1 September 13, 2013 Re: MCSD Administration Remodeling at Support Services Center, 1002 S. 3 rd Ave., Marshalltown, Iowa TSP C/N: SUBJECT: SECTION ADDENDUM NUMBER TWO 306 S 17 th Ave Marshalltown, IA phone (641) fax (641) Architecture Engineering The following clarifications, modifications and/or additions are issued to extend, supplement, clarify, or modify Bidding and Contract Requirements as contained in the Bidding and Contract Documents as originally issued. The clarifications, modifications, deletions and/or additions contained herein shall take precedent over drawings, specifications and previously issued addenda. All requirements of the originally issued Bidding and Contract Documents or previous Addenda, which are not specifically altered by this Addendum, shall remain in full force and effect. The Contractor shall acknowledge receipt of this Addendum as provided for on Document Bid Form. The Pre-Bid Conference was held as at the site at the Support Services Center (MLA), 1002 S. 3 rd Ave., Marshalltown, Iowa on Tuesday, September 10, :30 p.m. as scheduled. Significant items of discussion are included in this subsequent Addendum. Contractor Attendance: Generals: Michael Huff, Huey -Dean Snyder Construction; Jeff Buckley-Lansink Construction; Wes Bryngelson-Brycon LLC, Tom Supercynski- Woodruff Construction; Robert Boyer-Pro Commercial; Doug DeMealenaere-Garling Construction; John Mahlstede- Hay Construction Services; Ron Beason- Lang Construction Electricals: Carroll DePenning, Jason Selk-DPAI; Paul Johnson, Sam Nicklos-NAI; Mechanicals: Jim Dunston-Young Plumbing & Heating; Chad Gauthier-B&G HVAC; Mike Cusnell- Tony s Plumbing, Chris Harrison-Advanced Sheet Metal; Denny Bartlett- Kapaun&Brown; Dave Beenen-A.J. Allen; Other: Joe Moench-Woodman Controls; Chet M. Summit Fire Sprinkler; Jerry Brown, Dean Pearson-SCI Communications; A. Division 00 and 01 Items: 1. Pre-Bid Conference Attendance Not Mandatory a. Reference: Documents Notice of Letting, Pre-Bid Conference b. Description: As discussed at the Pre-Bid Conference, attendance at the Pre-Bid Conference, though highly encouraged, is not mandatory and no evidence of attendance is required to be submitted with the Bid. Those who did not attend, may make individual site visits as scheduled with the Owner s Representative. Marshalltown, IA Marshall, MN Minneapolis, MN Rochester, MN Omaha, NE Rapid City, SD Sioux Falls, SD Sheridan, WY B. General Items: 1. Sheet Names: a. Reference: Drawing Sheets: AD102 b. Description: The reference note at the doors to be demolished at the entrance into Vestibule 101 should be note #10 not note # Room B17 Ceiling Modifications: a. Reference: Drawing Sheets: AD101, AP101, AC101 b. Description: Due to the scheduled demolition of the south wall and the construction of a new south wall, the ceiling grid will need to be expanded to fit the new space. Reinstall and add new ceiling tiles as required to fill the new grid. 3. Ceiling Access: a. Reference: Drawing Sheets: AP101, AP102, MP101, EP101, EP102 b. Description: Due to the scheduled changes and additions to the existing mechanical and electrical systems. Remove the existing SAT ceiling systems and / or FRP Ceiling Panels as at Lower level, as required to perform work, reinstall tiles / panels when work is completed, replace all tiles damaged due to the construction process. TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 1 of 7 9/12/2013

2 4. Door Numbers: a. Reference: Drawing Sheets: AP101, AP102; Specifications: Door Hardware; Supplemental Drawing; ADD #02 A3. b. Description: Some of the door tags got corrupted and miss-labeled. 1) B20 should be B44 2) B25 should be B25B (at IT MDF B25B) 3) B43 should be B46 (at office B46) 4) B43 should be B47 (at office B47) 5) B37 should be S4-1, 6) B18A should be 101A, 7) B18B should be 101B, 8) B20A should be 112A, 9) B20B should be 112B 5. Door Schedule Remarks: a. Reference: Drawing Sheets: A-601; Specifications: Alternates b. Description: 1) Doors 101A & 101B should reference remark #7 in lieu of remark #1 a) Remark #7 : See Alternate #3 2) Doors B39D & B41D should reference remark #2: See alternate #1 6. Door Openers: a. Reference: Drawing Sheets: AP102; Supplemental Drawings: ADD #02-A3, Specifications: Alternates, Aluminum Framed Entrances and Storefronts, Door Hardware, Automatic Door Openers, b. Description: Under Alternate G-3, door 101A and the corresponding existing interior vestibule door shall both receive new automatic door openers per Section The Electrician shall provide power to a new junction box above the ceiling at each door location. The existing interior door has been assigned door number 101C. 7. Aluminum Entrances: a. Reference: Drawing Sheets: AP102; Specifications: Alternates, Aluminum-Framed Entrances and Storefronts. b. Description: All aluminum storefronts shall be: Kawneer 451UT, Manko 5450i, Tubelite TU24000, or equal. 8. Window Blind Controls a. Reference: Drawing Sheets: A-602; Specification Sections: Aluminum Windows b. Description: The tilt controls shall be permanent knurled knobs. At fixed glazing (no screens) the knobs shall be equal to WACI standard Straight knobs. Removable tools or wrenches will not be accepted. At operable windows (with screens) the knobs shall be equal to WACI Extended Straight knobs and shall penetrate the screen at a rubber grommet hole sized for the knob penetration. 9. IT Department (B43) Changes: a. Reference: Drawing Sheets: AD101, AP101, AC101; Supplemental Drawings: ADD #02-A1, ADD #02-A2 b. Description: The South wall of room B43 shall be moved farther south, the drinking fountain in locker room B41 moves to the adjacent chase wall, a new stub wall is added to divide the new kitchenette casework from the IT work bench area and added wall cabinets. Door B41C moves to the adjacent wall and switches form a LHR to a RHR operation. See attached Supplemental Drawing(s). 10. Roof/Ceiling Fire Membrane: a. Reference: Drawing Sheets: AC104, MH104; Supplemental Drawing: ADD #02-A4 b. Description: On the third floor the new fire membrane shall be raised up between the joist spaces which contain the new main ducts coming off the new fan coil units. Attach the 5/8 gypsum board to the bottom of deck between these joist, fully wrap all joists and beams. TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 2 of 7 9/12/2013

3 C. Mechanical Items: 1. Duct Airflow Measuring Station Specification: Add the following Paragraph 2.11 to Section : 2.11 AIRFLOW MEASURING STATIONS A. Duct Airflow Station: 1. Frame: Welded galvanized-steel frame. 2. Sensing Probes: Multiple air traverse probes mounted within the station frame containing multiple total and static pressure sensors arranged in equal areas across the station s face area. 3. Sensors: Located along the exterior surface of the sensing probes, and internally connected to averaging manifolds. The flow sensors shall be the offset (Fechheimer) type for static pressure and chamfered impact type for total pressure measurement. 4. Pressure and Flow Transmitter: Multiprocessor-based transmitter capable of receiving flow signals from an air flow station and producing an output linear and scaled for air volume, velocity, and differential pressure. Transmitter shall contain a digital display for one transmitter output, and transmit an air flow volume output signal to the BMS. 5. Accuracy: Transmitter shall operate within the range of 0.05 to 25.0-inches wg. and produce a signal with an accuracy of 0.25 percent of natural span. Air flow station shall have an accuracy of plus or minus 2.0 percent of actual air flow. 6. Air Monitor Corporation Volu-probe/VS with a Velton DPT 2500-plus transmitter. 7. Ebtron, Inc. Gold Series Thermal Dispersion Airflow / Temperature Measurement Devices with a C Density and with a Model GTA116-PC transmitter may be utilized if equivalent performance can be provided. 2. Cabinet Unit Heaters: a. Reference: Drawing Sheet MD101. b. Description: Existing cabinet unit heaters in Locker Rooms B39 and B41 will remain including all piping and controls. Do not remove. Keynote 2 is removed. 3. Ductwork Revisions: a. Reference: Revised Drawing Sheets MH103 and MH104 (attached). b. Description: Revisions to grilles, ductwork and dampers. 4. HVAC Piping Revisions: a. Reference: Revised Drawing Sheets MP101, MP103 and MP104 (attached). b. Description: Added references to details, added zone shutoff and balancing valves and relocated thermostats. 5. Clarification on Chilled Water Flow Diagrams: a. Reference: Drawing Sheet M-501, New 11 x 17 Sheet ADD2-M1 (attached). b. Description: 1) Clarified the equipment being piped with chilled water for this project. Attached Sheet ADD2-M1. 2) Added buffer tank to chiller piping diagram. Attached Sheet ADD2-M1. 6. Revised Details: a. Reference: Drawing Sheet M-502, Revised Sheet M-503 (attached), New 11 x 17 Sheet ADD2-M2 (attached). b. Description: 1) Delete Detail D2 on Sheet M ) Revision to Detail C1 on Sheet M-502. Attached Sheet ADD2-M2. 3) Revision to Detail A3 on Sheet M-502. Attached Sheet ADD2-M2. 4) Add Detail C2 on Sheet M ) Delete Details A4 and A5 on Sheet M ) Remove note and revise piping on Details B4 and B5 on Sheet M Revised Schedules: a. Reference: Revised Drawing Sheet M-601 (attached). b. Description: 1) In the Diffuser, Register & Grille Schedule delete Grille G3. 2) In the Plumbing Fixture Schedule delete Fixtures P-7 and P-7A and add Fixtures P-6 and P-6A. 3) In the Louver Schedule, remove louvers L-B-1, L-B-2, L-B-3 and L-B-4. TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 3 of 7 9/12/2013

4 8. References on Fire Sprinkler Drawings: a. Reference: Drawing Sheets FD103 and FD104. b. Description: 1) Change the reference in Keynote 1 on Sheet FD103 to read Refer to Drawing FS103. 2) Change the reference in Keynote 1 on Sheet FD104 to read Refer to Drawing FS Move Fire Sprinkler Heads: a. Reference: Drawing Sheet FS103. b. Description: Move sprinkler heads at movable partition in Rooms 208 and 210 farther apart. 10. Remove Floor Cleanouts From 2 nd Floor: a. Reference: Drawing Sheet PL102 and Revised Drawing Sheet PL103 (attached). b. Description: Put cleanouts at the ends of the pipe mains and remove the pipes going up to floor cleanouts on the 2 nd Floor. 11. Add Recirculating Domestic Hot Water: a. Reference: Revised Drawing Sheet PL103 (attached). b. Description: Add recirculating hot water piping and connect to main riser. 12. Revise HVAC Condensate Piping: a. Reference: Revised Drawing Sheets PL103 and PL104 (attached). b. Description: Condensate piping changed to allow more piping to run in 2 nd Floor ceiling. 13. Change to Lavatory Number: a. Reference: Revised Drawing Sheets PL103, PL104 and P-601 (attached). b. Description: Lavatory P-3 is changed to P-3A. 14. Revisions to Plumbing Risers: a. Reference: Revised Drawing Sheet P601 (attached). b. Description: 1) Added Fixture P-5 to Riser A1. 2) Revised Risers A1 and D1 to add RHW piping. 3) Revised P-3 to P-3A on all applicable risers. 4) Deleted Risers A4, B4 and C4. D. Electrical Items: 1. IT Department (B43) Changes: a. Reference: Drawing Sheet EL101, EP10, E-604; Supplemental Drawings: ADD2-E1, ADD2-E2, & ADD2-E3 b. Description: 1) Revise lighting layout in this room per attached drawing ADD2-E1. 2) Revise power & communications layouts in this room per attached drawing ADD2-E2. 3) Revise panel schedule per attached drawing ADD2-E3. 2. Lighting Schedule: a. Reference: Drawing Sheet E-604 Electrical Schedules b. Description: Light fixture schedule add light fixture type U2. GM Lighting fixture UCLED-24-WH. 24-inch LED under-cabinet light with integral on/off rocker switch. 3. Floor Poke Thrus: a. Reference: Drawing Sheet: EP104 (EP104R); b. Description: In Room 302, modify the Keyed Note 2 (there are two of them) to Keyed Note Cord Reels: a. Reference: Specification: Wiring Devices b. Description: Add paragraph 2.9 as follows: 2.9 CABLE (CORD) REELS 1. Manufacturer Hubbell 2. Device: a) Power: 25 feet of 14/3 cord with duplex receptacle. Circuit breaker that feeds the reel shall be GFI. b) Data: 25 feet of Category 5e UTP TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 4 of 7 9/12/2013

5 5. Fire Alarm System Changes: a. Reference: Drawing Sheet E-603; b. Description: 1) Add new Fire Alarm Cabling Type, labeled as follows I. UTP CATEGORY 6 CABLE (REFER TO ) 2) Change fire alarm cable called out by keyed notes 1, 2, and 3 on the drawing to type #/I 3) Add fire alarm cable designator between FACP and RCP s to read #/D 4) Modify keyed note 3 to read 3. BACNET/LON GATEWAY COMMUNICATION CONNECTION TO BUILDING AUTOMATION SYSTEM 5) Modify keyed note 9 to read 9. PROVIDE CONNECTION AND INTEGRATION OF EXISTING FIRE ALARM DEVICES, USING EXISTING FIRE ALARM CONTROL PANEL AS PULL BOX. PROVIDE COMPONENTS (LINE CARDS, CONTACTS, COMMUNICATION CARDS, ETC.), REPLACEMENT OF ALL EXISTING ADDRESSABLE DEVICES (REFER TO EXISTING PLAN DRAWINGS, ASSUME A MINIMUM OF 50 ADDRESSABLE DEVICES), AND PROGRAMMING NECESSARY FOR A FULL AND OPERATIONAL SYSTEM. 6) Modify paragraph 3.4.B as read as follows: B. the following zone outputs: 1. (1) per staff assist work areas (quantity of 4) 2. (1) Zone for 2nd level hallways/lobbies 3. (1) Zone for 3rd level hallways/lobbies 4. (1) Zone for board room 5. (1) Zone Exterior 6. (1) All Call 7. Accommodations for future 14 zones when existing building is remodeled. 6. Security System: a. Reference: Drawing Sheets: EP102, E-607 (Access Control Schedule); b. Description: Door Tag changes, added doors. 1) Access Control Schedule (E-607) modify responsible contractor by Division of ELECTRIC POWER SUPPLY to division 28 in lieu of division 8. 2) B37 should be S4-1, 3) B18A should be 101A 4) B18B should be 101B 5) Vestibule 101 southeast interior door shall be labeled 101C, and shall be added to the access control schedule with the following information a) Provide door with Electric Power Supply, Door Position Switch, Electric Power Transfer, Request to Exit, Card Reader, Automatic Operator, Intercom, Emergency Release Button, and Notes INTERCOM AND EMERGENCY RELEASE TO TIE BACK TO CONTROL IN OFFICE Video Surveillance: a. Reference: Specification: Video Surveillance; Drawing Sheets: E-607 (Video Surveillance Schedule); b. Description: Add paragraph 2.1.A.6 & 7 as follows: 6. Camera Lens a. ImmerVision Enables Panamorph Video Interpreter a. ImmerVision Panamorph Player c. Description: Modify Article 2.6 as follows: 2.6 NETWORK VIDEO MANAGEMENT STORAGE (SAN) A.The Video Management Storage shall allow the use of off-the-shelf computer components that meet the minimum performance requirements. B.The Performance requirements for the SAN are as follows: 1. Form Factor: Rackmount a. Hard Drives: 2TB NL-SAS Hot Swappable (sized as required by video criteria) b. Connectors: iscsi c. Network Interface: 10GbE d. Operating System: Windows 2000 Server, Windows Server 2003, Windows Server 2008, including Hyper-V e. RAID 5 Compliant f. Network Interface: 10GBASE-T (RJ-45) TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 5 of 7 9/12/2013

6 d. Description: Add Article as follows: SAN Sizing A. Contractor shall provide storage capacity sized based on the following criteria 1. All new cameras provided as part of this project and integration of existing cameras. 2. Event based recording 3. 7 frames per second 4. H.264 Compression 5. 4 CIF days worth of recorded storage 8. Section Title Correction: a. Reference: Document Table of Contents, Section b. Description: The Section was titled incorrectly (should be titled Security Management System per Table of Contents and not Video Surveillance. E. Sitework and Utility Items: No Items Approved Product Substitutions: Contingent upon strict compliance with the drawings and specifications, the following are Architect / Engineer Approved Equal Manufacturers and or Products: Items shown in bold type are new as of this Addendum, items shown in normal type are from previous Addenda. A. General: 1. Section : Tubelite TU Section : Record-USA Section : Scranton Products 4. Section : Moderco 700 Series; Model 741 B. Mechanical: 1. Drawing M601 Buffer Tank: Taco, Laars and Wheeler 2. Section : a. Fan Coil Units: Airtherm, International Environmental and Zehnder Rittling 3. Section : 4. Balancing Valves: Pro Hydronic Specialties C. Electrical: 1. Section : a. Stauss LLC: 1). Lumax; A, A1, A2, A3, A3D, A3E, AE, B1, B2, F, H4, L1, X2, X4 2). Spectrum; D1 3). Mule; E1, E2, F 4). Forum; L1, W2 5). Fluorescent Lighting Corp.; W 6). Day-o-Lite; W1 b. M&M sales: 1). Lithonia; A,AE, A1, A1E, A2, A3, A3D, A3E, B1, B2, E1, E2, F, H4, H4E, X2, X4 2). Kurtzon; W 3). PAL; W1 4). Atlantic; D1 5). Axis; J10 6). Finelite; G1, G2, W1 7). Nulite: W2 c. Lighting Solutions of Iowa: 1). Bruck: P THIS ADDENDUM INCLUDES: Division 00 & 01 Items A1; General Items B1 thru B10; Mechanical Items C1 thru C14; Electrical Items D1 thru D7; Sitework & Utility Items None; New or Re-Issued Specification Sections None; New or Re-Issued Drawing Sheets MH-103, MH-104, MP-101, MP-103, MP-104, PL-103, Pl-104, P-601, M-503, M-601; Supplemental Drawings ADD #02-A1, ADD #02-A2, ADD TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 6 of 7 9/12/2013

7 #02-A3, ADD #02-A4, ADD #02-M1, ADD #02-M2, ADD #02-E1, ADD #02-E2, ADD #02-E3. Bidding Documents may be ordered and Current Plan Holders List may be viewed at or by contacting Action Reprographics at Issued by, TSP, Inc. David D. Schulze, AIA Encl.: As Noted Above Cc: All Plan Holders, All Plan Centers, Design Team, Rick Simpson. TSP, Inc. MCSD Administration Remodeling Addendum Two DDS Page 7 of 7 9/12/2013

8

9 2

10

11

12

13

14

15

16

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1 A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017 These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Addendum No. 4 page 1

Addendum No. 4 page 1 Addendum No. 4 page 1 Project: Proj. No: 1541.01 Athletic Support Building and Site Improvements Woehrle Athletic Complex Jeffersonville, Indiana Date: December 11, 2015 This addendum is a part of the

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No. July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

ADDENDUM NO 1 Bid Package 3

ADDENDUM NO 1 Bid Package 3 ADDENDUM NO 1 Bid Package 3 Addendum No.: Addendum 1 Bid Package 3 Issue Date: October 10, 2014 Project: Walker Natatorium Kirkwood High School Kirkwood School District Kirkwood, MO 63122 Project Number:

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2 FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions

More information

ADDENDUM NO. 1. Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID

ADDENDUM NO. 1. Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID FACILITIES PLANNING & CONSTRUCTION ADDENDUM NO. 1 PROJECT NAME: UNL PROJECT NUMBER: CONSULTANT: ADDRESS: University of Nebraska Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID C060P103

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall

More information

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016 ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620

More information

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014 FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder. ADDENDUM TWO Client: The Abla Griffin Partnership Project Name: Sooner Elementary Media Center Saferoom Project Location: Oklahoma City, OK Issue Date: February 22, 2018 Owner: Moore Public Schools Engineer:

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

ADDENDUM NO. 3. Ellis County Elections Building

ADDENDUM NO. 3. Ellis County Elections Building AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

EPIC Academy High School

EPIC Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

A. This Section includes plumbing fixtures and related components.

A. This Section includes plumbing fixtures and related components. SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue

More information

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.: KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06 CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617 S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre April 12, 2019 COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations 19-10 - To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre The attached information, questions and

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone: DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

Rufus M Hitch Elementary School

Rufus M Hitch Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

George Washington Elementary School

George Washington Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information