1 ADDENDUM 002 Addendum to the Drawings and Specifications dated, March, 2019, for Vincennes University, located at the Vincennes Campus in Vincennes, Indiana, as prepared by Andrew Young, Campus Architect, Vincennes University. All Contractors bidding on this project shall read all of the items covered below and shall comply with all of the requirements as set forth, including any necessary refinements or additions generated by this Addendum and required by the intent of the original contract documents. All Contractors shall acknowledge on their bid form that they have received this Addendum and included the appropriate content of same within their bid proposal. For the Convenience of the bidders, bid categories possibly affected in price and/or construction by the various items in this addendum are listed at the beginning of each item. GENERAL ITEMS: 1. General Sheet A1.1, A1.2, A1.3: Stair Tread Cover Clarification A. North Stair (Room # s 134, 201, 304) a. Tread equal to Johnsonite, Tread with Photoluminescent - PVIHD nosing (Tread only), color and pattern to be selected from manufacturer s full range. B. East Stair (Room # s 122, 223, 319) a. Tread and Riser combo equal to Johnsonite, Photoluminescent PVIHD nosing, color and pattern to be selected from manufacturer s full range. C. West Stair (Room # s 139, 206, 301) a. Tread and Riser combo equal to Johnsonite, Photoluminescent PVIHD nosing, color and pattern to be selected from manufacturer s full range. AD.02 1

2 SPECIFICATIONS: 1. Specification Section: HVAC Piping Insulation A. To clarify section 1.2, B: a. The existing heat pump piping loop consists of uninsulated steel/copper pipe. This system shall be converted into the new heating hot water system (180 F water) and shall require insulation. b. Project scope includes a new chilled water system (44 F water) which shall also require insulation. c. The existing condensate collection system consists of uninsulated steel/copper/pvc pipe. This system shall remain in place, to be re-used with new fan coil units, and shall require insulation. 2. Specification Section: Instrumentation and Control for HVAC A. Add section 1.1, G: a. All temperature control wiring shall be plenum-rated cabling, to be installed in workmanlike manner with J-hooks conduit not necessary. 3. Specification Section: Variable Frequency Drives A. Add section 1.1, A, 1: a. Chiller & ERV-1 VFD s shall be integral to the equipment. Electrical Contractor shall provide for power circuiting, complete with final terminations, to the equipment control panel. b. MAU-1 VFD and all other VFD s shall be provided and installed by Mechanical Contractor. Electrical Contractor shall provide for power circuiting, complete with final terminations, to the VFD itself. Temperature Controls Contractor shall provide circuiting from the VFD to the motor. 4. Specification Section: HVAC Ducts and Casings A. Add section 3.1, K: a. Install exterior ducts with double-leg enclosed duct supports, as detailed. Premanufactured duct support #PHP-D Enclosed, by PHP Systems, are approved, but must be installed with adhesive between membrane/pad/base. 5. Specification Sections: Fan Coil Units AD.02 2

3 A. Add section 1.1, C: a. All new fan coil units shall be installed in same location as existing heat pump units, with exception of: 1. Fan coil units that are new, so that new hydronic & condensate pipes need installed: FC-302B, FC-318B, FC-329B, FC-320A. 2. Fan coil units that have shifted location, so that hydronic & condensate pipes need to be extended: FC-330, FC-303A, FC- 329A, FC-328A, FC-328B, FC-321A, FC-321B. B. Add section 1.1, D: a. Mechanical Contractor shall demolish/remove existing VAV boxes & electric heaters associated with existing FC-119, FC-126, FC-217, FC-312, as shown on drawings, and install new insulated duct to replace box/heater. b. Electrical Contractor shall disconnect existing VAV boxes & electric heaters associated with existing FC-119, FC-126, FC-217, FC-312, as shown on drawings, and remove circuit back to feeder panel. C. Below photos show a typical existing heat pump piping configuration. AD.02 3

4 DRAWINGS: 1. Drawing Sheet: E3.01 REV 2 A. See attached Sheet #E3.01 REV Drawing Sheet: SU1.01 REV 2 A. See attached Sheet #SU1.01 REV 2. B. Below photo shows the First Street switch & vault in the foreground. AD.02 4

5 Pages 1 through 5, inclusive, and Sheets #E3.01 REV 2 & SU1.01 REV 2 constitutes the total makeup of Addendum 2. AD.02 5

6 GENERAL SITE UTILITY NOTES KEYED SITE UTILITY NOTES WATER LINE TRENCH DETAIL (RIGID PIPE) NOTE: ALL TRENCH WORK SHALL IN BE COMPLIANCE WITH OSHA PART 26 OF THE CODE OF FEDERAL REGULATIONS. NOTE: WHEN PIPE GRADES ARE NOT DEFINED ON THE CONTRACT DRAWINGS, MAINTAIN A MINIMUM OF 60" OF COVER OVER THE TOP OF PIPE, EXCEPT AS OTHERWISE ORDERED BY THE ENGINEER. NOTE: PROVIDE COMPACTION TO 95% STANDARD PROCTOR. VINCENNES UNIVERSITY ARCHITECTURAL SERVICES AND FACILITIES 817 N. SECOND STREET VINCENNES, INDIANA P: F: ARCHITECT: ANDREW W. YOUNG SIDEWALK CUT REPAIR DETAIL NOTE: ALL TRENCH WORK SHALL IN BE COMPLIANCE WITH OSHA PART 26 OF THE CODE OF FEDERAL REGULATIONS. NOTE: SIDEWALKS SHALL BE REMOVED TO THE NEAREST CONTROL OR EXPANSION JOINT. NOTE: ALL CONCRETE SIDEWALK SHALL HAVE 6x6 1.4/1.4 W.W.F. INSTALLED. SITE UTILITY DEMOLITION PLAN HEINZ ASSOCIATES, LLC architecture + engineering 3252 W 500 N Jasper, IN w w w. h e i n z a s s o c i a t e s. n e t STREET/ALLEY CUT REPAIR DETAIL NOTE: ALL TRENCH WORK SHALL IN BE COMPLIANCE WITH OSHA PART 26 OF THE CODE OF FEDERAL REGULATIONS. CONCRETE STRAIGHT CURB THOMAS W. WATHEN BUSINESS BUILDING RENOVATION PROJ. #05BDB VINCENNES CAMPUS CONCRETE WALK NOTE: ALL CONCRETE SIDEWALK SHALL HAVE 6x6 1.4/1.4 W.W.F. INSTALLED. SITE UTILITY PLAN SU1.01 SITE UTILITY PLANS & DETAILS

7 SITE LIGHTING PLAN SCALE: 1" = 30'-0" LIGHT POLE FOUNDATION ELEVATION NOTE: ELECTRICAL CONTRACTOR RESPONSIBLE FOR COMPLETE FOUNDATION INSTALLATION. LIGHT POLE FOUNDATION PLAN NOTE: ELECTRICAL CONTRACTOR RESPONSIBLE FOR COMPLETE FOUNDATION INSTALLATION. GENERAL SITE LIGHTING NOTES KEYED SITE LIGHTING NOTES VENTILATION FAN ONE-LINE DIAGRAM CONDENSATE PUMP ONE-LINE DIAGRAM IN-LINE PUMP ONE-LINE DIAGRAM BASE-MOUNT PUMP ONE-LINE DIAGRAM MAU-1 ONE-LINE DIAGRAM ERV-1 ONE-LINE DIAGRAM CHILLER ONE-LINE DIAGRAM FAN COIL UNIT ONE-LINE DIAGRAM E3.01 ELECTRICAL SCHEDULES & DETAILS THOMAS W. WATHEN BUSINESS BUILDING RENOVATION PROJ. #05BDB VINCENNES CAMPUS HEINZ ASSOCIATES, LLC architecture + engineering 3252 W 500 N Jasper, IN w w w. h e i n z a s s o c i a t e s. n e t VINCENNES UNIVERSITY ARCHITECTURAL SERVICES AND FACILITIES 817 N. SECOND STREET VINCENNES, INDIANA P: F: ARCHITECT: ANDREW W. YOUNG

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors

More information

Addendum No. 1 page 1

Addendum No. 1 page 1 Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:

More information

Answer: Only to ChurchWoods, LLC.

Answer: Only to ChurchWoods, LLC. ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017 Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

Company. Signed: Date:

Company. Signed: Date: ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

Quality Control Checklist - Design Drawings

Quality Control Checklist - Design Drawings Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017 Review the Process Building Assessment Prioritize into Tiered Matrix Develop Cost Estimate per Scope Items Schematic Design Renovation + Addition Schematic Drawings Interior + Exterior Perspectives Recommendations

More information

1.1 The Bid Date has changed to October 4, The time and place will remain the same.

1.1 The Bid Date has changed to October 4, The time and place will remain the same. Addendum Number Four To The Drawings and Specifications for Pleasant Valley Elementary School Wichita, Kansas Issued: Wednesday Wichita Unified School District # 259 Project No. 12-25077 HANNEY & ASSOCIATES

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

State College of Florida, Manatee-Sarasota

State College of Florida, Manatee-Sarasota State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision Electric Service Guide Residential Subdivision January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall

More information

Rufus M Hitch Elementary School

Rufus M Hitch Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

ADDENDUM NO. 4 November 15, Page 1

ADDENDUM NO. 4 November 15, Page 1 ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,

More information

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R. ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below. DATE: November 16, 2018 PROJECT: JJL Library & Street Level Renovation RFP NO: 744-R1903 OWNER: The University of Texas Health Science Center at Houston TO: Prospective Proposers This Addendum forms part

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608 W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

John L Marsh Elementary School

John L Marsh Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference Cone HVAC Modernization Thursday, September 1, 2016 Pre Proposal Conference Meeting Agenda Part I: General Part II: Submittal Part III: Project Overview Part IV: Questions General Welcome Introductions

More information

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre April 12, 2019 COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations 19-10 - To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre The attached information, questions and

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT 1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot

More information

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Multicultural Academy of Scholarship

Multicultural Academy of Scholarship Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017. Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647 3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

Daniel S Wentworth Elementary School

Daniel S Wentworth Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

Disney II Magnet School

Disney II Magnet School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610 22 W Evergreen Ave Chicago, IL 1 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

University of Chicago Charter - NKO

University of Chicago Charter - NKO Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

Langston Hughes Elementary School

Langston Hughes Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK AREVIATIONS AFF AOVE FINISHED FLOOR AHJ AUTHORITIES HAVING JURISDICTION APPROX APPROXIMATE LDG UILDING CLG CEILING CONST CONSTRUCTION CD CEILING DIFFUSER CO CARON DIOXIDE CXA COMMISSIONING AGENT DEG DEGREES

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

SECTION EQUIPMENT WIRING

SECTION EQUIPMENT WIRING PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 26 27 17 EQUIPMENT WIRING A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General Provisions,

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING 1 1 1 1 1 NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING NORTH CAROLINA BUILDING CODE COUNCIL Notice of Rule-making Proceedings is hereby given by NC Building Code Council in accordance with G.S.

More information

(Larry D. Svitak, PE) License No

(Larry D. Svitak, PE) License No ADDENDUM NO. engineering design initiative north 5 th Street minneapolis, mn 55 Phone: () 33-55 AX: () 33-58 or Project: Nobles County Government Center AHU- Replacement EDI Project No.: 7-075 Owner: Nobles

More information