1 Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at when using this file. Thank you.

2 BIM & THE VALUE STREAM LCI: Cascadia Intro to Lean Design 15 Sept Robert J. Mauck AIA, PE Vice President: Virtual Design & Construction GHAFARI Associates LLC AGENDA: BIM & THE VALUE STREAM A. Market Drivers B. Supply Chain Workflow C. Value Stream Enablers D. Break Out Sessions E. Discussion Breakout Sessions P2SL Lab REVIT/AMEP/ABS Laser Scan Laser Equip Navisworks Big Room/Integration Model by Project Team 1

3 (BIM) MARKET DRIVERS CONSTANT $ OF CONTRACTS / WORK HOURS OF HOURLY WORKERS SOURCES: U.S. BUREAU OF LABOR STATISTICS, U.S. DEPT. OF COMMERCE Current state inefficiencies and waste in workflow: Non-Lean Silo Based 2D paper based hand-offs No direct digital exchange WASTE 26% SUPPORT ACTIVITY 12% VALUE ADDED 62% CII Data WASTE 57% VALUE ADDED 10% SUPPORT ACTIVITY 33% WASTE IN MANUFACTURING VALUE STREAM WASTE IN CONSTRUCTION SUPPLY CHAIN 2 TECHNOLOGIES & METHODOLOGIES Methodologies across the Value Stream Technologies across the Value Stream 3

4 3D + LEAN + INTEGRATED TEAM = BREAKTHROUGH RESULTS 3D Model Based Communication>Collaboration>Delivery a. Visualization: Real-Time/Shared b. Model Based Drawing Production (view extraction, schedules) c. All Discipline/Trades Coordination > Collaboration d. Automated Collision Detection/Integration Sessions/PM - D/B/B Delivery: designers correct the drawings Iterate until highly coordinated Model generated bid drawings - D/B, IPD Delivery: subs correct the system models Iterate until collision free at fab/install level (ROI: Str. Stl., ductwork, piping, elect., arch) Model generated shop drawings Build-to-the-Model capabilities e. Opportunities for: Direct Digital Exchange Just-In-Time delivery and installation Other lean tools: e.g., Jidoka (via collision avoidance) 4 What is Lean Production? The principles of lean production include: Teamwork Communication Efficient use of resources and Elimination of waste Continuous improvement Lean production vs. mass Production: ½ the human effort in the factory ½ the manufacturing space ½ the investment tools ½ the engineering hours ½ the time to develop new products 5

5 7 TYPES OF WASTE IN CONSTRUCTION Correction: Overproduction: Performing Work Ahead Of Schedule, Causing Interferences With Other Planned Work. Additional Material Ordered Due To Inability Of Suppliers To Provide Quality. Motion: Construction Teams Returning Back To Office To Pick Up Plans, Tools Or Materials Not Available At The Site. Material Movement: Rework, Re-doing Some Tasks Because Of Errors In The Design Process Discovered After Work Was Started. Moving Materials From One Staging To Another, Handing Off Work Between Crews. Waiting: People Waiting For Equipment, Plans, Or Instructions On How To Proceed. Waiting For Material Because Of Ineffective Supply Chains. Inventory: Material Staged On Site Too Far In Advance Of When Needed. Processing: Redundant Or Unnecessary Reporting, Expediting Material Orders, Or Excessive Coordination Between Suppliers. 6 BIM MARKET DRIVERS GLOBAL PRESSURE & AUTO OEM MANDATE 25% Improvement In Construction Project Delivery: Speed, Quality, Safety, Cost Could Not Attain 25% Improvement By Tweaking Existing Procedures - Required A New Design/Construction Paradigm. GENERAL SPECIFIC CURRENT STATE FUTURE STATE Out-of-the-box Changes: Adopt Lean Lessons From Manufacturing Colleagues 3d (Math Based) Direct Digital Exchange Some Form Of Integrated Design/Construction 7

6 (BIM) MARKET DRIVERS (2D PAPER BASED) SILOS GENERAL CRITERIA Design Data SCHEMATIC DESIGN Design Data DETAILED DESIGN CDS/SPECS Design Data DETAILING FABRICATION Design Data CONSTRUCTION/ ERECTION Design Data OPERATION/ MANAGEMENT SPECIFIC CURRENT STATE FUTURE STATE Review Review Review Review Review C W M M O P I 8 (BIM) MARKET DRIVERS ACCELERATED SCHEDULE & 2D PAPER BASED APPROACH OWNER Kick-off AE SUPPLY CHAIN INTEGRATION WITH 3D-ENABLED PROJECT DELIVERY INCREASED REWORK CONTRACTOR FABRICATOR COST OF FIELD CHANGES PRODUCTION DELAYS DESIGN VALIDATI ON AFTER LAUNCH GENERAL SPECIFIC CURRENT STATE FUTURE STATE 3D/4D TECHNOLOGY & LEAN W/DIRECT DIGITAL EXCHANGE OWNER AE CONTRACTORS TIME TO MARKET ADVANTAGE Kick-off FABRICATOR PRODUCTION INTERFERENCE AVOIDANCE TYPICAL PROCESS CHANGES RE-WORK CHANGES 9

7 SUPPLY CHAIN WORKFLOW 3D ENABLED LEAN PROJECT DELIVERY STEEL STRUCTURE HVAC PIPING FIRE PROTECTION 10 SUPPLY CHAIN WORKFLOW If model updates are need, AE staff manually inputs the data into the 3D Model or record 2D set Shop drawing PDFs thousands of files for review Time consuming process updating the 3D physical member model, analysis models, and construction documents STEEL STRUCTURE HVAC PIPING A/E 3D Analysis or Design Model FIRE PROTECTION Steel Fabricator Extracts Shop Drawings for Engineering Review/Approval Steel Fabricator Constructs 3D Manufacturing Detailed Model A/E 2D Drawings (diagrams) A/E: Issues 2D mill order & IFC drawings to steel fabricator Mill Order Manual takeoffs ~ 2 weeks Re-input in fabrication models ~ 4-9 weeks 11

8 SUPPLY CHAIN WORKFLOW On-board review of shop drawings using 3D Model Reduced quantity of shop drawings for review Analysis & design interface. Model and issued for construction documents interface. -- Savings due to reduced markups and reviews STEEL STRUCTURE HVAC PIPING A/E 3D Analysis or Design Model FIRE PROTECTION Direct exchange of A/E model to steel fabricator Import steel fabrication model into A/E design model (as-built) Steel Fabricator Extracts Shop Drawings for Engineering Review/Approval Steel Fabricator Constructs 3D Manufacturing Detailed Model A/E 2D Drawings (diagrams) A/E: Issues 2D mill order 3D Model & IFC drawings to steel fabricator (for record). Automatic BOM for Mill Order Manual takeoffs ~ 1-2 days. Import Design model data into fab. software ~1-3 weeks savings vs. 4-9 for manual input. 12 SUPPLY CHAIN WORKFLOW Eliminated requirements for 2D shop drawing reviews Direct review of 3D Models and Associated Shop drawings SDS2 or XSteel with Triforma Structural A/E 3D Analysis or Design Model Analysis & design interface. Model and issued for construction documents interface. -- Savings due to reduced markups and reviews STEEL STRUCTURE HVAC PIPING FIRE PROTECTION Direct exchange of A/E model to steel fabricator CIS2 Import Direct Review of Detailed Model (approvals) Steel Fabricator Constructs 3D Manufacturing Detailed Model A/E 2D Drawings (diagrams) 2D drawings provided to the fabricator as needed for reference And to communicate design changes. 13

9 SUPPLY CHAIN WORKFLOW 14 SUPPLY CHAIN WORKFLOW FULLY COORDINATED HVAC MODEL WITH STEEL AND OTHER MEP SYSTEMS STEEL STRUCTURE HVAC PIPING FIRE PROTECTION DIRECT INTERFACE FROM FULLY COORDINATED 3D MODEL TO CNC MACHINES INSTALLATION DRAWINGS FROM 3D MODEL. JIT DELIVERY & INSTALLATION WITHOUT FIELD CHANGES POTENTIAL TO REDUCE RAW MATERIAL BY UP TO 20% OFFSITE FABRICATION 15

10 SUPPLY CHAIN WORKFLOW LINKING 3D FORMS TO INFORMATION STEEL STRUCTURE HVAC PIPING FIRE PROTECTION Fire protection model (Design Series) Automatic fabrication ISO drawing with detailed bill of materials PIPE MODELS & QUANTITY EXTRACTIONS Excel report (schematic elements for estimates) 16 VD&C MANAGEMENT STRATEGY 3D ENABLED LEAN PROJECT DELIVERY MULTI-DISCIPLINE COORDINATION SESSIONS BUILD TO THE MODEL MINDSET RESULTS 17

11 VD&C MANAGEMENT STRATEGY MULTI-DISCIPLINE COORDINATION SESSIONS BUILD TO THE MODEL MINDSET RESULTS Initial interferences 18 VD&C MANAGEMENT STRATEGY Collision of piping & gusset plate Collision of piping & gusset plate Early availability of the 3D fabrication steel model including gusset plate sizes allowed the team to detect and resolve many interferences with gusset plates. Impact: Over 75% of detected piping to steel interferences were due to gusset plate interferences. Owner requirements were only to model pipes larger than 2-1/2 diameter. Subcontractors felt the model was so cost effective all pipes were integrated into the 3D model 19

12 VD&C MANAGEMENT STRATEGY DESIGN TO DETAILING COLLABORATIVE WORKFLOW (Eliminating Uncertainty) 20 VD&C MANAGEMENT STRATEGY 3D Model Using Space Protection Advantages Commissioning Preventative Maintenance Future Space Protection Access Door Code Requirement Space Protection 21

13 VD&C MANAGEMENT STRATEGY MULTI-DISCIPLINE COORDINATION SESSIONS BUILD TO THE MODEL MINDSET RESULTS VD&C MANAGEMENT STRATEGY Delta Between Design Model And Coordinated Submittal 3D model of the ceiling MEP systems as shown on the construction documents. 23

14 VD&C MANAGEMENT STRATEGY MULTI-DISCIPLINE COORDINATION SESSIONS 0 BUILD TO THE MODEL MINDSET RESULTS Jan. 25, 2005 session 1324 interferences Mar. 11, 2005 session 0 interferences AUTOMATED COLLISION DETECTION 24 VD&C MANAGEMENT STRATEGY MULTI-DISCIPLINE COORDINATION SESSIONS BUILD TO THE MODEL MINDSET RESULTS Steel Detailer s Model Process Systems Added Target for 80% Clash-Free Collision- Free 25

15 VD&C MANAGEMENT STRATEGY MULTI-DISCIPLINE COORDINATION SESSIONS BUILD TO THE MODEL MINDSET RESULTS 26 BREAKTHROUGH RESULTS ACCELERATED SCHEDULE: ESP. GREENFIELD > TIME TO MARKET (MOVE BL DG OFF CRITICAL PATH) REDUCED FIRST COST ( O & M: TBD) NO CO S FROM FIELD INTERFERENCES VIRTUALLY NO TEAR-OUT/REWORK REDUCED SCRAP (LEED IMPACT ) INCREASED OFF-SITE FABRICATION POTENTIAL FOR JIT DELIVERY & INSTALL The Right Combination of 3D, Lean, Integrated Team RFI S ONLY TO OWNER LESS TRADES OVERLAP (ESP. WITH 4D) REDUCED FIELD OVERTIME FEWER (JLG) LIFTS IN BL DG AT SAME TIME LESS JOB SITE CLUTTER / JIT MATERIAL REDUCED GENERAL CONDITIONS REDUCE # OF DUMPSTERS: OFF-SITE FAB, RE- DUCED TEAR-OUT/REWORK INSTALL ONCE: IMPROVED TRADES MORALE 3D AS-BUILTS BEFORE CONSTRUCTION VALUE ENGR DECISIONS EARLIER USING FULL- DISCIPLINE 3D SCHEMATIC MODEL ACCELERATED STEEL MILL ORDER 3D ELEMENTS CREATED ONCE AND SHARED (SELECT DRAWINGS EXTRACTED FROM MODEL) SPACE PROTECTION: MAINTENANCE/CODES/PROCESS (WEEKLY) IN-MODEL, ON-BOARD REVIEWS: WITH END USERS > REDUCES OWNER CHANGES MAINTENANCE REVIEWS SAFETY REVIEWS FASTER, BETTER LOWER COST SAFER/ GREENER CONSTRUCTION/SITE 27

16 MOVING THE SUPPLY CHAIN TO A VALUE STREAM Value as defined by the customer (vs. silo business case) Shared goals, commitments, trust Pull: Across the design/construction work flow Flow: large batch vs. small batch Early build-side input 2D paper based hard hand-offs > 3D bi-directional exchange 24/7 model/drawing accessibility 28 ENABLERS 3D ENABLED LEAN PROJECT DELIVERY LEAN PRINCIPLES/TOOLS ESP: ACROSS SUPPLY CHAIN HAND-OFFS VALUE STREAM MAPPING INTEGRATED PROJECT DELIVERY 3D MODEL BASED TRANSITION VS. 2D BASED HAND-OFFS BIG ROOM - INTEGRATION SESSIONS 29

17 ENABLER: LEAN Eliminate Waste Esp. across the design/fabrication/construction supply chain Inherent with 2D paper based hand-offs Multiple logs Improve consistency esp. across the supply chain Pull Scheduling Small batch flow Leveled production Early/regular visibility of shared model data Early build side input Real-time review same model, same time vs. 2D silo based review Value stream mapping 30 ENABLER: LEAN VALUE STREAM MAPPING 31

18 LEARNING TO SEE: VSM THE MISSING LINK? - Excerpted from Learning To See, Forward by James Womack & Dan Jones 32 WHY VSM IS AN ESSENTIAL TOOL Objectively Outlined - Linkages - Team Oriented Milestones - Excerpted from Learning To See, Forward by James Womack & Dan Jones 33

19 CURRENT STATE: STEEL MILL ORDER IN 2D - D/B/B CAN BE PLACED WEEKS AFTER START OF DESIGN Design Review Bidding Mill Order DWGs Steel mill order weeks from start of design Mill order issue Material Detailing Shop DWG Review Detailing Fabrication Delivery Installation 34 NEED FOR A DETAILED REVIEW OF SUPPLY CHAIN PROCESSES 35

20 ENABLER: INTEGRATED PROJECT DELIVERY Some Key Constructs for Collaborative Workflow 1. Shared Objectives > Commitments Project Schedule: pull driven, small batch flow Target cost performance 2. Risks (minimize vs. shift) Profit at risk (portion or all) Portion of corp overhead may be at risk Owner bears majority of risk 3. Incentives (primarily via contingency preservation) Profit: normal is restored Profit: enhanced for extraordinary team performance 4. Win/Win: Optimize efficiencies across the design/fab/construction value stream by eliminating wasteful practices esp. in supply chain handoffs 36 ENABLER 3D: (PROJECT) MANAGEMENT COMMITMENT No 2½D Model based drawings (not model team & drawing team) Mandatory integration session(s) Assigned integrator MODELING = COORDINATION People will still have a tendency to remain in their silos Team oriented model based Training Orientation: all persons as Lunch & Learns Clicks 1: Application (train just before deploy) Clicks 2: Subject Matter Experts Project Workflow, Team Oriented 37

21 ENABLER 3D: MODEL BASED WORKFLOW CONSIDERATIONS 3D subsystem models for drawings (at milestones) Model management Subsystem per floor All (relevant) disciplines in model Same LOD (level of Detail) Agreed to authoring rules Optimize space protect Consistent 3D CAD standards (e.g., datum) Reference files Direct digital exchange across the discipline/trade value stream Team Oriented Integration Sessions via Big Room 38 ENABLER BIG ROOM: 3D MODEL BASED INTEGRATION > PROGRESSION Team Oriented, Model Based Reviews: TBD Team Oriented, Model Based Reviews: Safety, Ops Team Oriented, Model Based Reviews: Maintenance Team Oriented, Model Based Reviews: Constr Sequencing Team Oriented, Model Based Reviews: Constructability/Costing Regular 3D Integration Sessions: Disciplines & Trades Regular 3D Model Integration Sessions: Multi-Disciplines 3D Subsystem Models Developed in Context 3D Subsystems Models for Coordination (Collision Detect) 3D Subsystem Models for Drawings 39

22 THANK YOU! QUESTIONS DISCUSSION 40

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP BIM Preparation for the USACE Lessons Learned in Conversion from REVIT to BENTLEY BIM Presenters: Samuel Hudson BIM Support Specialist Jeff Owens AIA, LEED AP L E ll Lee Ezell Consulting BIM Specialist

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer MP3512-L: In this class we will harness the power of MEP Data in AutoCAD. We will review the workflow to fully utilize this Data throughout

More information

Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer, Inc. 24 Years of Experience in Sheet Metal

Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer, Inc. 24 Years of Experience in Sheet Metal ADVANCED BIM PART II Communication and Meetings Presenter: Steve Hunt Dee Cramer, Inc. Presenter BIO Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer,

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology SBS5411 Building Information Modelling for BSE http://ibse.hk/sbs5411/ MEP Coordination Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2018 Contents Introduction Clash

More information

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado October 17-19, 2016 ATLANTA, GEORGIA Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado Case Study Overview Explore BIM requirements of

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

AVEVA PDMS.  Business Benefits. Accurate and clash-free 3D plant design AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality

More information

Session 3 _ Part A Effective Coordination with Revit Models

Session 3 _ Part A Effective Coordination with Revit Models Session 3 _ Part A Effective Coordination with Revit Models Class Description Effective coordination relies upon a measured strategic approach to using clash detection software. This class will share best

More information

d e n v e r a r t m u s e u m

d e n v e r a r t m u s e u m d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition

More information

BIM/VDC on TAA Projects:

BIM/VDC on TAA Projects: 2018 Logan International Airport BIM/VDC on TAA Projects: Direct Tenant TAA Projects Third Party Development Properties Massachusetts Port Authority Capital Programs & Environmental Affairs Preface Massport

More information

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl Learning Objectives What is BIM? > BIM definition > BIM history > Common current uses (3D

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director

Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director Trust in the Power of Prism Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director jehlers@prismelectric.com Agenda Understanding why

More information

Welcome / COBie Help Desk Mechanics COBie Fact or Fiction! Life-Cycle information exchange COBie Calculator

Welcome / COBie Help Desk Mechanics COBie Fact or Fiction! Life-Cycle information exchange COBie Calculator 0900-0901 Welcome / COBie Help Desk Mechanics 0901-0910 COBie Fact or Fiction! 0910-0920 Life-Cycle information exchange 0920-0935 COBie Calculator (Penn State) 0935-0950 Case Study 1 (Tokmo/EcoDomus)

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes

Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes Allbban H. Khalid Southern Polytechnic State University, 1100 South Marietta Parkway, Marietta GA 30067

More information

How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia.

How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia. How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia. ABSTRACT Our industry is witnessing its biggest change since CAD was introduced

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Tekla 기반의 EPC 업무효율성향상 테클라코리아 / 정종훈

Tekla 기반의 EPC 업무효율성향상 테클라코리아 / 정종훈 Tekla 기반의 EPC 업무효율성향상 테클라코리아 / 정종훈 Contents Tekla Corporation Tekla Structures 소개 Tekla Structures 적용사례 Tekla Structures 적용범위 2 Tekla Corporation 3 Tekla Corporation Model-based software for customers

More information

Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense!

Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense! AUTOCAD MEP Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense! If you create building mechanical, electrical, or plumbing (MEP) construction documents and are currently working with AutoCAD software

More information

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP BIM Case Study About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP Coordination Rob Muellner MEP Fabrication Chad

More information

Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM)

Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM) Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM) Basel Abdulaal, Ahmed Bouferguene, Mohamed Al-Hussein Department of Civil & Environmental Engineering Hole School

More information

BIM Won t Work as a Deliverable, Will It? Dace A. Campbell, AIA, LEED AP (Moderator)

BIM Won t Work as a Deliverable, Will It? Dace A. Campbell, AIA, LEED AP (Moderator) BIM Won t Work as a Deliverable, Spring BIMForum San Diego, CA Hilton San Diego Bayfront April 29-30, 2015 Will It? Dace A. Campbell, AIA, LEED AP (Moderator) @DaceCampbell Learning Objectives 1. Gain

More information

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA DESIGN AND CONST RUCTION AUTOMATION: COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA 94305-4020, USA Abstract Many new demands

More information

Integrating Design using BIM and IFC

Integrating Design using BIM and IFC Integrating Design using BIM and IFC Thomas Liebich AEC3, Munich, Germany tl@aec3.de www.aec3.com Company overview Founded 1997 7 employees established in 2 countries Main activities information modeling

More information

MP BIM at the Heart of the MEP Subcontractor Business

MP BIM at the Heart of the MEP Subcontractor Business MP4229 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand Sophie Montenot BIM Business Development Executive MEP BIM Manager 1 Class Summary Dive into the heart of an MEP subcontractor

More information

Efficient Tactics of Project Management

Efficient Tactics of Project Management Ohio Structure Steel & Architectural Metals Association Efficient Tactics of Project Management Friday, June 23, 2017 Mark V. Holland, P.E. Chief Engineer Paxton & Veirling Steel Co. How to get paid. This

More information

Modules for Graduate Certificate in Construction Productivity Enhancement Coming up soon Tentatively from January 2019 SkillsFuture funding may apply

Modules for Graduate Certificate in Construction Productivity Enhancement Coming up soon Tentatively from January 2019 SkillsFuture funding may apply Modules for Graduate Certificate in Construction Productivity Enhancement Coming up soon Tentatively from January 2019 SkillsFuture funding may apply 1. CE5808A Digital Design Using BIM Technologies 2.

More information

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Industrial Case Study of Electronic Design, Cost, & Schedule Integration By Sheryl Staub-French Martin Fischer CIFE Technical Report #122 January, 2001 STANFORD

More information

END-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC.

END-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC. END-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC. TRADITIONAL AEC PROCESS ISSUES The only industry that does not test a complete design before its implementation TRADITIONAL AEC

More information

CS BIM Execution Plans That Are Actually Executable

CS BIM Execution Plans That Are Actually Executable CS125136 BIM Execution Plans That Are Actually Executable Nick Dyer Okland Construction Learning Objectives Learn how to create BIM Execution Plans that are scalable to project requirements Learn how to

More information

Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay

Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay Western Kentucky University TopSCHOLAR Masters Theses & Specialist Projects Graduate School Fall 2016 Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction

More information

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles

More information

Top Findings From the Safety Management in the Construction Industry 2017 SmartMarket Report

Top Findings From the Safety Management in the Construction Industry 2017 SmartMarket Report Top Findings From the Safety Management in the Construction Industry 2017 SmartMarket Report Donna Laquidara-Carr, Ph.D., LEED AP Research Director Industry Insights donna.laquidara@construction.com 1

More information

* SkillsFuture credit (available for Singapore Citizens, subject to approval)

* SkillsFuture credit (available for Singapore Citizens, subject to approval) Modules for Graduate Certificate in Construction Productivity Enhancement * SkillsFuture credit (available for Singapore Citizens, subject to approval) ^ SkillsFuture Singapore (SSG) subsidy available

More information

WELCOME TO CHEMIONIX. Chemionix e-solutions Pvt Ltd Mumbai India

WELCOME TO CHEMIONIX. Chemionix e-solutions Pvt Ltd Mumbai India WELCOME TO CHEMIONIX Mumbai CHEMIONIX: YOUR OUTSOURCING PATNER Companies have been outsourcing since time began. It is only recently that business processes can be outsourced across countries and continents.

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Managing the Line Between Cx Provider and MEP Coordinator

Managing the Line Between Cx Provider and MEP Coordinator Managing the Line Between Cx Provider and MEP Coordinator Kevin Fish, P.E., LEED TM AP Northwest Engineering Service, Inc. 2008 National Conference on Building Commissioning An important and difficult

More information

Why BIM? VASQUEZ MARSHALL ARCHITECTS

Why BIM? VASQUEZ MARSHALL ARCHITECTS Why BIM? VASQUEZ MARSHALL ARCHITECTS Agenda Introductions Using BIM Software For Drawing Production Using BIM Software For Constructability Review Benefits Of BIM Getting Started BIM Experts Michael Smith

More information

Implementing BIM for infrastructure: a guide to the essential steps

Implementing BIM for infrastructure: a guide to the essential steps Implementing BIM for infrastructure: a guide to the essential steps See how your processes and approach to projects change as you adopt BIM 1 Executive summary As an ever higher percentage of infrastructure

More information

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Project) (Date) (Location) Turner Job # (TBD) Item No. 15 SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Location) TURNER CONTRACT

More information

Adapt or Fail coordination in different environments

Adapt or Fail coordination in different environments October 17-19, 2016 ATLANTA, GEORGIA Adapt or Fail coordination in different environments Speakers Pablo Medina VDC Manager San Diego Daniel Sistrunk VDC Manager SoCal Agenda Design Coordination Speaking

More information

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE

PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE OUR PROMISE. PROFITABLE PRECAST. WHAT IS PRECAST? A smart and safe way to build consistent high quality Beautiful and sustainable Precast is a smart, industrialized

More information

BIM for FM: Helping Owners Realize the Benefits of BIM

BIM for FM: Helping Owners Realize the Benefits of BIM Monday, June 13, 2016-4:00pm-5:15pm, Clark, Lower Level Presented by: Bert Jones, Associate Vice Chancellor for Facilities Management Services, Virginia Community College System Jeff Van Fleet, Account

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

DreamCatcher Agile Studio: Product Brochure

DreamCatcher Agile Studio: Product Brochure DreamCatcher Agile Studio: Product Brochure Why build a requirements-centric Agile Suite? As we look at the value chain of the SDLC process, as shown in the figure below, the most value is created in the

More information

Model-Based Definition using Creo Parametric and GD&T Advisor

Model-Based Definition using Creo Parametric and GD&T Advisor Model-Based Definition using Creo Parametric and GD&T Advisor Ted Anderson Product Line Manager Sigmetrix, LLC Model-Based Definition What is it? Why Model-Based Definition? What tools are required to

More information

DRAWING MANAGEMENT MISTAKES

DRAWING MANAGEMENT MISTAKES 5 DRAWING MANAGEMENT MISTAKES You re Making and How to Avoid Them Everything from the site plan, to punch lists and RFIs, to detailed call-outs are part of construction drawings the life blood of the AEC

More information

Level of Development vs. Level of Detail for BIM

Level of Development vs. Level of Detail for BIM Faculty of Civil, Geo and Environmental Engineering Prof. Dr.-Ing. André Borrmann Faculty of Architecture Prof. Dr.-Ing. Frank Petzold Level of Development vs. Level of Detail for BIM 27. July 2018 Report

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

5 Drawing Management Mistakes You re Making. And How to Avoid Them

5 Drawing Management Mistakes You re Making. And How to Avoid Them 5 Drawing Management Mistakes You re Making And How to Avoid Them 2 Table of Contents THE TOP FIVE MOST COMMON DRAWING MANAGEMENT MISTAKES I. Paper-based Drawings II. Drawing Management System Without

More information

How technology is changing the way we deliver Structural Steelwork. Brenden Picton Phil Shanks

How technology is changing the way we deliver Structural Steelwork. Brenden Picton Phil Shanks How technology is changing the way we deliver Structural Steelwork Brenden Picton Phil Shanks Presentation Outline Project Introduction & Process Description From the Engineers Perspective From the Detailers

More information

Software Maintenance Cycles with the RUP

Software Maintenance Cycles with the RUP Software Maintenance Cycles with the RUP by Philippe Kruchten Rational Fellow Rational Software Canada The Rational Unified Process (RUP ) has no concept of a "maintenance phase." Some people claim that

More information

CONSTRUCTION MACHINES IN THE DIGITAL AGE CONSTRUCTION EQUIPMENT MAKERS NEED TO FIND THEIR PLACE IN SMART BUILDING SITES. Romed Kelp and David Kaufmann

CONSTRUCTION MACHINES IN THE DIGITAL AGE CONSTRUCTION EQUIPMENT MAKERS NEED TO FIND THEIR PLACE IN SMART BUILDING SITES. Romed Kelp and David Kaufmann CONSTRUCTION MACHINES IN THE DIGITAL AGE CONSTRUCTION EQUIPMENT MAKERS NEED TO FIND THEIR PLACE IN SMART BUILDING SITES Romed Kelp and David Kaufmann At first glance, giant earth-moving excavators and

More information

1 Introduction. M.Rajabi a, T.Bigga b and M.A.Bartl c.

1 Introduction. M.Rajabi a, T.Bigga b and M.A.Bartl c. Optimization of the quantity take-off (QTO) process for Mechanical, Electrical and plumbing (MEP) trades in tender estimation phase of the construction projects M.Rajabi a, T.Bigga b and M.A.Bartl c a

More information

Maximising customer value through flow

Maximising customer value through flow Maximising customer value through flow October 2008 Facilitated by Hugh O Donnell High Performance Consortium hugh.odonnell@hpc.org.au HPCI 2008 High Performance Consortium International What will be covered?

More information

AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design

AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design The process and power industries seek to commission high-quality plant earlier, and to bring it on line with minimum

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

Services Overview. Northeast Blueprint

Services Overview. Northeast Blueprint Services Overview 2D CAD Conversions Paper to CAD 2D CAD Conversions Construction Engineering / CAD Services Construction Markups Consultant Drawings Coordinated Drawings As -Builts Steel Structural Detailing

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Bridging the Gap. How to leverage BIM and VDC technology for marketing purposes

Bridging the Gap. How to leverage BIM and VDC technology for marketing purposes Bridging the Gap How to leverage BIM and VDC technology for marketing purposes Before we get started please download kahoot! Kahoot.it Marketers aren t using BIM/VDC as a differentiator within the AEC

More information

Implementing an Effective Model-based Coordination Review Strategy USACE/Industry BIM and CIM Consortia 7 Nov 2017

Implementing an Effective Model-based Coordination Review Strategy USACE/Industry BIM and CIM Consortia 7 Nov 2017 Implementing an Effective Model-based Coordination Review Strategy USACE/Industry BIM and CIM Consortia 7 Nov 2017 The views, opinions and findings contained in this report are those of the authors(s)

More information

Introduction to adoption of lean canvas in software test architecture design

Introduction to adoption of lean canvas in software test architecture design Introduction to adoption of lean canvas in software test architecture design Padmaraj Nidagundi 1, Margarita Lukjanska 2 1 Riga Technical University, Kaļķu iela 1, Riga, Latvia. 2 Politecnico di Milano,

More information

Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014

Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room The Process Room were established

More information

LEAN NPI AT OPTIMUM DESIGN ASSOCIATES: PART 2 WHAT IS LEAN NPI AND HOW TO ACHIEVE IT

LEAN NPI AT OPTIMUM DESIGN ASSOCIATES: PART 2 WHAT IS LEAN NPI AND HOW TO ACHIEVE IT W H I T E P A P E R LEAN NPI AT OPTIMUM DESIGN ASSOCIATES: PART 2 WHAT IS LEAN NPI AND HOW TO ACHIEVE IT RANDY HOLT, OPTIMUM DESIGN ASSOCIATES JAMES DOWDING, MENTOR GRAPHICS w w w. o d b - s a. c o m In

More information

BIM and Urban Infrastructure

BIM and Urban Infrastructure BIM and Urban Infrastructure Vishal Singh Assistant Professor Department of Civil and Structural Engineering, Aalto University 14 th September 2015 Learning objectives Describe the underlying concepts

More information

The Importance of Being Lean: Using Lean Principles and Tools to Improve Acquisitions Workflows

The Importance of Being Lean: Using Lean Principles and Tools to Improve Acquisitions Workflows Library Faculty Presentations Library Faculty/Staff Scholarship & Research 11-2014 The Importance of Being Lean: Using Lean Principles and Tools to Improve Acquisitions Workflows John Novak University

More information

PDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC

PDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC PDMS INFORMATION BOOKLET Date: 15/08/2013 OTHER SERVICES ON OFFER BY PIPING STRESS ANALYSIS USING CEASER II EQUIPMENT DESIGN USING PV ELITE ISOMETRIC & P&ID IN AUTOCAD version 2012 MATERIAL INSPECTION

More information

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System. SECTION 15910 DUCT ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15890 - Ductwork. 2. 15900 - Controls and Instrumentation. 3. 15940 - Outlets (HVAC). 4. 15970 - HVAC Control System.

More information

Agenda 1 Introduction 2 Navisworks Overview

Agenda 1 Introduction 2 Navisworks Overview Agenda 1 Introduction 2 Navisworks Overview BIM for Contractors: Autodesk Navisworks from Design to Construction to Facilities Management David Epps Manager Building Information Modeling Holder Construction

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand.

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand. WHOWE ARE We help construction companies, general contractors, architects & engineers, integrate BIM into their projects seamlessly within their predefined timelines and budget, bridging the gap between

More information

Analysis 3. Immersive Virtual Modeling for MEP Coordination. Penn State School of Forest Resources University Park, PA

Analysis 3. Immersive Virtual Modeling for MEP Coordination. Penn State School of Forest Resources University Park, PA Analysis 3 Immersive Virtual Modeling for MEP Coordination Background When looking at the entire process of constructing a building, from the design phase through construction and turnover to the owner,

More information

Using Lean Startup Principles to Guide all Agile Adoptions For Management and Teams

Using Lean Startup Principles to Guide all Agile Adoptions For Management and Teams Using Lean Startup Principles to Guide all Agile Adoptions For Management and Teams Product Portfolio Management Lean for Executives Business technical Team process Kanban / Scrum ATDD / TDD / Design Patterns

More information

The Benefits of Using the Electrical Toolset in AutoCAD

The Benefits of Using the Electrical Toolset in AutoCAD The Benefits of Using the Electrical Toolset in AutoCAD A productivity study detailing the differences between AutoCAD and the Electrical toolset. Built specifically to create and modify electrical controls

More information

Manufacturing Complexity in the World of Production

Manufacturing Complexity in the World of Production Manufacturing Complexity in the World of Production Sebastian Fixson Technology, Management and Policy Program (TMP) Massachusetts Institute of Technology fixson@mit.edu Outline of the Presentation for

More information

Leverage 3D Master. Improve Cost and Quality throughout the Product Development Process

Leverage 3D Master. Improve Cost and Quality throughout the Product Development Process Leverage 3D Master Improve Cost and Quality throughout the Product Development Process Introduction With today s ongoing global pressures, organizations need to drive innovation and be first to market

More information

NCSIMUL HIGH SPEED 3D G CODE VERIFICATION INTERACTIVE & SMART CNC MACHINING SIMULATION MACHINE MILL LATHE MILL-TURN COMPLEX CNC MACHINES

NCSIMUL HIGH SPEED 3D G CODE VERIFICATION INTERACTIVE & SMART CNC MACHINING SIMULATION MACHINE MILL LATHE MILL-TURN COMPLEX CNC MACHINES NCSIMUL MACHINE HIGH SPEED 3D G CODE VERIFICATION MILL LATHE MILL-TURN COMPLEX CNC MACHINES INTERACTIVE & SMART CNC MACHINING SIMULATION REDUCE PRODUCTION COSTS MASTER YOUR SHOP FLOOR CHALLENGES PRODUCTION

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

Moving from R&D to Manufacture

Moving from R&D to Manufacture Moving from R&D to Manufacture Webinar to SBIR awardees May 9, 2013 Clara Asmail Senior Technical Advisor NIST MEP 1 Agenda Overview of NIST MEP program Technology Acceleration and MEP s role Sampling

More information

Learning Objectives. Description. Your AU Experts: Gabriel Hernandez Applied Software. David Ronson Applied Software

Learning Objectives. Description. Your AU Experts: Gabriel Hernandez Applied Software. David Ronson Applied Software MSF21377 The Optimal Revit to Fab Workflow Gabriel Hernandez Applied Software David Ronson Applied Software Learning Objectives Design to Fabrication workflows General modification of Fabrication parts

More information

ActionCAD. ActionCAD provides a professional service to the Construction Industry

ActionCAD. ActionCAD provides a professional service to the Construction Industry ActionCad BIM Consultants ActionCAD ActionCAD provides a professional service to the Construction Industry based in Cheshire operating Globally. We are Certified Professional BIM Consultants and are helping

More information