Pre-Bid Query Replies

Size: px
Start display at page:

Download "Pre-Bid Query Replies"

Transcription

1 PROJECT 1 Technical Specifications 29 of Feed for PGTR The feed for PGTR has to be the same as design feed stocks. Refer clause and together for more clarity on the issue. Accordingly tender document to be followed. 2 Technical Specifications 67 of 88 Time Schedule for BEDP Given the design basis in terms of feed cases and check case, and the deliverables requested, we propose the following schedule: Finalization of design basis:0 week H&W Balance, PFDs for owner review: 8 weeks PFD review by Licensor/Consultant/Owner: 10 weeks Release of critical process data sheets (a) Reactors: 12 weeks (b) Other long lead equipment data-sheets: 14 weeks (c) Other equipment data-sheets: Along with Final BEDP Indicative plot plan: 14 weeks Utility summary: 8 weeks P&IDs with preliminary HAZOP incorporated: 16 weeks P&ID review by Licensor/Consultant/Owner: 18 weeks Cause & Effect Diagram: 16 weeks Mech design drawings/datasheets, where applicable: 26 week Final BEDP (Hard copies, inclusive of all reviews):28 weeks Operating instructions/laboratory manual: 28 weeks Other check case data: 28 weeks For changes if any bidder, shall be intimated through 3 Technical Specifications 67 of 88 Note-1 The zero date for schedule for BEDP The zero date will start from completion of Kick-off meeting, during which the design basis will be finalized. Kick off meeting (design basis meeting) will be held within 2 weeks from the date of issue of FOA/LOA. Changes with respect to same shall be noted through amendment

2 PROJECT 4 Section III: Part of Technical Specifications Table (A) Minimum Process Guarantee parameters The minimum process guarantees should be for the most critical parameters of Unit. The product quality parameters listed are quire elaborate. We will offer guarantees as below: Min Process Guarantees Unit Capacity Make up total hydrogen consumption (Chemical and dissolution loss excluding mechanical loss) Hydrotreated Diesel Yield Process Performance Guarantees amendment 5 Definition of Battery Limits 4 of Maintenance Facilities for carrying out on stream and shut down maintenance is outside of our scope Definition of Battery Limits 4 of catalyst loading unloading Catalyst loading unloading facility is outside of our scope. Definition of Battery Limits 4 of Injection system Chemicals storage, preparation and dilution facilities will be outside of our scope Definition of Battery Limits 4 of Spent Caustic Degassing System Definition of Battery Limits 4 of Neutralization/ Passivation Facilities Spent caustic degassing system will be outside of our scope. Neutralization/ Passivation Facility will be outside of our scope. Definition of Battery Limits 4 of Wash Water Facility Wash Water Facility will be outside of our scope. Definition of Battery Limits 4 of Fire fighting and safety systems Fire fighting and safety systems will be outside of our scope Facilities required for maintenance as relevent to P&IDs to be provided by bidder. Accordingly tender document to be followed. If there is any specific requirement as per technology requirement within ISBL facilities, same shall be provided Bidder to follow tender document If spent caustic is required to be disposed based on process requirement, degassing facilities to be provided by licensors. Accordingly tender document to be followed. If applicable as per technology requirement, ISBL facilities for same to be Tender document to be followed. Bidder to follow tender document If there is any specific requirement as per technology requirement within ISBL facilities, same shall be provided

3 PROJECT Definition of Battery Limits 4 of Environment protection and safety Definition of Battery Limits 4 of Facilities for corrosion monitoring and control Definition of Battery Limits 4 of Blowdown and Effluent Systems Necessary facilities required for environment protection and occupational safety related to process of unit will be outside of our scope. Corrosion monitoring and control facilities will be outside of our scope ISBL Closed Blowdown System (CBD) including Closed blow down drum, closed blowdown pump and treatment facilities for all process effluents during start up/ shutdown and normal operation will be outside of our scope Issue was clarified. Bidder to follow tender document. If there is any specific requirement as per technology requirement within ISBL facilities, same shall be provided Definition of Battery Limits 4 of Fuel Gas/Fuel Oil System Definition of Battery Limits 4 of Flare System ISBL Flare system including Knock out drum will be outside of our scope Design Feed and Unit Capacity ISBL Fuel gas/fuel oil system will be outside of our scope 5 of Check Case For the check case, the limting equipments need to be identified only. No specs to be generated. Kindly confirm. Make-UP Hydrogen 8 of Startup Hydrogen Proposal will be prepared based on CCR hydrogen as source of hydrogen for normal operation. amendment Confirmed. bidder to follow tender document Confirmed, bidder to follow tender document 18 Product Specification 10 of LPG Product Specification The specification for vapor pressure has been given. Hence, the specification of C2 and lighters should be removed. We will not be able to agree to double liability for single property Specific Process Design Guidelines Specific Process Design Guidelines 18 of Plot Plan Customized plot plan is outside of our scope. We will provide a typical plot plan. 19 of Environment protection and safety Kindly refer to item 7 above. This item is usually taken care by EPC contractor. Bidder to follow tender document Issue was clarified. Tender document to be followed.

4 PROJECT Specific Process Design Guidelines Specific Process Design Guidelines Safety and Environmental Aspects 20 of Dryer Logic Dryer Logic is proprietary item and we will not be able to provide the same as part of BEDP. 21 of Corrosion Mapping This is outside our scope. 21 of Flare KOD and CBD Flare KOD system and CBD system is outside our scope. Supply of BEDP 23 of HAZOP Report HAZOP study is not part of BEDP scope. This review is normally carried out during detailed engineering stage. We will be happy to participate in the same on mutually agreed terms. All relevant documents for implementation, operation and maintenance shall be provided as part of BEDP. The issue was clarified. Bidders to follow the tender document. Material selection Diagrams (MSD) shall be substantiated with adequate notes indentifying the corrosion prone areas, specifc corrosion checks required in particualr areas etc. amendment Supply of BEDP 24 of Equipment Specification Please note that the specifications in technical proposal are provided as preliminary data sheets and an extensive optimization will be performed to finalize the equipment datasheets. Hence the equipment specifications are subject to revision. Supply of BEDP 24 of Pinch Analysis Report We will provide a design optimized for energy and utilities. There is no report generated and hence we will not be able to provide the same. Mandatory Services 25 of Guarantee Test Run The PGTR should be conducted within 3 months of commissionign. We will not be able to agree to 12 months period for PGTR. Information required from Licensor for Proposal Information required from Licensor for Proposal 33 of d Process Flow Diagram Operating conditions on PFDs will not be It will be made available in Technical Proposal as a separate table. 33 of d Process Flow Diagram Startup Line and Utility Lines will not be included in process flow diagrams. As long as the changes in equipment specs does not increase the overall capital cost of total equipments or results in reducing equipment cost without affecting final performance guarantees, the same can be accepted. Under no circumstances, the total equipment cost will be allowed to exceed what is considered in NPV calculation. Licensors shall optimize the unit design using pinch technology. Changes if any with respect to same, shall be intimated through Bidder to follow Tender document Licensor shall provide the major operating process conditions in the proposal. Relevant documents shall be provided at PFD/P&ID stage.

5 PROJECT Information required from Licensor for Proposal 34 of Equipment Data Equipment datasheets will be provided which includes all the information required for EIL to work out the cost for economic assessment. Estimated weight of equipment/internals will be outside our scope. Annexure IV A 42 of Process description Information on kinetics of the reaction chemistry, which is proprietary, will not be provided. Annexure IV A 42 of Process Flow Diagrams This item will be considered out of Bidder's scope of work. Number of passes could be shown on PIDs only if applicable. PFD shall show the functionality of the unit with main process streams (and not with all the passes), process equipment, main utility streams and process control philosophy. Annexure IV A 44 of Heat and Material Balance Not shown on Heat and Material Balances. Critical temperature and critical pressure will be only shown on process data sheets (i.e. control valve data sheets for example) where these data specifications are mandatory to perform a proper design. Data as per tender document to be provided by bidders. Estimated weight, if available to be Information to the extent deemed proprietary information by bidder may not be All other relevant information as per provisions of bidding document to be furnished. Bidder to follow tender document. Refered data to be provided, wherever relevant Annexure IV A 44 of Material of Construction MSD will be in black and white. Bidder to Follow tender document Annexure IV A 50 of Compressors For capacity control Bidder will specify required range if any. Information on mechanism will be provided by the Bidder to Follow tender document 36 vendor. 37 Annexure IV A 50 of Compressors Mechanical design is outside of our scope. Bidder to Follow tender document Annexure IV A 52 of Flare Load Summary Flare mitigation strategy for minimizing Flare load is 38 outside of our scope. Bidder to Follow tender document 39 Electrical and 57 of Electrical Item 10.1 is outside ourscope. Instrumentation Bidder to Follow tender document 40 Technical Specifications 27 of Technical Specifications 9 of Technical Specifications 18 of Scope of licensor's services HGU/PSA Make Up hydrogen Maximum Height of Structure The applicable unit (Kg or ft3) for catalysts/adsorbents/chemicalswill be mentioned. Quanity of startup hydrogen is dependent on number of days until CCR hydrogen becomes available. Kindly confirm the height limitation for the site to be considered for the proposal preparation. Bidder to Follow tender document Bidder to Follow tender document

6 PROJECT 43 Product Specification 10 of and Technical Specifications 23 of 77; 39 of Isomerate Product Specification Review and Approval of Vendors drawings/data of critical equipment. The specification for C4 and lighters has been given.the specification of RVP with a RON target of 89 min makes it an extremely tight design and may not be technically viable. Hence, the RVP spec should be removed. We only gets involved with the review of these items and provide its comments on critical equipment (Specification 111). Our review is limited for adherence to equipment design as per the Schedule A requirement. The charges for review of the list of documents will be included in BDEP fees. Bidder to refer responses of Query No. 89 & 90 for clarification. Approval process means that licensor will agree that their comments have been incorporated in the documents to meet all process performance guarantees. 45 Technical Specifications 24 of Participation during BDEP Preparation Except for the PFD Review meeting and the P&ID Review meeting as defined in the proposals; we do not envisage any participation from or its consultant during the preparation of the BDEP Package. Bidder to follow tender document 46 Technical Specifications 24 of PFD and P&ID Review Meetings We would like to clarify that Design Basis KOM will be at Licensee s office. The PFD and P&ID Review meeting typically engages the participation from specialists from different departments as applicable. This is highly recommended to bring in more clarity and answer all possible queries, hence as per past projects, we request to kindly consider this meeting to be held at our offices. 47 Technical Specifications 25 of Licensor personnel shall work for 48 hours a week, i.e. 8 hours per day with Sunday as holiday 48 Technical Specifications 40 of Smart P&ID's 49 Technical Specifications 27 of Training As per US labor law, our personnel at site will only work for 40 hours per week. However, We agrees to extend support if needed or required depending upon the actual condition at site. We will provide standard P&ID and Smart P&ID's will be out-of-our Scope. Site Specific Training in similar operating units will be based on Refinery Owners Approval. Bidder to follow tender document Bidder to follow tender document Bidder to follow tender document 50 Technical Specifications 29 of Correlations for predicting Unit performance These correlations are proprietary and hence can not be shared. However, some information pertaining to these requirements are provided in the General Operating Manual. Refer response to query no. 32 for clarification

7 PROJECT 51 Technical Specifications 21 of Sulfur Guard Bed 52 Technical Specifications 23 of Supply of BEDP 53 Technical Specifications 42 of Process Description Please confirm requirement of Sulfur guard Bed in the event of Naphtha Hydrotreater unit upsets. Certification that "unit is safe for operation and Hazop reccommendations have been incorporated" is outside our scope. We will provide unit specific process description and other information will be available in general operating manual. Energy consumption information will be available in utility summary. Utility flow diagram preparation is not in bidder scope of work; hence process description for utility system will be excluded from scope of work. Licensor to follow the tender document. Basis for the design of sulpur guard bed shall be provided in Refer response to query no-25 for clarification Tender document to be followed. All data required as per tender document to be 54 Technical Specifications 43 of b,h,k Process Flow Diagram Information for both SOR and EOR consitions will be provided in the same PFD. Enthalpy of streams is not included but delta enthalpy is given (where heat exchange takes place). Our PFD does not contain interlocks, it will be provided in the P&ID only. Our PFD does not contain information on pump flow rates. Our PFD does not contain equipment design information, it will be available in individual design specification only. Tender document to be followed. However, interlocks are not required to be depicted on PFDs. 55 Technical Specifications 45 of Utilities 56 Technical Specifications 46 of Equipment List Bearing cooling water will have to be provided by the individual vendors of the rotating equipment. We will provide estimated normal utilities and these details are provided in 103 specifications. We will not be able to provide information on raw water, instrument and plant air consumption. Equipment list will contain equipment name/tag number and type & service only. No other information will be provided through equipment list. Normal CW is sea cooling water, if licensor recommend very specific consumer to be on good cooling water (bearing cooling water) for process use, the same to be specified by licensor. For rest tender document to be followed. Instrument air shall be deleted in Bidder to follow Tender document

8 PROJECT 57 Technical Specifications 47 of Heat Exchangers We provide average properties of all liquid phases, that includes, density, Viscosity, Thermal Conductivity, Specific heat, Surface Tension, Critical Pressure and Critical Temperature. Exchanger shells, no. of fans for aircoolers Bidder to follow Tender document will be provided by DEC. 58 Technical Specifications 49 of f, m Heaters Coke thickness information is not Stack details including monitoring instruments is out of our Scope. Thermal design of heaters is out-of-ourscope and will be in DEC Scope. Bidder to follow Tender document. 59 Technical Specifications 51 of Conceptual Layout of Firefighting Equipments 60 Technical Specifications 53 of Piping Item 7.2 is is outside our scope. Conceptual layout of firefighting equipments will be part of DEC Scope. our P&ID contains information on equipment name and tag number only. No further detailed data will be provided on our P&ID Bidder to follow Tender document Bidder to follow Tender document 61 Technical Specifications 53 of b Piping ISBL utility distribution P&ID showing unit utility headers and connections as per equipment layout is in licensor s scope. our does not show ISBL utility header on our P&ID. 62 Technical Specifications 53 of e; 8.1.2h Piping: PRV inlet / outlet piping sizes and set pressure, recommended size These are not shown in P&IDs but are mentioned in PRV (807) specifications. PRV inlet and outlet line size estimation is excluded from our s scope of work. Bidder to follow Tender document 63 Technical Specifications 54 of Instrumentation 64 Technical Specifications 55 of l Thermal Rating of Heat Exchangers 65 Technical Specifications 57 of Line Schedule 66 Technical Specifications 57 of Control Valves & Shutdowns Size of Control Valve is typically not shown on P&IDs and is included in the Instrument data sheets. Thermal rating of heat exchangers is out-of-our Scope and will be in DEC Scope. We will provide typical line list. Other information such as velocity, pressure drop information will be available in the hydraulic report. We will list metallurgy and flange class on valve datasheets however does not list mechanical design conditions on datasheets. Piping Specs will take care of this. Congealing is not listed. Bidder to follow Tender document Bidder to follow Tender document Tender document to be followed. All data required as per tender document to be Tender document to be followed. All data required as per tender document to be

9 PROJECT 67 Technical Specifications 58 of Temperature and Pressure Instruments 68 Technical Specifications 58 of Flow Instruments Fluid properties data and mechanical design conditions are not listed in the data sheets. Control set points are provided on PFDs. We specifies normal and maximum flow rates, along with differential pressure instrument calibration on data sheets. Maximum and Minimum flow is not listed as the meter max is evaluated. Also mechanical design conditions are not listed. Tender document to be followed. All data required as per tender document to be Tender document to be followed. All data required as per tender document to be 69 Technical Specifications 59 of Level Instruments Viscosity is listed in HWB. Fluid is congealing or not is not listed and mechanical design conditions are not listed in the data sheets. Alarm set-point is listed in separate specification. Normal control liquid level in vessels is depicted on P&ID and vessel specification. Tender document to be followed. All data required as per tender document to be 70 Technical Specifications 59 of a, b General Instrument Specification We do not require the use of foundation field bus Transmitters / Controllers. If installed incorrectly the Field Bus system can be detrimental to the control and operation of the unit. We will only identify the complex loops which in our opinion should not be in Foundation Field Bus and will accordingly indicate in the BDEP package. Bidder to follow the tender document. 71 Technical Specifications 59 of Supervisory Operating Manual Bidder will provide a General Operating Manual. The EPC Contractor typically provides unit specific operating manuals. Bidder's technical advisors will review the unit specific manual prepared by others and provide comments. Bidder to follow the tender document. 72 Technical Specifications (Shifted from commercial to technical queries) 28 of 77 4 Guarantees and Liabilities has requested very stringent guarantee & liability positions. Normally, minimum guarantees are applied to the few, most critical parameters of the Unit. Accordingly, we are willing to offer the following as a minimum guarantees, - Unit Capacity - Isomerate Product Quality as requested in Tender amendment

10 PROJECT /77 Please confirm sulfur level of 5.0 ppm to be used for design. Please confirm average CO/CO2 levels to be used for methanator design Issue was clarified.tender document to be followed /77 Please confirm LPG Specification in terms of C2- content. Typical specification is provided for RVP only. C2- is to be reported: 0.15 vol.% specification is stringent. amendment /77 Please confirm RVP specification for final isomerate. 85 kpa specification does not conform for 89.0 RONC quality Isomerate. RVP specification is to be increased or reported by Licensor. Bidder to refer reponse of Query No. 89 for clarification /77 Please confirm Isomerate pricing for economic evaluation. Can Isomerate price as Rs /MT be considered? /77 Owner has mentioned that catalyst regeneration is not to be considered. For Bidder s Isomalk-2 process one of the outstanding benefits is guaranteed service life of over 10 years. This is different from other technology providers and we hope that can consider this. Bidder to follow tender document. Bidder to follow tender document /77 Process performance Guarantees and Minimum Performance Guarantees for Unit Capacity/ Isomerate Yield and product Quality are identical. A gap in these two guarantees be defined (ii) 31/77 What exactly Other Services means. Are these in addition to Mandatory Services and Additional Services as described under points 3.4 and 3.5 (Page25/77) amendment Other services including Mandatory and Additional services shall be considered. 80 Annex. IV B 61/77 BEDP schedule may please be revised as follows: Time Schedule 6 weeks for PFD/MB. 22 weeks for PDP OP 8 weeks after PDP approval /77 Please confirm whether reactor system and catalyst system is to be designed for 100% or 110% of design capacity amendment Issue was clarified. Tender document to be followed.

11 PROJECT /77 Please discuss the super structure height limitations with. The current limitation is 54 meters. DIP and DIH column is expected to have more height. How stringent is this limit and what implications it has on bid evaluation. Refer resolution to query no.3 of Set-2 of Licensor A /77 Client is requesting to add a sulfur guard bed for the future refinery naphtha stream upset in the design. We need to know the sulfur concentration to be considered for designing the sulfur bed. Refer resolution to query no.12 of Set-2 of Licensor A xii) 31/77 Please confirm that Design case -1 will be considered for evaluation. Confirmed. Tender document to be followed / /77 Estimated weight with and without internals to be provided in the proposal. This will not be possible at proposal stage. Please confirm the acceptance. Details of Instrument technical specification and instrument data sheets shall be provided in BDEP according to FF Bus technology. Please confirm. Refer resolution to query no.31 of Set-1 of Licensor A. Confirmed; except for complex loops as specified in tender document. 87 Benzene/ aromatics has been specified as Nil in Isomerate. Please review the specification. Maximum allowable Benzene/Aromatic spec shall be specified in 88 NIT 2 of 10 f) Date of Bid Submission Please extend bid submission time by 3 weeks i.e Bid due date extension shall be intimated December 10 th. through Corrigendum 89 Technical Specifications 6 of 77 Table Feed definition case 1 Feed case 1 has very high C5 content which lead to high Bidder requested to increase RVP spec to 95 RVP (around 80 kpa). Specification of 85 max kpa RVP is not achievable in the product with such a feed after isomerization of the feed. Please release the RVP specifications for feed case 1 to max 100 kpa in the product. Kpa based on feed quality provided and RON spec targeted. /EIL will review and 90 Technical Specifications 7 of 77 Table Feed definition case 2 For feed case 2 RON of 89 and RVP max of 85 kpa can be reached with higher C4 content.

12 PROJECT Please release the max C4 content of Feed case 2 to 2 % wt max to cope with the RON and RVP specifications. 91 Annexure IV A 41 of Autocad Please clarify AUTOCAD version 11. Bidder to follow Tender documents Bidder will supply files having a DWG extension and are compatible with AutoCAD 2010 and later release. At client s request, they can be saved as per other releases or with other extensions as far as available within AutoCAD 2014 release. (refer to Licensor's IN-025) Additionally, files can be supplied in PDF format. 92 Annexure IV A 44 of n HMB Surface tension could be shown in process stream for Data as required shall be total liquid phase properties. 93 Annexure IV A 44 of o HMB Critical temperature and critical pressure are data that will be shown on process data sheet only if required Refer response to query no. 34 for clarification (compressor, control valve, ) 94 Annexure IV A 45 of Utilities For the following utilities, only process specific Instrument air shall be deleted. For rest tender requirements for intermittent operations (start-up, document to be followed. shutdown, catalyst regeneration, catalyst activation, ) are given if applicable : - Service water (raw water) - Demineralised water - Blowdown streams - Nitrogen (inert gas) - Plant Air - Instrument Air 95 Annexure IV A 47 of g Heat exchangers TEMA type of exchanger will be As per Tender document, thermal design of Bidder understand that HTRI thermal and hydraulic exchangers is in licensor's scope. So all details calculations should be issued with report in a preliminary of exchangers to be provided in BEDP. TEMA data sheet. Please confirm.

13 PROJECT This preliminary TEMA data sheet is provided for bidding purpose only and is not approved for construction. TEMA data sheet subsequent issues, to be issued under responsibility of FEED Contractor and Detail Engineering Contractor, shall incorporate all detailed engineering information along with vendors specific details and requirements. 96 Annexure IV A 48 of d,h,j Pumps Material class according to API will be provided for All data as requested in tender document to be centrifugal pumps. Bidder understand that a preliminary API data sheet should be issued with basic process data and following additional information: - API pump type and mechanical seal general type for centrifugal pumps (API seal plan will not be provided) - Capacity control type and vendor furnished relief valve type and set pressure for reciprocating and metering pumps. Please confirm. 97 Annexure IV A 50 of m,n Heaters No fired heater on Isomerization unit is foreseen. Noted. 98 Annexure IV A 50 of Compressor Bidder will issue preliminary API data sheet with basic All data as requested in tender document to be process data and following additional information: - Centrifugal compressors : seal type (oil seal or dry gas seal) and preliminary materials for casing, diaphragms, impellers, shaft and labyrinths - Reciprocating compressors : cylinder lubrication (lubricated or not lubricated) and preliminary materials for cylinders, pistons, valves and crosshead. Please confirm. 99 Annexure IV A 51 of f g Filters / Mixers Task to be done by Detailed Engineering / filter supplier as typical task of FEED / EPC phase Noise limitations to be provided, if applicable.

14 PROJECT 100 Annexure IV A 52 of Flare load summary Flare mitigation study to be done by Detailed Engineering as typical task of EPC phase Refer response to query no.38 for clarification 101 Annexure IV A 57 of Piping specifications Valving and welding requirement, gasket types, reinforcing requirements to be done by Detailed Bidder to follow Tender documents Engineering as typical task of EPC phase 102 Annexure IV A 57 of Line schedule Details of any special piping items to be done by Detailed Engineering as typical task of EPC phase Data as requested in tender document to be 103 Annexure IV B 61 of 77 Time schedule Please clarify the contents of following item: - Other Check Case data - Other major equipment data sheets - with preliminary Hazop incorporated Bidder proposes the following time schedule for this BEDP: A- Finalisation of design basis : 0 week; B- HMB s and PFD s: 7 weeks C- PFD review meeting : 9th week D- Release of critical Process Data sheets: (a) Reactors : 12 weeks (b) Other long lead equipment data sheets : 12 weeks (c) Other major equipment data sheets : 14 weeks E- Indicative Plot plan : 10 weeks F- Utility summary : 10 weeks G- P&ID s for owner consultant review : 16 weeks H- Cause and Effects Diagram : 16 weeks I- P&ID review meeting : 18 th week J- Mech. Design Drawings / Data sheets, where applicable : 16 weeks K- Final BEDP ( Electronic version) : 24 weeks Final BEDP ( hard copies) : 27 weeks L- Operating Instructions (electronic version) : 30 weeks Operating Instructions (hard copies) : 33 weeks

15 PROJECT Note : 1. Bidder to note that replies to prebid queries are provided for clarity with respect to Tender Specification 2. Bidder to submit the offer based on the Tender docoument and 3. Prebid responses shall not be made part of contract document

Comparison that shows the differences between a PFD and P&ID :

Comparison that shows the differences between a PFD and P&ID : Comparison that shows the differences between a PFD and P&ID : PFD P&ID Used during construction? No Yes* Shows all process and service piping? No Yes Indicates presence of all controls? No Yes Shows all

More information

EQUIPMENT DESIGN. LECTURE 3 Chemical Process Diagrams. Block Flow Diagrams (BFD) Process Flow Diagrams (PFD) Piping and Instrument Diagrams (P&ID)

EQUIPMENT DESIGN. LECTURE 3 Chemical Process Diagrams. Block Flow Diagrams (BFD) Process Flow Diagrams (PFD) Piping and Instrument Diagrams (P&ID) EQUIPMENT DESIGN LECTURE 3 Chemical Process Diagrams Outline Flow Diagrams Block Flow Diagrams (BFD) Process Flow Diagrams (PFD) Piping and Instrument Diagrams (P&ID) Other common diagrams 3-D plant layout

More information

InstrumentationTools.com

InstrumentationTools.com Author: Instrumentation Tools Categories: Guest Articles Level Transmitter and Level Gauge Design Tips Level Transmitter and Level Gauge Design Tips Level / Vessel Sketches What is this? Level sketch or

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS LAST UPDATED 25-10-2017 DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS COURSE DURATION: 5 DAYS REACH US Today for Greater Safety, Quality, Reliability, Productivity, Profitability HRD Approved Class A

More information

INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING

INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING Enquiry letter for Engineering Services Consultancy for National Aerosol Facility at IIT Kanpur Sub: Quotation for Scope of the work and technical

More information

ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996

ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and Dec. 2011(2). The approved

More information

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER ANNEXURE-C TO TENDER BAP/FGD/2012/OT-1 BONGAIGAON 3X250 MW FLUE GAS DESULFURIZATION SYSTEM TECHNICAL SPECIFICATION LEVEL CONTROL VALVE HANDLING WATER CUSTOMER : NATIONAL THERMAL POWER CORPORATION LIMITED

More information

INTRODUCTION TO PROCESS ENGINEERING

INTRODUCTION TO PROCESS ENGINEERING Training Title INTRODUCTION TO PROCESS ENGINEERING Training Duration 5 days Training Venue and Dates Introduction to Process Engineering 5 12 16 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date: TCN 01 Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date: 21-02-2011 Sub Tender Change Notice (TCN- 01). Job Identification & Receipt of materials, Erection, Testing, Commissioning, Handing over etc

More information

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS... 4 3.0 DRAWING CONTROL... 4 4.0 PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 5.0 GUIDELINES FOR PREPARATION OF DRAWINGS... 5 6.0 CONTENTS

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant), TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone: +91 431 257 7653 Fax

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

Solutions, Standards and Software Kolmetz Handbook of Process Equipment Design PROCESS FLOW SHEET (ENGINEERING DESIGN GUIDELINE)

Solutions, Standards and Software Kolmetz Handbook of Process Equipment Design PROCESS FLOW SHEET (ENGINEERING DESIGN GUIDELINE) Page : 1 of 94 KLM Technology Processing Plant www.klmtechgroup.com, Standards and Software Rev 01 March 2015 Rev 02 KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor

More information

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample. SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI)

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI) Oil and Natural Gas Corporation Limited Eastern Offshore Asset Office of Project Manager, KG-DWN- 98/2 Project 3rd Floor, Subhadra Arcade, Near Bhanugudi Junction Kakinada - 533 003, Andhra Pradesh, India

More information

Process Control Drawings

Process Control Drawings Process Control Drawings Drawings provide a simple visual representation of process designs and automa tion approaches. Since so many people are involved in the design, building, and operation of a process

More information

ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996

ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000. The approved modifications

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

Logic Developer Process Edition Function Blocks

Logic Developer Process Edition Function Blocks GE Intelligent Platforms Logic Developer Process Edition Function Blocks Delivering increased precision and enabling advanced regulatory control strategies for continuous process control Logic Developer

More information

ADDENDUM 4 BID OPPORTUNITY NO

ADDENDUM 4 BID OPPORTUNITY NO ` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER

More information

001: 2007 CEB STANDARD

001: 2007 CEB STANDARD 001: 2007 CEB STANDARD ALUMINIUM RE-DRAW RODS FOR ELECTRICAL PURPOSES CEYLON ELECTRICITY BOARD SRI LANKA Specification for ALUMINIUM RE-DRAW RODS FOR ELECTRICAL PURPOSES CEB Standard 001: 2007 CEYLON ELECTRICITY

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Subject Document no. Page Drafting of P&IDs TBA 1 / 6. Group Issued (by / date) Revised (by / date) Rev. Instruction TSN 15.5.

Subject Document no. Page Drafting of P&IDs TBA 1 / 6. Group Issued (by / date) Revised (by / date) Rev. Instruction TSN 15.5. GENERAL INSTRUCTION Subject Document no. Page Drafting of P&IDs TBA 1 / 6 Group Issued (by / date) Revised (by / date) Rev. Instruction TSN 15.5.2017 - - 1 General The P&ID (Piping & Instrumentation Diagram)

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 Scope This Practice Note is intended to identify responsibilities and contractual arrangements for precast elements used in buildings. Such

More information

Engineering Design and Training Services

Engineering Design and Training Services PRESSURE VESSEL RELATED SERVICES: Pressure Vessels essels, Heat Exchangers,, Tanks Oil & Gas, Power,, Chemical, Petrochemical, Fertilizer etc. Engineering Design and Training Services Vision Statement

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 15547-2 First edition 2005-11-01 Petroleum, petrochemical and natural gas industries Plate-type heat exchangers Part 2: Brazed aluminium plate-fin heat exchangers Industries

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) S. No. PARTICULARS BHEL SPECIFICATIONS

TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) S. No. PARTICULARS BHEL SPECIFICATIONS TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) BIDDER s OFFER S. No. PARTICULARS BHEL SPECIFICATIONS 1.0 Area of Application The 300kV Constant potential

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT STATUTORY INSTRUMENTS SUPPLEMENT No. 18 24th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 45, Volume CIX, dated 24th June, 2016 Printed by UPPC, Entebbe, by Order of the Government.

More information

OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES

OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Title OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Duration 5 days Training Venue and Dates Operation Skills Enhancement - Measurement & Instrument For

More information

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Emergency Pipeline Repair Systems; A Global Overview of Best Practice Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James

More information

SmartBrains. Process Plant Layout & Piping Design engineering. Institute of Oil and Energy. What You Will Learn...

SmartBrains. Process Plant Layout & Piping Design engineering. Institute of Oil and Energy. What You Will Learn... SmartBrains Institute of Oil and Energy Oil & Energy Process Plant Layout & Piping Design engineering What You Will Learn... Introduction to Industry. Role of a Piping Engineer in various fields of industry.

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

Appendix A Pipe Data and Fitting Dimensions 157. Post Course Test 173

Appendix A Pipe Data and Fitting Dimensions 157. Post Course Test 173 Contents Prelim i-x 1 Introduction to Process Plant Layout and Piping Design 1 1.1 Plant layout fundamentals 1 1.2 Procedures and workflow methods used in plant layout and piping design 6 1.3 Physical

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process ASME B73.1-2012 [Revision and Consolidation of ASME B73.1-2001 (R2007) and ASME B73.5M-1995 (R2007)] Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process AN AMERICAN NATIONAL

More information

Air Monitoring Directive Chapter 9: Reporting

Air Monitoring Directive Chapter 9: Reporting Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

National Unit specification: general information. Process Operations: Utilities. Unit code: FM3E 11. Summary. Superclass: Publication date: May 2011

National Unit specification: general information. Process Operations: Utilities. Unit code: FM3E 11. Summary. Superclass: Publication date: May 2011 National Unit specification: general information Unit code: FM3E 11 Superclass: YB Publication date: May 2011 Source: Scottish Qualifications Authority Version: 01 Summary This Unit is designed for candidates

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

General information 1 / 17

General information 1 / 17 General information 1 / 17 SF 6 -gas Sulphur hexafluoride (molecule) Sulphur hexafluoride is a non-toxic, inert, insulating and quenching gas of high dielectric strength and thermal stability. colourless

More information

Industrial Mechanic (Millwright) Level 4

Industrial Mechanic (Millwright) Level 4 Level 4 Rev. September 2005 Unit: A3 Pre-Interprovincial Review 50 hours Theory: Practical: 50 hours 0 hours This unit offers apprentices a systematic review of skills and knowledge required to pass the

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC) PIOEER I HEAT TRASFER TECHOLOGY DOLPHI SHELL & TUBE MARIE CODESERS (DSTMC) Dolphin Shell & Tube Marine Condenser (DSTMC) General Information Dolphin carries out Thermal Design, Mechanical Design & detailed

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

CONTROL OF FLOWNEX NETWORK USING SIMULINK

CONTROL OF FLOWNEX NETWORK USING SIMULINK CONTROL OF FLOWNEX NETWORK USING SIMULINK This case study demonstrates how Flownex and Simulink are integrated to perform different parts of a simulation. Integration of Flownex with Simulink is a powerful

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

Top 10 Questions About Aspen HYSYS Dynamics FAQ

Top 10 Questions About Aspen HYSYS Dynamics FAQ Top 10 Questions About Aspen HYSYS Dynamics FAQ 1. I already have my equipment modeled in steady state with Aspen HYSYS. Do I need to recreate it from scratch in Aspen HYSYS Dynamics? No, Aspen HYSYS Dynamics

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

Petrosync Distinguished Instructor Mandar Mulay

Petrosync Distinguished Instructor Mandar Mulay Shell and Tube Heat Exchangers : Mechanical Design (ASME/TEMA), Operations and Maintenance Improve Your Heat Exchanger Performance by Maximizing Your Mechanical Design, Operation and Maintenance Knowledge

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

TOOL DESIGN - MANUFACTURING DESIGN SPECIFICATIONS FOR TOOLING AND EQUIPMENT SECTION H - DIE DESIGN TABLE OF CONTENTS. H.1 General...

TOOL DESIGN - MANUFACTURING DESIGN SPECIFICATIONS FOR TOOLING AND EQUIPMENT SECTION H - DIE DESIGN TABLE OF CONTENTS. H.1 General... TABLE OF CONTENTS H.1 General...Page 2 H.2 General Die Layout...Page 2 H.3 General Die Features...Page 2 H.4 Specific Die Type Features...Page 5 H.5 Special Punches and Die Bushings...Page 6 H.6 Wire E.D.M...Page

More information

Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments

Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments Samuel Paul Flow Assurance Engineer Ratnam Sathananthan Global Flow Assurance Manager / Technical Authority 20 th June 2018

More information

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance

More information

Two Days Course: November 2018

Two Days Course: November 2018 Energy Geosciences Research & Development Two Days Course: 18-19 November 2018 Venue: Somerset Hotel, Panorama Mall, Muscat, Oman Instructor: Ali Al Lawati, Engineering Manager, Petrogas EP Oman Organizer:

More information

Process Solutions for the Oil and Gas Industry

Process Solutions for the Oil and Gas Industry Process Solutions for the Oil and Gas Industry VME Process (VME) is a global provider of process equipment packages and separation products to the oil and gas industry. Using both cutting edge and conventional

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-33 34 13 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-33 34 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

CHEMICAL STORAGE TANK FARM & INTERCONNECTED PIPING AT ANSOL PROJECT, JAFZA.

CHEMICAL STORAGE TANK FARM & INTERCONNECTED PIPING AT ANSOL PROJECT, JAFZA. Project Credentials Pro CHEMICAL STORAGE TANK FARM & INTERCONNECTED PIPING AT ANSOL PROJECT, JAFZA.ect Credentials Page 1 Kavya llc scope Preparation of Process Flow Diagram, P&ID, PLOT plan. Preparation

More information

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design June 2013 Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design Executive Summary A vendor pre-project design review of a new nuclear power plant provides an

More information

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools CECIMO position on the applicability of the Pressure Equipment Directive (97/23/EC) to machine tools Summary: The Pressure Equipment Directive (97/23/EC) was enforced in a mandatory way on 29 May 2002.

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR August 31, 2009 Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR-1000-1 Executive Summary A vendor pre-project design review of a new nuclear power plant provides an opportunity

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Dewatering Case Study Rotary Press Versus Screw Press

Dewatering Case Study Rotary Press Versus Screw Press Dewatering Case Study Rotary Press Versus Screw Press OWEA 2012 Annual Conference June 20, 2012 Kyle Novak, P.E. Presentation Overview Project Background Onsite Dewatering Consideration Case Study: Rotary

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

Your Partner for Subsea Pumping

Your Partner for Subsea Pumping Your Partner for Subsea Pumping Our Experience Dedicated to Your Success With the drivers of increased oil recovery and the depletion of traditionally accessible oil fields, the trend in oil and gas is

More information

Call for Papers. Düsseldorf, 28 th 29 th October Pump Users. Compressor Users. International Forum International Forum 2008

Call for Papers. Düsseldorf, 28 th 29 th October Pump Users. Compressor Users. International Forum International Forum 2008 International Rotating Equipment Conference Düsseldorf, 28 th 29 th October 2008 Compressor Users International Forum 2008 Pump Users International Forum 2008 Call for Papers International Rotating Equipment

More information

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2 TECHNICAL SPECIFICATIONS Rev 00 Page 1 of 2 0 IFI Release for Enquiry 14/12/18 SSS 14/12/18 HGG 14/12/18 RBU - Rev. Status Description Date Prepared Date Checked Date Approved AC Based on: PIN-QMC-03-F101

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

Section XV - PER, Design, and Construction Submittal Requirements

Section XV - PER, Design, and Construction Submittal Requirements Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department

More information

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 78 as amended

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

AVEVA PDMS.  Business Benefits. Accurate and clash-free 3D plant design AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

UNIFORM NETWORK CODE OFFTAKE ARRANGEMENTS DOCUMENT SECTION E TELEMETRY, ETC

UNIFORM NETWORK CODE OFFTAKE ARRANGEMENTS DOCUMENT SECTION E TELEMETRY, ETC 1 General 1.1 Introduction Joint Office of Gas Transporters UNIFORM NETWORK CODE OFFTAKE ARRANGEMENTS DOCUMENT 1.1.1 This Section E sets out: SECTION E TELEMETRY, ETC National Grid NTS' requirements for

More information