1 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum Curtain Walls, Windows and Glazing (in original RFP it was noted that the schedule would be issued in an addendum). Addendum No. A0 (Architectural) o Text 1 page o o SK-10b o SK-11
2
3 Addendum No. A0 Page 1 of 2 Suite 10 Tel: Fax: Project: Hamilton Air Cargo Logistics Facility Hanger Service Road, Hamilton, ON Date: September 2, 2014 Project No The following information supplements and/or supersedes the id Documents issued on August 22, This addendum forms part of the Contract Documents and is to be read, interpreted, and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the information contained in the original drawings and specifications issued for the above-named project to the extent referenced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number on the Tender Form. Failure to do so may subject bidder to disqualification. This Addendum consists of four pages Drawings: 1.1 A101 Ground Floor Plan A vestibule added to Cargojet tenant between grid lines 1, 2 with grid lines A1, as attached sketch (SK-10) Column protector has been added to the columns at grid lines 4/, 5/, / and 5/C 1.1. Charging stations have been added to Cargojet warehouse total of (8) located between grid lines E1-E&8, E1- E&8, E-D1&8, D1-D&8, D-C1&8, C1-C&8, 1-&8, C-1&2 and between C1-C&outside of washrooms wall At GC Manager office at ground floor, the door number is (120) Scissor lifts at loading docks are 8.0 wide. The pits sizes to be confirmed with tenant 1.1. The scale pits sizes to be confirmed with tenant 1.2 A01 Door Schedule Hollow metal door jamb and head details as attached sketch (SK-11) The door spec. at GC Manager Office at ground floor (120) is: Door type G, width is 915mm, height is 202mm, door material is HM, thickness is 45mm, frame material is HM, frame type is A, no fire rating is required At door no.(100t), the frame type has been changed from HM to Steel At door no. (11b), the door type has been changed from type H to type F A new door at Cargojet vestibule has been added. The door no. is (), type K, 915mmW X 2128mm H, X 45mm thickness, door material is aluminium/glass, frame material is aluminium, with panic hardware, no fire rating is required, provide automatic door opener set in interior curtain wall as attached sketch (,SK- 10b) 1.2. Door no. (100q): The size has been changed from 18.0 W x12.0 H to 14.0 x 12.0 H Door no. (100r): The size has been changed from 18.0 W x12.0 H to 14.0 x 12.0 H Doors no. ((100a), (100b), (100c), (100d), (100e), (100f), (100g) and (100h); The size has been changed from 9.0 W x 10.0 H to 8.0 W x 10.0 H Replace solid core wood doors with hollow metal doors 1. A02 Window& Room Schedule 1..1 Curtain wall () has been updated as attached sketch (SK-10b) 1..2 Interior curtain walls have been added (CW), (CW4) as attached sketch (,SK-10b) End of addendum no. A0 Rev. (Mar/0) Ext. - Form Q010
4 SEALANT (AS REQUIRED) POP RIVETS FRAMED OPENING SEE STRUCT.DWGS. ROD AT OTH SIDES FASTENER (AS REQUIRED) PREFINISHED CURTAIN WAL THERMALLY ROKEN FRAME WITH SEALED DOULE GLAZING ROD AT OTH SIDES CAP TRIM 4 CURTAIN WALL JAM DETAIL AT CJ VEST. 1 : CONFIRM W/ CURTAIN WALL MANUFACTURER CONFIRM W/ CURTAIN WALL MANUFACTURER 102 CONFIRM W/CURTAIN WALL MANUFACTURER 101a INTERIOR CURTAIN WALL CW4 PREFINISHED CURTAIN WALL THERMALLY ROKEN FRAME WITH SEALED DOULE GLAZING PLAN DETAIL AT VEST. 1 : 10 Suite 10 Tel: Fax: Architects Constructors Managers NO. ISSUED DATE ADDENDUM NO. SEPTEME R 2, a C:\11402\11402-Air Cargo-Hamilton _htanious.rvt STEEL FRAMING SEE STRUCT.DWGS HSS GIRT SEE STRUCT.DWGS -19mm STRUC. CEMENT OARD TYPE ARMOROC OR EQUAL -152mm STEEL JOIST -PREFIN. ALUMINUM CEILING TILES. COLOUR TO MATCH CURTAIN WALL MULLEON DOCUM SECTION VEST. 1 : SECOND FLOOR 500 T/O GROUND FLOOR 0 A A STAIR NO.1 UP 102 WT DOCUM b a ENLARGED PLAN@CJ VEST. 1 : CW CW SK-10b 101b WT4 PROJECT NAME Hamilton International Air Cargo Logistics Facility PROJECT ADDRESS Hanger Service Road, Hamilton International Airport, Hamilton, ON SHEET NAME PROJECT NO.: DRAWN Y HT PLOT DATE 09/18/14 SCALE As indicated DRAWING:
5 GENERAL NOTES 1. EGIN LAYOUT OF CEILING TILES AT CENTER OF ROOMS AS SHOWN 2. CENTER LIGHT FIXTURES ON CEILING TILE. SEE ELECTRICAL DWGS. FOR DETAILED LIGHTING LAYOUT 4. SEE MECHANICAL DWGS. FOR DETAILED SUPPLY& RETURN LAYOUT Suite 10 Architects Constructors Managers 2 Tel: Fax: NO. ISSUED DATE ADDENDUM NO. SEPTEME R 2,2014 PREFIN. ALUMINUM CEILING TILES. COLOUR TO MATCH CURTAIN WALL MULLEON 4 RCP AT SK-10b 1 : 50 C:\11402\11402-Air Cargo-Hamilton _htanious.rvt LEGEND : DOULE GLAZED : SINGLE GLAZED : TEMPERED GLASS CW4 INTERIOR CURTAIN WALL AT REFER TO DOOR SCHEDULE CW INTERIOR CURTAIN WALL AT REFER TO DOOR SCHEDULE CURTAIN WALL AT SOUTH ELEVATION PROJECT NAME Hamilton International Air Cargo Logistics Facility PROJECT ADDRESS Hanger Service Road, Hamilton International Airport, Hamilton, ON SHEET NAME PROJECT NO.: DRAWN Y HT PLOT DATE 09/2/14 SCALE As indicated DRAWING: SK-10b
6 "LOW PROFILE" THROUGH FASTENER POP RIVETS EXTERIOR CAP TRIM SEALANT (AS EQUIRED) FASTENER (AS REQUIRED) FRAMED OPENING SEE STRUCT.DWGS. DRIP FLASHING FIELD CUT FEMALE JOINTS WHERE REQUIRED INSULATED THERMALLY ROKEN FRAME SK-11 ROD AROUND DOOR FRAME OTH SIDES INSULATED DOOR 2 HOLLOW METAL DOOR HEAD DETAIL 1 : 5 POP RIVETS ROD AROUND DOOR FRAME OTH SIDES 100 INSULATED DOOR INSULATED THERMALLY ROKEN FRAME SEALANT (AS REQUIRED) FASTENER (AS REQUIRED) FRAMED OPENING SEE STRUCT.DWGS. 00 SK-11 1 HOLLOW METAL DOOR JAM DETAIL (TYP.) 1 : 5 GRID PROJECT NAME Suite 10 Tel: Fax: Architects Constructors Managers PROJECT ADDRESS Hanger Service Road, Hamilton International Airport, Hamilton, ON SHEET NAME PROJECT NO.: DRAWN Y C:\11402\11402-Air Cargo-Hamilton _htanious.rvt Hamilton International Air Cargo Logistics Facility PLOT DATE SCALE 1 : 5 DRAWING: HOLLOW METAL DOOR FRAME DETAILS HT 09/22/14 SK-11 Revision Schedule NO. REVISIONS DATE 1 ADDENDUM NO. SEPTEMER 2,2014
Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationA101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN
A00 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" 0' - 0" A00 A0 A0 A B C D E F G ' - 0" 8' - 0" 9' - 0" 9' - 0" 9' - 0" 8' - 0" OVERHANG OF ROOF ABOVE RECESSED PEDI-MAT AT ENTRANCE MECH ENCL 0 0 WOMENS
More informationThe following information supplements and/or supersedes the bid documents issued on July 10, 2017.
Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationAddendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:
Addendum No.: 1 Date: 3/15/216 Project: Canyon ISD City View Elementary Additions Project No.: 15-48.1 From: To: Dekker/Perich/Sabatini 5 South Taylor St., Suite 75 Amarillo, TX 7911 All Prospective Bidders
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationDimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More information1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated
2014-10-30 REQUEST FOR TENDER WILDLIFE HEALTH CENTRE RFT # 47 (2014-09) ADDENDUM # 4 This addendum shall be incorporated into, and form part of RFT # 47 (2014-09) and take precedence over all requirements
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More information1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.
DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationNIAGARA REGIONAL HOUSING MZE FILE NO
M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April
More informationADDENDUM NO. 3, March 14, 2017 A.B.C. No
ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,
More informationKS SERIES - VERTICAL INSTALLATION
CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV
More informationSERIES 300 SINGLE HUNG WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:
ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of
More informationExtrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.
Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationDBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies
Technical Data Series Revised: 1 January, 2011 Article IX. SECTION 9.01 PERSONAL DOOR CANOPIES...3 SECTION 9.02 ERECTION INSTRUCTIONS...4 SECTION 9.03 ERECTION ILLUSTRATIONS...7 SECTION 9.04 MULL INSTRUCTIONS
More informationSTEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504
ATTACH TO STRUC- TURE ABOVE 1/8"Ø BOLT W/ LOCKING NUT #12 WIRE TIE IN PLANE EACH TEE ANGLED 45 FROM HORIZ ATTACH 2" FROM INTERSECTION COMPRESSION POST LOCATE WITHIN 2" OF TEE INTERSECTION SIZE STRUTS FOR
More informationRequest for Information 0026
Request for Information 0026 Detailed, RFIs Grouped by RFI Number SLAC Photon Science Lab (PSLB) Project # 02001.105960 2575 Sand Hill Road Tel: Fax: Menlo Park, CA 94025 RFI #: 0026 Date Created: 4/4/2017
More informationSERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationACME 50 Application Guide
ACME 50 Application Guide p1 CONTENTS Features & Benefits... 2 Product Images... 3-8 TRIM AND CONNECTORS Trim & Connector Diagram.... 9 Partition Profile Section... 10 Adjustability.... 11 Ceiling & Floor
More information400 SERIES VERTICAL INSTALLATION
CI-DS-01-400V CI-PJ-01-400V CI-PJ-02-400V CI-PJ-03-400V CI-BS-01-400V CI-BS-02-400V CI-BS-03-400V CI-BS-04-400V CI-BS-05-400V CI-OC-01-400V CI-OC-02-400V CI-IC-01-400V CI-IC-02-400V CI-FO-01-400V CI-FO-02-400V
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationAAMA Voluntary Guideline For Engineering Analysis of Window and Sliding Glass Door Anchorage Systems
A M E R I C A N A R C H I T E C T U R A L AAMA 2501-06 Voluntary Guideline For Engineering Analysis of Window and Sliding Glass Door Anchorage Systems M A N U F A C T U R E R S A S S O C I A T I O N TABLE
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More informationArchitect. Architect.
The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationDW HORIZONTAL INSTALLATION
AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More information.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.
PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation
More informationInstallation Instruction 3-D Model 3D 03/01/17. 0 Flush Siding Horizontal System N/C WPS, Inc.
I B D L K C E G M F A H J Installation Instruction 3-D Model 3D 03/01/17 Detail: System Type: Scale: Drawn By: 0 Flush Siding Horizontal System N/C WPS, Inc. Wall Panel System, Inc. 15/16" 1 1/4" Bottom
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationCarpentry/Carpenter CIP Task Grid
1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify
More informationPERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY. PRODUCT TYPE: 6' x 8' Double Inswing Hardwood Door with Half Circle Transom
PERFORMANCE TEST REPORT Rendered to: GLASSCRAFT DOOR COMPANY PRODUCT TYPE: 6' x 8' Double Inswing Hardwood Door with Half Circle Transom Title Uniform Load Deflection Test Pressure Uniform Load Structural
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationA-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile
Telephone 0.7.500 //0 06-G/06-G EXTERIOR RENDERINGS A-08 0 NOTE: SIGNAGE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. STREETSCAPE DETAILS ARE SHOWN IN CONCEPT FOR ILLUSTRATIVE PURPOSES. THE FINAL DETAILS OF THE
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationMaterial List for Log Complete Packages
Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers
More informationBidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationCARRIER OVERHANG 1'-0" MAX PANEL LENGTH 3'-0" MIN - 16'-0" MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise)
DETAIL 5 32 5 " 27 32 " 6" OPTIONAL FLAT RECESSED CLOSURE 1 1 4 " 17 32 " 1 25 32 " OPTIONAL BUTTERFLY CLOSURE CARRIER OVERHANG 1'-0" MAX CARRIER SPAN 4'-0" 12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER
More informationENTRY DOOR TEST REPORT. Rendered to: The Vistawall Group
ENTRY DOOR TEST REPORT Rendered to: The Vistawall Group Product: Single 500 Wide Stile Outswing Full-Lite Aluminum Entry Door w/ Standard TH-43 Threshold and Woolpile Weathering Title Air Infiltration@
More informationDHS-500 IMPACT SYSTEM INSTALLATION MANUAL
DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE
More informationTO: All Recipients Date: March 20, 2015
CITY OF VALDEZ Project Title: Valdez Museum, Library, Elementary School roof replacements Project No.: 15-310-4250, 15-310-4260, 15-310-9513 Contract No.: 1214 TO: All Recipients Date: March 20, 2015 SUBJECT:
More informationPanel Grille Suspended Ceiling Installation Guide
Panel Grille Suspended Ceiling Installation Guide World Commerce Center 2000 Ring Way Road, St. Augustine, FL 32092 Phone: 800-227-8566 or 904-584-1400 www.rulonco.com Receipt and Storage: a. All material
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationCOTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC
GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More information900 SERIES WALL PANELS
CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900
More informationPERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY
PERFORMANCE TEST REPORT Rendered to: GLASSCRAFT DOOR COMPANY SERIES/MODEL: Buffalo Forge Steel Doors / Arch Top Double PRODUCT TYPE: In-swing Arch Top Double Door RH-4-5/8 Title Uniform Load Deflection
More informationGuide Specification Section Interior Aluminum Doors and Frames
Guide Specification Section 08 11 16 Interior Aluminum Doors and Frames SECTION 08 11 16 The Sliding Door Company s door and frame system includes glazed swing doors, sidelights, transoms, and fixed panels
More informationSECTION B INDEX STOREFRONT FRAMING SYSTEMS
SECTION B INDEX STOREFRONT FRAMING SYSTEMS B PAGE DESCRIPTION 01 STOREFRONT FRAMING SPECIFICATIONS 02 175 SERIES 1 3/4" (44.5) X 4 1/2" (114.3) FLUSH GLAZE FRAMING FOR SINGLE GLAZING. 06 200 SERIES 2"
More informationInstallation Guide for E-Series/Eagle Clad Mechanically Fastened Windows
Guide for E-Series/Eagle Clad Mechanically Fastened Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions
More informationKS42 MF SERIES - HORIZONTAL INSTALLATION
CI-DS-01-KSMF H CI-PJ-01-KSMF H CI-PJ-02-KSMF H CI-PJ-03-KSMF H CI-PJ-04-KSMF H CI-PJ-05-KSMF H CI-PJ-06-KSMF H CI-PJ-07-KSMF H CI-PJ-08-KSMF H CI-PJ-09-KSMF H CI-PJ-10-KSMF H CI-PJ-11-KSMF H CI-PJ-12-KSMF
More informationSECTION FRAMELESS GLASS SLIDING BI-FOLD SHOWER DOOR HARDWARE
1 SECTION 10 2880 FRAMELESS GLASS SLIDING BI-FOLD SHOWER DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationINSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR
INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com 11M0292 HANDLING, STORAGE,
More informationINSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS
INSTALLATION INSTRUCTIONS SERIES 87 CENTER GLAZED WITH -/" TRIM OFFICE PARTITIONS Phone: (800) -6 Fax: (800) 58-7 crlaurence.com usalum.com crl-arch.com M056_Rev_D SERIES 87 OFFICE PARTITIONS CENTER GLAZED
More informationYSD 400 Sliding Door System Installation Manual
System Installation Manual 2006 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION
More informationThe following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-12 36 00.00 20 (August 2011) --------------------------------- Preparing Activity: NAVFAC Superseding UFGS-12 36 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.
ADDENDUM_04 1 page(s) I 1 project number CIN001 project name Cinemark XD12 Altoona, IA issue date December 16, 2013 venue > distribution Jeff Duffy EDC jduffy@edcweb.com Justin Couch VCC USA jcouch@vccusa.com
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More informationNon-Reinforced Joining Guide (1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products
(1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products Non-Reinforced Joining Guide Congratulations! You have just purchased one of the many fine
More informationHOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY
HOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY PIONEERING INSULATED METAL PANEL TECHNOLOGY TABLE OF CONTENTS DETAIL TITLE PAGE
More informationMULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET
KPH-DS-01-MTLV KPH-PP-01-MTLV KPH-PP-02-MTLV KPH-PJ-01-MTLV KPH-PJ-02-MTLV KPH-PJ-03-MTLV KPH-PJ-04-MTLV KPH-PJ-05-MTLV KPH-FS-01-MTLV KPH-FS-02-MTLV KPH-FS-03-MTLV KPH-BS-01-MTLV KPH-BS-02-MTLV KPH-BS-03-MTLV
More informationWood Squares Installation Guide
Wood Squares Installation Guide World Commerce Center 2000 Ring Way Road, St. Augustine, FL 32092 Phone: 800-227-8566 or 904-584-1400 www.rulonco.com Rulon Wood Squares Ceiling Installation Guide Receipt
More informationChevy Chase Club June 30, 2008 Bowie Gridley Architects
SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationArchitecture Firm ID 439 Contract Design I Due: May 4, 2015
Architecture Firm ID 439 Contract Design I Due: May 4, 2015 Project Objectives: 1) To engage in multi-disciplinary collaboration 2) To understand sustainability as it pertains to building methods, materials,
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationDoor Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:
Door Canopy Door Canopies are attractive and efficient while eliminating the need and expense of drafting and manufacturing canopies as part of the building package. Construction: 26 gauge material around
More informationSingle-Hung Windows Premium Atlantic Aluminum
TABLE OF CONTENTS Specifications... 2-2 QuickSpecGuide... 2-3 Elevations: Scale Single-Hung-FloridaSizes... 2-4 Grille Patterns... 2-5 SectionDetails: 6 Scale... 2-6 InstallationWallDetails... 2-10 PagethroughthePDFusingthebutonsontheright,
More informationEagle clad double-hung window installation instructions
Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS SHOWER DOOR KIT ALUMINUM 2503 E. Vernon Avenue, Los Angeles, CA 90058-1826 Phone: (800) 421-6144 EXT. 7740 Fax: (800) 458-7496 crlaurence.com Email: showers@crlaurence.com 11M0260
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation
More informationApril 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593
April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation
More informationTAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT. Rendered to: DIAMOND DOOR PRODUCTS
Architectural Testing TAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT Rendered to: DIAMOND DOOR PRODUCTS SERIES/MODEL: Diamond GEM 130 MPH Series PRODUCT TYPE: Out-Swing Steel Entry Door
More informationUnit 9. Wall and Ceiling Framing
Unit 9 Wall and Ceiling Framing Wall construction Wall framing includes the assembly of horizontal and vertical members that make up exterior walls and interior partitions. Theses walls support the ceilings
More informationL:\Document Control\DR Drafting\Records\Royce\Facades\Plank\US BenchmarkTM By Kingspan 40% RGB Gold 2013.jpg FACADES - BRICK INDEX SHEET
KPV-DS-01-BRH KPV-PJ-01-BRH KPV-PJ-02-BRH KPV-PJ-03-BRH KPV-BS-01-BRH KPV-BS-02-BRH KPV-BS-03-BRH KPV-OC-01-BRH KPV-IC-01-BRH KPV-FO-01-BRH KPV-FO-02-BRH KPV-FO-03-BRH KPV-SJ-01-BRH KPV-PR-01-BRH KPV-LE-01-BRH
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.