Pacificans for Highway 1 Alternatives c/o Hal Bohner
|
|
- Shon O’Neal’
- 6 years ago
- Views:
Transcription
1 Pacificans for Highway 1 Alternatives c/o Hal Bohner A n g e l i t a A v e n u e P a c i f i c a, C A phone hbohner@earthlink.net Via September 6, 2012 Mr. Bijan Sartipi District Director California Department of Transportation District 4 Bijan.Sartipi@dot.ca.gov Re: Caltrans Proposed Calera Parkway / Highway 1 Widening Project in Pacifica Dear Mr. Sartipi: Caltrans is proposing to widen Highway 1 in Pacifica. We write on behalf of Pacificans for Highway 1 Alternatives (PH1A), an organization advocating implementation of alternatives to Caltran s proposed Highway 1 widening project. PH1A believe there are viable alternatives that can substantially alleviate traffic congestion sooner than the widening project as currently proposed, that these alternatives could be promptly implemented, at less cost, and with far less impact to neighborhoods, businesses, and the environment. As you may be aware, Caltrans proposed widening project is called the Calera Parkway project, and Caltrans has prepared and circulated a Draft Environmental Impact Report/ Environmental Assessment concerning the proposed project. (Draft Environmental Impact Report / Environmental Assessment for State Route 1 / Calera Parkway / Highway 1 Widening Project San Mateo County, California 04-SM-1 / PM 41.7/43.0 / EA ) Page 1 of 5
2 Caltrans has, of course, studied some alternatives to the project and reported the results of those studies in the DEIR/EA, and in the DEIR/EA, Caltrans rejected as unfeasible all project alternatives except widening. However, PH1A have studied the DEIR/EA carefully and believe that some of the rejected alternatives, as well as alternatives which Caltrans failed to consider in the DEIR/EA, would be far superior to Caltrans selected alternative. The purpose of this letter is to request that Caltrans place its widening project on hold and properly study alternatives to the project. We believe that it is very likely that implementation of an alternative or alternatives could render highway widening unnecessary, or if widening is nevertheless necessary it could be reduced in scale. Some of the alternatives worthy of further consideration include changes in traffic signal timing, modifications to the Reina Del Mar intersection, a flex lane with moveable cones, increased public transportation, increased school bus service, car and van-pooling, and changes to school schedules. However, we would like to explain in this letter our thoughts about just one of the many alternatives and why we firmly believe that this specific alternative would be superior to the alternative which Caltrans has elected to pursue. In the DEIR/EA the alternative of Signal Interconnect & Signal Timing Improvements was rejected. The DEIR/EA states (emphasis added): Signal Interconnect & Signal Timing Improvements without Roadway Widening This alternative would install signal interconnect cable between the Fassler Avenue/Rockaway Beach Avenue and the Reina Del Mar Avenue signals to coordinate timing of green phases. A variation of this alternative would also include widening to add a third lane in the northbound direction. The environmental and property right-of-way impacts for this alternative would be minimal. The estimated construction cost for this alternative for signal interconnect only is approximately $0.3 million. Signal interconnect would not, however, provide an appreciable benefit due to the distance between the two signals. This alternative was primarily rejected because the Page 2 of 5
3 traffic operation benefit would be considerably less than the proposed Build Alternatives. (DEIR pgs. 36 & 91 of 287) However, Caltrans has apparently recently reversed this decision and is now planning to include signal interconnection and timing improvements as part of the Calera Parkway project. The U.S. Fish and Wildlife Service issued a Biological Opinion (BO) dated January 29, 2012 concerning the Calera Parkway project. The BO describes the Caltrans project and states at page 6 of 46: Other project components include:... Replacing the existing intersection traffic signal equipment at both the Fassler Avenue and Reina Del Mar intersections and interconnect the two signals. Upon reading this we ask ourselves why Caltrans cannot interconnect the existing signals and adjust the signal timing immediately, instead of at least three years from now when the widening project is predicted to be completed. Further, if replacing the existing intersection signal equipment is required, that could apparently be done promptly as well. And, the $300,000 price tag would obviously be preferable to the currently estimated price tag of over $50 million for the widening project. There seems to be no valid reason to delay signal interconnection and timing improvements until the widening project is done. There can be no doubt that there are sometimes significant traffic delays and Caltrans seems to believe, as do we, that interconnecting the signals and resetting the timing could reduce traffic delays. It is important to note that Caltrans own consultants have concluded both that interconnecting the signals and improving signal timing could have significant benefit to traffic flow and that it is standard practice to coordinate traffic signals to minimize delay in congested corridors. I am attaching a copy of a memo from Fehr and Peers, transportation consultants to Page 3 of 5
4 the San Mateo County Transportation Authority, dated December 10, 2008 (SR1 Supplemental Memo regarding Signal Timing for Existing Conditions.pdf) The memo states at page 3 of 4 (underlining added): Southbound (PM Peak Period) Unlike the AM situation, traffic conditions in the PM peak hour could be improved to LOS D conditions with retiming and coordination of the two signals. The main difference between the AM and PM is the Fassler Avenue intersection: as described above, in the AM, two major movements must be served, and they cannot be served concurrently, which precludes effective platooning and the benefits of coordination. However, in the PM, the two major movements at Fassler Avenue (the southbound through movement and the southbound left turn) can be served at the same time. Approximately 30 seconds after southbound Reina del Mar Avenue turns green, both the southbound through and protected southbound left turn at Fassler Avenue would turn green. This might require retiming the traffic signals to a shorter cycle length, such as 150 seconds. Currently, the two traffic signals operate independently of each other and are not coordinated. In a congested or urban corridor, engineers usually coordinate traffic signals to minimize delay and vehicle stops. This is less common in suburban locations, where traffic volumes are lower and traffic signals are spaced farther apart. According to the Manual on Uniform Traffic Control Devices, it is recommended to coordinate signals that are less than half a mile apart (these signals are 0.57 miles apart). Thank you for your consideration of the above proposal. Please contact PHIA at the address above so that we can meet with you to discuss this matter further. We look forward to hearing from you. Sincerely, Pete Shoemaker, Chair, Pacificans for Highway 1 Alternatives Page 4 of 5
5 Hal Bohner, Member, Pacificans for Highway 1 Alternatives Copy: Malcolm Dougherty, Director, California Department of Transportation, Malcolm.Dougherty@dot.ca.gov Madeline Cavalieri, California Coastal Commission mcavalieri@ coastal.ca.gov San Mateo County Transit Authority Carole Groom (Chair), cgroom@smcgov.org Karyl Matsumoto (Vice Chair), Rosanne Foust, Don Horsley, Terry Nagel, Naomi Patridge, Sepi Richardson, karyl.matsumoto@ssf.ne rfoust@redwoodcity.org dhorsley@smcgov.org tnagel@burlingame.org naomip@hmbcity.com sepirichardson@ci.brisbane.ca.us Encl: SR1 Supplemental Memo regarding Signal Timing for Existing Conditions.pdf Page 5 of 5
ACEC OC February 22, 2017
ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of
More informationUpdate on Traffic Results and Findings
Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes
More informationState Road A1A North Bridge over ICWW Bridge
Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida
More informationCharlton/Oxford Route 20 Reconstruction Project
Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting
More informationKing Mill Lambert DRI# 2035 Henry County, Georgia
Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.
More informationAgenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works
Agenda Item No. August 28, 2007 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David Van Kirk, City Manager Dale I. Pfeiffer, Director of Public Works RESOLUTION TO ADOPT A MITIGATED NEGATIVE
More informationMINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M.
MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M. CALL TO ORDER ROLL CALL Chair Palmer called the meeting to order at 3:34 p.m. The following persons were
More informationExit 61 I-90 Interchange Modification Justification Study
Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.
More informationCLINTON CLOSURE DETOURS
S W Princen Ave Southbound Hwy off ramp at Shields Ave Ave: Exit Southbound Hwy at Shields, proceed south on Marks Ave Ave Southbound Hwy on ramp at Shields Ave from Ave: Ave Marks Ave north. Proceed north
More informationPUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS
PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: 2552-03-058 EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018 Hearing Information
More informationRail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets
Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets By: Marty Amundson, PE, TE, PTOE Eugene Bachtinov, P.E. Jonathan Hofert, PE, TE, PTOE Metro Provides Excellence in Service
More informationSDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses
FINAL SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses SCH# 2016121025 Prepared for: 5500 Campanile Drive San Diego, California 92182-1624 Contact: Laura Shinn
More informationTechnical Advisory Committee MINUTES
Technical Advisory Committee Wednesday, October 10, 2018 MINUTES CALL TO ORDER The Regular Meeting of the Technical Advisory Committee (TAC) was called to order at 1:30 p.m. by Chairperson Morley in Conference
More informationSingle Point Urban Interchange (SPUI) with Signals
1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large
More informationUSING BLUETOOTH TM TO MEASURE TRAVEL TIME ALONG ARTERIAL CORRIDORS
USING BLUETOOTH TM TO MEASURE TRAVEL TIME ALONG ARTERIAL CORRIDORS A Comparative Analysis Submitted To: City of Philadelphia Department of Streets Philadelphia, PA Prepared By: KMJ Consulting, Inc. 120
More informationDE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008
DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor
More informationVulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis
3.0 TRAFFIC IMPACTS 3.1 TRIP GENERATION To assess the impacts that the project may have on the surrounding streets, the first step was to determine Project trip generation. Project trip generation is shown
More informationAirport / Community Roundtable Meeting No. 266 Overview Wednesday, December 2, 2009
Item IV No. C Airport / Community Roundtable Meeting No. 266 Overview Wednesday, I. Call to Order / Roll Call / Declaration of Quorum Present Mark Church, County of San Mateo Supervisor and Roundtable
More informationCoastside Fire Protection District
Folsom (Sacramento), CA Management Consultants Fire Station Relocation Study for the Coastside Fire Protection District Volume 1 of 2 Main Report February 19, 2014 www.ci.pasadena.ca.us 2250 East Bidwell
More informationThe WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG
The WISE Experience Association of Monterey Bay Area Governments (AMBAG) September 20, 2017 Bhupendra Patel, Ph.D. Director of Modeling, AMBAG Paul Ricotta, P.E. Principal Transportation Engineer, Caliper
More informationEDUCATION COOPERATION UNIFORMITY
How Has Traffic Reporting Changed?, pg 1 EDUCATION COOPERATION UNIFORMITY $583M I-215 Project Begins, pg 3 The Official Newsletter of the Orange County Traffic Engineers Council SEPTEMBER 2009 PROGRAM
More information1050 Page Mill Road Office Development
1050 Page Mill Road Office Development Transportation Impact Analysis Prepared for: 1050 Page Mill Road Property, LLC April 15, 2015 Hexagon Office: 2 N. Second Street, Suite 400 San Jose, CA 95113 Hexagon
More informationTCAG Annual Intersection Monitoring Program
TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT
More informationTCAG Annual Intersection Monitoring Program
TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT
More informationUsing Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101
More informationMINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on
MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal
More informationStudy Description. November 29, Overpass Road Alternatives Public Workshop
Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination
More informationDEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA
DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610 REPLY TO ATTENTION OF October 12, 2012 Tampa Permits Section SAJ-2011-00551 (IP-TEH)
More informationAttachment #2 PPW133-07
Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements
More informationEVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.
EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion
More informationAlameda Corridor-East Construction Authority THE ACE REPORT. ACE Board Chair s Message. Dear Friends:
Alameda Corridor-East Construction Authority THE ACE REPORT www.theaceproject.org Summer 2012 / Volume 3, Issue 4 Inside this issue: Contract OKed for Trench Children Dig ACE Project Chair Thanks Sen.
More informationThe Edward V. Lofstrom Collection M/A
The Edward V. Lofstrom Collection M/A 1994.29.01-02 Finding aid prepared by Benjamin C. Skinner This finding aid was produced using the Archivists' Toolkit August 01, 2015 Describing Archives: A Content
More information3.0 AFFECTED ENVIRONMENT
3.0 AFFECTED ENVIRONMENT 3.1 Visual Resources This section provides a discussion of the existing visual resources in the vicinity of the Imperial Valley Solar Energy Center South project site that could
More informationDiversion Analysis. Appendix K
Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,
More informationPennDOT District 6-0 Signal Retiming Initiative The Route 611 Story
PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story Presented By David Adams, PE PennDOT District 6-0 John Albeck, PE, PTOE Albeck Gerken, Inc. PennDOT District 6-0 PennDOT Ownership by
More informationAppendix G. Visual Simulations and Illustrations
Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99
More informationVTA Board of Directors: This is for your information only.
From: Board.Secretary Sent: Tuesday, March 24, 2015 11:26 AM To: VTA Board of Directors Cc: Alaniz, Bernice Subject: VTA/Santa Clara County Human Trafficking press conference - March 24, 2015 2 p.m. Importance:
More informationCounty of Sonoma Agenda Item Summary Report
County of Sonoma Agenda tem Summary Report Agenda tem Number: 20 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More informationACE VENTURA ROUTE INSTRUCTIONS GROUPS R and X September 8, 2012
ACE VENTURA ROUTE INSTRUCTIONS GROUPS R and X September 8, 2012 1 Please read the General Rules and Regulations carefully. Ask a rally worker for clarification if necessary. Drive safely and legally at
More informationNoise Study Report. Addendum. Interstate 10 Corridor Project. In the Counties of San Bernardino and Los Angeles
Interstate 10 Corridor Project Draft NSR Addendum Noise Study Report Addendum Interstate 10 Corridor Project In the Counties of San Bernardino and Los Angeles 07-LA-10 PM 44.9/48.3 08-SBD-10 PM 0.0/R37.0
More informationESCONDIDO VALLEY CENTER. 1346, 1352 & 1358 West Valley Parkway Escondido, California SAN DIEGO GROCERY-ANCHORED INVESTMENT OPPORTUNITY
ESCONDIDO VALLEY CENTER 1346, 1352 & 1358 West Valley Parkway Escondido, California 92029 SAN DIEGO GROCERY-ANCHORED INVESTMENT OPPORTUNITY INVESTMENT ADVISORS ROB IPPOLITO T +1 858 875 5925 rippolito@ngkf.com
More informationSignal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates
Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light
More information2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment
2.8 NOISE 2.8.1 CONSTRUCTION NOISE The noise impacts are not adequately addressed or studied in the DEIR, as there appears to be no analysis at all of potential noise level increases as measured from locations
More informationVertical emphasis examples from the Station Park Green Design Guidelines are shown on the following page.
ARCHITECTURE PLANNING URBAN DESIGN Ms. Lorraine Weiss Department of Community Development City of San Mateo 330 West 20th Avenue San Mateo, CA 94403-1388 RE: Station Park Green Dear Lorraine: I attended
More informationRECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8)
Rec. ITU-R M.1310 1 RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8) Rec. ITU-R M.1310 (1997) Summary This Recommendation
More informationNewtown SGA Master Plan
Newtown SGA Master Plan CITY OF VIRGINIA BEACH 25 MARCH 2010 Consultant Team Urban Design Associates Lead Firm, Urban Design Landmark Design Group Landscape and Civil Engineering URS Corporation Transportation
More informationCHAPTER 1: TITLE SHEET and GENERAL LAYOUT
CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations
More informationFM 691 CORRIDOR STUDY
FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289
More information2015 HDR, Inc., all rights reserved.
2015 HDR, Inc., all rights reserved. The Making of a Smart City Eric Plapper 2015 HDR, Inc., all rights reserved. Transportation Trends Defining a Smart City Example Deployments How to Get Started Transportation
More informationTRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey
TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450
More informationWelcome Public Open House
Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationCity of Surrey Adaptive Signal Control Pilot Project
City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors
More informationFinal Environmental Impact Report
NORTHWEST NEWMAN MASTER PLAN Final Environmental Impact Report SCH No. 2013032010 City of Newman Community Development Department 938 Fresno Street Newman, CA 95360 October 2017 LAMPHIER - GREGORY URBA
More informationUpdated: April 7, 2016
Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace
More informationAPPENDIX 4.8 Transportation Impact Study
APPENDIX 4.8 Transportation Impact Study Prepared for: Submitted by:, CA 95 El Dorado Hills Town Center Apartments Transportation Impact Study - Revised Draft June 207 Table of Contents.0 INTRODUCTION.....3
More informationSYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS
SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS Chao Chen* EECS Department University of California, Berkeley, 94720 Tel: (510)643-5894; Fax: (510)643-2356 chaos@eecs.berkeley.edu Alexander Skabardonis
More informationReview Status 8150 Sunset
Eileen Hunt Review Status 8150 Sunset Ron Hirsch To: Eileen Hunt Tue, Feb 4, 2014 at 4:17 PM Thanks, Eileen. We ll look into these issues and get back
More informationCONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES
CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES Yao Cheng*, Saed Rahwanji, Gang-Len Chang MDOT State Highway Administration University of Maryland,
More informationSeptember 28, 2018, Board of Directors Meeting Minutes
Board of Directors October 26, 2018 Item: 1B Action Requested: Approve September 28, 2018, Board of Directors Meeting Minutes Chair Terry Sinnott (Del Mar) called the meeting of the SANDAG Board of Directors
More informationI-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP
Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout
More informationREPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS AND REQUESTS FOR HEARINGS
Julie A. Miller Senior Attorney Julie.Miller@SCE.com May 25, 2005 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: A.05-04-015 Dear Docket Clerk:
More informationPinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.
BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationHOW ITS IS. Beyond Border: Leading the Way 19TH ANNUAL CONFERENCE AND EXHIBITION. the
19TH ANNUAL CONFERENCE AND EXHIBITION SEPT. 30 OCT. 2, 2013 SAN DIEGO MARRIOTT MISSION VALLEY PRELIMINARY PROGRAM the Beyond Border: HOW ITS IS Leading the Way PROGRAM Overview TIME 12:00 p.m.-5:00 p.m.
More informationON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE
ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,
More informationA. INTRODUCTION PRINCIPAL CONCLUSIONS
Chapter 16: Traffic and Parking A. INTRODUCTION This chapter examines the potential traffic and parking impacts of the proposed development of the Fresh Kills Park project. The analysis of the proposed
More informationCurrently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)
INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication
More informationPreparing for an Uncertain Future:
: for a Greater Baltimore Region DRAFT Maximize2040 is an initiative of the Baltimore Regional Transportation Board, the metropolitan planning organization for the Baltimore region. 1 SCENARIO THINKING:
More informationArkansas State Highway and Transportation Department
Arkansas State Highway and Transportation Department Fayetteville Rotary Club Mermaids Restaurant Thursday, January 30, 2014 About AHTD The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per
More information800 Lake Murray Blvd
Kinley Rd SITE VPD 13,200 Columbiana Dr Quail Valley Neighborhood 800 IRMO, SC 29063 FOR MORE INFORMATION: JP SCURRY, CCIM Vice President 803 401 4223 jp.scurry@colliers.com SCOTTIE SMITH Senior Brokerage
More informationHwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise
Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction
More informationConnected Car Networking
Connected Car Networking Teng Yang, Francis Wolff and Christos Papachristou Electrical Engineering and Computer Science Case Western Reserve University Cleveland, Ohio Outline Motivation Connected Car
More informationNotice of Availability of the Desert Renewable Energy Conservation Plan Proposed
This document is scheduled to be published in the Federal Register on 11/13/2015 and available online at http://federalregister.gov/a/2015-28791, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau
More informationAUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES
AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES ITS California Technical Session 9 - Innovative Technology for Local Cities Thursday, October 16, 2014 Mark Taylor, P.E., PTOE Traffic Signal Operations Engineer
More informationInglewood Oil Field Specific Plan Project Public Information Meeting
Public Information Meeting Wednesday, February 21, 2018 6:30 to 8:00 PM Culver City Veterans Memorial Auditorium 4117 Overland Avenue Public Information Meeting Agenda Inglewood Oil Field Specific Plan
More informationNorth American Amphibian Monitoring Program. Massachusetts Procedures and Protocols Spring 2007
North American Amphibian Monitoring Program Massachusetts Procedures and Protocols Spring 2007 Overview The North American Amphibian Monitoring Program (NAAMP) seeks to involve volunteers in a longterm
More informationGeorgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details
Georgia Department of Transportation Automated Traffic Signal Performance Measures Prepared for: Georgia Department of Transportation 600 West Peachtree Street, NW Atlanta, Georgia 30308 Prepared by: Atkins
More informationThe Traffic Jam of Robots: Implications of Autonomous Vehicles for Trip-Making and Society
The Traffic Jam of Robots: Implications of Autonomous Vehicles for Trip-Making and Society Joan Walker University of California, Berkeley ASILOMAR 2017 The 16 TH Biennial Conference on Transportation and
More informationLegislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013
Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November
More informationContext Aware Dynamic Traffic Signal Optimization
Context Aware Dynamic Traffic Signal Optimization Kandarp Khandwala VESIT, University of Mumbai Mumbai, India kandarpck@gmail.com Rudra Sharma VESIT, University of Mumbai Mumbai, India rudrsharma@gmail.com
More information%&g( %&g( ) Bridge Projects DRAFT
BELCHER RD 66TH ST N DRAFT 09-18-14 GULF BLVD Dunedin Causeway 16 Gulf of Mexico WEST BAY DR WALSINGHAM RD Beckett Bridge 102ND AVE N 26 27 S MYRTLE AVE 113TH ST N EDGEWATER DR BAYSHORE BLVD S MISSOURI
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationAddressing Issues with GPS Data Accuracy and Position Update Rate for Field Traffic Studies
Addressing Issues with GPS Data Accuracy and Position Update Rate for Field Traffic Studies THIS FEATURE VALIDATES INTRODUCTION Global positioning system (GPS) technologies have provided promising tools
More informationGetting Through the Green: Smarter Traffic Management with Adaptive Signal Control
Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is
More informationFINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers
FINAL REPORT On Project - Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers Prepared for: National Cooperative Highway Research Program (NCHRP) Transportation
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 AMARILLO DISTRICT MARCH 20 TH OUT- OF - CYCLE REVISIONS 3-16-2009 file://d:\documents and Settings\LMOREL\Local Settings\Temp\XPgrpwise\49BE6199RS1H...
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More informationThe Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).
The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February
More informationValidation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015
Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell
More informationPurple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018
Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018 1 Agenda Westwood/UCLA Map and Schedule Advance Utility Relocation Bus Stop Relocations Westwood/VA Hospital Map Advance
More informationThis is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.
SIGNAL PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,
More informationSan Antonio Wrong Way Driver Initiative
San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force
More informationMove In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B
Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence
More informationCITIZENS ADVISORY COMMITTEE OF THE HUNTSVILLE AREA METROPOLITAN PLANNING ORGANIZATION MINUTES. Regular Meeting - November 26, p.
CITIZENS ADVISORY COMMITTEE OF THE HUNTSVILLE AREA METROPOLITAN PLANNING ORGANIZATION MINUTES Regular Meeting - November 26, 2018-5 p.m City Council Chambers, Municipal Building Huntsville, Alabama Committee
More informationADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY
ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY Joseph K. Lam, P.Eng., Managing Director Delcan Corporation 625 Cochrane Drive, Suite 500, Markham, Ontario, Canada, L3R 9R9 Tel: +1-905-943-0521,
More information2017 San Juan College Luminarias 6:00pm - 11:30pm
Parking For Walking available north side of college campus 2017 San Juan College Luminarias 6:00pm - 11:30pm Drive-Thru Entrance (2 Lanes) Drive-Thru Entrance starts at 30th Street & Butler Avenue * sign
More information2560 LORD BALTIMORE DRIVE BALTIMORE, MD SJPI.COM
2560 LORD BALTIMORE DRIVE BALTIMORE, MD 410.788.0100 SJPI.COM GREENLEIGH AT CROSSROADS ABOUT Baltimore County s New Urbanism About Greenleigh at Crossroads A Premier Live-Work-Play Community in Baltimore
More informationTraffic Noise and Vibration Impact Assessment Technical Report for the North Meadows Extension to US 85 and Interstate 25
Traffic Noise and Vibration Impact Assessment Technical Report for the North Meadows Extension to US 85 and Interstate 25 February 2010 Prepared for: Town of Castle Rock Douglas County Colorado Department
More information