ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
|
|
- Chester Shepherd
- 6 years ago
- Views:
Transcription
1 The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T DESCRIPTION: INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON THE additions, deletions and/or revisions as hereinafter specified, shall form an integral part of the bid document and shall be read in conjunction with the requirements set forth in the bid document. THE Addendum shall take precedence over all requirements to the aforementioned information in which it may prove to be at variance. QUESTIONS AND ANSWERS SEE ATTACHED FOUR (4) PAGES THIS Addendum shall be acknowledged in the spaces provided on the Bid Form. THIS Addendum has been issued by the City of Vaughan and is in effect this 18 TH day of April, Scott Wigmore, CPPB, Buyer Procurement Services Department Tel: (905) , Ext scott.wigmore@vaughan.ca mb Page 1 of 1
2 1 April 17, 2018 Project: Bid No.: T Clark Avenue West, Thornhill, ON L4J 8C1 ward99 architects Project No RE: Addendum No.3 Pages: General Addendum No.3 forms part of the Contract Documents and amends the drawings and specifications as noted below Receipt of this addendum shall be acknowledged on the Bid Form Clarification in response to submitted questions: Question: Demolition Drawing: Please clarify what items to be demolished/removed are being re-used or disposed (refer to Drawing A2). Refer to Architectural Drawing A2, General Demolition Notes, Note 1 that indicates that all items noted to be demolished and/or removed are to be disposed of off-site unless noted otherwise. Refer to Structural, Mechanical and Electrical Drawings for additional noted demolition and removals. Refer to additional clarifications below Question: Washroom Accessories: Please clarify if items being installed are from existing demolished/removed items. Note #6 (on architectural drawing A6) related to hand dryers to be installed do not mention if re-use or new. Please note that there were four (4) hand dryer that were removed from the existing washroom, but there are five (5) to be installed. All existing four (4) hand dryers in the Existing Men s Washroom G105 and Existing Women s Washroom G106 are to be demolished as noted by demolition Note 17 on architectural drawing 1/A2 and as noted by Note 6 on Electrical Drawing E3. Electrical Drawing E3 indicates to demolish existing hand dryers and replace with new. Refer to architectural drawing 1/A6 and Electrical Drawing E5 for the location of all five (5) new hand dryers. Refer to Project Manual Section Washroom Accessories page 5 of 7 and Section Electric Heaters for specification of new electric hand dryer Question: Referring to Drawing A4: are the MS-BAYS supplied by the Owner? Refer to Architectural Drawing A4, General Ground Floor Plan Notes, Note 10 that indicates MS refers to metal shelving. Note 10 indicates that the Owner is to supply and install metal shelving Question: As per the Schedule 1B Cash Allowance, it is mentioned that Cash Allowance (as described under item 1.24 in Project Manual, General Instructions. Kindly specify the item no.1.24, since it has two different items which represent and respectively. For the list and description of Cash Allowance Items, refer to page 13 of 18 in the Project Manual, Section General Instructions under paragraph 1.24 Cash Allowances Question: Can we use existing water and power for construction purposes? Refer to Project Manual Section Temporary Utilities.
3 Question: Can we use the existing Library area for a site office? Refer to Project Manual Construction Facilities Question: Does the demolition involve asbestos removal? Asbestos removal is not required in this facility Question: Can you specify PRE-FABRICATED WIER DECK LAVATORY SYSTEM shown on 2/A6 and give supplier? Refer to Project Manual Section Plumbing Fixtures and Fittings, page Question: Phasing the project calls for 2 phases but all of the demolition work seems to fall under one. Do phases apply for demolition scope? All demolition work is to occur in Construction Phase One. Refer to Project Manual Section General Instructions and notes on Architectural Drawing A Question: Garbage Bin will the bin location be shared with other trades? What is the preferred route for the disposal through the building? Can the bin be placed closer to the entrance? All disposal bins must be located within the General Contractor Mobilization Area indicated on architectural drawing 1 on A1. It is the General Contractor s responsibility to coordinate all trades and their required disposal bins. During Construction Phase One, the route to exit the building can be from any door on the north side of the building (that is not within the Staff Area). During Construction Phase Two, the route to exit the building is the south door noted with the number 5 and as the Main Construction Entry on architectural drawings on A Project Manual Project Manual Architectural, Mechanical and Electrical Specifications No amendments to the Architectural and Mechanical Specifications in this addendum Electrical Addendum No. E-1 issued by WSP Canada and dated April 17, 2018 is hereby issued and forms an integral part of this Addendum. 1.3 Architectural Drawings REF: Architectural Drawing A2; Architectural Drawing 1 on A2 Existing Demolition Ground Floor Plan All lines noted as dashed indicate gypsum board finished steel stud partitions that are to be demolished and disposed of in their entirety from top of existing concrete slab to underside of existing roof assembly. Height to underside of existing roof assembly is approximately 8000mm. Refer to Construction Legend Note 2 on Architectural Drawing A Demolish existing hollow metal door frame, screen frames and doors as noted by demolition notes 2 and 9 and demolish existing doors and door frames noted with dashed door swings including the existing doors and door frames to Existing Men s Wrm G105 and Existing Women s Wrm G106, existing door between Existing South Lobby G104 and Existing Corridor G129 and existing door between Existing Program Room G126 and Existing Corridor G In Existing Family Washrooms G122 and G123, demolish existing recessed waste receptacles (total of 2), mirrors (total of 2) and coat hooks (total of 2). In Existing Family Washrooms G122 and G123, uninstall existing soap dispensers (total of 2), baby change tables (total of 2), paper towel dispensers (total of 2) and toilet tissue dispensers (total of 2) and hand over to the Owner In Existing Family Washrooms G122 and G123 and Existing Men s Washroom G105 and Existing Women s Washroom G106, demolish existing grab bars (total of 8) In Existing Family Washroom G123, patch the opening at the location of the demolished waste receptacle with 16mm gypsum board and steel stud framing as required. 1.4 Structural Drawings and Specifications No amendments to the Structural Drawings and Specifications in this Addendum.
4 3 1.5 Mechanical Drawings No amendments to the Mechanical Drawings in this addendum. 1.6 Electrical Drawings No amendments to the Electrical Drawings in this Addendum. End of Addendum No.3 ward99 architects 2053 Williams Parkway, unit 49A p Brampton Ontario L6S 5T4
5 WSP Canada 600 Cochrane Drive, 5 th Floor Markham, ON Canada L3R 5K3 t: The Corporation of the City of Vaughan BATHURST CLARK LIBRARY WSP Project No. 17M Electrical Addendum No. E-1 April 17, 2018 INCLUDE IN YOUR BID AMOUNT FOR THE FOLLOWING ITEMS OF ADDITION, DELETION OR CLARIFICATION. INDICATE IN THE SPACE PROVIDED ON THE BID FORM THAT YOU HAVE RECEIVED AND INCLUDED FOR THE REQUIREMENTS OF THIS ADDENDUM. 1. SPECIFICATIONS 1.1 SECTION BASIC ELECTRICAL MATERIALS AND METHODS Refer to article 2.02 and add item.4 as follows: Hubbell Canada Inc. HBLCFB7G series multi-service floor box, CSA approved, fully adjustable, both vertically and angular, formed galvanized steel, round/rectangular/square as required, flush, concrete floor mounting, boxes complete with adjustable collars, brass screw on or hinged flip open covers with provisions for mounting of duplex power receptacles, telephone jacks and data jacks. Boxes with both power and communication outlets shall be barriered. Acceptable manufacturers are Hubbell Canada Inc., Cooper Wiring Division, Pass & Seymour Canada Inc. and Leviton. END OF ADDENDUM E-1 Page 1
ADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationSECTION 10520: FIRE EXTINGUISHERS AND CABINETS
SECTION 10520: FIRE EXTINGUISHERS AND CABINETS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS: A. This section specifies fire extinguishers, cabinets for fire extinguishers, fire and other accessories. Their
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationNCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice
NCIDQ Restroom Drawing Answers to the most common questions about this drawing for the Practicum. 2016 Qpractice Table of Contents This is a summary guide of most frequently asked questions about the Practicum
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016
ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620
More informationBidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.
Addendum No. 3 Re / Objet: Phase Two Espanola High School Redevelopment Project 147 Spruce Street Espanola, ON YBA Project No.: 1323 `The following information, amendments and revisions shall constitute
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationINVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2
FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationKidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:
KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More information.2 Section Steel Doors and Frames.1 Item 1.6 Delete for ten (10) years respectively. and replace with for two (2) years respectively.
École Secondaire Publique Odyssée New Childcare Centre, Site and Interior Renovations Conseil scolaire public du Nord-Est de l Ontario Project No. 1819 SECTION 00 54 13 ADDENDUM NO. 2 Issued July 4, 2018
More informationADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center
ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors
More informationWayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009
ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationWASHROOM ACCESSORIES 2013 CATALOG
WASHROOM ACCESSORIES 2013 CATALOG Washroom Accessories engineered for the high traffic restroom. 12-14 GAUGE STAINLESS STEEL 1 Paper Towel Dispenser C-Fold or Multi-Fold Towels Refill indicator slot Heavy
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationPriority 3 - Toilet Rooms
The ADA Checklist for Readily Achievable Barrier Removal Priority 3 - Toilet Rooms Project Building Location Date Surveyors Contact Information When toilet rooms are open to the public they should be accessible
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationWALKS AND SIDEWALKS REQUIREMENTS:
DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationThe following information supplements and/or supersedes the bid documents issued on July 10, 2017.
Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationADDENDUM NO. 3. Ellis County Elections Building
AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationA. It is preferred that all submittals to be submitted electronically in PDF format.
June 20 2013, Rev 00 10 2800 Toilet, Bath, and Laundry Accessories PART 1. GENERAL 1.01 This Section includes: A. Toilet room accessories: 1.02 Submittals 1. Grab bars 2. Metal framed mirrors 3. Sanitary
More informationADDENDUM TO RFP DOCUMENTS
Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationINDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:
INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue
More informationPriority 3 - Toilet Rooms
The ADA Checklist for Existing Facilities Priority 3 - Toilet Rooms Based on the 2010 ADA Standards for Accessible Design Project Building Location Date Surveyors Contact Information When toilet rooms
More informationCOUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre
April 12, 2019 COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations 19-10 - To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre The attached information, questions and
More informationAddendum #1 - Bid Package #
Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction
More informationTOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.
SECTION 10800 TOILET ROOM ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic Tile. 4. 10170 - Solid Plastic Toilet Partition.
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED DISTRICT, DESIGN AND ADDENDUM NO. PROJECT: ADA Site Improvements of April 0, 08 Upper Play Yard at Noriega EES 775 44 th -Avenue San Francisco, CA 94 SFUSD Project No. 004 OWNER:
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:
CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,
More informationTELEPHONE: (215) Addendum No. 1
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationADDENDUM NO. 3, March 14, 2017 A.B.C. No
ADDENDUM NO. 3, March 14, 2017 A.B.C. No. 2017044 RE: UM Harman Hall Mechanical Renovation Montevallo, Alabama 35115 Architect s job no. 2747 FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham,
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationAddendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:
Addendum No.: 1 Date: 3/15/216 Project: Canyon ISD City View Elementary Additions Project No.: 15-48.1 From: To: Dekker/Perich/Sabatini 5 South Taylor St., Suite 75 Amarillo, TX 7911 All Prospective Bidders
More informationActivity Commercial Electrical Systems (Optional)
Activity 3.3.5 Commercial Electrical Systems (Optional) Introduction The design of power distribution, lighting, communication equipment and alarm systems for a commercial project is often performed by
More information1. Name the horizontal member that rests on the foundation wall to support other wood members.
Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests
More informationDimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More informationRENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA
RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA KOCH HAZARD ARCHITECTS ADDENDUM DATE:. SCOPE OF THIS ADDENDUM: The following becomes a part of the original
More informationMultilift (B613 & B355)
Multilift (B613 & B355) VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: CSA B613 CSA B355-09 13-m03-2014 Part No. 000790 Copyright 2014 Savaria Corporation All rights reserved. Printed in Canada
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: 2018 Interior Renovations Jeffersonville Township Public Library Jeffersonville Facility Jeffersonville, Indiana Project No.: 1723.01 Date: April 12, 2018 This addendum is
More informationADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:
ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationPUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE
Multilift PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CSA B613 CSA B355-09 Part No. 000790 07-m03-2016 Copyright 2016 Savaria Concord Lifts, Inc. All Rights Reserved
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationJames W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.
ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings
More informationCompany. Signed: Date:
ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET
More informationPUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE
Multilift PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CSA B613 CSA B355-09 Part No. 000790 16-m02-2017 Copyright 2017 Savaria Concord Lifts, Inc. All Rights Reserved
More informationThe following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationAddendum Number: 1 WT White HS Additions and Renovations, Dallas ISD
Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications
More informationMontclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation
Montclair, NJ 07043 ADDENDUM NO. 2 Issue Date: June 18, 2010 Request for Proposal # 898 Finley Hall Renovation Number of Pages: 14 (plus attachment) Date of Original Bidding Documents: April 28, 2010 INTENT:
More informationADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.
ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL
More informationLincoln County Tax Appraisal Office Project No. RFB
Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior
More informationPROCUREMENT SERVICES th St, SW Calgary, AB T2R 0L4 Telephone: (403) Fax: (403)
TENDER ADDENDUM PROCUREMENT SERVICES 1221 8 th St, SW Calgary, AB T2R 0L4 Telephone: (403) 817-7495 Fax: (403) 777-6008 Proposal No: 2017TEN754 Covering: DR. G. M. EGBERT SCHOOL VARIOUS UPGRADES Addendum
More informationREAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map
Electrical Information Breaker Panel 1: Service Type: 120/208 Panel Type: LP2 Panel Number: CHH31500 Manufacturer: Cutler Hammer Amps: 150 Location: Back Room Breaker Panel 2: Service Type: 120/208 Panel
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationWEST HOLLYWOOD ACCESSIBLE UNISEX BATHROOMS: COMMERCIAL CLEARANCES. Accessible Unisex Bathrooms: Commercial Page 1 of 5
Page 1 of 5 When toilet rooms are provided, each toilet room shall comply with Section 11B-213.2 of the California Building Code. Unisex toilet rooms (Single-use or family) shall contain not more than
More information***************************************************************************************************************
10800 TOILET ROOM ACCESSORIES SPECIFIER: CSI MasterFormat 2004 number 10 28 13 PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic
More informationINVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS
FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / NO. PS20152055 QUESTIONS AND ANSWERS NO. 1 ISSUED ON MARCH 4, 2016 Q1 Would it be possible to schedule another site visit to allow
More informationCKBD Peakes Bath Scoresheet
CKBD Peakes Bath Scoresheet Part I: Graphics & Presentation Standards Each question pertains to all four drawing documents: Floor Plan, Mechanical, Construction Plan, and Elevation Drawing unless specifically
More informationRFQ Question and Answer List State of Ohio Standard Forms and Documents
RFQ Question and Answer List State of Ohio Standard Forms and Documents Project Name University Hall Renovation Project Number BGU-565 Project Location Bowling Green State University Date posted: June
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationDIVISION 26 ELECTRICAL SECTION ELECTRICAL
DIVISION 26 ELECTRICAL SECTION 26 1000 ELECTRICAL PART 1 - GENERAL 1.1 WORK INCLUDED A. Furnish all labor, material and equipment necessary for the complete installation of the Electrical System as shown
More informationBathroom Fittings. Hardware Bathroom Washroom Handrail Wardrobe Signs KNUD HOLSCHER H DESIGN
KNUD HOLSCHER H DESIGN www.dline.com Bathroom Fittings Hardware Bathroom Washroom Handrail Wardrobe Signs d line no: 1038-1215 Carl F as, Denmark E-mail: dline@dline.com Internet: www.dline.com Photography:
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCESA / NASA UFGS-11 42 00 (January 2008) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED
More informationNIAGARA REGIONAL HOUSING MZE FILE NO
M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April
More information12560 W. Cedar Drive Lakewood, CO Barry Himmelman President
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationHardware Bathroom Washroom Handrail Signs. Bathroom Fittings
Bathroom Fittings Hardware Bathroom Washroom Handrail Signs 2 Marine Quality Stainless Steel The high humidity levels in the bathroom setting necessitates the use of a non-corrosive rustresistant. On
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationCommercial Infill Project Guide
Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit
More informationSolicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers
Solicitation No. VA244-13-B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers 1. Question: Is this project Tax Exempt in regards to materials and equipment as per PA State
More informationCity of St. Charles School District New Addition and Renovation at George M. Null Elementary School 435 Yale Boulevard St. Charles, Missouri 63301
City of St. Charles School District 435 Yale Boulevard St. Charles, Missouri 6330 ADDENDUM #2 Date: April 03, 209 Prepared or: City of St. Charles School District Project Number: 709 Architect: Dickinson
More informationCOMPILATION OF TENDER DOCUMENTS
COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to
More informationCOVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS
TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL
More informationPROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT
ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:
More informationTELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More information