Operations Program 9

10 Regionally Significant Corridors Phase 1 June 9, 2010 Phase 2 October 27, 2010 Phase 3 January 4, 2013 Phase 4 October 15, 2013

11 What have we been doing? Preventative/Routine maintenance Repair of equipment Operational Improvements Communications to traffic signals Surveillance at key locations Active signal timing adjustments Technology evaluation/deployment Georgia s Regional Signal Operations Program 11

12 Percent Operational Equipment Repair Operational Detection 100% 95% Program Goal 90% 85% 80% Vehicle Detection 75% Pedestrian Detection 70%

13 Equipment Repair Vehicle Detectors 2,150 Replaced 537 Repaired Pedestrian Detectors 1,394 Replaced 248 Repaired PM Program Ground Testing Georgia s Regional Signal Operations Program 13

14 Remote Communications RTOP connected signals to the GDOT TMC Full intersection control Accessible to GDOT (610) Accessible to Locals (56) No remote communications (84)

15

16 Communications Plan

17 Communications Plan

18 Remote Communications Status Monitoring Detector Diagnostics

19 Traffic Responsive Operation

20 When Signal Timing Just Isn t Enough Applications of Synchro and VISSIM to evaluate alternatives Operational Improvements Turn lane additions Phasing changes Lane Diets Indirect Lefts Tool selection based on needs Complex intersections require VISSIM (weaves, closely spaced signals) Corridor level changes can be done in Synchro (turn lane addition, lane diets)

21 Surveillance Currently have 113 CCTV monitoring about 1/2 of the assigned corridors Planned expansion covers all routes and increases the CCTV count to 275 Additionally we are now adding new hardware to bring back all IVDS back to TMC/TCCs 21

22 Active Management (before remote communication) Limited to: Major Events Planned Events Incidents lasting longer than one peak period

23 Active Management Control from a single location AM Peak 6 AM to 10 AM PM Peak 3 PM to 7 PM Response to any event C2C signal system Video sharing

24 Firsts Shared Communication Network RNET Program Based Technology Evaluation Cloud Based Traffic Signal System Citrix Successful TR operation in GA Across Jurisdiction Boundaries Video Sharing Architecture Ethernet over Copper Wireless Ethernet IP-based CCTV Retroreflective Backplates Deployments of Flashing Yellow Arrow

25 Program Benefits Spring 2013 comparison to baseline Reduced number of stops by 4% Reduced stopped time delay by.1% Traffic volumes increased by 10.8%

26 Other Traffic Operational Programs GDOT has provided seed money Community Improvement Districts to Implement Three Programs Perimeter CIDs Midtown Alliance Downtown

27 Lessons Learned Understanding RTOP s Role and achieving understanding with our stakeholders Understanding of stakeholders needs, resources, and objective Improved maintenance Better timings Balanced operation / significant generators Budget constraints (manpower, equipment, technology) Grasping the state of the infrastructure Detection (vehicular and pedestrian) Communications Displays Safety concerns Meeting the standards Georgia s Regional Signal Operations Program

28 Lessons Learned Evolution of roles and responsibilities Firefighter, designer, constructor, integrator, maintainer, and operator Defining the needs and priorities Each agency is unique Each corridor has special requirements Improving the operations within constraints Coordination with other program/projects Local agency, other key stakeholders (CID), DOT (LARP, District, GO), Operational Improvements IT/Systems challenges Equipment purchases, network connection, system configuration, system interfaces Georgia s Regional Signal Operations Program

29 RTOP Funding Late start the first year funding cut Success in 2011 and 2012 lead to increased funding Program is now in expansion phase Anticipated Growth in 2016 to $23.5 Million $3M $8M $10M $12.75M $16.25M $16.25M $16.25M Georgia s Regional Signal Operations Program 29

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Roadmap to Successful Deployment of Adaptive Systems

Roadmap to Successful Deployment of Adaptive Systems Smart Information for a Sustainable World Roadmap to Successful Deployment of Adaptive Systems Farhad Pooran Telvent Transportation North America Hampton Roads Transportation Operation Sub- Committee June

More information

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout

More information

OPAC Adaptive Engine Pinellas County Deployment

OPAC Adaptive Engine Pinellas County Deployment OPAC Adaptive Engine Pinellas County Deployment Farhad Pooran Telvent Transportation North America Baltimore Regional Traffic Signal Forum May 25, 2011 Presentation Agenda Adaptive control systems - expected

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES ITS California Technical Session 9 - Innovative Technology for Local Cities Thursday, October 16, 2014 Mark Taylor, P.E., PTOE Traffic Signal Operations Engineer

More information

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is

More information

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road)

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road) Adaptive Signal System Mt. Juliet, TN SR-171 (Mt. Juliet Road) Project Background Project Location Mt. Juliet, TN: 2015 Census: 28,159 Doubled since 2000 Immediately east of Metro Nashville Mt. Juliet

More information

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District 0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL

More information

PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story

PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story Presented By David Adams, PE PennDOT District 6-0 John Albeck, PE, PTOE Albeck Gerken, Inc. PennDOT District 6-0 PennDOT Ownership by

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

Columbus Computerized Traffic Signal System

Columbus Computerized Traffic Signal System Where have we been? Where are we today? Where are we going? Eagan L. Foster, P.E. Transportation Division Columbus Public Service Department The Importance of Coordinated Traffic Signal Systems Reduce

More information

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned ARIZONA CONNECTED VEHICLE PROGRAM Arterial Connected Vehicle Test Bed Deployment and Lessons Learned Faisal Saleem ITS Branch Manager & SMARTDrive Program Manager Maricopa County Department of Transportation

More information

Minnesota Department of Transportation Rural Intersection Conflict Warning System (RICWS) Reliability Evaluation

Minnesota Department of Transportation Rural Intersection Conflict Warning System (RICWS) Reliability Evaluation LLLK CENTER FOR TRANSPORTATION STUDIES Minnesota Department of Transportation Rural Intersection Conflict Warning System (RICWS) Reliability Evaluation Final Report Arvind Menon Max Donath Department of

More information

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S WHITE PAPER BENEFITS OF OPTICOM GPS Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S 2 CONTENTS Overview 3 Operation 4 Advantages of Opticom GPS 5 Opticom GPS

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

Joint OCTEC / ITS-CA Southern Section Luncheon Meeting. February 22, 2018

Joint OCTEC / ITS-CA Southern Section Luncheon Meeting. February 22, 2018 Joint OCTEC / ITS-CA Southern Section Luncheon Meeting February 22, 2018 Advanced Transportation Controller (ATC) How did we get here?...where are we going? Introduction OCTA has a county wide traffic

More information

Assessing the Performance of Integrated Corridor Management (ICM) Strategies

Assessing the Performance of Integrated Corridor Management (ICM) Strategies Assessing the Performance of Integrated Corridor Management (ICM) Strategies Matt Burt, Battelle Research and Evaluation Session, NATMEC 2012 June 7, 2012 1 Presentation Outline The U.S. DOT ICM Program

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

Traffic Signal System Upgrade Needs

Traffic Signal System Upgrade Needs Traffic Signal System Upgrade Needs Presented to: Dallas City Council November 20, 2013 DEPARTMENT OF STREET SERVICES Purpose The City of Dallas has a program to achieve and maintain street pavement condition

More information

FINAL DRAFT. Prepared for: Metropolitan Washington Council of Governments. May 29, 2002

FINAL DRAFT. Prepared for: Metropolitan Washington Council of Governments. May 29, 2002 Satisfaction Through Superior Service Metropolitan Washington Region Traffic Signal Systems White Paper FINAL DRAFT Prepared for: Metropolitan Washington Council of Governments May 29, 2002 Trichord, Inc.

More information

Next Generation Traffic Control with Connected and Automated Vehicles

Next Generation Traffic Control with Connected and Automated Vehicles Next Generation Traffic Control with Connected and Automated Vehicles Henry Liu Department of Civil and Environmental Engineering University of Michigan Transportation Research Institute University of

More information

Communications Design Challenges for the Edmonton North LRT Extension

Communications Design Challenges for the Edmonton North LRT Extension Communications Design Challenges for the Edmonton North LRT Extension Syl Santo, RCDD ITS Designer Stantec Consulting Syl Santo, RCDD 24 years of experience in communications technology Prior experience

More information

Adaptive Signal Control in Tyler Texas

Adaptive Signal Control in Tyler Texas Kirk Houser City of Tyler Kent Kacir - Siemens Adaptive Signal Control in Tyler Texas June 16, 2007 Amarillo, TX Agenda Transportation Planning and City Comprehensive Plan Description of the Corridor Operational

More information

Deploying Transit Signal Priority Systems

Deploying Transit Signal Priority Systems Deploying Transit Signal Priority Systems Christopher Poe, Ph.D., P.E. Assistant Agency Director ITS Annual Meeting Austin, September 5, 2008 Acknowledgements n DART - Abed Abukar, Chris Patrick, and Koorosh

More information

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL ACTIVATING/DEACTIVATING A SIGNAL Activating a traffic control signal requires careful planning and coordination between the project engineer, the contractor

More information

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE First Annual 2018 National Mobility Summit of US DOT University Transportation Centers (UTC) April 12, 2018 Washington, DC Research Areas Cooperative

More information

1 of REV:0

1 of REV:0 1 of 5 683-10573-0418 This specification sets forth the minimum requirements for purchase and installation of an aboveground Radar Advance Detection Device (RADD) system for a real-time, advance vehicle-detection

More information

San Antonio Wrong Way Driver Initiative

San Antonio Wrong Way Driver Initiative San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force

More information

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Model Deployment Overview Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Test Conductor Team 2 3 Connected Vehicle Technology 4 Safety Pilot Model Deployment

More information

Linking TransCAD to Synchro Micro-simulation

Linking TransCAD to Synchro Micro-simulation Linking TransCAD to Synchro Micro-simulation -Using DTA as an Intermediate Maggie Lin Dr. Zong Tian (CATER) Outline Background / Introduction Development of DTA model Using DTA for Conversion Conclusions

More information

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 ACS-Lite The Next Generation of Traffic Signal Control Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 Outline Background on adaptive traffic signal Systems ACS-Lite Goals Development Functionality

More information

COUNTYWIDE TRAFFIC CONTROL DEVICES STUDY

COUNTYWIDE TRAFFIC CONTROL DEVICES STUDY LEE COUNTY COUNTYWIDE TRAFFIC CONTROL PRESENTED TO LEE COUNTY METROPOLITAN PLANNING ORGANIZATION PRESENTED BY VANUS, INC. VANUS December 19, 2008 Overview Purpose Evolution of the Project Master Plan Purpose

More information

Traffic Solutions. How to Test FCD Monitoring Solutions: Performance of Cellular-Based Vs. GPS-based systems

Traffic Solutions. How to Test FCD Monitoring Solutions: Performance of Cellular-Based Vs. GPS-based systems Traffic Solutions How to Test FCD Monitoring Solutions: Performance of Cellular-Based Vs. GPS-based systems About Cellint Israel Based, office in the US Main products NetEyes for quality of RF networks

More information

Just Announced! General Registration : Includes all three days of Technical Sessions, $150 for Florida Section Members / $300 for Nonmembers

Just Announced! General Registration : Includes all three days of Technical Sessions, $150 for Florida Section Members / $300 for Nonmembers Tuesday May 30th Wednesday May 31st Challenge Exams $200 Vendor Show 11:30-5 Traffic Signal II Classes $500 / $550 Reception Signs & Markings Level I Signal related Tech Sessions Day 1 Signal Inspection

More information

City of Orlando Alpha Test July 10, 2000

City of Orlando Alpha Test July 10, 2000 City of Orlando Alpha Test July 10, 2000 Submitted by Naztec, Inc. Naztec, Inc. installed local intersection equipment and StreetWise control system under the City of Orlando s Alpha Test to replace existing

More information

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014 Integrated Corridor Management Brian Cronin USDOT October 14, 2014 ICM Program Objectives 1. Demonstrate and evaluate pro-active integrated approaches, strategies, and technologies for efficient, productive,

More information

Technical Memorandum# TM2

Technical Memorandum# TM2 Technical Memorandum#0-6902-TM2 To: From: RTI Project Manager: Sonya Badgley CTR Research Team: Andrea Gold, Kristie Chin, C. Michael Walton Subject: TxDOT Project 0-6902 Technical Memorandum for Task

More information

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS L.A. Griffin Director of Expressway Operations, Orlando-Orange County Expressway Authority 4974 ORL Tower Road Orlando, FL 32807 (407)

More information

Transit Signal Priority (TSP) System Replacement Concept Detail and Technical Requirements

Transit Signal Priority (TSP) System Replacement Concept Detail and Technical Requirements Transit Signal Priority (TSP) System Replacement Concept Detail and Technical Requirements Pamela Wrenn, Owen Kehoe, John Toone KC Metro Karl Typolt, Polly Okunieff, Bryan Nace Consultant Team Project

More information

VALIDATION OF LINK TRAVEL TIME USING GPS DATA: A Case Study of Western Expressway, Mumbai

VALIDATION OF LINK TRAVEL TIME USING GPS DATA: A Case Study of Western Expressway, Mumbai Map Asia 2005 Jaarta, Indonesia VALIDATION OF LINK TRAVEL TIME USING GPS DATA: A Case Study of Western Expressway, Mumbai Saurabh Gupta 1, Tom V. Mathew 2 Transportation Systems Engineering Department

More information

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger PIARC WG5 Complex Underground Road Networks Part A Case Studies - appendices Appendix 3.1 - CANADA / Québec Montréal tunnels Ville-Marie & Viger 1. SUMMARY The Ville-Marie and Viger tunnel complex is part

More information

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Jamie Mackey, P.E., PTOE Utah Department of Transportation Statewide Signal Engineer jamiemackey@utah.gov NOCoE Webinar Are Your Traffic Signals Ready

More information

Collin Castle. NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016

Collin Castle. NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016 Collin Castle NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016 Session 1: Innovation & Emerging Technologies Infrastructure Readiness for Connected Vehicles & Traffic

More information

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101

More information

Area Traffic Control System (ATCS)

Area Traffic Control System (ATCS) Area Traffic Control System (ATCS) 1. Introduction: Area Traffic Control System is an indigenous solution for Indian Road Traffic, which optimizes traffic signal, covering a set of roads for an area in

More information

City of Surrey Adaptive Signal Control Pilot Project

City of Surrey Adaptive Signal Control Pilot Project City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors

More information

2-800 MHz CCCS Sys Extension

2-800 MHz CCCS Sys Extension 2-800 MHz CCCS Sys Extension 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner. 3. Is the Strategic Priority new or previously identified in an earlier Strategic

More information

FINAL REPORT IMPROVING THE EFFECTIVENESS OF TRAFFIC MONITORING BASED ON WIRELESS LOCATION TECHNOLOGY. Michael D. Fontaine, P.E. Research Scientist

FINAL REPORT IMPROVING THE EFFECTIVENESS OF TRAFFIC MONITORING BASED ON WIRELESS LOCATION TECHNOLOGY. Michael D. Fontaine, P.E. Research Scientist FINAL REPORT IMPROVING THE EFFECTIVENESS OF TRAFFIC MONITORING BASED ON WIRELESS LOCATION TECHNOLOGY Michael D. Fontaine, P.E. Research Scientist Brian L. Smith, Ph.D. Faculty Research Scientist and Associate

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

Abilene District Traffic Signal Timing and Capacity Analysis

Abilene District Traffic Signal Timing and Capacity Analysis Abilene District Traffic Signal Timing and Capacity Analysis 2017 IAC Report Task-45 TransTech Lab, TechMRT Hongchao Liu, Ph.D., P.E. Jason (Bo) Pang, Ph.D. Ariel Castillo-Rodriguez, E.I.T. I Table of

More information

PALMETTO 800 History Project Cost

PALMETTO 800 History Project Cost PALMETTO 800 South Carolina has implemented the largest statewide emergency communications radio system in the nation. With over twenty thousand users, the system is available to federal, state, and local

More information

Evaluation of Actuated Right Turn Signal Control Using the ITS Radio Communication System

Evaluation of Actuated Right Turn Signal Control Using the ITS Radio Communication System 19th ITS World Congress, Vienna, Austria, 22/26 October 2012 AP-00201 Evaluation of Actuated Right Turn Signal Control Using the ITS Radio Communication System Osamu Hattori *, Masafumi Kobayashi Sumitomo

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner 3. Is the Strategic Priority new

More information

WSDOT LED Adaptive Roadway Lighting & Illumination Reform

WSDOT LED Adaptive Roadway Lighting & Illumination Reform WSDOT LED Adaptive Roadway Lighting & Illumination Reform Keith Calais Signal and Illumination Engineer Western States Rural Transportation Technology Implementers Forum June 17-19, 2014 Yreka, CA 1 Each

More information

EMERGENCY COMMUNICATIONS

EMERGENCY COMMUNICATIONS EMERGENCY COMMUNICATIONS FY2004-2010 1. BACKGROUND ISSUES The Emergency Communications element of the capital plan is comprised of three projects concerning emergency radio communications, computer aided

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

Managing traffic through Signal Performance Measures in Pima County

Managing traffic through Signal Performance Measures in Pima County CASE STUDY Miovision TrafficLink Managing traffic through Signal Performance Measures in Pima County TrafficLink ATSPM Case Study Contents Project overview (executive summary) 2 Project objective 2 Overall

More information

Traffic Operations Division. FY Budget Presentation

Traffic Operations Division. FY Budget Presentation FY 2018-19 Budget Presentation Goals and Accomplishments Prior Year Accomplishments in FY 2017-2018 Signals o Installed/Replaced 10 traffic signals o Upgraded 27 traffic signals with ITS equipment Signs

More information

Complete Streets & PPM to FDM Update

Complete Streets & PPM to FDM Update Florida Department of TRANSPORTATION Complete Streets & PPM to FDM Update Derwood Sheppard, P.E. Design Standards Paul Hiers, P.E. Roadway Criteria State Roadway Design Office February 2017 - FTBA Construction

More information

Vehicle speed and volume measurement using V2I communication

Vehicle speed and volume measurement using V2I communication Vehicle speed and volume measurement using VI communication Quoc Chuyen DOAN IRSEEM-ESIGELEC ITS division Saint Etienne du Rouvray 76801 - FRANCE doan@esigelec.fr Tahar BERRADIA IRSEEM-ESIGELEC ITS division

More information

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor

More information

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1 REGIONAL TRANSIT AUTHORITY RESOLUTION NO. 98-1 BACKGROUND AND COMMENTS Meeting: PGA Committee Board of Directors Date: 1/16/98 1/22/98 Agenda Item: No. 4 No. 7C-1 Staff Contact: Barbara Dougherty, Communications

More information

Frequently Asked Questions

Frequently Asked Questions The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions

More information

Design Guidelines for Deploying Closed Loop Systems

Design Guidelines for Deploying Closed Loop Systems Final Report FHWA/IN/JTRP-2001/11 Design Guidelines for Deploying Closed Loop Systems By Andrew Nichols Graduate Research Assistant Darcy Bullock Associate Professor School of Civil Engineering Purdue

More information

Adaptive signal Control. Tom Mathew

Adaptive signal Control. Tom Mathew Adaptive signal Control Tom Mathew Adaptive Control: Outline 1. Signal Control Taxonomy 2. Coordinated Signal System 3. Vehicle Actuated System 4. Area Traffic Control (Responsive) 5. Adaptive Traffic

More information

Context Aware Dynamic Traffic Signal Optimization

Context Aware Dynamic Traffic Signal Optimization Context Aware Dynamic Traffic Signal Optimization Kandarp Khandwala VESIT, University of Mumbai Mumbai, India kandarpck@gmail.com Rudra Sharma VESIT, University of Mumbai Mumbai, India rudrsharma@gmail.com

More information

I. Travel Time Determinations on London Bridge Road and_i-264 Corridor using of Bluetooth Detection Devices

I. Travel Time Determinations on London Bridge Road and_i-264 Corridor using of Bluetooth Detection Devices October/November/December 2016 I. Travel Time Determinations on London Bridge Road and_i-264 Corridor using of Bluetooth Detection Devices The TMC recently installed blue tooth devices for a pilot project

More information

Preparing for an Uncertain Future:

Preparing for an Uncertain Future: : for a Greater Baltimore Region DRAFT Maximize2040 is an initiative of the Baltimore Regional Transportation Board, the metropolitan planning organization for the Baltimore region. 1 SCENARIO THINKING:

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016 Integrated Corridor Management (ICM) Planning Study MPO Presentation September 8, 2016 ICM Grant Background On February 26, 2015, the Broward MPO was awarded a grant by FHWA in the amount of $180,000 for

More information

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Peter Xin, P.Eng. Senior Transportation Engineer Policy

More information

Synthesis Study of Texas Signal Control Systems: Technical Report

Synthesis Study of Texas Signal Control Systems: Technical Report Synthesis Study of Texas Signal Control Systems: Technical Report Technical Report 0-6670-1 Cooperative Research Program TEXAS A&M UNIVERSITY KINGSVILLE KINGSVILLE, TEXAS TEXAS A&M TRANSPORTATION INSTITUTE

More information

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms INTRODUCTION Use the following Guidelines in conjunction with the ITS & Signals Scope of work provided in the Project Scoping

More information

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania Information Communications Technology Innovation Commonwealth of Pennsylvania Executive Summary In the mid-1990s, the Commonwealth of Pennsylvania faced the prospect of replacing an aging analog radio

More information

State. Alabama. Arizona. Arkansas. Delaware. Florida. Idaho. Illinois. Iowa. Michigan. New Hampshire. New Mexico

State. Alabama. Arizona. Arkansas. Delaware. Florida. Idaho. Illinois. Iowa. Michigan. New Hampshire. New Mexico Alabama Arizona Arkansas Delaware Florida Idaho Illinois Iowa Michigan New Hampshire New Mexico Answer for Question 1 ) How does your state decide who has responsibility for maintenance when a signal is

More information

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC. NCTCOG Regional Travel Model Improvement Experience in 2009 and Data Management Presented to TMIP VMTSC December 7, 2009 Presenters Kathy Yu Senior Modeler Arash Mirzaei Manager Model Group Behruz Paschai

More information

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Impacts of Traveler Information on the Overall Network FINAL REPORT Prepared by September 2012 i 1. Report No. ENT-2012-2 2. Government Accession

More information

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY Introduction In 2010, the North Central Texas Council of Governments (NCTCOG) launched the Regional Traffic Signal Retiming Program (RTSRP), the

More information

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY Joseph K. Lam, P.Eng., Managing Director Delcan Corporation 625 Cochrane Drive, Suite 500, Markham, Ontario, Canada, L3R 9R9 Tel: +1-905-943-0521,

More information

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE

More information

Smart Cities. Wednesday, May 16, :30 a.m. - 12:00 p.m. (EDT) What is a smart city? Are we ready for it? What are the challenges?

Smart Cities. Wednesday, May 16, :30 a.m. - 12:00 p.m. (EDT) What is a smart city? Are we ready for it? What are the challenges? Smart Cities Wednesday, May 16, 2018 11:30 a.m. - 12:00 p.m. (EDT) What is a smart city? Are we ready for it? What are the challenges? Elements of a Smart(er) City The application of a wide range of electronic

More information

Connected Car Networking

Connected Car Networking Connected Car Networking Teng Yang, Francis Wolff and Christos Papachristou Electrical Engineering and Computer Science Case Western Reserve University Cleveland, Ohio Outline Motivation Connected Car

More information

DAS Solutions. Delivering coverage and capacity in today s challenging environments

DAS Solutions. Delivering coverage and capacity in today s challenging environments DAS Solutions Delivering coverage and capacity in today s challenging environments Wireless subscribers expect clear coverage Partner with an industry leader With a diverse offering of communications sites

More information

FDOT Voice Radio Communications and Microwave Network

FDOT Voice Radio Communications and Microwave Network FDOT Voice Radio Communications and Microwave Network Presented at the 2013 Transportation Hazards and Security Summit and Peer Exchange, AASHTO Special Committee Meeting on Wireless Communications Technology

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology

Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology Keith Riniker Director of Traffic Engineering & ITS Sabra,

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-05/0-4422-2 4. Title and Subtitle DEVELOPMENT OF A TRAFFIC SIGNAL PERFORMANCE MEASUREMENT SYSTEM (TSPMS) 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

Transportation Tuesdays Online Fourth in webinar series for transit CEOs & board members on economic sustainability March 6, 2012

Transportation Tuesdays Online Fourth in webinar series for transit CEOs & board members on economic sustainability March 6, 2012 Transportation Tuesdays Online Fourth in webinar series for transit CEOs & board members on economic sustainability March 6, 2012 State Transportation Study Commissions: How Did We Do? Frederick L. Daniels,

More information

Capability Statement

Capability Statement Capability Statement Who we are RCS Telecommunications (RCST) is a leading Australian telecommunications service provider for medium to large organisations. With over 35 years experience in communication

More information

CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES

CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES Arizona ITE March 3, 2016 Faisal Saleem ITS Branch Manager & MCDOT SMARTDrive Program Manager Maricopa County Department of Transportation ONE SYSTEM MULTIPLE

More information

City of Calgary, Alberta

City of Calgary, Alberta City of Calgary, Alberta An Encom Then and Now Success Story The Challenge Boomtown needed innovative solution Calgary is known worldwide as the Stampede City, thanks to its annual 10-day rodeo and Western

More information

1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4.

1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4. 1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4. Travel time prediction Travel time = 2 40 9:16:00 9:15:50 Travel

More information

Applicability of Adaptive Traffic Control Systems in Nevada s Urban Areas

Applicability of Adaptive Traffic Control Systems in Nevada s Urban Areas NDOT Research Report Report No. 92-9-83 Applicability of Adaptive Traffic Control Systems in Nevada s Urban Areas March 211 Nevada Department of Transportation 1263 South Stewart Street Carson City, NV

More information