1 October 22, 202 hevron nergy Solutions ompany ivision of hevron U.S.. Inc oster, Suite 400 Overland Park, KS Tel: ax: RO: hevron nergy Solutions ompany NU hevron- TO: R: Prospective idders ddendum hevron- to Houston ommunity ollege lief enter Renovation You are instructed to read and to note the following described changes, corrections, clarifications, approvals, additions, and/or deletions. Receipt of ddendum hevron- is to be acknowledged on the bid form by the idder. HNGS/LRIITIONS ) Owner shall have first right of refusal for all equipment removed from the facility. idder shall be responsible for removal and proper disposal of refrigerant. If existing chillers must be disassembled to allow them to be removed from the facility, reassembly is not required. 2) There will be lay down area available for the ontractors. It will be located north of the lief enter parking lot; map is attached at the end of this document. General ontractor shall provide security fence around area shown. idder shall be responsible for secure containers as required. 3) xisting air-handling units to be replaced that are currently serving occupied areas on the st floor include: HU--, HU-3-, HU-P- and HU-P-2. 4) New variable frequency drives shall be provided by idder and installed by General ontractor. 5) ontrol valves and control dampers (not provided with HU) shall be provided by ontrols ontractor and installed by idder. 6) hiller automatic isolation valves shall be replaced. New valves provided by ontrols ontractor and installed by idder; existing actuators shall be reused. 7) Remove existing balancing valves on existing air-handling units to remain that shall receive new pressure independent control valves, provide and install spool piece as required. 8) Refrigerant monitor shall be provided and installed by idder. ontrols ontractor shall interface with refrigerant monitor and interlock with purge system. ontrols ontractor shall also provide and install strobe lights and pull stations/emergency push buttons. Power wiring by General ontractor. WS-3248 Page of 3
2 9) ume hoods and fume hood controls shall be provided and installed by idder. ontrols ontractor shall interface to fume hood controller via net. Point mapping shall be provided by idder. 0) ooling tower motors to be provided and installed by idder. lectrical by General ontractor. ) rawings show existing VV boxes to be locked closed on the 3 rd and 4 th floor; this work shall be completed by ontrols ontractor. 2) Roof curbs and penetrations associated with mechanical installation shall be provided and installed by idder. ontact H Roofing onsultant, ike Perry , regarding roofing requirements including warranty. 3) ire protection shall be provided and installed by General ontractor. This shall include any existing fire protection systems that must be removed and replaced or relocated to remove and install equipment. 4) ire dampers shall be provided and installed by idder. 5) Smoke detectors shall be provided and installed by General ontractor. 6) idder shall determine means necessary to remove and install equipment. Should existing doors, walls, louvers, etc. need to be removed and replaced, idder shall include this work in his/her price. idder shall also include roof protection to prevent damage while working on the roof. 7) The chilled water tie-ins for the new U s serving the north stairwell are not shown on the drawings. New chilled water supply and return piping shall be routed to existing 2 lines from shaft near room uilding Ops oordinate exact location with hevron onstruction anager and ngineer. 8) sbestos abatement shall be by General ontractor. WS-3248 Page 2 of 3
3 WS-3248 Page 3 of 3
4 October 29, 202 hevron nergy Solutions ompany ivision of hevron U.S.. Inc oster, Suite 400 Overland Park, KS Tel: ax: RO: hevron nergy Solutions ompany NU hevron-2 TO: R: Prospective idders ddendum hevron-2 to Houston ommunity ollege lief enter Renovation You are instructed to read and to note the following described changes, corrections, clarifications, approvals, additions, and/or deletions. Receipt of ddendum hevron-2 is to be acknowledged on the bid form by the idder. HNGS/LRIITIONS ) Remove Paragraph from Specification Section Refer to revised fume hood supply and exhaust valve schedules. 2) Specification Section is attached and shall be included in id ocuments. 3) ive (5) existing Liebert units located on the 2 nd floor across from the freight elevator shall be removed by idder. Remove piping back to valves and provide blind flanges shall be removed by General ontractor. 4) ir-handling units that must be broken down and reassembled in the field shall be reassembled per manufacturer s written instructions. ll joints shall be caulked and properly sealed. pply ¼ thick by -/4 wide closed cell neoprene gasketing to all joints. Use commercial grade silicone (indoor use) to seal seams. 5) The following changes shall be included in Section , Part GNRL, rticle.6 VRIITION O HILLR PITY N IINY, Paragraph TORY PRORN TST; Remove subparagraph 4 and subparagraph 5 and replace with the following: The equipment will be accepted if the test procedures and results are in conformance with HRI Standard 550/590. If the equipment fails to perform within allowable tolerances, the manufacturer will be allowed to make necessary revisions to his equipment and retest as required. The manufacturer shall assume all expenses incurred by the owner or his representative to witness the request. WS-3248 Page of 2
5 Subparagraph 6 Line a, Revise line "a" to read: or each ton below the allowable capacity as set forth in HRI 550/590 of the design capacity, $,000 (one thousand dollars) per ton will be deducted from the contract price. Subparagraph 6 Line b, Revise line "b" to read: llowable capacity = [( - tolerance) x design capacity]; tolerance per HRI 550/590. Subparagraph 6 Line c, dd the following to end of line "c": tolerance per HRI 550/590. Section , Part GNRL, rticle.6 VRIITION O HILLR PITY N IINY, Paragraph ; Paragraph.: dd the following to end of paragraph : onduct the performance test in accordance with HRI Standard 550/590 procedures and tolerances. Section , Part GNRL, rticle.9 WRRNTY, Paragraph ; change materials to materials, labor and refrigerant. 6) Section , Part 2 PROUTS, elete rticle 2.2 IRLOW SURNT. 7) H-2 and H-4 have mechanical issues and are not currently operable. One () chiller is required to be running to condition the building. 8) idder shall tie-in chilled water lines for the new U s serving the north stairwell per ddendum hevron-. This piping originally served two (2) ceiling hung units and has been abandoned. idder shall remove abandoned piping. 9) ivision- General Requirements are attached and shall be included in id ocuments. Specifications available at: d872-4f75-9c86-cd33e9cd2e4}. ll correspondence from idder shall be through hevron nergy Solutions. 0) idder shall include a project schedule with his/her bid. ) - shall be equipped with 2-speed motor. 2) LP- and LP-2 shall be rotated 90 degrees, coordinate exact location/orientation with hevron nergy Solutions Project anager and ngineer. 3) Provide alternate educt for arrier hillers as substitution for Trane hillers. 4) The following sheets have been revised and are attached:.04,.02,.03,.04,.07,.40,.406,.408 and.60. WS-3248 Page 2 of 2
6 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN JO RV. O HNIL.dwg H-UT-LI RWN Y RH/H HK Y H JO NO. SL /8" = '-0" T ISSU ISSU OR I SHT ONTNTS 2nd LOOR HNIL OLITION - PRT 3 RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
7 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN JO RV. HNIL-R.dwg H-UT-LI RWN Y RH/H HK Y H JO NO. SL /8" = '-0" T ISSU ISSU OR I SHT ONTNTS 2nd LOOR HNIL PLN - PRT RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
8 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN JO RV. HNIL-R.dwg H-UT-LI RWN Y RH/H HK Y H JO NO. SL /8" = '-0" T ISSU ISSU OR I SHT ONTNTS 2nd LOOR HNIL PLN - PRT 2 RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
9 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN JO RV. HNIL-R.dwg H-UT-LI RWN Y RH/H HK Y H JO NO. SL /8" = '-0" T ISSU ISSU OR I SHT ONTNTS 2nd LOOR HNIL PLN - PRT 3 RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
10 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN HNIL-R.dwg JO RV. RWN Y RH/H HK Y H JO NO. SL /6" = '-0" T ISSU ISSU OR I SHT ONTNTS ROO HNIL PLN RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
11 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN HNIL O.dwg JO RV. RWN Y W HK Y JW JO NO. SL /4" = '-0" T ISSU ISSU OR I SHT ONTNTS NLRG PLNS RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
12 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN HNIL NW.dwg JO RV. RWN Y W HK Y JW JO NO. SL /4" = '-0" T ISSU ISSU OR I SHT ONTNTS NLRG PLNS RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
13 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN HNIL NW.dwg JO RV. RWN Y W HK Y JW JO NO. SL /4" = '-0" T ISSU ISSU OR I SHT ONTNTS NLRG PLNS RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
14 5850 SN LIP ST. SUIT NU NO. HVRON 2 2 ISSU OR I ISSU OR PRIT LT# T SRIPTION PROSSIONL SLS ILN JO RV. HNIL-R.dwg H-UT-LI RWN Y RH/H HK Y H JO NO. SL /8" = '-0" T ISSU ISSU OR I SHT ONTNTS SHULS RWING NUR 5850 SN LIP, SUIT 40, HOUSTON TX office: RGISTRTION NO
15 October 3, 202 hevron nergy Solutions ompany ivision of hevron U.S.. Inc oster, Suite 400 Overland Park, KS Tel: ax: RO: hevron nergy Solutions ompany NU hevron-3 TO: R: Prospective idders ddendum hevron-3 to Houston ommunity ollege lief enter Renovation You are instructed to read and to note the following described changes, corrections, clarifications, approvals, additions, and/or deletions. Receipt of ddendum hevron-3 is to be acknowledged on the bid form by the idder. HNGS/LRIITIONS ) Section , Part GNRL, rticle.9 WRRNTY shall be replaced with:. See Section loseout Procedures, for additional warranty requirements.. Provide a one year warranty for parts, labor, and refrigeration from date of issuance of occupancy permit. Warranty to coincide with manufacturer s parts warranty.. Provide second through fifth year parts warranty on compressors. 2) ll supply ductwork to be externally wrapped. 3) T/T duct flange is acceptable for rectangular fume hood ductwork, mig welded joints are acceptable for round fume hood ductwork. 4) Painting specified on Sheet.406 shall be by idder. 5) New equipment pads required for mechanical work shall be provided and installed by idder. 6) idder shall provide list of any electrical support required for temporary setups. 7) Original structural drawing S is included for reference. 8) id ue ate shall be revised. ids will be received by :00 p.m. (local time) riday, November 2 nd, 202. WS-3248 Page of
University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationA/E REVIEW CHECKLIST HVAC
A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationAcknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.
ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationPRESTON HEALTH SERVICES ARCHITECT S NO. 2700
SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.
More informationA. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationDIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS
DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication
More informationCOMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST
COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST Two copies of this worksheet/checklist must accompany plans sets submitted with commercial kitchen application. The applicant is responsible for assuring the
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationADDENDUM NO. 3, March 14, 2017 A.B.C. No
ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationStantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)
Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION
More informationInstallation and Maintenance Manual IM 770-1
Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready
More informationADDENDUM NO. 4 November 15, Page 1
ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More informationInstallation and Maintenance Manual
Installation and Maintenance Manual IM770 Group: pplied ir Part Number: IM770 Date: pril 2003 Roof Curb for Skyline TM Outdoor ir Handlers 2013 Daikin pplied IM 770 Page 1 Table of Contents General Description...
More informationThe General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.
SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in
More informationADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.
DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part
More information(Larry D. Svitak, PE) License No
ADDENDUM NO. engineering design initiative north 5 th Street minneapolis, mn 55 Phone: () 33-55 AX: () 33-58 or Project: Nobles County Government Center AHU- Replacement EDI Project No.: 7-075 Owner: Nobles
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationGUIDE SPECIFICATIONS CONTROLS SPECIFICATIONS AND CONTROL POINT DATA MAP GENERAL DESCRIPTION
GUIDE SPECIFICATIONS 256920-UGS-A-0506 Simplicity Intelli-Comfort Optional Control in 3-25 Ton Packaged Units GENERAL DESCRIPTION CONTROLS SPECIFICATIONS AND CONTROL POINT DATA MAP Equipment with Simplicity
More informationM1.0 MECHNANICAL FLOOR PLAN
GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationRS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section
RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section Editing (date): Marie-Clémence DEGALLAIX (30/05/2016) Checking (date): Jean FOURCROY (02/06/2016)
More informationSteel Sound Enclosure
Steel Sound Enclosure INSTALLATION MANUAL List of tools recommended for use during installation: vise grips c clamp ladder electric drill drill bits / taps as req d screw drivers hammer rubber mallet pipe
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationCommercial Infill Project Guide
Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit
More informationTravis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock
Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue
More informationADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017
Procurement Services Lucas Administrative Center, 617 1 Nunn Drive Highland Heights, KY 41099 859.572.6605 FAX 859.572.6995 ADDENDUM NO: 1 IFB/RFP No: NKU-22-18 Commodity: Kentucky Hall Renovation Date:
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationDuctwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.
SECTION 15910 DUCT ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15890 - Ductwork. 2. 15900 - Controls and Instrumentation. 3. 15940 - Outlets (HVAC). 4. 15970 - HVAC Control System.
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationSECTION LOW PRESSURE DUCTWORK
SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More information2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES
APT #1 APT #1 11/12/2014 NEW GARAGE LOCKS $ 89.00 11/12/2014 NEW LOCKS $ 169.80 1/11/2015 GARAGE KEY COPIES $ 6.47 1/23/2015 PLUMBING REPAIRS REPLACED MAIN BATH SINK PIPES $ 299.76 2/2/2015 PAINTING $
More informationADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01
ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014
More informationCITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE
San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE Seivices of the San Francisco Public Utilities Commission Signatures: OCEANSIDE WATER
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1
A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10
More informationCYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL
T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated
More informationSECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationADDENDUM 4 BID OPPORTUNITY NO
` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationJanuary, 2014 Page 1 of 5
Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationLOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.
SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS
More informationEstimated Cost of Project Contractor License No. Contractor Qualifier No.
Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your
More informationADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.
ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL
More informationInstallation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio
Installation Guide Model #400 Corporate Office: 349 Highland Road East Macedonia, Ohio 44056 1.866.822.7328 www.ezbreathe.com Copyright 2006, EZ Breathe, LLC WHAT S INSIDE Before installing your EZ Breathe
More informationPART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,
More informationHousing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16
Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB Job # BID-CDBG #16 Bid is to be turn-key, including all applicable code requirements, materials, labor, City Business License permits,
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS
SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationSolid Surface Countertops
USE THIS SECTION FOR COUNTERTOPS. USE SECTION 06 61 16 FOR OTHER SOLID SURFACING APPLICATIONS INCLUDING WALL CLADDING AND MISCELLANEOUS FABRICATIONS. GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION
More informationThis Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.
Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision
More informationDistribution: X Owner X Landscape X Structural X Mechanical. X Civil X Electrical X Acoustical. Date of
planning architecture construction NUM 03 istribution: X Owner X Landscape X Structural X Mechanical X ivil X lectrical X coustical Project: venir Museum ddendum No.: Project 15037-00-00 (rchitect s) ate
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationPiping & Equipment Identification
Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and
More informationSeries 1600 WeatherGuard Dock Enclosure
Fairborn USA Inc. 205 Broadview Street Upper Sandusky, OH 43351 1-800-262-1188 Fax 1-419-294-4980 Series 1600 WeatherGuard Dock Enclosure All Models! WARNING Do not install this product unless you read
More informationSunTrackerTwo Preparation
TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationSection COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.
PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More information1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.
SECTION 230800 GENERAL MECHANICAL REQUIREMENTS 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. General 1. Incorporate,
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationVE15 & VE25 Home Elevator
If In oubt - sk Safe Working Load = 0 Ib levator Power Supply = 0Vac Single Phase. mp RO. levator ontrol Voltage = Vdc levator Refer to V 900 for aperture details Refer to SK0 for structural details Refer
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationSolid Surface Fabrications
USE THIS SECTION F WALL CLADDING AND MISCELLANEOUS FABRICATIONS OTHER THAN COUNTERTOPS. USE SECTION 06 61 18 F COUNTERTOPS. GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST
More information1.1 The Bid Date has changed to October 4, The time and place will remain the same.
Addendum Number Four To The Drawings and Specifications for Pleasant Valley Elementary School Wichita, Kansas Issued: Wednesday Wichita Unified School District # 259 Project No. 12-25077 HANNEY & ASSOCIATES
More informationReliance SG800 Series Steel Water Gage Valves
Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,
More informationSTANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.
STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1
More informationThe General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.
SECTION 15800! AIR DISTRIBUTION PART 1! GENERAL 1.01 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017
SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More information*************************************************************************************************************
15890 DUCTWORK ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 33 13 *************************************************************************************************************
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to