1 BIM Submission Reference Guide Book (Structural) This Document is currently under provisional status and is available for public review and comment. As the provisional status denotes, however, it will continue to serve as the basis for further development, pilot validation, and professional editing. While BCA attempts to highlight major points to submission requirements, BCA cannot take into account all exceptions and special cases neither with all other regulatory agencies, nor to the fast changing landscape of technology. Updated versions to this document will continue to be issued, to address and incorporate on-going feedback in an open, collaborative process. All readers to this provisional guide are encouraged to submit feedback to BCA CORENET. No part of these materials shall be copied, reproduced or published in any form by any means whatsoever electronic or mechanical including photocopy or by way of any information storage or retrieval system nor should the material be disclosed to other parties without the expressed written consent and authorization of Building and Construction Authority. Information and content set forth in this document are subjected to changes without notice, but will be released as updates in subsequent version. Readers, who wish to adopt this provisional document as a guide for their own purpose, are strongly advised to exercise discretionary judgment as neither BCA nor the respective agencies stated in this document will stand liable to any consequences arising from your adoption here. Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore

2 Building and Construction Authority Ref: BIM-Submission Reference Guide (Structural) Current Version: a If you have any comments or questions, please write to CORENET eplan Check Team Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore Page 2 May-2010, v100409b BIM Submission Guide Book (Structural)

3 TABLE OF CONTENT 1. GENERAL REQUIREMENTS Drawings Deliverable Format Project Model Scale Site Configuration / Layout Project Model Orientation Project Model Elevation Datum Standardized File Naming for BIM Submission Standardized Drafting View Names in Project Last Saved Views Addition and Alteration Projects Project Re-Submission Project Basic Composition Standardized Libraries Information to present on Views & Sheets Modeling Workflow 19 BIM Submission Guide Book (Structural) May-2010, v100409b Page 3

4 Page 4 May-2010, v100409b BIM Submission Guide Book (Structural)

5 Acknowledgement A collaborative effort among a panel of knowledgeable Industry Consultants & QPs, Software Vendors and Processing Officers from different Regulatory Agencies, has contributed significantly to the successful development of this document. They are, Regulatory Agencies Building and Construction Authority Building Engineering Division Participating Organisations and Software Vendors Autodesk Asia Pte Ltd Tekla (S) Pte Ltd ///??? LSW Consulting Engineers Pte Ltd ARUP Singapore Pte Ltd BECA Carter Hollings & Ferner (SEA) Pte Ltd Additional Notes The version of software used in compiling this document is as follows. As most software do get upgraded / updated on a regular basis, you may encounter variation between the images displayed here against your current software version. BCA will do its best in keeping this document updated with the latest version of software images as and when possible. You are advised to contact your software vendor for assistance, if you encounter difficulties related to software products. Autodesk REVIT Structure 2010 Autodesk Design Review 2010 Tekla Structure Adobe Acrobat 8 BIM Submission Guide Book (Structural) May-2010, v100409b Page 5

6 Glossary of Acronyms and Terms The following is a list acronyms and terms used within this document. Do take note that some of terms are of local context and may not have the same connotation when used elsewhere. No. Acronym / Term Definitions 1 A&A Addition and Alteration works 2 AMSL Above Mean Sea Level 3 BIM Building Information Model 4 CAD Computer Aided Design 5 CSC Certificate of Statutory Completion 6 DWF A type of file format known as Design Web Format which is light-weight and non-editable. See for more information 7 IFC Industry Foundation Class. See for more information 8 GFA Gross Floor Area 9 Legend A list of the various building components and annotations used in a project 10 LEW Licensed Electrical Worker 11 M&E Mechanical and Electrical 12 QP Qualified Persons / Practitioner 13 RVT 14 PLA A type of file format created by software product Revit from Autodesk (see for more information) An archival file format created by software product ArchiCAD from Graphisoft (see for more information) 15 SS CP Singapore Standard Code of Practice 16 Sheet/Layout 17 Schedule The composition area of a CAD drawing environment. It is usually the actual printing or layout environment where the Model View is attached and placed within a drawing border (or title block) A tabular display of information (eg. Quantity, Types and Summary) extracted from the properties of objects in a project drawings / Model. 18 SIP Sewerage Interpretation Plan 19 TOP Temporary Occupation Permit 20 View 21 PDF 22 DGN 23 DWG Orientation of the project model from the angle of a viewer, for instance Floor plan view, Elevation view and Sectional view as well as 3D view. A type of file formats that is light-weight and non-editable, developed by Adobe and can be exported by a wide range of 3 rd Party software product. See for more information A type of file format created by software product Microstation from Bentley (see for more information) A type of file format typically created by software product AutoCAD from Autodesk (see for more information) 24 GA General Assemblies Drawings Page 6 May-2010, v100409b BIM Submission Guide Book (Structural)

7 1. GENERAL REQUIREMENTS Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle. Typically it uses three-dimensional building modeling software to increase productivity in building design and construction. The process produces the Building Information Model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, and quantities and properties of building components. (Abstract from Therefore, to enable BIMeSubmission, all projects drawings will need to be prepared and presented in 3- Dimension (3D). This Chapter outlines some background, and the specifications required to deliver your project in BCA s BIM esubmission format. To jump-start your effort in BIM, BCA together with the Software Vendors, has developed a BIM esubmission Template that you will help manage your project regulatory submission requirement. You can obtain a copy of this template from BCA, or from your software vendor. Most BIM software is more complex than conventional 2D software; we strongly recommend that you equipment yourself with fundamental skills through authorized training sites before you embark on your BIM journey. Step 1 Step 2 Step 3 Step 4 Step 5 Check Latest Submission Template Version Modeling, Detailing & Presentation Prepare Submission Views/Sheets Modeling, Detailing & Presentation Submit to Regulatory Agency CORENET Environment BIM Environment CORENET Environment Figure 1 - Steps in Preparing the BIM Project for Submission The diagram above gives a high level 5-steps process flow of how BIM esubmission can be carried out in a BIM environment. The rest of the section in the chapter will guide you to making this possible with your BIM software. BIM Submission Guide Book (Structural) May-2010, v100409b Page 7

8 1.1. Drawings Deliverable Format For every Project BIM-eSubmission, QP only needs to prepare 2 Packages for submission as opposed to what you would do in current practice; today if you have 50 drawings files associated to your project, you will be encrypting all these documents individually for submission into CORENET. For BIM-eSubmission, these 2 packages are a 3-D model (aka BIM native file) of your project, accompanied by a Light-Weight File (either DWF or PDF). This Light-Weight File is a static equivalent of your BIM Native File. This diagram below illustrated conceptually, the differences between current esubmission with 2D documents against BIM esubmission. Current esubmission Method BIM-eSubmission Method Table 1 sums up todays approved file format for BIM-Submission. Currently, the Regulatory Agency do not required the BIM native file to be submitted for Approval, but you are advice to keep a backup of this document as the Authority reserves the rights to request for it anytime, should they decide to verify the information presented in the equivalent Light-Weight File. All formal endorsement and approval by the Regulatory Agency will be done on the Light-Weight File submitted (either DWF or PDF) instead of the BIM Native File. The 2 primary reasons are a) The Light-Weight File is non-editable and static, that means its content cannot be tempered. And their formats are generally accepted as neutral. b) Singapore s National Archival has guidelines in place to ensure information captured in documents / drawings can be archival and retrieved. Note all BIM-Submission using CORENET esubmission System is limited to 100MB per file for each submission. If the file size is greater than 100MB, alternative means would be to submit via CD-ROM to the respective agency. Page 8 May-2010, v100409b BIM Submission Guide Book (Structural)

9 Table 1 - Accepted File Format in BIM esubmission for Regulatory Approval Ref Regulatory Agencies BIM Submission File Format Remarks 1 Regulatory Agencies - BCA A single Light-Weight File published from the equivalent BIM native file, either - DWF (.dwf) - PDF (.pdf) The respective regulatory agency reserves the right to request BIM native for verification, where necessary All drawing views of your project must be compiled into one single DWF/PDF file for BIM-Submission 1. If you are not familiar on the procedure to export DWF (or PDF) you need to seek assistance from your respective software vendors, or software manual to use this feature. This task may require a 2-step action to publish the document for submission a) Publish plans, elevations, sections, layout and / or sheet views (refer to XXX for the specifics to each regulatory agency) b) Publish the 3D model, which needs to be merged into the published file in Step (a) to produce a single PDF / DWF file Project Model Scale When you are modeling your Project in the BIM software 2, your project model must be presented in Real-World measurements. That means if a wall in its physical state reads 5metres by 3metres, you will draw that wall in the BIM software as 5metres by 3metres. If you intend to use millimeters as the base unit of measure, in your model within the software, then all objects modeled must be in millimeters. Do note that most BIM software has a utility to setup the project unit of measurements. If you not familiar on how to do this, please consult your software vendor for assistance. See also Chapter xxx. Project Basic Composition for related information. 1 As of 1 st May 2010, the composition of the light weight file includes Architectural Drawings and Structural Drawings. According to Building Control Act (Chapter 29) Building Control Regulations 2003, Part 2, Submission and Approval of Plans, there is no role for PE to sign on Architectural Plans. If this act is to be strictly enforced, BIM Structural esubmission will require 2 DWF (or PDF) files to be submitted, one for Building Plans, and the other for Structural Plans. 2 BCA currently acknowledges Autodesk Revit Structure, and Tekla Structure as BIM-enabled software for Structural Engineers. This list is not exhaustive and will progressively include additional software to the list. BIM Submission Guide Book (Structural) May-2010, v100409b Page 9

10 1.3. Site Configuration / Layout This requirements is an additional task that is now required for any BIM Project Submission. You will need to present at least the followings in this section, to ensure consistent information across different engineering discipline documents, The Project Grids The architecture project grids must be re-produced into the structural project correctly The Project Site Boundary It must coincide within the structural project When you model the project site into the BIM software, you need to ensure they are positioned in its real world coordinates and the site orientation must be aligned to True- North. You can obtain this information from your Architect; this information is available from Land Surveying Plans, and you can overlay them into your project. But if you cannot have this information, you would need to use the paper plans that you have and input those coordinates, bearing and distance into your project. Take note that most Land Surveyors Plans units of measurements are in meters whereas Architectural Plans are in millimeters. If you are fortunate enough to obtain the building plans in the form of a BIM document, you only need to attach this document to your working structural document; most BIM software will allow you to copy over the coordinates and orientation already established in the building plans model so you do not need to perform this task of Site Setup. Otherwise, you will have to perform this task ensure the right position and orientation are established. This task needs to be completed in 2 steps a. Setup consistent project grids and site boundaries between engineering disciplines. The steps to perform this task is generalized as follows Create a Site Plan View in your current BIM environment Attach Building Plan Site View as reference to this created Site Plan View Use tools (or features) in your BIM software to create project grids You are expected to key-in the inter-grid values instead of copying from the building plans, to ensure there are no discrepancies in project grid values You can now copy the project site boundaries across to your structural project b. Allocate project position to the its equivalent real-world coordinates You need to know which boundary point is your datum. This is usually represented with Northing, Easting and Reduced Level. Next you have to associate this boundary point datum to the real world values in Northing and Easting; this process is synonymous to moving your entire project to the equivalent X and Y value in AutoCAD environment. For most BIM software, there will be a feature in the software to associate these readings to a pre-defined point on the project space virtually, without having to physically moving the entire project. Page 10 May-2010, v100409b BIM Submission Guide Book (Structural)

11 1.4. Project Model Orientation In almost all circumstances, QP / PE would prefer to work on their project orientation aligned to a horizontal line, something that they can easily associate for visualization. Thus in this context, the term that the industry has adopted is known as Project North. For all your project document views in your submission file, you can align them to Project-North, except for Site Layout. Site layout must be presented in True-North, which is aligned to the real-world orientation. In short, the North-Arrow symbol can only be pointed up and not elsewhere. Most BIM software supports this setting between Project-North and True-North in your project, usually configured within Project Setup. That means you do not need to physically rotate your project model, and the software will manage between both orientations virtually; you can toggle between these 2 orientations as and when the needs arises. If you are unfamiliar with this feature within your BIM software, please refer to your BIM Software manual, or contact your Software vendor for assistance. This task is typically a subsequent task after you have completed Site Configuration / Layout documented above. This task generally follows the sequence below if the reference file has not been set with the right orientation. Setup your Site Plan drafting view to read True North Using one of the boundary lines, create a reference line to represent the actual bearing of the project file. You can read this value from the site boundary lines; presented in degree, minutes and seconds. Note you probably need to use your boundary point datum as the starting reference to this orientation Once done, activate the command from within your BIM software, the tool to rotate the entire project to this newly created reference line. This will complete this task. For all other views in your BIM software, you need to ensure the viewing properties has been set to read Project North before you start any modeling or annotation works Project Model Elevation Datum Another element in project setting lies with Elevation View. Project Elevation Datum must be align to Singapore Standard Elevation Datum (>100m), and not placed on ground zero. Again this is typically a set-up function you need to configure in your BIM software; you do not need to physically move the project to actual elevation but virtually established this value in the environment setup. If you are problem setting up this requirement in your software, you may refer to your BIM software manual, or approach your software vendor for assistance. Please note that the unit of measurements for Singapore Standard Datum is usually represented in meters whiles your project measurement units maybe in millimeters. To complete this setup, you will generally follow the steps illustrated here. This task is typically done on conjunction with Site Configuration / Layout. BIM Submission Guide Book (Structural) May-2010, v100409b Page 11

12 Note the Reduced Level readings on your Elevation Datum point. It is usually located at one of the site boundary points. Also note that your Site Plan elevation is usually a duplicated view of your ground-level drafting view. Otherwise, you may need to adjust this difference. Next, activate the function within your BIM software to associate the reference point in your project to the actual elevation datum value. This step will complete this task. You can now switch to your project elevation view, and change the readings to show according to Singapore Standard Elevation Datum Standardized File Naming for BIM Submission This section suggests adopting SS-CP83, Part 3 to manage naming your file for submission if you do not have a standard within your organization. This section can be applied to your Light-Weight File as well as the Native BIM file. The followings describe briefly how this can be done. For full details on how this standard, you need to refer to SS-CP83 documents. The file naming convention is divided into 5 parts, where Part 1 to Part 4 is delimited by an underscore _ and they are mandatory fields. Part 5 is optional but it is recommended that you use it to give better meaning to the file. This is then followed by the file extension which represents the file format. The illustration shown below is a sample to naming a file. To decipher the meaning of the file name, see Table 2. Table 2 Abbreviations to use in File Naming Convention Name of Field Number of Characters Indicators Description Project Identification 4 (minimum) User defined field for the Project. Any meaningful abbreviations to describe your project. Author 2 A- Architect C- Civil Engineer E- Electrical Engineer L- Land Surveyor M- Mechanical Engineer N- Equipment Supplier Page 12 May-2010, v100409b BIM Submission Guide Book (Structural)

13 Name of Field Number of Characters Indicators Description T- Telecommunication / Signal Engineer V- Other Disciplines X- Contractor Zone (or Block) 2 NN Where N: zone or Block Number Eg. 01 for Block 1 A1 for Zone A1 -- For all blocks Version (Revision / 2 A- 1 st Submission Submission) B- 2 nd Submission C- 3 rd Submission User-defined (Optional) 3 (minimum) User defined code for in-house applications (Optional Field) 1.7. Standardized Drafting View Names in Project In almost all BIM software, you can present the 3D-Model that you have done, in a 2D perspective. These are commonly called Views ; some examples of these are Top Views, Sectional Views and Elevation Views. These views are automatically generated from the Model; you do not need to draw them in these views. For every BIM esubmission document, there will be composition of views and sheets with the relevant annotative information, so that downstream users such as Contractors and Manufacturers can utilize them for their works. To facilitate unambiguous understanding to these views for regulatory approval as well as information sharing among project members, we need to adopt a standardized definition to these views. This section explains a standardized format that must be adopted strictly within your BIM esubmission document. Failing which, your submission may be rejected which could delay your project. This section is divided into 2 main sub-sections, a. Renaming Views in project Submission (View Naming) b. Renaming Sheets in project submission (Sheet Naming) VIEW NAMING This naming pattern is divided into 3 parts, each part is delimited by an underscore _. All parts to this naming convention are mandatory and you are advice to adhere strictly. The illustration shown here is a sample to naming a view. To decipher the meaning, see Table 3. BIM Submission Guide Book (Structural) May-2010, v100409b Page 13

14 Table 3 - Naming Convention for each Drawing View Field Name Number of Characters Indicators Description Discipline 4 ARCH Architectural Discipline STRU Structural Engineering Discipline MEPS Building Services Engineering Displace OTHS Others, for future use View SP Site Plan 2 (Type of FR Roof Plan View) FP Floor Plan FE Elevation FX Building / Project Section 3D Project 3D View DT Details sectional views LV Layout View (only for textual data information) User Defined 4 (minimum) This part can be use to describe the view meaningful. Some suggestions are list below but not exhaustive 1st Storey 2nd Storey 3rd Storey Nth Storey Lower Roof Roof Mezzanine N Basement N Elevation X or X Elevation Section N Architect s Declaration Engineer s Declaration QP s Declaration Where N = Storey Number Where N = Mezzanine number Where N = Basement Number Where X = Directions (eg. East, West, North, South or 1, 2, 3, 4) Where N = Section Number Page 14 May-2010, v100409b BIM Submission Guide Book (Structural)

15 SHEET NAMING This naming pattern is divided into 2 parts, each part is delimited by an underscore -. All parts to this naming convention are mandatory and you are advice to adhere strictly. Field Name Sheet Number User Defined Number of Characters 2 (minimum) 4 (minimum) Indicators Description Sheet Number 15. This must tally with the sheet 1 5 reference on the Title Block This part can be use to describe the Sheet meaningful. Some organization associate this part with the Drawing Number / Reference in the Title Block, followed by a descriptive text to explain the purpose of the sheet Last Saved Views Checking and approval from the regulatory agency will be based on the last saved views of your project model, including all peripheral views and sheets such as Site Plans, Floor Plans, Elevations and Sections. QP/PE is advised to ensure that the following actions are exercised before exporting to the Light-Weight File and doing BIM-submission. Maximize your all project s view extent before saving No hidden objects or annotations Any external links such as attached 2D drawing files, 3D model and Project Segment saved in other file, which is part of the submission must be bind into a single integrated Model All other external and internal references objects, regardless of drawing layers, annotations, draft work and construction lines, that are inside the Project Model and has no bearing for the submission purpose, must be removed or purged before doing BIM-Submission. Do not use propriety fonts for annotations and all the fonts must be legible For regulatory approval, no furniture needs to be presented in the model, unless they have implication to regulatory matters. All objects and annotation for each phase must be displayed in the last saved view. BIM Submission Guide Book (Structural) May-2010, v100409b Page 15

16 If you project is an A&A Works, ensure the relevant phase have been activated with the right colour-coding (reference SS-CP83). Ensure you have all the Project Basic Composition views in your project. See chapter 1.11 for information. Your BIM Native File may contain more than what is needed for submission but the Light-Weight File must contain only the listed composition 1.9. Addition and Alteration Projects If you are working on Addition and Alternation (A&A) projects, you are required to demarcate your project model accordance to SS-CP83, Part 5. You need apply colour identifier (see Table 4) to all the objects in your model before doing BIM-Submission. In most BIM software, you do not need to physically change the colour of these objects; it can be configured virtually through Phase Settings (or View Configuration). Do seek assistance from your software vendor on how you can activate this feature in your software. To present you re A&A project according to the SS-CP83 guidelines, any parts of the building project that will be demolished, you have to represent this information on your project model using Dotted Lines on the plan view. This dotted line must be presented explicitly. A sample of such presentation is illustrated in Figure 2. Table 4 - A&A Projects Objects Colour Coding Colour Usage Remarks Magenta Proposed Elements All additional works on existing structure needs to be added as new objects in your model Cyan Existing Elements All existing parts of your structure needs to be updated in your BIM repository with this status Yellow Deleted Elements Any parts of your project that has to be removed, before new additional works can be carried on existing structure, must be indicated. Because your project eventually will be printed for task such as construction site inspection or discussion, the colour mode may be difficult for communication; typically printed in black-and-white. As such, you much include clouding in your project, over the areas that will be affecting by the A&A works. Therefore, the task here will require 2 subtasks, as illustrated below. a. Applying Colour coding to your project model b. Clouding area/zone of A&A works Page 16 May-2010, v100409b BIM Submission Guide Book (Structural)

17 Figure 2 - Sample of A&A Project / Project for re-submission (2D and 3D Views) COLOUR CODING This task can generally be executed in the following sequence with most BIM Software Highlight all objects in your model and update its phase (or status) properties to Existing Zoom in to the area that needs to be updated with additional works Select objects / members in the project model, and update their phase (or status) properties to demolished Your view will now hide these objects/members in the project model. You should also be able to switch the current view to present the colour coded view according to SS-CP83. When you have completed with the above, you can now add new objects/members to the structure. If your view has been set to SS-CP83 colour-coded view, these newly added members should be displayed in magenta colour. CLOUDING AFFECTED AREA This task can only be carried out once you have completed the Colour-Coding subtask outline above. The following sequence illustrates some process that some BIM Software may adopt to achieve this task. Toggle to one of the plan view in your project that is affected Switch the View Properties to display SS-CP83 colour codes In the View Properties, you should have additional options to display only demolished items. Select this option to do this. You will notice your current view will only show objects that are has colour yellow, and nothing else. Use the cloud tool available in most BIM software and circle around these yellow colour coded objects. BIM Submission Guide Book (Structural) May-2010, v100409b Page 17

18 Next, in the view properties, toggle back to display only Existing and New Works. You will notice all yellow colour coded objects has disappear and your clouds now overlay the project drafting view. You can repeat the above sequence for any views (plans, elevation and sections) to highlight all affected area with clouding Project Re-Submission In the event your BIM-Submission has clarifications, or you are required to perform Re-Submission, you to need to use the same revision of the Project Model that you initially submitted to the respective Agencies, and reflect the differences / changes with colour identifier accordance to Table 4. Once you have done this, only then should you publish it to the Light-Weight File for BIM-Submission. Note that the file name will have to be updated for this re-submission and you need to refer to chapter XXX for reference. Figure 2 above illustrates a sample of how a re-submission project model may look like. Again, cautions needs to be emphasized for line types presentation, and it must be explicitly identifiable Project Basic Composition Within your BIM software, you should see an Explorer-Like Browser (or Navigator), that describe the composition of your BIM project, such as Views, Sheets, Layouts and Libraries. But not all items in this Navigator are required for the BIM-eSubmission. You only need to export the fundamental compositions illustrated in the following section to the Light-Weight File (DWF or PDF). This file is then digitally signed and transmitted over CORENET esubmission to complete the BIM esubmission process. The list suggested here is subjected to addition for future needs. You are advised to check for revisions periodically. Do note guidelines identified in this document in order to ensure smooth approval process. Any non-compliance with the guidelines can result in rejection, which will delay approval process. Ref BCA-View-Use Name Types of View View-Name (Sample) Remarks 1 ARCHITECTURAL Plans ARCH_FP_1 st Storey Elevations Sections ARCH_EL_North View ARCH_FX_A-A Details ARCH_DT_Window Frame Only if needed for BP approval Others ARCH_<.> Any other documents, needed for BP approval, or already approved in BP stage Page 18 May-2010, v100409b BIM Submission Guide Book (Structural)

19 Ref BCA-View-Use Name Types of View View-Name (Sample) Remarks 2 SITE Plans STRU_SP_Site Layout 3 STRUCTURAL-GA Plans STRU_FP_3 rd Storey 4 STRUCTURAL-DT Details STRU_DT_2HB45-2HB27 5 STRUCTURAL-EL Elevations STRU_EL_Front View 6 STRUCTURAL-FX Sections STRU_FX_B1-B1 7 STRUCTURAL-3D 3D View STRU_3D_Shaded View 8 SHEETS (ALL) Sheets 05 - S_MS/D/01_Misc Details Only Sheets required for current ST Approval Standardized Libraries In current 2D drawings practices, annotating symbol can adopt SS-CP83:Part2 as a baseline. <waiting for BE (Hui-Ling) to provide the documents here> <to update by 31-May> Information to present on Views & Sheets <waiting for BE (Hui-Ling) to provide the documents here> <to update by 31-May> Modeling Workflow This section suggests a modeling workflow within your BIM software. Note the information is generalized to a certain degree. When you need to execute it within specific software, the details will vary from one platform to another. Thus, you may need to engage your software vendor or IT support engineers to work on the details. There are 2 workflow outlined here a. New project Modeling in your BIM Software b. A&A project Modeling in your BIM Software This section assumes you want to model existing structure and incorporate new works over it. If you decide not the model the existing structure, it is advisable to follow conventional 2D practices. This workflow will not be presented here. BIM Submission Guide Book (Structural) May-2010, v100409b Page 19

20 Modeling Workflow (New Project) You need to verify Project Grid and Boundary are set to the True coordinates, orientation and Elevation Datum. Otherwise you may have to perform task in Section 1.3, 1.4 and 1.5 Architectural Documents in BIM Copy & Monitor Project Grid Copy Project Boundary START Architectural Drawings in 2D Format Request for Site Plan Attach as Reference to BIM software Minimum Information Required Project Grid Boundary Lines Reference Datum Point with Northing/Easting/ Reduced Level Set Orientation, Coordinates See Section 1.3, 1.4 and 1.5 Create Project Grid & Boundary If the Architectural BIM did not set Structural identifier to the Structural members, you may have to manual create them Copy Structural Members Prepare GA Views Model Structural Members This step is usually identified by the Structural Engineer after discussions with Architects Prepare DT Views Prepare SHEETS for Submission The information here is provided by the Engineer and this step is quite iterative; structural member size, location & properties are subjected to changes based on Design & Analysis Rename Views & Sheets See Section 1.7 Export PDF/DWF Verified & Digital Sign by PE / AC Submit to CORENET esubmission Page 20 May-2010, v100409b BIM Submission Guide Book (Structural)

21 Modeling Workflow (A&A Project) You need to verify Project Grid and Boundary are set to the True coordinates, orientation and Elevation Datum. Otherwise you may have to perform task in Section 1.3, 1.4 and 1.5 Architectural Documents in BIM Copy & Monitor Project Grid Copy Project Boundary START Architectural Drawings in 2D Format Request for Site Plan Attach as Reference to BIM software Minimum Information Required Project Grid Boundary Lines Reference Datum Point with Northing/Easting/ Reduced Level Set Orientation, Coordinates See Section 1.3, 1.4 and 1.5 If the Architectural BIM did not set Structural identifier to the Structural members, you may have to manual create them See Section 1.9 Copy Structural Members Apply Phase settings to Structure Colour Code & Clouding Settings Prepare GA Views Prepare DT Views Prepare SHEETS for Submission Create Project Grid & Boundary Model Structural Members This step is usually identified by the Structural Engineer after discussions with Architects The information here is provided by the Engineer and this step is quite iterative; structural member size, location & properties are subjected to changes based on Design & Analysis Rename Views & Sheets See Section 1.7 Export PDF/DWF Verified & Digital Sign by PE / AC Submit to CORENET esubmission BIM Submission Guide Book (Structural) May-2010, v100409b Page 21

22 Notes Page 22 May-2010, v100409b BIM Submission Guide Book (Structural)

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010 BIM e Submission Guideline Structural Annex 1a Recommended Process Revit 2010 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 www.bca.gov.sg Revision

More information

Training of Architectural BIM e- Submission Template (AECOsim Building Designer v8i Users ONLY)

Training of Architectural BIM e- Submission Template (AECOsim Building Designer v8i Users ONLY) Training of Architectural BIM e- Submission Template (AECOsim Building Designer v8i Based on Bentley AECOsim Building Designer v8i SS4 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block

More information

Section 4: Ontario Realty Corporation CAD Standards and Guidelines

Section 4: Ontario Realty Corporation CAD Standards and Guidelines Section 4: Ontario Realty Corporation CAD Standards and Guidelines Ontario Realty Corporation 11 th Floor, Ferguson Block 77 Wellesley Street West Queen s Park Toronto, ON, M7A 2G3 August 10, 2007 Version

More information

Miami University. Physical Facilities Department. CAD Standards. April 2004

Miami University. Physical Facilities Department. CAD Standards. April 2004 Miami University Physical Facilities Department CAD Standards April 2004 1.0.0 OVERVIEW These standards pertain to the use, production and submittal of electronic CAD files at Miami University. They have

More information

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects. 1.0 Introduction A computer aided design (CAD) procedure is necessary to ensure that drawings produced by and for the University are readable, understandable, of a consistent standard, and, where necessary,

More information

ELECTRONIC DRAFTING GUIDELINES

ELECTRONIC DRAFTING GUIDELINES ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground

More information

BIM/VDC on TAA Projects:

BIM/VDC on TAA Projects: 2018 Logan International Airport BIM/VDC on TAA Projects: Direct Tenant TAA Projects Third Party Development Properties Massachusetts Port Authority Capital Programs & Environmental Affairs Preface Massport

More information

Services Overview. Northeast Blueprint

Services Overview. Northeast Blueprint Services Overview 2D CAD Conversions Paper to CAD 2D CAD Conversions Construction Engineering / CAD Services Construction Markups Consultant Drawings Coordinated Drawings As -Builts Steel Structural Detailing

More information

Session 3 _ Part A Effective Coordination with Revit Models

Session 3 _ Part A Effective Coordination with Revit Models Session 3 _ Part A Effective Coordination with Revit Models Class Description Effective coordination relies upon a measured strategic approach to using clash detection software. This class will share best

More information

ARCHITECT VECTORWORKS EIGHTH EDITION TUTORIAL MANUAL BY JONATHAN PICKUP

ARCHITECT VECTORWORKS EIGHTH EDITION TUTORIAL MANUAL BY JONATHAN PICKUP CH EIGHTH EDITION TUTORIAL MANUAL BY JONATHAN PICKUP A M TO R I A L T TU EC IT UA L AR ARCHITECT N HTH EDITION EIG / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

More information

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder 9 LAND SURVEYING 9.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with land surveying, including Project and supplemental horizontal and vertical control

More information

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS WHAT S INSIDE INTRODUCTION 1 PART ONE LAYERS AND CLASSES FOR RENOVATION PROJECT 1 OVERVIEW 1 SETTING UP LAYERS AND CLASSES 1 CREATING OBJECT

More information

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology SBS5411 Building Information Modelling for BSE http://ibse.hk/sbs5411/ MEP Coordination Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2018 Contents Introduction Clash

More information

Create styles that control the display of Civil 3D objects. Copy styles from one drawing to another drawing.

Create styles that control the display of Civil 3D objects. Copy styles from one drawing to another drawing. NOTES Module 03 Settings and Styles In this module, you learn about the various settings and styles that are used in AutoCAD Civil 3D. A strong understanding of these basics leads to more efficient use

More information

Revit Revit A step by step guide. 11/14/2011 jimmy boone

Revit Revit A step by step guide. 11/14/2011 jimmy boone Revit 2012 Revit A step by step guide 11/14/2011 jimmy boone Contents Environment settings... 4 Setting up a new MEP models... 5 Step 1, beginning from an architectural model... 5 Step 2 (if using a separate

More information

Autodesk Revit MEP Learning Essentials Training Course Outline

Autodesk Revit MEP Learning Essentials Training Course Outline Module 00 Revit in a Nutshell Interactive exercise on creating and documenting a basic building Module 01 Introduction to the Principles of BIM Simple Truths Behind the hype The benefits of BIM What will

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP BIM Preparation for the USACE Lessons Learned in Conversion from REVIT to BENTLEY BIM Presenters: Samuel Hudson BIM Support Specialist Jeff Owens AIA, LEED AP L E ll Lee Ezell Consulting BIM Specialist

More information

RIT CAD Specifications

RIT CAD Specifications RIT CAD Specifications The design team shall provide RIT with Revit, AutoCAD, and PDF files that capture the construction conditions of the associated project. This document outlines requirements for submitting

More information

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Optimizing Digital Drawing Files and BIM Models for Measurement and Estimating

Optimizing Digital Drawing Files and BIM Models for Measurement and Estimating Optimizing Digital Drawing Files and BIM Models for Measurement and Estimating Simon Lovegrove MRICS, AAIQS - Exactal CM4228 Drawing file formats issued for measurement and estimating purposes range from

More information

CR BIM at the Heart of the MEP Subcontractor Business

CR BIM at the Heart of the MEP Subcontractor Business CR4224 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand BIM Solutions Centre Sophie Montenot BYME Engineering Hub (Singapore) Class Description Dive into the heart of an MEP subcontractor

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages

Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages What is CADD or CAD CADD- CAD- BIM- What does BIM require? Intro to CADD & BIM 1 Autodesk AutoCAD REVIT

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

A Quick Spin on Autodesk Revit Building

A Quick Spin on Autodesk Revit Building 11/28/2005-3:00 pm - 4:30 pm Room:Americas Seminar [Lab] (Dolphin) Walt Disney World Swan and Dolphin Resort Orlando, Florida A Quick Spin on Autodesk Revit Building Amy Fietkau - Autodesk and John Jansen;

More information

MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS

MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS MODEL SETUP FOR RENOVATION PROJECTS: INSTRUCTIONS AND TUTORIALS TABLE OF CONTENTS INTRODUCTION 1 PART ONE LAYERS AND CLASSES FOR RENOVATION PROJECT 2 OVERVIEW 2 SETTING UP LAYERS AND CLASSES 2 CREATING

More information

MP BIM at the Heart of the MEP Subcontractor Business

MP BIM at the Heart of the MEP Subcontractor Business MP4229 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand Sophie Montenot BIM Business Development Executive MEP BIM Manager 1 Class Summary Dive into the heart of an MEP subcontractor

More information

Designing with BIM for Infrastructure on Large Transportation Projects

Designing with BIM for Infrastructure on Large Transportation Projects Designing with BIM for Infrastructure on Large Transportation Projects July 19, 2012, 10:00 a.m. Pacific Time Join civil designer Dave DeJong from Stantec as he discusses how BIM for Infrastructure has

More information

5.4 TECHNICAL REQUIREMENTS FOR DRAWINGS AND ELECTRONIC DOCUMENT SUBMISSIONS

5.4 TECHNICAL REQUIREMENTS FOR DRAWINGS AND ELECTRONIC DOCUMENT SUBMISSIONS Chapter 5 Technical Documents 5.4 TECHNICAL REQUIREMENTS FOR DRAWINGS AND ELECTRONIC DOCUMENT SUBMISSIONS A. GENERAL 1. The need to exchange information during a projects life cycle with the State, Client

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes BWSC CAD Standards for Site Plans (Design and As-Built) Type A The following CAD standards are for Type A application and involve no work in Public Street, except for connection(s) to the Boston Water

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015 FACILITIES MANAGEMENT AutoCAD Guidelines & Standards May 2015 PLEASE NOTE: Changes in the 2015 guidelines appear in these sections; 1.1, 3.2, and 5.2. SECTION 1: General Guideline Table of Contents 1.1

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

Model Curriculum. Draughtsman SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:

Model Curriculum. Draughtsman SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: Model Curriculum Construction Real Estate and Infrastructure Construction Draughting CON/Q1301 4 2 TABLE OF CONTENTS 1. Curriculum 04 2. Trainer Prerequisites

More information

CHAPTER A-10 DRAWINGS

CHAPTER A-10 DRAWINGS CHAPTER A-10 DRAWINGS INDEX Revised May 2018 10.1 GENERAL 10.1.1 Purpose and Scope 10.2 APPLICABLE PUBLICATIONS 10.3 COMPUTER AIDED DESIGN (CAD) 10.3.1 CAD Requirements 10.3.2 CAD Deliverables 10.3.3 CAD

More information

Design, Drawing and Sheet Composition

Design, Drawing and Sheet Composition Design, Drawing and Sheet Composition Tools, Technologies and Concepts 1 WWW.BENTLEY.COM 2018 Bentley Systems, Incorporated 2018 Bentley Systems, Incorporated 2 WWW.BENTLEY.COM 2018 Bentley Systems, Incorporated

More information

ISO INTERNATIONAL STANDARD. Technical product documentation Digital product definition data practices

ISO INTERNATIONAL STANDARD. Technical product documentation Digital product definition data practices INTERNATIONAL STANDARD ISO 16792 First edition 2006-12-15 Technical product documentation Digital product definition data practices Documentation technique de produits Données de définition d'un produit

More information

Mastering AutoCAD 2D

Mastering AutoCAD 2D Course description: Mastering AutoCAD 2D Design and shape the world around you with the powerful, flexible features found in AutoCAD software, one of the world s leading 2D design applications. With robust

More information

CMW DELIVERABLES SPECIFICATION Version 1.0

CMW DELIVERABLES SPECIFICATION Version 1.0 CMW DELIVERABLES SPECIFICATION Version 1.0 Code: CMW-CADD-STD-06 June 2012 CONTENTS 1 INTRODUCTION... 3 2 GENERAL... 3 3 GRAPHIC FORMAT... 3 4 CADD STANDARDS... 3 5 DELIVERY MEDIA AND FORMAT... 4 6 DRAWING

More information

Cloud Based Plan Review Process (Applicant)

Cloud Based Plan Review Process (Applicant) 1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you

More information

PADS Layout for an Integrated Project. Student Workbook

PADS Layout for an Integrated Project. Student Workbook Student Workbook 2017 Mentor Graphics Corporation All rights reserved. This document contains information that is trade secret and proprietary to Mentor Graphics Corporation or its licensors and is subject

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

11.0 INSTRUMENTATION LOOP DIAGRAMS

11.0 INSTRUMENTATION LOOP DIAGRAMS 11.0 INSTRUMENTATION LOOP DIAGRAMS Table of Contents 11.0 INSTRUMENTATION LOOP DIAGRAMS... 11-1 11.1 HISTORY OF CHANGE... 11-2 11.2 INSTRUMENT LOOP DIAGRAMS (ILD)... 11-4 11.2.1 Drawing Content... 11-4

More information

Visualizing Construction: A Course in Digital Graphics for Construction Management Students

Visualizing Construction: A Course in Digital Graphics for Construction Management Students Visualizing Construction: A Course in Digital Graphics for Construction Management Students Junshan Liu, MBC Auburn University Auburn, Alabama Michael F. Hein, PE Auburn University Auburn, Alabama Constructors

More information

Using Dynamic Views. Module Overview. Module Prerequisites. Module Objectives

Using Dynamic Views. Module Overview. Module Prerequisites. Module Objectives Using Dynamic Views Module Overview The term dynamic views refers to a method of composing drawings that is a new approach to managing projects. Dynamic views can help you to: automate sheet creation;

More information

Getting started with AutoCAD mobile app. Take the power of AutoCAD wherever you go

Getting started with AutoCAD mobile app. Take the power of AutoCAD wherever you go Getting started with AutoCAD mobile app Take the power of AutoCAD wherever you go Getting started with AutoCAD mobile app Take the power of AutoCAD wherever you go i How to navigate this book Swipe the

More information

Table of contents. User interface 1: Customizable tool palette... 6 User interface 2: General GUI improvements... 7

Table of contents. User interface 1: Customizable tool palette... 6 User interface 2: General GUI improvements... 7 Table of contents WELCOME TO ADVANCE CONCRETE 2014... 5 USER INTERFACE ENHANCEMENTS... 6 User interface 1: Customizable tool palette... 6 User interface 2: General GUI improvements... 7 MODELING... 10

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

FACILITIES CADD STANDARD

FACILITIES CADD STANDARD 2015 Facilities Services Division of Design and Construction CADD Department FACILITIES CADD STANDARD CAD, BIM, & GIS Standards for the University of Alaska Fairbanks The University of Alaska Fairbanks

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

BIM Toolbox. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

BIM Toolbox. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES BIM Toolbox User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Trace around a site

More information

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction University of California, Santa Cruz Physical Planning & Construction 1. General Requirements: 1.1 Format 1.2 Ownership 2. Required Data: 2.1 Area Tabulation 2.2 Drawing Files 2.3 External References 2.4

More information

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl Learning Objectives What is BIM? > BIM definition > BIM history > Common current uses (3D

More information

Advance Concrete 2014 Service Pack 1

Advance Concrete 2014 Service Pack 1 Advance Concrete 2014 Service Pack 1 This document describes the improvements in Service Pack 1 for Advance Concrete 2014. GENERAL Interaction between Advance Concrete and Advance Steel. Advance Steel

More information

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

LA DOTD Electronic Plans Breaking New Ground

LA DOTD Electronic Plans Breaking New Ground LA DOTD Electronic Plans Breaking New Ground Louisiana Transportation Engineering Conference Baton Rouge River Center February 13, 2007 Presented by Hollis Ward Electronic Plans - A Team Effort Bridge

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

Issue Date: August 2018 Revision: 03

Issue Date: August 2018 Revision: 03 ENGINEERING CADD MANUAL Issue Date: August 2018 Revision: 03 Developed For: Metra Engineering Department 547 West Jackson Blvd. Chicago, Illinois 60661 Developed By: Chandra Mahalingam CADD System Administrator

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

Electronic Document Review (EDR)

Electronic Document Review (EDR) Electronic Document Review (EDR) Submittal Requirements Table of Contents Introduction... 3 Electronic Document Review Submittals:... 4 Plans... 4 Plat... 4 Forms... 4 Correspondence... 5 Plan Revisions...

More information

DRAWING FROM WITHIN USING ART TO TREAT EATING DISORDERS

DRAWING FROM WITHIN USING ART TO TREAT EATING DISORDERS page 1 / 5 page 2 / 5 drawing from within using pdf This post was guest authored and contributed by Suresh Mohan. Suresh is the Product Manager for PDF Viewer at Syncfusion Software where he specializes

More information

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

The coordinate system and vertical datum shall be noted in the drawing in the metadata. Purpose This document is provided for informational purposes and to assure data compatibility and compliance for as-built drawings or vector data formats specifically for the 354th Civil Engineer Squadron

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense!

Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense! AUTOCAD MEP Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense! If you create building mechanical, electrical, or plumbing (MEP) construction documents and are currently working with AutoCAD software

More information

Autodesk Revit MEP Fundamentals

Autodesk Revit MEP Fundamentals Autodesk Revit MEP Fundamentals Course Length: 4 days To take full advantage of Building Information Modeling, the Autodesk Revit MEP: Fundamentals training course has been designed to teach the concepts

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

Autodesk Revit MEP 2014

Autodesk Revit MEP 2014 ISI ACADEMY Autodesk Revit MEP 2014 Getting Started Starting Revit Starting Revit for the First Time Opening a Project File Identifying the User Interface Components Managing User Interface Components

More information

Release: 1. MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements

Release: 1. MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements Release: 1 MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements Modification History

More information

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS... 4 3.0 DRAWING CONTROL... 4 4.0 PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 5.0 GUIDELINES FOR PREPARATION OF DRAWINGS... 5 6.0 CONTENTS

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC 1/7 1.0 PURPOSE This specification describes the procedure for working with the Vale Drawing Checker Utility. This utility checks the drawing for adherence to many mandatory Vale drawing standards and

More information

PTC Technical Specialists E-Newsletter Date: April 1, 2006

PTC Technical Specialists E-Newsletter Date: April 1, 2006 PTC Technical Specialists E-Newsletter Date: April 1, 2006 PTC Product Focus: A) What s New in Detail Drawings for Wildfire 3.0 Tips of the Month: B) Windchill Supplier Management Solution A) Tricks with

More information

Building Construction Details Practical Drawings Pdf

Building Construction Details Practical Drawings Pdf Building Construction Details Practical Drawings Pdf This pioneering textbook details how construction drawings are used to implement Understanding Construction Drawings for Housing and Small Buildings

More information

Bureau of Engineering. CADD Standards. Preface

Bureau of Engineering. CADD Standards. Preface BOE CADD STANDARDS Preface The is committed to improving the quality of project delivery offered to all our Clients. By producing electronic design data consistently, communication among designer, owner

More information

1 Higher National Unit credit at SCQF level 7: (8 SCQF credit points at SCQF level 7)

1 Higher National Unit credit at SCQF level 7: (8 SCQF credit points at SCQF level 7) Higher National Unit specification General information Unit code: DW1E 34 Superclass: CH Publication date: August 2006 Source: Scottish Qualifications Authority Version: 03 (August 2016) Unit purpose This

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

APP 4. UNSW DRAFTING STANDARDS... 3

APP 4. UNSW DRAFTING STANDARDS... 3 APP 4. UNSW DRAFTING STANDARDS... 3 APP 4.1 GENERAL... 3 APP 4.1.1 Scope... 3 APP 4.1.2 Document Transmittal... 3 APP 4.1.3 Drawings... 4 APP 4.1.4 Operating and Maintenance Manuals... 4 APP 4.1.5 Equipment/Asset

More information

AUGI Tips and Tricks: The Reunion Tour Autodesk Revit Style

AUGI Tips and Tricks: The Reunion Tour Autodesk Revit Style AUGI Tips and Tricks: The Reunion Tour Autodesk Revit Style Donnia Tabor-Hanson Cope Architecture AB3279 After many years of having a successful Autodesk University class on AUGI tips and tricks featuring

More information

Title. Author(s)YU-CHIH SU; YI-CHUAN HSIEH; MENG-CHUNG LEE; CHIH-YUA. Issue Date Doc URL. Type. Note. File Information CONSTRUCTION

Title. Author(s)YU-CHIH SU; YI-CHUAN HSIEH; MENG-CHUNG LEE; CHIH-YUA. Issue Date Doc URL. Type. Note. File Information CONSTRUCTION Title DEVELOPING BIM-BASED SHOP DRAWING AUTOMATED SYSTEM I CONSTRUCTION Author(s)YU-CHIH SU; YI-CHUAN HSIEH; MENG-CHUNG LEE; CHIH-YUA Issue Date 2013-09-11 Doc URL http://hdl.handle.net/2115/54245 Type

More information

Autodesk Revit Architecture 2014

Autodesk Revit Architecture 2014 CADLearning for Autodesk Revit Architecture 2014 Course Details 52+ hours of training 534 video tutorials Exercise files included Instructor: Jason Boehning Course Description CADLearning for Autodesk

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

Chief Architect X3 Training Series. Layers and Layer Sets

Chief Architect X3 Training Series. Layers and Layer Sets Chief Architect X3 Training Series Layers and Layer Sets Save time while creating more detailed plans Why do you need Layers? Setting up Layer Lets Adding items to layers Layers and Layout Pages Layer

More information

A Productivity Comparison of AutoCAD and AutoCAD Architecture Software

A Productivity Comparison of AutoCAD and AutoCAD Architecture Software AUTODCAD ARCHITECTURE A Productivity Comparison of and Software provides the best software-based design and documentation productivity for architects. This study details productivity gains over in designing

More information

Standard Drawing Conventions

Standard Drawing Conventions TRADE OF Pipefitting PHASE 2 Module 5 Technical Drawing UNIT: 2 Produced by In cooperation with subject matter expert: Finbar Smith SOLAS 2014 Table of Contents Unit Objective... 1 Learning Outcome...

More information

Part 1: Common symbols

Part 1: Common symbols INTERNATIONAL STANDARD ISO 6405-1 Third edition 2017-02 Earth-moving machinery Symbols for operator controls and other displays Part 1: Common symbols Engins de terrassement Symboles pour les commandes

More information

Drawing Management Brain Dump

Drawing Management Brain Dump Drawing Management Brain Dump Paul McArdle Autodesk, Inc. April 11, 2003 This brain dump is intended to shed some light on the high level design philosophy behind the Drawing Management feature and how

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

2. Node mapping. 4D construction learning environment virtual tour making. Team leader: Dr Chris Landorf. Contributors:

2. Node mapping. 4D construction learning environment virtual tour making. Team leader: Dr Chris Landorf. Contributors: 4D construction learning environment virtual tour making Team leader: Dr Chris Landorf Contributors: Rick Hill Marc Steffens Lorinne du Toit Edited by: Rick Hill Lorinne du Toit 2018 School of Architecture

More information

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001 PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS Date: January 26, 2001 Portage County Water Resources Drafting Standards. AutoCad 2000/Land Development Desktop R2 Friday, January 26, 2001 Preface: Part

More information

Revit Structure 2012 Basics:

Revit Structure 2012 Basics: SUPPLEMENTAL FILES ON CD Revit Structure 2012 Basics: Framing and Documentation Elise Moss autodesk authorized publisher SDC PUBLICATIONS www.sdcpublications.com Schroff Development Corporation Structural

More information

Integrating Design using BIM and IFC

Integrating Design using BIM and IFC Integrating Design using BIM and IFC Thomas Liebich AEC3, Munich, Germany tl@aec3.de www.aec3.com Company overview Founded 1997 7 employees established in 2 countries Main activities information modeling

More information