Planning Type EPCC Onshore_TEST v1. TYP MIL Typicals milestones 545.3d. PCS Process 525.0d. TYP MIL.Project Main project Milestones 535.
|
|
- Rosemary Davis
- 5 years ago
- Views:
Transcription
1 TYP MIL Typicals milestones 545.3d TYP MIL.Project Main project Milestones 535.0d Basic design frozen 0.0d Feed endorsement 0.0d Start Project 0.0d End of engineering 0.0d TYP MIL.P&S Process and Safety 271.0d PID Issued for design 0.0d HAZOP Review report first issue 0.0d PID Issued for construction 0.0d TYP MIL.CIV Civil / Earthwork 380.5d Building service technical specification 0.0d First Piling Requisition 0.0d Earthworks Drawings IFC (30%) 0.0d Civil Drawings (30%) 0.0d Civil Drawings Completion 0.0d TYP MIL.STR Structural 336.5d First Structural MTO 0.0d Steelwork drawings completion 0.0d TYP MIL.PIP Piping 406.3d 3D Model - 30 % progress 0.0d Piping bulk first MTO 0.0d Piping Valves 1rst MTO 0.0d Plot plan (IFD) 0.0d 3D Model - 70 % progress 0.0d Piping Valves last MTO 0.0d Piping bulk last MTO 0.0d Piping Isometrics - 50% of progress 0.0d Piping support last MTO 0.0d 3D Model % progress 0.0d Piping Isometrics - 99% of progress 0.0d TYP MIL.E&I Electrical & Instrumentation 209.0d Instruments first requisition for queries 0.0d Control System requisition for query 0.0d First main electrical equipment requisition for query 0.0d Last main electrical equipment requisition for query 0.0d Instruments last requisition for queries 0.0d List of consumers & Power balance IFD 0.0d First electrical cable routing drawings issued for construction 0.0d Electrical bulk first MTO 0.0d Last electrial cable routing drawings issued for construction 0.0d Electrical bulk last MTO 0.0d PCS Process 525.0d PCS.PR Process discipline 525.0d PCS.PR.01 Design Basis 249.0d Block Flow Diagram (IFA) 23.0d Design Basis (IFA) 23.0d Equipment List (IFA) 45.0d Process Description (IFA) 23.0d Utility Information Specification (IFA) 23.0d Design Basis (IFD) 23.0d Utility Information Specification (IFD) 23.0d Equipment List (IFD) 23.0d Process Description (IFD) 23.0d Block Flow Diagram (IFD) 23.0d Equipmenty list (IFC) 45.0d PCS.PR.02 HMB & Process Flow Diagram 182.0d Heat & Material Balance (IFA) 23.0d Process Flow Diagram & Utility Flow Diagram (IFA) 23.0d Heat & Material Balance (IFD) 23.0d Process Flow Diagram & Utility Flow Diagram (IFD) 23.0d Process Flow Diagram & Utility Flow Diagram (IFC) 23.0d
2 PCS.PR.04 Process data Sheet for Equipment & Pack 462.0d Process Spec for critical Equipment (IFA) 45.0d Process and Utility Data sheet for Equipment / Packages ( 45.0d Process Spec for critical Equipment (IFD) 45.0d Process and Utility Data sheet for Equipment / Packages ( 45.0d Process and Utility Data sheet for Equipment / Packages ( 45.0d Process Spec for critical Equipment (IFD 1) 45.0d PCS.PR.05 Utility Consumption & Effluent List 183.0d Utility Balance (IFA) 23.0d Table of simultaneous vent to Flare & Blow Down (IFA) 23.0d Utility Balance (IFD) 23.0d Table of simultaneous vent to Flare & Blow Down (IFD) 23.0d Table of simultaneous vent to Flare & Blow Down (IFC) 23.0d PCS.PR.06 Process and Instrument Diagrams (P&ID) 454.0d PID / UID (IFA) 66.0d PID / UID (IFD) 109.0d PID / UID (IFC) 271.0d PCS.PR.08 Calculation Report 390.0d Calculation Report 390.0d Adequacy checks of existing equip & system (IFA) 45.0d Adequacy checks of existing equip & system (IFD) 66.0d Dynamic Simulation (IFA) 42.0d Dynamic Simulation (IFD) 23.0d PCS.PR.09 Safety & Shut Down Philo, CEM & Safegua 395.0d Shut Down & Blow Down Philosophy (IFA) 23.0d Safeguarding Flow Diagram (IFA) 23.0d Safeguarding Memorandum (IFA) 23.0d Shut Down & Blow Down Narrative (IFA) 23.0d Process Cause & Effect Matrix (IFA) 45.0d Safeguarding Flow Diagram (IFD) 23.0d Shut Down & Blow Down Narrative (IFD) 23.0d Shut Down & Blow Down Philosophy (IFD) 23.0d Process Cause & Effect Matrix (IFD) 23.0d Safeguarding Memorandum (IFD) 23.0d Process Cause & Effect Matrix (IFC) 45.0d Safeguarding Memorandum (IFD 1) 23.0d PCS.PR.10 Valves & Instrumentation DS & Control ph 440.0d Control Philosophy (IFA) 23.0d Process and Utility Control and Safety Valves data Sheet (I 45.0d Control Philosophy (IFD) 23.0d Control Narrative (IFA) 45.0d Process and Utility Data Sheets of instruments & analyzers 45.0d Process and Utility Control and Safety Valves data Sheet (IF 45.0d Process and Utility Control and Safety Valves data Sheet (IF 45.0d Process and Utility Data Sheets of instruments & analyzers 45.0d Control Narrative (IFD) 23.0d Control Narrative (IFC) 45.0d Process and Utility Data Sheets of instruments & analyzers 45.0d PCS.PR.11 Health, Safety & Environment 155.0d HAZOP Analysis 23.0d Safety Integrity Level 23.0d HAZOP Analysis Follow up 132.0d Safety Integrity Level Follow up 110.0d PCS.PR.12 Materials Supply 187.3d Chemical Supply Specification (IFA) 23.0d Catalyst & Chemicals summary (IFA) 23.0d Chemical Supply Specification (IFD) 23.0d Catalyst & Chemicals summary (IFC) 23.0d PCS.PR.13 Operating Manuals 289.8d Operating Manual Index (IFA) 23.0d Operating Manual Index (IFD) 23.0d Operating Manual (IFA) 66.0d Precommissioning procedure 154.0d Operating Manual (IFC) 45.0d
3 Test Run Performance Procedure (IFA) 23.0d Test Run Performance Procedure (IFC) 23.0d LPE Loss Prevention & Environnement 515.5d LPE.SE Safety engineering 482.0d LPE.SE.01 HSE Plan 459.0d HSE plan for engineering 88.0d HSE Plan General 454.0d LPE.SE.03 Project HSE Requirements 89.0d HSE Philosophy (safety concept) 89.0d Project Environmental Requirement 62.0d LPE.SE.06 Hazard identification 78.0d HAZARD Identification for design 78.0d LPE.SE.07 HAZOP 459.0d Coarse HAZOP 43.0d Main HAZOP during detailed design 131.0d Pre start HAZOP on modification 23.0d LPE.SE.08 Safety Integrity Level 161.0d Safety Integrity Procedure 45.0d Safety Integrity Level Allocation Report 66.0d LPE.SE.09 Safety at Site 23.0d Operating Plan of safety 23.0d LPE.LP Loss Prevention 515.5d LPE.LP.01 Design Basis 177.0d Active Fire Specification (IFA) 66.0d Active fire specification (IFD) 45.0d Active Fire Specification (IFC) 66.0d LPE.LP.02 HMB and Process Flow Diagram 111.0d Process Flow Diagram PFD ( HMB inclus) IFA 43.0d Process Flow Diagram PFD ( HMB inclus) IFD 23.0d LPE.LP.04 Process data Sheets for eqp and Packages 178.0d Process data Sheet for Equipments (IFA) 23.0d Requirements for fire protection facilities in pack eqp and bu 154.0d Process data Sheet for Equipments (IFD) 23.0d Process data Sheet for Equipments (IFC) 66.0d LPE.LP.05 Utility Consumption and Effluent List 45.0d Electrical Load List 45.0d LPE.LP.06 Process & Instrument Diagram (P&ID) 220.5d PID (IFA) 45.0d PID (IFD) 45.0d PID (IFC) 110.0d LPE.LP.07 Firefighting Distribution Layouts 286.0d Fire Master plan (IFA) 66.0d Fire Master plan (IFD) 23.0d Fire Protection Plan (Sprinker line location) IFA 23.0d Fire Master plan (IFC) 66.0d Fire Protection Plan (Sprinker line location) IFD 66.0d Fire Protection Plan (Sprinker line location) IFC 23.0d LPE.LP.08 Calculation reports 220.0d Adequacy check for existing equipment and systems 23.0d Calculation reports for distribution networks (IFA) 23.0d Calculation reports for distribution networks (IFD) 45.0d Calculation reports for distribution networks (IFC) 23.0d Calculation reports for local distribution networks 45.0d LPE.LP.09 Safety & Shut down Philo, CEM & Safegua 176.5d Fire & gas cause and effect matrix (IFA) 23.0d Fire & gas cause and effect matrix (IFD) 66.0d Fire & gas cause and effect matrix (IFC) 23.0d LPE.LP.10 Valves and Instrum Data Sheets & Control 117.0d Process Data Sheet for Instrumentation (IFA) 21.5d Process Control and Safety Valves Data Sheets (IFA) 23.0d Process Control and Safety Valves Data Sheets (IFD) 23.0d Process Data Sheet for Instrumentation (IFD) 21.5d LPE.LP.12 Operating Manual 155.0d
4 Operating Manual (IFA) 23.0d Operating Manual (IFD) 132.0d LPE.LP.13 Health, Safety and Environmental 155.0d HAZOP 23.0d SIL 23.0d HAZOP action sheet 132.0d SIL action sheets 132.0d LPE.LP.14 Loss Prevention & Environment Plan 91.0d Loss Prevention Plan (IFA) 45.0d Loss Prevention Plan (IFD) 23.0d Loss Prevention Plan (IFC) 23.0d LPE.LP.15 Safety Studies 132.0d Anti Sismic Design Report (IFD) 45.0d CFD Simulation Report (IFD) 132.0d Flare Emission Study Report (IFD) 34.0d Toxic Gas Dispersion Report (IFD) 34.0d Vent Radiation Study Report (IFD) 45.0d LPE.LP.16 Risk Analysis 305.5d Building Risk-Assessment (IFA) 34.0d Building-Risk-Assessment (IFD) 55.0d Qualitative Risk Assessment (IFC) 132.0d Quantitative Risk Assessment (IFC) 261.0d Building-Risk-Assessment (IFC) 66.0d LPE.LP.17 Safety Reports ( RdS) 460.0d Preliminary Risk Assement Report (IFD) 144.0d Safety Report for minor plant modification (IFC) 66.0d Final Risk Assement Report (IFC) 250.0d LPE.LP.18 Safety Integrity Level Verification 45.0d SIL Verification Report (IFC) 45.0d LPE.LP.19 Hazardous Area Classification 384.0d Hazardous Area Classification Data Sheet (IFA) 45.0d Hazardous Area Classification Data Sheet (IFD) 35.0d Hazardous Area Classification Layouts (IFA) 77.0d Hazardous Area Classification Layouts (IFD) 34.0d HAC Supplementary Clarification (IFC) 45.0d Hazardous Area Classification Data Sheet (IFC) 45.0d Hazardous Area Classification Layouts (IFC) 45.0d LPE.LP.20 Fire and Gas Detection Design 212.5d Design Criteria (IFA) 23.0d Design Criteria (IFD) 34.0d Fire & Gas Schematic layout drawing (IFA) 66.0d Design Criteria (IFC) 45.0d Fire & Gas Schematic layout drawing (IFD) 23.0d Fire & Gas Schematic layout drawing (IFC) 45.0d LPE.LP.21 Fireproofing Design 268.0d List of Potential source of fire (IFA) 40.0d List of Potential source of fire (IFD) 21.0d List of Potential source of fire (IFC) 21.0d Fire Proofing layout drawing (IFA) 40.0d Fire Proofing layout drawing (IFD) 21.5d Fire Proofing layout drawing (IFC) 21.5d List of structures and equipments to be fireproofed (IFA) 45.0d List of structures and equipments to be fireproofed (IFD) 21.5d List of structures and equipments to be fireproofed (IFC) 21.5d LPE.LP.22 Emergency Management for Operation 391.0d Environmental Emergency Plans for Operation (IFD) 45.0d Pollution Contingency Plans for Operation (IFD) 45.0d Emergency Escape drawings (IFA ) 45.0d Environmental Emergency Plans for Operation (IFC) 45.0d Pollution Contingency Plans for Operation (IFC) 45.0d Emergency Escape drawings (IFC) 23.0d LPE.LP.23 Safety Signs 237.5d Definition of Safety Signs Criteria (IFD) 45.0d Layout drawings indicating Signs location (IFC) 45.0d
5 LPE.LP.24 RAM Analysis 111.0d PLANT RAM Analysis (IFA) 88.0d PLANT RAM Analysis (IFD) 23.0d LPE.LP.25 Environmental and Social Impact Assessm 228.0d Environmental impact assessment (IFA) 88.0d Environmental impact assessment (IFD) 45.0d LPE.LP.26 Environmental Studies for Operation 332.5d Preliminary Noise Study (IFA) 45.0d Preliminary Noise Study (IFD) 23.0d Noise Control Plan (IFA) 45.0d Noise Control Plan (IFD) 23.0d Final Noise Study (IFA) 45.0d Final Noise Study (IFD) 23.0d EQP Equipment & Packages 446.4d EQP.PK Process Packages & Handling 376.0d Technical Specification Issue for PK 21.5d Material Requisition for PK 10.0d Technical Evaluation for PK 21.5d Technical Documentation Issue for Order for PK 21.5d Vendor Doc Follow up for PK 270.0d EQP.CL Pressure Equipment 374.9d Material Requisition for CL 21.5d Technical Evaluation for CL 35.0d Technical Doc Issue for order for CL 21.5d Vendor Doc Follow up for CL 250.0d EQP.FR Furnaces 383.5d Technical Specification for FR 10.0d Material Requisition for FR 10.0d Technical Evaluation fo FR 21.5d Technical Documentation Issue for Order for FR 12.0d Vendor Doc Follow up for FR 250.0d EQP.PE Energy Packages 354.0d Material Requisition Issue for PE 21.5d Technical Evaluation for PE 21.5d Technical Documentation Issue for Order for PE 21.5d Vendor Documents Follow up for PE 258.0d EQP.MM Rotating Equipement 403.5d Technical Specification for MM 22.0d Material Requisition for MM 21.5d Technical Evaluation for MM 21.5d Technical Doc Issued for Order for MM 21.5d Vendor Doc Follow up for MM 270.0d EQP.SC Shell & Columns 348.0d Thermal Design for SC 21.5d Material Requisition for SC 21.5d Technical Evaluation for SC 35.0d Technical Doc Issued for Order for SC 21.5d Vendor doc Follow up for SC 215.0d PIP Piping & Layout 545.3d PIP.TB Piping 545.3d PIP.TB.02A Process P&ID Mechanization 387.0d Process PID Mechanization (IFA) 53.8d Process PID Mechanization (IFD) 75.3d Process PID Mechanization (IFC) 64.5d Process PID Mechanization (update) 193.5d PIP.TB.03 Plot Plan & Single Line Structure 454.0d Plot Plan (IFA) 129.0d Single Line Structure IFA 86.0d Single Line Structure IFD 150.5d Plot Plan (IFD) 150.5d Plot Plan (IFC) 107.5d Plot Plan (update) 129.0d
6 PIP.TB.04 Underground Networks 377.8d Underground Networks (IFA) 64.5d Underground Networks MTO1 32.3d Underground Networks (IFD) 53.8d Underground Networks MTO2 53.8d Underground Networks (IFC) 86.0d Underground Networks (update) 150.5d PIP.TB.05 Materials Specification 454.0d Specifications of Piping Component 43.0d Valves Specifications 155.0d Bids:Control & Tech Appraisal (piping component) (TE1) 86.0d Update Specification with Engineering & Client 150.5d Bids for material not covered in previous agreement (TE2) 107.5d Final Revision of Material Specification 248.0d Technical Appraisal for Motorized Valves (TEV) 52.0d PIP.TB.06A Market Evaluation & Project Agreement 52.5d MTO for TB06A 31.0d Technical Evaluation for TB06A 21.5d PIP.TB.06B 1rst Piping Material Take Off 118.3d MTO1 for piping bulk 32.3d Material Requisition 43.0d Technical Evaluation 43.0d PIP.TB.06C 2nd Piping Material Take Off 64.5d MTO2 32.3d Material Requisition (for missing material on MTO1) 32.3d PIP.TB.06D 3rd Piping Material Take Off (3rd MTO) 86.0d MTO3 21.5d Material Requisition (for missing material on MTO2) 43.0d Technical Evaluation 21.5d PIP.TB.07 Piping Layout above ground 440.8d Preliminary Routings (Nozzles Orientation-Bases profile) 64.5d Intermediate 3D Model (Piping layout & supports) 150.5d Final 3D Model (Update piping layout above ground) 225.8d PIP.TB.08 Isometrics 310.0d Isometrics (drawings with materials list) 310.0d PIP.TB.09 Piping Arrangement 451.5d Key Plan Execution 75.3d Piping Arrangment 172.0d PIP.TB.10A Stress Analysis 429.8d General Specification for stress analysis 258.0d Material Requisition d Technical Evaluation d Vendor's doc. follow up 129.0d Material Requisition d Reports & Calculations 129.0d Technical Evaluation d Field Assistance 48.0d PIP.TB.11A Ladders & Platforms 1 MTO 198.5d MTO d Material Requisition d Vendor's doc. follow up d MTO d Material Requisition d Vendor's doc. follow up d PIP.TB.11C Engineering and ladders and platforms 150.5d Ladders and platform layout 64.5d Ladders and platform layout (updated) 64.5d PIP.TB.12 Valves Materials MTO 246.0d Valves specifications 1 (MR1) 21.5d Valves MTO d Material Requisition d Valves MTO d Material Requisition d Valves specifications 2 (MR2) 21.5d
7 PIP.TB.02B Utility Distribution P&ID 333.3d Utility Distribution Diagrams Mechanization (IFA) 43.0d Utility Distribution Diagrams Mechanization(IFD) 43.0d Utility Distribution Diagrams Mechanization(IFC) 64.5d Utility Distribution Diagrams Mechanization (Update) 182.8d PIP.TB.10B Piping Supports 365.5d Definition of Support Engineering Methodology (case B) 64.5d Design of Support Engineering Methodology (case A) 64.5d MTO 1 (case A) 21.5d MTO 1 (case B) 43.0d Definition of standard and special supports (case A) 150.5d Material Requisition 1 (case B) 43.0d MTO 2 (Case B) 54.8d Support Standardization (case B) 215.0d Material Requisition 2 (case B) 43.0d MTO 2 (case A) 43.0d MTO 3 (Case B) 64.5d Material Requisition 3 (case B) 43.0d INS Instrumentation 523.0d INS.AS Instrumentation 523.0d INS.AS.01 PID & Loop Data Sheet 395.0d Instrument Data Base (Data entry) 334.0d General Specification (IFA) 35.0d PID Mechanization (IFA) 86.0d General Specification (IFD) 35.0d PID Mechanization (IFD) 108.0d INS.AS.02 Control, Motorized & Safety valves 407.5d Quality / Technical Spec for AS02 (IFA) 65.0d Data Sheet & Calculation for AS02 (IFA) 151.0d Quality / Technical Spec for AS02 (IFD) 42.0d Technical Evaluation for AS d Data Sheet & Calculation for AS02 (IFC) 85.0d Vendor Doc Follow Up for AS d Quality / Technical Spec for AS02 (IFC) 86.0d INS.AS.03 Measurement & Control Instrument 355.0d Quality / Technical Spec for AS03 (IFA) 67.0d Data Sheet & Calculation for AS03 (IFA) 129.0d Quality / Technical Spec for AS03 (IFD) 42.0d Technical Evaluation for AS d Vendor Doc Follow Up for AS d Data Sheet & Calculation for AS03 (IFC) 64.5d Quality / Technical Spec for AS03 (IFC) 65.0d INS.AS.04 Analysers Systems 367.0d Quality / Technical Spec for AS04 (IFA) 42.0d Data Sheet & Calculation for AS04 (IFA) 43.0d Quality / Technical Spec for AS04 (IFD) 34.0d Technical Evaluation for AS d Vendor Doc Follow Up for AS d Data Sheet & Calculation for AS04 (IFC) 21.0d Quality / Technical Spec for AS04 (IFC) 20.0d INS.AS.05 Supervision & Control Systems 438.5d General Spec for AS d Functional & Detailed technical Spec for AS d Technical Evaluation for AS d Vendor Doc Follow Up for AS d Factory Acceptance Test (FAT) for AS d INS.AS.06 Safety, Alarm & Automation System 393.0d General Spec for AS d Functional & Detailed technical Spec for AS d Technical Evaluation for AS d Vendor Doc Follow Up for AS d Factory Acceptance Test (FAT) for AS d INS.AS.08 Process Simulators 403.0d General Spec for AS d
8 Functional & Detailed technical Spec for AS d Technical Evaluation for AS d Vendor Doc Follow Up for AS d Model Acceptance Test (MAT) for AS d Factory Acceptance Test (FAT) for AS d INS.AS.09 Installation drawings & Materials 373.5d Quality/Technical Job Spec for AS09 (IFA) 65.0d 1 MTO, sketches, datasheets, BOQ (IFA) 64.5d Main Cable Routing Layouts (IFA) 54.0d Quality / Technical Job Spec for AS09 (IFD) 43.0d Job Spec for ins. installation on vessels (IFA) 64.5d Wiring Diagram (IFA) 84.0d Vendors Doc Follow up for 1 MTO AS d Detailed cable Run Layouts (IFA) 67.0d Job Spec for inst. installation on vessels (IFD) 35.0d 1 MTO, sketches, datasheets, BOQ (IFC) 86.0d Quality / Technical Job Spec for AS09 (IFC) 86.0d Wiring Diagram (IFD) 90.0d Main Cable Routing Layouts (IFD) 43.0d 2 MTO 65.0d Detailed cable Run Layouts (IFD) 43.0d Vendors Doc Follow up for 2 MTO AS d Main Cable Routing Layouts (IFC) 43.0d Wiring Diagram (IFC) 107.5d Detailed cable Run Layouts (IFC) 42.0d 3 MTO 43.0d Vendors Doc Follow up for 3 MTO AS d Job Spec for instrum instal on vessels (IFC) 35.0d INS.AS.10 Control Room Drawings 392.5d Wiring Diagram (IFA) 66.0d Control & Technical Rooms Layouts (IFA) 65.0d Detailed Layouts (IFA) 65.0d Wiring Diagram (IFD) 43.0d Control & Technical Rooms Layouts (IFD) 43.0d Wiring Diagram (IFC) 43.0d Control & Technical Rooms Layouts (IFC) 42.0d Detailed Layouts (IFD) 45.0d Detailed Layouts (IFC) 45.0d INS.AS.11 Instrum Packages & Follow up from other 336.5d Technical Spec for AS11 (IFA) 54.0d Technical Spec for AS11 (RFA) 43.0d Technical Evaluation for AS d Technical Spec for AS11 (IFD) 21.0d Vendor Doc Follow Up for AS d INS.AS.20 Telecommunication Systems 396.5d Technical Spec for AS20 (IFA) 61.0d Plant Layout with Telecom equipment locati (IFA) 162.0d Technical Spec for AS20 (IFD) 38.0d Technical Evaluation for AS d Plant Layout with Telecom equipment locati (IFC) 77.0d Vendor Doc Follow Up for AS d Wiring Diagram 190.0d Technical Spec for AS20 (IFC) 77.0d INS.AS.21 Telecommunication System Packages 470.0d General Spec for AS21 (IFA) 61.0d General Spec for AS21 (IFD) 38.0d General Spec for AS21 (IFC) 22.0d Technical Evaluation for AS d Vendor Doc Follow Up for AS d ELE Electrical 484.0d ELE.LAY Electrical Layouts 484.0d ELE.LAY.03C Electrical Load Data, Cable Sizing & rep 377.0d Electrical Load List - 1st Issue (25%) 43.0d Electrical Load Summary - 1st Issue (25%) 43.0d
9 Power Cable Sizing Criteria (IFA) 22.0d Power Cable Sizing Criteria (IFA Update) 10.0d Electrical Load List - 2nd Issue (55%) 63.0d Electrical Load Summary - 2nd Issue (55%) 61.0d Power Cable Sizing Calculation - 1st Issue (70%) 129.0d Power Cable Sizing Criteria (IFD) 10.0d Electrical Load List - 3rd Issue (70%) 66.0d Electrical Load Summary - 3rd Issue (70%) 62.0d Power Cable Sizing Calculation - 2nd Issue (80%) 20.0d Electrical Load List - 4th Issue (80%) 10.0d Electrical Load Summary - 4th Issue (80%) 10.0d Power Cable Sizing Calculation - 3rd Issue (90%) 10.0d Electrical Load List - 5th Issue (90%) 10.0d Electrical Load Summary - 5th Issue (90%) 10.0d Electrical Load List - Final Issue 10.0d Electrical Load Summary - Final Issue 10.0d Power Cable Sizing Calculation - Final Issue 10.0d ELE.LAY.03B Electrical System Design 442.0d Electrical System Design (IFA) 22.0d Electrical Proj. Document Standardization (IFA) 22.0d Electrical System Control (IFA) 45.0d Electrical System Design (IFA Update) 10.0d Elec System Field Inspection & Test Plan (IFA) 22.0d Electrical System installation (IFA) 22.0d Erection BoQ List d Electrical Proj. Document Standardization (IFA update) 40.0d Electrical System Design (IFD) 10.0d Electrical System Control (IFA Update) 21.0d Electrical System installation (IFD) 14.0d Erection BoQ List d Elec System Field Inspection & Test Plan (IFD) 14.0d Electrical System Control (IFD) 10.0d Electrical Proj. Document Standardization (IFD) 22.0d Erection BoQ List d Erection BoQ List d Erection BoQ List d Electrical System Operating Manual (IFA) 43.0d Electrical System Operating Manual (IFD) 44.0d ELE.LAY.03D Elec Single Line Diagram, Interconnect 413.5d Electrical General Single Line Diagram (IFA) 43.0d Electrical General Single Line Diagram (IFA Update) 63.0d Substations Single Line Diagram (IFA) 22.0d Substations Single Line Diagram (IFA Update) 42.0d Electrical General Single Line Diagram (IFD) 65.0d Substations Single Line Diagram (IFD) 42.0d Interconnection Wiring Diagram (IFA) 66.0d Interconnection Wiring Diagram (IFD) 42.0d Interconnection Wiring Diagram (IFC) 65.0d ELE.LAY.03E Electrical System Studies & reports 479.0d Motor Starting Studies (IFA) 43.0d Short Circuit / Load Flow (IFA) 43.0d Earthing Studies (IFA) 23.0d Earthing Studies (IFA Update) 42.0d Harmonic Studies (IFA) 43.0d Motor Starting Studies (IFA Update) 63.0d Short Circuit / Load Flow (IFA Update) 63.0d Transcient Stability (IFA) 43.0d Earthing Studies (IFD) 41.0d Lighting Studies (IFA) 42.0d Plant Lighting Calculation (IFA) 42.0d Road Lighting Calculation (IFA) 42.0d Harmonic Studies (IFA Update) 85.0d Motor Starting Studies (IFD) 44.0d Short Circuit / Load Flow (IFD) 44.0d
10 Transcient Stability (IFA Update) 85.0d Lighting Studies (IFA Update) 65.0d Road Lighting Calculation (IFA Update) 22.0d Plant Lighting Calculation (IFA Update) 22.0d Road Lighting Calculation (IFD) 20.0d Harmonic Studies (IFD) 88.0d Plant Lighting Calculation (IFD) 20.0d Lighting Studies (IFD) 45.0d Transcient Stability (IFD) 88.0d Documents for Local authorities 66.0d ELE.LAY.03F Protection Relay Setting Studies 449.0d General Protection Relay & Metering Diagram (IFA) 45.0d CT's Calculation (IFA) 45.0d CT's Calculation (IFA Update) 21.5d General Protection Relay & Metering Diagram (IFA Update) 64.0d CT's Calculation (IFD) 33.0d General Protection Relay & Metering Diagram (IFD) 65.0d Protection Coord Study & Relay Setting Tab (IFA) 86.0d Protection Coord Study & Relay Setting Tab (IFD) 60.0d ELE.LAY.03G Electrical Substations Layouts 445.5d Substations Layout & Arrangment Drawings (IFA) 45.0d Substations Cable Routing (IFA) 22.0d Substations Earthing Layout (IFA) 21.0d Substations Layout & Arrangment Drawings (IFD) 60.0d Substations Cable Routing (IFD) 25.0d Substations Cable Routing Cross Section (IFA) 45.0d Substations Layout & Arrangment Drawings (IFC) 153.0d Substations Earthing Layout (IFD) 22.0d Substations Tray / Ladders Arrangement DWG (IFA) 20.0d Substations Earthing Layout (IFC) 25.0d Substations Cable Routing Cross Section (IFD) 25.0d Substations Slab Drilling & Wall openings (IFA) 65.0d Substations Tray / Ladders Arrangement DWG (IFD) 21.0d Substations Cable Routing (IFC) 20.0d Substations Tray / Ladders Arrangement DWG (IFC) 23.0d Substations Slab Drilling & Wall openings (IFD) 108.0d Substations Cable Routing Cross Section (IFC) 24.0d Substations Slab Drilling & Wall openings (IFC) 65.0d ELE.LAY.13K Cable Run Layouts 277.3d General Main Cable Run Layout (IFA) 40.0d Area Cable run Layout (IFA) 22.0d General Main Cable Run Layout (IFA Update) 20.0d Cable Cross Section (IFA) 45.0d Road Crossing General Layout / Sections (IFA) 45.0d Area Cable run Layout (IFA Update) 24.0d General Main Cable Run Layout (IFD) 23.0d Cable Cross Section (IFA Update) 24.0d Road Crossing General Layout / Sections (IFA Update) 24.0d Area Cable run Layout (IFC) 26.0d Cable Cross Section (IFC) 24.0d Road Crossing General Layout / Sections (IFC) 24.0d ELE.LAY.17D Earthing System Layouts 204.5d Typical Earthing Details (IFA) 23.0d Earthing General Layout (IFA) 22.0d Earthing General Layout (IFA Update) 22.0d Typical Earthing Details (IFD) 24.0d Earthing Area Layout (IFA) 21.0d Earthing Area Layout (IFD) 24.0d Earthing General Layout (IFD) 23.0d Typical Earthing Details (IFC) 24.0d Earthing Area Layout (IFC) 24.0d ELE.LAY.19H Lighting Layouts 171.0d Road & Open Yard Layouts (IFA) 41.0d Fence Lighting Layouts (IFA) 41.0d
11 Plant Lighting Layout (IFA) 43.0d Road & Open Yard Layouts (IFD) 20.0d Lighting Schematic & Wiring Diagrams (IFA) 45.0d Fence Lighting Layouts (IFD) 20.0d Road & Open Yard Layouts (IFC) 18.0d Plant Lighting Layout (IFD) 24.0d Fence Lighting Layouts (IFC) 18.0d Lighting Schematic & Wiring Diagrams (IFD) 23.0d Plant Lighting Layout (IFC) 24.0d Lighting Schematic & Wiring Diagrams (IFC) 24.0d ELE.EQP Electrical Equipment 311.0d ELE.EQP.SQ1 Electrical Equipment First sequence 279.0d Technical Spec for ELE.EQP.SQ1 (IFA) 22.0d Requisition Specification for ELE.EQP.SQ1 43.0d Technical Spec for ELE.EQP.SQ1 (IFA Update) 10.0d Technical Spec for ELE.EQP.SQ1 (IFD) 10.0d Technical Evaluation for ELE.EQP.SQ1 43.0d Instruction to Bidders for ELE.EQP.SQ1 21.5d Vendor Doc Follow up for ELE.EQP.SQ d ELE.EQP.SQ2 Electrical Equipment Second sequence 311.0d Technical Spec for ELE.EQP.SQ2 (IFA) 22.0d Requisition Specification for ELE.EQP.SQ2 43.0d Technical Spec for ELE.EQP.SQ2 (IFA Update) 10.0d Technical Spec for ELE.EQP.SQ2 (IFD) 10.0d Technical Evaluation for ELE.EQP.SQ2 43.0d Instruction to Bidders for ELE.EQP.SQ2 21.5d Vendor Doc Follow up for ELE.EQP.SQ d ELE.EQP.SQ3 Electrical Equipment Third sequence 265.5d Technical Spec for ELE.EQP.SQ3 (IFA) 43.0d Requisition Specification for ELE.EQP.SQ3 32.3d Technical Spec for ELE.EQP.SQ3 (IFA Update) 21.5d Technical Evaluation for ELE.EQP.SQ3 43.0d Technical Spec for ELE.EQP.SQ3 (IFD) 21.5d Instruction to Bidders for ELE.EQP.SQ3 21.5d Vendor Doc Follow up for ELE.EQP.SQ d ELE.EQP.SQ4 Electrical Equipment Fourth sequence 308.5d Technical Spec for ELE.EQP.SQ4 (IFA) 22.0d Requisition Specification for ELE.EQP.SQ4 35.0d Technical Spec for ELE.EQP.SQ4 (IFA Update) 10.0d Technical Spec for ELE.EQP.SQ4 (IFD) 10.0d Technical Evaluation for ELE.EQP.SQ4 35.0d Instruction to Bidders for ELE.EQP.SQ4 21.5d Instruction to Bidders (IFC) for ELE.EQP.SQ4 10.0d Vendor Doc Follow up for ELE.EQP.SQ d ELE.EQP.SQ5 Electrical Equipment Fifth sequence 204.5d Technical Spec for ELE.EQP.SQ5 (IFA) 22.0d Requisition Specification for ELE.EQP.SQ5 43.0d Technical Spec for ELE.EQP.SQ5 (IFA Update) 10.0d Technical Evaluation for ELE.EQP.SQ5 21.5d Technical Spec for ELE.EQP.SQ5 (IFD) 10.0d Instruction to Bidders for ELE.EQP.SQ5 21.5d MTO 1 for ELE.EQP.SQ5 10.0d MTO 2 for ELE.EQP.SQ5 10.0d Instruction to Bidders (IFC) for ELE.EQP.SQ5 10.0d MTO 3 for ELE.EQP.SQ5 10.0d ELE.BLK Electrical Bulk 196.0d ELE.BLK.SQ1 Electrical Bulk Second sequence 196.0d Requi Spec for ELE.BLK.SQ1 43.0d Technical Evaluation for ELE.BLK.SQ1 21.5d 1st MTO for ELE.BLK.SQ1 10.0d Instruction to Bidders for ELE.BLK.SQ1 21.5d Vendor Doc Follow up for ELE.BLK.SQ d 2nd MTO for ELE.BLK.SQ1 10.0d ELE.BLK.SQ2 Electrical Bulk Second sequence 100.0d
12 1st MTO for ELE.BLK.SQ2 10.0d 2nd MTO for ELE.BLK.SQ2 10.0d 3rd MTO for ELE.BLK.SQ2 10.0d CIV Civil 494.0d CIV.CV Civil 494.0d CIV.CV.01 Site Investigation 124.0d Documentation for site investigation requisition 12.0d Technical Evaluation 12.0d Investigation Execution 45.0d Investigation Report 24.0d CIV.CV.02 Site Preparation 96.0d Documentation for subcontracting requisition 22.0d Technical Evaluation 22.0d Demolition Layouts 22.0d Grading Plans for Earthworks 22.0d CIV.CV.03 Piling & Soil Improvement 75.5d Layout of Soil Improvment works 22.0d Typical Drawings 22.0d Documentation for subcontracting requisition 22.0d Technical Evaluation 10.0d CIV.CV.04A Roads, dikes and area finishing 203.0d Typical Road Section 32.0d Dike and finishing area 22.0d Grading Plan 100.0d CIV.CV.04B Fences 35.0d Typical Drawings & Fencing Plan 35.0d CIV.CV.04C Storm Water & Sanitary Sewers 111.3d Sewer scheme plan 33.0d Storm Water sewer layout 43.8d Sanitary sewer layout 43.0d CIV.CV.07A HVAC system 478.5d HVAC system design criteria 35.0d HVAC Technical Specification 46.0d Schematic diagram for HVAC system 46.0d HVAC Detailed Design 63.0d Docu for subcontracting requisition for CV07A 33.0d Technical Evaluation for CV07A 23.0d HVAC Construction Drawings 110.0d HVAC Vendor Documents Follow up 210.0d CIV.CV.07B Building Services 398.5d Building Service design criteria 32.0d Technical specification for building services 43.0d Design of Electrical System 63.0d Design of fire & gas detection system 63.0d Design of Firefighting system 63.0d Design of Plumbing system 63.0d Design of Telecom System 63.0d Documentation for subcontracting requisition for CV07B 21.5d Technical Appraisal for CV07B 11.0d Construction drawings for CV07B 90.0d Vendor documents follow up for CV07B 176.0d CIV.CV.08 Reinforced Concrete Works 455.5d Reinforced Concrete Works design criteria 22.0d Reinforced Concrete Documents Standardization 23.0d Design of interconnecting piperack foundation 58.0d Cooling Tower & other special works 133.0d Design of process/utility piperack for foundation 123.0d Prefabricated Piperack 70.0d RC Foundation & Structures for Equipment design 112.0d Design of storage sheds foundation 123.0d Design of supp./serv. structures foundation 172.0d Sleeper Design 23.0d Design of compressor houses/shelters foundation 110.0d Secondary & miscellaneous RC works 198.0d
13 Bridge Design 60.0d Tank Foundation Design 66.0d Heaters & Packages foundation Design 130.0d Machines Foundation Design 130.0d RC Bassins Design 88.0d Design of secondary structures foundation 188.0d CIV.CV.09 Building General Activities 287.0d Building General Activities design criteria 32.0d Front End Design 66.0d Docu for subcontracting requisition for CV d Technical Appraisal for CV d Subcontractor construction drawings for CV d CIV.CV.10A Electrical Substations 155.0d Electrical Substations Architectural Design 155.0d Electrical Substations Structural Design 133.0d Electrical Substations Specific Design 67.0d CIV.CV.10B Control Rooms 155.0d Control Rooms Architectural Design 155.0d Control Rooms Structural Design 133.0d Control Rooms Specific Design 67.0d CIV.CV.10C Laboratories 155.0d Laboratories Architectural Design 155.0d Laboratories Structural Design 133.0d Laboratories Specific Design 67.0d CIV.CV.10D Other Buildings 155.0d Other Buildings Architectural Design 155.0d Other Buildings Structural Design 135.0d Other Buildings Specific Design 67.0d CIV.CV.11 Civil Works Subcontracting 93.0d Docu for subcontracting requisition for CV d Technical Appraisal for CV d CIV.CV.12 Purchase of Material 395.0d Material requisition for CV d Technical Appraisal for CV d Construction drawings for CV d Vendor Documents follow up for CV d CIV.CV.05A Harbours, jetties and costal works 484.0d Docu for site investigation requisition for CV d Site Investigation Technical Appraisal for CV d Investigation Execution for CV d Front End Design (IFA) 67.0d Docu for subcontracting requisition for CV d Investigation Report for CV d Dredging layout (IFA) 23.0d Technical Appraisal for CV d Subcontractor detailed design 155.0d Subcontractor Construction Drawings 70.0d CIV.CV.06 Steelworks 416.0d Steelworks design criteria 22.0d Steelworks Document Standardization 23.0d Steelworks Material Requisition 22.0d Design of interconnecting piperack for CV d Design of process/utility piperack for CV d Steelwork Technical Evaluation 22.0d Design of storage sheds for CV d Design of supp./serv. structures for CV d Design of compressor houses/shelters for CV d Steelworks Construction Drawings 220.0d Steelworks Vendor Document Follow up 220.0d Design of secondary structures for CV d MAE Material Engineering 521.0d MAE.TB Piping 503.5d MAE.TB.01A Material supply by contractors 503.5d Technical specification for TB01A 140.0d
14 MTO 1 / Estimate for Bid and Appraisal 86.0d Support to bid construction for TB01A (TE1) 44.0d Quality Control Plan for TB01A 132.0d Check Materials for TB01A (TE2) 58.0d MTO2 / Final Appraisal for TB01A 24.0d MAE.TB.01B Materials Supply by Saipem to contracto 373.5d Technical specification for TB01B 51.0d MTO 1 / Material Quantity Estimation for TB01B 43.0d Technical Evaluation for TB01B 35.0d Vendors Doc Follow up for TB01B 97.0d MTO 2 / Final Quantities of materials for TB01B 43.0d MAE.LP Loss Prevention 89.0d MAE.LP.03 Materials Selection 89.0d Materials Selection (IFA) 23.0d Materials Selection ( IFD) 23.0d MAE.PR Process 132.0d MAE.PR.03 Material Selection 132.0d Material Selection Report (IFA) 23.0d Material Selection Diagram (IFA) 23.0d Follow up for PR d Material Selection Report (IFD) 23.0d Material Selection Diagram (IFD) 23.0d MAE.EL Electrical 435.0d MAE.EL.23B Cathodic Protection System 339.0d Design & Studies (IFA) 21.5d Design & Studies (IFA Update) 21.5d Design & Studies (IFD) 23.0d Requisition Specification (MR) 45.0d Technical Evaluation 23.0d Materials Take Off (1rst MTO) 20.0d Requisition Specification (ORD) 23.0d Cathodic Protection Detail Design (IFA) 54.0d Vendor Doc Follow Up (IFA) 129.0d Materials Take Off (2nd MTO) 20.0d Cathodic Protection Detail Design (IFC) 45.0d MAE.EL.23C Cathodic Protection system - Package 435.0d Design & Studies (IFA) 21.5d Design & Studies (IFA Update) 21.5d Requisition Specification (MR) 22.0d Design & Studies (IFD) 20.0d Technical Evaluation 35.0d Requisition Specification (ORD) 20.0d Vendor Doc Follow Up (IFA) 270.0d
ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY
ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY BACK GROUND BASIS ENGINEERING IS A PROVIDER OF FACILITIES SOLUTION DESIGN TO THE OIL & GAS UPSTREAM MIDSTREAM MARKETS Founded in 1981, Basis Engineering
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationaspro DESIGN & ENGINEERING SERVICES
aspro DESIGN & ENGINEERING SERVICES ABOUT US ( & ( ) * +, - ). )/ 0 & 0 ' % - - 1 % 0 & 2 3 ' 4 / % " ' & 0 ) 4 % % & 5 '$) 67789:77; '$) 8 3 ( 0 $ ( & (?, % ) &
More informationAddendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers
Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building
More informationComparison that shows the differences between a PFD and P&ID :
Comparison that shows the differences between a PFD and P&ID : PFD P&ID Used during construction? No Yes* Shows all process and service piping? No Yes Indicates presence of all controls? No Yes Shows all
More informationDRAFT. Winnipeg Sewage Treatment Program Integrated Management System. WSTP Technical Document Numbering System DOCUMENT NUMBER: CD-RC-PC-01
Winnipeg Sewage Treatment Program Integrated Management System WSTP Technical Document Numbering System DOCUMENT NUMBER: CD-RC-PC-01 DRAFT Rev Prepared by Reviewed by Date Approved by Date 2014/04/02 Philippe
More informationChemionix Solutions. Outsourcing. Engineering. Drafting
Chemionix Solutions. Outsourcing. Engineering. Drafting Chemionix Your Outsourcing Partner Companies have been outsourcing since time began. It is only recently that business processes can be outsourced
More informationWELCOME TO CHEMIONIX. Chemionix e-solutions Pvt Ltd Mumbai India
WELCOME TO CHEMIONIX Mumbai CHEMIONIX: YOUR OUTSOURCING PATNER Companies have been outsourcing since time began. It is only recently that business processes can be outsourced across countries and continents.
More informationINTRODUCTION TO PROCESS ENGINEERING
Training Title INTRODUCTION TO PROCESS ENGINEERING Training Duration 5 days Training Venue and Dates Introduction to Process Engineering 5 12 16 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The
More informationAVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design
AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality
More informationAVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design
AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design The process and power industries seek to commission high-quality plant earlier, and to bring it on line with minimum
More informationStepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS
Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.
More informationDETAILED ENGINEERING OF PROCESS PIPING SYSTEMS
LAST UPDATED 25-10-2017 DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS COURSE DURATION: 5 DAYS REACH US Today for Greater Safety, Quality, Reliability, Productivity, Profitability HRD Approved Class A
More informationINDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING
INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING Enquiry letter for Engineering Services Consultancy for National Aerosol Facility at IIT Kanpur Sub: Quotation for Scope of the work and technical
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationVendor Document Requirement Titles Titles Count: 471
Vendor Document Requirement s s Count: 471 Sorted: VDR category / VDR Nr VDR Nr Project documents s Count: 28 005 Project plan / handbook 006 Detailled list of drawings and documents with document numbers
More informationCHEMICAL STORAGE TANK FARM & INTERCONNECTED PIPING AT ANSOL PROJECT, JAFZA.
Project Credentials Pro CHEMICAL STORAGE TANK FARM & INTERCONNECTED PIPING AT ANSOL PROJECT, JAFZA.ect Credentials Page 1 Kavya llc scope Preparation of Process Flow Diagram, P&ID, PLOT plan. Preparation
More informationINSTRUMENTATION DESIGN ENGINEERING: Oil & Gas
SmartBrains Engineers & Technologist Pvt. Ltd. DESIGN ENGINEERING: Oil & Gas Building Nation Through SmartBrains Skill Development & Enterpreneurship Website : www.samrtbrains.in To Apply Please contact
More informationSECTION III INSTRUMENT DELIVERABLES
SECTION III INSTRUMENT DELIVERABLES Page 1 of 22 INDEX SR. NO. TOPIC PAGE 1 SCOPE 4 2 CLARIFICATIONS OF THE INSTRUMENT DELIVERABLES 4 3 INSTRUMENTATION INTERFACES WITH OTHER DESCIPLINES 13 4 INSTRUMENTS
More informationSafety (OSHA 10 hour)
Construction Technology Core and Sustainable Construction Subject Code: 178000 Students will learn principles in basic safety (10-hr OSHA), construction math, hand and power tool are and operation, blueprint
More informationNCCER Progress Blvd, Alachua, Florida Phone: (888)
NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationGAIL (India) Limited (A Govt. of India Undertaking) A Navratna Company New Delhi (India)
GAIL (India) Limited (A Govt. of India Undertaking) A Navratna Company New Delhi (India) BID DOCUMENT FOR CONSTRUCTION OF 10" DIA. X 60 KM STEEL PIPELINE, TERMINALS AND ASSOCIATED FACILITIES FOR UPGRADATION
More informationA/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY
A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural,
More informationScope of work of Architect (as per the agreement signed by the Architect)
Annexure I Scope of work of Architect (as per the agreement signed by the Architect) 3. DETAILED SCOPE OF WORK The detailed scope of works for Architect/ Consultant shall comprise of the following for
More informationA/E REVIEW CHECKLIST HVAC
A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,
More informationThis specification describes the minimum technical requirements for drawings, as applicable to all disciplines.
SPEC-0800 1/5 1.0 PURPOSE This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. 2.0 VALE DRAWING TYPE DEFINITIONS Engineering Drawings Engineering
More informationProcess & Instrumentation Diagram * (P&ID) Tutorial
The Kendall Group 2018 Technology Summit Process & Instrumentation Diagram * (P&ID) Tutorial * a.k.a Piping & Instrumentation Diagram Tech Session T44 Presenter: Jon Puskarich Tutorial Overview Common
More informationSmartBrains. Process Plant Layout & Piping Design engineering. Institute of Oil and Energy. What You Will Learn...
SmartBrains Institute of Oil and Energy Oil & Energy Process Plant Layout & Piping Design engineering What You Will Learn... Introduction to Industry. Role of a Piping Engineer in various fields of industry.
More informationUsing BIM to follow up milestones in a project plan during the design phase
Building Information Modelling (BIM) in Design, Construction and Operations 97 Using BIM to follow up milestones in a project plan during the design phase Ø. Mejlænder-Larsen Norwegian University of Science
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationCITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES
CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)
More informationADDENDUM NO. 02 July 31, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON
More informationADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions
More informationAPPLICATION FORM FOR INFRASTRUCTURE NOC
APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others
More informationOPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES
Training Title OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Duration 5 days Training Venue and Dates Operation Skills Enhancement - Measurement & Instrument For
More informationAppendix A Pipe Data and Fitting Dimensions 157. Post Course Test 173
Contents Prelim i-x 1 Introduction to Process Plant Layout and Piping Design 1 1.1 Plant layout fundamentals 1 1.2 Procedures and workflow methods used in plant layout and piping design 6 1.3 Physical
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationNIAGARA REGIONAL HOUSING MZE FILE NO
M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April
More informationEQUIPMENT DESIGN. LECTURE 3 Chemical Process Diagrams. Block Flow Diagrams (BFD) Process Flow Diagrams (PFD) Piping and Instrument Diagrams (P&ID)
EQUIPMENT DESIGN LECTURE 3 Chemical Process Diagrams Outline Flow Diagrams Block Flow Diagrams (BFD) Process Flow Diagrams (PFD) Piping and Instrument Diagrams (P&ID) Other common diagrams 3-D plant layout
More informationEmployability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.
TRACEZ Training Services Oman www.tracezglobal.com Employability Enhancement Program for Engineers Transformation of an engineering degree holder to a real Engineer, who can do more at work. EEP- Introduction
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationP&ID (PIPING & INSTRUMENTATION DIAGRAM) & ENGINEERING DRAWINGS INTERPRETATION
P&ID (PIPING & INSTRUMENTATION DIAGRAM) & ENGINEERING DRAWINGS INTERPRETATION PROFESSIONAL DEVELOPMENT: Two classroom days providing 1.6 CEU (Continuing Education Units) or 16 PDH (Professional Development
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationU of I Facilities Standards Updates for 2017
U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),
More informationIt all starts here. Format fermé : 9" x 12" Format ouvert : 18 x 12 Marges : 0,125" Couleurs : CMYK
It all starts here 4521, rue clark, montréal (québec) H2T 2T3 t. 514.286.9696 f. 514.284.9152 espressocommunication.com Date : 3 septembre 2010 Client : Ultragen Projet : ULT1001_Brochure EN Numéro d épreuve:
More informationPre-Bid Query Replies
PROJECT 1 Technical Specifications 29 of 77 4.1.3 Feed for PGTR The feed for PGTR has to be the same as design feed stocks. Refer clause 4.1.3 and 4.1.4 together for more clarity on the issue. Accordingly
More informationNSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy
Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid
More informationCAD PIPING INTRODUCTION Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 CAD PIPING INTRODUCTION Course Syllabus Course Number: TTC-0327 OHLAP Credit: No OCAS Code: None Course Length: 60 Hours Career Cluster: Architecture
More informationCONSTRUCTION OF NORTH TORRANCE WELL FIELD PROJECT C.I.P. No. I-108 PHASE III CONCEPT DESIGN PLANS
CONSTRUCTION OF NORTH TORRANCE WELL FIELD PROJECT C.I.P. No. I-108 PHASE III CONCEPT DESIGN PLANS PLANT SITE 17825 YUKON AVE TORRANCE, CA UTILITY CONTACT LIST: PROJECT LIMITS LOCATION MAP BASIS OF BEARINGS
More informationPlant Design work flow Using Autodesk Plant Design Suite Ultimate. Carlos Caminos CAD Manager - Venture Engineering & Construction, Inc.
Plant Design work flow Using Autodesk Plant Design Suite Ultimate Carlos Caminos CAD Manager - Venture Engineering & Construction, Inc. Class Summary In this class, you will learn about a proven oil and
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationChuck Caesar. VIA: /Webposting April 27, 2017
VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationIntroduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products
Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More informationNational Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL PIPEFITTER V4 September 2013 Focus Statement An advanced pipefitter: Masters mathematical functions and knows
More informationOne-Stop Solution for Foundation Design
[Automated Foundation Engineering System] One-Stop Solution for Foundation Design Civil & Architecture Team Jbchoe@gsconst.co.kr 2006.11.02 (Automated Foundation Engineering System) Contents 1. General
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationBIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos
BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow
More informationDE-PRIME GLOBAL SERVICES LTD DE-PRIME GLOBAL SERVICES LTD. ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State.
ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State. PHONE: 08140925499, 08068365019,0706856979 EMAIL: deprimegloballimited@yahoo.com WEBSITE: www.deprimelimitd.com MISSION
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationPROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA
PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval
More informationThe drawing numbering system applies to all drawings produced for Vale that are archived in the Drawing Management System.
SPEC-0002 2016/0/26 1/15 1.0 PURPOSE This specification describes the administrative drawing requirements such as numbering, titles, and border information, etc. for Engineering Drawings produced for Vale.
More informationTRANSFORMER OPERATIONAL. Principles, Selection & Troubleshooting
TRANSFORMER OPERATIONAL Principles, Selection & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Power and distribution transformers
More informationNomarna Construcciones e Ingeniería develops a high knowledge in solutions of design, consulting, training, supervision, manufacturing and management
Nomarna Construcciones e Ingeniería develops a high knowledge in solutions of design, consulting, training, supervision, manufacturing and management of engineering and construction design for the Oil
More informationIntroduction to Piping Material Activities
A description of the current practices within the Materials Section of the By Dr M. A. Meshkot 25 October -30 November 1997 8/11/97 First Draft for Comment 24/11/97 Final Draft for Basic Approval Table
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction
More informationAutotransformer Condition Monitoring Systems
Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following
More informationPROTECTION of electricity distribution networks
PROTECTION of electricity distribution networks Juan M. Gers and Edward J. Holmes The Institution of Electrical Engineers Contents Preface and acknowledgments x 1 Introduction 1 1.1 Basic principles of
More informationCAP ANALOG 410 INSTALLATION & OPERATION MANUAL
CAP ANALOG 410 INSTALLATION & OPERATION MANUAL An L&J Technologies Co. 5911 Butterfield Road Hillside, IL 60162 Phone: 708-236-6000 Fax: 708-236-6006 1 was started in 1976 to offer new and innovative electronic
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationCITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK
PROJECT LOCATION FOR 3MG ELEVATED STORAGE TANK AT SAN ISIDRO SUBDIVISION CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK engineers architects surveyors below. Knowwhat's Call beforeyoudig.
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationUpdate: July 20, 2012
Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationIndustrial Pipe Marking
Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining
More informationGENERAL TECHNICAL SPECIFICATION
GENERAL TECHNICAL SPECIFICATION September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More informationwww.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete
More informationTrade of Plumbing. Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2
Trade of Plumbing Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 1 Thermal Process
More informationPDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC
PDMS INFORMATION BOOKLET Date: 15/08/2013 OTHER SERVICES ON OFFER BY PIPING STRESS ANALYSIS USING CEASER II EQUIPMENT DESIGN USING PV ELITE ISOMETRIC & P&ID IN AUTOCAD version 2012 MATERIAL INSPECTION
More informationGreenlining and Bluelining of Ergon Energy Substation Drawings
Greenlining and Bluelining of Ergon Energy Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 General... 1 Requirements... 3 Testing
More informationSECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section
More informationGENERAL TECHNICAL SPECIFICATION (Turnkey Work)
GENERAL TECHNICAL SPECIFICATION (Turnkey Work) March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,
More informationWEB-BASED QUALITY CONTROL OF PRECAST CONCRETE
WEB-BASED QUALITY CONTROL OF PRECAST CONCRETE G. Arslan, O. Arıöz, M. Tuncan, S. Kıvrak Civil Engineering Department, Anadolu University, Eskisehir, Turkey E-mail: gokhana@anadolu.edu.tr ABSTRACT: Precast
More informationENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996
ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and Dec. 2011(2). The approved
More information21 Convegno Annuale Sezione Componentistica d Impianto ANIMP
SEZIONE COMPONENTISTICA D IMPIANTO ANIMP 21 Convegno Annuale Sezione Componentistica d Impianto ANIMP STRATEGIE E PREVISIONI DI MERCATO PER LA FILIERA DELL IMPIANTISTICA INDUSTRIALE PACKAGES PER L IMPIANTISTICA:
More information