Integration Strategy for Fast-Chargers in Existing Power Grid

Size: px
Start display at page:

Download "Integration Strategy for Fast-Chargers in Existing Power Grid"

Transcription

1 0 ETS M.S. Thesis Mster of Siene in Sustinle Energy - Eletril Energy Systems Integrtion Strtegy for Fst-hrgers in Existing Power Grid Frederik Willim indner Kongens Lyngy 2016

2 DTU Eletril Engineering Deprtment of Eletril Engineering Tehnil University of Denmrk Supervisors: hresten Træholt Seyedmostf Hshemi Toghroljerdi Peter h ndersen Dniel Sndermnn Jensen Ørsteds plds uilding Kongens Lyngy, Denmrk Phone elektro@elektro.dtu.dk

3 strt Reent yers hs seen n enormous inrese in the fous on humn used limte hnge nd wys to void the ontinued temperture rise used y greenhouse gses. lrge prt of this prolem is the trnsition to n energy supply from sustinle soures. The trnsition to sustinle soiety inludes the trnsporttion setor. s of now, the solution seems to e eletri vehiles with tteries s energy storge. This thesis ims t nlyzing the Nordhvn power grid in the se where one or more 500kW+ fst-hrgers for E-uses re deployed. model for the relevnt prt of the Nordhvn grid is implemented in MTL Simulink. The hrgers will drw minimum of 500kW of power for short periods of time, mking lod nd voltge onstrint nlysis for the lol grid neessry. Simulink model for the hrger is developed nd implemented in the simultions long with lod profiles nd grid speifitions provided y DONG. The effets on the grid used y the fst-hrger is investigted in terms of urrent nd voltge level, oth during norml opertion nd fults. The effets of supporting the implementtion of fst-hrgers with ttery is investigted. Severl hrging ptterns, hrger lotions nd setups re explored to find the onstrints for suessful integrtion of fst-hrger.

4 ii

5 Resumé I løet f de seneste år hr verden st et øget fokus på de menneskeskte klimforndringer og ekæmpelsen f temperturstigninger som skyldes øgede mængder f drivhusgsser i tmossfæren. En stor del f udfordringen er omstillingen til æredygtige energiresourer. Omstillingen til et æredygtigt smfund omftter også trnsportsektoren, som i dg er seret på olie. Den mest lovende løsning ser i øjelikket ud til t være tteridrevne elektriske køretøjer. Målet med dette projekt er t nlysere Nordhvns elnetværket i det tilfælde t en 500kW hurtiglder til E-usser liver instlleret. En model f netværket er udviklet og indst i MTL Simulink for t undersøge prolemstillingen. Lderen vil som minimum påtrykke en elstning på 500kW i korte tidsperioder, dette nødvendiggør en nlyse f elstnings- og spændingsgrænser og niveuer. Der er udviklet en model for lderen smt elstninger på 10/0.4kV trnsformerne i netværket, derudover er en tterimodel også udviklet. Netværksmodellen er udviklet på en sis f speifiktioner leveret f DONG Energy. Det er undersøgt hvordn implementtionen f en hurtiglder påvirker strøm- og spændingsniveuer på to rdiler in elnettet. Der er undersøgt hvordn et tteri kn støtte under driften f hurtigldere. Sidst er der undersøgt hvd det vil kræve for et tteri for t vretge fuldstændig pek shving for forskellige ldemønstre.

6 iv

7 Prefe This report is 0 ETS point thesis nd requirement to omplete the Mster progrmme Sustinle Energy - Eletril Energy Systems nd therey otin the degree Mster of Siene in Engineering, Sustinle Energy t the Tehnil University of Denmrk. The thesis work ws rried out t the Deprtment of Eletril Engineering in ollortion with Dniel Sndermnn Jensen of DONG Energy nd is relted to the EnergyL Nordhvn reserh projet. The projet ws initited 5th of Mrh 2016 nd finished on the 5th of ugust The thesis dels with the onsequenes of instlling fst-hrger into n existing power grid, nd how it n e integrted so the power grid n ontinue opertion without expnding the pity of the grid. The intertion with ttery Energy Storge System is investigted s well s the effets of hving multiple fst-hrgers. The thesis onsists of five hpters. First, short introdution nd kground introduing the sujet to reder. Then Model desription nd prmeters hpter whih desries how the model is generted nd where the prmeters omes from. Next, results hpter, whih presents nd disusses the results of the simultions nd puts them into perspetive. t the end onlusion, summing up the whole projet. Kongens Lyngy, ugust 5, 2016 Frederik Willim indner

8 vi

9 knowledgements Severl people hve ontriuted with dvie, inspirtion nd support throughout this thesis journey. I owe ll of you my deepest grtitude. First nd foremost I would like to thnk my supervisors hresten Træholt, Seyedmostf Hshemi Toghroljerdi nd Peter h ndersen for the first lss supervision. gret thnks to you for letting me work with projet in my field of interest nd lwys tking the time to give me gret dvie when i needed it! It hs een n exiting hllenge to work on this projet. gret thnks to Dniel Sndermnn Jensen who offered me the opportunity to write my thesis in ollortion with DONG Energy nd ontriuted to seleting the min sujet nd mking it ll possile. For gret ptiene nd understnding, my most hertfelt thnks goes to Simone nd ugust, for enduring me during this time of high stress. Finlly, grteful thnks to my prents, my mother for sving the dy multiple times when ugust needed to e y-sitted nd for my fther for using hours upon hour on proof-reding nd mking suggetions to the report. Thnk you ll, I would never hve een le to pull through this if you hd not een there!

10 viii

11 ontents strt Resumé Prefe knowledgements ontents i iii v vii ix 1 Introdution Reders guide kground E-uses Sope Projet nd pproh Projet limittions EnergyL Nordhvn Grid model nd prmeters Model desription ttery Energy Storge System model Lod omposition Fult situtions Pek lod mitigtion y lodshift hrging pttern derivtion hoie of hrger dimensions Summry of modelling ssumptions se study 21.1 Senrios Summry of senrios Results seline senrios Simultion using two 500kW units nd ESS

12 x ontents 4. ttery support during feeder fult Lod shifting during pek hour Pekshving estimtion onlusion Future Work ppendix : Model Overview 54 iliogrphy 57

13 HPTER 1 Introdution 1.1 Reders guide This hpter explins the motivtion of this Msters thesis nd the effet of integrting fst-hrger into n existing power grid long with the potentil nd possiilities offered y hving grid sle ttery Energy Storge System (ESS) providing support in fult nd pek demnd situtions. The sope, limittions nd outline of the thesis is presented. It is ssumed tht the reder possesses knowledge of eletril energy systems in ddition to n understnding of power system opertion, eletril omponents nd the network dministrtor regultion nd governne surrounding the opertion of power grid. 1.2 kground Reent yers hs seen n enormous inrese in the fous on humn used limte hnge nd wys to void the ontinued temperture rise used y greenhouse gses. lrge prt of this prolem is the trnsition to n energy supply from sustinle soures. In this ontext, Denmrk hs n mitious gol of eing ompletely fossil fuel free y 2050[1]. This trnsition does nturlly inlude the trnsporttion setor, where n lterntive to oil s primry fuel hs to e implemented. s of now, the solution seems to e eletri vehiles with tteries s energy storge. Of the ttery types ville, Lithium-ion hs eome the most dominnt due to its reltively high energy density, power output nd eptle durility. Li-ion tteries hve seen quik mturtion over few yers s the demnd for the tehnology hs inresed rpidly. urrent tteries offer signifintly etter performne, oth in solute terms nd in performne per investment[2]. This hs opened the opportunity to eletrify the puli us network in ities to derese point pollution, noise level nd help omplete the trnsition to fossil fuel free soiety. Multiple ities ross the world re lredy running projets where some us lines re servied y E-uses[]. The ontinued trnsition to n eletrifition of our soiety poses new tehnil hllenges for oth Trnsmission System Opertor (TSO) nd for the Distriution System Opertor (DSO) s the infrstruture hs to e upgrded to e le to hndle the new system with deentrlised plnts, Distriuted Energy Resoures (DERs) nd inresed

14 2 1 Introdution demnd prtilly used y the eletrifition of the heting nd trnsporttion setors. E-uses dds different hllenge thn personl EVs or PHEVs s they hve very inflexile demnd nd, in some onfigurtions, lk the ility of providing lning servies for the grid during idle hours. Furthermore, their inflexile driving pttern puts dditionl strin on the Medium Voltge (MV) distriution grid s. 1. E-uses The gol of eing fossilfuel free is not rehed without inluding the trnsporttion setor, oth privte nd puli. Sine the S-trin nd metro net re lredy fully eletri, the regionl trins re plnned to e eletrified in the oming yers, the next step is to eletrify the us network. Eletrified uses (E-us) offers some tehnil dvntges over diesel uses, mong these re regenertive rking where power is regined to the ttery from using the motor s genertor to rke[4], no point pollution, options for different fuels depending on wht method is used to generte the eletriity hrging methods Severl methods re ville to implement this, the three mjor types eing trolleyuses, ttery powered uses with lrge pity nd lstly ttery powered uses with smller tteries. Eh offers its own set of dvntges nd disdvntges. Trolleyuses trolleyus does not rely on on-ord energy storge s it is onstntly onneted to the eletril grid y overhed wires. This elimintes the need for hrging sttions, ut stritly limits its movements to the route of the overhed wires. The dependene on wires mkes this rigid solution with low rerouteing possiilities if rod work, idents et. requires it. E-us with opportunity hrging This type of us rries smller ttery or superpitor, whih needs to e rehrged fter shorter distne eg. 0km[5]. The dvntges of this design re the lower weight, whih results in higher effiieny in terms of km/kwh nd higher reliility[5]. Disdvntges re the need for frequent rehrging, lower energy density if using superpitors nd higher investment ost for hrging equipment s it hs to e more powerful nd instlled t more lotions.

15 1.4 Sope Night-/Slow hrging Similrly to onventionl EV, this type of us relies on lrge ttery whih llows for longer trips etween hrging periods. The lrge tteries will e hrging for longer periods, espeilly during night time, whih mkes it possile to use them s network utility nd for the owner to profit on the trding of power when the uses re idle nd therefore ville to provide system servies on the sme level s dedited ESS in terms of voltge regultion, frequeny support et. 1.4 Sope The fous of this thesis is to investigte the effets fst-hrger my hve on MV distriution grid in residentil re. The MV grid is hosen due to DONG Energy, the lrgest DSO in Denmrk [6], eing ollortor in the thesis. DONG hs provided dt for two of the 10 kv rdil lines in their grid in Nordhvn. The ngle of investigtion is from the DSO point of view, mening the onsumption on the 0.4kV side of the 10/0.4kV trnsformers re ggregted nd following the sme 24-hour lod profile with sling orresponding to the numer of registered ustomers per 10/0.4kV trnsformer. The onnetion to the 60kV grid is regrded s n infinite soure onneted y 60/10kV tp hnging trnsformer. This mens tht the grid frequeny does not ply ny role, oth in terms of the dded onsumption ffeting the grid frequeny nd fst-hrger ehvior during frequeny normlities. s prt of the full sle energy development projet, EnergyL Nordhvn[7], it seeks to identify the hllenges tht my rise when instlling fst-hrgers in n existing grid nd wht ountermesures n e tken to void overloding the grid or feeder in oth urrent nd future lod ptterns. The primry ftors used for evlution of the grids response to fst-hrger re line urrent nd voltge level. The thesis seeks to first disover wht prt of the grid the fst-hrger should e instlled t to use the worst performne in terms of urrent levels in feeders nd the voltge level t the lod frthest from the 60/10kV trnsformer on the respetive feeder. The onnetion point found in the forementioned senrios will e used s point of investigtion when determining the possile risks of diretly integrting fst-hrger into the power grid. This is investigted with respet to the grid still eing le to omply with norml opertion riteri for voltge level nd feeder lod perentge. nother onstrint it must omply with is to not overlod supporting feeder during fult on the feeder rrying the fst-hrger. lterntives to grid upgrdes y instlling lrger feeder les is explored, s future power grids will likely rely on energy storge servies in order to ope with the flututions of DERs. It is intuitive to mke use of these tehnologies, leding to the

16 4 1 Introdution investigtion of the possile intertion etween fst-hrger nd ttery Energy Storge System (ESS) The ESS is introdued to llevite the grid from the lrge lod spikes ssoited with the ursts of power the fst-hrger delivers. To mke more generl piture of the effets of fst-hrgers, senrios with two units will e investigted to explore more severe ses of fult opertion nd higher pek demnd. Finlly n investigtion of the pity requirements for ESS to keep the lod of feeder elow norml opertion onstrints will e rried out to give n impression of the possiility for this type of flexile support s n lterntive to onventionl grid upgrdes. Sine grid sle ESS is lredy plnned to e instlled in the Nordhvn grid, the speifitions used in the Simulink grid model resemles the prmeters for the tul Nordhvn ESS. The ttery is modelled s progrmmle lod with stte of hrge determining the mount of power ville. The prmeters for the ESS re sed off the tul ESS in terms of in-/output power nd ttery pity. It is ssumed tht the ESS is ompletely dedited to supporting the fst-hrger, so ttery degrdtion nd other servies the ESS might e le to utilize hs een omitted in this investigtion. To summrize the gols of this projet: dpt nd upgrde the existing model of the Nordhvn grid to inlude residentil lods with vrying demnd over 24-hour yle. Determine the power nd hrge length for fst-hrger tht n supply ity us onsumption. Develop ESS model tht n support the opertion of grid when one or more fst-hrgers is integrted. Determine the pity requirements for running multiple fst-hrgers within grid ode limits. 1.5 Projet nd pproh In order to investigte the effets of instlling 500kW fst-hrger in the existing power grid in Nordhvn, n existing model[8] of two rdil rnhes hs een dpted nd expnded to inlude ontrollle lods, rel physil prmeters for les nd ESS with power flow driven ontroller. The onsequenes of the fst-hrger, seen from the DSO perspetive, re mesured in the individul line power flows, urrents nd voltge level. Simultions re done to disover if the implementtion will violte ny of the urrent

17 1.6 Projet limittions 5 rules in the grid opertion ode, minly if 50 % line lod is exeeded during norml opertion nd if the mximum line pity is exeeded during fult senrios. Furthermore, the potentil synergy with grid size ESS hs een investigted in terms of pek shving nd ful sitution power support. suessful integrtion of fst-hrger in the power grid will meet the following riteri: Will e le to supply the power need for n E-us to finish hrging efore new rrives. Deliver the power without overloding the trnsformer it is onneted to. e le to run t ll times of the dy without exeeding the orresponding 10kV feeders 50% pity during norml opertion. Not overlod feeder during fult opertion where the remining feeder hs to rry two feeder lods. drg the voltge of the frthest lod elow the regultory threshold. Furthermore, suessful integrtion of fst-hrger in omintion with ESS will, in ddition to the ove, meet the following: Signifintly redue the urrent on remining feeder during fult. e le to disple lod during high demnd hours. 1.6 Projet limittions s the sope of this thesis is to investigte nd present the possile hllenges in regrds to line lods nd ongestions. The fst-hrger model is modelled s PQ lod nd its trnsient ehvior is not investigted. The lotion nd power of the hrger is ssumed to e of insignifint influene on the high voltge grid nd the frequeny is therefore omitted s ftor in the opertion riteri for the hrger. In relity, hrger of this size will likely e sujet to set of grid odes. ll lods re modelled s resistive lods, s detiled lod dt hs not een ville for the projet. The model used limits the lod nlysis to -phse onneted, symmetril omponents whih exludes investigtion of phse voltge unlnes. The tul plement of the physil ESS re not inluded in this model s the ESS used hs een pled t the sme us s the hrger to show the optiml synergy effet it my hve on the opertion of the fst-hrger. The ESS is ssumed to e dedited to the hrger, whih would not e the se in prtie s it would e required to provide grid servies in order to mke profit.

18 6 1 Introdution The PV instlled in Nordhvn is not inluded in the model nd its possily positive influene on the opertion is not investigted.

19 1.7 EnergyL Nordhvn EnergyL Nordhvn EnergyL Nordhvn is full sle energy reserh nd urn development projet situted in openhgen. The gol of the projet is to develop nd implement new tehnologil solutions to the future energy infrstruture. The topis of reserh inlude: Utilistion of renewle energy, smrt grids, eletrified trnsporttion nd energy effiieny in uildings. The min gol is to unify ll these sutegories of the energy setor into n intelligent smrt ity. The projet is funded y the Dnish Energy Tehnology Development nd Demonstrtion Progrmme (EUDP) nd hs totl udget of 14 million DKK nd runtime period spnning [7]. Figure 1.1: Reserh re overview for projet EnergyL Nordhvn [7]. s seen in figure 1.1, the projet spns over mny topis, distriuted over severl work pkges within the portfolio. This thesis is prt of the work pkges WP6: Eletriity Infrstruture nd WP7: Trnsporttion Infrstruture whih fouses on EV integrtion nd eletril infrstruture. The WP leder for WP6 is DONG Energy, the DSO responsile for the entire Nordhvn power grid. The sope of WP6 is s follows: The WP investigtes flexile nd dynmi onsumption ptterns nd new grid designs. numer of innovtive dd-ons to the urrent grid lyout will e developed nd evluted for grid performne nd finnil fesiility[9].

20 8 1 Introdution nd the sope for WP7: There re severl eletri usses urrently in initil tril set-ups in severl regions of the world. In this Work Pkge, we will nlyze urrent eletri us projets nd their ssoited hrging tehnologies nd grid integrtive solutions. The findings from the nlysis will serve s referene point for Smrt Grid potentil for eletri uses[9] This projet ridges the two work pkges s it investigtes oth the possiility of hving E-uses present in Nordhvn nd the effets n integrtion of fst-hrgers for E-uses will hve on the eletril grid nd wht power grid dd-ons my do to mitigte the onsequenes of integrting sid fst-hrgers.

21 HPTER 2 Grid model nd prmeters This hpter fouses on desriing the model tht hs een uilt in MTL Simulink nd used to simulte the senrios onstruted to investigte the effets of integrting fst hrger in MV power grid. It moves on to define the prmeters for the senrios suh s the power of the fsthrger unit, ESS ontroller, hrging yle nd demnd distriution. 2.1 Model desription model of of the Nordhvn MV power grid developed in [8], hs een dpted nd expnded. The model onsists of 60/10kV tp hnging trnsformer tht supplies two prllel 10kV feeders, eh with set of 5-7, 10/0.4kV trnsformers onneted long its length. S1 Externl grid 60kV / 10kV 10kV / 0.4kV S2 S 10kV / 0.4kV Figure 2.1: Overview of the grid tht hs een used in this thesis. Figure 2.1 is sketh of the grid implemented in the Simulink model. Swithes hve een deployed t the eginning of eh feeder for the ske of demonstrting opertion in worst se fult situtions whih is if feeder is ompletely disonneted t its strt. swith t the end of line 1 is lso present in the event of fult t either line. Swith S 1 nd S re oth losed during norml opertion nd swith S 2 t the end is open.

22 10 2 Grid model nd prmeters When fult sitution is to e simulted either S 1 or S is opened nd swith S 2 is losed t the sme time to irumvent the fult nd seure power to ll lods. omplete overview of the developed Simulink lok model n e seen in Simulink nd SimPowerSystems MTL Simulink is used to simulte the power grid in this projet. Simulink uses lok interfe, where ll mthemtil funtions re pkged nd onneted in lok digrm. This llows for grphil overview mimiking the shemtis of rel power grid. Simulink ontins the lirry Simspe Power Systems whih hs defined loks for the most ommon elements in power systems suh s genertors, line setions, trnsformers nd RL lods. The model used uses the uilt-in loks for trnsformers nd π-line segments whih hs een modified with prmeters provided y DONG[10]. The model from [8] hs een extended with lods on eh 10/0.4kV trnsformer, n externlly ontrollle lod hs een developed for the simultions done in this thesis Lod loks The lod lok interfe provided in the model omes from [8]. It provides onnetion etween SimPowerSystems- nd stndrd Simulink-signls. It is done y mesuring the phse-phse voltges V nd V. these re used to rete voltge signl, V1, given s: V 1 = 1 (V 2 V ) (2.1) where 2 is the omplex onjugtion e j 2π. This results in the sme voltge s the phse to ground for V. Using the expression for pprent power, the voltge is omined with the ontrollle power signl to derive the orresponding urrent. S = (V I ) (2.2) 2 2 S = I (2.) V The resulting urrent is then split gin nd phse ngles re pplied to rerete lned -phse urrent signl. This method of modelling the lod y muxing the three phse system into single phse, mnipulting the urrent nd then demuxing into three phse gin, is only possile s long s the system is lned. This limits the model from eing used for voltge unlne nlysis in its urrent form. The lod is hnged through the simultion y lookup tle ontining the lod profile developed in this projet.

23 2.2 ttery Energy Storge System model Fst-hrger lok The fst-hrger model hs een developed with fous on the effet the dded lod used y the fst-hrger lod step hs on the lol power grid. The fst-hrger is onsidered to hve idel power eletronis le to mintin unity power ftor nd with ner-instntneous rmp up pility. The fst-hrger is using the sme interfe s the lod loks nd will therefore intert with the grid through the sme equtions shown in (2.1) nd (2.). It is ontrolled with inry on/off pulse genertor using the pttern tht will e onstruted in setion 2.6, whih toggles the 500kW lod step le speifitions The indutive retne, X, is given s [Ω/km] in the dt provided y DONG[10]. Sine Simulink Simspe EletriPowerSystems uses [H/km] s prmeter for its π line segments, it must e onverted y using the reltion elow: X[Ω] = 2πf L (2.4) X 2πf = L (2.5) 2.2 ttery Energy Storge System model The ESS tehnology hs een suggested s n opportunity to provide utility servies on grid level suh s frequeny support nd voltge support[11]. ESS unit is lso plnned to e prt of the Nordhvn projet[12], this ESS will e dimensioned to e le to produe or sor 1MW of power with pity of 0.5MWh[12]. Using this s design point, the ESS hs een modelled nd integrted in the simultion to explore the opportunities for synergy it my provide with fst-hrger. The ESS is used when investigting fult sitution support nd pek shving y lod shifting. It is ontrolled y proportionl ontroller whih uses the mgnitude of the power flow t the eginning of the relevnt 10kV feeder s input nd n externlly speified set point whih is hnged depending on the desired ggressiveness of the ttery ontrol strtegy. The ESS ontrol eqution is reted s: P out = (P set P mesured ) G P ESS (2.6) Where P set is the speified opertion point for the ESS, P mesured is the mesured power flow, G is the gin of the ontroller, P ESS is the mximum power output nd P out is the ommnded output y the ESS, if this is negtive it will put the ESS into hrge mode nd it will sor power from the grid. It is ssumed tht the ESS is dedited to supporting fst-hrger nd it is pled on

24 12 2 Grid model nd prmeters the sme us s the hrger. This is done in the ttempt to mke generl evlution of the enefits of hving ESS s support when integrting one or more fst-hrgers in power grid. 2. Lod omposition The Nordhvn grid onsists primrily of residentil lods. onsequently, the lod profile onsists of morning nd evening peks with medium onsumption during the dy nd low onsumption during the night. The lod type is regrded s resistive nd with no rotting mhines ggregted onsumption profile The model hs een dpted from stte without ny lod eing onneted to the 10/0.4kV trnsformers. These hs, s mentioned erlier een modelled in this thesis s ontrollle PQ lods. The lod shpe hs een derived from dt out the numer of onsumers onneted to eh trnsformer[10] in omintion with n verged lod profile onstruted from dt from Energinet.dk. Tle 2.1: Numer of onsumers on eh 10/0.4kV trfo used for sling lod on eh lod us in the model. Trfo no. onsumers Trfo no. onsumers The onsumer numers re normlized reltive to the highest numer of onsumers on trnsformer nd pplied to the model s rough sling of the lod distriution. Due to zero or ner-zero onsumer onnetions on some trnsformers, the lower numers hs een djusted to resemle more uniform distriution ross the feeders. Tle 2.2: Trnsformer lod sling, sorted y distne to 60/10kV trnsformer. Line ID Normlized onsumption sle Pink lue Sine the lod of network is vrying through the dy, lod urve hs to e pproximted. This is done on 24-hour yle whih repets if the simultion is longer. The

25 onsumption ftor 2. Lod omposition 1 lod profile is onstruted y sorting nd verging ll hours over yer into set of onsumption vlues overing one dy using the following eqution: P vg (h) = 65 d=1 P d (h) 65 (2.7) Where P vg (h) is the verged demnd for hour h of the dy nd P d (h) is the dy of the yer for the given hour h. The dt re gthered from Energinet.dk s dthu[1] nd overs the net onsumption for DK1+DK2 for the yer my my The sling otined from the urve is pplied to the model through Look Up tle whih onsists of 24 points with interpoltion etween. To keep the prmeter ount of the investigtion low, sesonl hnges in demnd hve not een implemented. 1 onsumption sle Time of dy Figure 2.2: verged onsumption used s 24-hour lod profile. The two slings re then omined nd the finl onsumption sle n e expressed s: P trfo,n (t) = P vg (t) P trfosle,n P sle (2.8) Where P trfo,n (t) is the lod t trnsformer n t time t, P vg (t) is the verged lod ftor t time t, P trfosle,n is the lod sling for trnsformer n nd P sle is the lod t pek onsumption time t the heviest loded trnsformer. Lod mesurement dt for the individul grid uses hs not een ville for this work nd n estimtion of lod sling hs een used insted. The tul lod t present time is derived on verge lod per onsumer in Denmrk nd numer of onsumers per trnsformer. The lod sle used in the simultions is signifintly higher thn the expeted urrent lod nd re sed off the expettion of more eletrified privte setor in the future due to het pumps nd EVs eoming more prevlent.

26 14 2 Grid model nd prmeters 2.4 Fult situtions mjor prt of the work presented in this thesis is the effet filure of one of the feeders hs on the opertion of the grid. fult n rise from multiple resons, le eing ut, reker triggering, short iruit et. The fult itself is not nlysed s this is outside the purpose of this work. Normlly when fult ours there will e period of time where the segment ehind the fult is ompletely disonneted efore the fult proedures re tivted nd the power is rerouted through the neighouring feeder(s). The simultion of fult sitution is hndled s instntneous, mening when fult is introdued it is hndled s if reker is tripped nd the swith t end of the lines is losed in the sme time step N-1 riterion The dimensioning rule for power grids re s minimum to e le to operte if the iggest unit in the system trips nd disonnets. This rule is ditted y the Europen TSO ENTSOE [14] nd y extension, the Dnish TSO Energinet.dk [1]. The rule rries over to the design riteri for MV grids where DONG hs speified the limits s 2/ of the mximum pity. This is due to DONG s grid design hoie where two neighoring feeders re set to over for one if fult ours, splitting the lod in two insted of one. Sine the model used for this thesis only ontins two feeders, onstrint of 50% lod during norml opertion hs een used s evlution prmeter.

27 2.5 Pek lod mitigtion y lodshift Pek lod mitigtion y lodshift Pek lod mitigtion or pek shving is n option to defer or postpone trditionl grid upgrdes where the method is to reinfore the grid y instlling dditionl/lrger trnsmission lines. The onept hs een visulised in figure 2. Figure 2.: Pek shving exmple [15]. The ESS desried erlier llows for n lterntive solution where the grid is mde flexile in terms of deentrlized regultion units, in this se the ESS, supports the lod flow in the lol re insted of power plnt hving to push the power through the whole grid. In this se, the purpose of the ESS is to ttempt to keep the lod of the feeders elow the threshold of 50% during norml opertion. The ESS is to dishrge during peks nd to exploit the exess line pity to hrge during off pek hours. Eqution 2.8 is used to govern the ehvior of the ESS, with the Stte Of hrge (SO) nd mximum Power s limits to its opertion. It is of ourse not possile to utilize ll exess pity, whih is leds to the prolem of ttery size whih is investigted further in the lod shift simultion se. 2.6 hrging pttern derivtion The hrging pttern used for the simultion is sed off the ssumption tht the openhgen us route will servie the route tht is to e eletrified. This route termintes t Nordhvn sttion, mking it n ovious ndidte for n E-us fst-hrger lotion for the Nordhvn projet. The route is depited in figure 2.4.

28 16 2 Grid model nd prmeters Figure 2.4: us route used for estimting onsumption[16]. Length of roundtrip is pproximtely 1 km ording to Google Mps[16]. Estimted onsumption rtes re sed on OWI report[17] where three onsumption levels re presented s low, medium nd high onsumption rte. The influening ftors re, mong others, lod weight, verge speed nd driving pttern. Using the vlues from [17] yields the energy onsumption seen in tle 2.. Tle 2.: onsumption estimtion for route with l roundtrip levels of. se kwh/km kwh/trip Low Mid High = 1km using different The rnge of onsumption, s n e seen from 2., hs wide gp from highest to lowest, dding some unertinty to the estimtion of hrger size nd hrging time. To show some of the options ville, severl possile hrger power levels hs een investigted. These re hosen on the kground of the rnge presented y Solris us nd oh in []. lulting the hrging time for the three onsumption level re done for three fsthrger power levels, 0.90 effiieny ftor for the ttery hrging loss is used, the expression used is: t hrge = e us l roundtrip P hrger η hrge (2.9) Where t hrge is the time it tkes to hrge, e us is the onsumption of the us in [ ] kw h km, l roundtrip is the length of the us route, η hrge is the hrge yle effiieny nd P hrger is

29 hrger on/off 2.6 hrging pttern derivtion 17 the power delivered y the hrger in [kw]. This yields the hrging times seen in tle 2.4 Tle 2.4: hrging times t different levels of hrger power output nd onsumption rtes. hrging time [minutes] se kwh 150kW 00kW 500kW Low Mid High With 6 minutes eing the shortest time etween deprtures from the hrging terminl, some of the hrging solutions re undesirle to implement in prtie s they would violte the time onstrint posed y the shedule. With one hrger ville, hrging times longer thn 6 minutes re uneptle. With 4.8 minutes eing the worst se senrio for the 500kW fst-hrger, n estimted hrging time rounded to five minutes will e used. The frequeny of rrivls of uses vries through 24 hour yle, with rush hour pek oiniding with residentil onsumption pek seen in figure 2.2. This retes higher risk of lod prolems on line with hrgers onneted. hrging frequeny through 24 hour yle with 5 minutes hrging period on off Time of dy Figure 2.5: hrge frequeny used for simultion,with eh hrge yle set to 5 minutes. Figure 2.5 shows the hrging pttern derived from the time tle for us line. Tle 2.5 explins the rrivl frequeny of eh group seen in 2.5.

30 18 2 Grid model nd prmeters Tle 2.5: Frequeny groups for us line [18]. Setion Frequeny [minutes] hoie of hrger dimensions The fst-hrger speifitions hs een hosen on the sis of us frequeny in tle 2.5, the onsumption nd orresponding hrge time in tle 2.4 nd the physil limits of the 10/0.4kV trnsformers in the grid. The fst-hrger lok used is then hosen to hve power of 500kW whih is sustined for five minutes for eh hrge yle. This hoie is to over the worst se hrging time for n E-us overing the 1km route. The power of the hrger orresponds to ville tehnology s seen in [] nd is le to keep within the 60kV limit of the urrent trnsformers instlled in the Nordhvn grid. The 500kW power does put high lod perentge on the trnsformer nd it might e worth onsidering n upgrde of the trnsformer to etter ope with the lod in prtie.

31 2.8 Summry of modelling ssumptions Summry of modelling ssumptions The ssumptions mde in order to simulte nd evlute the senrios for n integrtion of fst-hrger in MV power grid re summrized here: Grid ssumptions le length on 0.4kV side is ssumed to e negligile 10/0.4kV trnsformer t hrger us is ssumed to e upgrded if lod exeeds pity Lod ssumptions Lod sle is mde on kground of Denmrk s whole Is lmost purely resistive hrger ssumptions Trnsient ehvior is not investigted Power eletronis re ssumed to e le to mintin unity powerftor Totl hrmoni distortion is ssumed to e negligile rmp up is ssumed to e ner instntneous ESS ssumptions ESS is dedited to supporting fst-hrger Is loted t sme us s fst-hrger Hs the sme properties s the plnned Nordhvn ESS in terms of pity nd mx power

32 20

33 HPTER se study This hpter desries the senrios used to determine the impts of the integrtion of fst-hrger in the power grid. The effets re investigted in terms of feeder lod nd voltge qulity. The investigtion is done to ensure tht the opertion of fst-hrgers does not rek ny grid odes or entirely overlod the system during fult on feeder. Synergy with ESS is eing investigted to see if it is possile to redue the stress on the grid used y fst-hrger y supporting during fult or y supplying power lolly when demnd is high. fter showing the effets of single fst-hrger, nother one is introdued in order to explore more hypothetil senrio where the grid proves too wek to operte with the fst-hrgers within the grid ode oundries. Finlly it will e explored if it is tehnilly possile to sty within norml opertion oundries with the help of ESS when two 500kW fst-hrgers re instlled..1 Senrios series of senrios hs een simulted to investigte the onsequenes of instlling fst-hrger in n existing residentil power grid nd to give piture the tions tht n e tken to void overloding the grid or violting norml opertion riteri desried in the previous hpter. The sope of the projet is to investigte the lod hnge on the grid during different opertion modes. The senrios re foused on norml opertion nd opertion during single fult on one feeder t time. The simultions hs een onduted in n order with inresing omplexity nd fult severity. First, the integrtion of single 500kW hrger is simulted t severl lotions to determine the worst se lotion to e used when simulting other senrios with different onfigurtions. Seond, the grid response to fult on one feeder is investigted with oth one nd two 500kW units. During 1000kW senrios, the pity of the trnsformer onneting the fst-hrgers hs een inresed from 60kV to 1.5MV to e le to hndle the extr lod. The forementioned senrios re used s se ses for omprison to senrios where

34 22 se study the ESS re then introdued to show the support it n provide to void reking the norml opertion riteri for the grid or to keep the grid from overloding in fult situtions..1.1 Influene of the lotion of fst-hrger in norml opertion simultion of three senrios hs een rried out to determine the differene of influene the distne from the fst-hrger lod us to the 60/10kV trnsformer hs during norml oper tion. oth swith S 1 nd S t the eginning the the feeders re losed during the length of the simultion nd the end swith,s 2, is open. The fst-hrger onfigurtion is single unit of 500kW. The senrio length is one hrge yle nd is t the pek onsumption time of dy t hour 18 to 19 s seen in figure 2.2. The senrios re ompred in terms of urrent flow in the feeders where the fst-hrger is loted nd y mesuring the voltge level t the lod us frthest from the 60/10kV trnsformer on the feeder ontining the fst-hrger. Figures.1,.2,. show the positions to e srutinized. S1 Externl grid 60kV / 10kV 10kV / 0.4kV S ESS S2 10kV / 0.4kV Figure.1: Overview of the grid with oth fst-hrger nd ESS onneted t lotion 1.

35 .1 Senrios 2 S1 Externl grid 60kV / 10kV 10kV / 0.4kV S ESS S2 10kV / 0.4kV Figure.2: Overview of the grid with oth fst-hrger nd ESS onneted t lotion 2. S1 Externl grid 60kV / 10kV 10kV / 0.4kV S2 S 10kV / 0.4kV ESS Figure.: Overview of the grid with oth fst-hrger nd ESS onneted t lotion..1.2 Influene of the lotion of fst-hrger during feeder fult sitution worst se sitution fult is introdued on one feeder in this set of senrios. The swith on one of the feeders is opened during pek hour nd the other feeder hs to rry the lod through the end swith whih is losed t the sme time s the fult ours. For these simultions, pling the fst-hrger t the strt of the feeder is expeted to generte the lrgest prolem s this retes the longest distne from supply to frthest lod. This senrio is lso used to demonstrte the potentil for supporting the opertion of fst-hrger with ESS. These simultions re done with oth single 500kW fst-hrger nd with two units with the sme power. This is done to rete sis to ompre the improvements used y introduing ESS.

36 24 se study The performne of the grid is gin mesured in terms of urrent nd power flow in the feeders where the fst-hrger is loted nd y mesuring the voltge level t the lod us ontining the fst-hrger. The retive power is expeted to e of little signifine due to the resistive modelling of the lods, thus ll retive power needed will e from the feeders. Tle.1: Swith sttus during the three opertion situtions used for the se study. Norml opertion Feeder 1 fult Feeder 2 fult S 1 losed Open losed S 2 Open losed losed S losed losed Open Tle.1, gives n overview of the swith onfigurtion used in the senrios..1. Worst se fult sitution with ESS support The worst se plement of fst-hrger determined y the previous simultion is used here to show the improvement ESS n provide during fult. The ESS is loted on the sme lod us s the fst-hrger nd provides lol power injetion to relieve the surrounding grid. The simultion is done with either one nd two 500kW units onneted to the first trnsformer on feeder minute fult is then introdued t the sme time s ove to e le to ompre the grid ehvior. The ESS will injet power during the fult, leding to smller drop in voltge nd lower lod on the remining feeder..1.4 Pek shving y lod shifting with ESS Fult situtions our rrely ompred to demnd peks whih hppen dily, therefore it would e very ostly to instll grid sized ESS just to mitigte fult lods. nother purpose for ESS ould then e to ensure tht the norml opertion limits re not exeeded during pek hours. This is done y letting the ESS injet power proportionl to the mount ove the riteri limit on the respetive feeder. The dishrged energy is then repled during off pek hours nd thus the lod will e shifted. The lod shift pility is of ourse limited y the physil speifitions of the ESS in terms of mximum power nd energy pity. The simultion is rried out for oth one nd two 500kW units. The ESS is not expeted to e le to hndle ll of the exess demnd, the pity required is investigted fter.

37 .2 Summry of senrios Estimtion of ESS pity required to fully over pek shving demnd The finl spet of this investigtion is n estimtion of the totl ttery pity needed to fully over the lod shift demnd shown in previous simultions. This is done y mesuring the urrent mgnitude t ll time steps where the feeder urrent exeeds 50% of mx nd then mesuring the gp when there is exess pity. The two resulting vetors re then plotted s umultive sums showing the totl power required s well s the ville power for hrging the ESS k up. The slope of the dishrge umultive sum revels where the ritil time period is, the steeper the urve, the more power is needed. Sutrting the hrge nd dishrge umultive sums will revel when there is defiit of hrging opportunities. To show the signifine of hrge time length, this investigtion is rried out for hrge time lengths of 5, 4 nd minutes..2 Summry of senrios Tle.2 shows n overview over the onduted simultions nd the si prmeters used. Tle.2: List of simultions nd se prmeters used to disover the impt of fsthrgers on the grid. hrger lotion P hrger Fult ESS Lotion omprison Feeder kw No No Feeder kw No No Feeder 1 end 500 kw No No N-1 omprison Feeder kw Yes No Feeder kw Yes No Feeder 1 end 500 kw Yes No N-1 with support Feeder kw Yes Yes Feeder kw Yes Yes Lodshift pility Feeder kw Yes Yes Feeder kw Yes Yes Lodshift ESS pity estimtion Feeder kw No No Feeder 1 refers to the pink/upper feeder in the model nd Feeder 2 to the lue/ottom

38 26 se study feeder. The ESS hs onstnt pity of 500kWh nd strts t 80% SO in ll simultions where it is present. This is done to reflet prtil opertion of ESS whih rrely rehes 100% SO.

39 HPTER 4 Results The senrios desried in the previous hpter hve een simulted using MTL Simulink nd the results hve een doumented in this hpter where it will e desried nd evluted in terms of lod flow, feeder urrents nd voltge levels. The otined results re presented in n order strting with n investigtion of the effet 500kW lod step hs on the power grid t three lotion. The response to 10 minute fult on one feeder is then shown t three lotions. sed on these results the worst se lotion is hosen for use in the following simultions. The fult sitution is then investigted gin ut with ESS onneted on the sme us s the fst-hrger, to show the improvements on grid strin tht my e provided y suh servie. Finlly, senrios re simulted with the ESS used for pek shving when the grid is operting in norml onditions. n investigtion of the required pity is done for vrious hrge time lengths. 4.1 seline senrios The se senrios shows the simplest onfigurtion of the grid, with single 500kW fst-hrger unit onneted t 10/0.4kV trnsformer on one of the feeders. The grid is simulted in three onfigurtions where the fst-hrger is loted t either one of the first trnsformers on the feeders, or t the end trnsformer of feeder 1. These senrios re eing used s enhmrk for the more dvned senrios where multiple fsthrger units nd ESS is onsidered. The simultions give sis for omprison t the pek onsumption hour s this will e the time where overloding will our if it hppens se senrio w/ hrgers in ll lotions The first simultions re done to determine the lod on the grid when fst-hrger of 500kW is introdued. The simultions re done over the spn of five minutes nd over lod step during the pek hour of the dy.

40 urrent [] urrent [] 28 4 Results Feeder 1 urrent, 500kW hrger with no ESS Lotion 1 Lotion 2 Lotion Time [s] Figure 4.1: urrent in feeder 1 during 500kW lod step t pek hour, the smll ox is zoom on the urrents t the eginning of the lod step Feeder 2 urrent, 500kW hrger with no ESS Lotion 1 Lotion 2 Lotion Time [s] Figure 4.2: urrent in feeder 2 during 500kW lod step t pek hour, the feeder urrent is uffeted of lod steps on feeder 1. Figure 4.1 nd 4.2 show the urrent flow mesured t the eginning of eh feeder in the event of lod step of 500kW used y the fst-hrger. Sine the feeders do not hve the sme se lod due to differene in numer of trnsformers, the results hve een split nd shown on two figures, one for eh feeder. From figure 4.1 it n e seen tht the effet of hving the fst-hrger pled t the end of feeder of this length is insignifint in terms of urrent flow. Thus the resistive losses of moving the hrger to the k of the feeder is negligile nd is not signifint ftor in the identifition of worst se lotion senrio in norml opertion.

41 tive power [MW] tive power [MW] 4.1 seline senrios Feeder 1 tive power, 500kW hrger with no ESS 1.7 # Lotion 1 Lotion 2 Lotion Time [s] Figure 4.: tive power flow in feeder 1 during 500kW lod step, the smll ox is zoomed re showing the eginning of the lod step Feeder 2 tive power, 500kW hrger with no ESS 1.08 # Lotion 1 Lotion 2 Lotion Time [s] Figure 4.4: tive power flow in feeder 2 during 500kW lod step, the smll ox is zoomed re showing the eginning of the lod step. The hnge in urrent is trnslted into power hnge s seen in figures 4. nd 4.4. From the zoom on figure 4. the differene etween pling the fst-hrger t the eginning or t the end of feeder 1 is pproximtely 0.00MW or kw.

42 Retive power [kvr] Retive power [kvr] 0 4 Results Feeder 1 retive power, 500kW hrger with no ESS Lotion 1 Lotion 2 Lotion Time [s] Figure 4.5: Retive power flow in feeder 1 during 500kW lod step. Feeder 2 retive power, 500kW hrger with no ESS Lotion 1 Lotion 2 Lotion Time [s] Figure 4.6: Retive power flow in feeder 2 during 500kW lod step. The retive power flow omes exlusively from the loding of the feeders. s seen in figure 4.5, the differene etween the worst nd est lotion on feeder 1 is less thn one kvr. Thus the retive power is not the deiding prmeter for worst se lotion. The influene of the retive power would of ourse e greter if different power ftor hd een used for the lod models. This leds to the next evlution prmeter, whih is the voltge level. This hs een mesured on the end of the sme feeder s the fst-hrger is loted t, it is mesured during the sme lod step s the ove results.

43 Voltge [p.u.] 4.1 seline senrios Voltge levels t end trnformers 500kW hrger with no ESS Lotion 1 Lotion 2 Lotion Time [s] Figure 4.7: Voltge hnge during 500kW lod step, the voltge is mesured t the end of the respetive feeder rrying the fst-hrger. Figure 4.7 shows the voltges mesured t the end lod of the feeder rrying the fsthrger during the lod step. The voltge is shown in per unit to give etter reltion to the grid ode requirements for voltge qulity. Looking t the voltges llows one to distinguish the effet eh lotion hs on the grid response to the fst-hrger lod step. s it might e expeted, the longest pth hs the most severe effet on the lod voltge level. Lotion of the fst-hrger t the end of feeder 2 is not investigted s the end of feeder 1 will lwys hve worse onditions due to the numer of 10/0.4kV trnsformers is seven on feeder 1 ompred to five on feeder 2. The results show tht it is possile to integrte fst-hrger into the power grid with the urrent onfigurtion without exeeding ny oundries for norml opertion. From this simultion lone it mkes sense to hoose the end of feeder 1 s lotion for the fst-hrger in the following simultions. Sine the length of the feeder from trnsformer to fst-hrger hs shown its signifine, it is ovious tht further simultions must e onduted to show the most extreme length of feeder to fst-hrger us to determine the worst se lotion. This is done in the following simultions y looking t the fult opertion Feeder fult ll lotions The sme grid onfigurtions s efore is used gin for the investigtion of the ehvior during totl fult t the eginning of the feeder rrying the fst-hrger. The simultions lst for one hour t the pek onsumption hour of the dy. The fult is introdued fter 10 minutes of simultion nd lered gin fter nother 10 minutes. The mesurement point is lwys on the non-fult feeder in order to mesure urrent nd power during the fult. The fult is ssumed to e hndled instntneously nd S 2 t the end of the feeders is losed in the sme time step. It is importnt to note tht this would not e the se in

44 Voltge [p.u.] urrent [] 2 4 Results rel world opertion s ll proedures hve dely nd some even re mnully operted kW hrger N-1 sitution urrent flow Line 1 Strt Line 2 Strt Line 1 End Time of dy Figure 4.8: urrent hnge during lod step. Looking t figure 4.8 revels the urrent experiened y the remining feeder during fult sitution, the feeder hs to e le to rry oth lods without exeeding the physil limits of the le. The lk, dotted, horizontl line t the top of the plot signifies the 100% loding of the feeder kW hrger N-1 sitution Voltge level Line 1 Strt Line 2 Strt Line 1 End Time of dy Figure 4.9: Voltge hnge t frthest trnsformer during lod step. Moving on to the voltge level during fult. It n e seen from figure 4.9 tht the differene in voltge levels re more outspoken during fult. The severity of the voltge drop is worst when the fst-hrger is loted t the first trnsformer of feeder 1. This is onsistent with the ft tht feeder impedne is very influentil on the voltge level due to the omplex impedne of the les[19].

Analog Input Modules

Analog Input Modules 7 922 nlog Input odules G56... nlog input modules for the ontrol of SQ5... ir dmper tutors y ontinuous nlog ontrol signls, suh s 4...20 m, nd ontinuous nlog position feedk signls. For supplementry Dt Sheets,

More information

AGA56... Analog Input Modules. Siemens Building Technologies HVAC Products

AGA56... Analog Input Modules. Siemens Building Technologies HVAC Products 7 922 nlog Input odules G56... nlog input modules for the ontrol of SQ5... ir dmper tutors y ontinuous nlog ontrol signls, suh s 4...20 m, nd ontinuous nlog position feedk signls. For supplementry Dt Sheets,

More information

Resistors, Current and Voltage measurements, Ohm s law, Kirchhoff s first and second law. Kirchhoff s first Objectives:

Resistors, Current and Voltage measurements, Ohm s law, Kirchhoff s first and second law. Kirchhoff s first Objectives: EE -050 Ciruit L Experiment # esistors, Current nd Voltge mesurements, Ohm s lw, Kirhhoff s first nd seond lw. Kirhhoff s first Ojetives: Slmn in Adul Aziz University Eletril Engineering Deprtment. Fmiliriztion

More information

Probability and Statistics P(A) Mathletics Instant Workbooks. Copyright

Probability and Statistics P(A) Mathletics Instant Workbooks. Copyright Proility nd Sttistis Student Book - Series K- P(A) Mthletis Instnt Workooks Copyright Student Book - Series K Contents Topis Topi - Review of simple proility Topi - Tree digrms Topi - Proility trees Topi

More information

VOLTAGE SAG IMPROVEMENT BY PARTICLE SWARM OPTIMIZATION OF FUZZY LOGIC RULE BASE

VOLTAGE SAG IMPROVEMENT BY PARTICLE SWARM OPTIMIZATION OF FUZZY LOGIC RULE BASE VOL., NO. 7, PRIL 206 ISSN 89-6608 RPN Journl of Engineering nd pplied Sienes 2006-206 sin Reserh Pulishing Network (RPN). ll rights reserved. VOLTGE SG IMPROVEMENT Y PRTILE SWRM OPTIMIZTION OF FUZZY LOGI

More information

Digital Simulation of an Interline Dynamic Voltage Restorer for Voltage Compensation

Digital Simulation of an Interline Dynamic Voltage Restorer for Voltage Compensation JOURNL OF ENGINEERING RESERH ND TEHNOLOGY, VOLUME 1, ISSUE 4, DEEMER 214 Digitl Simultion of n Interline Dynmi Voltge Restorer for Voltge ompenstion Dr.P.Ush Rni R.M.D.Engineering ollege, henni, pushrni71@yhoo.om

More information

Patterns and Algebra

Patterns and Algebra Student Book Series D Mthletis Instnt Workooks Copyright Series D Contents Topi Ptterns nd funtions identifying nd reting ptterns skip ounting ompleting nd desriing ptterns numer ptterns in tles growing

More information

SLOVAK UNIVERSITY OF TECHNOLOGY Faculty of Material Science and Technology in Trnava. ELECTRICAL ENGINEERING AND ELECTRONICS Laboratory exercises

SLOVAK UNIVERSITY OF TECHNOLOGY Faculty of Material Science and Technology in Trnava. ELECTRICAL ENGINEERING AND ELECTRONICS Laboratory exercises SLOVAK UNIVERSITY OF TECHNOLOGY Fulty of Mteril Siene nd Tehnology in Trnv ELECTRICAL ENGINEERING AND ELECTRONICS Lbortory exerises Róbert Riedlmjer TRNAVA 00 ELECTRICAL ENGINEERING AND ELECTRONICS Lbortory

More information

Macroscopic and Microscopic Springs Procedure

Macroscopic and Microscopic Springs Procedure Mrosopi nd Mirosopi Springs Proedure OBJECTIVE Purpose In this l you will: investigte the spring-like properties of stright wire, disover the strethiness of mteril, independent of the size nd shpe of n

More information

Notre Dame Tasks. Activity since last Telecon (Feb 7, 2011)

Notre Dame Tasks. Activity since last Telecon (Feb 7, 2011) Notre Dme Tsks tivity sine lst Teleon (Feb, ) Interfe Speifition beteen UWM/Dispth gent Frequeny estimtion simpoer omponent E-bord lod-shedding simpoer omponent Smrt-Sith simpoer omponent Single-phse Odyssin

More information

RWM4400UH High Performance Hand Held Wireless Microphone System

RWM4400UH High Performance Hand Held Wireless Microphone System CH 1 CH 2 CH 3 CH 4 UHF QUAD VOLUME MAX VOLUME MAX VOLUME MAX VOLUME RWM 4400UH MIN MIN MIN CHANNEL 1 CHANNEL 2 CHANNEL 3 CHANNEL 4 RWM4400UH High Performne Hnd Held Wireless Mirophone System OWNER S MANUAL

More information

TRANSIENT VOLTAGE DISTRIBUTION IN TRANSFORMER WINDING (EXPERIMENTAL INVESTIGATION)

TRANSIENT VOLTAGE DISTRIBUTION IN TRANSFORMER WINDING (EXPERIMENTAL INVESTIGATION) IJRET: Interntionl Journl of Reserh in Engineering nd Tehnology ISSN: 2319-1163 TRANSIENT VOLTAGE DISTRIBUTION IN TRANSFORMER WINDING (EXPERIMENTAL INVESTIGATION) Knhn Rni 1, R. S. Goryn 2 1 M.teh Student,

More information

(1) Primary Trigonometric Ratios (SOH CAH TOA): Given a right triangle OPQ with acute angle, we have the following trig ratios: ADJ

(1) Primary Trigonometric Ratios (SOH CAH TOA): Given a right triangle OPQ with acute angle, we have the following trig ratios: ADJ Tringles nd Trigonometry Prepred y: S diyy Hendrikson Nme: Dte: Suppose we were sked to solve the following tringles: Notie tht eh tringle hs missing informtion, whih inludes side lengths nd ngles. When

More information

URL: mber=

URL:   mber= Wijnhoven, T.; Deonink, G., "Flexile fult urrent ontriution with inverter interfed distriuted genertion," in IEEE Power nd Energy Soiety Generl Meeting (PES), Vnouver, BC, Cnd, -5 July, 5 p. doi:.9/pesmg..66769

More information

Understanding Three-Phase Transformers

Understanding Three-Phase Transformers PDH ourse E450 (4 PDH) Understnding Three-Phse Trnsformers Rlph Fehr, Ph.D., P.E. 2014 PDH Online PDH enter 5272 Medow Esttes Drive Firfx, V 22030-6658 Phone & Fx: 703-988-0088 www.pdhonline.org www.pdhenter.om

More information

Math Circles Finite Automata Question Sheet 3 (Solutions)

Math Circles Finite Automata Question Sheet 3 (Solutions) Mth Circles Finite Automt Question Sheet 3 (Solutions) Nickols Rollick nrollick@uwterloo.c Novemer 2, 28 Note: These solutions my give you the nswers to ll the prolems, ut they usully won t tell you how

More information

COMPUTER NETWORK DESIGN Network layer protocols

COMPUTER NETWORK DESIGN Network layer protocols OMPUTER NETWORK ESIGN Network lyer protools Network lyer (lyer 3) Gruppo Reti TL nome.ognome@polito.it http://www.telemti.polito.it/ OMPUTER NETWORK ESIGN Review of network lyer protools - opyright This

More information

The PWM switch model introduced by Vatché Vorpérian in 1986 describes a way to model a voltage-mode switching converter with the VM-PWM switch model.

The PWM switch model introduced by Vatché Vorpérian in 1986 describes a way to model a voltage-mode switching converter with the VM-PWM switch model. The PWM swith model introdued by Vthé Vorpérin in 1986 desribes wy to model voltge-mode swithing onverter with the VM-PWM swith model. The lrge-signl model is equivlent to d trnsformer whose turns rtio

More information

Adaptive Droop Control Shunt Active Filter and Series AC Capacitor Filter for Power Quality Improvement in Power System

Adaptive Droop Control Shunt Active Filter and Series AC Capacitor Filter for Power Quality Improvement in Power System ville online t: http://www.ijmtst.om/neeses17.html Speil Issue from nd Ntionl onferene on omputing, Eletril, Eletronis nd Sustinle Energy Systems, 6 th 7 th July 17, Rjhmundry, Indi dptive Droop ontrol

More information

Interaction Analysis in Islanded Power Systems with HVDC Interconnections

Interaction Analysis in Islanded Power Systems with HVDC Interconnections 3rd Interntionl Hyrid Power Systems Workshop Tenerife, Spin 8 9 My 218 Intertion Anlysis in Islnded Power Systems with HVDC Interonnetions Crlos Colldos-Rodríguez, Edurdo Prieto-Arujo, Mr Cheh-Mne, Rird

More information

Pearson Education Limited Edinburgh Gate Harlow Essex CM20 2JE England and Associated Companies throughout the world

Pearson Education Limited Edinburgh Gate Harlow Essex CM20 2JE England and Associated Companies throughout the world Person Edution Limited Edinurgh Gte Hrlow Essex M20 2JE Englnd nd ssoited ompnies throughout the world Visit us on the World Wide We t: www.personed.o.uk Person Edution Limited 2014 ll rights reserved.

More information

Detection of Denial of Service attacks using AGURI

Detection of Denial of Service attacks using AGURI Detetion of Denil of Servie ttks using AGURI Ryo Kizki Keio Univ. kizki@sf.wide.d.jp Kenjiro Cho SonyCSL kj@sl.sony.o.jp Osmu Nkmur Keio Univ. osmu@wide.d.jp Astrt Denil of Servie ttks is divided into

More information

Voltage Management in Unbalanced Low Voltage Networks Using a Decoupled Phase- Tap-Changer Transformer

Voltage Management in Unbalanced Low Voltage Networks Using a Decoupled Phase- Tap-Changer Transformer Downloded from orit.dtu.dk on: Jul 5, 28 Voltge Mngement in Unlned Low Voltge Networks Using Deoupled Phse- Tp-Chnger Trnsformer Coppo, Mssimilino ; Turri, Roerto ; Mrinelli, Mtti; Hn, Xue Pulished in:

More information

Performance Investigation of SEPIC based Dynamic Voltage Restorer

Performance Investigation of SEPIC based Dynamic Voltage Restorer T.Suneel, nd r. SN Gnesh / nterntionl Journl of New Tehnologies in Siene nd Engineering ol., ssue. 4, e. 4, SSN 349-78 Performne nvestigtion of SEP sed ynmi oltge Restorer T. SUNEEL ssistnt Professor eprtment

More information

GLONASS PhaseRange biases in RTK processing

GLONASS PhaseRange biases in RTK processing ASS PhseRnge ises in RTK proessing Gle Zyrynov Ashteh Workshop on GSS Bises 202 Bern Switzerlnd Jnury 8-9 202 Sope Simplified oservtion models for Simplified oservtion models for ASS FDMA speifi: lok nd

More information

A Development of Embedded System for Speed Control of Hydraulic Motor

A Development of Embedded System for Speed Control of Hydraulic Motor AISTPME (2011) 4(4): 35-39 A Development of Embedded System for Speed Control of Hydruli Motor Pornjit P. Edutionl Mehtronis Reserh Group Deprtment of Teher Trining in Mehnil Engineering, KMUTN, ngkok,

More information

ALONG with the maturity of mobile cloud computing,

ALONG with the maturity of mobile cloud computing, An Optiml Offloding Prtitioning Algorithm in Moile Cloud Computing Huming Wu, Dniel Seidenstüker, Yi Sun, Crlos Mrtín Nieto, Willim Knottenelt, nd Ktink Wolter system, nd their min gol is to keep the whole

More information

Evaluating territories of Go positions with capturing races

Evaluating territories of Go positions with capturing races Gmes of No Chne 4 MSRI Pulitions Volume 63, 2015 Evluting territories of Go positions with pturing res TEIGO NAKAMURA In nlysing pturing res, or semeis, we hve een fousing on the method to find whih plyer

More information

Installation manual. Daikin Altherma LAN adapter BRP069A61 BRP069A62. Installation manual Daikin Altherma LAN adapter. English

Installation manual. Daikin Altherma LAN adapter BRP069A61 BRP069A62. Installation manual Daikin Altherma LAN adapter. English Instlltion mnul Dikin Altherm LAN dpter BRP069A6 BRP069A6 Instlltion mnul Dikin Altherm LAN dpter English Tle of ontents Tle of ontents Aout the doumenttion. Aout this doument... Aout the produt. Comptiility....

More information

A New Control for Series Compensation of UPQC to Improve Voltage Sag/Swell

A New Control for Series Compensation of UPQC to Improve Voltage Sag/Swell AUT Journl of Modeling nd Simultion AUT J. Model. Simul., 49()(7)7584 DOI:.6/misj.6.843 A New Control for Series Compenstion of to Improve oltge Sg/Swell M. Torin Esfhni, nd B. hidi Dept. of Eletril Engineering,

More information

arxiv: v2 [cs.sy] 16 Nov 2012

arxiv: v2 [cs.sy] 16 Nov 2012 IEEE Personl use of this mteril is permitted Permission from IEEE must e otined for ll other uses, in ny urrent or future medi, inluding reprinting/repulishing this mteril for dvertising or promotionl

More information

ISM-PRO SOFTWARE DIGITAL MICROSCOPE OPERATION MANUAL

ISM-PRO SOFTWARE DIGITAL MICROSCOPE OPERATION MANUAL MN-ISM-PRO-E www.insize.om ISM-PRO SOFTWARE DIGITAL MICROSCOPE OPERATION MANUAL Desription Clik Next. As the following piture: ISM-PRO softwre is for ISM-PM00SA, ISM-PM600SA, ISM- PM60L digitl mirosopes.

More information

Module 9. DC Machines. Version 2 EE IIT, Kharagpur

Module 9. DC Machines. Version 2 EE IIT, Kharagpur Module 9 DC Mchines Version EE IIT, Khrgpur esson 40 osses, Efficiency nd Testing of D.C. Mchines Version EE IIT, Khrgpur Contents 40 osses, efficiency nd testing of D.C. mchines (esson-40) 4 40.1 Gols

More information

Section 6.1 Law of Sines. Notes. Oblique Triangles - triangles that have no right angles. A c. A is acute. A is obtuse

Section 6.1 Law of Sines. Notes. Oblique Triangles - triangles that have no right angles. A c. A is acute. A is obtuse Setion 6.1 Lw of Sines Notes. Olique Tringles - tringles tht hve no right ngles h is ute h is otuse Lw of Sines - If is tringle with sides,, nd, then sin = sin = sin or sin = sin = sin The miguous se (SS)

More information

MODELING OF SEPIC FED PMBLDC MOTOR FOR TORQUE RIPPLE MINIMIZATION

MODELING OF SEPIC FED PMBLDC MOTOR FOR TORQUE RIPPLE MINIMIZATION ODEING OF SEPIC FED PBDC OOR FOR ORQUE RIPPE INIIZAION N.kshmipriy.E.,Assistnt Professor Deprtment of EEE Jy Shrirm Group of Institution, irupur, Indi lkshmipriyme9@gmil.om S.nivel.E.,Assistnt Professor

More information

Abdominal Wound Closure Forceps

Abdominal Wound Closure Forceps Inventor: Crlson, Mrk A. My 25, 2007 Adominl Wound Closure Foreps Astrt. The devie is modifition of stndrd tissue foreps for use during losure of dominl wounds mde for surgil proedure. The modifition onsists

More information

Dynamic analysis of inverter dominated unbalanced LV micro-grids

Dynamic analysis of inverter dominated unbalanced LV micro-grids Dynmi nlysis of inverter dominted unlned LV miro-grids N. L. Soultnis, A. I. Tsouhniks, N. D. Htzirgyriou, J. Mhseredjin Astrt This pper presents simultion of the dynmi ehvior of low voltge miro-grids

More information

Research Article Evaluation of Harmonic Content from a Tap Transformer Based Grid Connection System for Wind Power

Research Article Evaluation of Harmonic Content from a Tap Transformer Based Grid Connection System for Wind Power Journl of Renewle Energy Volume 2013, rtile ID 190573, 8 pges http://dx.doi.org/10.1155/2013/190573 Reserh rtile Evlution of Hrmoni ontent from Tp Trnsformer sed Grid onnetion System for Wind Power S.

More information

Improved sensorless control of a permanent magnet machine using fundamental pulse width modulation excitation

Improved sensorless control of a permanent magnet machine using fundamental pulse width modulation excitation Pulished in IET Eletri Power Applitions Reeived on 19th April 2010 Revised on 27th July 2010 doi: 10.1049/iet-ep.2010.0108 Improved sensorless ontrol of permnent mgnet mhine using fundmentl pulse wih modultion

More information

CHAPTER 3 AMPLIFIER DESIGN TECHNIQUES

CHAPTER 3 AMPLIFIER DESIGN TECHNIQUES CHAPTER 3 AMPLIFIER DEIGN TECHNIQUE 3.0 Introduction olid-stte microwve mplifiers ply n importnt role in communiction where it hs different pplictions, including low noise, high gin, nd high power mplifiers.

More information

CHAPTER 2 LITERATURE STUDY

CHAPTER 2 LITERATURE STUDY CHAPTER LITERATURE STUDY. Introduction Multipliction involves two bsic opertions: the genertion of the prtil products nd their ccumultion. Therefore, there re two possible wys to speed up the multipliction:

More information

Published in: Wireless Communications and Networking Conference, IEEE WCNC 2009

Published in: Wireless Communications and Networking Conference, IEEE WCNC 2009 Alorg Universitet Cross-Lyer Optimiztion of Multipoint Messge Brodst in MANETs Nielsen, Jimmy Jessen; Grønæk, Lrs Jesper; Renier, Thiult Julien; Shwefel, Hns- Peter; Toftegrd, Thoms Pulished in: Wireless

More information

Exercise 1-1. The Sine Wave EXERCISE OBJECTIVE DISCUSSION OUTLINE. Relationship between a rotating phasor and a sine wave DISCUSSION

Exercise 1-1. The Sine Wave EXERCISE OBJECTIVE DISCUSSION OUTLINE. Relationship between a rotating phasor and a sine wave DISCUSSION Exercise 1-1 The Sine Wve EXERCISE OBJECTIVE When you hve completed this exercise, you will be fmilir with the notion of sine wve nd how it cn be expressed s phsor rotting round the center of circle. You

More information

1/4" Multi-Turn Fully Sealed Container Cermet Trimmer

1/4 Multi-Turn Fully Sealed Container Cermet Trimmer www.vishy.om Vishy Sfernie 1/4" Multi-Turn Fully Seled Continer Cermet Trimmer Due to their squre shpe nd smll size (6.8 mm x 6.8 mm x 5 mm), the multi-turn trimmers of the series re idelly suited for

More information

Simulation of a zero-sequence relay for a distribution network with EMTP-RV Discrimination between fault current and magnetizing inrush current

Simulation of a zero-sequence relay for a distribution network with EMTP-RV Discrimination between fault current and magnetizing inrush current imultion of zero-sequene rely for distriution network with MTP-RV Disrimintion etween fult urrent nd mgnetizing inrush urrent M. Petit, P. Bstrd Astrt-- The zero-sequene relys re widely used to protet

More information

Comparison of Geometry-Based Transformer Iron- Core Models for Inrush-Current and Residual-Flux Calculations

Comparison of Geometry-Based Transformer Iron- Core Models for Inrush-Current and Residual-Flux Calculations omprison of Geometry-Bsed Trnsformer Iron- ore Models for Inrush-urrent nd Residul-Flux lultions R. Yonezw, T. Nod Astrt--When trnsformer is energized, oltge drop is osered due to the inrush urrents. An

More information

COMPUTER MODELLING OF FLICKER PROPAGATION

COMPUTER MODELLING OF FLICKER PROPAGATION OMPUTER MODELLING OF FLIKER PROPGTION T.Keppler N.R.Wtson J.rrillg University of nterury hristhurh, New Zelnd n.wtson@ele.nterury..nz strt The time series of the voltges t the desired lotions re first

More information

POWER TRIM. Table of Contents. Section 5C - Dual Power Trim System

POWER TRIM. Table of Contents. Section 5C - Dual Power Trim System SERVICE MANUAL NUMBER 28 Tle of Contents POWER TRIM Setion 5C - Dul Power Trim System DUAL POWER TRIM SYSTEM Lurints / Selnts / Adhesives..... 5C-2 Importnt Informtion................ 5C-2 Testing Dul

More information

8.1. The Sine Law. Investigate. Tools

8.1. The Sine Law. Investigate. Tools 8.1 Te Sine Lw Mimi 50 ermud Tringle ermud 1600 km Sn Jun 74 Puerto Rio Te ermud Tringle, in te nort tlnti Oen, is te lotion of severl unexplined plne nd sip disppernes. Vrious teories ve een suggested

More information

Kirchhoff s Rules. Kirchhoff s Laws. Kirchhoff s Rules. Kirchhoff s Laws. Practice. Understanding SPH4UW. Kirchhoff s Voltage Rule (KVR):

Kirchhoff s Rules. Kirchhoff s Laws. Kirchhoff s Rules. Kirchhoff s Laws. Practice. Understanding SPH4UW. Kirchhoff s Voltage Rule (KVR): SPH4UW Kirchhoff s ules Kirchhoff s oltge ule (K): Sum of voltge drops round loop is zero. Kirchhoff s Lws Kirchhoff s Current ule (KC): Current going in equls current coming out. Kirchhoff s ules etween

More information

Power Density and Efficiency Optimization of Resonant and Phase-Shift Telecom DC-DC Converters

Power Density and Efficiency Optimization of Resonant and Phase-Shift Telecom DC-DC Converters Power Density nd Effiieny Optimiztion of Resonnt nd PhseShift Teleom DCDC Converters U. Bdstuener, J. Biel nd J. W. Kolr Power Eletroni Systems Lortory, ETH Zurih ETHZentrum, ETL H12, Physikstrsse 3 CH892

More information

Proposed Cable Tables for SAS2

Proposed Cable Tables for SAS2 Tle 50 Requirements for internl le ssemlies using SASDrive onnetors n kplnes. Requirement, Units 1,5 Gps 3Gps 6 Gps Bulk le or kplne:, Differentil impene ohm 100 ± 10 100 g Common-moe impene ohm 32,5 ±

More information

Geometric quantities for polar curves

Geometric quantities for polar curves Roerto s Notes on Integrl Clculus Chpter 5: Bsic pplictions of integrtion Section 10 Geometric quntities for polr curves Wht you need to know lredy: How to use integrls to compute res nd lengths of regions

More information

3/8" Square Multi-Turn Cermet Trimmer

3/8 Square Multi-Turn Cermet Trimmer Vishy Sfernie 3/8" Squre Multi-Turn Cermet Trimmer FEATURES Industril grde W t 70 C The T93 is smll size trimmer - 3/8" x 3/8" x 3/16" - nswering PC ord mounting requirements. Five versions re ville whih

More information

Multivariable integration. Multivariable integration. Iterated integration

Multivariable integration. Multivariable integration. Iterated integration Multivrible integrtion Multivrible integrtion Integrtion is ment to nswer the question how muh, depending on the problem nd how we set up the integrl we n be finding how muh volume, how muh surfe re, how

More information

Modeling and Control of a Six-Switch Single-Phase Inverter Christopher L. Smith. Electrical Engineering

Modeling and Control of a Six-Switch Single-Phase Inverter Christopher L. Smith. Electrical Engineering Modeling nd Control of Six-Swith Single-Phse Inverter Christopher. Smith Thesis sumitted to the Fulty of the irgini Polytehni Institute nd Stte University in prtil fulfillment of the requirements for the

More information

Multi-beam antennas in a broadband wireless access system

Multi-beam antennas in a broadband wireless access system Multi-em ntenns in rodnd wireless ccess system Ulrik Engström, Mrtin Johnsson, nders Derneryd nd jörn Johnnisson ntenn Reserch Center Ericsson Reserch Ericsson SE-4 84 Mölndl Sweden E-mil: ulrik.engstrom@ericsson.com,

More information

Balancing Your Life. Ideas that might help you

Balancing Your Life. Ideas that might help you Blning Your Life Ides tht might help you Pul Hoskin Summer 2007 Let s e honest if one lists off the responsiilities nd hoies tht eh of us hve nd ssigns weekly hourly time tht eh needs to e fulfilled, then

More information

Technical Note 7. General Introduction. Holy Stone

Technical Note 7. General Introduction. Holy Stone Generl Introdution Tehnil Note 7 The Multilyer Cermi Chip Cpitors supplied in bulk, ssette or tped & reel pkge re idelly suitble for thik-film Hybrid iruits nd utomti surfe mounting on printed iruit bords.

More information

GENERAL NOTES USE OF DESIGN DATA SHEETS:

GENERAL NOTES USE OF DESIGN DATA SHEETS: GENERL DT: TE FOLLOWING DT IS SSUMED: USE OF DT SEETS: ED REVIEWED INTERNL NGLE OF FRITION OF KFILL SOIL, = 30 TOTL UNIT WEIGT OF KFILL SOIL = 20 PF bf. LULTE TE REQUIRED EIGT "" PER TE "STEM EIGT" NOTE

More information

High power busbar trunking

High power busbar trunking High power usr trunking Cnlis KTA (1000 to 4000 A) For feeding nd onnetions in : industry ommeril nd servie uildings nd infrstrutures Presenttion 1 2 Run omponents From 1000 to 4000 A. 4 live luminium

More information

Comparison of Minimising Total Harmonic Distortion with PI Controller, Fuzzy Logic Controller, BFO- fuzzy Logic Controlled Dynamic Voltage Restorer

Comparison of Minimising Total Harmonic Distortion with PI Controller, Fuzzy Logic Controller, BFO- fuzzy Logic Controlled Dynamic Voltage Restorer Interntionl Journl of Eletroni nd Eletril Engineering. ISSN 974-274, Volume 7, Numer 3 (24), pp. 299-36 Interntionl Reserh Pulition House http://www.irphouse.om omprison of Minimising Totl Hrmoni Distortion

More information

THe overall performance and the cost of the heating

THe overall performance and the cost of the heating Journl of Eletril Engineering Spe etor Modultion For Three Phse ndution Dieletri Heting Y B Shukl nd S K Joshi Deprtment of Eletril Engineering The M.S.University of Brod dodr, ndi, e-mil : yshukl@yhoo.om,

More information

Comparison of SVPWM and SPWM Techniques for Back to Back Converters in PSCAD

Comparison of SVPWM and SPWM Techniques for Back to Back Converters in PSCAD , 35 Otoer, 03, Sn Frniso, USA Comprison of SVPWM nd SPWM Tehniques for Bk to Bk Converters in PSCAD Agustin Hernndez, Ruen Tpi, Memer, IAENG, Omr Aguilr, nd Ael Gri Astrt This rtile presents the simultion

More information

3/8" Square Multi-Turn Cermet Trimmer

3/8 Square Multi-Turn Cermet Trimmer www.vishy.om 3/8" Squre Multi-Turn Cermet Trimmer Vishy Sfernie ermet element. FEATURES Industril grde The is smll size trimmer - 3/8" x 3/8" x 3/16" - nswering PC ord mounting requirements. Five versions

More information

Experiment 3: Non-Ideal Operational Amplifiers

Experiment 3: Non-Ideal Operational Amplifiers Experiment 3: Non-Idel Opertionl Amplifiers 9/11/06 Equivlent Circuits The bsic ssumptions for n idel opertionl mplifier re n infinite differentil gin ( d ), n infinite input resistnce (R i ), zero output

More information

Experiment 3: Non-Ideal Operational Amplifiers

Experiment 3: Non-Ideal Operational Amplifiers Experiment 3: Non-Idel Opertionl Amplifiers Fll 2009 Equivlent Circuits The bsic ssumptions for n idel opertionl mplifier re n infinite differentil gin ( d ), n infinite input resistnce (R i ), zero output

More information

& Y Connected resistors, Light emitting diode.

& Y Connected resistors, Light emitting diode. & Y Connected resistors, Light emitting diode. Experiment # 02 Ojectives: To get some hndson experience with the physicl instruments. To investigte the equivlent resistors, nd Y connected resistors, nd

More information

Genetically Tuned STATCOM for Voltage Control and Reactive Power Compensation

Genetically Tuned STATCOM for Voltage Control and Reactive Power Compensation Interntionl Journl of omputer Theory nd Engineering, Vol. 2, No. 3, June, 2 793-82 Genetilly Tuned STTOM for Voltge ontrol nd Retive Power ompenstion Nveen Goel, R.N. Ptel, Memer, IEEE, Sji T. hko strt

More information

7 8 9 0 OFFIE ROOF,000 SF /.7 RES VLLO TOWN ENTER OWNER - VLLO PROPERTY OWNER LL. 9 PGE MILL ROD, PLO LTO, 90 T. 0--00 RHITETURE - RFEL VINOLY RHITETS 0 VNDM STREET, NEW YORK, NY 00 T. -9-00 LOK 0 - PRIVTE

More information

1/4" Multi-Turn Fully Sealed Container Cermet Trimmer

1/4 Multi-Turn Fully Sealed Container Cermet Trimmer 1/4" Multi-Turn Fully Seled Continer Cermet Trimmer Due to their squre shpe nd smll size (6.8 mm x 6.8 mm x 5 mm), the multi-turn trimmers of the series re idelly suited for PCB use, enling high density

More information

Programming Guide. Neurostimulators for Chronic Pain. RestoreSensor, RestoreUltra, RestoreAdvanced, and PrimeAdvanced

Programming Guide. Neurostimulators for Chronic Pain. RestoreSensor, RestoreUltra, RestoreAdvanced, and PrimeAdvanced Progrmming Guide Neurostimultors for Chroni Pin RestoreSensor, RestoreUltr, RestoreAdvned, nd PrimeAdvned For use with SureSn MRI nd erlier non-suresn Neurostimultion Systems. Overview This guide desries

More information

Student Book SERIES. Patterns and Algebra. Name

Student Book SERIES. Patterns and Algebra. Name E Student Book 3 + 7 5 + 5 Nme Contents Series E Topic Ptterns nd functions (pp. ) identifying nd creting ptterns skip counting completing nd descriing ptterns predicting repeting ptterns predicting growing

More information

Mixed CMOS PTL Adders

Mixed CMOS PTL Adders Anis do XXVI Congresso d SBC WCOMPA l I Workshop de Computção e Aplicções 14 20 de julho de 2006 Cmpo Grnde, MS Mixed CMOS PTL Adders Déor Mott, Reginldo d N. Tvres Engenhri em Sistems Digitis Universidde

More information

Digital Design. Sequential Logic Design -- Controllers. Copyright 2007 Frank Vahid

Digital Design. Sequential Logic Design -- Controllers. Copyright 2007 Frank Vahid Digitl Design Sequentil Logic Design -- Controllers Slides to ccompny the tetook Digitl Design, First Edition, y, John Wiley nd Sons Pulishers, 27. http://www.ddvhid.com Copyright 27 Instructors of courses

More information

Sequential Logic (2) Synchronous vs Asynchronous Sequential Circuit. Clock Signal. Synchronous Sequential Circuits. FSM Overview 9/10/12

Sequential Logic (2) Synchronous vs Asynchronous Sequential Circuit. Clock Signal. Synchronous Sequential Circuits. FSM Overview 9/10/12 9//2 Sequentil (2) ENGG5 st Semester, 22 Dr. Hden So Deprtment of Electricl nd Electronic Engineering http://www.eee.hku.hk/~engg5 Snchronous vs Asnchronous Sequentil Circuit This Course snchronous Sequentil

More information

The Nottingham eprints service makes this work by researchers of the University of Nottingham available open access under the following conditions.

The Nottingham eprints service makes this work by researchers of the University of Nottingham available open access under the following conditions. Remenyte-Presott, Rs nd Andrews, John (27) Prime implints for modulrised non-oherent fult trees using inry deision digrms. Interntionl Journl of Reliility nd Sfety, (4). pp. 446-464. ISSN 479-393 Aess

More information

Three-Phase Synchronous Machines The synchronous machine can be used to operate as: 1. Synchronous motors 2. Synchronous generators (Alternator)

Three-Phase Synchronous Machines The synchronous machine can be used to operate as: 1. Synchronous motors 2. Synchronous generators (Alternator) Three-Phse Synchronous Mchines The synchronous mchine cn be used to operte s: 1. Synchronous motors 2. Synchronous genertors (Alterntor) Synchronous genertor is lso referred to s lterntor since it genertes

More information

IMPROVING THE RELIABILITY OF THREE PHASE INVERTER BASE ON CUK CONVERTER FOR PV APPLICATION

IMPROVING THE RELIABILITY OF THREE PHASE INVERTER BASE ON CUK CONVERTER FOR PV APPLICATION MPRONG TE RELABLTY OF TREE PASE NERTER BASE ON CUK CONERTER FOR P APPLCATON inyk Bhgwn Kshid M. Teh (Eletril Power System) Rjrmpu nstitute of Tehnology Mhrshtr, ndi Prof..T.Jdhv Deprtment of Eletril Engineering

More information

GENERAL NOTES USE OF DESIGN DATA SHEETS:

GENERAL NOTES USE OF DESIGN DATA SHEETS: GENERL DT: TE FOLLOWING DT IS SSUMED: USE OF DT SEETS: ED INTERNL NGLE OF FRITION OF KFILL SOIL, = 0 TOTL UNIT WEIGT OF KFILL SOIL = 0 PF bf. LULTE TE REQUIRED EIGT "" PER TE "STEM EIGT" NOTE ON TIS SEET.

More information

ABB STOTZ-KONTAKT. ABB i-bus EIB Current Module SM/S Intelligent Installation Systems. User Manual SM/S In = 16 A AC Un = 230 V AC

ABB STOTZ-KONTAKT. ABB i-bus EIB Current Module SM/S Intelligent Installation Systems. User Manual SM/S In = 16 A AC Un = 230 V AC User Mnul ntelligent nstlltion Systems A B 1 2 3 4 5 6 7 8 30 ma 30 ma n = AC Un = 230 V AC 30 ma 9 10 11 12 C ABB STOTZ-KONTAKT Appliction Softwre Current Vlue Threshold/1 Contents Pge 1 Device Chrcteristics...

More information

Seamless Integration of SER in Rewiring-Based Design Space Exploration

Seamless Integration of SER in Rewiring-Based Design Space Exploration Semless Integrtion of SER in Rewiring-Bsed Design Spe Explortion Soeeh Almukhizim* & Yiorgos Mkris Eletril Engineering Dept. Yle University New Hven, CT 62, USA Astrt Rewiring hs een used extensively for

More information

Alternating-Current Circuits

Alternating-Current Circuits chpter 33 Alternting-Current Circuits 33.1 AC Sources 33.2 esistors in n AC Circuit 33.3 Inductors in n AC Circuit 33.4 Cpcitors in n AC Circuit 33.5 The LC Series Circuit 33.6 Power in n AC Circuit 33.7

More information

Artificial Neural Network Based Backup Differential Protection of Generator-Transformer Unit

Artificial Neural Network Based Backup Differential Protection of Generator-Transformer Unit Interntionl Journl of Eletronis nd Eletril Engineering Vol. 3, No. 6, Deemer 05 rtifiil Neurl Network sed kup Differentil Protetion of Genertor-Trnsformer Unit H. lg nd D. N. Vishwkrm Deprtment of Eletril

More information

Critical Evaluation of FBD, PQ and CPT Power Theories for Three-Wire Power Systems

Critical Evaluation of FBD, PQ and CPT Power Theories for Three-Wire Power Systems Critil Evlution of FBD, PQ nd CPT Power Theories for Three-Wire Power Systems Fernndo MARAFÃO Group of Automtion nd Integrting Systems, São Pulo Stte University Soro, São Pulo, 17-1, Brzil Helmo MORALES

More information

Multilevel Inverter with Less Number of Isolated dc Bus Voltages

Multilevel Inverter with Less Number of Isolated dc Bus Voltages Interntionl Journl of Engineering & ehnology IJE-IJENS ol: No: 8 Multileel Inerter with Less Numer of Isolted Bus oltges Mhrous E. Ahmed, Htim Ghzi M. Zini Fulty of Engineering, if Uniersity, KSA mehmed7@ieee.org

More information

ICL7116, ICL / 2 Digit, LCD/LED Display, A/D Converter with Display Hold. Description. Features. Ordering Information. Pinouts.

ICL7116, ICL / 2 Digit, LCD/LED Display, A/D Converter with Display Hold. Description. Features. Ordering Information. Pinouts. SEMICONDUCTOR ICL116, ICL11 August 199 3 1 / 2 Digit, LCD/LED Disply, A/D Converter with Disply Hold Fetures HOLD Reding Input Allows Indefinite Disply Hold Gurnteed Zero Reding for 0V Input True Polrity

More information

Experiment 8 Series DC Motor (II)

Experiment 8 Series DC Motor (II) Ojectives To control the speed of loded series dc motor y chnging rmture voltge. To control the speed of loded series dc motor y dding resistnce in prllel with the rmture circuit. To control the speed

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 4 Bttery Chrging Methods EXERCISE OBJECTIVE When you hve completed this exercise, you will be fmilir with the different chrging methods nd chrge-control techniques commonly used when chrging Ni-MI

More information

Patterns and Relationships

Patterns and Relationships Series Techer Ptterns nd Reltionships opyright 009 3P Lerning. All rights reserved. First edition printed 009 in Austrli. A ctlogue record for this ook is ville from 3P Lerning Ltd. ISBN 978-1-91860-3-4

More information

Lecture 16. Double integrals. Dan Nichols MATH 233, Spring 2018 University of Massachusetts.

Lecture 16. Double integrals. Dan Nichols MATH 233, Spring 2018 University of Massachusetts. Leture 16 Double integrls Dn Nihols nihols@mth.umss.edu MATH 233, Spring 218 University of Msshusetts Mrh 27, 218 (2) iemnn sums for funtions of one vrible Let f(x) on [, b]. We n estimte the re under

More information

INSTALLATION & OPERATION INSTRUCTIONS LEVER HANDLE LOCKSETS.

INSTALLATION & OPERATION INSTRUCTIONS LEVER HANDLE LOCKSETS. INSTALLATION & OPERATION INSTRUCTIONS FOR LEVER HANDLE LOCKSETS 999-00333E_EN FOR BRINKS HOME SECURITY INTERIOR LOCKING & NON-LOCKING LEVER HANDLE LOCKSETS. FITS DOORS 1-3/8" (35 mm) TO 1-3/4" (45 mm)

More information

Switching Algorithms for the Dual Inverter fed Open-end Winding Induction Motor Drive for 3-level Voltage Space Phasor Generation

Switching Algorithms for the Dual Inverter fed Open-end Winding Induction Motor Drive for 3-level Voltage Space Phasor Generation S.Srinivs et l: Swithing Algorithms for the Dul Inverter fed... Swithing Algorithms for the Dul Inverter fed Open-end Winding Indution Motor Drive for 3-level Voltge Spe Phsor Genertion S. Srinivs nd V..

More information

ISSCC 2006 / SESSION 21 / ADVANCED CLOCKING, LOGIC AND SIGNALING TECHNIQUES / 21.5

ISSCC 2006 / SESSION 21 / ADVANCED CLOCKING, LOGIC AND SIGNALING TECHNIQUES / 21.5 21.5 A 1.1GHz Chrge-Recovery Logic Visvesh Sthe, Jung-Ying Chueh, Mrios Ppefthymiou University of Michign, Ann Aror, MI Boost Logic is chrge-recovery circuit fmily cple of operting t GHz-clss frequencies

More information

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH "H" HOLDER ARMS

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH H HOLDER ARMS MODEL POWERGLIDE SERIES INSTRUTIONS FOR INSTLLING SRGENT LOSERS WITH "H" HOLDER S SERIES NON SIZED DJUSTLE SIZES THRU 6 UTION: FILURE TO INSTLL OR DJUST PROPERLY MY RESULT IN INJURY OR DMGE. FOR SSISTNE,

More information

Discontinued AN6262N, AN6263N. (planed maintenance type, maintenance type, planed discontinued typed, discontinued type)

Discontinued AN6262N, AN6263N. (planed maintenance type, maintenance type, planed discontinued typed, discontinued type) ICs for Cssette, Cssette Deck ANN, ANN Puse Detection s of Rdio Cssette, Cssette Deck Overview The ANN nd the ANN re the puse detection integrted circuits which select the progrm on the cssette tpe. In

More information

Notes on Spherical Triangles

Notes on Spherical Triangles Notes on Spheril Tringles In order to undertke lultions on the elestil sphere, whether for the purposes of stronomy, nvigtion or designing sundils, some understnding of spheril tringles is essentil. The

More information

A Novel SVPWM Technology Used in PWM Rectifiers of WPGS

A Novel SVPWM Technology Used in PWM Rectifiers of WPGS Reserh Journl of Applie Sienes, Engineering n Tehnology 5(1): 4-45, 13 ISSN: 4-7459; e-issn: 4-747 Mxwell Sientifi Orgniztion, 13 Sumitte: Otoer, 1 Aepte: Novemer 9, 1 Pulishe: April 3, 13 A Novel SPWM

More information

(1) Non-linear system

(1) Non-linear system Liner vs. non-liner systems in impednce mesurements I INTRODUCTION Electrochemicl Impednce Spectroscopy (EIS) is n interesting tool devoted to the study of liner systems. However, electrochemicl systems

More information

10.4 AREAS AND LENGTHS IN POLAR COORDINATES

10.4 AREAS AND LENGTHS IN POLAR COORDINATES 65 CHAPTER PARAMETRIC EQUATINS AND PLAR CRDINATES.4 AREAS AND LENGTHS IN PLAR CRDINATES In this section we develop the formul for the re of region whose oundry is given y polr eqution. We need to use the

More information