FM 691 CORRIDOR STUDY
|
|
- Rosamond Clarke
- 5 years ago
- Views:
Transcription
1 FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008
2 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289 Access Management Schedule
3 Study Area CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE SSH H PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ 9911 LLOO YY SPUR 503 FM 691 FM FM FM FM FUTURE FUTURE SH SH FM FM LLAA KK EE NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD
4 Proposed Developments near US 75/FM 691 Cigna Office Complex Texoma Medical Center (2010) Hotel/Convention Center (2010) Proposed Town Center (2015)
5 Short-Term Site Generated Trips 2,900 trips 6,100 trips Projected 27,700 Additional Daily Trips 6,800 trips 8,400 trips 5,400 trips
6 Long-Term Site Generated Trips 2,900 trips 20,000 trips Projected 67,700 Additional Daily Trips 8,400 trips 5,400 trips 6,100 trips 6,800 trips 15,000 trips 5,000 trips
7 US 75/FM 691 in Short-Term Close Proximity of SB Exit Ramp to Driveway Heavy U-turn traffic to TMC and from Hotel/Convention Center NB access to US 75 from TMC, CIGNA, and Office limited Signalize interchange, Pool Road and Town Center Blvd. Operates acceptably with existing geometry
8 US 75/FM 691 in Long-Term Increases total trips from 30,000 to 70,000 SB Exit Ramp results in poor operation and potential safety issues NB Entrance Ramp over capacity NB access to US 75 from TMC, CIGNA, and Office limited Gateway Blvd over capacity U-turn traffic to TMC and from Hotel/Convention Center & Town Center
9 Recommended Short-Term Improvements for US 75/FM 691 Limited access for planned driveway (inbound only) Signalize major intersections once warranted Existing configuration projected to operate acceptable in short-term
10 Recommended Long-Term Improvements for US 75/FM 691 Four through lanes along FM 691 with exclusive turn lanes for major access points US 75 ramp alternatives
11 Benefit for US 75 Ramp Alternatives Improve local access to proposed developments Minimize safety and operational impacts to the interchange and local roadways Improve regional movement
12 US 75 Ramp Option Methodology Provide necessary distance between ramp and access Loy Lake Proper weaving distances Spur 503 Maximize interchange operation Maintain access SH 131 FM 691 Pool Road Theresa Road SH 91 Terrell Road Blue Flame Loy Lake Fallon Dr.
13 TxDOT s s Planned Ultimate US 75 Ramp Configuration Provide full ramp access to Fallon Drive for improved Midway Mall access Loy Lake Spur 503 Maintain full ramp access to FM 691 SH 131 Pool Road Theresa Road SH 91 FM 691 Terrell Road Blue Flame Loy Lake Fallon Dr. Existing Remove New
14 US 75 Ramp Option 1 Flip FM 691 ramps to provide frontage road access Loy Lake Eliminate direct connectors to/from Spur 503 Move NB Entrance from FM 691 and SB Exit to FM 691 Continuous NB Frontage Road goes under Spur 503 SH 131 Town Center Hotel/Conv. FM 691 Terrell Road Loy Lake Future Dev. Spur 503 Cigna TMC Future Dev. Pool Road Blue Flame Fallon Dr. Theresa Road SH 91 Existing Remove New
15 US 75 Ramp Option 2 Flip SB Entrance ramp from Loy Lake Loy Lake Flip FM 691 ramps NB Frontage Road spans over Spur 503 and WB to NB DC Eliminate NB to EB DC in order to provide NB Entrance ramp from FM 691 SH 131 Town Center Hotel/Conv. FM 691 Terrell Road Loy Lake Future Dev. Spur 503 Cigna TMC Future Dev. Pool Road Blue Flame Fallon Dr. Theresa Road SH 91 Existing Remove New
16 US 75 Ramp Option 3 Rural diamond interchange for Spur 503 with uninterrupted frontage roads Loy Lake Flip FM 691 ramps Spur 503 New ramps between Loy Lake and FM 691 SH 131 Town Center Hotel/Conv. Cigna TMC Pool Road Theresa Road SH 91 FM 691 Future Dev. Future Dev. Terrell Road Blue Flame Loy Lake Fallon Dr. Existing Remove New
17 FM 691 Corridor Goals Improve east-west movement and provide connection to future SH 289 Sub-regional alternate to US 82 Outline an access plan for future development
18 FM 691 Corridor Typical Section SSH H PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ 9911 LLOO YY FM FM SPUR 503 CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE FM 691 FM FM LA LA CIMA CIMA FM FM FUTURE FUTURE SH SH LLAA KK EE NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD
19 FM 691 Corridor Typical Section (Future SH 289 to FM 131) Rural four-lane with potential expansion to six lanes
20 FM 691 Corridor Typical Section (FM 131 to Texoma Parkway) Urban four-lane with potential expansion to six lanes
21 FM 691 Corridor Evaluation (Future SH 289 to FM 131) SSH H PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ 9911 LLOO YY FM FM SPUR 503 CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE FM 691 FM FM LA LA CIMA CIMA FM FM FUTURE FUTURE SH SH LLAA KK EE NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD
22 Need for FM 691 Extension Future SH 289 extension Future industrial development along SH 289 Intermodal development at the Airport Sub-regional alternative to US 82
23 on B LA LA CIMA CIMA 9911 SSH H FM FM FM 691 FM Op FM tio nc PLAINVIEW RD. PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE Op ti FM FM on A Op ti FUTURE FUTURE SH SH NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD SPUR 503 LLOO YY LLAA KK EE FM 691 Corridor Evaluation (Future SH 289 to FM 131)
24 Comparison of New FM 691 Alignments (Future SH 289 to FM 131) FUTURE SH 289 NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD Option A FM 1417 LA CIMA PLAINVIEW RD. GRAYSON COUNTY COLLEGE Option B FM 131 FM 691 FM 691 PROPOSED TOWN CENTER CIGNA OFFICE HOTEL/ COMPLEX CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE DEVELOPMENT FUTURE DEVELOPMENT Estimated Total Construction Cost $21 million $19.6 million $20.4 million Option C Feature Option A Option B Option C Length Used Along Existing Plainview Road (miles) FM Total Length of New Roadway (miles) Total Length along existing FM Total New ROW Needed (acres) Estimated Cost of New Alignment Roadway $10 million $14 million $16.4 million SH 91 SH 91
25 Evaluation of FM 691 Corridor (FM 131 to Texoma Parkway) FUTURE SH 289 NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD Option A FM 1417 PLAINVIEW RD. PLAINVIEW RD. LA CIMA GRAYSON COUNTY COLLEGE Option B FM 131 FM 691 FM 691 Option C FM 131 PROPOSED TOWN CENTER CIGNA OFFICE HOTEL/ COMPLEX CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE DEVELOPMENT FUTURE DEVELOPMENT SH 91 SH 91 Feature Total Length of Roadway(miles) Total New ROW Needed (acres) Estimated Cost of Widened Roadway Quantities 1.75 minimal $10.5million
26 on C Op ti on B 9911 SSH H FM FM Phase 3 Op ti on A Phase 2 Phase 2 Phase 2 Op ti FUTURE FUTURE SH SH NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD SPUR 503 LLOO YY LLAA KK EE FM 691 Corridor Phased Implementation Phase 1 Phase 4 Phase 3 Phase 3
27 Access Management Driveway management Median design and control Signal spacing Interchange design and layout Coordinated land uses
28 Example of relatively poor access management
29 Example of relatively good access management
30 Bad Cross Access
31 Good Shared Access
32 Supporting Street Circulation Source: Vergil Stover
33 Access Management Policy FM 691 Corridor Access Management Plan developed through MPO Driveway spacing Median openings Corner clips Acceleration/deceleration lanes Assist TxDOT and Cities with access for future development
34 Schedule Evaluation of Existing Conditions June 2008 Develop Conceptual Alternatives June 2008 Technical Steering Committee June 25, 2008 Evaluate Conceptual Alternatives July 2008 Transportation Policy Board Meeting August 13, 2008 Public Meeting August 20, 2008 Completion of Alternatives Comparison August 2008 Finalize FM 691 Corridor Study Report October 2008
35 FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 and Associates, Inc.
36 Trip Distribution N N 40% 55% W 10% Site 10% E W 10% Site 10% E 40% 25% S Cigna Office Complex (Existing) Hotel/Convention Center (2010) Proposed Town Center (2015) Future Development on Southern Quadrants (2015) S Texoma Medical Center (2010) Medical / Dental Office (2010)
I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median
I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median
More informationKing Mill Lambert DRI# 2035 Henry County, Georgia
Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationExit 61 I-90 Interchange Modification Justification Study
Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.
More informationPUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS
PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: 2552-03-058 EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018 Hearing Information
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More informationHwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise
Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction
More informationSingle Point Urban Interchange (SPUI) with Signals
1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large
More informationDE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008
DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor
More informationSan Antonio Wrong Way Driver Initiative
San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force
More informationAbilene District Traffic Signal Timing and Capacity Analysis
Abilene District Traffic Signal Timing and Capacity Analysis 2017 IAC Report Task-45 TransTech Lab, TechMRT Hongchao Liu, Ph.D., P.E. Jason (Bo) Pang, Ph.D. Ariel Castillo-Rodriguez, E.I.T. I Table of
More informationFARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr
FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate
More informationManaging traffic through Signal Performance Measures in Pima County
CASE STUDY Miovision TrafficLink Managing traffic through Signal Performance Measures in Pima County TrafficLink ATSPM Case Study Contents Project overview (executive summary) 2 Project objective 2 Overall
More informationWSDOT LED Adaptive Roadway Lighting & Illumination Reform
WSDOT LED Adaptive Roadway Lighting & Illumination Reform Keith Calais Signal and Illumination Engineer Western States Rural Transportation Technology Implementers Forum June 17-19, 2014 Yreka, CA 1 Each
More informationNOTICE OF A MEETING. Monday, February 6 2:30 P.M. to 4:00 P.M. AGENDA QUESTIONS? PLEASE CONTACT DINA LOPEZ AT OR
NOTICE OF A MEETING RICKENBACKER COMPREHENSIVE STUDY ECONOMIC DEVELOPMENT WORKING GROUP MEETING MID-OHIO REGIONAL PLANNING COMMISSION 111 LIBERTY STREET, SUITE 100 COLUMBUS, OHIO 43215 SCIOTO CONFERENCE
More informationNCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.
NCTCOG Regional Travel Model Improvement Experience in 2009 and Data Management Presented to TMIP VMTSC December 7, 2009 Presenters Kathy Yu Senior Modeler Arash Mirzaei Manager Model Group Behruz Paschai
More informationCharlton/Oxford Route 20 Reconstruction Project
Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting
More information2017 San Juan College Luminarias 6:00pm - 11:30pm
Parking For Walking available north side of college campus 2017 San Juan College Luminarias 6:00pm - 11:30pm Drive-Thru Entrance (2 Lanes) Drive-Thru Entrance starts at 30th Street & Butler Avenue * sign
More informationEVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.
EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion
More informationState Road A1A North Bridge over ICWW Bridge
Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida
More informationTEXAS SENATE MILES DESCRIPTION: WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION TO: 0.25 MILES N. OF LOOP 20/FM 3464 IN
Page 1 IH 35 0018-06-136 1.4 WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION SHILOH ROAD TO: 0.25 N. OF LOOP 20/FM 3464 IN URBAN FREEWAY $6,000,000 $23,000,000 IH 35 0018-06-138 0.9 FOR THE CONST OF
More informationUpdated: April 7, 2016
Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace
More informationAttachment #2 PPW133-07
Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements
More informationUSE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT
USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT Justin Effinger, EIT Research Assistant/Teaching Assistant Department of Civil Engineering & Mechanics University of Wisconsin Milwaukee
More informationAMES INDUSTRIAL PARK AND OFFICE PLAZA
SILICON VALLEY LEASED INVESTMENT OR OWNER/USER OPPORTUNITY FOR SALE ±177,820 SF MULTI-TENANT INDUSTRIAL PARK & OFFICE PLAZA MILPITAS, CALIFORNIA $18,200,000.00 OR $102.35 PSF BACK ON THE MARKET! BUILDING
More informationANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS.
ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. Benjamin A. Coifman, Associate Professor Department of Civil and Environmental Engineering and Geodetic Science Department
More informationUpdate on Traffic Results and Findings
Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationAesthetic Steering Committee Meeting No. 8
I-395 Reconstruction Project Aesthetic Steering Committee Meeting No. 8 July 17, 2015 1 Sunshine Law Concepts All meetings of any board or commission of any state agency at which official acts are to be
More informationLAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017
LAND FOR SALE DEVELOPMENT OPPORTUNITY St. Louis, Missouri 63121 JUNE 2017 GWEN KNIGHT (D) +1 314 932 4096 (M) +1 314 422 0467 gwen.knight@colliers.com Table of Contents Offering Summary pg. 4-8 District
More informationVulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis
3.0 TRAFFIC IMPACTS 3.1 TRIP GENERATION To assess the impacts that the project may have on the surrounding streets, the first step was to determine Project trip generation. Project trip generation is shown
More informationAugust 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.
August 18, 2016 FS-1604A US 70 Improvements, Johnston County VHB Engineering NC, P.C. Agenda Project Description and Location Purpose and Need Background Plans Local Plans Legislation Adjacent STIP Projects
More informationFlorida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3
Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable
More informationSacramento Gateway. J o n Schult z Lic
3511-3698 ORTH FREEWAY BOULEVARD SACRAMETO, CALIFORIA EXCLUSIVELY LISTED BY: J o n Schult z Lic. 00844740 +1 916 446 8261 jon.schultz@cbre.com www.cbre.com/jon.schultz R i c k Mart i n e z Lic. 00991459
More informationSHOPPES AT DAVIS LAKE
CHARLOTTE, NORTH CAROLINA SHOPPES AT DAVIS LAKE WT Harris Boulevard & Davis Lake Parkway Charlotte, North Carolina 1,200-9,000 SF FOR LEASE 831 E. Morehead Street, Suite 245, Charlotte, NC 28202 PROJECT
More informationLegislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013
Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November
More informationPinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.
BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ
More information6.5+ Acres: Commercial Zoning Auto Dealership Entitled US 98 North - South of I-4
US 98 North - South of I-4 2510 NOrth Florida Ave.,, FL Square Mall Park Center To Orlando Exit 32 Market Square To Tampa Griffin Rd. Audi Dealership Providence Road Office Furniture Depot Griffin Rd.
More information2015 GDOT PowerPoint. Title Page
Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation
More informationArkansas State Highway and Transportation Department
Arkansas State Highway and Transportation Department Fayetteville Rotary Club Mermaids Restaurant Thursday, January 30, 2014 About AHTD The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per
More information800 Lake Murray Blvd
Kinley Rd SITE VPD 13,200 Columbiana Dr Quail Valley Neighborhood 800 IRMO, SC 29063 FOR MORE INFORMATION: JP SCURRY, CCIM Vice President 803 401 4223 jp.scurry@colliers.com SCOTTIE SMITH Senior Brokerage
More informationCONTACT US. NOW LEASING Woodcreek Plaza SHOP SPACE AVAILABLE
SHOP SPACE AVAILABLE CONTACT US Heath Kastner +1 916 446 8795 heath.kastner@cbre.com www.cbre.us/heath.kastner Lic. 01301753 CBRE, Inc. 500 Capitol Mall, Suite 2400 Sacramento, CA 95814 T +1 916 446 6800
More informationTexas Transportation Institute The Texas A&M University System College Station, Texas
1. Report No. FHWA/TX-08/0-4986-1 4. Title and Subtitle AN ASSESSMENT OF YIELD TREATMENTS AT FRONTAGE ROAD EXIT RAMP AND FRONTAGE ROAD U-TURN MERGE AREAS 2. Government Accession No. 3. Recipient's Catalog
More informationInterchange Feasibility Study
Interchange Feasibility Study I-88/Illinois Route 47 Full Interchange Kane County, IL Prepared for Village of Sugar Grove, Illinois August 5, 2010 Prepared by GRAEF 8501 West Higgins Road, Suite 280 Chicago,
More informationFORMER COMMUNITY BETHESDA SPACE
7776 Norfolk Avenue Bethesda, MD 20814 FULLY BUILT-OUT RESTAURANT 3,020 SF FORMER COMMUNITY BETHESDA SPACE CONTACT: Andrew Rose 703.442.8837 arose@nextrealty.com Andrew S. Tkach 703.442.8843 atkach@nextrealty.com
More informationAdversity Volleyball Center. Energy Sports Complex
Adversity Volleyball Center is located at: 700-710 Corporate Woods Parkway, Vernon Hills, IL 60061 700 Corporate Woods Parkway, is located just west of Milwaukee Ave (Route 21) midway between Route 22
More information0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District
0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL
More informationAgenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:
Four Case Studies Agenda Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Traffic diversion caused by capacity reduction (Fort Lauderdale, FL) Impacts on traffic due
More informationAPPENDIX M NOISE ANALYSIS
APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO
More informationDirections to Office
Directions to Office Sara Westgate, M.D., Ph.D. What area are you coming from? 1. North Austin, north of HWY 71 Ben White / HWY 290 proceeding south on MOPAC 2. Arboretum proceeding south on Loop 360,
More informationMove In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B
Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationI-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP
Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout
More informationLocate Request Information
Locate Request Information NOTE: DO NOT USE any apostrophes ( )or quotation marks ( ) in Web Ticket Entry. Doing so may hamper the transmission of tickets to the utilities and locators. Limit per Ticket
More informationACEC OC February 22, 2017
ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of
More informationAppendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation
Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report
More informationZOO INTERCHANGE PROJECT
ZOO ITERCHAGE PROJECT GET AROUD GUIDE winter 0/0 - summer 0 TAKE A LOOK ISIDE FOR CLOSURE IFORMATIO, ALTERATE ROUTES, TRASPORTATIO OPTIOS, HOW TO STAY COECTED TO THE ZOO ITERCHAGE PROJECT AD MUCH MORE!
More informationLOCATION: RIDGE AVENUE FROM LAKE STREET TO DEMPSTER STREET LENGTH: APPROXIMATELY 1075' 2-WAY STOP AT RIDGE AVENUE AND GREENWOOD STREET
CLIENT: CITY OF EVANSTON CHRISTOPHER B. BURKE ENGINEERING, LTD. PROJECT: EXISTING STREET LIGHT EVALUATION 9575 W. Higgins Road, Suite 00 DATE STUDY PERFORMED: /17/2017 Rosemont, Illinois 001 CBBEL PROJECT
More informationAVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF
AVAILABLE FOR LEASE AND SPACE Approximately 322,384 RSF 2400 Ellis Road Research Triangle Park, North Carolina www.goellisresearchcenter.com PROPERTY DESCRIPTION Administrative Wing Cafeteria Lobby/Atrium
More informationhauger bunch REALTOR 47+ Gross Acres / 33 Upland Acres Mixed Use / Office Sites US Highway 98 South Lakeland, Florida Polk State College
47+ Gross Acres / 33 Upland Acres Mixed Use / Office Sites US Highway 98 South Lakeland, Florida Autumnwood Townhomes Polk State College Bramble Ridge Golf Course 47+ Gross Acres 33+ Upland Acres City
More informationACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007
ACS-Lite The Next Generation of Traffic Signal Control Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 Outline Background on adaptive traffic signal Systems ACS-Lite Goals Development Functionality
More informationOVERVIEW WATERMARK. "Prestigious Scottsdale Road Business Address in the Valley's Most Vibrant City of Tempe."
WATERMARKTEMPE.COM "Prestigious Scottsdale Road Business Address in the Valley's Most Vibrant City of Tempe." WATERMARK OVERVIEW The Watermark is Tempe s newest premier mixed use development located on
More informationAppendix B: Noise Study
Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared
More informationWAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD
A H U R D D E V E L O P M E N T S W C O R N E R O F H I C K M A N R D. & A L I C E ' S R D. W A U K E E, I A 5 0 2 6 3 RICHIE HURD RICHARD HURD DANIEL HURD V I C E P R E S I D E N T P R E S I D E N T V
More informationPlanarization & Routing Guide
Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager
More informationNewtown SGA Master Plan
Newtown SGA Master Plan CITY OF VIRGINIA BEACH 25 MARCH 2010 Consultant Team Urban Design Associates Lead Firm, Urban Design Landmark Design Group Landscape and Civil Engineering URS Corporation Transportation
More informationPHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground
ARCADIA LOGISTICS CENTER ARCADIA, CALIFORNIA PHASE II FOR LEASE 3 BUILDINGS +-150,672 SF TO +- 529,179 SF STATE OF THE ART DEVELOPMENT ˑ ADJACENT TO I-605, BETWEEN I-10 AND I-210 ˑ LEED SILVER DEVELOPMENT
More informationWAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD
A H U R D D E V E L O P M E N T H I C K M A N R O A D & A L I C E ' S R O A D W A U K E E, I A 5 0 2 6 3 RICHIE HURD RICHARD HURD DANIEL HURD V I C E P R E S I D E N T P R E S I D E N T V I C E P R E S
More informationFM SETTLERS VILLAGE
FM 529 @ SETTLERS VILLAGE SWC & SEC of Dr Katy Texas 77449 www.capitalretailproperties.com WESTPARK TOLLWAY HARDY TOLLWAY SAM HOUSTON TOLLWAY 45 59 290 249 1960 Lake Houston 45 290 6 99 6 59 288 Galveston
More informationLocation, Design & Options
RIDGEFIELD BUSINESS CENTER Asheville s Premier, Class A Office Park (828) 665-9085 WhitneyCRE.com Asheville, North Carolina Location, Design & Options From large spaces to high-end Executive Suites across
More information2018 District 1 Highway Construction Program
District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last
More informationCTA Blue Line Forest Park Branch Feasibility/Vision Study
CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!
More informationSummerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011
Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item
More informationCotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning
Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation
More informationNORTH TARRANT EXPRESS IH35W / IH820 INTERCHANGE (OPTION B) PROPOSAL SCHEMATIC PLAN SET
99 886 C 99 TEA TEA 99 99 87 4 DIDO 886 0 580 0 0 99 LAKEVIEW U RR ACIFIC AIR FORCE LANT 4 78 8 87 U RR 580 0 BN RR 8 87 87 AVONDALE CARLL TATION/ JOINT REERVE BAE 8 0 0 0 8 B87 AVON BURLINGTON NORTHERN
More informationDirections to Fields (5/17/12) All directions from Rt 22. Directions from your home location may vary. Please note that
Directions to Fields (5/17/12) All directions from Rt 22. Directions from your home location may vary. Please note that these are not official. Teams are urged to check the best directions from their location
More information1050 Page Mill Road Office Development
1050 Page Mill Road Office Development Transportation Impact Analysis Prepared for: 1050 Page Mill Road Property, LLC April 15, 2015 Hexagon Office: 2 N. Second Street, Suite 400 San Jose, CA 95113 Hexagon
More informationApplication of the Network Robustness Index to Identifying Critical Road-Network Links in Chittenden County, Vermont
A report by the University of Vermont Transportation Research Center Application of the Network Robustness Index to Identifying Critical Road-Network Links in Chittenden County, Vermont Report # 10-009
More informationPLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO
PREAMBLE 1 PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO HIGHWAY 404 AND 16 TH AVENUE INTERCHANGE RECONSTRUCTION
More informationC o n t a c t : J e r r y F e n n e l l y, P a t r i c k D i n t r o n e
The information contained herein has been given to us by the owner of the property or other sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. All information
More informationPrecast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001
Precast Concrete Pavement Background Concepts Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001 Project Background CTR contracted by FHWA/TxDOT to investigate the feasibility of using precast
More informationCOMMERCIAL PARCELS AT MIRASOL TOWN CENTER LAUREL ROAD EAST AT KNIGHTS TRAIL ROAD, VENICE, FL 34275
COMMERCIAL PARCELS AT MIRASOL TOWN CENTER LAUREL ROAD EAST AT KNIGHTS TRAIL ROAD, VENICE, FL 34275 Executive Summary PROPERTY OVERVIEW Mirasol Town Center is a commercial development project located at
More informationTRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey
TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450
More informationCENTENNIAL GATEWAY 5780 CENTENNIAL CENTER BLVD. LAS VEGAS, NV 89149
PROPERTY FEATURES Under new ownership, LOI s on over 30,000 SF of the center New proposed site plan Contact agents for retailers performance in corridor but all reported top stores in Las Vegas and region
More information7972 North Tamiami Trail Sarasota, FL PROPERTY FEATURES ADDRESS acres - Frontage on US ft
ADDRESS 7972 North Tamiami Trail Sarasota, FL 34243 PROPERTY FEATURES 1.65 acres - Frontage on US 41-300+ ft High Traffic Volume -40,000+ traffic count Adjacent to Sarasota - Bradenton International Airport
More informationMACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017
MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,
More informationCHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS
CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1
More informationChapter 23. Signing and Pavement Marking Plans
Chapter 23 Signing and Pavement Marking Plans 23.1 General... 23-3 23.2 Key Sheet... 23-4 23.3 Signature Sheet... 23-4 23.4 Tabulation of Quantities and Pay Item Notes... 23-4 23.4.1 Standard Notes...
More informationINTELLIGENT COMPACTION
INTELLIGENT COMPACTION More Science than Art Jimmy Si, Ph.D., P.E. Richard Williammee, P.E. San Antonio, TX Footer Text March 23, 2015 Date Table of Contents 1 Why use IC? 3 2 What is it? 4-6 3 What information
More informationWYONG SHIRE COUNCIL S.H.30 CENTRAL COAST HIGHWAY Provision of 4 lanes & turning bays through Long Jetty
WYONG SHIRE COUNCIL S.H.30 CENTRAL COAST HIGHWAY Provision of 4 lanes & turning bays through Long Jetty SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 Wyong Road to Minto Avenue Sheets 2 to
More informationArterial Connected Vehicle Test Bed Deployment and Lessons Learned
ARIZONA CONNECTED VEHICLE PROGRAM Arterial Connected Vehicle Test Bed Deployment and Lessons Learned Faisal Saleem ITS Branch Manager & SMARTDrive Program Manager Maricopa County Department of Transportation
More informationStudy Description. November 29, Overpass Road Alternatives Public Workshop
Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination
More informationPROPERTY HIGHLIGHTS PROPERTY SPECIFICATIONS. The building can be occupied by a single tenant or demised into smaller units
F O R S A L E O R L E A S E 5 3 6-6 1 6 A T R I U M D R I V E V E R N O N H I L L S PROPERTY HIGHLIGHTS The building can be occupied by a single tenant or demised into smaller units Ribbon window line
More informationPlease remove and replace the entire Table of Contents, Section A to Section J and all Appendices.
Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination
More informationAppendix E-4. City of Fort Collins. Requirements for Utility Plans
Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development
More informationD r a f t I m p l e m e n t a t i o n P l a n : D a l l a s a n d K a u f m a n C o u n t i e s
D r a f t I m p l e m e n t a t i o n P l a n : D a l l a s a n d K a u f m a n C o u n t i e s Sunnyvale 2 352 460 740 1392 598 5 986 548 635 Balch Springs Dallas AE-1 Median Barrier Installation I-635
More informationSome of the information contained herein is from owner and has not been independently verified by us. The balance of the information is from sources
F O R S A L E O R L E A S E 5 3 6-6 1 6 A T R I U M D R I V E V E R N O N H I L L S PROPERTY HIGHLIGHTS The building can be occupied by a single tenant or demised into smaller units Ribbon window line
More information2013 FOURTH QUARTER PROPERTY INVENTORY OFFICE LISTINGS CONWAY ROAD ST. LOUIS, MO INTELICACRE.COM
OFFICE LISTINGS 15455 CONWAY ROAD ST. LOUIS, MO 63017 314.270.5991 15933 Clayton Rd St. Louis, MO 63011 126,545 1,445 to 13,493 $17.95 PSF FS 126,546 SF office building On-site property management 5:1,000
More informationUsing Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101
More information