1 BIM Status Overview Arto Kiviniemi Research Professor ICT for Built Environment VTT Technical Research Centre of Finland

2 BIMs VBE Measurement Framework ICTs can have three types of business effects Markets Increased TRANSFORMATIONAL Long Lasting Competitive Advantage Functionality Increased INFORMATIONAL Productivity Increased AUTOMATIONAL Operational Thinking Tactical Thinking Strategic Thinking BIM Status - October 25, 2006 Source: VBE2 WP1 Stephen Fox 2

3 BIMs VBE Measurement Framework Automational Effects Use of BIMs as a means of increasing productivity through direct substitution of labor Automational Example Radical reduction of person hours needed for, e.g. structural calculations; cost calculations; heat loss calculations etc. Automational Competitive Advantage Advantages within existing business models - in a short time the competition will catch up and advantage is lost and profitability of basic design and analyses activities will be driven down BIM Status - October 25, 2006 Source: VBE2 WP1 Stephen Fox 3

4 BIMs VBE Measurement Framework Informational Effects Use of BIMs to collect, store, process, and disseminate information more effectively thereby enabling better quality decisions Informational Example Using BIMs to provide increased functionality, e.g. the application of computational fluid dynamics (CFD) to the design of buildings Informational Competitive Advantage Advantage through providing value-added within existing business model, more scope for innovation and more difficult for competition to catch up BIM Status - October 25, 2006 Source: VBE2 WP1 Stephen Fox 4

5 BIMs VBE Measurement Framework Transformational Effects Use of BIMs to carry out innovative changes through unique combinations of processes within and between organizations Transformational Example Combination of formerly separate business domains and creation of new markets, e.g. enable building clients to become building designers Transformational Competitive Advantage Advantage through new value-adding business models - offers most scope for innovation - very difficult for noninnovative competition to catch up BIM Status - October 25, 2006 Source: VBE2 WP1 Stephen Fox 5

6 Internal and External Processes Moving from documents to modeling can improve internal processes without need to share data externally Generation of traditional documents from the model Changes needed only in one place; improved productivity and document quality Integration of internal tasks Simulation and analysis based on a single model Shared data, interoperability, can improve the whole process Efficient utilization of the data without need to recreate it for different purposes; improved project productivity Tasks and roles can change - added value for others Improved design coordination; better design quality BIM Status - October 25,

7 Reasons for the Slow Adoption of IFCs 2D drafting still dominating practice Real market demand for IFCs has been missing However, the market situation is now changing Technical problems IFC certified software, but certification process is not rigid and implementation quality is not sufficient Lack of sufficient technical support Human obstacles Resistance for change Lack of knowledge and skills Lack of clear evidence of the benefits Fragmented market Who owns the process? Who invests in the development? Who gets the benefits? BIM Status - October 25,

8 Data Specification, Implementation and Use Real Estate and Construction Industry Software vendors uses Process Map Exchange Requirements (IDM) IFC Implementations IFC Model View Definitions (MVD) IFC Model Specification BIM Status - October 25, 2006 Source: VBE2 WP2 Jiri Hietanen 8

9 Current BIM potential Robust modeling software exists No reason to postpone use of modeling Learning the new methods and possibilities takes time Business cases based on IFC exchange already exist Architectural, structural, HVAC and electrical design Design integration Energy and comfort simulation Lighting simulation LCA and LCC analysis Model and design checking Quantity take-off Cost Estimation Spatial management BIM Status - October 25,

10

11 Examples of Interoperability Status New marketing brand of IAI: buildingsmart Finland has been among the first countries to adopt IFCs: National Programs: VERA , SARA Several pilot projects by Senate Properties since 2001 Senate will star requiring models starting Oct 1st 2007 Wide adoption by the contractors: ProIT by Confederation of Finnish Construction Industry Singapore has actively developed the use of IFC in the Corenet project Main focus in the Code Checking Norway has been very active since 2005 Information Delivery Manual (IDM) Funding also IFC 2x2G (GIS extension of IFCs) Some pilot projects: New Akershus Hospital, Statsbygg, University College in Tromsø BIM Status - October 25,

12 VTT s Recent Main Activities VBE2 (Virtual Building Environments) with Virtual Building Laboratory/TUT ; collaboration with CIFE/Stanford, SCRI/Salford, CRC/Australia Company Strategies and Benefits Data Transfer Technologies and Solutions Decision Support Technologies Model Based FM and Real Estate Business GPS (Global Project Strategies) with Department of Industrial Engineering and Management/TKK and CKIR/HSE InfraPDM (Product Model-based System for the Finnish Infra Sector) report 2006 Several EU and ERAbuild projects ECTP ICT platform, I 3 CON, ISCIS, ManuBuild, StratCON BIM Status - October 25,

13 Shared Model Server Integrated Building Information Model Requirements Model Design Model(s) Production Model Maintenance Model Control Layer: Access and change permissions, revisions, etc. Link layer: corresponds with the real world objects Building Element Domain specific property level: geometry, attributes, etc. BIM Status - October 25,

14 Source: Organizing to Exploit Integrated Information Technologies Ray Levitt and John Taylor, CIFE - Stanford University BIM Status - October 25,

Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014

Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room Report Jan Karlshøj, IDM Coordinator/Process Room Leader buildingsmart Building (Process) Room Toronto, October 30, 2014 Building (Process) Room The Process Room were established

More information

CLIENTS DRIVING INNOVATION: MOVING IDEAS INTO PRACTICE

CLIENTS DRIVING INNOVATION: MOVING IDEAS INTO PRACTICE CLIENTS DRIVING INNOVATION: MOVING IDEAS INTO PRACTICE Keynote Address ADOPTING INNOVATION: BUILDING INFORMATION MODELS IN THE FINNISH REAL ESTATE AND CONSTRUCTION CLUSTER VTT Technical Research Centre,

More information

Why make classification based on international standards?

Why make classification based on international standards? Why make classification based on international standards? A status on CCS and CoClass, and examples of how findings are taken up by other industries (infrastructure, shipbuilding and airplanes) ICIS DA,

More information

buildingsmart work for your organization

buildingsmart work for your organization BSAME Build SMART 2009, Abu Dhabi, 15 th November 2009 2009 multibim as business opportunities through h better digital collaboration; The buildingsmart Aquarium: a way to make buildingsmart work for your

More information

INTEGRATED PRODUCT MODELS IN LIFE-CYCLE EVALUATION AND MANAGEMENT OF THE BUILT ENVIRONMENT

INTEGRATED PRODUCT MODELS IN LIFE-CYCLE EVALUATION AND MANAGEMENT OF THE BUILT ENVIRONMENT INTEGRATED PRODUCT MODELS IN LIFE-CYCLE EVALUATION AND MANAGEMENT OF THE BUILT ENVIRONMENT Dr Arto Kiviniemi 1 ABSTRACT: The artifacts which form our built environment are complex and have very long lifespan

More information

FINAL proposal for Scope, Business Plan and initial Work Programme

FINAL proposal for Scope, Business Plan and initial Work Programme . FINAL proposal for Scope, Business Plan and initial Work Programme CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-12-10 Version: Final proposal Page: 1 Proposal developed

More information

Value driven processes

Value driven processes May 2009 Value driven processes for construction and operation of buildings Eracobuild transnational program on research and innovation Background Eracobuild is an ERA-net cooperative effort under contract

More information

Building BIM in Australia: A Retrospective and Prospective Analysis

Building BIM in Australia: A Retrospective and Prospective Analysis Building BIM in Australia: A Retrospective and Prospective Analysis Professor Keith Hampson Sustainable Built Environment National Research Centre, Australia Co-author: Professor Robin Drogemuller Professor

More information

BUSINESS PLAN CEN/TC 442 BUILDING INFORMATION MODELLING (BIM) SCOPE CEN TC 442 Building Information Modelling

BUSINESS PLAN CEN/TC 442 BUILDING INFORMATION MODELLING (BIM) SCOPE CEN TC 442 Building Information Modelling Page: 1 BUSINESS PLAN CEN/TC 442 BUILDING INFORMATION MODELLING (BIM) SCOPE CEN TC 442 Building Information Modelling Standardization in the field of structured semantic life-cycle information for the

More information

Tekes in the Finnish innovation system encouraging change in construction

Tekes in the Finnish innovation system encouraging change in construction Conference 2011 Conference under the patronage of the Polish National Contact Point for Research Programmes of the EU Supported by: Let s Construct Europe s Future With Innovative Buildings and Infrastructures

More information

INTERDISCIPLINARY, BIM-SUPPORTED PLANNING PROCESS

INTERDISCIPLINARY, BIM-SUPPORTED PLANNING PROCESS INTERDISCIPLINARY, BIM-SUPPORTED PLANNING PROCESS Lars Oberwinter Vienna University of Technology, E234 - Institute of Interdisciplinary Construction Process Management, Vienna, Austria, Vienna, Austria,

More information

Lessons Learned from National Deployment of BIM in Finland

Lessons Learned from National Deployment of BIM in Finland Atelier Stratégique: «L'approcheBIM au service de la compétitivité de l'industrie de la construction» Montreal, 1-2 February, 2018 Lessons Learned from National Deployment of BIM in Finland Gulnaz Aksenova

More information

Robotics in Horizon 2020 ICT Work Programme

Robotics in Horizon 2020 ICT Work Programme Robotics in Horizon 2020 ICT Work Programme 2018 2020 Leadership in Enabling and Industrial Technologies (LEIT) Information and Communication Technologies (ICT) Draft elements for discussion with Programme

More information

Hvorfor skal vi have BIM i vejsektoren? PLCS as an integrating framework

Hvorfor skal vi have BIM i vejsektoren? PLCS as an integrating framework Hvorfor skal vi have BIM i vejsektoren? PLCS as an integrating framework Dr Väino Tarandi Professor, KTH, Royal Institute of Technology, Stockholm Nyborg 2015-12-02 Agenda The Lab goals BIM and GIS how

More information

Research Infrastructure Programme

Research Infrastructure Programme Research Infrastructure Programme Humanities Information Day 18 February 2015 Katie Lambert UK National Contact Point Overview What are Research Infrastructures? What did the 2014-2015 WP fund? What has

More information

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 Medina Jordan & Howard Jeffrey Skanska ABSTRACT The benefits of BIM (Building Information Modeling) in design, construction and facilities

More information

Integrating Design using BIM and IFC

Integrating Design using BIM and IFC Integrating Design using BIM and IFC Thomas Liebich AEC3, Munich, Germany tl@aec3.de www.aec3.com Company overview Founded 1997 7 employees established in 2 countries Main activities information modeling

More information

The function is assumed by technology management, usually the Technological Development Committee.

The function is assumed by technology management, usually the Technological Development Committee. Integrated Report 6.8 Innovation 167 The ACS Group is a continuously evolving organisation that responds to the growing demand for improvements in processes, technological advances and quality of service

More information

Assessment of Smart Machines and Manufacturing Competence Centre (SMACC) Scientific Advisory Board Site Visit April 2018.

Assessment of Smart Machines and Manufacturing Competence Centre (SMACC) Scientific Advisory Board Site Visit April 2018. Assessment of Smart Machines and Manufacturing Competence Centre (SMACC) Scientific Advisory Board Site Visit 25-27 April 2018 Assessment Report 1. Scientific ambition, quality and impact Rating: 3.5 The

More information

White paper The Quality of Design Documents in Denmark

White paper The Quality of Design Documents in Denmark White paper The Quality of Design Documents in Denmark Vers. 2 May 2018 MT Højgaard A/S Knud Højgaards Vej 7 2860 Søborg Denmark +45 7012 2400 mth.com Reg. no. 12562233 Page 2/13 The Quality of Design

More information

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive Technology Executive Committee 29 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft executive summaries to target groups on industrial energy efficiency and material substitution

More information

PROJECT FACT SHEET GREEK-GERMANY CO-FUNDED PROJECT. project proposal to the funding measure

PROJECT FACT SHEET GREEK-GERMANY CO-FUNDED PROJECT. project proposal to the funding measure PROJECT FACT SHEET GREEK-GERMANY CO-FUNDED PROJECT project proposal to the funding measure Greek-German Bilateral Research and Innovation Cooperation Project acronym: SIT4Energy Smart IT for Energy Efficiency

More information

Moving to Model-Based Design

Moving to Model-Based Design Infrastructure Solutions White Paper Moving to Model-Based Design Choosing Between 2D and 3D Do you really have to choose between 2D and 3D? The answer is no, but it is important to know why. Over the

More information

Level 1 before Level 2 - an Irish BIM mandate

Level 1 before Level 2 - an Irish BIM mandate Level 1 before Level 2 - an Irish BIM mandate Robert Moore, Msc (Hons) Construction Informatics RICS Certified BIM Manager Client BIM/Information Manager Grangegorman Development Agency Agenda GCCC position

More information

Strategic Information Management: Issues

Strategic Information Management: Issues Strategic Information Management: Issues David Bearman & Jennifer Trant Archives & Museum Informatics dbear@archimuse.com jtrant@archimuse.com Workshop at the MCN Annual Conference Philadelphia PA October

More information

A study on facility management application scenario of BIMGIS modeling data

A study on facility management application scenario of BIMGIS modeling data International Journal of Engineering Science Invention ISSN (Online): 2319 6734, ISSN (Print): 2319 6726 Volume 6 Issue 11 November 2017 PP. 40-45 A study on facility management application scenario of

More information

An Ontological Approach to Building Information Model Exchanges in the Precast/Pre-stressed Concrete Industry

An Ontological Approach to Building Information Model Exchanges in the Precast/Pre-stressed Concrete Industry 1114 An Ontological Approach to Building Information Model Exchanges in the Precast/Pre-stressed Concrete Industry Manu VENUGOPAL 1, Charles M. EASTMAN 2, and Jochen TEIZER 3 1 Postdoctoral Research Fellow,

More information

New Cooperation Models in BIM Contexts

New Cooperation Models in BIM Contexts New Cooperation Models in BIM Contexts by Albert LEJEUNE, Prof. ESG-UQAM COSIMA 2 cosima.uqam.ca Director of the Cognitive Science Institute UQAM ETS, Montréal February 2, 2018 BIM in an Architectural

More information

ICT : Internet of Things and Platforms for Connected Smart Objects

ICT : Internet of Things and Platforms for Connected Smart Objects LEIT ICT WP2014-15 ICT 30 2015: Internet of Things and Platforms for Connected Smart Objects Peter Friess (peter.friess@ec.europa.eu), Network Technologies Werner Steinhoegl (werner.steinhoegl@ec.europa.eu),

More information

Product and Process Room Workshops in Tokyo, October 2012

Product and Process Room Workshops in Tokyo, October 2012 Title Organisation /Author Date Status Product and Process Room Workshops Oslo bsi/roger Grant/Jan Karlshøj 11-Oct.-12 Final Product and Process Room Workshops in Tokyo, October 2012 buildingsmart International

More information

Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM)

Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM) Benchmark of Alberta s AEC Industries Knowledge of Building Information Modeling (BIM) Basel Abdulaal, Ahmed Bouferguene, Mohamed Al-Hussein Department of Civil & Environmental Engineering Hole School

More information

D8.1 PROJECT PRESENTATION

D8.1 PROJECT PRESENTATION D8.1 PROJECT PRESENTATION Approval Status AUTHOR(S) NAME AND SURNAME ROLE IN THE PROJECT PARTNER Daniela De Lucia, Gaetano Cascini PoliMI APPROVED BY Gaetano Cascini Project Coordinator PoliMI History

More information

Mauro Isaja Engineering Group

Mauro Isaja Engineering Group Mauro Isaja mauro.isaja@eng.it Engineering Group Hello! Mauro Isaja mauro.isaja@eng.it Project Manager, Research & Development BU @Engineering Group The first IT player in Italy: 9% market share > 1,000

More information

ARTEMIS The Embedded Systems European Technology Platform

ARTEMIS The Embedded Systems European Technology Platform ARTEMIS The Embedded Systems European Technology Platform Technology Platforms : the concept Conditions A recipe for success Industry in the Lead Flexibility Transparency and clear rules of participation

More information

buildingsmart International

buildingsmart International buildingsmart International buildingsmart Aquarium QTA and costing in building services/mep Bjørn K Stangeland & Lars C Christensen IFC/IFD/IDM Workshop: April 6 th 8 th 2008 Embassy Suites, Alexandria

More information

Meetings and Proceedings; Book Chapter. Dawood, N. N. (Nashwan); Iqbal, N. (Nahim)

Meetings and Proceedings; Book Chapter. Dawood, N. N. (Nashwan); Iqbal, N. (Nahim) TeesRep - Teesside's Research Repository Building information modelling (BIM): A visual & whole life cycle approach Item type Authors Citation Publisher Additional Link Rights Meetings and Proceedings;

More information

A New Platform for escience and data research into the European Ecosystem.

A New Platform for escience and data research into the European Ecosystem. Digital Agenda A New Platform for escience and data research into the European Ecosystem. Iconference Wim Jansen einfrastructure DG CONNECT European Commission The 'ecosystem': some facts 1. einfrastructure

More information

Public Purchasing Policies for e-local government services and the emergence of KIE: The Case of the LGAF (Local Government Application Framework)

Public Purchasing Policies for e-local government services and the emergence of KIE: The Case of the LGAF (Local Government Application Framework) Public Purchasing Policies for e-local government services and the emergence of KIE: The Case of the LGAF (Local Government Application Framework) initiative in Greece DIME-AEGIS-LIEE/NTUA ATHENS 2010

More information

High Performance Computing in Europe A view from the European Commission

High Performance Computing in Europe A view from the European Commission High Performance Computing in Europe A view from the European Commission PRACE Petascale Computing Winter School Athens, 10 February 2009 Bernhard Fabianek European Commission - DG INFSO 1 GÉANT & e-infrastructures

More information

Building Information Modeling

Building Information Modeling Building Information Modeling Gunnar Grün, Munich, 7.3.2018 Auf Wissen bauen Building Information Modeling (BIM) towards the uniform central building model BIM today (1) Used for visualization Reception

More information

The Road to BIM through Open Collaboration and Connected Construction. Erkki Mäkinen. BIM World MUNICH 2018

The Road to BIM through Open Collaboration and Connected Construction. Erkki Mäkinen. BIM World MUNICH 2018 The Road to BIM through Open Collaboration and Connected Construction Erkki Mäkinen BIM World MUNICH 2018 Information flow in Construction Industry How documents are shared in construction industry in

More information

Aerospace Software* Cost and Timescale Reduction *and complex electronic hardware

Aerospace Software* Cost and Timescale Reduction *and complex electronic hardware Aerospace Software* Cost and Timescale Reduction *and complex electronic hardware Andrew Hawthorn Deputy Director, Intelligent Systems / Altran UK and SECT-AIR WP4 Lead on behalf of the SECT-AIR Consortium

More information

Integrated Transformational and Open City Governance Rome May

Integrated Transformational and Open City Governance Rome May Integrated Transformational and Open City Governance Rome May 9-11 2016 David Ludlow University of the West of England, Bristol Workshop Aims Key question addressed - how do we advance towards a smart

More information

Emerging Innovative Technologies Driving Change. Stephen R Hagan FAIA

Emerging Innovative Technologies Driving Change. Stephen R Hagan FAIA Emerging Innovative Technologies Driving Change President CEO Stephen R Hagan FAIA Hagan Technologies LLC Emerging Innovative Technologies Driving Change for Buildings, Eco-Districts and Smart Sustainable

More information

EIT RawMaterials Stakeholders Meeting Trondheim, Norway 20 Sept Partner presentation: Modelling Factory & other VTT projects

EIT RawMaterials Stakeholders Meeting Trondheim, Norway 20 Sept Partner presentation: Modelling Factory & other VTT projects EIT RawMaterials Stakeholders Meeting Trondheim, Norway 20 Sept. 2017 Partner presentation: Modelling Factory & other VTT projects Sami.majaniemi@vtt.fi VTT Technical Research Centre of Finland Ltd 75

More information

Plenary Assembly European Construction Technology Platform (ECTP( Building the Europe of Knowledge ECTP) Special features. Specific Programmes

Plenary Assembly European Construction Technology Platform (ECTP( Building the Europe of Knowledge ECTP) Special features. Specific Programmes Plenary Assembly European Construction Technology Platform (ECTP( ECTP) Opportunities for construction In the 7th Framework programme Christophe Lesniak DG-RTD:G2 25th, October 2005 Paris CT/DGRTD/G2 1

More information

GUIDE 75. Strategic principles for future IEC and ISO standardization in industrial automation. First edition

GUIDE 75. Strategic principles for future IEC and ISO standardization in industrial automation. First edition GUIDE 75 First edition 2006-11 Strategic principles for future IEC and ISO standardization in industrial automation Reference number ISO/IEC GUIDE 75:2006(E) GUIDE 75 First edition 2006-11 Strategic principles

More information

Energy modeling/simulation Using the BIM technology in the Curriculum of Architectural and Construction Engineering and Management

Energy modeling/simulation Using the BIM technology in the Curriculum of Architectural and Construction Engineering and Management Paper ID #7196 Energy modeling/simulation Using the BIM technology in the Curriculum of Architectural and Construction Engineering and Management Dr. Hyunjoo Kim, The University of North Carolina at Charlotte

More information

Examples of Public Procurement of R&D services within EU funded Security Research actions

Examples of Public Procurement of R&D services within EU funded Security Research actions Examples of Public Procurement of R&D services within EU funded Security Research actions Paolo Salieri 18 / 10 / 2017 paolo.salieri@ec.europa.eu PCP to steer the development of solutions towards concrete

More information

Industry 4.0: the new challenge for the Italian textile machinery industry

Industry 4.0: the new challenge for the Italian textile machinery industry Industry 4.0: the new challenge for the Italian textile machinery industry Executive Summary June 2017 by Contacts: Economics & Press Office Ph: +39 02 4693611 email: economics-press@acimit.it ACIMIT has

More information

PPP InfoDay Brussels, July 2012

PPP InfoDay Brussels, July 2012 PPP InfoDay Brussels, 09-10 July 2012 The Factories of the Future Calls in ICT WP2013. Objectives 7.1 and 7.2 DG CONNECT Scientific Officers: Rolf Riemenschneider, Mariusz Baldyga, Christoph Helmrath,

More information

Industrial Innovation Information Days Brussels 3-4 October 2017

Industrial Innovation Information Days Brussels 3-4 October 2017 Industrial Innovation Information Days Brussels 3-4 October 2017 NMBP Programme 2018 TOPICS FACTORIES OF THE FUTURE (FOF) DG RTD & DG CNECT DT-FOF-05-2019: Open Innovation for collaborative production

More information

Initiatives to accelerate the deployment of Industry 4.0

Initiatives to accelerate the deployment of Industry 4.0 Initiatives to accelerate the deployment of Industry 4.0 Dr. Pierre Padilla, IDEA Consult ERRIN ADMA Working Group Tuesday, 20 June 2017 Brussels With the Support of Agenda 1. The Vanguard Initiative 2.

More information

April 2015 newsletter. Efficient Energy Planning #3

April 2015 newsletter. Efficient Energy Planning #3 STEEP (Systems Thinking for Efficient Energy Planning) is an innovative European project delivered in a partnership between the three cities of San Sebastian (Spain), Bristol (UK) and Florence (Italy).

More information

FOREST PRODUCTS: THE SHIFT TO DIGITAL ACCELERATES

FOREST PRODUCTS: THE SHIFT TO DIGITAL ACCELERATES FOREST PRODUCTS: THE SHIFT TO DIGITAL ACCELERATES INTRODUCTION While the digital revolution has transformed many industries, its impact on forest products companies has been relatively limited, as the

More information

THE ROLE OF TRANSPORT TECHNOLOGY PLATFORMS IN FOSTERING EXPLOITATION. Josef Mikulík Transport Research Centre - CDV

THE ROLE OF TRANSPORT TECHNOLOGY PLATFORMS IN FOSTERING EXPLOITATION. Josef Mikulík Transport Research Centre - CDV THE ROLE OF TRANSPORT TECHNOLOGY PLATFORMS IN FOSTERING EXPLOITATION Josef Mikulík Transport Research Centre - CDV Outlines European Technology Platforms ERTRAC Czech ERTRAC Other national TP Technology

More information

DIGITAL FINLAND FRAMEWORK FRAMEWORK FOR TURNING DIGITAL TRANSFORMATION TO SOLUTIONS TO GRAND CHALLENGES

DIGITAL FINLAND FRAMEWORK FRAMEWORK FOR TURNING DIGITAL TRANSFORMATION TO SOLUTIONS TO GRAND CHALLENGES DIGITAL FINLAND FRAMEWORK FRAMEWORK FOR TURNING DIGITAL TRANSFORMATION TO SOLUTIONS TO GRAND CHALLENGES 1 Digital transformation of industries and society is a key element for growth, entrepreneurship,

More information

Key Words: Building Information Modelling (BIM); BIM for Infrastructure; constructor perspective; AECOO

Key Words: Building Information Modelling (BIM); BIM for Infrastructure; constructor perspective; AECOO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 BIM for Infrastructure: An Overall Review and Constructor Perspective Alex Bradley, Haijiang

More information

Public BIM-based model checking solutions: lessons learned from Singapore and Norway

Public BIM-based model checking solutions: lessons learned from Singapore and Norway Building Information Modelling (BIM) in Design, Construction and Operations 421 Public BIM-based model checking solutions: lessons learned from Singapore and Norway E. Hjelseth Department of Civil Engineering

More information

BIM and Urban Infrastructure

BIM and Urban Infrastructure BIM and Urban Infrastructure Vishal Singh Assistant Professor Department of Civil and Structural Engineering, Aalto University 14 th September 2015 Learning objectives Describe the underlying concepts

More information

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA DESIGN AND CONST RUCTION AUTOMATION: COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA 94305-4020, USA Abstract Many new demands

More information

Roadmap Pitch: Road2CPS - Roadmapping Project Platforms4CPS Roadmap Workshop

Roadmap Pitch: Road2CPS - Roadmapping Project Platforms4CPS Roadmap Workshop Roadmap Pitch: Road2CPS - Roadmapping Project Platforms4CPS Roadmap Workshop Meike Reimann 23/10/2017 Paris Road2CPS in a nutshell Road2CPS: Strategic action for future CPS through roadmaps, impact multiplication

More information

ICT Enhanced Buildings Potentials

ICT Enhanced Buildings Potentials ICT Enhanced Buildings Potentials 24 th CIB W78 Conference "Bringing ICT knowledge to work". June 26-29 2007, Maribor, Slovenia. Per Christiansson Aalborg University 27.6.2007 CONTENT Intelligent Building

More information

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand.

OUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand. WHOWE ARE We help construction companies, general contractors, architects & engineers, integrate BIM into their projects seamlessly within their predefined timelines and budget, bridging the gap between

More information

UK Government BIM Programme. Simon Rawlinson

UK Government BIM Programme. Simon Rawlinson UK Government BIM Programme Water Industry Forum 19 June 2013 Simon Rawlinson 1 WWW.BENTLEY.COM Introduction Government BIM Strategy Application of BIM under the strategy Value added information exchange

More information

The Geotechnical Data Journey How the Way We View Data is Being Transformed

The Geotechnical Data Journey How the Way We View Data is Being Transformed Information Technology in Geo-Engineering D.G. Toll et al. (Eds.) IOS Press, 2014 2014 The authors and IOS Press. All rights reserved. doi:10.3233/978-1-61499-417-6-83 83 The Geotechnical Data Journey

More information

SMART PLACES WHAT. WHY. HOW.

SMART PLACES WHAT. WHY. HOW. SMART PLACES WHAT. WHY. HOW. @adambeckurban @smartcitiesanz We envision a world where digital technology, data, and intelligent design have been harnessed to create smart, sustainable cities with highquality

More information

Pre-Commercial Procurement (PCP) Actions

Pre-Commercial Procurement (PCP) Actions Pre-Commercial Procurement (PCP) Actions Open call in Objective 11.1 Targeted Calls in objectives 5.1(d), 11.2, 11.3, 8.2, 5.1(e)(1), 2.2(b) lieve.bos@ec.europa.eu EU Commission, DG INFSO Lisbon policy

More information

Brussels 18/12/2018. Level(s) pilot project Experience Center in Slovenia Vincent Briard, Sustainability and Product Regulatory Affairs Director

Brussels 18/12/2018. Level(s) pilot project Experience Center in Slovenia Vincent Briard, Sustainability and Product Regulatory Affairs Director Brussels 18/12/2018 Level(s) pilot project Experience Center in Slovenia Vincent Briard, Sustainability and Product Regulatory Affairs Director Knauf Insulation supports Level(s) Part of Knauf Insulation

More information

Work Programme Fostering the innovation potential of RIs

Work Programme Fostering the innovation potential of RIs Work Programme 2018-2020 Fostering the innovation potential of RIs Philippe Froissard Deputy Head of Unit Research Infrastructures Unit European Commission DG Research & Innovation Disclaimer: The following

More information

A Test Bed for Verifying and Comparing BIM-based Energy Analysis Tools

A Test Bed for Verifying and Comparing BIM-based Energy Analysis Tools 211 A Test Bed for Verifying and Comparing BIM-based Energy Analysis Tools Yu-Hsiang Wen 1, Han-Jung Kuo 2 and Shang-Hsien Hsieh 3 1 Computer-Aided Engineering Group, Department of Civil Engineering, National

More information

UK Government Building A New World

UK Government Building A New World CONSTRUCTION 4.0 CONFERENCE CONSTRUCTION DIGITALIZATION CHALLENGE AND CIVIL ENGINEERING IN THE CONTEXT OF INDUSTRY 4.0 UK Government Building A New World Digital Built Britain Sector Digitalisation March

More information

Home platforms and services: On the need for synergies between research and Standardisation

Home platforms and services: On the need for synergies between research and Standardisation Home platforms and services: On the need for synergies between research and Standardisation Jeanne De Jaegher European Commission DG Information Society and Media http://www.cordis.lu/ist/directorate_d/audiovisual/index.htm

More information

National Standard Details Library An Electronic Library of Parametric CAD Details

National Standard Details Library An Electronic Library of Parametric CAD Details National Standard Details Library An Electronic Library of Parametric CAD Details James Nyambayo and Robert Amor Building Research Establishment Bucknalls Lane, Garston, Watford, WD2 7JR, UK Phone +44-1923-664168.

More information

Towards implementation of building information modelling in the construction industry

Towards implementation of building information modelling in the construction industry Towards implementation of building information modelling in the construction industry Arayici, Y, Khosrowshahi, F, Ponting, AM and Mihindu, SA Title Authors Type URL Published Date 2009 Towards implementation

More information

Terms of Reference. Call for Experts in the field of Foresight and ICT

Terms of Reference. Call for Experts in the field of Foresight and ICT Terms of Reference Call for Experts in the field of Foresight and ICT Title Work package Lead: Related Workpackage: Related Task: Author(s): Project Number Instrument: Call for Experts in the field of

More information

DFI Europe Chapter Digitalisation Working Group

DFI Europe Chapter Digitalisation Working Group DFI Europe Chapter Digitalisation Working Group Jason Boddy, Arup jason.boddy@arup.com Definitions Digitalisation - Creating and using digital geotechnical data to make better use of digital technology

More information

The management of information over the life-cycle of a construction project using open-standard BIM

The management of information over the life-cycle of a construction project using open-standard BIM The management of information over the life-cycle of a construction project using open-standard BIM J.G. Hoeber MSc, hans.hoeber@rhdhv.com Royal HaskoningDHV, The Netherlands Ir. D.M. Alsem, daan.alsem@rhdhv.com

More information

DEVELOPMENT OF THE NATIONAL BIM STANDARD (NBIMS) FOR PRECAST/PRESTRESSED CONCRETE

DEVELOPMENT OF THE NATIONAL BIM STANDARD (NBIMS) FOR PRECAST/PRESTRESSED CONCRETE DEVELOPMENT OF THE NATIONAL BIM STANDARD (NBIMS) FOR PRECAST/PRESTRESSED CONCRETE Ivan Panushev, Research Scientist, ivan.panushev@gatech.edu Charles Eastman, Professor, charles.eastman@coa.gatech.edu

More information

Summary report RCN project no /I40

Summary report RCN project no /I40 Summary report RCN project no. 188913/I40 Construction and intervention vessel for Arctic conditions Project period: September 2008 December 2011 Project partners: MARINTEK CeSOS, Norwegian University

More information

Anne-Grete Ellingsen, CEO GCE NODE

Anne-Grete Ellingsen, CEO GCE NODE Anne-Grete Ellingsen, CEO GCE NODE The Norwegian cluster program Three levels: Arena Norwegian Center of Expertise Global Center of Expertise Ministry of Trade and Industry Ministry of Local Government

More information

Zeinab El-Sadr Ministry of Scientific Research, Egypt CAASTNet Stakeholders Meeting, Dakar Senegal 25 th April 2012

Zeinab El-Sadr Ministry of Scientific Research, Egypt CAASTNet Stakeholders Meeting, Dakar Senegal 25 th April 2012 Zeinab El-Sadr Ministry of Scientific Research, Egypt zelsadr@rdi.eg.net CAASTNet Stakeholders Meeting, Dakar Senegal 25 th April 2012 MIRA AIMS AT Developing a scientific and technological partnership

More information

buildingsmart International

buildingsmart International buildingsmart International buildingsmart Aquarium QTA and costing in building services/mep Bjørn K Stangeland & Lars C Christensen IFC/IFD/IDM Workshop: April 6 th 8 th 2008 Embassy Suites, Alexandria

More information

2013 A Giant Leap Forward for openbim

2013 A Giant Leap Forward for openbim December 2013 Issue 10 Official Publication of the buildingsmart UK User Group 2013 A Giant Leap Forward for openbim In this issue: Page 3 Page 6 Page 10 Page 12 The Rise of the User in the Development

More information

Сonceptual framework and toolbox for digital transformation of industry of the Eurasian Economic Union

Сonceptual framework and toolbox for digital transformation of industry of the Eurasian Economic Union Сonceptual framework and toolbox for digital transformation of industry of the Eurasian Economic Union Dmitry Krupsky Head of Department of Economy of Innovation Activity, Ministry of Economy of the Republic

More information

PV and other Technology Platforms

PV and other Technology Platforms PV and other Technology Platforms Evelyne Schellekens 2nd General Assembly of the European Photovoltaic Technology Platform Berlin,, 12 June 2007 Evelyne Schellekens 1 2nd General Assembly 2007, Berlin

More information

CS21297 Visualizing Mars: Enabling STEM Learning Using Revit, Autodesk LIVE, and Stingray

CS21297 Visualizing Mars: Enabling STEM Learning Using Revit, Autodesk LIVE, and Stingray CS21297 Visualizing Mars: Enabling STEM Learning Using Revit, Autodesk LIVE, and Stingray Fátima Olivieri, AIA KieranTimberlake folivieri@kierantimberlake.com Efrie Friedlander, AIA KieranTimberlake efriedlander@kierantimberlake.com

More information

Innovative public procurement case Finland

Innovative public procurement case Finland Innovative public procurement case Finland 14.9.2009 Petri Lehto Ministry of Employment and the Economy Innovation department / Demand-based Innovations (www.tem.fi/inno) Finland s Innovation strategy

More information

Potentials and Barriers for Implementing BIM in the German AEC Market

Potentials and Barriers for Implementing BIM in the German AEC Market Potentials and Barriers for Implementing BIM in the German AEC Market Results of a current market analysis Petra von Both Karlsruhe Institute for Technology, Department Building Lifecycle Management, Germany

More information

NORDIC ICT FORESIGHT Current state and future prospects in 2006

NORDIC ICT FORESIGHT Current state and future prospects in 2006 NORDIC ICT FORESIGHT Current state and future prospects in 2006 Toni Ahlqvist Senior Research Scientist, Project Manager VTT Technical Research Centre of Finland Technology Foresight and Technology Assessment

More information

D.T Benchmarking Report

D.T Benchmarking Report Project Acronym: SMART-SPACE Project title: ASP478 D.T1.3.1. Benchmarking Report WP n : Task n : Author(s): T1: The digital revolution to support AS innovation and growth Activity A.T1.3 Rainer Steindler,

More information

Digitization of the built environment

Digitization of the built environment Digitization of the built environment 15.00-16.15 Chair: Kieran Parkinson, BSI David Mudd, BSI Gavin Summerson, BSI Matt Crunden, Legrand 1 11/10/2017 Standards in the Built Environment Energy Performance

More information

French Speaking Chapter Status Report October 2014

French Speaking Chapter Status Report October 2014 French Speaking Chapter Status Report October 2014 Contacts Chair Technical Coordinator IDM Contact International User Group Delegate Local Implementers Support Group Open Infra coordinator French Product

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

Quality Management in BIM Use of Solibri Model Checker and CoBIM Guidlines for BIM Quality Validation.

Quality Management in BIM Use of Solibri Model Checker and CoBIM Guidlines for BIM Quality Validation. Jacob Wangara Quality Management in BIM Use of Solibri Model Checker and CoBIM Guidlines for BIM Quality Validation. Helsinki Metropolia University of Applied Sciences Bachelor of Engineering Civil Engineering

More information

Strategic Policy Forum: A Roadmap for Digital Entrepreneurship

Strategic Policy Forum: A Roadmap for Digital Entrepreneurship Member State Board on Digital Entrepreneurship Strategic Policy Forum: A Roadmap for Digital Entrepreneurship 2 nd meeting of the Member State Board Brussels, 26 September 2014 John Higgins President,

More information

Services Overview. Northeast Blueprint

Services Overview. Northeast Blueprint Services Overview 2D CAD Conversions Paper to CAD 2D CAD Conversions Construction Engineering / CAD Services Construction Markups Consultant Drawings Coordinated Drawings As -Builts Steel Structural Detailing

More information

Sharing Cities Stockholm can the sharing economy facilitate climate transition, locally in a city district?

Sharing Cities Stockholm can the sharing economy facilitate climate transition, locally in a city district? Sharing Cities Stockholm can the sharing economy facilitate climate transition, locally in a city district? Dr Charlie Gullström, KTH Royal Institute of Technology Digitalisation and interactive architecture

More information

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: NATIONAL REPRESENTATIVES GROUP (NRG) SUMMARY REPORT AND CONCLUSIONS OF THE MEETING OF 10 DECEMBER 2002 The third meeting of the NRG was

More information

Digital Built Britain David Philp Digital Built Britain (DBB): BIM Working Group

Digital Built Britain David Philp Digital Built Britain (DBB): BIM Working Group Digital Built Britain David Philp Digital Built Britain (DBB): BIM Working Group Digital Construction Week 2017 18 th October 2017 Digital Construction Week 2017 OVERVIEW: DIGITAL BUILT BRITAIN Welcome

More information