1 ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall supersede or clarify the Early Bid Package Documents dated , as originally issued. The cost of the Work of all trades affected by the changes in this Addendum shall be included in the Base Bid or Alternates, on the Bid Forms, as applicable. Failure to do so may subject the Bidder to disqualification. This Addendum forms a part of the Contract Documents. It supplements and/or modifies them as follows: Addendum Items: Item No.. Contract Drawing C- Remove notes from the hatched area of the existing security office that read: Portion of the building and slab to be demolished. Sections of the existing foundation wall to remain (coordinate with architectural plans). Add new note to read: Existing area foundation, slab, and roof to remain (coordinate with architectural plans). Item No.2. Contract Drawing C-3 Remove notes from the hatched area of the existing security office that read: Concrete patio placed over 4 of polystyrene insulation; over compacted earth where existing slab was removed. Perimeter is defined by existing foundation walls. Item No.3. Contract Drawing AD. Revised the existing security office area, see SKA-. Item No.4. Contract Drawing AD.2. Remove the notes relating to the roof area over the exiting security office that read: Relocate HVAC Units(s) and roof drains as required to allow for new construction and Remove existing roof along existing wall to remain prep for new insulated metal wall system. Item No.5. Contract Drawing AD.2 Add the following note to the area over the existing security office, to read: Remove existing metal roof edge over existing exterior wall and prep for new metal roof edge. This note refers to the West side of the existing security office that faces the existing courtyard. Item No.6. Contract Drawing S0.3 - Add Small Beam Penetration Typical Detail, see SKS-. 55 Dow Street, Suite 400 Manchester, NH 030 tel: web: LBPA.com 92 Montvale Ave, Suite 4000 Stoneham, MA 030 tel: web: LBPA.com

2 MCC Student Center Addition Page 2 March 3, 202 Item No.7. Contract Drawing S0. Cast-in-place Concrete notes, Note C6. Change Slabs on grade + structural slabs to 3000 psi (normal weight), and change Site Paving to 4000 psi (normal weight). Item No.8. Contract Drawing S0. Change headings to read as follows, Shear Connectors (Section 05200), Steel Deck (Section ), and Steel Joist Framing (Section ). Item No.9. Contract Drawing S.0 Change column on grid line D.5-3 to an HSS8x8x/4 with a base plate type BP-D. This column will remain the same size above and below the column splice at the first floor level. Item No.0. Contract Drawing S. Foundation Wall on grid line E between grid lines and 2 shall have a top of wall elevation of Item No.. Contract Drawing S. Clarification Column on grid line D.4- is an HSS6x6x/4 with a BP EL -0-4½. The section mark should read Section 2 on Drawing S5.2. Item No.2. Contract Drawing S. Add Foundation Section 20 at Fireplace Surround, on grid line G between grid lines 6 to 7. See SKS-9. Item No.3. Contract Drawing S. Add Column, pilaster, and footing to grid line D.6-.2, see SKS-3. Item No.4. Contract Drawing S. Revised end of bridge structure at line J, see SKS-0. Item No.5. Contract Drawing S. Added Sections to Entrance area, see SKS-7. Item No.6. Contract Drawing S. Added frost walls at exterior door near E.8-2, see SKS-9. Item No.7. Contract Drawing S. Added new section at grid line 3-eT, facing north, see SKS- 20. Item No.8. Contract Drawing S. Add note #4 to plan notes, note to read All Columns and braces are Architecturally Exposed Structural Steel (A.E.S.S.). Refer to the specifications for surface preparation and finish requirements. Coordinate column and brace locations with Drawings. Item No.9. Contract Drawing S.2 Revise Plan note #8 to read All Columns and braces are Architecturally Exposed Structural Steel (A.E.S.S.). Refer to the specifications for surface preparation and finish requirements. Coordinate column and brace locations with Drawings. Item No.20. Contract Drawing S.2 Add column to grid line D.6-.2 and reframing, see SKS-4. Item No.2. Contract Drawing S.2 Change 6 - dimension, between grid line D and the W2x6 near grid line 4, to read 3-9. Edge of deck dimension to change to 2. Item No.22. Contract Drawing S.2 - Revised end of bridge structure at line J, see SKS-2. Item No.23. Contract Drawing S.2 Add HSS2x8 header at opening and change edge of deck at stairs to 5, see SKS-2.

3 MCC Student Center Addition Page 3 March 3, 202 Item No.24. Contract Drawing S.2 Delete W2x44 cantilever off of Column E-8. Delete moment connection from Column E-8 to W2x44 beam (provide typical double angle connection). Add two W2x6 beams and two W2x6 cantilevers, similar to beam and cantilever two feet off column E-7, one shall be two feet to the west and one shall be two feet to the east of Column E- 8. Change two W2x6 beams on grid line E between grid lines 7 to 9 to W2x9 beams. Item No.25. Contract Drawing S.2 Change W2x44 beam on grid line D between grid lines 4 to 6 to two separate beams. One beam will span from grid line 4 to 5 and will be a W2x30. The second beam will span from grid line 5 to 6 and also be a W2x30. Item No.26. Contract Drawing S.2 Change two W2x6 beams on grid line 3 between grid lines D.2 to D.8 to W2x44 beams. Shear connector stud count to remain the same. Item No.27. Contract Drawing S.2 Add beam end reaction to facilitate the design of the connections to the W2x55 beam framing near column E.8-3 to W2x73 on grid line 7. End reactions to the W2x55 at the west end (near column E.8-3) = 30 kips. Item No.28. Contract Drawing S.2 Add beam end reaction to facilitate the design of the connections to the W2x55 beam on grid line 3 between grid lines E.8-3 to G-3. End reactions to the W2x55 at the north end (at column E.8-3) = 40 kips. Item No.29. Contract Drawing S.2 Revised W2 Beam Cantilever, See SKS-6. Item No.30. Contract Drawings S.3 Revise Plan note #6 to read All Columns and braces are Architecturally Exposed Structural Steel (A.E.S.S.). Refer to the specifications for surface preparation and finish requirements. Coordinate column and brace locations with Drawings. Item No.3. Contract Drawing S.3 Add column on grid line D.6-.2 and reframing, see SKS-5. Item No.32. Contract Drawing S.3 - Revised end of bridge structure at line J, see SKS-4. Item No.33. Contract Drawing S.3 Change W2x22 beam on grid line D between grid lines 4 to 6 to two spate beams. The beams will span from grid line 4 to 5, and from grid line 5 to 6. Both beams remain W2x22. Item No.34. Contract Drawing S.3 Change W2x4 beam on line B between grid lines to.9 to a W4x22 beam. Item No.35. Contract Drawing S.3 Change W2x6 beam on line B between grid lines 3 to 5 to a W4x22 beam. Item No.36. Contract Drawing S.3 Change W4x30 beam on line G between grid lines 6 to 7 to a W2x30 beam. Item No.37. Contract Drawing S.3 Change W4x30 beam on line H between grid lines 9 to 0 to a W2x30 beam.

4 MCC Student Center Addition Page 4 March 3, 202 Item No.38. Contract Drawing S.3 Change W4x26 beam on line 4 between grid lines D.2 to D.5 to a W2x30 beam. Item No.39. Contract Drawing S.3 Change W4x26 beam on line 4 between grid lines D.5 to D.8 to a W2x30 beam. Item No.40. Contract Drawing S.3 Change W4x30 beam on line E between grid lines 6 to 7 to a W2x30 beam. Item No.4. Contract Drawing S.3 Change W4x30 beam on line E between grid lines 9 to 0 to a W2x30 beam. Item No.42. Contract Drawing S.3 Change two W2x4 beams on line E.8 between grid lines 2 to 3 to W2x44 beams. Item No.43. Contract Drawings S.4 Revise Plan note #6 to read All Columns and braces are Architecturally Exposed Structural Steel (A.E.S.S.). Refer to the specifications for surface preparation and finish requirements. Coordinate column and brace locations with Drawings. Item No.44. Contract Drawing S.4 Change W2x9 beam online D between grid lines 6 to 7 to a W8x50 beam. Item No.45. Contract Drawing S2.2 Revise Brace A, see SKS-2. Item No.46. Contract Drawing S2.2 Revised Brace C, see SKS-6. Item No.47. Contract Drawing S2.2 Revise Brace D working point, see SKS-7. Item No.48. Contract Drawing S2.2 Revise Brace H working point, See SKS-8. Item No.49. Contract Drawing S3., Section 6 and Section 7 Delete perimeter drain with crushed stone and filter fabric. Provide continuous bentonite waterstop at bottom of wall. Item No.50. Contract Drawing S3. Revised Foundation Section 9, see SKS-. Item No.5. Contract Drawing S3. Add new Foundation Section 2 at entrance, see SKS-8. Item No.52. Contract Drawing S4. Revised Steel Section 9, see SKS-3. Item No.53. Contract Drawing S4.2 Add new Steel Section 42 at end of bridge at grid line J, see SKS-5. Item No.54. Contract Drawing S5., Wall Elevation C Delete fourteen (4) HSS6x2X/4 vertical girts shown above the elevation 24-8½. Vertical girts below this elevation remain. Item No.55. Contract Drawing ED. Replace Drawing ED. within Early Bid Package. Item No.56. Contract Drawing ED. Revise Demo Plan, see SKE-.

5 MCC Student Center Addition Page 5 March 3, 202 Item No.57. Contract Drawing ED. Revise Demo Plan, see SKE-2. Item No.58. Contract Drawing ES. Add Site Electrical Plan to Early Bid Package. Item No.59. Contract Drawing FP. Revise Lobby Area, see SKFP-. Item No.60. Contract Drawing MD. Revise Demo Plan, see SKM-. Item No.6. Contract Drawing MD. Revise Demo Plan, see SKM-3. Item No.62. Contract Drawing MD.2 Revise Demo Plan, see SKM-2. Attachments: Specifications Sections Issued with this Addendum: None Drawings issued with this Addendum: ED. First Floor Part Plan - Electrical Demolition revision date ES. Site Plan Electrical revision date Sketches issued with this Addendum: SKA- SKS- through SKS-2 SKE- and SKE-2 SKM- through SKM-3 SKFP- END OF ADDENDUM No.

6 55 Dow Street, Suite 400, Manchester, NH 030 NH: MA: A B C SEE SKE - 2 D Manchester Community College SEE SKE - 2 NEW STUDENT CENTER ADDITION E 066 Front Street Manchester NH, 0302 F SEE SKE- NO. DESCRIPTION DATE Addendum No SEE SKE- G N H KEY PLAN CONTENT: FIRST FLOOR PART PLAN ELECTRICAL DEMOLITION DRAWN BY: PJM PROJECT NO: I DATE: 03/0/2 REVISED: AS INDICATED ED. Project Phase Early Bid Package GMP Set J ASSOCIATION. ALL RIGHTS RESERVED. NO REPRODUCTION WITHOUT PERMISSION.

7 55 Dow Street, Suite 400, Manchester, NH 030 NH: MA: A B C D Manchester Community College E NEW STUDENT CENTER ADDITION 066 Front Street Manchester NH, 0302 F NO. DESCRIPTION DATE G N H CONTENT: SITE PLAN - ELECTRICAL DRAWN BY: PJM I PROJECT NO: DATE: REVISED: /0/2 AS INDICATED ES. Project Phase GMP Set J COPYRIGHT 202 BY LAVALLEE/BRENSINGER PROFESSIONAL ASSOCIATION. ALL RIGHTS RESERVED. NO REPRODUCTION WITHOUT PERMISSION

8 eu EXISTING SLAB TO REMAIN ev EXISTING ROOF TO REMAIN REMOVE EXISTING EXTERIOR MASONRY WALL (CMU AND BRICK VENEER SYSTEMS) REMOVE FLOORING AND CEILING FINISHES EXISTING SECURITY OFFICE NOTE: OTHER DEMOLITION NOTES THAT DO NOT REFER TO ITEMS INDICATED ABOVE SHALL REMAIN REQUIREMENTS AS NOTED ON DRWG AD. EXISTING SECURITY OFFICE DEMO 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '-0" DATE: RL SKA-

9 CL SUPPORT CL SUPPORT L EQUAL d/8 EQUAL d/3 d/3 d/3 d/3 MAX. d (4" MINIMUM) 2'0" ZONE ZONE 2 ZONE 2'0" L/3 L/3 L/3 NOTES:. THE NUMBER, SIZES, AND LOCATIONS OF OPENINGS REQUIRED THROUGH STEEL BEAMS AND GIRDERS SHALL BE DETERMINED BY THE GENERAL CONTRACTOR AND SHOWN ON THE SHOP DRAWINGS SUBMITTED FOR ENGINEER'S REVIEW. REFER TO ALL THE DRAWINGS IN THE SET. FIELD CUTTING OPENINGS IS NOT PERMITTED. FIELD DRILLING OPENINGS OR PLASMA CUTTING MAY BE PERMITTED WITH THE SPECIFIC APPROVAL OF THE STRUCTURAL ENGINEER. 2. OTHER SPECIAL OPENING CASES MAY BE SHOWN ON THE STRUCTURAL DRAWINGS. 3. ALL OPENINGS ARE TO BE SHOWN ON THE SHOP DRAWINGS AND SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW PRIOR TO FABRICATION SINCE IN SOME CASES MODIFICATIONS MAY BE REQUIRED. SMALL BEAM PENETRATION STEEL CONSTRUCTION S9 SMALL BEAM PENETRATION TYPICAL DETAIL 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /4" = '0" DATE: 03/0/2 SKS 3/9/202 4:43:08 PM

10 C 7'8 /2" D EL 24' 4 /2" HSS6X6X5/6 W4X30 (± 0 KIPS) EL 2' 2" HSS6X6X5/6 (± 0 KIPS) W2X40 (8) EL 0' 0" HSS6X6X5/6 (± 25 KIPS) HSS6X6X5/6 (± 25 KIPS) S2.2 TYP A BRACE A /8" = '0" REVISED BRACE A/S Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/07/2 SKS2 3/9/202 4:43:08 PM

11 D.5 D.8 D C.J. HSS2X6X3/8 BP2GBR, AB22 BP EL 20'2" F9 [25' 2 6"] HSS6X6X/4 BP2A BP EL 20'2" SKS8 S2.2 HSS2X6X3/8 BP2G, AB22 BP EL 20'2" 3 S3. F9 [25' 2 6"] F9 [25' 2 6"] Sim BRACE H for BRACE H SKS8 C.J..2 P25BR2 P2 2'5" P25 P2 P2 F4.0 [26' 2 0"] HSS6X6X/4 BP2A BP EL 20'2" F4.0 [25' 2 6"] HSS6X6X/4 BP2A BP EL 20'2" F4.0 [26' 2 0"] 0 S3. Sim HSS6X6X/4 BP A BP EL 20'2" HSS6X6X3/8 BP2C BP EL 20'2' PC4 5'0" e7 2.8 '8" (E)W2x26 4 S3. eq er E P25 F4.0 [24' 2 9"] P26 '4" es F9 [25' 2 6"] FOUNDATION PLAN PART PLAN /8" = '0" e7 NEW COLUMN D Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/07/2 SKS3 3/2/202 4:5:26 PM

12 D.2 D.5 D.8 E SKS8 S2.2 W2X6 (2) eq er es SECOND FLOOR FRAMING PART. PLAN /8" = '0" e7 3 e6 BRACE H for BRACE H W2X9 (0) W2X30 (0) SKS8 W2X30 W2X6 (E)4B26 (E)6K4 (E)6K4 D.6 7 S4. W2X4 (8) W2X4 (8) (E)W6x45 W2X44 W2X26 (20) W2X4 (6) W2X44 (20) C2X25 (E)6K5 (E)6K5 (E)6K5 2.8 W2X4 (0) W2X4 (0) W2X4 (0) (E)6K5 (E)6K5 (E)4B26 (E)6K4 (E)6K4 4 S4. 2'5" 6'0" W2X6 (2) W2X4 (2) 5 S4. (E)W6x45 6 S4. W2X4 W2X4 W2X4 W2X4 W2X4 (E)6K5 W2X4 (E)6K5 Wall Elevation D W2X4 D W2X44 (24) W2X4 (4) S5. S5. E Wall Elevation E 2'0" HSS6X6X/4 POST UP NEW COLUMN D Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/07/2 SKS4 3/2/202 4:5:26 PM (E)6K5 W2X4 (E)6K5 W2X4 (E)6K5 W2X4 (E)4B26 (E)6K4 (E)6K4

13 S5. E D.5 SKS8 S2.2 BRACE H for BRACE H SKS8 Wall Elevation E 2.8 (E)C0x5.3 (E)W0x5 40 D.6 W2X4 W2X30 W2X4 W2X4 W6X3 S4.2 W2X4 er D.8 W2X4 W6X3 W2X4 W6X3 (E)W0x5 W2X4 W2X4 W2X4 3 S4.2 E W2X6 W2X4 W2X44 es e7 3e6 LOW ROOF FRAMING PART PLAN /8" = '0" NEW COLUMN D Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/07/2 SKS5 3/2/202 4:5:27 PM

14 5 /2" COMPOSITE CONCRETE SLAB W2 CANTILEVER SEE SECTION 4/S4. FOR MORE INFO 9" 2 '6" MAX BOTTOM FLANGE PLATE TO MATCH W2 FLANGE SHOP WELD PROVIDE DETAIL AT W2 CANTILEVERS ON GRID LINES: D.24, D.54, D.84, G9, G0, AND G2. 2 Steel Section 2 3/4" = '0" REVISED W2 BEAM CANTILEVER 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /4" = '0" DATE: 03/08/2 SKS6 3/2/202 4:5:27 PM

15 E D.8 D.5 D.2 W2X26 HSS6X6X5/6 (± 5 KIPS) W2X26 HSS6X6X5/6 (± 5 KIPS) HSS6X6X5/6 (± 30 KIPS) W2X30 '0" W2X30 HSS6X6X5/6 (± 30 KIPS) W2X45 (8) W2X45 (8) 28"ø HSS6X6X3/8 (± 40 KIPS) 28"ø HSS6X6X3/8 (± 40 KIPS) '0" MIN TYP 24"ø 36"ø 9'0" 5'7" 8'7" 3'8" 6'2" 9'4" 8'9" 4'7" 36"ø '2" New Basement 3' 4" D BRACE D /8" = '0" REVISE BRACE D WORKING POINT 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/08/2 SKS7 3/2/202 4:5:28 PM

16 D.2 D.5 D.8 8'0" 8'0" W2X26 W2X26 HSS6X6X/4 (± 5 KIPS) HSS6X6X/4 (± 5 KIPS) W2X30 '0" W2X30 HSS6X6X5/6 (± 30 KIPS) HSS6X6X5/6 (± 30 KIPS) W2X30 W2X30 (0) HSS6X6X3/8 (± 40 KIPS) HSS6X6X3/8 (± 40 KIPS) H BRACE H /8" = '0" REVISE BRACE H WORKING POINT 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/08/2 SKS8 3/2/202 4:5:29 PM

17 G 2'4" '0" 4" INTERIOR SLAB ON GRADE #4 6" o.c. 8" #4@6" #4@6" ALTERNATE DIRECTION OF LEG CONT. 2#5 '0" 8" 8" 8" SECTION IS LOCATED ON DRAWING S., GRID LINE G BETWEEN GRID LINES 6 TO Foundation Section 20 /2" = '0" FOUNDATION SECTION AT FIREPLACE SURROUND 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /2" = '0" DATE: 03/08/2 SKS9 3/2/202 4:5:29 PM

18 2 6'0" 8'0" G.9 J 2'3" '0" HSS8X8X5/6 BP2DBR, AB22 BP EL 0'2" P2BR P2BR 9 SKS SKS6 S2.2 BRACE C F2x6.5 [24' 2 0"] P2BR P2BR HSS8X8X5/6 BP2DBR, AB22 BP EL 0'2" FACE OF EXISTING BUILDING 0' HSS8X8X5/6 BP2DBR, AB22 BP EL 0'2" 2.4 HSS8X8X5/6 BP2DBR, AB22 BP EL 0'2" EXISTING SLAB ON GRADE A' B' C' FOUNDATION PART PLAN /8" = '0" REVISED END OF BRIDGE FOUNDATION 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/09/2 SKS0 3/2/202 4:5:29 PM

19 G.9 2'3" J '0" 0' EXISTING CMU WALL TOP OF PILASTER TO MATCH HEIGHT OF EXISTING BRICK SHELF EXISTING SLAB ON GRADE PILASTER SEE DETAILS 3'3" 2'3" DRILL AND GROUT #5@2" o.c. (8" MIN EMBEDMENT) 2'0" FOOTING #6@2" EACH WAY TOP AND BOTTOM MATCH EXISTING ELEVATION 4'0"± 9 Foundation Section 9 /2" = '0" REVISED END OF BRIDGE FOUNDATION SECTION 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /2" = '0" DATE: 03/09/2 SKS 3/2/202 4:5:30 PM

20 2 S4. HSS20X8X3/8 F2 HSS20X8X3/8 SKS6 S2.2 G.9 HSS5X5X/4 W8X0 POST UP FROM EXISTING CMU J 2'3" BRACE C W2X26 (6) W2X26 (6) W2x22 CANTILEVER BOTH SIDES 0' 9 SKS3 W8X0 2.4 (E)22K7 (E)22K7 (E)22K7 (E)22K7 (E)22K7 (E)22K5 (E)22K5 (E)22K5 A' B' C' Second Floor Framing Part. Plan /8" = '0" REVISED END OF BRIDGE LEVEL 2 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/09/2 SKS2 3/2/202 4:5:30 PM

21 0' J G.9 2'0" ± 2'3" NEW HSS COLUMN PROVIDE BOXOUT FOR EXPANSION JOINT COVERS SEE ARCH DWGS (TYP) 5/8"x7"x0'" BASE PLATE WITH 45/8"ø ADHESIVE ANCHORS (8" EMBED) EXISTING CONCRETE SLAB 2" EXP. JOINT '6" 2" EXP. JOINT '3" 0" 5 /2" COMPOSITE CONCRETE SLAB L4x4x3/8 SHIP LOOSE FIELD WELD EXISTING CMU WALL GROUT SOLID AT COLUMN REMOVE BRICK AS REQUIRED L6x6x/2 WITH STIFFENED SEAT FULL CAPACITY WELDED MOMENT CONNECTION AT TOP AND BOTTOM FLANGE 9 Steel Section 9 3/4" = '0" REVISED END OF BRIDGE LEVEL 2 SECTION 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /4" = '0" DATE: 03/09/2 SKS3 3/2/202 4:5:3 PM

22 2 W8X0 W8X0 W8X40 W8X0 W8X40 W8X0 SEE DRAWING S.4 G.9 0' J SKS6 S2.2 2'3" BRACE C W8X0 HSS2X8X/4 W2X26 42 SKS5 2.4 A' B' C' LOW ROOF FRAMING PART PLAN /8" = '0" REVISED END OF BRIDGE LOW ROOF 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/09/2 SKS4 3/2/202 4:5:3 PM

23 0' J G.9 4" 4" '4" '" CONT. 3/8"x2'5" PLATE 4" 0" WOOD BLOCKING SEE ARCH DWGS /2"ø 36" o.c. CONT. /4"x0" PLATE T.O. STEEL CONT. L4x4x3/8 DECK SUPPORT ANGLE /4"x6" SIDE PLATES FIELD WELD TO HSS2X8 L4x4x3/8 SEAT ANGLE 42 Steel Section 42 3/4" = '0" REVISED END OF BRIDGE LOW ROOF SECTION 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /4" = '0" DATE: 03/09/2 SKS5 3/2/202 4:5:3 PM

24 2.4 8'0" 2 W2X26 (6) HSS6X6X/4 (± 0 KIPS) HSS6X6X/4 (± 0 KIPS) PROVIDE BRACE AT LINE J AND AT LINE G.9 C BRACE C /8" = '0" REVISED END OF BRIDGE BRACING ELEVATION 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/09/2 SKS6 3/2/202 4:5:32 PM

25 e4 e2 4" SLAB ON GRADE DEDUCT ALTERNATE # HSS5X5X/4 BP2A BP EL 20'27" 2 SKS8 5'2" P22 SIM F3.0 [24' 2 6"] P2 2'0" ± e2 HSS6X6X/4 BP EL 20'27" BP2A ev 4 e4 F4.0 [24' 2 9"] P 8" 8" HSS6X6X3/8 BP2A BP EL 20'27" F4.0 [24' 2 9"] H. 0' EXISTING SLAB ON GRADE 4" SLAB ON GRADE EL 0'0" 5'0" 2'0" H HSS6X6X3/8 BP2J BP EL 0'2" 2'3 /4" P 6 S3. Sim HSS6X6X/4 BP EL 20'27" BP2A ' O' F4.0 [24' 2 9"] 8" FOUNDATION PART. PLAN /8" = '0" H.3 FOUNDATION PLAN AT ENTRANCE 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/09/2 3/2/202 4:5:32 PM SKS7

26 SLAB ON GRADE #4 6" o.c. 8" T.O. SLAB EL 0' 0" #5@2" VERTICAL #4@2" HORIZONTAL '0" CONT 3#5 8" 8" 8" 2'0" 2 Foundation Section 2 /2" = '0" NEW FOUNDATION SECTION AT ENTRANCE 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /2" = '0" DATE: 03/09/2 SKS8 3/2/202 4:5:33 PM

27 E.5 8'3" FOOTING STEP FOOTING STEP 2 '8" [ 3' 0" ] [ 0' 0" ] W4X22 (7) P22 4'6" HSS6X6X/4 BP2A BP EL 20'24 /2" C.J. HSS6X6X/4 BP2E BP EL 20'27" W4X22 (23) HSS6X6X/4 BP2A BP EL 20'27" P24 F5 [2' 22"] P23 F4.0 [2' 2"] 7 S2.2 '0" Basement South Wall E.8 3'6" '0" 3 S3. '0" 4" EXTERIOR SLAB ON GRADE Sim [ 0' 0" ] 6 S3. Sim [ 7' 0" ] FOOTING STEP P3 SIM HSS8X8X3/8 BP2D BP EL 20'27" G '0" F4.0 [28' 2 "] [ 7' 0" ] FOOTING STEP '0" 2.4 FOUNDATION PART. PLAN /8" = '0" ADDED FROST WALLS AT DOOR 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/2/2 SKS9 3/2/202 4:5:33 PM

28 3 e6 '8" SLAB ON GRADE HSS COLUMN EXISTING W COLUMN PILASTER SEE DETAILS FOUNDATION WALL SEE SECTION 8/S3. EXISTING PILASTER '0" MIN EXISTING FOOTING FOOTING SEE SCHEDULE MATCH BOTTOM OF EXISTING FOOTING DRILL & GROUT #5@2" o.c. (8" MIN EMBED) FOUNDATION SECTION CUT AT GRID LINE 3eT FACING NORTH. 22 Foundation Section 22 /2" = '0" NEW FOUNDATION SECTION 22 AT 3eT 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /2" = '0" DATE: 03/2/2 SKS20 3/2/202 4:5:34 PM

29 3 4 6 E W2X44 (22) W2X4 (0) W2X4 (8) W2X4 (0) W2X4 (0) W2X4 (4) W2X50 (42) W2X44 (6) S2.2 BRACE F W2X40 (20) 0' 5/8" E.5 7'0" 6'8" W2X44 (2) W2X4 (8) W2X4 (8) W2X44 (6) 5" E.O.D. TYP W2X55 (42) 4 S4. Sim W2X44 (0) E.8 R=40 KIPS W2X44 (4) R=30 KIPS 0" 6'7" 6" E.O.D. HSS2X8X3/8 COORD. WITH STAIR LANDING W2X4 (22) 4 S4. Sim W2X44 (8) W2X4 (20) BRACE J W2X9 W2X26 S2.2 G Second Floor Framing Part. Plan /8" = '0" ADDED HEADER AT STAIRS 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '0" DATE: 03/2/2 SKS2 3/2/202 4:5:34 PM

30 5 XACV ACV 24 ACV 24 T XS XS XL XL 9 XACV T 4 XHWR XHWS T K' L' M' N' 4 G.9 K XS XL 3/2/202 5:50:00 PM EARLY BID PACKAGE, ADDENDUM 2 PROJECT: NEW STUDENT CENTER ADDITION /8" = '-0" DATE: 03/3/2 REF. DRAWING MD. SKM- 66 Jackson Street Littleton, NH ME 55 Dow Street, Suite 400, Manchester, NH 030 NH: MA:

31 K' L' M' N' 66 Jackson Street Littleton, NH ME REF. DRAWING MD.2 EARLY BID PACKAGE, ADDENDUM 2 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /2/202 3:02:33 PM /8" = '-0" DATE: 03/3/2 SKM-2

32 MECHANICAL DEMOLITION KEYNOTES REMOVE EXISTING RADIANT PANEL, THERMOSTAT, CONTROLS, WIRING AND PIPING TO POINTS INDICATED. CAP OR REWORK PIPING WITH NEW AS INDICATED ON NEW WORK PLANS. REMOVE EXISTING DUCT MOUNTED HEATING COIL, ASSOCIATED THERMOSTAT AND PIPING TO POINTS INDICATED. CAP OR REWORK PIPING WITH NEW AS INDICATED ON NEW WORK PLANS. EXISTING DUCT MOUNTED HEATING COIL TO REMAIN AS IS. CLEAN EXISTING COIL AS/IF REQUIRED. EXISTING HWS&R PIPING TO REMAIN AS IS. EXISTING FIN-TUBE RADIATION AND ASSOCIATED CONTROLS TO REMAIN AS IS. EXISTING UNIT HEATER AND ASSOCIATED CONTROLS TO REMAIN AS IS. EXISTING CABINET HEATER AND ASSOCIATED CONTROLS TO REMAIN AS IS. EXISTING GAS FIRED BOILER TO REMAIN AS IS. EXISTING ROOF-MOUNTED CONDENSING UNIT AND ASSOCIATED REFRIGERANT PIPING TO REMAIN AS IS. EXISTING EXPANSION TANKS TO REMAIN AS IS EXISTING HOT WATER HEATER TO BE RELOCATED. REMOVE ASSOCIATED CONCRETE EQUIPMENT PAD AND PIPING COMPLETE. REFER TO PLUMBING DRAWINGS FOR ANY ASSOCIATED WORK. REMOVE EXISTING SUPPLY DUCT COMPLETE TO POINTS INDICATED AND ASSOCIATED DIFFUSER(S) COMPLETE. CAP OR REWORK WITH NEW AS INDICATED ON NEW WORK PLANS. REMOVE EXISTING RETURN DUCT COMPLETE TO POINTS INDICATED AND ASSOCIATED GRILLE(S) COMPLETE. CAP OR REWORK WITH NEW AS INDICATED ON NEW WORK PLANS. 4. EXISTING UNIT VENTILATOR AND ASSOCIATED SUPPLY DUCT AND DIFFUSERS TO REMAIN AS IS. 5. REMOVE EXISTING OUTSIDE AIR DUCT COMPLETE TO POINTS INDICATED AND ASSOCIATED LOUVER(S) COMPLETE. CAP OR REWORK WITH NEW AS INDICATED ON NEW WORK PLANS EXISTING SUPPLY DUCT TO REMAIN AS IS. EXISTING RETURN DUCT TO REMAIN AS IS. EXISTING COMBUSTION AIR INTAKE TO REMAIN AS IS REMOVE EXISTING INLINE EXHAUST FAN COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, WIRING, DUCTWORK AND GRILLES INDICATED. TURN FAN OVER TO OWNER. REMOVE EXISTING GOOSENECK DUCT ASSEMBLY AND ASSOCIATED CURB COMPLETE TO UNDERSIDE OF ROOF DECK. INSULATE EXISTING DUCT RISER WITH 2" RIGID INSULATION AND CAP DUCT BELOW ROOF DECK. C.M. TO PATCH ROOF. REMOVE ALL MECHANICAL EQUIPMENT INCLUDING DUCTWORK, AIR HANDLERS, PIPING, INSULATION HANGERS, ETC. COMPLETE. REMOVE EXISTING CABINET HEATER, THERMOSTAT, CONTROLS, WIRING AND PIPING TO POINTS INDICATED. CAP OR REWORK PIPING WITH NEW AS INDICATED ON NEW WORK PLANS. REMOVE EXISTING EXHAUST DUCT COMPLETE TO POINTS INDICATED AND ASSOCIATED LOUVER(S) COMPLETE. REWORK WITH NEW AS INDICATED ON NEW WORK PLANS. REMOVE EXISTING HOT WATER SUPPLY AND RETURN PIPING COMPLETE TO POINTS INDICATED. CAP OR REWORK WITH NEW AS INDICATED ON NEW WORK PLAN. REMOVE EXISTING FIN TUBE RADIATION, THERMOSTAT, CONTROLS, WIRING AND PIPING TO POINTS INDICATED. CAP OR REWORK PIPING WITH NEW AS INDICATED ON NEW WORK PLANS. 66 Jackson Street Littleton, NH ME REF. DRAWING MD. EARLY BID PACKAGE, ADDENDUM 2 55 Dow Street, Suite 400, Manchester, NH 030 NH: MA: " = '-0" DATE: 03/3/2 SKM-3 3/2/202 5:54:22 PM

33 REF. DRAWING FP. EARLY BID PACKAGE, ADDENDUM 2 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: /8" = '-0" DATE: 03/3/2 SKFP-

34 REF. DRAWING ED. EARLY BID PACKAGE, ADDENDUM 2 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: DATE: 03/3/2 8" = '-0" SKE-

35 REF. DRAWING ED. EARLY BID PACKAGE, ADDENDUM 2 55 Dow Street, Suite 400 Manchester, NH 030 NH: MA: DATE: 03/3/2 N.T.S. SKE-2

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06 CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway. TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE

More information

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

3 DATE ISSUE R# Forefront Dermatology. CONFLUENCE DESIGN GROUP #2 Daniel Drive O'Fallon, MO ph: St. Peters, Missouri 63376

3 DATE ISSUE R# Forefront Dermatology. CONFLUENCE DESIGN GROUP #2 Daniel Drive O'Fallon, MO ph: St. Peters, Missouri 63376 THESE DRAWINGS ARE FOR THE TENANT FINISH PORTION OF THE SCOPE. LANDLORD IS RESPONSIBLE FOR THE SHELL WORK. THOSE DOCUMENTS ARE PROVIDED FOR REFERENCE ONLY New 5700 Mexico Road Suite 14 St. Peters, MO 63376

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

Sections & Details VOCABULARY

Sections & Details VOCABULARY 1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS: ADDENDUM 002 Addendum - 002 to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect,

More information

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL

More information

JOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

STRUCTURAL WOOD DETAILING IN CAD FORMAT

STRUCTURAL WOOD DETAILING IN CAD FORMAT STRUCTURAL WOOD DETAILING IN CAD FORMAT STRUCTURAL WOOD DETAILING IN CAD FORMAT K.A. ZAVAT lnm51springer Science+Business ~---Media, LLC Copyright 1993 by Springer Science+Business Media New York Originally

More information

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1 Wood structures Copyright G G Schierle, 2001-02 press Esc to end, for next, for previous slide 1 Wood Types: Balloon framing (rare) Platform framing Heavy timber framing Advantages: The only renewable

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application?

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application? P.O. Box 1190, Fort Collins, Colorado 80522-1190, Planning (970) 498-7683, Building (970) 498-7700, Larimer.org When is a Building Permit Required? A permit is required if ANY of the following is true:

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Garage Design Guide. October 2018

Garage Design Guide. October 2018 Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2

24 max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2 NOTE: All exposed lumber to be pressure treated (P.T.) or decay resistant. Fasteners for P.T. wood shall be hot-dipped galv. or stainless steel, typical. see pages 2 & 5 for footings 8'-0" -10'-0" Beam

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: DOCUMENT NO.: P/GI 2014-009 Previously Issued As: P/GI 2011-009 Effective: 01-01-2014 Revised : DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8. PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

12'-0" SIDE YARD 12'-0" SIDE YARD NEW 3,826 SF 2 STORY + BASEMENT S.F.D. PLOT PLAN SCALE 1 8" = 1'-0" 2

12'-0 SIDE YARD 12'-0 SIDE YARD NEW 3,826 SF 2 STORY + BASEMENT S.F.D. PLOT PLAN SCALE 1 8 = 1'-0 2 LEGAL DESCRIPTION ADDRESS: 3599 LANKERSHIM BOULEVARD APN LOT LOT SIZE TRACT BLOCK ARB 2380-005-009 10 22,282.0 SQ.F.T TR 12578 NONE 3 LIC ENSED A RC HIT ECT V LA DIMIR T O MA LEV SK I No. C 22417 ST A

More information

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft Material Report for plan: Willowdale A Page 1 of 7 SQUARE FOOTAGE TOTAL Area 1692 sqft EXCAVATION & FOUNDATION EXCAVATION & BACKFILL Conc. Footing (volume) 5 m³ 122.50 612.50 Conc. Footing (length) 6"x20"

More information

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7. DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing

More information

Project Booklet. Structural Drafting with AutoCAD

Project Booklet. Structural Drafting with AutoCAD Project Booklet Structural Drafting with AutoCAD Introduction 1 General Setup 2 Border and Title Block 3 Drafting the Foundation Plan (Plate 1) 8 Drafting the South Elevation (Plate 2) 11 Drafting Section

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

TYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:

TYPICAL PATIO COVERS.  OWNER: ADDRESS: PHONE: City of Aliso Viejo Building Division 12 Journey, Suite 100 Aliso Viejo, CA 92656 (949)425-2540 Fax (949)425-3899 www.cityofalisoviejo.com TYPICAL PATIO COVERS 111 I. GENERAL Patio covers are one-story,

More information

ADDENDUM NO 1 Bid Package 3

ADDENDUM NO 1 Bid Package 3 ADDENDUM NO 1 Bid Package 3 Addendum No.: Addendum 1 Bid Package 3 Issue Date: October 10, 2014 Project: Walker Natatorium Kirkwood High School Kirkwood School District Kirkwood, MO 63122 Project Number:

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)? Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:

More information

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017. Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents

More information

UNDER-FLOOR PLAN SCALE: 3/16"=1'-0"

UNDER-FLOOR PLAN SCALE: 3/16=1'-0 KEY: NOTE # SEE PLAN NOTES OR DETAIL NOTES FOR CORRESPONDING # 5 8 " DIAMETER ANCHOR BOLTS X "L90" "LTP" "HORIZONTAL 5 8" DIAMETER ANCHOR BOLT" '0" INDICATES # OF ANCHOR BOLTS OR "UFP10" 1'10" "L90" "HDU5"

More information

City of Long Beach Department of Development Services Building and Safety Bureau. Wood Frame Prescriptive Provisions For Residential Construction

City of Long Beach Department of Development Services Building and Safety Bureau. Wood Frame Prescriptive Provisions For Residential Construction City of Long Beach Department of Development Services Building and Safety Bureau Wood Frame Prescriptive Provisions For Residential Construction Information Bulletin BU-010 Eff: 01-01-2011 Rev: 07-05-2017

More information

Central Office Grayson County Schools Leitchfield, Kentucky BG #13-089

Central Office Grayson County Schools Leitchfield, Kentucky BG #13-089 Central Office Grayson County Schools Leitchfield, Kentucky BG #13-089 ADDENDUM NO. 3 June 7, 2013 The original specifications and drawings dated May 9, 2013, for the above referenced project are amended

More information

Typical Deck Details

Typical Deck Details Based on the 2009 Michigan Statewide Building Code guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachement to existing house s footing beam

More information

NORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION

NORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION GENERAL DETAILS 100 TYPICAL FLOOR CONSTRUCTION NORMAL WEIGHT CONCRETE WELDED WIRE MESH FIBERGLASS BATT INSULATION (OPTIONAL) 18 GAUGE TIE WIRE 7/8" RESILIENT CHANNEL NOTE: CEILING MAY ALSO BE SUSPENDED

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

Carpentry/Carpenter CIP Task Grid

Carpentry/Carpenter CIP Task Grid 1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE

More information

Joshua Woodsman

Joshua Woodsman CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION Project: Junction City HS General Contractor: Corp Inc. RFI #: MVCC 0 RFI Title: Cold Framing Submittal EOR Response RFI Section: 05 40 00 Date: 0/4/07 Response Required: ASAP Information

More information

TYPE J (20 FT - 40 FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" NOTE: sheet 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.

TYPE J (20 FT - 40 FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0 7-6 NOTE: sheet 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T. Column truss connection Chord splice (see details (See details sheets 3 & 4 of 10) s Top truss chord Free end panel 10-0" Support end panels length varies (See chart below) \ Truss Back truss chord Top

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

GlasRoc Sheathing Type X

GlasRoc Sheathing Type X Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity

More information

Glulam Connection Details

Glulam Connection Details T E C H N I C A L N O T E Glulam Connection Details Note: This version is superseded by a more current edition. Check the current edition for updated design and application recommendations. ENGINEERED

More information

Typical Deck Details

Typical Deck Details Botetourt County guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachment to existing house s footing beam -to-beam connection post-to-beam connection

More information

602.4, TABLE 602.4, , , , , , , , , TABLE

602.4, TABLE 602.4, , , , , , , , , TABLE 602.4, TABLE 602.4, 602.4.1, 602.4.2, 602.4.3, 602.4.4, 602.4.5, 602.4.9, 2304.11, 2304.11.1, TABLE 2304.11.1.1, 2304.11.2, 2304.11.3, 602.4.8, 602.4.8.2, 602.4.8.1, 602.4.6, 602.4.6.2, 602.4.6.1, 2304.11.4,

More information

3.1 General Provisions

3.1 General Provisions WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope

More information

Shearwall System Installation Guide

Shearwall System Installation Guide Shearwall System Installation Guide Complete HFX product listing with dimensions, weights, connectors, typical installations and accessories. Also includes Hardy Frame Moment Frame information. Easy as

More information

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE U.S. Technical Guide U.S. TECHNICAL GUIDE LP SolidStart LVL & Header Technical Guide 2900F b -2.0E Please verify availability with the LP SolidStart Engineered Wood Products distributor in your area prior

More information

GENERAL ISOMETRIC LAYOUT

GENERAL ISOMETRIC LAYOUT EXISTING OR PROPOSED WIPER WALL SUPPORT STRUCTURE GATE LID CARBATHAN HG 0 WEB GRAY LOWER PAN GRATING ALUMINUM WIPER WALL CARBATHANE HG, 90 GRAY STRUCTURAL SPECIFICATIONS:. FLOODGATE MATERIAL TO BE ALUMINUM

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS

More information