1 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy GRE SF CHIMNEY Brick Chimney - Concrete/ Mortar Liner GRE LF $38,467 $38,467 Assessment Date: 2/26/2013 Page 1 of 14
2 DOORS Exterior Steel Door Transom Lite GRE EA $1, EA $1,982 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Ramp Handrails Stair Handrails GRE GRE LF $1, LF 116 LF 16 LF $1,609 FOUNDATION Concrete Foundation ,020 1,020 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted GRE EA 4 EA LINTELS Lintels - Steel BLU ,375 1,465 LF $432,504 $432,504 Assessment Date: 2/26/2013 Page 2 of 14
3 PARAPET Coping - Metal ,307 1,307 LF ROOF SYSTEM Interior Downspouts Modified Bitumen Roof Roof Structure: Steel/Metal Deck/Concrete Topping GRE BLU ,942 7 GRE 7 30, LF 30,442 SF $365,038 30,442 SF $365,038 SUPERSTRUCTURE Metal Deck/Concrete Topping GRE 7 68,227 68,227 SF WALLS Brick Stone - Cast GRE 7 23,445 GRE ,445 SF 830 SF WINDOWS Window - Guards perforated Windows - Sash Aluminum Double-pane EXTERIOR GRE 7 2,573 GRE 7 8,696 2,573 SF 8,696 SF $839,599 Assessment Date: 2/26/2013 Page 3 of 14
4 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency generator below 60 KW natural gas - Outdoor Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - CCTV Security System - Intrusion detection ,113 GRE 7 7,264,488 GRE 7 7 GRE 7 2 GRE GRE 7 7 GRE 7 68,227 GRE 7 68,227 GRE 7 68,227 10,113 SF 7,264 SF 1,488 SF 7 EA 2 EA $7, EA 7 EA 68,227 SF 68,227 SF 68,227 SF $7,508 MAIN SERVICE Main Electrical service 1600 A 120/208/3PH BLU 5 1 $26,956 $26,956 POWER DISTRIBUTION Lighting and power panels Main distribution panels above 600 amp Main distribution panels less than 400 amp ELECTRICAL GRE YEL 4 2 GRE EA $20,163 2 EA $37,180 2 EA $57,343 $91,806 Assessment Date: 2/26/2013 Page 4 of 14
5 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION GRE 7 68,227 68,227 SF 68,227 SF $240,985 $240,985 $240,985 MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS GRE EA $5,577 $5,577 Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm Air Handling Package - Single Zone - Steam 12,001 to 20,000 cfm Air intake for all Air Handling s except built up AHU Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor less than 5,000 CFM GRE 7 2 GRE EA $2,431 $2,431 BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler HP Boiler Auxiliary - Steam Boiler HP Chemical Feed System (Steam Boilers) Combustion Dampers Feed Water Pumps and Tank - Steam Boilers GRE 7 2 GRE 7 2 GRE EA 2 EA 4 EA Assessment Date: 2/26/2013 Page 5 of 14
6 HEATING DEVICES Cabinet Heaters With Steam Coils Heater - Electric Wall Heater - Electric GRE GRE EA $12,513 $103 $12,615 MECHANICAL PLUMBING Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Vacuum TEMPERATURE CONTROL BLU BLU GRE LF $16, LF $24,739 $2,860 $43,865 Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) GRE 6 68,227 7 GRE ,227 SF $68, EA $68,295 UNIT VENTILATION Ventilators - Steam VENTILATION GRE EA $75,504 $75,504 Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen GRE EA $4,290 $4,290 Assessment Date: 2/26/2013 Page 6 of 14
7 MECHANICAL $212,578 PLUMBING HOT WATER Hot Water Heater - Gas 150, ,000 BTU/HR GRE EA PIPING Domestic Piping - Cold Water from Risers to Fixtures 68,227 SF $22,440 Domestic Piping - Cold Water Risers 68,227 SF $43,904 Domestic Piping - Hot Water from Riser to fixtures 68,227 SF $14,635 Domestic Piping - Hot Water Return Risers 68,227 SF $31,221 Domestic Piping - Hot Water Risers 68,227 SF $37,075 Domestic Piping Cold Water Horizontal lines 68,227 SF $162,933 Domestic Piping Hot Water Horizontal lines 68,227 SF $134,639 Domestic Piping Hot Water Return Lines 68,227 SF $78,052 Sanitary Piping BLU 5 68,227 68,227 SF $41,953 Storm Piping BLU 5 68,227 68,227 SF $32,196 Vent Piping BLU 5 68,227 68,227 SF $24,391 $623,438 PUMPS Domestic Booster Pump duplex PLUMBING $623,438 Assessment Date: 2/26/2013 Page 7 of 14
8 INTERIOR ADMINISTRATIVE SUITES Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block GRE 7 2,195 GRE 7 2,195 GRE GRE 7 5,877 2,195 SF 2,195 SF 44 SF $13 5,877 SF $13 CORRIDOR Stairs - Asphalt Stairs - Terrazzo Stairs - Wood LF 10 LF 10 LF DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Store Front Door Transom Window GRE GRE GRE 7 5 GRE EA $1, EA $8,117 5 EA 36 SF $9,532 DRINKING FOUNTAINS Single Fountain EA GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall GRE 7 4,641 4,641 SF Assessment Date: 2/26/2013 Page 8 of 14
9 Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Metal Halide/Sodium Vapor Stage Curtain Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile KITCHEN GRE GRE GRE 7 4 GRE 7 26 GRE 7 2 GRE 7 2,672,210 GRE SF 448 SF 4 SF 26 EA 2 EA 2,672 SF 1,210 SF 924 SF Ceiling - Plaster/Drywall Flooring - Tile Quarry Lighting - Pendant/Surface Wall - Structural Glazed Tile ,042,042 8,512 1,042 SF 1,042 SF 18 SF 1,512 SF LOCKER/SHOWER ROOM Lockers LUNCHROOM GRE EA $196 $196 Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Concrete Block GRE 7 2,623 GRE 7 2,623 GRE GRE 7 2,288 2,623 SF 2,623 SF 72 SF 16 LF 2,288 SF Assessment Date: 2/26/2013 Page 9 of 14
10 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room ,012 GRE 6 3 GRE GRE ,296 1,012 SF 3 SF $ SF 1,376 SF $378 $392 STAFF RESTROOM Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Structural Glazed Tile Water Closet GRE ,975 GRE 7 2,166 GRE ,662 GRE GRE 7 31 YEL 4 7 BLU GRE ,990 GRE 7 5,026 GRE ,166 SF $1,475 2,166 SF 15 EA $300 1,662 SF 504 SF 12 EA 3 7 SF $25 31 SF $103 4 $ EA 1,990 SF 5,026 SF 47 EA $2,262 VOCATIONAL SHOP Work Sink INTERIOR GRE EA $2,317 $2,317 $14,712 Assessment Date: 2/26/2013 Page 10 of 14
11 ROOM CASEWORK Casework GRE LF $10,368 $10,368 CEILING Lay-In/Drop Plaster/Drywall GRE 7 3,222 GRE 7 25,816 3,222 SF 25,816 SF CORRIDORS Concrete Block Concrete Epoxy/Painted Pendant/Surface Stair Handrails Structural Glazed Tile Tile Ceramic/Porcelain Tile/Sheet Flooring GRE 7 8,360 GRE 7 2,217 1,835 GRE ,360 GRE GRE 7 9,325 8,360 SF 2,217 SF 11,835 EA 210 LF 13,360 SF 539 SF 9,325 SF CORRIDORS CEILING Plaster/Drywall ,835 11,835 SF FLOOR Carpet Floor ,488 GRE 6 1,794 1,488 SF 1,794 SF $7,696 Assessment Date: 2/26/2013 Page 11 of 14
12 Tile/Sheet GYM_FLOOR GRE 6 12,454 13,302 25,756 SF $17,809 $25,505 Gymnasia Floor GRE 7 3,825 3,825 SF LIGHTING Lay-In Lighting Pendant/Surface GRE 7 48 GRE 7 54 GRE EA 54 EA 577 EA MARKER BOARD Marker Board GRE LF RESTROOM_WALL Restroom Walls SF STAIRS Terrazzo SF WALL Concrete Block GRE 7 33,378 33,378 SF Assessment Date: 2/26/2013 Page 12 of 14
13 Structural Glazed Tile ROOM SITE CIVIL/DRAINAGE GRE SF $35,873 Catch Basin Site Manhole FENCING GRE 6 3 GRE EA $1,630 4 EA $2,917 $4,547 Chain Link Guard Rail Ornamental Iron GRE GRE LF $11, LF 484 LF $11,589 LANDSCAPE Benches Grass Hardscape - Concrete Parkway trees Trash Receptacles GRE 7 3 GRE 6 2,700 GRE 6 2,453 GRE 7 9 GRE EA 2,700 SF $1,081 2,453 SF $4,630 9 EA 4 EA $5,711 PARKING LOT Asphalt Trash Enclosure GRE 6 28,360 7 GRE ,360 SF $24, SF $24,333 Assessment Date: 2/26/2013 Page 13 of 14
14 PLAYGROUND Playground Equipment - Pre-K 3-5 Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface GRE 7 5,665 5,665 SF SIDEWALKS Perimeter Sidewalks SIGNAGE GRE 6 17, ,096 SF $32,270 $32,270 Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ GRE $78,451 $2,137,442 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/26/2013 Page 14 of 14
Marcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell Smith Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRobert Fulton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDaniel S Wentworth Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles N Holden Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Milton Gregory Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJonathan Burr Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRichard J Oglesby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAlexander Graham Bell Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Harvard Elementary School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago Charter - Carter G Woodson
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationLangston Hughes Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCyrus H McCormick Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUrban Prep Academy for Young Men - West
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBrian Piccolo Elementary Specialty School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAcademy for Global Citizenship Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge W Tilton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArthur A Libby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Penn Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago Charter - NKO
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWalt Disney Magnet Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArthur E Canty Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRufus M Hitch Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhoenix Military Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJoseph E Gary Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationTheodore Roosevelt High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMarcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationAmandla Charter High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorman A Bridge Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn F Kennedy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn L Marsh Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationLegacy Charter Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Hancock College Preparatory High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRichard T Crane Medical Preparatory HS
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationHenry H Nash Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationBetty Shabazz Intl Charter - DuSable Leadership
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMulticultural Academy of Scholarship
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEmmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationFriedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657
39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWilliam Howard Taft High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationHiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationHarriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationPaul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620
82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationNathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the
More informationJoseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationBowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJohann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647
3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationFrederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622
2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationA.N. Pritzker School 2009 W Schiller St Chicago, IL 60622
A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document
More informationJohn Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationFranklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610
22 W Evergreen Ave Chicago, IL 1 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More informationEllen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612
33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationLorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationThomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK
Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the
More informationUniversity of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL
Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationThomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608
W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJohn Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641
Kilbourn Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJoseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623
3 W 3st St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJames Otis Elementary School 525 N Armour St Chicago, IL 60642
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationPerspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653
33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationWilliam Rainey Harper High School 6520 S Wood St Chicago, IL 60636
0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJohn Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629
3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJames Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647
W Schubert Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationCharles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639
28 Long Ave Chicago, IL 39 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653
E Pershing Rd Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationManley Career Academy High School 2935 W Polk St Chicago, IL 60612
293 W Polk St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationWilliam J Onahan Elementary School 6634 W Raven St Chicago, IL 60631
3 W Raven St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationSITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA
Facility Assessment Report S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS This report contains a summary of the results from the facility
More informationFrancis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER
Facility Assessment Report S Stewart Ave Chicago, IL 2 Co-locating on this campus are AMADLA and PARKER This report contains a summary of the results from the facility assessment completed on the date
More informationWilliam Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631
W Bryn Mawr Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationU of I Facilities Standards Updates for 2017
U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),
More informationRECAPP Facility Evaluation Report
RECAPP Facility Evaluation Report Edmonton School District No. 7 Garneau Elementary School B3123A Edmonton Report run on: April 7, 211 4:59 PM Building Name: Address: Location: Building Id: Gross Area
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More information