Welcome / COBie Help Desk Mechanics COBie Fact or Fiction! Life-Cycle information exchange COBie Calculator
|
|
- Archibald Hardy
- 6 years ago
- Views:
Transcription
1 Welcome / COBie Help Desk Mechanics COBie Fact or Fiction! Life-Cycle information exchange COBie Calculator (Penn State) Case Study 1 (Tokmo/EcoDomus) Case Study 2 (VELA) Case Study 3 (TMA) COBie Help Desk (panel) FMOC Meeting Announcement (Bill Brodt)
2 Welcome / COBie Help Desk Mechanics COBie Fact or Fiction! Life-Cycle information exchange COBie Calculator (Penn State) Case Study 1 (Tokmo/EcoDomus) Case Study 2 (VELA) Case Study 3 (TMA) COBie Help Desk (panel) FMOC Meeting Announcement (Bill Brodt)
3 COBie fact and fiction Bill East, PhD, PE, F.ASCE 14-Mar-11 ERDC 2010(c) 3
4 Adoption Process 2008 what s it all about? 2009 can it be done? 2010 how is it used? 2011 rumor control 14-Mar-11 ERDC 2010(c) 4
5 overheard in Dec 2010: COBie is a spreadsheet required by the Corps of Engineers forcing architects to produce O&M manuals 14-Mar-11 ERDC 2010(c) 5
6 COBie fiction 14-Mar-11 ERDC 2010(c) 6
7 COBie is a fixed spreadsheet required by the Corps of Engineers that requires architects to produce contractor s operations and maintenance manuals during design. 14-Mar-11 ERDC 2010(c) 7
8 COBie is a fixed spreadsheet FICTION FM Handover MVD Presented in SPFF, ifcxml, SpreadsheetML, etc Does Not Require OmniClass Extensible fields, attributes, and implementations FM Handover MVD forces owners to consider what they currently ask for and possibly get without rows of re-typists versus what is possible to achieve given current state of technology. 14-Mar-11 ERDC 2010(c) 8
9 COBie is a fixed spreadsheet required by the Corps of Engineers that requires architects to produce contractor s operations and maintenance manuals during design. 14-Mar-11 ERDC 2010(c) 9
10 required by the Corps of Engineers FICTION Corps - option in BIM spec used <10% of Corps Projects 1 Pilot currently underway, James Lovo, HQUSACE 14-Mar-11 ERDC 2010(c) 10
11 COBie is a spreadsheet required by the Corps of Engineers that requires architects to produce contractor s operations and maintenance manuals during design. 14-Mar-11 ERDC 2010(c) 11
12 that requires architects FICTION Since July 2008 there as been published a UFGS-style specification that changes the format of existing contract deliverables from paper to COBie, provided a non-proprietary, performance-based mechanism to deliver what is currently in contracts in a format that can be actually used. Requirements for designers, builders, commissioning agents for DBB and DB forms. Where is it? Google COBie 14-Mar-11 ERDC 2010(c) 12
13 COBie is a fixed spreadsheet required by the Corps of Engineers that requires architects to produce contractor s operations and maintenance manuals during design. 14-Mar-11 ERDC 2010(c) 13
14 to produce contractor s FICTION Each party is required to provide the information they are responsible for in the contract, but that impossible for the owner to use without retyping What of this list is the responsibility of the builder? List of rooms and functions Door schedule Equipment schedules Contractor owns Valve schedule Serial numbers 14-Mar-11 ERDC 2010(c) 14
15 COBie is a fixed spreadsheet required by the Corps of Engineers that requires architects to produce contractor s operations and maintenance manuals during design. 14-Mar-11 ERDC 2010(c) 15
16 operations and maintenance manuals FACT TAKEN OUT OF CONTEXT O&M manuals, warranties, product data sheets created by manufacturers Start-up, shut-down, operations procedures created by commissioning agent By product all fixed assets a free and accurate DD1354 OBJECTIVE of 3 projects to get information at the source and delivery to all authorized parties as the project proceeds. Deliver at 60% complete to allow pre-planning by O&M staff 14-Mar-11 ERDC 2010(c) 16
17 overheard in Dec 2010: COBie is a spreadsheet required by the Corps of Engineers forcing architects to produce O&M manuals 14-Mar-11 ERDC 2010(c) 17
18 COBie fact 14-Mar-11 ERDC 2010(c) 18
19 COBie is an internationally recognized, flexible data specification used in commercial software available in several formats. COBie replaces document-centric work flows enabling each stakeholder to do their job as specified in the contract while eliminating duplicated effort to deliver a better product. 14-Mar-11 ERDC 2010(c) 19
20 conclusion 14-Mar-11 ERDC 2010(c) 20
21 when I first played I believed everything I hear I heard something different I change my mind When I heard something that s I wasn t sure was correct I passed it along anyway 14-Mar-11 ERDC 2010(c) 21
22 when I last played I went to the source of the information I asked them what is fact and what is fiction I learned that If I didn t know, first hand, I should refer to the source of the information 14-Mar-11 ERDC 2010(c) 22
23 thank you 14-Mar-11 ERDC 2010(c) 23
Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer
Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationAssessment of Life Cycle Information Exchanges (LCie) Understanding the Value-Added Benefit of a COBie Process
ERDC/CERL CR-13-6 Assessment of Life Cycle Information Exchanges (LCie) Understanding the Value-Added Benefit of a COBie Process Kristine Fallon Associates, Inc. 11 E. Adams Street, Suite 1100 Chicago,
More informationBG6 Design Framework for Building Services
BG6 Design Framework for Building Services Why? What? How? Martin Ronceray 01 Oct 2018 BSRIA Values 2 BSRIA Sustainable Construction Group 3 Why? The purpose 4 Purpose of BG6 Details of limitations not
More informationHeat Exchanger Construction Checklist
Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist
More informationGovernment Soft Landings (GSL) An Overview 29 th October 2013
Government Soft Landings (GSL) An Overview 29 th October 2013 1 WWW.BENTLEY.COM Customers not getting the assets & outcomes they need / want? Dropping the baton at key stages 2 WWW.BENTLEY.COM Have greater
More informationWBDG: A Resource for All
WBDG: A Resource for All By Bill Brodt and Dana K. Smith, FAIA The Whole Building Design Guide (WBDG) (www.wbdg.org) is the only Web-based portal providing government and industry practitioners with one-stop
More informationPiping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer
Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer MP3512-L: In this class we will harness the power of MEP Data in AutoCAD. We will review the workflow to fully utilize this Data throughout
More informationEXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1
EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 Medina Jordan & Howard Jeffrey Skanska ABSTRACT The benefits of BIM (Building Information Modeling) in design, construction and facilities
More informationopenbim/cobie field Trials
Digital Engineering COBie Feedback from Phase 2 Trial November 2013 openbim/cobie field Trials Introduction A bit about LOR A bit about IFC and our Information Challenges A bit about the trial Thoughts
More informationActionCAD. ActionCAD provides a professional service to the Construction Industry
ActionCad BIM Consultants ActionCAD ActionCAD provides a professional service to the Construction Industry based in Cheshire operating Globally. We are Certified Professional BIM Consultants and are helping
More informationBIM Design Services/ Introduction. T: E:
Introduction At Godfrey Syrett, Revit is now our default software, we have embraced its capabilities to enhance our design process and add value to it by utilising all its benefits. It is the integration
More informationFINAL proposal for Scope, Business Plan and initial Work Programme
. FINAL proposal for Scope, Business Plan and initial Work Programme CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-12-10 Version: Final proposal Page: 1 Proposal developed
More informationBIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos
BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow
More informationWhat is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl
What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl Learning Objectives What is BIM? > BIM definition > BIM history > Common current uses (3D
More informationBuilding Information Modelling HMG Strategic Overview. Mark Bew
Building Information Modelling HMG Strategic Overview Mark Bew Chairman HMG BIM Working Group Chairman BuildingSMART UK Director ECS Ltd 1 WWW.BENTLEY.COM Introduction HMG BIM Strategy Where are we? Progress
More informationMoving to Model-Based Design
Infrastructure Solutions White Paper Moving to Model-Based Design Choosing Between 2D and 3D Do you really have to choose between 2D and 3D? The answer is no, but it is important to know why. Over the
More informationWhat is Meant by Level of Accuracy? As a service provider who. By John M. Russo, AIA. room width = 10'-0' building length = 100'-0' x = 1/4"
room width = 10'-0' x = 1/4" building length = 100'-0' x = 1/4" What is Meant by Level of Accuracy? As a service provider who documents buildings I often hear my clients say I need one quarter inch accuracy,
More informationSwiss-COBie: Development of a Design for Information Exchange Between Planners, Contractors and FM in Switzerland
Swiss-COBie: Development of a Design for Information Exchange Between Planners, Contractors and FM in Switzerland Marc El-Arousy Student MSc, Zurich University of Applied Sciences (ZHAW), Switzerland Simon
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-01 78 24.00 20 (February 2015) Change 1-08/15 --------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 78 24.00 20 (August 2014) UNIFIED FACILITIES
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-01 78 24.00 20 (February 2015) Change 1-08/15 --------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 78 24.00 20 (August 2014) UNIFIED FACILITIES
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More information[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]
SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each
More informationInformation Technology in Facilities Management. 4 Questions. Demystifying technology 9/1/2014
Information Technology in Facilities Management Chris Smeds APPA Institute February 2014 4 Questions Write down one tool that would make your job better/easier/quicker. What is one thing that if you KNEW
More informationBuilding (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014
Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room The Process Room were established
More information2013 A Giant Leap Forward for openbim
December 2013 Issue 10 Official Publication of the buildingsmart UK User Group 2013 A Giant Leap Forward for openbim In this issue: Page 3 Page 6 Page 10 Page 12 The Rise of the User in the Development
More informationConstruction Phase Project Management and Documentation
Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications
More informationEquipment EQ ID SOP. Filename: Equipment EQ ID SOP (OFPC) Process_ docx Date: Page 1 of 6
Equipment EQ ID SOP Purpose: To facilitate the efficient and timely transfer of equipment information to all FOM to have equipment and PM instructions in FAMIS by substantial completion (SC) and be prepared
More informationEsri and Autodesk What s Next?
AN ESRI VISION PAPER JANUARY 2018 Esri and Autodesk What s Next? Copyright 2018 Esri All rights reserved. Printed in the United States of America. The information contained in this document is the exclusive
More informationBIM for FM: Helping Owners Realize the Benefits of BIM
Monday, June 13, 2016-4:00pm-5:15pm, Clark, Lower Level Presented by: Bert Jones, Associate Vice Chancellor for Facilities Management Services, Virginia Community College System Jeff Van Fleet, Account
More informationCS21297 Visualizing Mars: Enabling STEM Learning Using Revit, Autodesk LIVE, and Stingray
CS21297 Visualizing Mars: Enabling STEM Learning Using Revit, Autodesk LIVE, and Stingray Fátima Olivieri, AIA KieranTimberlake folivieri@kierantimberlake.com Efrie Friedlander, AIA KieranTimberlake efriedlander@kierantimberlake.com
More informationUK Government Building A New World
CONSTRUCTION 4.0 CONFERENCE CONSTRUCTION DIGITALIZATION CHALLENGE AND CIVIL ENGINEERING IN THE CONTEXT OF INDUSTRY 4.0 UK Government Building A New World Digital Built Britain Sector Digitalisation March
More informationBIM & Beyond: Digitisation and a Modern Industrial Strategy a UK perspective
BIM & Beyond: Digitisation and a Modern Industrial Strategy a UK perspective David Philp Global i3 Consultancy Director, AECOM FICE, FCIOB, FRICS, FInstCES Thursday, 11 January 2018 Warsaw The UK: A need
More informationBIM Policy Development: Different Countries, Common Approaches
: Different Countries, Common Approaches Bilal Succar, PhD Director, BIMexcellence.com Mohamad Kassem, PhD Senior Lecturer + Enterprise Fellow, Teesside University 2 this presentation is in Two Parts:
More informationBIM: The UK Government Value Proposition
BIM: The UK Government Value Proposition David Philp Head of BIM Implementation Cabinet Office, UK Government UK Government Strategy Task Group Arrival of BIM in the UK: An industry awoken We need To talk
More informationUK Government BIM Programme. Simon Rawlinson
UK Government BIM Programme Water Industry Forum 19 June 2013 Simon Rawlinson 1 WWW.BENTLEY.COM Introduction Government BIM Strategy Application of BIM under the strategy Value added information exchange
More informationEfficient Tactics of Project Management
Ohio Structure Steel & Architectural Metals Association Efficient Tactics of Project Management Friday, June 23, 2017 Mark V. Holland, P.E. Chief Engineer Paxton & Veirling Steel Co. How to get paid. This
More informationSchool of Surveying and Construction Management
Dublin Institute of Technology ARROW@DIT Conference papers School of Surveying and Construction Management 2013-11 Establishing Key Performance Indicators to Measure the Benefit of introducing the Facilities
More informationJanuary 2014 bsa Challenge Meeting
January 2014 bsa Challenge Meeting 2013 10 18 Audio Conference Meeting Number(s): 877 336 1829 Access Code: 1876016 Security Code: 2013 (if prompted) Web Meeting Web Address: HYPERLINK "http://www.webmeeting.att.com"
More informationDigital Built Britain David Philp Digital Built Britain (DBB): BIM Working Group
Digital Built Britain David Philp Digital Built Britain (DBB): BIM Working Group Digital Construction Week 2017 18 th October 2017 Digital Construction Week 2017 OVERVIEW: DIGITAL BUILT BRITAIN Welcome
More informationDATA AT THE CENTER. Esri and Autodesk What s Next? February 2018
DATA AT THE CENTER Esri and Autodesk What s Next? February 2018 Esri and Autodesk What s Next? Executive Summary Architects, contractors, builders, engineers, designers and planners face an immediate opportunity
More informationDIGITAL CONSTRUCTION IN SAINT-GOBAIN
DIGITAL CONSTRUCTION IN SAINT-GOBAIN WHO IS NICOLAJ HVID? DIGITAL CONSTRUCTION DIRECTOR IN SG NORDIC & BALTIC SINCE AUGUST 2015 ARCHITECT & DESIGNER SINCE 1990, 56 YEARS FIRST BIM USER IN DENMARK PREVIOUSLY
More informationDavid Romanow, Chief Executive Officer
Turning Vision into Reality By nature, Mr. Romanow is a clear-minded individual with the vision to see the big picture as well as an excellent ability to focus on action-oriented solutions and opportunities.
More informationBIM and Urban Infrastructure
BIM and Urban Infrastructure Vishal Singh Assistant Professor Department of Civil and Structural Engineering, Aalto University 14 th September 2015 Learning objectives Describe the underlying concepts
More informationSession: For more information:
Session: For more information: www.hydropower.org/congress IHA World Hydropower Congress Beijing, China 20 May 2015 Mario Finis, P.E. Senior Vice President MWH has been Integral to Water Resources, Hydropower
More informationLevel 1 before Level 2 - an Irish BIM mandate
Level 1 before Level 2 - an Irish BIM mandate Robert Moore, Msc (Hons) Construction Informatics RICS Certified BIM Manager Client BIM/Information Manager Grangegorman Development Agency Agenda GCCC position
More informationBenchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM)
Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM) Basel Abdulaal, Ahmed Bouferguene, Mohamed Al-Hussein Department of Civil & Environmental Engineering Hole School
More informationBUSINESS PLAN CEN/TC 442 BUILDING INFORMATION MODELLING (BIM) SCOPE CEN TC 442 Building Information Modelling
Page: 1 BUSINESS PLAN CEN/TC 442 BUILDING INFORMATION MODELLING (BIM) SCOPE CEN TC 442 Building Information Modelling Standardization in the field of structured semantic life-cycle information for the
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. BIM & THE VALUE STREAM LCI:
More informationREAL BIM OBJECTS GET ACCESS TO THOUSANDS OF FROM REAL MANUFACTURERS AND BRANDS. Products. Downloads. Brands
www.bimobject.com GET ACCESS TO THOUSANDS OF REAL BIM OBJECTS FROM REAL MANUFACTURERS AND BRANDS 2008000+ Downloads 4500+ Products 280+ Brands BIM OBJECTS The fundamental building blocks of Building Information
More informationSECTION OPERATION AND MAINTENANCE DATA
SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.
More informationBIM adoption policies
. Dr. Bilal Succar Change Agents + BIMexcellence.org bsuccar@changeagents.com.au In this presentation, I will briefly: Explain what is meant by country-scale BIM adoption Explain five ways for measuring
More informationHow Contractors and Technology Solutions Providers are Partnering to Bring Advanced Technology
Enhancing BIM with Augmented & Virtual Reality How Contractors and Technology Solutions Providers are Partnering to Bring Advanced Technology James Benham Twitter: @JamesMBenham, #JBTechTalk COLLEGE STATION,
More informationObject-Oriented Design
Object-Oriented Design Lecture 2: USDP Overview Department of Computer Engineering Sharif University of Technology 1 Review The Unified Modeling Language (UML) is a standard language for specifying, visualizing,
More informationREADING ARCHITECTURAL PLANS
READING ARCHITECTURAL PLANS ARCHITECTURAL DRAWINGS FOR A HOUSE Architectural drawings contain information about the size, shape, and location of all parts of the house ARCHITECTURAL DRAWINGS FOR A HOUSE
More informationA study on facility management application scenario of BIMGIS modeling data
International Journal of Engineering Science Invention ISSN (Online): 2319 6734, ISSN (Print): 2319 6726 Volume 6 Issue 11 November 2017 PP. 40-45 A study on facility management application scenario of
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationHuge Culver 2. Hugh: Thanks, Jaime. It s always fun.
Huge Culver 2 Jaime: Welcome to Eventual Millionaire Builders. I have Hugh Culver on the show. He s been on my show twice, I adore him. He helps experts grow their business bigger, better, faster. He s
More informationBIM Status Overview. Arto Kiviniemi Research Professor ICT for Built Environment VTT Technical Research Centre of Finland
BIM Status Overview Arto Kiviniemi Research Professor ICT for Built Environment VTT Technical Research Centre of Finland BIMs VBE Measurement Framework ICTs can have three types of business effects Markets
More informationGREEN MINING INNOVATION I Q A L U I T, N U N A V U T
GREEN MINING INNOVATION E N E R G Y A N D M I N E S M I N I S T E R S C O N F E R E N C E 2 0 1 8 I Q A L U I T, N U N A V U T EMMC 2018 DELIVERABLES Two Green Mining Innovation Deliverables: National
More informationAutodesk University How to COBie-ize Revit MEPF Models for Efficient Data Deliverables
Autodesk University How to COBie-ize Revit MEPF Models for Efficient Data Deliverables So we're going to go ahead and start-- clip myself in. I'm Birgitta Foster. PECK SUKPHISIT: And I'm Peck Sukphisit.
More informationBlueprint Takeoff Guide
Blueprint Takeoff Guide If you are searching for the ebook Blueprint takeoff guide in pdf format, in that case you come on to right site. We present complete variant of this book in PDF, doc, txt, DjVu,
More informationFAST TRACK WORKSHOP OBJECTIVES
1 FAST TRACKING FAST TRACK WORKSHOP OBJECTIVES TO UNDERSTAND: 1. WHY ARE CRITICAL PATH ( FAST TRACK ) DESIGN SUBMITTAL PACKAGES ALLOWED 2. WHEN IS FAST TRACK ALLOWED 3. WHEN IS THE CONTRACTOR ALLOWED TO
More informationImplementing Model Semantics and a (MB)SE Ontology in Civil Engineering & Construction Sector
25 th Annual INCOSE International Symposium (IS2015) Seattle, WA, July 13 July 16, 2015 Implementing Model Semantics and a (MB)SE Ontology in Civil Engineering & Construction Sector Henrik Balslev Systems
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationABC PhD DOCTORAL PROGRAM IN ARCHITECTURE BUILT ENVIRONMENT AND CONSTRUCTION ENGINEERING
ABC PhD DOCTORAL PROGRAM IN ARCHITECTURE BUILT ENVIRONMENT AND CONSTRUCTION ENGINEERING ABCPhD CALL4SCHOLARSHIP 34 RESEARCH TOPIC: Technologies for the Design, Construction, Commissioning and Management
More informationExcellence in Engineering Since 1946
Excellence in Engineering Since 1946 Strand Associates, Inc. ( ) Lessons Learned Out In The Collection System Tom Brankamp, PE OWEA State Collection Systems Committee Specialty Conference May 18, 2016
More informationDomain Understanding and Requirements Elicitation
and Requirements Elicitation CS/SE 3RA3 Ryszard Janicki Department of Computing and Software, McMaster University, Hamilton, Ontario, Canada Ryszard Janicki 1/24 Previous Lecture: The requirement engineering
More informationTHE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX)
THE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX) 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationMADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017
MADISON LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY CURRENT TIMELINE TIMELINE MADISON LIBRARY PINNEY MING/ PRE-DESIGN 1 SCHEMATIC DESIGN 2 DESIGN DEVELOPMENT 3
More informationSpecification For. Asset Information Pr8701
Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationBrad Luke. Director Peddle Thorp Auckland
Brad Luke Director Peddle Thorp Auckland Site Observation and Practical Completion Preparation PEDDLE THORP Introduction Architects Agreement for Services. Observation Work Plans. Auckland Council Quality
More informationVanderbilt University Standard Specification Revised 2/6/08
SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides
More informationEnergy modeling/simulation Using the BIM technology in the Curriculum of Architectural and Construction Engineering and Management
Paper ID #7196 Energy modeling/simulation Using the BIM technology in the Curriculum of Architectural and Construction Engineering and Management Dr. Hyunjoo Kim, The University of North Carolina at Charlotte
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationTECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)
TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors
More informationEND-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC.
END-TO-END BIM SOLUTIONS INTEGRATED PRODUCT DELIVERY SOLUTIONS BY ESCA INC. TRADITIONAL AEC PROCESS ISSUES The only industry that does not test a complete design before its implementation TRADITIONAL AEC
More informationPhotography policy. Policy history
Reference: Date Approved: April 2017 Approving Body: Director of External Affairs on behalf of Directors Team Implementation Date: April 2017 Version: 1.0 Supersedes: Stakeholder groups consulted: Target
More informationProject NEON Announcement of Apparent Best Value Design-Build Proposer Transportation Board of Directors Meeting
Project NEON Announcement of Apparent Best Value Design-Build Proposer Transportation Board of Directors Meeting October 12, 2015 Project NEON Procurement A Request for Qualifications (RFQ) was issued
More informationM I N U T E S LOWER SWATARA TOWNSHIP MUNICIPAL AUTHORITY JUNE 22, 2015
M I N U T E S LOWER SWATARA TOWNSHIP MUNICIPAL AUTHORITY JUNE 22, 2015 Chairman Gingrich called the Regular Meeting of the Lower Swatara Township Municipal Authority to order at 7:00 P.M. Chairman Gingrich
More informationRobert Armstrong, Director of Development & Environmental Services. Water Meter Replacement Update
Date Monday, February 12, 2018 From Subject Report No. DES2018-10 Robert Armstrong, Director of Development & Environmental Services Water Meter Replacement Update Roll No. N/A Recommendation That Committee
More informationONE STEP AHEAD WITH BIM CHANGING OF ORGANISATIONS PROJECTS MINDS
ONE STEP AHEAD WITH BIM CHANGING OF ORGANISATIONS PROJECTS MINDS BIM EXPO 2017 HANOVER, SEP 6 TH & 7 TH Prof. Dr. Katharina Klemt-Albert Director Institute of Construction Management and Digital Engineering
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More information2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS
PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called
More informationSECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000
More informationBIM Won t Work as a Deliverable, Will It? Dace A. Campbell, AIA, LEED AP (Moderator)
BIM Won t Work as a Deliverable, Spring BIMForum San Diego, CA Hilton San Diego Bayfront April 29-30, 2015 Will It? Dace A. Campbell, AIA, LEED AP (Moderator) @DaceCampbell Learning Objectives 1. Gain
More informationSoftware Failures. Dr. James A. Bednar. Dr. David Robertson
Software Failures Dr. James A. Bednar jbednar@inf.ed.ac.uk http://homepages.inf.ed.ac.uk/jbednar Dr. David Robertson dr@inf.ed.ac.uk http://www.inf.ed.ac.uk/ssp/members/dave.htm SEOC2 Spring 2005: Failures
More informationBuilding Information Modeling (B.I.M.)
Building Information Modeling (B.I.M.) SEC Courtyard Building Information Services B.I.M. is more than just 3D design, it s intelligent! BIM knows what a wall is, what it is made out of, what color it
More informationRequirements Gathering using Object- Oriented Models
Requirements Gathering using Object- Oriented Models Cycle de vie d un logiciel Software Life Cycle The "software lifecycle" refers to all stages of software development from design to disappearance. The
More informationThe Benefits of Virtual Reality
The Benefits of Virtual Reality KAUSHAL DIWAN, RAYMOND HUYNH, OCEAN VAN Virtual Reality (VR) is a technology that is ready for large-scale implementation on projects that fulfill the criteria outlined
More informationWELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1
WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1-2017 - Industrialised Building System ( IBS ) is a system not a machine or component. Open System and Proprietary System is a Technology.
More informationImplementing Model Semantics and a (MB)SE Ontology in the Civil Engineering & Construction Sector
Nordic Systems Engineering Tour 2015 June 1 4, 2015 Implementing Model Semantics and a (MB)SE Ontology in the Civil Engineering & Construction Sector Henrik Balslev Systems Engineering A/S - Denmark www.syseng.dk
More informationBlogs (short for web logs ) have grown into one of the Internet s most. important types of websites. There are now more than 150 million of them,
!! Blogs (short for web logs ) have grown into one of the Internet s most important types of websites. There are now more than 150 million of them, published by office workers, singers, businesses, and
More informationIn this presentation, I will briefly:
In this presentation, I will briefly: Explain what is meant by country-scale BIM adoption Explain five ways for measuring BIM adoption. Compare the approaches taken by policy makers to encourage BIM diffusion.
More informationBUILDING INFORMATION MODELING (BIM) FOR FACILITIES MANAGEMENT LITERATURE REVIEW AND FUTURE NEEDS
BUILDING INFORMATION MODELING (BIM) FOR FACILITIES MANAGEMENT LITERATURE REVIEW AND FUTURE NEEDS Mehmet Yalcinkaya 1 and Vishal Singh 2 Department of Civil and Structural Engineering, Aalto University,