Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director
|
|
- Jeffry Walker
- 5 years ago
- Views:
Transcription
1 Trust in the Power of Prism Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director
2 Agenda Understanding why some trades may lack BIM capability and what can be done to integrate them into a collaborative environment. Hearing how inaccurate models or post-fabrication design changes can cause distrust of BIM and how to re-engage those contractors. Revealing the best practices in BIM for Multi-trade prefabrication: what further efficiencies can teams make?
3 Budget for BIM Review CD set, specifications, square footage, BIM XP, schedule, use cases and level of development. Generate the estimate and include in the bid. Don t depend on securing budget after the contract has already been awarded. Build the model per the CD set and secure additional budget when a change occurs in the CD set. Tie the budget to specific tasks and monitor Refine Scope at Project Kick-off Set expectations with your internal team and align with the expectations with the GC and the rest of the trades. Building Information Model Include code and installation clearances Include flanges, insulation and other elements that will need space Include hangers Model everything that you care about. If it isn t in the model you may need to tear it out and re-install it.
4 Building Information Model cont d Model equipment to the submittal specifications Model the equipment and review with the superintendent and manufacturing. Include the information in the model that will be necessary for manufacturing and installation. If your location or route is waiting on approval model an alternative option too. Coordination Do your own coordination between coordination meetings. Do not rely only on the GC to identify clashes and installation clearances Create allies and good cooperative working relationships with the other trades. Demand formal sign-offs Secure copy of the federated model at sign off Be leery of conditional sign-offs Shop Drawings Identify the use case for your shops. If they are going to be utilized for installation include all of the information in your model elements as you build it. Going back after the fact is inefficient and burns budget. Tie the shops to a system that will control the revisions for the field
5 Manufacturing and Installation Through out the BIM process tie the field and manufacturing together Identify the technology that the field is using and tie it to the to the technology that is used to develop the building information model Bluebeam PlanGrid ERP Navisworks Revit AutoCAD and other 3 rd party applications Leica Total Station Total Station Electronic Points Include points in families/blocks Build a process to get the points from the model to the total station in the field Include the points in the field model Model and coordinate sleeves and all other slab penetrations to avoid labor and perishable tools required for coring. Prefab Use the BIM to prefab underground stub ups, panel racks, feeder and sleeve assemblies, headwalls and devices for typical rooms.
CS BIM Execution Plans That Are Actually Executable
CS125136 BIM Execution Plans That Are Actually Executable Nick Dyer Okland Construction Learning Objectives Learn how to create BIM Execution Plans that are scalable to project requirements Learn how to
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationBridging the Gap. How to leverage BIM and VDC technology for marketing purposes
Bridging the Gap How to leverage BIM and VDC technology for marketing purposes Before we get started please download kahoot! Kahoot.it Marketers aren t using BIM/VDC as a differentiator within the AEC
More informationSECTION D BIM COORDINATION DRAWINGS - CONTRACTORS
END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,
More informationPiping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer
Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer MP3512-L: In this class we will harness the power of MEP Data in AutoCAD. We will review the workflow to fully utilize this Data throughout
More informationNational BIM Standard - United States Version 3
National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS
SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationMP BIM at the Heart of the MEP Subcontractor Business
MP4229 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand Sophie Montenot BIM Business Development Executive MEP BIM Manager 1 Class Summary Dive into the heart of an MEP subcontractor
More informationWHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar
WHO WE ARE We help construction companies, general contractors, architects & engineers to seamlessly integrate BIM into their projects within their predefined timelines, standards and budget thereby helping
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationAbout Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP
BIM Case Study About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP Coordination Rob Muellner MEP Fabrication Chad
More informationWhy BIM? VASQUEZ MARSHALL ARCHITECTS
Why BIM? VASQUEZ MARSHALL ARCHITECTS Agenda Introductions Using BIM Software For Drawing Production Using BIM Software For Constructability Review Benefits Of BIM Getting Started BIM Experts Michael Smith
More informationAutodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow
Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow Course Length: 2 days The Autodesk Navisworks Using Autodesk Navisworks in a BIM Workflow learning guide teaches you how to better predict
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationBIM/VDC on TAA Projects:
2018 Logan International Airport BIM/VDC on TAA Projects: Direct Tenant TAA Projects Third Party Development Properties Massachusetts Port Authority Capital Programs & Environmental Affairs Preface Massport
More informationMOVING TOWARD AN INTELLIGENT SHOP MODELING PROCESS
MOVING TOWARD AN INTELLIGENT SHOP MODELING PROCESS SUBMITTED: August 2007 REVISED: April 2008 PUBLISHED: June 2008 EDITORS: T. Olofsson, G. Lee & C. Eastman Robert Leicht, PhD Candidate, Department of
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationMEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology
SBS5411 Building Information Modelling for BSE http://ibse.hk/sbs5411/ MEP Coordination Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2018 Contents Introduction Clash
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01
More informationAdapt or Fail coordination in different environments
October 17-19, 2016 ATLANTA, GEORGIA Adapt or Fail coordination in different environments Speakers Pablo Medina VDC Manager San Diego Daniel Sistrunk VDC Manager SoCal Agenda Design Coordination Speaking
More informationDesign Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at
Aetna Information Services (AIS) http://ot.aetna.com March 16, 2016 Ver 21 Design Phase / Process This sequence of eight design weeks DW s leads the project team from project kickoff through to construction
More informationSection XV - PER, Design, and Construction Submittal Requirements
Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. BIM & THE VALUE STREAM LCI:
More informationSteven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer, Inc. 24 Years of Experience in Sheet Metal
ADVANCED BIM PART II Communication and Meetings Presenter: Steve Hunt Dee Cramer, Inc. Presenter BIO Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer,
More informationAgenda 1 Introduction 2 Navisworks Overview
Agenda 1 Introduction 2 Navisworks Overview BIM for Contractors: Autodesk Navisworks from Design to Construction to Facilities Management David Epps Manager Building Information Modeling Holder Construction
More informationGilbane Building Company Trade Contractor BIM Execution Plan
Gilbane Building Company Trade Contractor Version 3.70 NYRO (20160531) 1.0 General Requirements ---------------------------------------------------------------------------------- 2 1.00 Introduction ------------------------------------------------------------------------------------------------------------------------------2
More informationPledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project
Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements
More informationSECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000
More informationSuggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations
Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION
More informationProgrammatic Implementation of ABC: Module 6 Project Highlights Contractor Perspective
Programmatic Implementation of ABC: Module 6 Project Highlights Contractor Perspective 2 Presentation Outline Collaboration with Industry Evolution of Contractor Involvement in ABC Projects Case Studies
More informationEfficient Tactics of Project Management
Ohio Structure Steel & Architectural Metals Association Efficient Tactics of Project Management Friday, June 23, 2017 Mark V. Holland, P.E. Chief Engineer Paxton & Veirling Steel Co. How to get paid. This
More informationBIM Design Services/ Introduction. T: E:
Introduction At Godfrey Syrett, Revit is now our default software, we have embraced its capabilities to enhance our design process and add value to it by utilising all its benefits. It is the integration
More informationHow technology is changing the way we deliver Structural Steelwork. Brenden Picton Phil Shanks
How technology is changing the way we deliver Structural Steelwork Brenden Picton Phil Shanks Presentation Outline Project Introduction & Process Description From the Engineers Perspective From the Detailers
More informationTAHFM Interlink Prefab is FAB?
TAHFM Interlink 2015 Prefab is FAB? Panelists PRESENTERS: Nemours/Alfred I. Dupont Hospital for Children PRESENTERS: Jeff Kent, Managing Director of Corporate Facilities, Nemours Foundation Skanska FKP
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationWhat is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl
What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl Learning Objectives What is BIM? > BIM definition > BIM history > Common current uses (3D
More informationSECTION WIREWAYS FOR RADIOLOGY EQUIPMENT
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable
More informationPrecast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado
October 17-19, 2016 ATLANTA, GEORGIA Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado Case Study Overview Explore BIM requirements of
More informationGlobal Alignment of Survey Systems Proof of Concept
Presented to: Presentation: Global Alignment of Survey Systems Proof of Concept Submitted by: Jacobs Nederland B.V. Plesmanlaan 100 2332 CB Leiden Phone: + 31 71 582 7486 Fax: +31 71 582 7081 www.jacobs.com
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationIntroduction to Substation Design TADP 542
Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program Drawings Drawings are prime method for communicating
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More informationBIM Services India An Architectural & Engineering Company
BIM Services India An Architectural & Engineering Company Offices Our Spread USA UK Office India Office Canada Office Australia Office JBH-Tesla Design Group, Inc. 100 Executive Boulevard-Suite #204, Ossining,
More informationSUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS
SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have
More informationBG6 Design Framework for Building Services
BG6 Design Framework for Building Services Why? What? How? Martin Ronceray 01 Oct 2018 BSRIA Values 2 BSRIA Sustainable Construction Group 3 Why? The purpose 4 Purpose of BG6 Details of limitations not
More informationUtilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes
Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes Allbban H. Khalid Southern Polytechnic State University, 1100 South Marietta Parkway, Marietta GA 30067
More informationREVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following:
b. Lithonia Lighting LP6FN 42TRT 6O9A 120 ECOS TRW 9. Luminaire Schedule L-18D: a. Lithonia Lighting LP6FN 42TRT 6O9A MVOLT ECOS TRW b. Lithonia Lighting LP6FN 42TRT 6O9A 120 ADEZ TRW 10. Luminaire Schedule
More informationConstruction Phase Project Management and Documentation
Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications
More informationDRAWING MANAGEMENT MISTAKES
5 DRAWING MANAGEMENT MISTAKES You re Making and How to Avoid Them Everything from the site plan, to punch lists and RFIs, to detailed call-outs are part of construction drawings the life blood of the AEC
More informationBIM Technology Certificate Program
BIM Technology Certificate Program Program Description 216 Course Hours of Instruction Program Completion Time 9 Months Upon Completion VDCI Professional Technology Certificate Awarded BUILDING INFORMATION
More informationTARGET FIELD: REMOVING THE VARIABLES THROUGH BIM
TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM contents Introduction Owner s Statement Architect s Statement Contractor s Statement Cast in Place Coordination Structural Steel Working Within the Site
More informationSPECIFICATIONS SPECIFICATION TYPES
SPECIFICATION TYPES PRESCRIPTIVE (closed): Specs outline exactly what product or material you want the contractor to use or owner/purchasing agent to buy PERFORMANCE (open): Specs tell what results you
More informationTips for. milgard.com
Tips for Selecting Contractor milgard.com Tips for Selecting a Contractor 1 First, find a contractor that has experience doing the job. Find professional contractors, ideally with Installation Masters
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More information6/12/2012. ADVANCED BIM PART I Setting up Navisworks Files & Working with Clash Reports Presenter: Steve Hunt Dee Cramer, Inc.
ADVANCED BIM PART I Setting up Navisworks Files & Working with Clash Reports Presenter: Steve Hunt Dee Cramer, Inc. 1 Presenter BIO Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan.
More information6/12/2012. ADVANCED BIM PART I Setting up Navisworks Files & Working with Clash Reports Presenter: Steve Hunt Dee Cramer, Inc. Presenter BIO.
ADVANCED BIM PART I Setting up Navisworks Files & Working with Clash Reports Presenter: Steve Hunt Dee Cramer, Inc. Presenter BIO Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating
More informationOUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand.
WHOWE ARE We help construction companies, general contractors, architects & engineers, integrate BIM into their projects seamlessly within their predefined timelines and budget, bridging the gap between
More informationAVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design
AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationBIM Won t Work as a Deliverable, Will It? Dace A. Campbell, AIA, LEED AP (Moderator)
BIM Won t Work as a Deliverable, Spring BIMForum San Diego, CA Hilton San Diego Bayfront April 29-30, 2015 Will It? Dace A. Campbell, AIA, LEED AP (Moderator) @DaceCampbell Learning Objectives 1. Gain
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018
SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationHosting an Effective BIM Coordination Meeting. Brett Gatti, CANBIM BP3 IBI Group Southfield, MI
Hosting an Effective BIM Coordination Meeting Brett Gatti, CANBIM BP3 IBI Group Southfield, MI Who am I? 25+ years experience with multiple CAD packages In the AEC community for over 10 years BIM Manager
More informationd e n v e r a r t m u s e u m
d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationHva kan bygg og anlegg lære av olje- og gass prosjekter?
Hva kan bygg og anlegg lære av olje- og gass prosjekter? Tekna Effektivisering av bygg- og anleggsbransjen Oslo 18.10.18 Øystein Mejlænder-Larsen Photo: Lundin Industrial PhD At a glance Aim: Contribute
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationAccelerated Bridge Construction (ABC) and the Utah Experience
Accelerated Bridge Construction (ABC) and the Utah Experience by Kris Peterson, P.E., UDOT Mary Lou Ralls, P.E., Ralls Newman, LLC AASHTO Subcommittee on Construction Annual Meeting Computers and Technology
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationManaging the Line Between Cx Provider and MEP Coordinator
Managing the Line Between Cx Provider and MEP Coordinator Kevin Fish, P.E., LEED TM AP Northwest Engineering Service, Inc. 2008 National Conference on Building Commissioning An important and difficult
More informationDevelopments in BIM Infrastructure Design. Barry Blake 3 rd June 2014
Developments in BIM Infrastructure Design Barry Blake 3 rd June 2014 BIM Infrastructure Design BIM Collaboration / Sharing / Design validation / Integrating various elements of design What are we delivering
More informationEND-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC.
END-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC. TRADITIONAL AEC PROCESS ISSUES The only industry that does not test a complete design before its implementation TRADITIONAL AEC
More informationFactors influencing the adoption of building information modeling in the AEC Industry
icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) Factors influencing the adoption of building information
More informationWhite Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado
1 2 Structural Engineers Association of Colorado White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado Prepared by the
More informationUsing Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay
Western Kentucky University TopSCHOLAR Masters Theses & Specialist Projects Graduate School Fall 2016 Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction
More informationBIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos
BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow
More informationChicago Zoological Society
3300 Golf Road Brookfield, Illinois 6053 E0.0 E0. E0.2 E0.3 E0.4 E0.5 E0.6 DRAWING LIST GENERAL NOTES SYMBOL LIST AND SPECIFICATIONS WIRING DIAGRAM VOLTAGE DROP DIAGRAM PANEL SCHEDULES DETAILS SHEET DETAILS
More informationPhD Student Mentoring Committee Department of Electrical and Computer Engineering Rutgers, The State University of New Jersey
PhD Student Mentoring Committee Department of Electrical and Computer Engineering Rutgers, The State University of New Jersey Some Mentoring Advice for PhD Students In completing a PhD program, your most
More informationIncorporating BIM into Architectural Precast Concrete Fabrication
33 rd International Symposium on Automation and Robotics in Construction (ISARC 2016) Incorporating BIM into Architectural Precast Concrete Fabrication Jeffrey Collins Georgia Institute of Technology jcollins36@gatech.edu
More informationBIM & Emerging Technologies. Disrupting Design process & Construction
BIM & Emerging Technologies Disrupting Design process & Construction Introduction Introduction - BIM Disrupting the Construction Introduction Design Major disruption already in various parts of the World
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationChapter 25. Lighting Plans
Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace
More informationRIT CAD Specifications
RIT CAD Specifications The design team shall provide RIT with Revit, AutoCAD, and PDF files that capture the construction conditions of the associated project. This document outlines requirements for submitting
More informationTR21042 Geotechnical BIM: Applying BIM principles to the subsurface
TR21042 Geotechnical BIM: Applying BIM principles to the subsurface Gary Morin Keynetix Learning Objectives How the general principles of BIM can be applied to the subsurface. The use of tools such as
More informationImplementing BIM for infrastructure: a guide to the essential steps
Implementing BIM for infrastructure: a guide to the essential steps See how your processes and approach to projects change as you adopt BIM 1 Executive summary As an ever higher percentage of infrastructure
More informationWTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE
WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION
More informationListed below are the competencies required and examples from the aforementioned job:
1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.
More informationMagiCAD Cloud The World s Largest BIM Content Platform for MEP
MagiCAD Cloud The World s Largest BIM Content Platform for MEP MagiCAD Cloud is the world s largest MEP content platform, including 270 leading manufacturers and 1,000,000 BIM objects. Achieve dramatic
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationDetail Design for State Project
Introduction and Project Information Detail Design for State Project 4210-49 Introduction This contract includes detailed design to letting for the shoulder widening of Trunk Highway (TH) 68 between the
More informationTotal Precast Concrete Structures
Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and
More informationCLIENT QUESTIONNAIRE
CLIENT QUESTIONNAIRE Please fill out the following questionnaire to the best of your ability so we may be better equipped to meet your design needs. The following questions may prove useful for defining
More informationDefense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements
Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements DMEA/MED 5 March 2015 03/05/2015 Page-1 DMEA ATSP4 Requirements
More informationASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015
Unapproved ASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015 MEMBERS PRESENT MEMBERS ABSENT ADMINISTRATORS PRESENT ADMINISTRATORS ABSENT
More informationDIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines
DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...
More informationPRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering
PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering PRECAST SUBSTRUCTURE COMPONENTS ADVANTAGES SCHEDULE INCREASES CONSTRUCTION
More informationPDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC
PDMS INFORMATION BOOKLET Date: 15/08/2013 OTHER SERVICES ON OFFER BY PIPING STRESS ANALYSIS USING CEASER II EQUIPMENT DESIGN USING PV ELITE ISOMETRIC & P&ID IN AUTOCAD version 2012 MATERIAL INSPECTION
More information