1 How technology is changing the way we deliver Structural Steelwork Brenden Picton Phil Shanks

2 Presentation Outline Project Introduction & Process Description From the Engineers Perspective From the Detailers Perspective From the Client & Contractors Perspective

3 Project Introduction GHD was engaged to provide Architectural and Engineering services for an Art Gallery / Interpretative Centre for Fraser Coast Regional Council. The building consists of a braced steel frame with some tilt panels, large glazing windows and twisting soffits. The construction time on the project is unrealistic, so to save time, we undertook a delivery method by which we engaged Jackson Roxborough in the design phase to shorten the lead time on the structural steel

4 Fraser Coast Cultural Centre

5 The Process The Revit model was set up like all other models within GHD with all disciplines working on 1 central file. The Architects set up the initial model with the Structural team modelling the Structural Components (Columns, Framing, Foundations) Once the structure had been completed, the model was then transferred to Tekla using the Tekla Exporter in Revit. The result is an.ifc file which JR imported directly into Tekla along with all the sizes and spatial arrangement. Once transferred in Tekla, JR connected all the structural elements using design provided by GHD through the use of DWF files.

6 The Process JR then provided an.ifc file back to GHD with all the connections added. This file was then imported into Revit and then exported into Navisworks and connections were checked for clashes with other disciplines. This process was repeated several times over the course of the project.

7 From the Engineers Perspective Brenden Picton

8 From the Engineers Perspective Limitations Deliverables Benefits Downsides Other things to consider

9 From the Engineers Perspective. Limitations Tekla doesn t like the Shared Coordinate system. Grids don t transfer across Conversion of the IFC export from Tekla to Revit makes for a big file (200Mb) IFC file isn t an update from the previous file, it s a brand new file Round objects don t appear the same Structural Connections don t transfer across seamlessly Bolt size didn t transfer across

10 From the Engineers Perspective. Deliverables Tender: Plans, Elevations & Sections (GHD) BOQ (Jackson Roxborough) A copy of the Steel detailers model was provided to tenderers Construction (Contract Award) Plans, Elevations & Sections (GHD) No detail connection drawings were created 500+ Fabrication drawings (Jackson Roxborough)

11 From the Engineers Perspective. Benefits Less Documentation time Coordination of the steel detailing model happens during the design phase and highlights areas of concern earlier in the project phase We review a model rather then interpret drawings and it can be coordinated with other design disciplines Allows for Steel detailer to provide input into the design

12 From the Engineers Perspective.

13 From the Engineers Perspective. Downsides A little more care is required for the modelling of elements Time saved in less documentation is taken up in model management QA procedure is brought forward before the model is sent to the detailer The building design has to be frozen prior to sending to the detailers

14 From the Engineers Perspective. Other things to consider.. This only works if everyone is comfortable in a model environment Setup export views in Revit for both Tekla and Navisworks Communication is the key. The more you can do via the model the better (live Revit Model) The more information you can give to the detailer, the better! Don t attempt this on your first Revit project Once drawings are created in Tekla, the process of change is a costly one.

15 From the Detailers Perspective Philip Shanks

16 From the detailers perspective The Project The Detailing Process IFC File Conversion to Tekla Connection Design Revision Control Tekla Improvements A number of points to consider, hopefully will be answered by this demonstration: Is this a paradigm shift? Why do some of us want to see 3D models as a design medium? Who benefits? What are the risks? Where are the savings? What are the pros and cons? Is this process gaining ground?

17 The Project A real project with targets A process adopted and accepted to be used on this project No design drawings as in hard copy format GHD system of using DWF files for connection design

18 The Detailing Process How do we receive the model?

19 The Detailing Process Filtering the IFC file Production Steelwork

20 IFC file conversion to Tekla Profile and material mapping Build a library on the run Simple conversion process select and process

21 Connection Design Tags applied to members showing connection intent DWF viewer is free communication process a t no added cost

22 Revision Control IFC Revision Control

23 Connection Design Connected Steel Detailing Model

24 Tekla Improvements Export IFC for Design Review more advanced - Property set definitions allow Detailer to populate IFC export file with additional model data. - Data can be added to steelwork for design review purposes - Data can be added to bolts for design review purposes - Both Steelwork and bolts can be scrutinised in the IFC output file - Use Navisworks for review?

25 Tekla Improvements IFC Change Management System still in Beta phase.

26 In closing From a Detailer s perspective Why do this? Economy is driving Tech Innovation Integrated Project Delivery (IPD) - Early Engagement Preservation of data Data flow Economy for project Shop dwgs ready at time of award Pros and Cons

27 From the Client & Contractors Perspective

28 From the Client & Contractors Perspective. Client: Benefits Decreased Construction time A more refined price on steel with no chance of variation between Tender and Construction Downsides Upfront cost implications if the project doesn t proceed past design

29 From the Client & Contractors Perspective. Contractor: Increased efficiency..structural steel is on the critical path now and thanks to the design value of having shop drawings approved as part of contract documents we are ready to erect at least 60% of structure. Typical design process with Build only contract. Based on executing contract date of and then Sub contract procurement and letting of Structural steel supply and install package. PBS would of only have 90% of shop drawings complete and estimate around 60% approved by Client and at the best only 10% manufactured if lucky. So the benefits of completing the shop drawings up front will be a considerable factor on mitigating delays. (Wayne Ahrens, PBS)

30 Questions?

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer MP3512-L: In this class we will harness the power of MEP Data in AutoCAD. We will review the workflow to fully utilize this Data throughout

More information

MP BIM at the Heart of the MEP Subcontractor Business

MP BIM at the Heart of the MEP Subcontractor Business MP4229 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand Sophie Montenot BIM Business Development Executive MEP BIM Manager 1 Class Summary Dive into the heart of an MEP subcontractor

More information

WHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar

WHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar WHO WE ARE We help construction companies, general contractors, architects & engineers to seamlessly integrate BIM into their projects within their predefined timelines, standards and budget thereby helping

More information

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand.

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand. WHOWE ARE We help construction companies, general contractors, architects & engineers, integrate BIM into their projects seamlessly within their predefined timelines and budget, bridging the gap between

More information

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 Scope This Practice Note is intended to identify responsibilities and contractual arrangements for precast elements used in buildings. Such

More information

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology SBS5411 Building Information Modelling for BSE http://ibse.hk/sbs5411/ MEP Coordination Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2018 Contents Introduction Clash

More information

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP BIM Preparation for the USACE Lessons Learned in Conversion from REVIT to BENTLEY BIM Presenters: Samuel Hudson BIM Support Specialist Jeff Owens AIA, LEED AP L E ll Lee Ezell Consulting BIM Specialist

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Project: The Parklands Builder: JMac Constructions Location: Southport, Gold Coast Dates: Nov Feb 2017

Project: The Parklands Builder: JMac Constructions Location: Southport, Gold Coast Dates: Nov Feb 2017 Project: The Parklands Builder: JMac Constructions Location: Southport, Gold Coast Dates: Nov 2016 - Feb 2017 Watkins Steel were contracted by JMac Constructions to supply and install structural steelwork

More information

FACADE: Future-proofing Architectural Computer-Aided DEsign

FACADE: Future-proofing Architectural Computer-Aided DEsign FACADE: Future-proofing Architectural Computer-Aided DEsign MacKenzie Smith Associate Director for Technology, MIT Libraries Principal Investigator, MIT FACADE Project MIT FACADE Project Develop Long-Term

More information

Agenda 1 Introduction 2 Navisworks Overview

Agenda 1 Introduction 2 Navisworks Overview Agenda 1 Introduction 2 Navisworks Overview BIM for Contractors: Autodesk Navisworks from Design to Construction to Facilities Management David Epps Manager Building Information Modeling Holder Construction

More information

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow

More information

3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources

3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources 3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources Brief History 2 Conveying the Design Old Way Reviewing Changes Schematic Intent Design Change 3 4 Conveying the

More information

Integrating Design using BIM and IFC

Integrating Design using BIM and IFC Integrating Design using BIM and IFC Thomas Liebich AEC3, Munich, Germany tl@aec3.de www.aec3.com Company overview Founded 1997 7 employees established in 2 countries Main activities information modeling

More information

Create Structural Shop Drawings and Fabrication Models Using Autodesk Revit

Create Structural Shop Drawings and Fabrication Models Using Autodesk Revit Create Structural Shop Drawings and Fabrication Models Using Autodesk Revit Dan McCloskey, P.E. MB BIM Solutions Erich Bretz, P.E. MB BIM Solutions FB5474 New tools in Revit software have enhanced the

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

Designing with BIM for Infrastructure on Large Transportation Projects

Designing with BIM for Infrastructure on Large Transportation Projects Designing with BIM for Infrastructure on Large Transportation Projects July 19, 2012, 10:00 a.m. Pacific Time Join civil designer Dave DeJong from Stantec as he discusses how BIM for Infrastructure has

More information

Title. Author(s)YU-CHIH SU; YI-CHUAN HSIEH; MENG-CHUNG LEE; CHIH-YUA. Issue Date Doc URL. Type. Note. File Information CONSTRUCTION

Title. Author(s)YU-CHIH SU; YI-CHUAN HSIEH; MENG-CHUNG LEE; CHIH-YUA. Issue Date Doc URL. Type. Note. File Information CONSTRUCTION Title DEVELOPING BIM-BASED SHOP DRAWING AUTOMATED SYSTEM I CONSTRUCTION Author(s)YU-CHIH SU; YI-CHUAN HSIEH; MENG-CHUNG LEE; CHIH-YUA Issue Date 2013-09-11 Doc URL http://hdl.handle.net/2115/54245 Type

More information

CR BIM at the Heart of the MEP Subcontractor Business

CR BIM at the Heart of the MEP Subcontractor Business CR4224 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand BIM Solutions Centre Sophie Montenot BYME Engineering Hub (Singapore) Class Description Dive into the heart of an MEP subcontractor

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

BIM Services India An Architectural & Engineering Company

BIM Services India An Architectural & Engineering Company BIM Services India An Architectural & Engineering Company Offices Our Spread USA UK Office India Office Canada Office Australia Office JBH-Tesla Design Group, Inc. 100 Executive Boulevard-Suite #204, Ossining,

More information

Level 1 before Level 2 - an Irish BIM mandate

Level 1 before Level 2 - an Irish BIM mandate Level 1 before Level 2 - an Irish BIM mandate Robert Moore, Msc (Hons) Construction Informatics RICS Certified BIM Manager Client BIM/Information Manager Grangegorman Development Agency Agenda GCCC position

More information

Advance Concrete 2014 Service Pack 1

Advance Concrete 2014 Service Pack 1 Advance Concrete 2014 Service Pack 1 This document describes the improvements in Service Pack 1 for Advance Concrete 2014. GENERAL Interaction between Advance Concrete and Advance Steel. Advance Steel

More information

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010 BIM e Submission Guideline Structural Annex 1a Recommended Process Revit 2010 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 www.bca.gov.sg Revision

More information

Session 3 _ Part A Effective Coordination with Revit Models

Session 3 _ Part A Effective Coordination with Revit Models Session 3 _ Part A Effective Coordination with Revit Models Class Description Effective coordination relies upon a measured strategic approach to using clash detection software. This class will share best

More information

Why BIM? VASQUEZ MARSHALL ARCHITECTS

Why BIM? VASQUEZ MARSHALL ARCHITECTS Why BIM? VASQUEZ MARSHALL ARCHITECTS Agenda Introductions Using BIM Software For Drawing Production Using BIM Software For Constructability Review Benefits Of BIM Getting Started BIM Experts Michael Smith

More information

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado October 17-19, 2016 ATLANTA, GEORGIA Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado Case Study Overview Explore BIM requirements of

More information

Advance Steel Essentials

Advance Steel Essentials Advance Steel Essentials Course Length: 3 days This course is intended to give an overview of all of the basic commands that are required to create structures and associated documentation using the Autodesk

More information

d e n v e r a r t m u s e u m

d e n v e r a r t m u s e u m d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition

More information

Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director

Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director Trust in the Power of Prism Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director jehlers@prismelectric.com Agenda Understanding why

More information

Tekla 기반의 EPC 업무효율성향상 테클라코리아 / 정종훈

Tekla 기반의 EPC 업무효율성향상 테클라코리아 / 정종훈 Tekla 기반의 EPC 업무효율성향상 테클라코리아 / 정종훈 Contents Tekla Corporation Tekla Structures 소개 Tekla Structures 적용사례 Tekla Structures 적용범위 2 Tekla Corporation 3 Tekla Corporation Model-based software for customers

More information

Government Soft Landings (GSL) An Overview 29 th October 2013

Government Soft Landings (GSL) An Overview 29 th October 2013 Government Soft Landings (GSL) An Overview 29 th October 2013 1 WWW.BENTLEY.COM Customers not getting the assets & outcomes they need / want? Dropping the baton at key stages 2 WWW.BENTLEY.COM Have greater

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

Using BIM to follow up milestones in a project plan during the design phase

Using BIM to follow up milestones in a project plan during the design phase Building Information Modelling (BIM) in Design, Construction and Operations 97 Using BIM to follow up milestones in a project plan during the design phase Ø. Mejlænder-Larsen Norwegian University of Science

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

Getting started with AutoCAD mobile app. Take the power of AutoCAD wherever you go

Getting started with AutoCAD mobile app. Take the power of AutoCAD wherever you go Getting started with AutoCAD mobile app Take the power of AutoCAD wherever you go Getting started with AutoCAD mobile app Take the power of AutoCAD wherever you go i How to navigate this book Swipe the

More information

A Productivity Comparison of AutoCAD and AutoCAD Architecture Software

A Productivity Comparison of AutoCAD and AutoCAD Architecture Software AUTODCAD ARCHITECTURE A Productivity Comparison of and Software provides the best software-based design and documentation productivity for architects. This study details productivity gains over in designing

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

MANuFACturers industry QuALity statement.

MANuFACturers industry QuALity statement. MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off

More information

Building Construction Details Practical Drawings Pdf

Building Construction Details Practical Drawings Pdf Building Construction Details Practical Drawings Pdf This pioneering textbook details how construction drawings are used to implement Understanding Construction Drawings for Housing and Small Buildings

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001

LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001 LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001 Isao T Matsumoto 1, Antony Thorpe 1, Andrew Baldwin 1 and Richard McWilliams 2 1 CICE, Department Civil and Building Engineering, Loughborough

More information

Architecturally Exposed Structural Steelwork (AESS) Sample Specification (for Engineers)

Architecturally Exposed Structural Steelwork (AESS) Sample Specification (for Engineers) Architecturally Exposed Structural Steelwork (AESS) Sample Specification (for Engineers) Sample Specification (for Engineers) Architecturally Exposed Structural Steel (AESS) PART 1 GENERAL 1.1. RELATED

More information

i-models Kansas City Revit Users Group September, 2013

i-models Kansas City Revit Users Group September, 2013 i-models Kansas City Revit Users Group September, 2013 Agenda i-model Definition Creation of i-models from Revit Reading an i-model Bentley Users collaborating with Revit Users Bentley View free Bentley

More information

DOWNLOAD OR READ : CONSTRUCTION CAD SOLUTIONS PDF EBOOK EPUB MOBI

DOWNLOAD OR READ : CONSTRUCTION CAD SOLUTIONS PDF EBOOK EPUB MOBI DOWNLOAD OR READ : CONSTRUCTION CAD SOLUTIONS PDF EBOOK EPUB MOBI Page 1 Page 2 construction cad solutions construction cad solutions pdf construction cad solutions CONSTRUCTION CAD SOLUTIONS LTD - Free

More information

The Manufacturers Perspective

The Manufacturers Perspective Making BIM work for product manufacturers The Manufacturers Perspective Chris Witte Thank you BIM has been the preserve of Architects and Main Contractors The Manufacturers BIM continuum Stakeholder Management

More information

Architecturally Exposed Structural Steelwork (AESS) Code of Practice (for Fabricators)

Architecturally Exposed Structural Steelwork (AESS) Code of Practice (for Fabricators) Architecturally Exposed Structural Steelwork (AESS) Code of Practice (for Fabricators) Code of Practice (for Fabricators) Architecturally Exposed Structural Steel (AESS) 1.1 SCOPE AND REQUIREMENTS 1.1.1

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

NAPA User Meeting 2017

NAPA User Meeting 2017 1 (7) DAY 1 TUESDAY 6 JUNE 2017 9:00-10:30 Words of welcome Product News 2017 This presentation gives insight on the latest new features in NAPA and future plans of our solutions. 10:30-11:00 COFFEE 11:00-12:30

More information

Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes

Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes Allbban H. Khalid Southern Polytechnic State University, 1100 South Marietta Parkway, Marietta GA 30067

More information

Mick Hodgson. Tekla Structures, Tekla Versions And Software Evolution

Mick Hodgson. Tekla Structures, Tekla Versions And Software Evolution Mick Hodgson 2018 Tekla Structures, Tekla Versions And Software Evolution Tekla Version 15 Main Points Unlimited Models Quick modelling tools Fast drawing production Tube CNC Tekla Version 15 Main Points

More information

Precast Concrete Industry Extensions for Autodesk Revit Structure 2014

Precast Concrete Industry Extensions for Autodesk Revit Structure 2014 Precast Concrete Industry Extensions for Autodesk Revit Structure 2014 Reinhard Lackner Managing Director - IDAT Join us on Twitter: #AU2013 Class summary This class shows how extensions to Autodesk Revit

More information

BIM Submission Reference Guide Book (Structural)

BIM Submission Reference Guide Book (Structural) BIM Submission Reference Guide Book (Structural) This Document is currently under provisional status and is available for public review and comment. As the provisional status denotes, however, it will

More information

CEMCON Tekla Structures. Cast In Place (Reinforced Concrete) Precast. Prithviraj CM

CEMCON Tekla Structures. Cast In Place (Reinforced Concrete) Precast. Prithviraj CM CEMCON-2013 Tekla Structures Cast In Place (Reinforced Concrete) Precast Prithviraj CM Disclaimer The information presented regarding future product features and functionalities is for informational purposes

More information

Revit Revit A step by step guide. 11/14/2011 jimmy boone

Revit Revit A step by step guide. 11/14/2011 jimmy boone Revit 2012 Revit A step by step guide 11/14/2011 jimmy boone Contents Environment settings... 4 Setting up a new MEP models... 5 Step 1, beginning from an architectural model... 5 Step 2 (if using a separate

More information

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. SPEC-0800 1/5 1.0 PURPOSE This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. 2.0 VALE DRAWING TYPE DEFINITIONS Engineering Drawings Engineering

More information

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP BIM Case Study About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP Coordination Rob Muellner MEP Fabrication Chad

More information

1 Introduction. M.Rajabi a, T.Bigga b and M.A.Bartl c.

1 Introduction. M.Rajabi a, T.Bigga b and M.A.Bartl c. Optimization of the quantity take-off (QTO) process for Mechanical, Electrical and plumbing (MEP) trades in tender estimation phase of the construction projects M.Rajabi a, T.Bigga b and M.A.Bartl c a

More information

ATHENA2014. Drawing, planning, designing be even more productive with the new upgrade! Really fast! Really good!

ATHENA2014. Drawing, planning, designing be even more productive with the new upgrade! Really fast! Really good! ATHENA2014 Drawing, planning, designing be even more productive with the new upgrade! Really fast! Really good! With the development of the ATHENA 2014 Upgrade the emphasis this time is on increasing productivity.

More information

INNOVATIVE METHODS FOR LEVERAGING A 3D PRODUCT MODEL

INNOVATIVE METHODS FOR LEVERAGING A 3D PRODUCT MODEL INNOVATIVE METHODS FOR LEVERAGING A 3D PRODUCT MODEL M Waldie, D Larkins, D Morais SSI, Canada N Danese, NDAR, France SUMMARY By utilizing a 3D product model as a single source of truth, both for subsequent

More information

ASK A BESPOKE ARCHITECT

ASK A BESPOKE ARCHITECT i want to build/renovate, where do i start? WHAT is the difference between a building designer, a draftsperson and an architect? do architects prefer larger jobs? WHat is your architectual style? can architects

More information

Moving to Model-Based Design

Moving to Model-Based Design Infrastructure Solutions White Paper Moving to Model-Based Design Choosing Between 2D and 3D Do you really have to choose between 2D and 3D? The answer is no, but it is important to know why. Over the

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

BIM for FM: Helping Owners Realize the Benefits of BIM

BIM for FM: Helping Owners Realize the Benefits of BIM Monday, June 13, 2016-4:00pm-5:15pm, Clark, Lower Level Presented by: Bert Jones, Associate Vice Chancellor for Facilities Management Services, Virginia Community College System Jeff Van Fleet, Account

More information

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures

More information

BIM Toolbox. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

BIM Toolbox. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES BIM Toolbox User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Trace around a site

More information

NAPA User Meeting 2017

NAPA User Meeting 2017 1 (7) DAY 1 TUESDAY 6 JUNE 2017 9:00-10:30 Words of welcome Product News 2017 This presentation gives insight on the latest new features in NAPA and future plans of our solutions. 10:30-11:00 COFFEE 11:00-12:30

More information

Programme TOC. CONNECT Platform CONNECTION Client MicroStation CONNECT Edition i-models what is comming

Programme TOC. CONNECT Platform CONNECTION Client MicroStation CONNECT Edition i-models what is comming Bentley CONNECT CONNECT Platform MicroStation CONNECT Edition 1 WWW.BENTLEY.COM 2016 Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated Programme TOC CONNECT Platform CONNECTION Client MicroStation

More information

A Quick Spin on Autodesk Revit Building

A Quick Spin on Autodesk Revit Building 11/28/2005-3:00 pm - 4:30 pm Room:Americas Seminar [Lab] (Dolphin) Walt Disney World Swan and Dolphin Resort Orlando, Florida A Quick Spin on Autodesk Revit Building Amy Fietkau - Autodesk and John Jansen;

More information

7.1. NEW FEATURES IN Advance Steel MODELING FABRICATION DRAWING. LISTS and NC FILES

7.1. NEW FEATURES IN Advance Steel MODELING FABRICATION DRAWING. LISTS and NC FILES / NEW FEATURES IN Advance Steel 7.1 MODELING FABRICATION DRAWING LISTS and NC FILES TABLE OF CONTENTS Technology... 5 Technology 1: Unicode compatibility... 5 Technology 2: Unique ID for synchronization...

More information

Résume. Key Responsibilities and Achievements: TADELA. SIVAKUMAR Mobile: (+91)

Résume. Key Responsibilities and Achievements: TADELA. SIVAKUMAR Mobile: (+91) Résume Carrier Objective TADELA. SIVAKUMAR Mobile: (+91)7708161537 tekla_siva@yahoo.in siv.tadela@gmail.com To work in a challenging environment builds up confidence, to invoke my technical creative position

More information

January, 2014 Page 1 of 5

January, 2014 Page 1 of 5 Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development

More information

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

AVEVA PDMS.  Business Benefits. Accurate and clash-free 3D plant design AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality

More information

Seven Things to Know Before Hiring a General Contractor

Seven Things to Know Before Hiring a General Contractor Seven Things to Know Before Hiring a General Contractor Seven Things to Know Before Hiring a General Contractor Copyright All Rights Reserved 1 Introduction The kitchen is outdated and looks like something

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

Company Profile. Introduction. Contents. Orbitcad.com since 2009 Providing AutoCAD & Revit Support to Clients Globally

Company Profile. Introduction. Contents. Orbitcad.com since 2009 Providing AutoCAD & Revit Support to Clients Globally Company Profile Introduction OrbitCAD are an independent Multidisciplinary AutoCAD and Revit Outsourcing Production Office in Metro Manila, Philippines. We provide Building Services, Mechanical, Electrical,

More information

TABLE OF CONTENTS INTRODUCTION...4

TABLE OF CONTENTS INTRODUCTION...4 Starting Guide TABLE OF CONTENTS INTRODUCTION...4 Advance Steel... 4 Where to find information?... 5 INSTALLATION... 5 System requirements... 5 Starting the installation... 5 STARTING ADVANCE STEEL...

More information

Drawing Module, Import-Export

Drawing Module, Import-Export Drawing Module, Import-Export construction modelling systems www.comosys.com Save Time & Money In the engineering & design business one of the biggest issues is man-hours. How to get work done quickly

More information

MOVING TOWARD AN INTELLIGENT SHOP MODELING PROCESS

MOVING TOWARD AN INTELLIGENT SHOP MODELING PROCESS MOVING TOWARD AN INTELLIGENT SHOP MODELING PROCESS SUBMITTED: August 2007 REVISED: April 2008 PUBLISHED: June 2008 EDITORS: T. Olofsson, G. Lee & C. Eastman Robert Leicht, PhD Candidate, Department of

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

Parametric Analysis and Design Engine for Tall Building Structures

Parametric Analysis and Design Engine for Tall Building Structures ctbuh.org/papers Title: Authors: Subject: Keywords: Parametric Analysis and Design Engine for Tall Building Structures Goman Wai-Ming Ho, Arup Peng Liu, Arup Michael Liu, Arup Structural Engineering BIM

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

Select, wear adjust, use and maintain personal protective equipment

Select, wear adjust, use and maintain personal protective equipment ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and

More information

immersive visualization workflow

immersive visualization workflow 5 essential benefits of a BIM to immersive visualization workflow EBOOK 1 Building Information Modeling (BIM) has transformed the way architects design buildings. Information-rich 3D models allow architects

More information

Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014

Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room The Process Room were established

More information

Subject Description Form

Subject Description Form Subject Description Form Subject Code Subject Title Credit Value BRE222 Workshop Practices and Draftsmanship 3 Academic Credits Level 2 Pre-requisite/ Co-requisite/ Exclusion Objectives Nil 1) Provide

More information

Table of contents. User interface 1: Customizable tool palette... 6 User interface 2: General GUI improvements... 7

Table of contents. User interface 1: Customizable tool palette... 6 User interface 2: General GUI improvements... 7 Table of contents WELCOME TO ADVANCE CONCRETE 2014... 5 USER INTERFACE ENHANCEMENTS... 6 User interface 1: Customizable tool palette... 6 User interface 2: General GUI improvements... 7 MODELING... 10

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

Revit MEP Tips, Tricks & Golden Nuggets

Revit MEP Tips, Tricks & Golden Nuggets Adam Sheather, ADG Class Description A quick fire roundup of all the little Revit MEP tips and tricks we can cover in 80mins. If you have ever wondered what that orient to view command does, how to get

More information

Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist

Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist RIAI 2010 Contents Foreword 2 Background 3 Development of the Standard.4 Use of the Standard..5 Reading and interpreting

More information

AESS Documents prepared by CISC ad hoc committee

AESS Documents prepared by CISC ad hoc committee AESS Documents prepared by CISC ad hoc committee Included: AESS Matrix (Proposed as base document and part of an Appendix, Spec and Guide) Appendix I (Proposed for inclusion in CISC Code of Standard Practice)

More information

Architectural Precasters Design Assist Role

Architectural Precasters Design Assist Role Architectural Precasters Design Assist Role Find a Design Assist Consultant: GATEPRECAST.COM 888-470-3450 Architectural Precasters Design Assist Role Design Assist is the procurement method by which, prior

More information

BRAND MANUAL GUIDELINES

BRAND MANUAL GUIDELINES IME BRAND MANUAL GUIDELINES PHONE +58 416 605 5915 CONTACT euriciamadrid@gmail.com ON LINE @euricia_madrid BRAND GUIDELINES 02 BRAND GUIDELINES POWERED BY EURICIA MADRID IME 03 IME TABLE OF CONTENTS 01

More information

Propylene/propane separation market

Propylene/propane separation market Delivery Review Meeting Report Technology Portfolio Propylene/propane separation market September 2017 This document is not a final deliverable. This is a meeting presentation. Table of Contents Table

More information

AS10690 Revit Master Class Building Construction Ready Curtain Walls

AS10690 Revit Master Class Building Construction Ready Curtain Walls AS10690 Revit Master Class Building Construction Ready Curtain Walls Matt Stachoni BIM Specialist, Microsol Resources Twitter: @MattStachoni Join the conversation #AU2015 Class summary Curtain walls represent

More information

HMMA 841 TOLERANCES AND CLEARANCES FOR COMMERCIAL DOORS AND FRAMES HOLLOW METAL -07 MANUAL AMERICAN NATIONAL STANDARD ANSI/ NAAMM METAL DOORS & FRAMES

HMMA 841 TOLERANCES AND CLEARANCES FOR COMMERCIAL DOORS AND FRAMES HOLLOW METAL -07 MANUAL AMERICAN NATIONAL STANDARD ANSI/ NAAMM METAL DOORS & FRAMES HOLLOW METAL MANUAL AMERICAN NATIONAL STANDARD ANSI/ NAAMM HMMA 841-07 METAL DOORS & FRAMES 8d ANSI/NAAMM HMMA 841-07 June 12, 2007 TOLERANCES AND CLEARANCES FOR COMMERCIAL HOLLOW METAL DOORS AND FRAMES

More information

Efficient Tactics of Project Management

Efficient Tactics of Project Management Ohio Structure Steel & Architectural Metals Association Efficient Tactics of Project Management Friday, June 23, 2017 Mark V. Holland, P.E. Chief Engineer Paxton & Veirling Steel Co. How to get paid. This

More information

What is Meant by Level of Accuracy? As a service provider who. By John M. Russo, AIA. room width = 10'-0' building length = 100'-0' x = 1/4"

What is Meant by Level of Accuracy? As a service provider who. By John M. Russo, AIA. room width = 10'-0' building length = 100'-0' x = 1/4 room width = 10'-0' x = 1/4" building length = 100'-0' x = 1/4" What is Meant by Level of Accuracy? As a service provider who documents buildings I often hear my clients say I need one quarter inch accuracy,