1 Appendix C HCS 7 ANALYTICAL REPORTS: MITIGATED SIGNALIZED AND NON-SIGNALIZED INTERSECTIONS
2 HCS7 All-Way Stop Control Report Site Information Analyst M Hays Intersection Mulberry Newcomb St Agency/Co. TCAG Jurisdiction Porterville Date Performed 10/4/2018 East/West Street Mulberry Ave Analysis Year 2018 North/South Street Newcomb St Analysis Time Period (hrs) 0.25 Peak Hour Factor 0.86 Time Analyzed Project Description AM Peak 2018 Intersection Monitoring Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR L T TR L T TR Flow Rate, v (veh/h) Percent Heavy Vehicles Departure Headway and Service Time Initial Departure Headway, hd (s) Initial Degree of Utilization, x Final Departure Headway, hd (s) Final Degree of Utilization, x Move-Up Time, m (s) Service Time, ts (s) Capacity, Delay and Level of Service Flow Rate, v (veh/h) Capacity % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service, LOS C B B B C B C C Approach Delay (s/veh) Approach LOS C B C C Intersection Delay, s/veh LOS 16.9 C Copyright 2018 University of Florida. All Rights Reserved. HCS AWSC Version 7.6 Generated: 10/26/2018 9:28:20 AM Mulberry@Newcomb_MitigationAWSC.xaw
3 HCS7 Signalized Intersection Results Summary Intersection Information Agency Duration, h 0.25 Analyst Analysis Date 10/26/2018 Area Type Other Jurisdiction Time Period PHF 0.86 Urban Street 2018 Intersection Monit Analysis Year 2018 Analysis Period 1> 7:00 Intersection Mulberry Newco File Name Mulberry@Newcomb_Mitigation_Signal.xus Project Description AM Peak Demand Information EB WB NB SB Demand ( v ), veh/h Signal Information Cycle, s 30.4 Reference Phase 2 Offset, s 0 Reference Point End Green Uncoordinated Yes Simult. Gap E/W On Yellow Force Mode Fixed Simult. Gap N/S On Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) B B B A A B A A Approach Delay, s/veh / LOS 11.5 B 11.0 B 10.4 B 9.6 A Intersection Delay, s/veh / LOS 10.3 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.25 B 2.25 B 1.66 B 1.65 B Bicycle LOS Score / LOS 0.82 A 0.74 A 0.99 A 1.05 A Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.6 Generated: 10/26/2018 9:40:12 AM
4 HCS7 Roundabouts Report Site Information Analyst M Hays Intersection Ave Rd204 Agency or Co. TCAG E/W Street Name Ave 256 Date Performed 10/5/2018 N/S Street Name Rd 204 Analysis Year 2018 Analysis Time Period (hrs) 0.25 Time Analyzed AM Peak Peak Hour Factor 0.93 Project Description 2018 Intersection Monitoring Jurisdiction Tulare County Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N) Lane Assignment LTR LTR LTR LTR Volume (V), veh/h Percent Heavy Vehicles, % Flow Rate (vpce), pc/h Right-Turn Bypass None None None None Conflicting Lanes Pedestrians Crossing, p/h Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway (s) Follow-Up Headway (s) Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h Entry Volume veh/h Circulating Flow (vc), pc/h Exiting Flow (vex), pc/h Capacity (cpce), pc/h Capacity (c), veh/h v/c Ratio (x) Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh Lane LOS A A A A 95% Queue, veh Approach Delay, s/veh Approach LOS A A A A Intersection Delay, s/veh LOS 8.0 A Copyright 2018 University of Florida. All Rights Reserved. HCS7 Roundabouts Version /5/2018 8:50:45 AM Ave 256@Rd 204_Mitigation_Roundabout.xro
5 HCS7 Signalized Intersection Results Summary Intersection Information Agency Duration, h 0.25 Analyst Analysis Date 10/25/2018 Area Type Other Jurisdiction Time Period PHF 0.93 Urban Street 2018 Intersection Monit Analysis Year 2018 Analysis Period 1> 7:00 Intersection Ave Rd 204 File Name Ave 256@Rd 204_Mitigation_Signal.xus Project Description Mitigation Demand Information EB WB NB SB Demand ( v ), veh/h Signal Information Cycle, s 23.5 Reference Phase 2 Offset, s 0 Reference Point End Green Uncoordinated Yes Simult. Gap E/W On Yellow Force Mode Fixed Simult. Gap N/S On Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) A A A A Approach Delay, s/veh / LOS 8.0 A 7.9 A 5.7 A 5.3 A Intersection Delay, s/veh / LOS 6.1 A Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 1.65 B 1.65 B 1.63 B 1.63 B Bicycle LOS Score / LOS 0.76 A 0.74 A 1.42 A 1.29 A Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.6 Generated: 10/25/2018 4:09:44 PM
6 HCS7 Signalized Intersection Results Summary Intersection Information Agency TCAG Duration, h 0.25 Analyst M Hays Analysis Date Oct 3, 2018 Area Type Other Jurisdiction Tulare County Time Period AM Peak PHF 0.88 Urban Street 2018 Intersection Monit Analysis Year 2018 Analysis Period 1> 7:00 Intersection Ave Rd 104 File Name Ave 416@Rd 104_AM.xus Project Description AM Peak Demand Information EB WB NB SB Demand ( v ), veh/h Signal Information Cycle, s 13.4 Reference Phase 2 Offset, s 0 Reference Point End Green Uncoordinated Yes Simult. Gap E/W On Yellow Force Mode Fixed Simult. Gap N/S On Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) A A A A A A A A Approach Delay, s/veh / LOS 2.3 A 2.4 A 3.3 A 3.2 A Intersection Delay, s/veh / LOS 2.6 A Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 1.83 B 1.83 B 2.03 B 2.03 B Bicycle LOS Score / LOS 0.77 A 0.84 A 0.85 A 0.71 A Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.6 Generated: 10/25/2018 3:36:17 PM
7 HCS7 Two-Way Stop-Control Report Site Information Analyst M Hays Intersection Firebaugh Ave Agency/Co. TCAG Jurisdiction Exeter Date Performed 9/12/2018 East/West Street Firebaugh Ave Analysis Year 2018 North/South Street SR-65 Time Analyzed PM peak Peak Hour Factor 0.92 Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description Lanes Firebaugh Ave (Ave 276) PM Peak Vehicle Volumes and Adjustments Major Street: North-South Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority U U Number of Lanes Configuration L TR LTR LTR LTR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) E C C A A Approach Delay (s/veh) Approach LOS D C Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.6 Generated: 11/7/ :04:37 AM SR-65@Firebaugh Ave_PM_Mitigation.xtw
8 HCS7 Signalized Intersection Results Summary Intersection Information Agency Duration, h 0.25 Analyst Analysis Date 11/7/2018 Area Type Other Jurisdiction Time Period PHF 0.92 Urban Street 2018 Intersection Monit Analysis Year 2018 Analysis Period 1> 7:00 Intersection Firebaugh Ave File Name Firebaugh_PM_Mitig_Signal.xus Project Description PM Peak Mitigation Demand Information EB WB NB SB Demand ( v ), veh/h Signal Information Cycle, s 30.4 Reference Phase 2 Offset, s 0 Reference Point End Green Uncoordinated Yes Simult. Gap E/W On Yellow Force Mode Fixed Simult. Gap N/S On Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) B B A A A A Approach Delay, s/veh / LOS 11.6 B 11.2 B 7.5 A 8.8 A Intersection Delay, s/veh / LOS 8.9 A Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 1.89 B 1.89 B 1.64 B 1.64 B Bicycle LOS Score / LOS 0.72 A 0.65 A 1.15 A 1.39 A Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.6 Generated: 11/29/2018 1:50:40 PM
TCAG Annual Intersection Monitoring Program
TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT
More informationTCAG Annual Intersection Monitoring Program
TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT
More informationRecent research on actuated signal timing and performance evaluation and its application in SIDRA 5
Akcelik & Associates Pty Ltd REPRINT with MINOR REVISIONS Recent research on actuated signal timing and performance evaluation and its application in SIDRA 5 Reference: AKÇELIK, R., CHUNG, E. and BESLEY
More informationKing Mill Lambert DRI# 2035 Henry County, Georgia
Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.
More informationSignalized Corridor Assessment
Purdue University Purdue e-pubs Open Access Theses Theses and Dissertations Spring 2014 Signalized Corridor Assessment William Benjamin Smith Purdue University Follow this and additional works at: http://docs.lib.purdue.edu/open_access_theses
More informationSingle Point Urban Interchange (SPUI) with Signals
1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large
More informationClosed Loop Traffic Signal Systems Analysis: US 1 and PA 352 in Delaware County, Pennsylvania
Closed Loop Traffic Signal Systems Analysis: US 1 and PA 352 in Delaware County, Pennsylvania January 2010 The Delaware Valley Regional Planning Commission is dedicated to uniting the region s elected
More informationCurrently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)
INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication
More informationCONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES
CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES Yao Cheng*, Saed Rahwanji, Gang-Len Chang MDOT State Highway Administration University of Maryland,
More informationGeorgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details
Georgia Department of Transportation Automated Traffic Signal Performance Measures Prepared for: Georgia Department of Transportation 600 West Peachtree Street, NW Atlanta, Georgia 30308 Prepared by: Atkins
More informationDEVELOPMENT AND PRELIMINARY TESTING OF AN AUTOMATIC TURNING MOVEMENTS IDENTIFICATION SYSTEM
DEVELOPMENT AND PRELIMINARY TESTING OF AN AUTOMATIC TURNING MOVEMENTS IDENTIFICATION SYSTEM Final Report Submitted to Ohio Transportation Consortium By Ping Yi, Ph.D Chun Shao, Ph.D Jialei Mao Department
More informationUpdate on Traffic Results and Findings
Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes
More informationAbilene District Traffic Signal Timing and Capacity Analysis
Abilene District Traffic Signal Timing and Capacity Analysis 2017 IAC Report Task-45 TransTech Lab, TechMRT Hongchao Liu, Ph.D., P.E. Jason (Bo) Pang, Ph.D. Ariel Castillo-Rodriguez, E.I.T. I Table of
More informationCALGARY SOUTHEAST STONEY TRAIL Detailed Design 17th Avenue SE to Macleod Trail South (Hwy 2A) Calgary, Alberta
CALGARY SOUTHEAST STONEY TRAIL Detailed Design 17th Avenue SE to Macleod Trail South (Hwy 2A) Calgary, Alberta NOISE REPORT Prepared for: Alberta Infrastructure and Transportation 2 nd Floor, Twin Atria
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationState Road A1A North Bridge over ICWW Bridge
Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida
More informationDiversion Analysis. Appendix K
Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,
More information1050 Page Mill Road Office Development
1050 Page Mill Road Office Development Transportation Impact Analysis Prepared for: 1050 Page Mill Road Property, LLC April 15, 2015 Hexagon Office: 2 N. Second Street, Suite 400 San Jose, CA 95113 Hexagon
More informationUniversity of Nevada, Reno. Pedestrian Crossing Caused Signal Transition Study
University of Nevada, Reno Pedestrian Crossing Caused Signal Transition Study A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in Civil and Environmental
More informationTraffic Controller Timing Processes
4 Actuated Traffic Controller Timing Processes In Chapter 4, you will learn about the timing processes that run an actuated traffic controller. Many transportation engineers begin their study of signalized
More informationPerformance Evaluation of Coordinated-Actuated Traffic Signal Systems Gary E. Shoup and Darcy Bullock
ABSTRACT Performance Evaluation of Coordinated-Actuated Traffic Signal Systems Gary E. Shoup and Darcy Bullock Arterial traffic signal systems are complex systems that are extremely difficult to analyze
More informationCity of Surrey Adaptive Signal Control Pilot Project
City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors
More informationUTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES
Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE
More informationEVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.
EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion
More informationSignal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates
Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light
More informationDuluth Entertainment Convention Center (DECC) Special Events Traffic Flow Study. Traffic Data Analysis and Signal Timing Coordination
Duluth Entertainment Convention Center (DECC) Special Events Traffic Flow Study Traffic Data Analysis and Signal Timing Coordination Final Report Prepared by Jiann-Shiou Yang Department of Electrical and
More informationAgenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority
Morning Traffic Terminology TS2 Cabinet Components and Operation Traffic Signal Phasing Ring Structure Traffic Signal Timing Understanding a Signal Plan Maccarone Controller Programming Afternoon Basic
More informationChapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles
Chapter 39 Vehicle Actuated Signals 39.1 Introduction Now-a-days, controlling traffic congestion relies on having an efficient and well-managed traffic signal control policy. Traffic signals operate in
More informationPreemption Versus Priority
Port 1 MMU Preemption Versus Priority BIU Why Interrupt a Signalized Intersection There are several reasons to interrupt a signalized intersection from the normal operation of assigning right-of-way. Some
More informationManaging traffic through Signal Performance Measures in Pima County
CASE STUDY Miovision TrafficLink Managing traffic through Signal Performance Measures in Pima County TrafficLink ATSPM Case Study Contents Project overview (executive summary) 2 Project objective 2 Overall
More informationTraffic Signal Timing Coordination. Innovation for better mobility
Traffic Signal Timing Coordination Pre-Timed Signals All phases have a MAX recall placed on them. How do they work All phases do not have detection so they are not allowed to GAP out All cycles are a consistent
More informationFigures. Tables. Comparison of Interchange Control Methods...25
Signal Timing Contents Signal Timing Introduction... 1 Controller Types... 1 Pretimed Signal Control... 2 Traffic Actuated Signal Control... 2 Controller Unit Elements... 3 Cycle Length... 3 Vehicle Green
More informationFrequently Asked Questions
The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions
More informationAppendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)
Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained
More informationBOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST
BOSTON HORIZON WAY ALFORD ST BROADWAY BOSTON CITY LINE CITY LINE MANHOLE #101 (STA 5+00) BOW ST DEXTER ST ST LYNDE ST THORNDIKE ST COURTLAND ST RIVER PROP (TYP) ROBIN ST BETTY ST 50 500 1. BASELINE STATIONING
More informationSequence Optimization at Signalized Diamond Interchanges Using High-Resolution Event-Based Data
Purdue University Purdue e-pubs Lyles School of Civil Engineering Faculty Publications Lyles School of Civil Engineering 215 Sequence Optimization at Signalized Diamond Interchanges Using High-Resolution
More informationSignal Coordination for Arterials and Networks CIVL 4162/6162
Signal Coordination for Arterials and Networks CIVL 4162/6162 Learning Objectives Define progression of signalized intersections Quantify offset, bandwidth, bandwidth capacity Compute progression of one-way
More informationA. INTRODUCTION PRINCIPAL CONCLUSIONS
Chapter 16: Traffic and Parking A. INTRODUCTION This chapter examines the potential traffic and parking impacts of the proposed development of the Fresh Kills Park project. The analysis of the proposed
More informationUpdated: April 7, 2016
Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace
More informationUSING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION. A Thesis TAO ZHANG
USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION A Thesis by TAO ZHANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements
More informationTexas Transportation Institute The Texas A&M University System College Station, Texas
1. Report No. FHWA/TX-05/0-4422-2 4. Title and Subtitle DEVELOPMENT OF A TRAFFIC SIGNAL PERFORMANCE MEASUREMENT SYSTEM (TSPMS) 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More informationDevelopment and Application of On-Line Strategi for Optimal Intersection Control (Phase Ill) 1II II! IIi1111 III. I k I I I
iii DEPi T OF TRANSPORTATIONi j - "L IIIIIIIIIIIIIII l ll IIIIIIIIIIN lll111111111 II 1II II!11111 11IIi1111 III 3 0314 00023 6447 Report Number C/UU'. I -.: ; ',, I k I I S1 I 0 I I a, Cu 60 C P1-5 /I
More informationMetro - Let me know about major weekend traffic impacts
Highway 100 Construction Traffic Impacts Dates may change due to weather. West 36th St to Hwy 62 Currently April 4-mid Aug 50th St. ramp to NB Hwy 100 will close. The ramp will reopen in mid-august. Upcoming
More informationExit 61 I-90 Interchange Modification Justification Study
Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.
More information2017 San Juan College Luminarias 6:00pm - 11:30pm
Parking For Walking available north side of college campus 2017 San Juan College Luminarias 6:00pm - 11:30pm Drive-Thru Entrance (2 Lanes) Drive-Thru Entrance starts at 30th Street & Butler Avenue * sign
More informationArterial Traffic Signal Optimization: A Person-based Approach
Paper No. 13-3395 Arterial Traffic Signal Optimization: A Person-based Approach Eleni Christofa, Ph.D. corresponding author Department of Civil and Environmental Engineering University of Massachusetts
More informationAUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES
AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES ITS California Technical Session 9 - Innovative Technology for Local Cities Thursday, October 16, 2014 Mark Taylor, P.E., PTOE Traffic Signal Operations Engineer
More informationHwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise
Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction
More informationENTERPRISE Transportation Pooled Fund Study TPF-5 (231)
ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Impacts of Traveler Information on the Overall Network FINAL REPORT Prepared by September 2012 i 1. Report No. ENT-2012-2 2. Government Accession
More informationCLINTON CLOSURE DETOURS
S W Princen Ave Southbound Hwy off ramp at Shields Ave Ave: Exit Southbound Hwy at Shields, proceed south on Marks Ave Ave Southbound Hwy on ramp at Shields Ave from Ave: Ave Marks Ave north. Proceed north
More informationUsing Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101
More informationSDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses
FINAL SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses SCH# 2016121025 Prepared for: 5500 Campanile Drive San Diego, California 92182-1624 Contact: Laura Shinn
More informationTRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey
TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450
More informationDesign Guidelines for Deploying Closed Loop Systems
Final Report FHWA/IN/JTRP-2001/11 Design Guidelines for Deploying Closed Loop Systems By Andrew Nichols Graduate Research Assistant Darcy Bullock Associate Professor School of Civil Engineering Purdue
More informationUSE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT
USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT Justin Effinger, EIT Research Assistant/Teaching Assistant Department of Civil Engineering & Mechanics University of Wisconsin Milwaukee
More informationSignal Timing and Coordination Strategies Under Varying Traffic Demands
NDOT Research Report Report No. 236-11-803 Signal Timing and Coordination Strategies Under Varying Traffic Demands July 2012 Nevada Department of Transportation 1263 South Stewart Street Carson City, NV
More informationACEC OC February 22, 2017
ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of
More information0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District
0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL
More informationA STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS
0 0 A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS Rasool Andalibian (Corresponding Author) PhD Candidate Department of Civil and Environmental Engineering University of Nevada,
More informationDevelopment and Evaluation of Lane-by-Lane Gap-out Based Actuated Traffic Signal Control
Development and Evaluation of Lane-by-Lane Gap-out Based Actuated Traffic Signal Control Pennsylvania State University University of Maryland University of Virginia Virginia Polytechnic Institute and State
More informationFinal Environmental Impact Report
NORTHWEST NEWMAN MASTER PLAN Final Environmental Impact Report SCH No. 2013032010 City of Newman Community Development Department 938 Fresno Street Newman, CA 95360 October 2017 LAMPHIER - GREGORY URBA
More informationAppendix A. Congestion Management Process
Appendix A Congestion Management Process CONGESTION MANAGEMENT PROCESS NORTHEASTERN INDIANA REGIONAL COORDINATING COUNCIL This report represents an update of the activities documenting the development
More informationFLORIDA HIGHWAY PATROL OFFICIAL PRESS RELEASE PRESS RELEASE APPROVED FOR PUBLIC RELEASE BY: Trooper Joe M. Sanchez Public Affairs Officers 11/2/2016 T
FLORIDA HIGHWAY PATROL OFFICIAL PRESS RELEASE PRESS RELEASE APPROVED FOR PUBLIC RELEASE BY: Trooper Joe M. Sanchez Public Affairs Officers 11/2/2016 Troop E 11/02/2016 1:42 PM STATE ROAD 90 EB / SW 137
More informationThis is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.
SIGNAL PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,
More informationPlanarization & Routing Guide
Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager
More information20. Security Classif.(of this page) Unclassified
1. Report No. FHWA/TX-10/0-6029-1 4. Title and Subtitle IMPROVED INTERSECTION OPERATIONS DURING DETECTOR FAILURES Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog
More informationAllowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation.
Allowable Lane Closure Hours for the State Highway System in Hampton Roads District Virginia Department of Transportation June 06 Allowable Lane Closure Hours Hampton Roads District Revisions Date Description
More informationNCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.
NCTCOG Regional Travel Model Improvement Experience in 2009 and Data Management Presented to TMIP VMTSC December 7, 2009 Presenters Kathy Yu Senior Modeler Arash Mirzaei Manager Model Group Behruz Paschai
More informationConstructing a Traffic Control Process Diagram
22 Constructing a Traffic Control Process Diagram The purpose of this assignment is to help you improve your understanding of the operation of an actuated traffic controller system by studying eight cases
More informationAgenda. Morning. TS2 Cabinet Components and Operation. Traffic Signal Ring Structure. Afternoon. Basic Preemption/Priority
Agenda Morning Traffic Terminology TS2 Cabinet Components and Operation Traffic Signal Phasing Traffic Signal Ring Structure Understanding a Signal Plan Controller Programming Afternoon Basic Coordination
More informationSelf-Organizing Traffic Signals for Arterial Control
Self-Organizing Traffic Signals for Arterial Control A Dissertation Presented by Burak Cesme to The Department of Civil and Environmental Engineering in partial fulfillment of the requirements for the
More informationApplication of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta
Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Peter Xin, P.Eng. Senior Transportation Engineer Policy
More informationEnrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida
Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Background Objective Introduction Roadway Lighting Literature Review Study Area Data Illuminance, Crash, and Roadway
More informationTexas Transportation Institute The Texas A&M University System College Station, Texas
1. Report No. FHWA/TX-08/0-4986-1 4. Title and Subtitle AN ASSESSMENT OF YIELD TREATMENTS AT FRONTAGE ROAD EXIT RAMP AND FRONTAGE ROAD U-TURN MERGE AREAS 2. Government Accession No. 3. Recipient's Catalog
More informationDetector-Free Optimization of Traffic Signal Offsets with Connected Vehicle Data
Detector-Free Optimization of Traffic Signal Offsets with Connected Vehicle Data Christopher M. Day, Howell Li, Lucy M. Richardson, James Howard, Tom Platte, James R. Sturdevant, and Darcy M. Bullock Signal
More informationInput-Output and Hybrid Techniques for Real- Time Prediction of Delay and Maximum Queue Length at Signalized Intersections
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2007 Input-Output and Hybrid Techniques for Real- Time Prediction
More informationAvailable online at ScienceDirect. Procedia Engineering 142 (2016 )
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering (0 ) Sustainable Development of Civil, Urban and Transportation Engineering Conference Methods for Designing Signalized Double-Intersections
More informationMEMORANDUM BILL WUENSCH, P.E., PTOE DATE: JANUARY 4, 2018 ORGANIZATION: VIRGINIA S REGION 2000 LOCAL GOVERNMENT COUNCIL
MEMORANDUM TO: SCOTT SMITH ORGANIZATION: VIRGINIA S REGION 2000 LOCAL GOVERNMENT COUNCIL PHONE NUMBER: 434-845-3491 Re: MEETING SUMMARY GRAVES MILL ROAD COMMUNITY MEETING #1 FROM: DREW DRAPER, PTP BILL
More informationA Fuzzy Signal Controller for Isolated Intersections
1741741741741749 Journal of Uncertain Systems Vol.3, No.3, pp.174-182, 2009 Online at: www.jus.org.uk A Fuzzy Signal Controller for Isolated Intersections Mohammad Hossein Fazel Zarandi, Shabnam Rezapour
More informationAPPENDIX 4.8 Transportation Impact Study
APPENDIX 4.8 Transportation Impact Study Prepared for: Submitted by:, CA 95 El Dorado Hills Town Center Apartments Transportation Impact Study - Revised Draft June 207 Table of Contents.0 INTRODUCTION.....3
More informationTransportation and Traffic Theory: Flow, Dynamics and Human Interaction
Real-Time Estimation of Travel Times on Signalized Arterials 1 Transportation and Traffic Theory: Flow, Dynamics and Human Interaction Proceedings of the 16 th International Symposium on Transportation
More informationResearch Article Development of an Optimization Traffic Signal Cycle Length Model for Signalized Intersections in China
Mathematical Problems in Engineering Volume 2015, Article ID 954295, 9 pages http://dx.doi.org/10.1155/2015/954295 Research Article Development of an Optimization Traffic Signal Cycle Length Model for
More informationROUNDABOUTS - Comments on the SIDRA INTERSECTION Model and the UK TRL Linear Regression Model
Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA info@sidrasolutions.com Management Systems Registered to ISO 9001 ABN 79 088 889 687 ROUNDABOUTS - Comments on the SIDRA INTERSECTION
More informationCITY COUNCIL AGENDA REPORT
CITY COUNCIL AGENDA REPORT TO: FROM: Honorable City Council Michael J. Egan, City Manager Date: October 20, 2015 BY: Kurt H. Anderson, Director of Community Development William Zimmerman, City Engineer
More informationUSING BLUETOOTH TM TO MEASURE TRAVEL TIME ALONG ARTERIAL CORRIDORS
USING BLUETOOTH TM TO MEASURE TRAVEL TIME ALONG ARTERIAL CORRIDORS A Comparative Analysis Submitted To: City of Philadelphia Department of Streets Philadelphia, PA Prepared By: KMJ Consulting, Inc. 120
More information3-15 TRAFFIC AND TRANSPORTATION
3-15 TRAFFIC AND TRANSPORTATION Changes Since the Draft EIS/EIR Subsequent to the release of the Draft EIS/EIR in April 2004, the Gold Line Phase II project has undergone several updates: Name Change:
More informationPurple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018
Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018 1 Agenda Environmental Updates UCLA Station Advance Utility Relocation VA Station Advance Utility Relocation Underground
More informationJust Announced! General Registration : Includes all three days of Technical Sessions, $150 for Florida Section Members / $300 for Nonmembers
Tuesday May 30th Wednesday May 31st Challenge Exams $200 Vendor Show 11:30-5 Traffic Signal II Classes $500 / $550 Reception Signs & Markings Level I Signal related Tech Sessions Day 1 Signal Inspection
More informationPinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.
BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ
More informationON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE
ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,
More informationInterchange Feasibility Study
Interchange Feasibility Study I-88/Illinois Route 47 Full Interchange Kane County, IL Prepared for Village of Sugar Grove, Illinois August 5, 2010 Prepared by GRAEF 8501 West Higgins Road, Suite 280 Chicago,
More informationTraffic Signal and Junction Design: A Case Study of Rajkot City
http:// Traffic Signal and Junction Design: A Case Study of Rajkot City Vaishali Parmar Department of civil engineering, Indus University Ahmedabad, India Ruchika Lalit Department of civil engineering,
More informationCharlton/Oxford Route 20 Reconstruction Project
Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting
More informationMapping the capacity and performance of the arterial road network in Adelaide
Australasian Transport Research Forum 2015 Proceedings 30 September - 2 October 2015, Sydney, Australia Publication website: http://www.atrf.info/papers/index.aspx Mapping the capacity and performance
More informationCotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning
Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation
More informationGeorgia s Regional Traffic Operations Program
Georgia s Regional Traffic Operations Program Shahram Malek, PhD, PE Vice President, ARCADIS US Inc. Regional Traffic Operations Project Manager Koushik Arunachalam, PE Associate Project Manager, ARCADIS
More informationTraffic Signal System Master Plan
Town of Hamden Traffic Signal Study Phase Traffic Signal System Master Plan Prepared for: South Central Regional Council of Governments 7 Washington Street 4 th Floor West North Haven, CT 0647-75 Town
More informationData-Driven Approaches for Robust Signal Plans in Urban Transportation Networks. Zahra Amini. A dissertation submitted in partial satisfaction of the
Data-Driven Approaches for Robust Signal Plans in Urban Transportation Networks By Zahra Amini A dissertation submitted in partial satisfaction of the requirements for the degree of Doctor of Philosophy
More informationOnline Adaptive Traffic Signal Coordination. with a Game Theoretic Approach
Online Adaptive Traffic Signal Coordination with a Game Theoretic Approach by Xuan Han January 20 th, 2017 A thesis submitted to the Faculty of the Graduate School of the University at Buffalo, State University
More information